A method for reinforcing deep foundation pits adjacent to existing buildings
By setting up an L-shaped grouting reinforcement zone between the foundation pit and the existing building and constructing a continuous wall using the SMW method, the problem of the impact of deep foundation pit excavation on adjacent buildings was solved, and the structural stability and construction safety were improved.
Patent Information
- Application Number
- CN202211711592.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-29
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2042-12-29
AI Technical Summary
In deep foundation pit projects adjacent to existing buildings, the excavation of the foundation pit leads to a redistribution of the ground stress field, affecting the stability and safety of existing tunnels and buildings, and may cause structural deformation and settlement, posing significant safety hazards.
An L-shaped grouting reinforcement zone, including vertical and horizontal isolation sections, is set up between the foundation pit and the existing building. A continuous wall is constructed using the SMW method, and a composite foundation is formed using cement mixing piles to stabilize the strata and reduce the disturbance of the foundation pit excavation to the surrounding buildings.
It effectively prevents deformation of existing structures and ground settlement, improves the soil's self-stabilizing capacity and bearing capacity, reduces risks during foundation pit excavation, minimizes the impact on the surrounding environment, and ensures safe and efficient construction.
Smart Images

Figure CN115787670B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building reinforcement technology, and in particular to a method for reinforcing existing buildings adjacent to deep foundation pits. Background Technology
[0002] In recent years, with the rapid development of modern economy and urbanization, the scale of my country's rail transit has continued to expand, and urban land resources are scarce. To alleviate land shortages, construction land development focuses on vertical development. Correspondingly, the scale of subway foundation pit projects adjacent to existing buildings has gradually increased, exhibiting characteristics of being "large, compact, and deep." The construction plan for subway stations directly affects project costs and schedules, and is crucial to ensuring construction safety.
[0003] Due to the scarcity of urban land, an increasing number of foundation pit projects inevitably need to be constructed near existing rail transit systems. The impact of foundation pit projects on adjacent buildings, surface traffic, and subway tunnels cannot be ignored. Taking the subway system as an example, the excavation and unloading of deep foundation pits will disrupt the regional stress balance near the subway tunnels, leading to a redistribution of the ground stress field, which in turn affects the subway tunnels. At best, it will cause manageable deformation of the existing tunnel structure; at worst, it will cause cracks in the tunnel segments, affecting the daily operation of the subway, and even causing major safety accidents with adverse social impacts. For residential buildings and ancient buildings, foundation pit excavation may cause uneven settlement of the surrounding ground surface, which may lead to large cracks in the buildings and even affect the safety and stability of the structure. Summary of the Invention
[0004] The purpose of this invention is to address the shortcomings of existing technologies in which deep foundation pits near existing subway stations are prone to deformation, and to provide a method for reinforcing existing buildings near deep foundation pits.
[0005] To achieve the above objectives, the present invention provides the following technical solution: A method for reinforcing existing buildings adjacent to deep foundation pits includes the following steps: a. An L-shaped grouting reinforcement zone is set between the foundation pit and the existing building. The L-shaped grouting reinforcement zone includes a vertical isolation section and a horizontal isolation section. The vertical isolation section is located between the retaining structure of the foundation pit and the retaining structure of the existing building. The horizontal isolation section is located below the bottom surface of the existing building and above the bottom surface of the foundation pit. b. On the side of the vertical isolation section closest to the foundation pit, a continuous wall is constructed using the SMW method to complete the reinforcement.
[0006] The present invention describes a method for reinforcing deep foundation pits adjacent to existing buildings. First, an L-shaped isolation zone is formed through grouting, effectively filling large voids in the strata, especially stabilizing gravel strata. Then, the cement-soil reinforced body formed by cement-mixing piles in the SMW method serves as a composite foundation for vertical bearing and a large-volume cement-stabilized soil mass, further reducing disturbance to existing buildings caused by foundation pit excavation. This method simultaneously prevents deformation of existing structures and avoids ground settlement, effectively improving the self-stabilizing capacity and bearing capacity of the soil adjacent to the retaining structure, reducing the risk of further deformation during foundation pit excavation, minimizing the impact on surrounding buildings, and ensuring the normal progress of foundation pit construction while minimizing environmental disturbance. It is particularly suitable for reinforcing strata with poor stability after dewatering in gravel layers, and has good application prospects and economic benefits.
[0007] Preferably, in step a, the vertical isolation section is constructed first, followed by the horizontal isolation section.
[0008] More preferably, the vertical isolation section is constructed simultaneously with the excavation of the foundation pit.
[0009] This facilitates timely and effective prevention of building settlement, deformation, and damage caused by soil disturbance during excavation, thereby ensuring safe and efficient construction under numerous major risks. It also helps to shorten the construction period and prevents further deformation, thus providing a guarantee for the normal progress of construction.
[0010] Preferably, the L-shaped grouting reinforcement zone is grouted through a sleeve valve pipe.
[0011] More preferably, the sleeve valve pipe for constructing the vertical isolation section includes an upwardly inclined pipe and a horizontally arranged pipe, with the upwardly inclined pipe located above the horizontally arranged pipe.
[0012] More preferably, the sleeve valve pipe of the transverse isolation section is arranged inclined downward, and the angle between the sleeve valve pipe of the transverse isolation section and the horizontal direction is 10-15°.
[0013] More preferably, the distance between the uppermost row of pipes of the sleeve valve pipe in the construction of the transverse isolation section and the bottom surface of the existing building's enclosure structure is greater than or equal to 10cm.
[0014] It can effectively reduce disturbance to the surrounding environment.
[0015] Preferably, the continuous wall comprises a plurality of cement mixing piles, and the cement mixing piles are provided with structural steel.
[0016] Preferably, the distance between the top surface of the transverse isolation section and the bottom surface of the existing building's base plate is greater than or equal to 4m.
[0017] It reduces disturbance to the existing building's ground strata while ensuring that settlement is avoided.
[0018] Preferably, the length of the L-shaped grouting reinforcement zone is adapted to the length of the standard section of the foundation pit that overlaps with the existing building, and the width of the transverse isolation section is greater than or equal to 15m.
[0019] In summary, compared with the prior art, the beneficial effects of the present invention are: 1. The reinforcement method for deep foundation pits adjacent to existing buildings described in this invention can simultaneously prevent deformation of existing structures and avoid ground settlement, effectively improve the self-stabilizing capacity and bearing capacity of the soil adjacent to the retaining structure, reduce the risk of further deformation during foundation pit excavation, reduce the impact on surrounding buildings, and ensure the normal progress of foundation pit construction while minimizing disturbance to the surrounding environment and avoiding adverse effects. It can be applied to the reinforcement of strata with poor stability after dewatering of gravel layers, and has good application prospects and economic benefits. Attached image description: Figure 1 This is a cross-sectional view of the L-shaped grouting reinforcement zone in Example 1; Figure 2 This is a schematic diagram of the plan layout of the continuous wall in Example 1; Figure 3 This is a detailed drawing of the diaphragm wall in Example 1; Figure 4 This is a schematic diagram of the sleeve valve tube in Example 1.
[0020] Markings in the diagram: 1-Foundation pit, 2-Existing building, 3-Vertical isolation section, 4-Horizontal isolation section, 5-Sleeve valve pipe, 61-Cement mixing pile, 62-Structure steel, 7-Grouting hole, 8-Grouting core pipe, 9-Rubber sleeve. Detailed Implementation
[0021] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments. However, this should not be construed as limiting the scope of the present invention to the following embodiments; all technologies implemented based on the content of the present invention fall within the scope of the present invention.
[0022] Example 1 like Figures 1-3 As shown, the reinforcement method for deep foundation pits adjacent to existing buildings according to the present invention includes the following steps: a. An L-shaped grouting reinforcement zone is set between the foundation pit 1 and the existing building 2. The L-shaped grouting reinforcement zone includes a vertical isolation section 3 and a horizontal isolation section 4. The vertical isolation section 3 is located between the retaining structure of the foundation pit 1 and the retaining structure of the existing building 2. The horizontal isolation section 4 is located below the bottom surface of the existing building 2 and above the bottom surface of the foundation pit 1. b. The continuous wall is constructed using the SMW method on the side of the vertical isolation section 3 closest to the foundation pit 1.
[0023] Specifically, such as Figure 1 As shown, the underground structure of the newly constructed foundation pit 1 exceeds the fourth basement level. The L-shaped grouting reinforcement zone is grouted through the sleeve valve pipe 5. The vertical isolation section 3 is constructed first, followed by the horizontal isolation section 4. The vertical isolation section 3 is constructed simultaneously with the excavation of the foundation pit 1. Holes are drilled at locations 10 / 15 / 18 / 20m from the side wall of the foundation pit 1, based on the location of the existing building 2. The hole positions can be adjusted appropriately according to the locations of dewatering wells and pipelines at the construction site. The hole diameter can be Ф90mm. A down-the-hole drill is used for drilling. After drilling to the design depth, the hole is flushed with clean water. The sleeve valve pipe 5 is then inserted to the design depth and sealed, with the end of the sleeve valve pipe 5 protruding 50cm from the retaining pile wall.
[0024] Sleeve valve tube 5 can be adopted as follows Figure 4 The structure shown uses a plastic pipe with grouting holes 7 every 30cm, wrapped with a rubber sleeve 9. It is inserted into the borehole, with the pipe ends sealed, and the inside filled with underwater pipe. The casing material for the perforated pipe section is filled with a mortar mixture of fine sand and 1:1 cement grout. The mix ratio can be adjusted according to the construction conditions to ensure the brittleness and self-stability of the filling material. During grouting, this casing section is broken and opens into a ring, forcing the grout into the formation within a grouting section, achieving unidirectional grouting without backflow. The casing material can seal the annular space between the sleeve valve pipe and the borehole wall, preventing grout flow and wall leakage during grouting. The grouting material for the sleeve valve pipe 5 can be cement grout with a water-cement ratio of 1:1. The water-cement ratio can be adjusted appropriately according to the actual site conditions during grouting, and a single cement grout is preferred. For example, within the reinforcement range, three upward-sloping sleeve valve pipes 5 are installed between each pile at the corresponding foundation pit level 2 to 3, and six horizontal sleeve valve pipes 5 are installed at the level 3 to 4, arranged in a quincunx pattern, with a vertical spacing of 1m between the grouting pipes.
[0025] During grouting, a grouting core pipe 8 with double plugs is inserted into the sleeve valve pipe 5 for segmented inclined grouting and horizontal grouting. The sleeve valve pipe 5 of the construction of the transverse isolation section 4 is arranged inclined downwards, and the angle between the sleeve valve pipe 5 of the construction of the transverse isolation section 4 and the horizontal direction is 10-15°. The distance between the uppermost pipe of the sleeve valve pipe 5 of the construction of the transverse isolation section 4 and the bottom surface of the existing building 2's enclosure structure is greater than or equal to 10cm. During each grouting segment, the pressure is first increased to force the grout to push open the rubber sleeve 9, squeezing out the sleeve material, i.e., opening the ring, and then the grout enters the stratum. The grouting ends when the grouting pressure is gradually increased. When the design final pressure is reached and grouting continues for more than 10 minutes, a certain amount of grout has been injected. The amount of grout at the end of grouting is generally less than 20-30 minutes. The surrounding strata are inspected. If cement grout is found to be leaking from the surface, surrounding rainwater wells, or sewage wells, grouting should be suspended and a waiting period should be observed. If grout leakage continues after grouting is resumed, it proves that the formation fissures have been filled with cement grout. Grouting should be stopped immediately, ultimately forming an L-shaped grouting reinforcement zone. The length of the L-shaped grouting reinforcement zone (e.g.) Figure 2 The length of the horizontal isolation section 4 (in the direction of length) is adapted to the standard section length of the foundation pit 1 that coincides with the existing building 2, and the width of the horizontal isolation section 4 (e.g., the length of the standard section of the foundation pit 1 that coincides with the existing building 2) is also adapted to the standard section length of the foundation pit 1. Figure 1 The horizontal distance between the top surface of the horizontal isolation section 4 and the bottom surface of the existing building 2 is greater than or equal to 4m.
[0026] Subsequently, a continuous wall was constructed using the SMW method on the side of the vertical isolation section 3 near the foundation pit 1. The continuous wall comprises several cement mixing piles 61, each containing steel sections 62. Figure 2-3 As shown. Before the actual construction of the SMW method piles, the construction site is first surveyed and laid out. After determining the construction location, temporary control piles need to be set up. During the trench excavation, an excavator can be used to excavate the trench along the center line of the cement-soil mixing pile 61. After the trench excavation is completed, channel steel can be set on both sides of the trench. After the pile position is determined, drilling can begin. During the process, cement grout is continuously injected. The mixing head can cut and mix the soil in a top-down sequence, continuously sinking to the design elevation. H-beams 16 can be used, spaced one cement mixing pile 61 apart. When placing the steel in the mixing pile, a crane can be used for hoisting. The verticality deviation of the hoisting must be strictly controlled to be less than 1 / 200. A theodolite can be used for measurement. After the construction is completed, the reinforcement of the newly built foundation pit 1 and the adjacent existing building 2 is completed.
[0027] This method is applicable to foundation pits adjacent to existing buildings where strict control of surrounding building deformation is required. For example, the distance between foundation pit 1 and existing building 2 is less than 10m, and the deformation of the retaining structure of existing building 2 is less than 10mm, with differential settlement less than 4mm. It has broad application prospects, especially suitable for soil reinforcement projects where the stability of the gravel layer is poor after dewatering. It has good application prospects and economic benefits, effectively reducing the negative impacts of building deformation and settlement caused by foundation pit excavation, and lowering the risk level. While ensuring the normal progress of foundation pit construction, it minimizes disturbance to the surrounding environment and does not produce adverse effects. During excavation, it can effectively prevent building settlement and deformation damage caused by soil disturbance, thus effectively ensuring safe and efficient construction under many significant risks. Through targeted risk control and reinforcement of existing stations and tunnel sections, the risk control effect is excellent. Furthermore, it produces low vibration and noise, and by adopting civilized construction and environmental protection measures, it effectively reduces the impact on the surrounding environment, achieving green construction.
[0028] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A method for reinforcing existing buildings adjacent to deep foundation pits, characterized in that, Applied to pebble layers, in existing buildings that are subway stations, the process includes the following steps: a. An L-shaped grouting reinforcement zone is set between the foundation pit (1) and the existing building (2). The L-shaped grouting reinforcement zone includes a vertical isolation section (3) and a horizontal isolation section (4). The vertical isolation section (3) is located between the retaining structure of the foundation pit (1) and the retaining structure of the existing building (2). The horizontal isolation section (4) is positioned below the bottom surface of the existing building (2) and above the bottom surface of the foundation pit (1). The top surface of the horizontal isolation section (4) is spaced from the bottom surface of the base plate of the existing building (2). The distance between the top surface of 4) and the bottom surface of the existing building (2) is greater than or equal to 4m. The L-shaped grouting reinforcement zone is grouted through the sleeve valve pipe (5). The sleeve valve pipe (5) of the vertical isolation section (3) includes an inclined upward pipe and a horizontally arranged pipe. The inclined upward pipe is located above the horizontally arranged pipe. The sleeve valve pipe (5) of the horizontal isolation section (4) is inclined downward. The angle between the sleeve valve pipe (5) of the horizontal isolation section (4) and the horizontal direction is 10-15°. b. On the side of the vertical isolation section (3) near the foundation pit (1), a continuous wall is constructed using the SMW method to complete the reinforcement.
2. The reinforcement method for deep foundation pits adjacent to existing buildings according to claim 1, characterized in that, In step a, the vertical isolation section (3) is constructed first, and then the horizontal isolation section (4) is constructed.
3. The reinforcement method for deep foundation pits adjacent to existing buildings according to claim 2, characterized in that, The vertical isolation section (3) is constructed while the foundation pit (1) is being excavated.
4. The reinforcement method for deep foundation pits adjacent to existing buildings according to claim 1, characterized in that, The distance between the uppermost pipe of the sleeve valve pipe (5) of the transverse isolation section (4) and the bottom surface of the enclosure structure of the existing building (2) is greater than or equal to 10cm.
5. A method for reinforcing existing buildings adjacent to deep foundation pits according to any one of claims 1-4, characterized in that, The continuous wall includes a number of cement mixing piles (61), and the cement mixing piles (61) are provided with steel sections (62).
6. A method for reinforcing existing buildings adjacent to deep foundation pits according to any one of claims 1-4, characterized in that, The length of the L-shaped grouting reinforcement zone is adapted to the standard section length of the foundation pit (1) that overlaps with the existing building (2), and the width of the transverse isolation section (4) is greater than or equal to 15m.
Citation Information
Patent Citations
Shallow foundation building protection structure close to deep foundation pit engineering and construction method
CN113431097A
Foundation ditch excavation closes on existing shallow foundation protection architecture
CN205329735U
Reinforcing structure of existing building adjacent to deep foundation pit
CN218933931U