A water stopping method for water gushing in a deep foundation pit under gently sloping interlayers near a river

By setting up dewatering wells and local water-stopping curtains in deep foundation pits, and performing grouting reinforcement at the bottom of the foundation pit, the problem of water inflow in the foundation pit under sloping interlayer strata has been solved, and stable control of water levels inside and outside the foundation pit and soil mass have been achieved. The safety is enhanced, providing a cost-effective construction environment and overall stability.

CN115787693BActive Publication Date: 2024-10-29LANZHOU UNIVERSITY OF TECHNOLOGY
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211565113.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-07
Publication Date
2024-10-29
Estimated Expiration
2042-12-07

AI Technical Summary

Technical Problem

In deep foundation pit projects that are adjacent to rivers and have sloping interbedded strata, conventional water-stopping methods cannot effectively block the river supply water, resulting in uneven water levels inside and outside the foundation pit, causing lateral deformation of the enclosure structure and overall instability, and large Area precipitation is not conducive to the formation of a stable seepage field for groundwater, and the economic cost is high.

Method used

Set up a dewatering well before excavation of the foundation pit, and use local plain concrete piles and supporting piles to interlock with each other to form a water-stop curtain. After the excavation, grouting reinforcement is performed at the bottom of the foundation pit, combined with a weakly permeable inclined water-proof layer. Block water seepage and form a closed water-stop and isolation system to prevent the impact of rising water levels on the foundation pit during the flood season.

Benefits of technology

Effectively control water seepage in the foundation pit, ensure a dry construction environment, prevent the impact of rising water levels, enhance the safety of the soil at the bottom of the foundation pit against surges, and provide a stable construction environment and overall stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115787693B_ABST
    Figure CN115787693B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of foundation pit dewatering, and in particular to a method for stopping water inrush in a deep foundation pit under a gently inclined interlayer near a river, which specifically comprises the following steps: determining the depth of the inclined interlayer according to the results of stratum exploration, setting a pressure relief dewatering well outside the foundation pit with a burial depth of l w ; Determination of parameters of local interlocking water-stop curtain in foundation pit; Construction of local interlocking water-stop curtain in foundation pit; Construction and excavation of dewatering well inside foundation pit; Local grouting in inclined aquifer; Correction of grouting thickness inside inclined aquifer; Determination of cement equivalent required for grouting of the whole foundation pit; Construction of distribution of grouting holes at various locations; Grouting process flow of inclined aquifer; Closing of internal dewatering well after final setting of grouting body. Dewatering treatment at the bottom of foundation pit ensures construction environment, and grouting construction is carried out in the inclined aquifer in foundation pit after excavation is completed, which, in combination with weak permeable inclined aquiclude, blocks water seepage in foundation pit and effectively prevents the impact of rising river water level in flood season on the interior of foundation pit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit dewatering, and in particular to a water stopping method for water gushing in a deep foundation pit under gently sloping interlayers near a river. Background Art

[0002] Safety accidents in deep foundation pits are often closely related to groundwater control. Reasonable control of groundwater in the foundation pit is a prerequisite for ensuring the overall stability of the foundation pit. Near rivers, as the excavation depth of deep foundation pits increases, the difficulty of internal dry operations gradually increases. While ensuring the stability of the support structure, reasonable control of water seepage and water gushing inside the foundation pit is a key issue to be solved in the entire deep foundation pit excavation process. For deep foundation pit excavation problems under general working conditions, a water-stop curtain is used outside the foundation pit in combination with a precipitation well inside the foundation pit. While increasing the groundwater seepage path, it reduces the water gushing pressure at the bottom of the foundation pit, effectively isolating the inside of the foundation pit from its outside, and economically ensuring the safety of the entire foundation pit project.

[0003] However, for special strata near rivers and with a certain inclination of the interlayers with water, the vertical water-stop curtain set up in the deep foundation pit project cannot effectively block the river recharge water, and the water flow can still be continuously recharged into the foundation pit through the inclined aquifer. In this case, if a large area of ​​precipitation is continuously carried out in the foundation pit, it will not only fail to ensure the dry operation effect in the foundation pit, but also be economically expensive. At the same time, large-scale continuous precipitation is not conducive to the formation of a stable seepage field of groundwater at the bottom of the foundation pit. Therefore, during the excavation process, if the connection between the water levels inside and outside the foundation pit cannot be cut off in time, and the problem of large-scale water seepage inside cannot be effectively handled, it will not only cause uneven settlement of surrounding buildings outside the pit, but also cause lateral deformation of the retaining structure, making it difficult to ensure the overall stability of the entire foundation pit. In summary, it is obvious that conventional methods are uneconomical and undesirable for controlling groundwater in this special stratum. Summary of the invention

[0004] The purpose of the present invention is to address the problems raised in the background technology and to provide a method for stopping water gushing in a deep foundation pit under gently sloping interlayers near a river. Plain concrete water-blocking piles that engage with support piles are arranged at the locations where inclined interlayers appear. The piles engage with each other to form a local interlocking water-stopping curtain that has both support and water-stopping functions. At the same time, during the excavation process, the bottom of the foundation pit is dewatered to ensure the construction environment. After the excavation is completed, grouting construction is carried out in the inclined aquifer in the foundation pit. The combined effect of the piles and the weakly permeable inclined water-blocking layer can block water seepage in the foundation pit and effectively prevent the impact of rising river water levels during the flood season on the interior of the foundation pit.

[0005] In order to achieve the above object, the present invention provides the following technical solutions:

[0006] A water-stopping method for water gushing in a deep foundation pit under a gently sloping interlayer near a river, characterized in that: before excavating the foundation pit, a dewatering well 1 is arranged outside the foundation pit, and at the same time, a local plain concrete pile 3 is adopted inside the foundation pit in the form of interlocking with a supporting row of piles 2 to jointly bear the supporting and water-stopping function; after the excavation of the foundation pit is completed, a local grouting 4 is arranged at the bottom of the foundation pit, so that the foundation pit as a whole forms a closed water-stopping and water-isolating system, which is beneficial to the overall stability of the foundation pit;

[0007] The specific steps include:

[0008] Step 1: Determine the depth of the inclined interlayer according to the results of the stratum exploration and set the buried depth of the pressure relief well outside the foundation pit. w Before excavating the foundation pit, determine the depth of the drainage well outside the foundation pit based on the actual stratum, groundwater conditions and size of the foundation pit.

[0009] The construction of dewatering wells outside the foundation pit ensures dry operation inside the foundation pit when the upper part of the foundation pit is excavated, and also plays a role in controlling the water level during the flood season. During the construction of the foundation pit, when the river water level rises during the flood season, the rising water level can be lowered to a certain extent through the external pressure relief wells, so that the water level does not exceed the top depth of the local interlocking water-stopping curtain of the foundation pit, so that the inside of the foundation pit can always maintain a dry working environment during the entire early excavation. That is, the external early small-scale pressure relief and dewatering construction.

[0010] Step 2: Determine the parameters of the local interlocking water-stop curtain in the foundation pit; after the location of the peripheral dewatering well is determined, determine the parameters of the interlocking water-stop curtain in the foundation pit. Determine the specific parameters of the local interlocking support piles according to the designed excavation depth of the foundation pit and the Technical Code for Building Foundation Pit Support (JGJ120-2012), and at the same time determine the insertion depth of the overall interlocking water-stop curtain into the bottom of the foundation pit l d In order to ensure the stability of the flowing soil in the foundation pit, formula (1) is used for conversion calculation, as follows:

[0011]

[0012] K f —Safety factor of soil flow stability should not be less than 1.6, 1.5, or 1.4;

[0013] l d —Insertion depth of the water cut-off curtain below the pit bottom (m);

[0014] γ′—buoyancy density of soil (kN / m 3 );

[0015] Δh—water head difference inside and outside the foundation pit (m);

[0016] γ w —Gravity of water (kN / m 3 ).

[0017] After conversion, the water-stop curtain inside the foundation pit is inserted into the bottom of the foundation pit to a depth of l d as follows:

[0018]

[0019] Determine the total depth L of the water-stop curtain inside the foundation pit S .

[0020] L s ≥l d +H (3)

[0021] Step 3: Construction of local interlocking water-stop curtain in the foundation pit; Construction of foundation pit support structure measures taking into account both support and water-stopping effects, using plain concrete piles and reinforced concrete interlocking structure. That is, adjacent concrete piles are partially interlocked in circles, and steel cages are inserted into the piles that are constructed in sequence. The interlocking part between the piles is not less than 200mm, so as to form an overall continuous protective curtain with good anti-seepage effect. The specific construction is carried out in accordance with the requirements of the "Technical Code for Building Foundation Pit Support" (JGJ 120-2012). Among them, no interlocking construction of plain concrete is carried out in the strata above the inclined interlayer strata. The purpose is that the upper water level of the inclined interlayer strata is affected by the shallow dewatering well outside the foundation pit, the water level is well controlled, and the plain concrete piles contribute little to the lateral support of the foundation pit. Therefore, considering the comprehensive economic benefits, there is no need to increase the plain concrete piles with water-stopping effect;

[0022] Step 4: Construction and excavation of drainage wells inside the foundation pit; after the construction of the local interlocking water-stopping curtain measures outside the foundation pit is completed, the drainage wells inside the foundation pit are constructed. The drainage wells are evenly distributed inside the foundation pit to ensure that the inside of the foundation pit always maintains a certain dry working environment during the construction process; during the excavation of the upper horizontal rock and soil layer, the drainage wells inside and outside the foundation pit work together to make the overall water control of the foundation pit good. As the excavation of the foundation pit continues, the inclined interlayer strata gradually leak, and water seepage occurs on the side of the foundation pit. Considering that increasing the depth and working power of the internal and external drainage wells will cause uneven settlement of the buildings around the foundation pit, which is not conducive to the overall stability of the foundation pit, the local interlocking water-stopping curtain measures are comprehensively considered in the foundation pit. During the entire excavation process, multiple prestressed anchor cables are gradually constructed according to the design requirements, and they work together with the local water-stopping curtain. On the one hand, the seepage on the side of the foundation pit is well controlled, and on the other hand, the deformation of the foundation pit is effectively restricted, which provides a better construction environment for subsequent excavation.

[0023] Step 5: Local grouting in the inclined aquifer: With the excavation completed, local grouting is performed in the foundation pit to avoid the problem of seepage recharge along the inclined aquifer into the foundation pit; according to the geological survey report, the inclination angle, strike and proportion of the inclined interlayer and the aquifer are determined. The grouting thickness inside the foundation pit under the horizontal rock layer is calculated; because grouting can only be performed in the inclined aquifer, the weight of the soil after grouting is the mixed weight. According to the foundation pit anti-surge formula (4), the required grouting thickness D at the bottom of the foundation pit under the horizontal rock layer is calculated.

[0024]

[0025] K h —Surge stability safety factor should not be less than 1.1;

[0026] D—the thickness of the soil layer from the top of the confined water aquifer to the bottom of the pit (i.e. the thickness required for grouting) (m);

[0027] γ c —Mixed density of the aquifer soil layer after grouting (kN / m 3 );

[0028] h w —Height of the pressure head on the top of the confined water aquifer (m);

[0029] γ w —Gravity of water (kN / m 3 );

[0030] Step 6: Correction of grouting thickness inside the inclined aquifer: Based on the different weights and space proportions of the aquifer and aquiclude in the inclined interlayer, the grouting thickness under the horizontal rock layer is calculated and corrected to the grouting thickness of this special formation. Among them, the overlying water pressure remains unchanged, that is, the overall pressure of the grouting body is equal. Therefore, the conversion is performed according to formula (5), as follows:

[0031] Dγ c B=(γ n b1+γ c b2)d (5)

[0032]

[0033]

[0034] B—the sum of the horizontal widths of the aquifer and the aquiclude (m);

[0035] d—Grouting thickness in inclined aquifer (m);

[0036] γ s —Aquifer density (kN / m 3 );

[0037] γn — Unit weight of the aquitard (kN / m 3 ).

[0038] Among them, when the unit weight of the aquitard γ n = γ c , the grouting thickness of the horizontal aquifer is the same as that of the aquifer in the inclined interbedded formation, that is, D = d; when the unit weight of the aquitard γ n < γ c , the grouting thickness of the horizontal aquifer is less than that of the aquifer in the inclined interbedded formation, that is, D < d; when the unit weight of the aquitard γ n > γ c , the grouting thickness of the horizontal aquifer is greater than that of the aquifer in the inclined interbedded formation, that is, D > d;

[0039] Step 7: Determine the equivalent amount of grouting cement required for the overall foundation pit; Based on the calculated grouting depth h of the inclined aquifer, combined with the length, width of the entire foundation pit and the range within the excavation area, calculate the total amount of cement slurry required for the excavation surface of the entire foundation pit. As shown in the following formula (8):

[0040] Q = nhb1Lq (8)

[0041] In the formula:

[0042] Q—Total amount of cement slurry required to reinforce the entire foundation pit (m 3 );

[0043] n—Number of inclined aquifers at the bottom of the foundation pit;

[0044] L—Longitudinal length of the inclined aquifer at the bottom of the foundation pit (m);

[0045] q—Amount of cement slurry required for the inclined aquifer per cubic meter.

[0046] Step 8: Construction of the distribution of each position of the grouting holes; Based on the calculated amount of cement slurry, carry out grouting reinforcement at the bottom of the foundation pit. According to the requirements of the "Technical Code for Building Foundation Pit Support" (JGJ 120 - 2012), among them, the distribution of each position of the grouting holes is determined according to the setting range of the grouting body formed by a single grouting hole. Set multiple rows of grouting pipes in the inclined interbedded aquifer, the depth of the grouting pipes is h1, and strictly treat the cement slurry.

[0047] Step 9: Grouting process flow of inclined aquifer; This special stratum is planned to adopt the splitting grouting construction process, that is, high-pressure grouting, to inject cement or chemical slurry into the soil layer. The slurry applies additional compressive stress to the surrounding strata, causing shear cracks in the soil, and the slurry splits along the cracks from the low strength of the soil to the high strength. The slurry split into the soil forms a network or skeleton to reinforce the soil. The water-cement ratio of the cement slurry is 1:1, which ensures that the slurry can quickly penetrate into the pores of the soil. The water glass modulus is greater than 2.5. When the water glass modulus is larger, the viscosity of the water glass increases and the bonding force increases. The water glass content is 10% to 15% of the volume of the cement slurry. Within this range, the slurry can ensure a reasonable setting time, which can effectively penetrate into the soil and prevent it from being dispersed by groundwater. The specific construction steps are as follows: (1) The aperture is generally The hole spacing is generally about 1.5m-1.0m, and they are arranged in a plum blossom shape. (2) Filling the hole with casing material. The casing material is also called closed mud. When the borehole reaches the designed depth, the closed mud is poured into the drill. Its function is to close the gap between the one-way valve pipe and the borehole wall, forcing the ring to open in the grouting hole. The squeezed slurry breaks through the casing material and is injected into the surrounding soil layer. (3) Inserting a one-way valve pipe (splitting grouting pipe) into the borehole filled with closed mud is generally done with an inner diameter of A plastic pipe is used, and a group of grouting holes are drilled every 33-50cm (i.e. 2-3 groups per meter). The rubber sleeve is wrapped outside. When the pipe is inserted into the drill hole, the pipe end is closed and the pipe is filled with water. (4) After the sealed mud reaches a certain strength, a two-way sealed grouting core pipe is inserted into the one-way valve pipe for layered grouting. First, the pressure is increased so that the slurry pushes the rubber sleeve, squeezes the shell material, splits the soil, and spreads along the cracks. The diffusion range is affected by factors such as grouting pressure, time, slurry ratio, and soil layer characteristics. Generally, grouting is done once every meter from the bottom. After reaching a certain pressure, it is lifted up one meter and grouting is done again. This process is repeated. After the grouting is completed, the residual slurry in the pipe is cleaned to facilitate the second grouting.

[0048] Step 10: After the grouting body is finally set, close the internal dewatering well; after the grouting construction is completed, wait for the grouting body to be finally set and combine with the inclined aquifer to form a barrier with good water blocking effect. After this stage, there is no need for large-scale dewatering treatment inside the foundation pit, and it can be closed for a long time to minimize the disturbance of groundwater caused by dewatering inside the foundation pit, so that the groundwater seepage system inside and outside the entire foundation pit forms a steady-state seepage mode. At the same time, it provides a dry operation construction environment for the subsequent infrastructure construction in the foundation pit, and guarantees the overall stability of the foundation pit to a greater extent during the backfilling of the foundation pit.

[0049] Compared with the prior art, the beneficial effects of the present invention are as follows: during the excavation process, the bottom of the foundation pit is dewatered to ensure the construction environment, and after the excavation is completed, grouting construction is carried out in the inclined aquifer in the foundation pit, which acts in combination with the weakly permeable inclined waterproof layer to block water seepage in the foundation pit, effectively preventing the impact of rising river water levels during the flood season on the interior of the foundation pit. At the same time, the actual conversion grouting depth in the inclined aquifer is given. That is, it is a method that combines "local interlocking water-stopping curtain → inclined grouting". This method can better control the problem of strong recharge water in the aquifer, strengthen the safety of the pit bottom soil against sudden surges, and provide safety guarantees for the later construction of underground structures inside the foundation pit. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 It is a plan layout diagram of the dewatering wells, local plain concrete piles and supporting pile rows around the foundation pit in the present invention;

[0051] Figure 2 The arrangement of local plain concrete piles and supporting piles in the present invention Figure 1 ;

[0052] Figure 3 The arrangement of local plain concrete piles and supporting piles in the present invention Figure 2 ;

[0053] Figure 4 It is a cross-sectional arrangement diagram of the dewatering wells, local plain concrete piles and supporting pile rows around the foundation pit in the present invention;

[0054] Figure 5 It is a schematic diagram of grouting of an inclined aquifer in the present invention;

[0055] Figure 6 For the present invention Figure 5 A partial enlarged view of .

[0056] In the figure: dewatering well 1, supporting pile row 2, local plain concrete piles 3, local grouting 4, inclined waterproof layer 5, inclined aquifer 6, internal grouting hole 7. DETAILED DESCRIPTION

[0057] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0058] Example 1

[0059] A water stopping method for water gushing in a deep foundation pit under gently sloping interlayers near a river, such as Figure 1-Figure 6As shown, before the foundation pit is excavated, a dewatering well 1 is set outside the foundation pit, and at the same time, a local plain concrete pile 3 is used inside the foundation pit to engage with the supporting pile row 2 to jointly bear the supporting and water-stopping function; after the foundation pit is excavated, a local grouting 4 is set at the bottom of the foundation pit, so that the foundation pit as a whole forms a closed water-stopping and water-isolating system, which is beneficial to the overall stability of the foundation pit;

[0060] The specific steps include:

[0061] Step 1: Determine the depth of the inclined interlayer according to the results of the stratum exploration and set the buried depth of the pressure relief well outside the foundation pit. w ; Before excavating the foundation pit, determine the depth of the dewatering well outside the foundation pit according to the actual stratum, groundwater conditions and size of the foundation pit. The construction of the dewatering well outside the foundation pit, on the one hand, ensures dry operation inside the foundation pit during the excavation of the upper part of the foundation pit, and on the other hand, plays a role in controlling the water level during the flood season. During the construction of the foundation pit, when the river water level rises during the flood season, the rising water level can be reduced to a certain extent through the external pressure relief well, so that the water level does not exceed the top depth of the local bite water-stop curtain of the foundation pit, so that the inside of the foundation pit can always maintain a dry working environment during the entire early excavation. That is, the external early small-scale pressure relief and dewatering construction.

[0062] Step 2: Determine the parameters of the local interlocking water-stop curtain in the foundation pit; after the location of the peripheral dewatering well is determined, determine the parameters of the interlocking water-stop curtain in the foundation pit. Determine the specific parameters of the local interlocking support piles according to the designed excavation depth of the foundation pit and the Technical Code for Building Foundation Pit Support (JGJ120-2012), and at the same time determine the insertion depth of the overall interlocking water-stop curtain into the bottom of the foundation pit l d In order to ensure the stability of the flowing soil in the foundation pit, formula (1) is used for conversion calculation, as follows:

[0063]

[0064] K f —Safety factor of soil flow stability should not be less than 1.6, 1.5, or 1.4;

[0065] l d —Insertion depth of the water cut-off curtain below the pit bottom (m);

[0066] γ′—buoyancy density of soil (kN / m 3 );

[0067] Δh—water head difference inside and outside the foundation pit (m);

[0068] γ w —Gravity of water (kN / m 3 ).

[0069] After conversion, the water-stop curtain inside the foundation pit is inserted into the bottom of the foundation pit to a depth of l d as follows:

[0070]

[0071] Determine the total depth L of the water-stop curtain inside the foundation pit S .

[0072] L s ≥l d +H (3)

[0073] Step 3: Construction of local interlocking water-stop curtain in the foundation pit; Construction of foundation pit support structure measures taking into account both support and water-stopping effects, using plain concrete piles and reinforced concrete interlocking structure. That is, adjacent concrete piles are partially interlocked in circles, and steel cages are inserted into the piles that are constructed in sequence. The interlocking part between the piles is not less than 200mm, so as to form an overall continuous protective curtain with good anti-seepage effect. The specific construction is carried out in accordance with the requirements of the "Technical Code for Building Foundation Pit Support" (JGJ 120-2012). Among them, no interlocking construction of plain concrete is carried out in the strata above the inclined interlayer strata. The purpose is that the upper water level of the inclined interlayer strata is affected by the shallow dewatering well outside the foundation pit, the water level is well controlled, and the plain concrete piles contribute little to the lateral support of the foundation pit. Therefore, considering the comprehensive economic benefits, there is no need to increase the plain concrete piles with water-stopping effect;

[0074] Step 4: Construction and excavation of drainage wells inside the foundation pit; after the construction of the local interlocking water-stopping curtain measures outside the foundation pit is completed, the drainage wells inside the foundation pit are constructed. The drainage wells are evenly distributed inside the foundation pit to ensure that the inside of the foundation pit always maintains a certain dry working environment during the construction process; during the excavation of the upper horizontal rock and soil layer, the drainage wells inside and outside the foundation pit work together to make the overall water control of the foundation pit good. As the excavation of the foundation pit continues, the inclined interlayer strata gradually leak, and water seepage occurs on the side of the foundation pit. Considering that increasing the depth and working power of the internal and external drainage wells will cause uneven settlement of the buildings around the foundation pit, which is not conducive to the overall stability of the foundation pit, the local interlocking water-stopping curtain measures are comprehensively considered in the foundation pit. During the entire excavation process, multiple prestressed anchor cables are gradually constructed according to the design requirements, and they work together with the local water-stopping curtain. On the one hand, the seepage on the side of the foundation pit is well controlled, and on the other hand, the deformation of the foundation pit is effectively restricted, which provides a better construction environment for subsequent excavation.

[0075] Step 5: Local grouting in the inclined aquifer: With the excavation completed, local grouting is performed in the foundation pit to avoid the problem of seepage recharge along the inclined aquifer into the foundation pit; according to the geological survey report, the inclination angle, strike and proportion of the inclined interlayer and the aquifer are determined. The grouting thickness inside the foundation pit under the horizontal rock layer is calculated; because grouting can only be performed in the inclined aquifer, the weight of the soil after grouting is the mixed weight. According to the foundation pit anti-surge formula (4), the required grouting thickness D at the bottom of the foundation pit under the horizontal rock layer is calculated.

[0076]

[0077] K h —Surge stability safety factor should not be less than 1.1;

[0078] D—the thickness of the soil layer from the top of the confined water aquifer to the bottom of the pit (i.e. the thickness required for grouting) (m);

[0079] γ c —Mixed density of the aquifer soil layer after grouting (kN / m 3 );

[0080] h w —Height of the pressure head on the top of the confined water aquifer (m);

[0081] γ w —Gravity of water (kN / m 3 );

[0082] Step 6: Correction of grouting thickness inside the inclined aquifer: Based on the different weights and space proportions of the aquifer and aquiclude in the inclined interlayer, the grouting thickness under the horizontal rock layer is calculated and corrected to the grouting thickness of this special formation. Among them, the overlying water pressure remains unchanged, that is, the overall pressure of the grouting body is equal. Therefore, the conversion is performed according to formula (5), as follows:

[0083] Dγ c B=(γ n b1+γ c b2)d (5)

[0084]

[0085]

[0086] B—the sum of the horizontal widths of the aquifer and the aquiclude (m);

[0087] d—Grouting thickness in inclined aquifer (m);

[0088] γ s —Aquifer density (kN / m 3 );

[0089] γ n —Weight of aquiclude (kN / m 3 ).

[0090] Among them, when the water-blocking layer is heavy γ n =γ c When the grouting thickness of the horizontal aquifer is the same as that of the aquifer in the inclined interlayer, that is, D = d; when the aquiclude is heavy γ n <γ cWhen the thickness of grouting in the horizontal aquifer is less than that in the inclined interbedded formation, i.e., D < d; when the unit weight γ of the aquiclude n >γ c When the thickness of grouting in the horizontal aquifer is greater than that in the inclined interbedded formation, i.e., D > d;

[0091] Step 7: Determine the equivalent amount of grouting cement required for the overall foundation pit; based on the calculated grouting depth h of the inclined aquifer, combined with the length, width of the entire foundation pit and the scope within the excavation area, calculate the total amount of cement slurry required for the excavation surface of the entire foundation pit. As shown in the following formula (8):

[0092] Q = nhb1Lq (8)

[0093] In the formula:

[0094] Q—the total amount of cement slurry required to reinforce the entire foundation pit (m 3 );

[0095] n—the number of inclined aquifers at the bottom of the foundation pit;

[0096] L—the longitudinal length of the inclined aquifer at the bottom of the foundation pit (m);

[0097] q—the amount of cement slurry required for the inclined aquifer per cubic meter.

[0098] Step 8: Construction of the distribution of each position of the grouting holes; based on the calculated amount of cement slurry, carry out grouting reinforcement at the bottom of the foundation pit. According to the requirements of the "Technical Code for Building Foundation Pit Support" (JGJ 120 - 2012), among them, the distribution of each position of the grouting holes is determined according to the setting range of the grouting body formed by a single grouting hole. Set multiple rows of grouting pipes in the inclined interbedded aquifer, the depth of the grouting pipes is h1, and strictly treat the cement slurry.

[0099] Step 9: Grouting process flow for the inclined aquifer; the split grouting construction process is proposed for this special formation, that is, high-pressure grouting. Inject cement or chemical slurry into the soil layer. The slurry exerts additional compressive stress on the surrounding soil layer, causing shear cracks in the soil, and the slurry then splits along the cracks from the place with low soil strength to the place with high strength. The slurry split into the soil forms a network or skeleton for strengthening the soil. The water-cement ratio of the cement slurry is 1:1 to ensure that the slurry can quickly penetrate into the soil pores. The water glass modulus is greater than 2.5. When the water glass modulus is relatively large, the viscosity of the water glass increases and the bonding force increases. The water glass dosage is 10% - 15% of the volume of the cement slurry. Within this range, it can ensure a reasonable setting time of the slurry, which can not only effectively penetrate into the soil but also prevent being washed away by groundwater. The specific construction steps are as follows: (1) The hole diameter is generally The hole spacing is generally about 1.5m-1.0m, and they are arranged in a plum blossom shape. (2) Filling the hole with casing material. The casing material is also called closed mud. When the borehole reaches the designed depth, the closed mud is poured into the drill. Its function is to close the gap between the one-way valve pipe and the borehole wall, forcing the ring to open in the grouting hole. The squeezed slurry breaks through the casing material and is injected into the surrounding soil layer. (3) Inserting a one-way valve pipe (splitting grouting pipe) into the borehole filled with closed mud is generally done with an inner diameter of A plastic pipe is used, and a group of grouting holes are drilled every 33-50cm (i.e. 2-3 groups per meter). The rubber sleeve is wrapped outside. When the pipe is inserted into the drill hole, the pipe end is closed and the pipe is filled with water. (4) After the sealed mud reaches a certain strength, a two-way sealed grouting core pipe is inserted into the one-way valve pipe for layered grouting. First, the pressure is increased so that the slurry pushes the rubber sleeve, squeezes the shell material, splits the soil, and spreads along the cracks. The diffusion range is affected by factors such as grouting pressure, time, slurry ratio, and soil layer characteristics. Generally, grouting is done once every meter from the bottom. After reaching a certain pressure, it is lifted up one meter and grouting is done again. This process is repeated. After the grouting is completed, the residual slurry in the pipe is cleaned to facilitate the second grouting.

[0100] Step 10: After the grouting body is finally set, close the internal dewatering well; after the grouting construction is completed, wait for the grouting body to be finally set and combine with the inclined aquifer to form a barrier with good water blocking effect. After this stage, there is no need for large-scale dewatering treatment inside the foundation pit, and it can be closed for a long time to minimize the disturbance of groundwater caused by dewatering inside the foundation pit, so that the groundwater seepage system inside and outside the entire foundation pit forms a steady-state seepage mode. At the same time, it provides a dry operation construction environment for the subsequent infrastructure construction in the foundation pit, and guarantees the overall stability of the foundation pit to a greater extent during the backfilling of the foundation pit.

[0101] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for stopping water inrush in a deep foundation pit under gently sloping interlayers near a river, characterized by: Before excavation of the foundation pit, a foundation pit drainage well (1) is arranged outside the foundation pit, and at the same time, a local interlocking water-stopping curtain in which local plain concrete piles (3) and supporting pile rows (2) are interlocked inside the foundation pit is used to play a supporting and water-stopping role; after excavation of the foundation pit is completed, local grouting (4) is arranged at the bottom of the foundation pit, so that the foundation pit as a whole forms a closed water-stopping and water-isolating system, which is beneficial to the overall stability of the foundation pit; The specific steps include: Step 1: Determine the depth of the inclined interlayer according to the results of the stratum exploration and set the buried depth l of the foundation pit drainage well (1) w ; Step 2: Determine the parameters of the local interlocking water-stopping curtain in the foundation pit; after the location of the drainage well (1) outside the foundation pit is determined, determine the parameters of the local interlocking water-stopping curtain; the parameters of the local interlocking water-stopping curtain include the depth l of the overall interlocking water-stopping curtain inserted into the bottom of the foundation pit d And the total depth of the water-stop curtain inside the foundation pit L S ; In order to ensure the stability of the flowing soil in the foundation pit, formula (1) is used for conversion calculation, as follows: K f —The safety factor of soil flow stability should not be less than 1.4; l d —Integral interlocking water-stop curtain is inserted into the bottom of the foundation pit to a depth of m; γ′—buoyancy density of soil kN / m 3 ; Δh—water head difference inside and outside the foundation pit m; γ w —Specific gravity of water kN / m 3 ; After conversion, the depth of the integral interlocking water-stop curtain inserted into the bottom of the foundation pit is l d as follows: Determine the total depth L of the water-stop curtain inside the foundation pit S : L s ≥l d +H (3); Step 3: Construction of local interlocking water-stopping curtain in the foundation pit; Step 4: Construction and excavation of dewatering wells inside the foundation pit; Step 5: Local grouting in the inclined aquifer; With the excavation completed, local grouting is performed in the foundation pit to avoid the problem of seepage recharge along the inclined aquifer into the foundation pit (4); Based on the geological survey report, determine the inclination angle, strike and proportion of the inclined interlayer and the aquifer interlayer; Calculate the grouting thickness inside the foundation pit under the horizontal rock layer; Because grouting can only be performed in the inclined aquifer, the weight of the soil after grouting is the mixed weight; Based on the foundation pit anti-surge formula (4), calculate the required grouting thickness D at the bottom of the foundation pit under the horizontal rock layer; K h —Surge stability safety factor should not be less than 1.1; D—the thickness of the soil layer from the top of the confined water aquifer to the bottom of the pit, i.e. the thickness required for grouting m; γ c —Mixed density of the aquifer soil layer after grouting kN / m 3 ; h w —Height of the pressure head on the top of the confined water aquifer, m; γ w —Specific gravity of water kN / m 3 ; Step 6: Correcting the grouting thickness inside the inclined aquifer; Step 7: Determine the cement equivalent required for grouting of the entire foundation pit; Step 8: Construction of grouting holes at various locations; Step 9: the inclined aquifer grouting process; Step 10: After the grouting body has finally set, close the internal dewatering of the foundation pit.

2. A water stopping method for water gushing in a deep foundation pit under gently sloping interlayers near a river according to claim 1, characterized in that: In step 3, a local plain concrete pile (3) and a supporting pile row (2) interlocking structure is used, that is, a steel cage is set in the supporting pile row (2), and at the same time, the local plain concrete piles (3) on the adjacent two sides are connected to the supporting pile row (2) by interlocking and embedding. The interlocking and embedding part between the local plain concrete pile (3) and the supporting pile row (2) is not less than 200mm, so as to form an overall interlocking water-stopping structure with good anti-seepage effect; wherein, the construction of plain concrete piles is not carried out in the strata above the inclined interlayer strata.

3. A water stopping method for water gushing in a deep foundation pit under gently sloping interlayers near a river according to claim 1, characterized in that: In step 4, after the construction of the local interlocking water-stopping curtain measures on the periphery of the foundation pit is completed, the construction of drainage wells inside the foundation pit is carried out. The positions of the drainage wells inside the foundation pit are evenly distributed inside the foundation pit to ensure that the inside of the foundation pit always maintains a dry working environment during the construction process.

4. A water stopping method for water gushing in a deep foundation pit under gently sloping interlayers near a river according to claim 1, characterized in that: In step 6, according to the different weights of the aquifer and the aquiclude in the inclined interlayer and the proportion of space occupied, the grouting thickness under the horizontal rock layer is calculated and corrected to the grouting thickness of this special formation; wherein, according to the constant overlying water pressure, that is, the overall pressure of the grouting body is equal; therefore, the conversion is performed according to formula (5), as follows: Dγ c B=(γ n b1+c c b2)d (5) B—the sum of the horizontal widths of the aquifer and the aquiclude m; d—grouting thickness in inclined aquifer m; γ s —Aquifer density kN / m 3 ; γ n —Weight of aquiclude kN / m 3 ; Among them, when the specific weight γ of the aquitard n = γ c , the grouting thickness of the horizontal aquifer is the same as that of the aquifer in the inclined interbedded formation, that is, D = d; when the specific weight γ of the aquitard n < γ c , the grouting thickness of the horizontal aquifer is less than that of the aquifer in the inclined interbedded formation, that is, D < d; when the specific weight γ of the aquitard n > γ c , the grouting thickness of the horizontal aquifer is greater than that of the aquifer in the inclined interbedded formation, that is, D > d.

5. The method for stopping water inrush in a deep foundation pit under gently sloping interlayers near a river according to claim 1, characterized in that: In step 7, the total amount of cement slurry required for the entire excavation surface of the foundation pit is calculated based on the calculated grouting depth h of the inclined aquifer and the length, width and excavation area of ​​the entire foundation pit, as shown in the following formula (8): Q=nhb1Lq (8) Where: Q—Total amount of cement slurry required to reinforce the entire foundation pit m 3 ; n—number of inclined aquifers at the bottom of the foundation pit; L—longitudinal length of the inclined aquifer at the bottom of the foundation pit in m; q—the amount of cement slurry required per cubic meter for the inclined aquifer.

6. A water stopping method for water gushing in a deep foundation pit under gently sloping interlayers near a river according to claim 1, characterized in that: In step 8, grouting reinforcement is performed on the bottom of the foundation pit according to the calculated amount of cement slurry, wherein the positions of the grouting holes are distributed according to the coagulation range of the grouting body formed by a single grouting hole; multiple rows of grouting pipes are set in the inclined interlayer aquifer, the depth of the grouting pipes is h1, and the cement slurry is strictly treated.

7. A water stopping method for water gushing in a deep foundation pit under gently sloping interlayers near a river according to claim 1, characterized in that: In step 9, the splitting grouting construction process is adopted, and the specific construction steps are as follows: (1) the hole diameter is The hole spacing is 1.5m-1.0m, arranged in a plum blossom shape; (2) The casing material is also called closed mud. When the borehole reaches the designed depth, the closed mud is poured into the drill from the inside. Its function is to close the gap between the one-way valve pipe and the borehole wall, forcing the loop to open from the grouting hole. The squeezed slurry breaks through the casing material and is injected into the surrounding soil layer; (3) Insert the one-way valve pipe into the borehole filled with closed mud, that is, split the grouting pipe, and use an inner diameter of A plastic pipe is used, and a group of grouting holes are drilled every 33-50cm, that is, 2-3 groups per meter. The pipe is covered with a rubber sleeve. When the pipe is inserted into the drill hole, the end of the pipe is closed and the pipe is filled with water; (4) after the sealed mud reaches a certain strength, a two-way sealed grouting core pipe is inserted into the one-way valve pipe for layered grouting. First, the pressure is increased to make the slurry push open the rubber sleeve, squeeze the shell material, generate splitting in the soil, and spread along the cracks. The diffusion range is affected by the grouting pressure, time, slurry ratio, and soil layer characteristics. Grouting is done once every meter from the bottom. After reaching a certain pressure, it is lifted up one meter and grouting is done again. This process is repeated; after the grouting is completed, the residual slurry in the pipe is cleaned to facilitate the second grouting.

8. The method for stopping water inrush in a deep foundation pit under gently sloping interlayers near a river according to claim 1, characterized in that: In step 10, after the grouting construction is completed, the grouting body will be combined with the inclined aquifer stratum after final setting to form a water-blocking barrier; after this stage, there is no need for large-scale precipitation treatment inside the foundation pit, and the precipitation inside the foundation pit is closed for a long time, which reduces the disturbance to the groundwater to a minimum, so that the groundwater seepage system inside and outside the entire foundation pit forms a steady-state seepage mode; at the same time, it provides a dry operation construction environment for the subsequent infrastructure construction in the foundation pit, and guarantees the overall stability of the foundation pit to a greater extent during the backfilling of the foundation pit.

Citation Information

Patent Citations

  • Dewatering structure for low dip interbedding of water-bearing strata and water-resisting strata and construction method

    CN113463672A

  • Novel fabricated anchorage structure serving as both dewatering well and support, and construction method

    WO2021196657A1