A drilling parameter optimization method and device

Through flow pattern identification and cuttings migration model calculation, drilling parameters are optimized, which solves the drilling safety and efficiency problems caused by cuttings accumulation and increased ECD in long horizontal wells, and achieves auxiliary decision-making and parameter optimization for safe underground construction.

CN115859566BActive Publication Date: 2024-10-29CHINA NAT PETROLEUM CORP +2
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202211367890.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-03
Publication Date
2024-10-29
Estimated Expiration
2042-11-03

AI Technical Summary

Technical Problem

In long horizontal well drilling technology, due to the large inclination angle of the wellbore and the long horizontal well section, the accumulation of cuttings, increased ECD, and increased frictional torque will lead to pump failure, well leakage, difficulty in sliding drilling, slow drilling speed, and bit acceleration. A series of underground accidents, such as pressure difficulties and insufficient rotational torque of surface drive equipment, have complicated drilling operations.

Method used

By determining the flow pattern of the well section, select the corresponding cuttings migration model, calculate the cuttings concentration and cuttings bed height, and input them into the friction torque model and ECD model to determine whether the constraints are met, and based on the output results Optimize drilling parameters to evaluate underground drilling safety conditions and provide construction assistance decision-making.

Benefits of technology

Effectively evaluate the safety status of underground drilling, provide drilling parameter optimization, improve the safety and efficiency of drilling construction, reduce accidents, and improve drilling quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115859566B_ABST
    Figure CN115859566B_ABST
Patent Text Reader

Abstract

The present invention discloses a drilling parameter optimization method and device, wherein the method comprises: determining the flow pattern of each well section according to the drilling parameters of the target well; selecting a corresponding cuttings transport model according to the flow pattern; calculating the cuttings concentration and the cuttings bed height according to the borehole cleaning calculation formula corresponding to the cuttings transport model; inputting the cuttings concentration and the cuttings bed height into a friction torque model and an ECD model to obtain an output result; judging whether the constraint condition is met according to the output result; and optimizing the drilling parameters according to the judgment result. The present invention provides a drilling parameter optimization method based on the coupling of borehole cleaning with friction torque and annular pressure loss, which can effectively evaluate the downhole drilling safety status, provide effective drilling parameter optimization, and provide auxiliary decision-making for drilling safety construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of oil and gas drilling engineering drilling technology, and in particular to a drilling parameter optimization technology that couples wellbore cleaning, friction torque and ECD effects. Background Art

[0002] In the development of oil fields and special oil and gas reservoirs in the ocean, beach, and harsh ground conditions, long horizontal well technology has achieved significant economic benefits. For example, offshore oil development uses long horizontal wells to develop marginal oil reservoirs, increase single well production, reduce drilling platform costs, and save duplicate construction costs. Horizontal well drilling technology is an important way to improve the benefits of oil and gas development and is becoming a key research direction. However, compared with conventional well types, long horizontal well drilling technology faces more prominent and difficult problems.

[0003] During the construction of long horizontal wells, drilling accidents and complications occur frequently due to the large wellbore inclination angle, long horizontal well section and prominent gravity effect. The most prominent problems include cuttings accumulation and the high ECD (Equivalent Circulating Density) and large friction caused by it, which in turn lead to a series of downhole accidents such as pump blocking, well leakage, sliding drilling difficulties, slow drilling speed, difficulty in pressurizing the drill bit, insufficient rotation torque of ground drive equipment, drill sticking, drill string wear and fracture. Summary of the invention

[0004] In view of the technical defects and technical drawbacks existing in the prior art, the embodiments of the present invention provide a drilling parameter optimization method and device that overcome the above problems or at least partially solve the above problems.

[0005] One aspect of the present invention provides a method for optimizing drilling parameters, comprising:

[0006] Determine the flow pattern of each well section according to the drilling parameters of the target well;

[0007] Selecting a corresponding cuttings transport model according to the flow pattern;

[0008] Calculating the cuttings concentration and cuttings bed height according to the wellbore cleaning calculation formula corresponding to the cuttings transport model;

[0009] Inputting the cuttings concentration and cuttings bed height into a friction torque model and an ECD model to obtain output results;

[0010] Determining whether the constraint condition is satisfied according to the output result;

[0011] The drilling parameters are optimized according to the judgment result.

[0012] Another aspect of the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein the program implements the above method when executed by a processor.

[0013] Yet another aspect of the present invention provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above method when executing the program.

[0014] Another aspect of the present invention provides a drilling parameter optimization device, comprising:

[0015] A determination module, used to determine the flow pattern of each well section according to the drilling parameters of the target well;

[0016] A selection module, for selecting a corresponding cuttings transport model according to the flow pattern;

[0017] A calculation module, used to calculate the cuttings concentration and the cuttings bed height according to the wellbore cleaning calculation formula corresponding to the cuttings transport model;

[0018] An input module, used for inputting the cuttings concentration and cuttings bed height into a friction torque model and an ECD model to obtain an output result;

[0019] A judgment module, used for judging whether the constraint condition is satisfied according to the output result;

[0020] An optimization module is used to optimize the drilling parameters according to the judgment result.

[0021] Various aspects of the present invention provide a drilling parameter optimization method based on the coupling of wellbore cleaning with friction torque and annulus pressure loss, which can effectively evaluate the downhole drilling safety status and provide effective drilling parameter optimization, thereby providing auxiliary decision-making for drilling safety construction.

[0022] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structure described in the written description, claims, and drawings.

[0023] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0025] Figure 1A flow chart of a drilling parameter optimization method considering the coupling effects of wellbore cleaning, friction torque and ECD provided in an embodiment of the present invention;

[0026] Figure 2 Schematic diagram of the principle of the drilling parameter optimization method considering the coupling effects of wellbore cleaning, friction torque and ECD;

[0027] Figure 3 Schematic diagram of flow state judgment method;

[0028] Figure 4 Schematic diagram of drilling constraints;

[0029] Figure 5 Schematic diagram of the process of parameter optimization and improvement algorithm;

[0030] Figure 6 Schematic diagram of flow for different flow patterns;

[0031] Figure 7 It is a schematic diagram of the structure of the drilling parameter optimization device described in an embodiment of the present invention. DETAILED DESCRIPTION

[0032] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0033] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present invention. Instead, they are merely examples of devices and methods consistent with some aspects of the present invention as detailed in the appended claims.

[0034] After research, the inventor found that: Statistics show that about 70% of drilling time loss is related to drill tool sticking, and about 1 / 3 of drill tool sticking problems are related to insufficient wellbore cleaning. In addition to the above-mentioned technical difficulties, long horizontal well drilling technology is also a problem of comprehensive technical application, which makes drilling technology more complicated. Many drilling problems are related to operator errors or slow reactions. In addition to accurately simulating downhole conditions, it is also urgent to introduce optimization methods to avoid possible accidents downhole and improve drilling quality and efficiency. How to accurately simulate downhole cuttings distribution, drill string force distribution, and wellbore pressure distribution based on the coupling effects of wellbore cleaning, friction torque, and ECD, and combined with the actual limitations of the on-site engineering, find a drilling parameter optimization method to guide on-site drilling construction, is one of the key issues that urgently need to be solved for safe and efficient drilling of long horizontal wells.

[0035] To this end, this embodiment provides a drilling parameter optimization method that couples wellbore cleaning, friction torque and ECD effects, such as Figure 1 and Figure 2 As shown, the following steps are included:

[0036] Step 100, determining the flow pattern of each well section according to the drilling parameters required by the target well.

[0037] The drilling parameters include: static parameters required for analysis and calculation, such as wellbore trajectory, wellbore structure, drill bit assembly, drilling fluid rheological parameters, etc.; and construction parameters that need to be optimized, such as displacement Q, mechanical drilling speed (Rate of Penetration, abbreviated as: ROP), etc.

[0038] The flow types are divided into fixed cuttings bed flow, fluctuating cuttings bed flow, accumulated cuttings flow, and dispersed cuttings bed flow. Figure 6 The force balance equation of the borehole cleaning model will be different under different flow patterns. For the actual drilling process, it is necessary to judge the flow pattern and select the corresponding borehole cleaning formula to accurately calculate the result. The characteristics of different flow patterns are shown below.

[0039] Fixed cuttings bed flow: At locations with large well inclination angles (well inclination angle greater than 55 degrees), the cuttings form a fixed height cuttings bed along the axial direction on the lower side of the annulus. Above the fixed cuttings bed flow is a mixed layer. The cuttings concentration in the mixed layer is uneven. The cuttings concentration is highest at the bottom and gradually decreases toward the top. At the bottom of the mixed layer, the cuttings particles roll forward and move relatively slowly compared to the cuttings suspended at the top. As the local cuttings concentration decreases, the cuttings movement speed increases. Above the mixed layer is a liquid layer with almost no cuttings.

[0040] Fluctuating cuttings bed flow: As the well inclination angle decreases or the flow velocity on the cuttings bed surface increases, the fluid carries more cuttings particles away from the fixed cuttings bed flow. The cuttings still form a continuous fixed cuttings bed flow, but the interface between the bed and the flowing drilling fluid is not smooth for a long time. Some waves appear in the cuttings bed, which gives the cuttings bed a wavy appearance. The cuttings particles slide down along the slope of the front side of the wave and accumulate on the back side of the wave. In these changes of sliding and descending motions, the wavy cuttings bed moves forward at a fixed speed, and its moving speed and the distance between waves vary with the changes in the bed surface velocity, cuttings generation rate, well inclination angle, fluid properties and cuttings properties.

[0041] Accumulated debris flow: As the debris generation rate decreases or the flow velocity on the debris bed surface increases, the number of waves in the bed increases. Finally, the continuous fixed debris bed flow disappears, dunes appear, and an accumulated debris flow is formed. These debris particles slide down from the back of the dune, then are re-entrained in the flow, move forward and are redeposited in front of the dune.

[0042] Dispersed cuttings bed flow: Starting from the accumulation cuttings flow, by further reducing the cuttings generation rate or increasing the surface velocity, the particles of the accumulation cuttings flow are completely dispersed in the flow. Then, the flow pattern changes to dispersed cuttings bed flow. There is no cuttings sliding in the dispersed cuttings bed flow. The particles at the end of the dune are carried to the upper part of the annulus at a high speed, then move to the front of the dune, and then fall back to the lower part of the annulus again. If the liquid phase surface velocity is further increased, this up-and-down behavior disappears, and the cuttings will move forward in the form of a slug.

[0043] Specifically, the judgment idea of ​​the well section flow pattern model is as follows: Figure 3 As shown:

[0044] 1. Compare the well inclination angle θ and the critical slip well inclination angle θ s , if θ>θ s (55°), the flow type is determined to be fixed cuttings bed flow; otherwise, go to step 2;

[0045] 2. Calculate the dispersion coefficient N under the flow velocity and ROP of the current well section D ;

[0046] 3. Substitute N D To formula (1), calculate θ wp , if θ>θ w , then the flow type is determined to be fluctuating cuttings bed flow; otherwise, go to step 4;

[0047] 4. Substitute N D To formula (2), calculate θ pd , if θ>θ pd , the flow type is judged to be accumulation debris flow; otherwise, the flow type is judged to be dispersed debris bed flow.

[0048] Where N D The calculation formula is Dimensionless; V sl is the surface liquid velocity, m / s; V sc is the surface cuttings flow velocity, m / s. The critical value θ from fluctuating cuttings bed flow to accumulated cuttings flow wp The critical value θ between the accumulation cuttings flow and the dispersed cuttings bed flow pd The calculation expression is:

[0049] θ wp =0.0232·(N D -180)+25 (1)

[0050] θ pd =-4·10 -5 ·N D 2 +0.107 N D -20.75 (2)

[0051] Step 200: Select a corresponding cuttings transport model according to the flow pattern.

[0052] After determining the flow pattern, select the corresponding cuttings transport model for borehole cleaning calculation according to the flow pattern. The flow pattern of cuttings in different well sections and flow conditions will change greatly. The calculation of borehole cleaning is based on the flow pattern of cuttings transport. Therefore, the mechanical model of borehole cleaning needs to be based on the law of change of flow pattern with well inclination, and divide the wellbore of directional well into three different well sections: vertical and slightly inclined well section, moderately inclined well section, and highly inclined and horizontal well section.

[0053] Among them, the flow type corresponding to the vertical and slightly inclined well sections is dispersed cuttings bed flow, and the corresponding cuttings transport model is a dispersed model; the flow type corresponding to the moderately inclined well sections is accumulated cuttings flow / fluctuating cuttings bed flow, and the corresponding cuttings transport model is a block model; the flow type corresponding to the highly inclined and horizontal well sections is fixed cuttings bed flow, and the corresponding cuttings transport model is a three-layer model.

[0054] Step 300: Calculate the cuttings concentration and cuttings bed height according to the wellbore cleaning calculation formula corresponding to the cuttings transport model.

[0055] After the cuttings transport model is determined, the final cuttings bed height and cuttings concentration distribution in the entire well section are calculated.

[0056] Specifically, the calculation formula for wellbore cleaning of the dispersion model is as follows.

[0057] The formula for cuttings generation concentration is:

[0058]

[0059] Average slip velocity between cuttings and drilling fluid:

[0060]

[0061] Mixing speed:

[0062]

[0063] The final cuttings concentration can be obtained from the above three equations:

[0064]

[0065] Among them, the surface rock cuttings velocity m / s; surface liquid velocity m / s; Q l is the displacement, m 3 / s; ROP is mechanical drilling speed, m / s; A w is the cross-sectional area, m2; A annulus is the cross-sectional area of ​​the annulus, m2; C C is the cuttings concentration, dimensionless; v l is the liquid phase velocity, m / s; v c is the cuttings moving speed, m / s; v m is the mixing speed, m / s.

[0066] Specifically, the wellbore cleaning calculation formula of the block model is as follows.

[0067] According to the mass conservation equation:

[0068] Solid phase: ρ s v u A u C u +ρ s v d A d C d =λρ s ROPA bit

[0069] Liquid phase: ρ L v u A u (1-C u )+ρ L v d A d (1-C d )=ρ L Q

[0070] According to the momentum conservation equation:

[0071]

[0072] Total v u , v d , C u , C d and A u Six variables require six equations to be solved jointly, so in addition to the four equations of mass and momentum conservation mentioned above, two closed-loop equations are required. The closed-loop equations are based on the volume concentration of the rock cuttings particles in the mixed layer and the velocity of the rock cuttings particles in the mixed layer.

[0073] The closed equation for cuttings concentration is:

[0074] The closed equation of cuttings velocity is:

[0075] Among them, ρ s is the rock cuttings density, g / cm 3 ρ L is the drilling fluid density, g / cm 3 ;v u is the flow rate of the upper fluid, m / s; A u is the area of ​​the upper fluid flow-through surface, m2; C u is the rock cuttings concentration in the upper layer, dimensionless; v d is the fluid velocity in the dispersed area, m / s; C d is the concentration of rock cuttings in the dispersed area, dimensionless; λ is the correction factor for the concentration of generated rock cuttings, dimensionless; A bit is the cross-sectional area of ​​the drill bit, m2; is the pressure gradient, MPa / m; τ uw is the shear stress between the upper flow zone and the wellbore wall, MPa; τ ub is the shear stress between the upper flow zone and the debris block, MPa; τ ud is the shear stress between the upper flow area and the dispersion area, MPa; S uw is the wetted perimeter between the upper flow area and the wellbore wall, m; S ub is the wetted perimeter between the upper flow zone and the debris block, m; S ud is the wetted perimeter between the upper flow area and the dispersion area, m; ρ u is the average density of the upper region, g / cm 3 ; τ dw is the shear force between the dispersion area and the wellbore wall, MPa; S dw is the wetted perimeter between the dispersion area and the wellbore wall, m; ρ d is the average density of the dispersed area, g / cm 3 ; g is the acceleration due to gravity, m / s 2 ; R b It is the ratio of the length of the rock fragment to the dispersed section, dimensionless.

[0076] Specifically, the wellbore cleaning calculation formula of the three-layer model is as follows.

[0077] According to the momentum conservation equation:

[0078]

[0079]

[0080]

[0081] According to the mass conservation equation:

[0082] Solid phase: A sb C sb U sb +A mb C mb U mb =λA w U t

[0083] Liquid phase: A sd U sd +a mb (1-C mb ) mb +a sb (1-C sb ) sb =Q

[0084] Total C sb , C mb , U sb , U sd , U mb and A sd 7 variables require 7 equations to be solved jointly. Therefore, in addition to the 5 equations for conservation of mass and momentum mentioned above, 2 closed-loop equations are required, which have been given in the dispersion model. sd A is the flow cross-sectional area of ​​the upper liquid layer, m2; mb A is the flow cross-sectional area of ​​the moving cuttings bed, m2; sb is the cross-sectional area of ​​the fixed cuttings bed flow, m2; C sb is the cuttings concentration of the fixed cuttings bed flow, dimensionless; C mb is the cuttings concentration in the mobile cuttings bed, dimensionless; U sb is the fixed cuttings bed flow velocity, m / s; U mb is the speed of the moving cuttings bed, m / s; U t is ROP, m / s; τ sd is the shear force between the upper liquid layer and the wall, MPa; τ sdmbis the shear force between the upper liquid layer and the moving bed, MPa; S sd is the wetted perimeter between the wellbore, drill pipe and upper liquid layer, m; S sdmb is the wetted perimeter between the upper liquid layer and the mixed layer, m; ρ sd is the density of the upper liquid layer, g / cm 3 ; τ mb Shear force between the moving cuttings bed and the wall, MPa; S mb is the wetted perimeter between the mixed layer and the wall, m; τ mbsb is the shear stress between the moving bed and the fixed bed, MPa; S mbsb is the wetted perimeter between the mixed layer and the cuttings bed, m; ρ mb is the density of the mobile cuttings bed, g / cm 3 ; F mbsb is the dry friction between the moving bed and the fixed bed, N; F mb is the dry friction between the moving bed and the wall, N.

[0085] Step 400: Input the cuttings concentration and cuttings bed height into the friction torque model and the ECD model to obtain output results.

[0086] The output results include: axial force, torque and ECD. Considering the influence of the existence of cuttings in the wellbore on ECD and friction torque, the distribution results of cuttings bed height and cuttings concentration are respectively introduced into the friction torque model and ECD model to obtain the output results of axial force, torque and ECD in the whole well section.

[0087] The ECD model is also called the ECD calculation model, which couples the influence of cuttings on it, first, the influence of cuttings bed height on flow channel size, second, the influence of suspended cuttings on fluid density, and third, the influence of cuttings on friction coefficient. Based on these influences, the ECD model is constructed.

[0088] ECD calculation method: ECD = ESD + ΔP an / gh, ECD is equivalent circulation density, g / cm3; ESD is equivalent static density, g / cm 3 ; ΔP an is the annular pressure loss, MPa; h is the vertical depth, m.

[0089] Where ESD is equal to the drilling fluid mixture density ρ m , annulus pressure loss calculation formula: where ρ m is the mixed density, g / cm 3 ;f f is the friction coefficient, dimensionless; L is the length of the pipe, m; D hyis the equivalent diameter of the annulus, m; Q is the flow rate, m 3 / s; A is the flow channel area, m2.

[0090] Considering the influence of rock cuttings, the flow channel area A = A sd +A mb ; Fluid mixture density ρ m =ρ s C c +ρ L (1-C c ), friction coefficient where d c is the equivalent diameter of rock cuttings, m; N Re is the generalized Reynolds number, dimensionless.

[0091] The friction torque model can also be called the friction torque calculation model, which couples the effects of cuttings and ECD on it. First, the effect of cuttings on the friction coefficient will increase additional resistance. Second, ECD changes the pressure distribution in the wellbore, which will produce additional tension on the drill bit, thereby affecting the force of the drill bit, thereby affecting the output results of the axial force and torque. Based on these effects, the friction torque model is constructed.

[0092] If the influence of cuttings is not considered, the friction torque calculation model is already relatively mature. To facilitate calculation, in practical applications, an additional force is used to represent the complex interaction between the cuttings bed and the drill pipe: when drilling, the additional force is applied to the axial direction of the drill pipe to represent the influence of the cuttings bed on the axial force of the drill pipe; when the drill pipe rotates, the additional force is tangent to the curved surface of the drill pipe wall and its direction is opposite to the direction of rotation.

[0093] When the drill bit rotates, F c is the additional torque, F c =f cir w c r p ;w c is the contact force, N; r p is the drill pipe radius, m.

[0094] When the drill moves axially, F c is the additional axial force, F c =f axi w c

[0095] The expression of axial friction coefficient is:

[0096] f axi =A+Bn

[0097] Among them, the A and B coefficients are measured by experiments. dimensionless, where h bed is the height of the cuttings bed, Dw is the cross-sectional diameter of the drill bit.

[0098] The expression of circumferential friction coefficient is:

[0099] f cir =f clean +f clean ×f CR

[0100] f CR =αn β

[0101] Among them, f clean is the friction coefficient without rock debris generation, where α and β coefficients are measured by experiments. Considering the influence of ECD is equivalent to generating an additional axial force in the direction of the axial force, which can be expressed as:

[0102] F t =ECD×g×h×A t

[0103] Among them, F t To consider the additional axial force of ECD, N; A t is the contact cross-sectional area, m2.

[0104] Step 500: determine whether the constraint condition is satisfied according to the output result.

[0105] Specifically, the output results of the axial force, torque and ECD of the entire well section are compared with the constraints in the drilling to determine whether the constraints are met. The constraints in the drilling include whether the wellbore pressure is safe, whether the drilling rig can provide sufficient capacity, whether there is a risk of fracture failure of the drilling tool, and whether the displacement exceeds the rated value. Figure 4 As shown in the figure, the constraints for judging whether the constraint conditions (also called constraint factors) are met include: the ECD distribution is compared with the formation pore pressure and formation fracture pressure distribution at the same depth, the maximum axial force and torque of the wellhead drill bit are compared with the lifting capacity and torsional capacity provided by the drilling rig, the axial force and torque of each section of the drill bit are compared with the tensile and torsional limits of the corresponding drill bit, and the input displacement is compared with the rated displacement of the drilling pump.

[0106] Among them, the wellbore pressure safety means that ECD must be kept within the drilling fluid safety density window, that is, ρ 孔隙压力 ≤ECD≤ρ 破裂压力 , ρ 孔隙压力 is the equivalent density corresponding to the pore pressure, g / cm 3 ρ 破裂压力 is the equivalent density corresponding to the burst pressure, g / cm 3 .

[0107] Whether the drilling rig can provide sufficient capacity, that is, the drilling rig used for drilling must ensure sufficient lifting capacity and torsion. The lifting capacity and torsion capacity provided by the drilling rig must be greater than the maximum hook load D during each drilling operation. max and maximum wellhead torque T max .

[0108] D max ≤D 额

[0109] T max ≤T 额

[0110] D 额 is the rated lifting capacity, kN; T 额 is the rated torsional capacity, N·m.

[0111] Is there a risk of fracture failure of the drilling tool? That is, in order to ensure the smooth progress of each stage of the drilling operation, the tension σ on the drill string section must be guaranteed. axi Less than the tensile yield strength of the drill string Ensure that the drill string is not damaged; at the same time, when the drill string rotates, the torque σ on the drill string section cir Less than the torsional yield strength of the drill string Ensure that the drill string does not suffer from torsional damage. b is the safety factor, n n Similarly, σ b Tensile stress limit, σ n The torsional stress limit can be found in the drill tool manual. Allowable tensile stress, Allowable torsional stress.

[0112]

[0113]

[0114] Whether the displacement exceeds the rated value, that is, to ensure the maximum displacement Q max Less than the rated pump displacement Q 额 .

[0115] Q max ≤Q 额

[0116] Step 600: Optimize the drilling parameters according to the judgment result.

[0117] Specifically, according to the judgment results, the parameter optimization and improvement algorithm is used to quickly find the optimal ROP and Q. The main steps of the parameter optimization and improvement algorithm are as follows: Figure 5 As shown, including:

[0118] 1. Substitute the current ROP, Q and static parameters into the wellbore cleaning model, the friction torque model considering the influence of rock cuttings and the ECD model considering the influence of rock cuttings to obtain the output results of the model.

[0119] 2. Compare and analyze the output results with the drilling constraints. If any condition is found to be unsatisfied, reduce the ROP to 1 / 2 of the original value. If the constraint is met, increase the ROP to 2 times the original value.

[0120] 3. Repeat steps 1 and 2 until the constraint condition is satisfied after the ROP is reduced by 1 / 2 or repeat steps 1 and 2 until the constraint condition is not satisfied after the ROP is increased by 2 times.

[0121] 4. This unsatisfied parameter combination is recorded as the limit constraint parameter combination (recorded as g1), and the previous parameter combination that meets the conditions is recorded as the current constraint parameter combination (recorded as g2). Then take the average ROP value of the current constraint parameter combination (g2) and the limit constraint parameter combination (g1) as the median parameter combination (recorded as g), and perform step 1 again to obtain the model output result. If the constraint conditions are met, the current constraint parameter combination is updated to the median parameter combination (i.e. g2=g), otherwise the limit constraint parameter combination is updated to the median parameter combination (g1=g). Repeat this process until the difference between the limit constraint parameter combination and the current constraint parameter combination is less than the specific value set at the beginning, where the specific value is the ROP of the limit constraint parameter combination or the difference between the ROP of the current constraint parameter combination and the ROP of the median parameter combination is less than 0.01 times the ROP of the median parameter combination. Then the current median parameter combination (g) is the optimal ROP and Q.

[0122] 5. After the ROP is determined in steps 2, 3, and 4, if the result of substituting the current ROP and Q into the model satisfies the constraints, Q is not changed. Otherwise, Q is continuously increased until the constraints are satisfied. If Q increases to the rated pump displacement Q 额 , it is considered that the current ROP and Q do not meet the conditions. In the process of step 2, step 3 and step 4, these two parameters can be regarded as a parameter combination, that is, after ROP is determined, the corresponding maximum displacement Q is obtained through step 5.

[0123] This implementation can provide a drilling parameter optimization method based on the coupling of wellbore cleaning with friction torque and annulus pressure loss, which can effectively evaluate the downhole drilling safety status, provide effective drilling parameter optimization, and provide auxiliary decision-making for drilling safety construction.

[0124] Another embodiment of the present invention provides a drilling parameter optimization device capable of implementing the above method, such as Figure 7As shown, it includes: a determination module 10, a selection module 20, a calculation module 30, an input module 40, a judgment module 50 and an optimization module 60, and its working principle is as follows:

[0125] The determination module 10 determines the flow pattern of each well section according to the drilling parameters of the target well; the selection module 20 selects the corresponding cuttings migration model according to the flow pattern; the calculation module 30 calculates the cuttings concentration and the cuttings bed height according to the wellbore cleaning calculation formula corresponding to the cuttings migration model; the input module 40 inputs the cuttings concentration and the cuttings bed height into the friction torque model and the ECD model to obtain the output result; the judgment module 50 judges whether the constraint condition is met according to the output result; the optimization module 60 optimizes the drilling parameters according to the judgment result.

[0126] The specific technical details and technical effects of this embodiment can be found in the relevant content of the above method embodiment, which will not be repeated here.

[0127] In order to further verify the above technical effects of each embodiment of the present invention, the following experimental data are provided:

[0128] (1) Collect the drilling data required for the target well. Organize all relevant data contents. The collected data include static parameters (wellbore trajectory, wellbore structure, drilling tool assembly, drilling fluid rheological parameters) and construction parameters that need to be optimized (in this calculation example, the initial mechanical drilling speed is 10m / h and the initial displacement is 30L / s).

[0129] Table 1 Wellbore trajectory

[0130]

[0131]

[0132] Table 2 Wellbore structure

[0133]

[0134] Table 3 Drilling tool assembly

[0135]

[0136] Table 4 Rheological parameters of drilling fluid

[0137] Drilling sequence Four-open <![CDATA[Drilling fluid density g / cm 3 )]]> 2.00 Yield value (pa) 7 Plastic viscosity (mPa·s) 35

[0138] (2) First, the flow pattern is identified, and then the corresponding wellbore cleaning model is used according to the flow pattern to obtain the distribution results of the cuttings bed height and cuttings concentration in the entire well section.

[0139] Table 5 Distribution results of cuttings bed height and cuttings concentration in the whole well section

[0140] Well depth(m) Flow pattern Cuttings concentration (%) Cuttings bed height (mm) 30 Dispersed Cuttings Bed Flow 4.37 15 200 Dispersed Cuttings Bed Flow 4.37 15 230 Dispersed Cuttings Bed Flow 4.56 15 260 Dispersed Cuttings Bed Flow 4.76 16 290 Dispersed cuttings bed flow 4.97 16 303 Dispersed Cuttings Bed Flow 5.06 17 3908 Dispersed cuttings bed flow 5.06 17 3938 Dispersed Cuttings Bed Flow 4.51 14 3956 Dispersed Cuttings Bed Flow 4.51 14 3986 Dispersed Cuttings Bed Flow 5.05 15 4016 Dispersed cuttings bed flow 5.65 17 4046 Dispersed cuttings bed flow 6.33 18 4068 Dispersed Cuttings Bed Flow 6.88 19 4098 Dispersed cuttings bed flow 7.91 21 4128 Dispersed Cuttings Bed Flow 9.1 23 4158 Dispersed cuttings bed flow 10.48 26 4188 Dispersed Cuttings Bed Flow 12.07 29 4218 Deposited cuttings bed flow 13.92 32 4248 Deposited cuttings bed flow 16.07 35 4278 Deposited cuttings bed flow 18.57 40 4308 Fluctuating cuttings bed flow 19.36 41 4338 Fluctuating cuttings bed flow 19.67 42 4368 Fluctuating cuttings bed flow 19.79 42 4398 Fluctuating cuttings bed flow 19.73 42 4428 Fixed cuttings bed flow 19.51 42 4458 Fixed cuttings bed flow 19.12 41 4482 Fixed cuttings bed flow 18.69 40 6714 Fixed cuttings bed flow 18.69 40

[0141] (3) The distribution results of cuttings bed height and cuttings concentration are substituted into the friction torque and ECD calculation models respectively to obtain the output results of axial force, torque and ECD in the entire well section.

[0142] Table 6 Output results of axial force, torque and ECD in the whole well section

[0143]

[0144]

[0145]

[0146]

[0147]

[0148]

[0149] Table 7 Output results of axial force and torque in the whole well section

[0150]

[0151]

[0152]

[0153]

[0154]

[0155]

[0156] (4) Compare the output results of the axial force, torque and ECD of the entire well section with the constraints in drilling to determine whether the constraints are met. The constraints in drilling include whether the wellbore pressure is safe, whether the drilling rig can provide sufficient capacity, whether there is a risk of fracture failure of the drill bit, and whether the displacement exceeds the rated value. The constraints for judging whether the constraints are met include: comparing the ECD distribution with the formation pore pressure and formation fracture pressure distribution at the same depth, comparing the axial force and torque of each section of the drill bit with the tensile and torsional limits of the corresponding drill bit, comparing the maximum axial force and torque of the wellhead drill bit with the lifting capacity and torsional capacity that the drilling rig can provide, and comparing the input displacement with the rated displacement of the drilling pump. For example, in this example, the formation pore pressure equivalent density is 1.5g / cm 3 , the formation fracture pressure equivalent density is 2.2g / cm 3The tensile and torsional limits of the drilling tools are shown in Table 7 above. The lifting capacity and torsional capacity that the drilling rig can provide are determined by the model of the drilling rig on site. The rated displacement of the drilling pump is determined by the model of the drilling pump on site.

[0157] (5) The optimal ROP and Q are quickly found by combining the borehole cleaning model, the friction torque model considering rock cuttings, and the ECD model considering rock cuttings using the parameter optimization algorithm. Under the condition of mechanical drilling speed of 10m / h and displacement of 30L / s, the constraints are met and the mechanical drilling speed is increased to twice the original speed, that is, 20m / h. The borehole cleaning model, friction torque, and ECD model are combined again to calculate and find that the results do not meet the constraints. At this time, the constraint combination (g1) that meets the constraints and the combination (g2) that does not meet the constraints are determined. Then the average ROP value of g1 and g2 is taken, that is, 15m / h, and the above steps are repeated until the difference between the ROP of g1, g2 and the median parameter combination is less than 0.01 times the ROP of the median parameter combination, and the optimal ROP and Q are given. The final optimized ROP and Q using this algorithm are 14.5m / h and 36.32L / s.

[0158] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage and optical storage, etc.) containing computer-usable program code.

[0159] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems) and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the process in the flowchart. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0160] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0161] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0162] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A drilling parameter optimization method, characterized in that: include: Determine the flow pattern of each well section according to the drilling parameters of the target well; Selecting a corresponding cuttings transport model according to the flow pattern; Calculating the cuttings concentration and cuttings bed height according to the wellbore cleaning calculation formula corresponding to the cuttings transport model; Inputting the cuttings concentration and cuttings bed height into a friction torque model and an ECD model to obtain output results; Determining whether a constraint condition representing a drilling constraint is satisfied according to the output result; When the output result does not meet the constraint condition, the ROP in the drilling parameter is reduced to 1 / 2, and the steps of calculating, inputting and judging are repeated until the constraint condition is met, and the ROP and displacement at this time are recorded as the limit constraint parameter combination; When the output result satisfies the constraint condition, the ROP in the drilling parameter is doubled, and the steps of calculating, inputting and judging are repeated until the constraint condition is not satisfied, and the ROP and displacement at this time are recorded as the current constraint parameter combination; Obtaining a median parameter combination based on the limit constraint parameter combination and the current constraint parameter combination, and repeating the steps of calculating, inputting and judging; If the constraint condition is met, the current constraint parameter combination is updated to the median parameter combination, otherwise the limit constraint parameter combination is updated to the median parameter combination, and the steps of calculating, inputting and judging are repeated until a predetermined iteration condition is met, and the ROP and displacement in the median parameter combination at this time are used as the optimized drilling parameters.

2. The method according to claim 1, characterized in that Determining the flow pattern includes: The flow pattern of the well section where the well inclination angle is greater than the critical slip well inclination angle is determined as fixed cuttings bed flow; Determine the flow pattern of a well section where the well inclination angle is less than or equal to the critical sliding well inclination angle and greater than the critical value from the fluctuating cuttings bed flow to the accumulated cuttings flow as the fluctuating cuttings bed flow; Determine the flow pattern of the well section where the well inclination angle is less than or equal to the critical value from the fluctuating cuttings bed to the accumulated cuttings flow and greater than the critical value between the accumulated cuttings flow and the dispersed cuttings bed flow as the accumulated cuttings flow; The flow pattern of the well section where the well inclination angle is less than or equal to the critical value between the accumulated cuttings flow and the dispersed cuttings bed flow is determined as the dispersed cuttings bed flow.

3. The method according to claim 2, characterized in that Selecting the cuttings transport model includes: selecting a dispersion model for the dispersed cuttings bed flow; selecting a block model for the accumulated cuttings flow or the fluctuating cuttings bed flow; A three-layer model was selected for the fixed cuttings bed flow.

4. The method according to claim 3, characterized in that The wellbore cleaning calculation formula includes: wellbore cleaning calculation formulas corresponding to the dispersed model, the block model and the three-layer model respectively.

5. The method according to claim 1, characterized in that The ECD model is constructed based on the effect of cuttings bed height on flow channel dimensions, the effect of suspended cuttings on fluid density, and the effect of cuttings on friction coefficient.

6. The method according to claim 1, characterized in that The friction torque model is constructed based on the influence of cuttings on the friction coefficient and the influence of ECD on the pressure distribution state in the wellbore.

7. The method according to claim 6, characterized in that The influence of the rock cuttings on the friction coefficient includes: applying an additional force in the axial direction of the drill pipe when the drill is tripped; applying an additional force tangent to the curved surface of the drill pipe wall and in the opposite direction of the rotation direction when the drill pipe is rotated.

8. The method according to claim 1, characterized in that The output results include: axial force, torque and ECD, and the determination of whether the constraint is satisfied includes: Compare the distribution of ECD with the distribution of formation pore pressure and formation fracture pressure at the same depth; Compare the maximum axial force and torque on the wellhead drilling tool with the lifting and twisting capacity provided by the drilling rig; Compare the axial force and torque of the drilling tool in each well section with the tensile and torsional limits of the corresponding drilling tool; The displacement in the drilling parameters is compared with the rated displacement of the drilling pump.

9. The method according to claim 1, characterized in that: The iteration condition is: the difference between the extreme constraint parameter combination and the current constraint parameter combination is less than a predetermined specific value, which is the ROP of the extreme constraint parameter combination or the difference between the ROP of the current constraint parameter combination and the ROP of the median parameter combination is less than 0.01 times the ROP of the median parameter combination.

10. The method according to claim 1, characterized in that The drilling parameters include: ROP, displacement and static parameters.

11. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 10 is implemented.

12. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the method according to any one of claims 1 to 10 is implemented.

13. A drilling parameter optimization device, characterized in that: include: A determination module, used to determine the flow pattern of each well section according to the drilling parameters of the target well; A selection module, for selecting a corresponding cuttings transport model according to the flow pattern; A calculation module, used to calculate the cuttings concentration and the cuttings bed height according to the wellbore cleaning calculation formula corresponding to the cuttings transport model; An input module, used for inputting the cuttings concentration and cuttings bed height into a friction torque model and an ECD model to obtain an output result; A judgment module, used for judging whether a constraint condition representing a drilling constraint is satisfied according to the output result; An optimization module, used for optimizing the drilling parameters according to the judgment result; The optimization module, when the output result does not satisfy the constraint condition, reduces the ROP in the drilling parameter to 1 / 2, repeats the steps of calculating, inputting and judging, until the constraint condition is satisfied, and records the ROP and displacement at this time as the limit constraint parameter combination; When the output result satisfies the constraint condition, the ROP in the drilling parameter is doubled, and the steps of calculating, inputting and judging are repeated until the constraint condition is not satisfied, and the ROP and displacement at this time are recorded as the current constraint parameter combination; Obtaining a median parameter combination based on the limit constraint parameter combination and the current constraint parameter combination, and repeating the steps of calculating, inputting and judging; If the constraint condition is met, the current constraint parameter combination is updated to the median parameter combination, otherwise the limit constraint parameter combination is updated to the median parameter combination, and the steps of calculating, inputting and judging are repeated until a predetermined iteration condition is met, and the ROP and displacement in the median parameter combination at this time are used as the optimized drilling parameters.

Citation Information

Patent Citations

  • Managing equivalent circulating density during a wellbore operation

    AU2016406805A1

  • Method for determining borehole cleaning effect of special-shaped boreholes

    CN109812236A

  • A drilling fluid density determination method capable of meeting special-shaped borehole cleaning

    CN109815511A

  • Quantitative evaluation method for borehole cleanliness based on rock debris return condition

    CN114016999A

  • Oil and gas drilling shaft state monitoring method and device

    CN114352255A