Method, device and storage medium for confirming partial sequence relationship of front and rear trains
The trackside resource management system confirms the sorting and partial ordering of train operation tasks in real time, which solves the complexity of position confirmation and operational deadlock problems caused by communication failures in the train-to-train communication system, and achieves matching of resource allocation and plan and rapid recovery of operations. efficiency.
Patent Information
- Application Number
- CN202211503843.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-28
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-11-28
AI Technical Summary
In the train-to-train communication system of autonomous operation, communication failure causes the train to be unable to determine the position relationship before and after, resulting in chaotic operation tasks, mismatch between resource allocation and plan, low operation recovery efficiency, and may cause operational deadlock.
Confirm the sorting list and partial order relationship of train operation tasks in real time through the trackside resource management system to ensure that the sequence of train operation tasks matches the plan, and quickly confirm the train location in the event of a failure. A linked list communication link topology is used to reduce communication resource consumption. and scope of influence.
Effectively avoid resource allocation conflicts, reduce irrelevant train communications, improve system availability, shorten the scope of fault impact, and ensure train operation recovery efficiency.
Smart Images

Figure CN115946747B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a train signal control system, and in particular to a method, a device and a storage medium for confirming a partial sequence relationship between front and rear trains. Background Art
[0002] In a train-to-train communication system based on autonomous operation, once a communication failure causes all trains to lose communication, when the subsequent communication is restored, the system cannot determine the front and rear position relationship of the train, which in turn causes confusion in the subsequent operation tasks of the train. The process of train position confirmation is relatively cumbersome and complicated, which ultimately leads to a large impact of the failure and low efficiency of train operation recovery.
[0003] Therefore, how to avoid the concurrency of multiple train tasks, which may lead to the mismatch between the allocation of line resources and the actual operation plan or cause operational deadlock, becomes a technical problem that needs to be solved. Summary of the invention
[0004] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and to provide a method, device and storage medium for confirming the partial sequence relationship of front and rear trains.
[0005] The purpose of the present invention can be achieved by the following technical solutions:
[0006] According to the first aspect of the present invention, a method for confirming the partial sequence relationship of front and rear trains is provided. The method confirms the partial sequence relationship of the front and rear trains in real time in the trackside resource management system according to the sorting of the train running tasks and the train running direction, thereby realizing the verification with the sequence of the train running tasks and ensuring the matching of the train running tasks required by the operation plan; and in a fault scenario, the position relationship of the trains on the line can be confirmed in time.
[0007] As a preferred technical solution, the method specifically comprises the following steps:
[0008] Step S101, the trackside resource management system establishes a sorting list for each section in the line based on the operation task management;
[0009] Step S102, the trackside resource management system checks the partial sequence relationship between each train and the preceding and following trains;
[0010] Step S103, when the train resumes communication with the trackside resource management system, it is determined whether the current train has a partial sequence relationship with the adjacent train. If so, the trackside resource management system sends the identification numbers of the trains in front and behind to each train, and the train initiates the establishment of a communication connection with the preceding train; otherwise, step S104 is executed;
[0011] Step S104: If the current train has no partial sequence relationship with the adjacent trains, the line resources covered by the current train operation task are exclusively occupied by it.
[0012] As a preferred technical solution, the sorting list in step S101 is specifically:
[0013] According to the operation plan, the train dispatching and command system determines the time, path and sequence of each train's operation tasks. The trackside resource management system confirms the sections covered by all tasks on the line based on the trains, task time, path and sequence of the bicycle dispatching and command system, and creates or adds a sorted list of these sections for the current train.
[0014] As a preferred technical solution, step S101 specifically includes the following steps:
[0015] Step S1011, the train dispatching command system decides the running task sequence of each train based on the running plan;
[0016] Step S1012, the trackside resource management system and the train dispatching command system check the operation task sequence;
[0017] Step S1013, the trackside resource management system determines the train sequence list of the relevant section based on the verified operation task sequence;
[0018] Step S1014: the trackside resource management system determines the release status of train resources in real time based on the dynamic operation process of the train.
[0019] As a preferred technical solution, the step S1011 is specifically as follows:
[0020] The train dispatching and command system establishes a reasonable train operation task sequence based on the operation plan and assigns a unique operation task sequence number. When sending the train operation task to the trackside resource management system, all train operation task requests are sent in strict ascending order, and the next operation task can only be applied for after the previous request is met.
[0021] As a preferred technical solution, step S1012 is specifically as follows:
[0022] After the train dispatching and commanding system issues an operation task to a train, the trackside resource management system needs to feedback the sequence number of the operation task and the task receiving status to the train dispatching and commanding system when receiving the operation task application. Before receiving feedback from the trackside resource management system, the train dispatching and commanding system shall not issue operation tasks to subsequent trains;
[0023] The sequence of the operating tasks sent by the trackside resource management system and the train dispatching and command system is verified according to the serial numbers assigned to the operating tasks in the operation plan; after receiving an operating task for which no feedback is given by the resource management system, if it is inconsistent with the task information list sent previously, the train dispatching and command system continues to send the operating task for the current train.
[0024] As a preferred technical solution, step S1013 is specifically as follows:
[0025] The trackside resource management system receives the range and order of the train's resource application commands, requisitions line resources for the current train based on the current line resource status, determines the safe operation direction of the line resources, and establishes a sorting list in the corresponding section of the line resources or ranks them in order based on the "first come, first served" principle in the existing sorting list.
[0026] As a preferred technical solution, the step S1014 is specifically as follows:
[0027] After the train leaves a section, it initiates a section resource release command to the trackside resource management system, and the trackside resource management system deletes the current train from the section sorting list. If the sorting list of the current section is cleared, the resources of the current section are released.
[0028] As a preferred technical solution, step S102 is specifically as follows:
[0029] Based on the sorting list established in each section based on the running task sequence determined in step S101, and the running direction of the train, the partial order relationship between the trains is determined.
[0030] As a preferred technical solution, the partial order relationship determination principle between trains includes:
[0031] a) If there are multiple trains in the sorting list of the current occupied section and its running direction, and the train occupied by the current section is not in the position of the first train, the trackside resource management system determines the trains before and after the current train according to the sorting list order of the current section and running direction;
[0032] b) The train occupying the current section is in the first train position, and the current train is not in the first place in the sorting list of the nearest occupied section downstream of the section, and all the switch positions in the running path of the current train are connected to the downstream section, then the trackside resource management system determines the previous and next trains of the current train according to the sorting list order of the downstream section and the running direction;
[0033] c) Check the partial sequence relationship between the front and rear trains of each pair of trains.
[0034] As a preferred technical solution, the c) checking the partial sequence relationship of the front and rear trains of each pair of trains is specifically as follows:
[0035] If the received current train ID and the adjacent preceding train ID are consistent with the adjacent following train ID sent by the preceding train and the train ID in the sorting list of the two trains on the section, the trackside resource management system determines that the partial sequence relationship between the preceding and following trains of the current train is valid; if they are inconsistent, the trackside resource management system determines that there is no train in front or behind the current train that has a partial sequence relationship with it.
[0036] As a preferred technical solution, if the current train successfully establishes communication with the preceding train, the communication establishment status of the preceding train is immediately sent to the trackside resource management system.
[0037] As a preferred technical solution, the trackside resource management system receives the communication establishment status between the current train and the front and rear trains, and compares it with the front and rear train identification numbers of the current train sent previously. If they are consistent, the trackside resource management system terminates sending the partial sequence relationship of the front and rear trains of the train; otherwise, the trackside resource management system determines that the current train is running based on a quasi-moving block mode and continues to send its front sequence train identification number to the current train in real time. If the front train identification number received by the train from the trackside resource management system is inconsistent with the front train identification number of the currently established connection, the train actively initiates a connection interruption.
[0038] As a preferred technical solution, in the event of a failure, the train sends information to the trackside resource management system based on the linked list nodes of the front and rear trains and the current running direction. The trackside resource management system determines the relative position of the train in the section based on the partial sequence relationship of the trains.
[0039] According to a second aspect of the present invention, there is provided an electronic device, comprising a memory and a processor, wherein a computer program is stored in the memory, and the method described above is implemented when the processor executes the program.
[0040] According to a third aspect of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein the program implements the method described above when executed by a processor.
[0041] Compared with the prior art, the present invention has the following advantages:
[0042] 1) The present invention avoids conflicts between the resource allocation sequence and the operation plan. When trains compete for resources (such as in a fork operation scenario), conflicts with the operation plan are effectively avoided by sequencing the operation tasks.
[0043] 2) It can reduce the consumption of communication resources and avoid communication between unrelated trains to reduce the impact on train operations; each train can communicate with up to 4 adjacent trains in front and behind, without the need to communicate with other unrelated trains or broadcast communication methods, effectively reducing the consumption of communication resources on board and improving the availability of the system.
[0044] 3) Check adjacent trains, determine the relative position of trains, and quickly locate trains; the resource-based sorted list and the "linked list" communication link topology with trains as nodes in the vehicle can verify the position relationship of adjacent trains in real time. After the trackside resource management system is restarted, the train sequence within the jurisdiction can be determined based on the communication connection status given by the vehicle and the occupied section; realize efficient collaborative control between vehicles and between vehicles and ground, avoid the explosion of communication state space caused by the vehicle-to-vehicle communication mesh link topology, and reduce the communication resource load.
[0045] 4) Through the communication status of the front and rear trains, only the front and rear adjacent trains of the current train are affected, or based on the influence range of the line topology, the influence range of the line fault is shortened to prevent the impact of the fault from spreading to the entire line. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 Develop a flow chart for sorting rail transit operation tasks;
[0047] Figure 2 Flowchart for confirming the partial sequence relationship between the front and rear trains. DETAILED DESCRIPTION
[0048] The technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work should fall within the scope of protection of the present invention.
[0049] The present invention provides a method for confirming the partial sequence relationship of the positions of front and rear trains. According to the sequencing of train running tasks and the running direction of the trains, the partial sequence relationship of the running of front and rear trains is confirmed in real time on the trackside, thereby realizing verification with the sequence of train running tasks and ensuring the matching of train running tasks with the requirements of the running plan. More importantly, it ensures that in the above-mentioned fault scenario, the position relationship of the trains on the line can be confirmed in time, so as to facilitate the dispatching personnel to quickly resume operations.
[0050] In the vehicle-to-vehicle communication system based on autonomous operation, in order to avoid the mismatch between the allocation of line resources and the actual operation plan or operational deadlock caused by the concurrency of tasks of multiple trains, it is necessary to strictly confirm the order of operation tasks according to the train operation plan before allocating line resources and confirm in the trackside resource management system that the sorted list of resource allocation matches the operation plan.
[0051] like Figure 1 As shown, the method for confirming the partial sequence relationship of front and rear trains of the present invention specifically comprises the following steps:
[0052] Step S101, the trackside resource management system establishes a sorting list for each section in the line based on the operation task management. The train dispatching command system determines the time, path and order of executing the operation task for each train according to the formulated operation plan. The trackside resource management system determines the train to execute the task, the task time, path and order according to the task request from the bicycle dispatching command system, confirms the sections covered by all the operation tasks in the line, and establishes or adds the sorting list of these sections for the current train;
[0053] Step S102, the trackside resource management system checks the partial sequence relationship between each train and the trains before and after it. Based on the sorting list established in each section based on the determined train operation task sequence and the running direction of the train, the partial sequence relationship between the trains is determined.
[0054] Step S103, when the train resumes communication with the trackside resource management system, if it is determined that the current train has a partial sequence relationship with the adjacent train, the trackside resource management system sends the identification numbers of the preceding and following trains to each train, and the train initiates the establishment of a communication connection with the preceding train.
[0055] Step S104, if the trackside resource management system determines that the current train has no partial sequence relationship with the adjacent train, the line resources covered by the current train operation task are exclusive to the train, so there is no need to establish communication with other trains.
[0056] Step S105, if the vehicle-to-vehicle communication establishment status received by the trackside resource management system is consistent with the verification of the train identification numbers of the train before and after the trackside resource management system, the trackside resource management system stops sending the partial sequence relationship of the train before and after. Otherwise, the trackside resource management system determines that the current train is running based on the quasi-mobile block mode and continues to send its previous train identification number to the current train in real time. If the train receives the previous train identification number from the trackside resource management system and the previous train identification number of the current connection is inconsistent, the train will actively initiate the connection interruption.
[0057] Rail transit operation task sequencing process, such as Figure 2 As shown, specifically including:
[0058] 1. The train dispatching and commanding system decides the running task sequence of each train based on the running plan. The train dispatching and commanding system establishes a reasonable train running task sequence based on the running plan and assigns a unique running task sequence number. When sending the train running task to the trackside resource management system, all train running task requests are strictly sent in ascending order, and the next running task can only be applied after the previous request is satisfied.
[0059] 2. The trackside resource management system and the train dispatching and command system verify the order of operating tasks. After the train dispatching and command system issues an operating task to a train, the resource management system needs to feedback the serial number of the operating task and the task reception status to the train dispatching and command system when receiving the operating task application. Before receiving feedback from the resource management system, the train dispatching and command system shall not issue operating tasks to subsequent trains. Verify the order of operating tasks sent by the resource management system and the train dispatching and command system according to the serial numbers assigned to the operating tasks in the operation plan. After receiving an operating task for which no feedback is given by the resource management system, if it is inconsistent with the task information list sent previously, the train dispatching and command system continues to send the operating task to the current train;
[0060] 3. Once the train dispatching command system confirms to the trackside resource management system that the operation task information has been verified, the trackside resource management system determines the train sequence list for each section on the line based on the verified task sequence. The resource management system receives the range and sequence of the train's resource application command, and based on the current line resource status, it requisitions line resources for the current train, determines the safe operation direction of the line resources, and establishes a sequence list in the corresponding section of the line resources or ranks them in order based on the "first come, first served" principle in the existing sequence list;
[0061] 4. The resource management system determines in real time based on the information of resource release received from the train to delete the current train from the sorting list of the current section. If the sorting list of the current section is cleared, the resources of the current section are released.
[0062] The above is an introduction to a method embodiment. The following further illustrates the solution of the present invention through an electronic device and a storage medium embodiment.
[0063] The electronic device of the present invention includes a central processing unit (CPU), which can perform various appropriate actions and processes according to computer program instructions stored in a read-only memory (ROM) or loaded from a storage unit into a random access memory (RAM). In the RAM, various programs and data required for device operation can also be stored. The CPU, ROM and RAM are connected to each other via a bus. An input / output (I / O) interface is also connected to the bus.
[0064] Multiple components in the device are connected to the I / O interface, including: input units, such as keyboards, mice, etc.; output units, such as various types of displays, speakers, etc.; storage units, such as disks, optical disks, etc.; and communication units, such as network cards, modems, wireless communication transceivers, etc. The communication unit allows the device to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunication networks.
[0065] The processing unit performs the various methods and processes described above, such as methods S101 to S105. For example, in some embodiments, methods S101 to S105 may be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit. In some embodiments, part or all of the computer program may be loaded and / or installed on the device via a ROM and / or a communication unit. When the computer program is loaded into the RAM and executed by the CPU, one or more steps of methods S101 to S105 described above may be performed. Alternatively, in other embodiments, the CPU may be configured to execute methods S101 to S105 in any other appropriate manner (e.g., by means of firmware).
[0066] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.
[0067] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.
[0068] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0069] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A method for confirming the partial sequence relationship of front and rear trains, characterized in that: According to the sequence of train operation tasks and the train operation direction, the method confirms the partial sequence relationship of the front and rear train operations in real time in the trackside resource management system, thereby realizing the verification of the sequence of train operation tasks and ensuring the matching of train operation tasks with the operation plan requirements; The method specifically comprises the following steps: Step S101, the trackside resource management system establishes a sorting list for each section in the management line based on the operation task; Step S102, the trackside resource management system checks the partial sequence relationship between each train and the preceding and following trains; Step S103, when the train resumes communication with the trackside resource management system, it is determined whether the current train has a partial sequence relationship with the adjacent train. If so, the trackside resource management system sends the identification numbers of the trains in front and behind to each train, and the train initiates the establishment of a communication connection with the preceding train; otherwise, step S104 is executed; Step S104: If the current train has no partial order relationship with the adjacent trains, the line resources covered by the current train operation task are exclusively occupied by the current train; The sorting list in step S101 is specifically: According to the operation plan, the train dispatching and commanding system determines the time, path and order of each train to perform the operation task. The trackside resource management system confirms the sections covered by all tasks in the line according to the trains, task time, path and order of the bicycle dispatching and commanding system to perform the task, and establishes or adds a sorting list of these sections for the current train; The step S101 specifically includes the following steps: Step S1011, the train dispatching command system decides the running task sequence of each train based on the running plan; Step S1012, the trackside resource management system and the train dispatching command system check the operation task sequence; Step S1013, the trackside resource management system determines the train sequence list of the relevant section based on the verified operation task sequence; Step S1014, the trackside resource management system determines the release status of train resources in real time based on the dynamic operation process of the train; The step S1011 is specifically as follows: The train dispatching command system establishes a reasonable train operation task sequence based on the operation plan and assigns a unique operation task sequence number. When sending the train operation task to the trackside resource management system, all train operation task requests are sent in strict ascending order, and the next operation task can only be applied after the previous request is satisfied. The step S1013 is specifically as follows: The trackside resource management system receives the range and order of the resource application command from the train, requisitions the line resources for the current train based on the current line resource status, determines the safe operation direction of the line resources, and establishes a sorting list in the corresponding section of the line resources or ranks them in order based on the "first come, first served" principle in the existing sorting list; The step S102 is specifically as follows: Determine the partial order relationship between trains based on the sorted list established in each section based on the running task sequence determined in step S101 and the running direction of the trains; The partial order relationship determination principles between trains include: a) If there are multiple trains in the sorted list of the current occupied section and its running direction, and the train occupied by the current section is not in the first train position, the trackside resource management system determines the previous and next trains of the current train according to the sorted list order of the current section and running direction; b) The train occupying the current section is in the first train position, and the current train is not in the first place in the sorting list of the nearest occupied section downstream of the section, and all the switch positions in the running path of the current train are connected to the downstream section, then the trackside resource management system determines the previous and next trains of the current train according to the sorting list order of the downstream section and the running direction; c) Check the partial sequence relationship between the front and rear trains of each pair of trains.
2. A method for confirming the partial sequence relationship of front and rear trains according to claim 1, characterized in that: The step S1012 is specifically as follows: After the train dispatching and commanding system issues an operation task to a train, the trackside resource management system needs to feedback the sequence number of the operation task and the task receiving status to the train dispatching and commanding system when receiving the operation task application. Before receiving feedback from the trackside resource management system, the train dispatching and commanding system shall not issue operation tasks to subsequent trains; The sequence of the operating tasks sent by the trackside resource management system and the train dispatching and command system is verified according to the serial numbers assigned to the operating tasks in the operation plan; after receiving an operating task for which the trackside resource management system has not given feedback, if it is inconsistent with the task information list sent previously, the train dispatching and command system continues to send the operating task for the current train.
3. The method for confirming the partial sequence relationship of front and rear trains according to claim 1, characterized in that: The step S1014 is specifically as follows: After the train leaves a section, it sends a command to release the section resources to the trackside resource management system, and the trackside resource management system deletes the current train from the sorted list of the section. If the sorted list of the current section is empty, the resources of the current section are released.
4. The method for confirming the partial sequence relationship of front and rear trains according to claim 1, characterized in that: If the current train successfully establishes communication with the preceding train, the communication establishment status of the preceding train will be immediately sent to the trackside resource management system.
5. The method for confirming the partial sequence relationship of front and rear trains according to claim 1, characterized in that: The trackside resource management system receives the communication establishment status between the current train and the front and rear trains, and compares it with the front and rear train identification numbers of the current train sent previously. If they are consistent, the trackside resource management system stops sending the partial sequence relationship of the front and rear trains of the train; otherwise, the trackside resource management system determines that the current train is running based on the quasi-moving block mode and continues to send its front sequence train identification number to the current train in real time. If the front train identification number received by the train from the trackside resource management system is inconsistent with the front train identification number of the currently established connection, the train actively initiates the connection interruption.
6. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory, wherein: When the processor executes the program, the method according to any one of claims 1 to 5 is implemented.
7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.
Citation Information
Patent Citations
A train movement authorization method based on vehicle-vehicle cooperation
CN109080667A
Method for side impact protection of train and train control system
CN113479241A
