By introducing vertical shafts, purifying water pipes and gate mechanisms into the permeable paving system, the existing permeable paving lacks water seepage function when there is a lot of rainwater, and the rapid water seepage and drainage effect under different rainfall conditions is achieved, ensuring that Normal function of permeable paving.
Patent Information
- Application Number
- CN202211688692.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-12-27
AI Technical Summary
The existing permeable pavement cannot seep or drain quickly when there is a lot of rain, and the water seepage function becomes weak.
A permeable paving system for sponge cities is designed, including vertical shafts, surface layers, base layers, cushion layers and aquifers in rectangular pits. A transversely extending water permeable purified water pipes are provided in the aquifer, and the upper end of the vertical shaft is equipped with There is a cover plate and a sewage-intercepting hanging basket. The connecting pipe is equipped with a gate mechanism and a water guide structure. The rainwater overflow pipe is connected to the municipal pipeline network. The gate mechanism adjusts the alignment of the water hole through the rotating shaft and the limit stop. , control the water flow rate; the purified water pipe is equipped with staggered water permeability ports and wire brushes, and the chain drives the lower sprocket to remove garbage to ensure water permeability; the inner wall of the vertical shaft is equipped with an upper sprocket height adjustment groove, and the chain protection plate prevents garbage accumulation.
When there is too much rain, it will quickly discharge excess rainwater, and when there is too little rainwater, it will slowly release or stop release, ensuring that the permeable paving always maintains good water seepage, purification and drainage functions, and improves the water seepage performance and service life of the permeable paving.
Smart Images

Figure CN115948955B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of permeable pavement, and in particular to a permeable pavement system for a sponge city. Background Art
[0002] Permeable pavement is an important measure for rainwater collection and infiltration in the sponge city construction technology system. By adopting a large-pore structure layer or drainage and infiltration facilities, rainwater can infiltrate on-site through the pavement structure, thereby eliminating surface runoff and restoring rainwater to the underground. It is suitable for squares, parking lots, sidewalks, and roads with light traffic and load.
[0003] However, the existing permeable pavement can play a normal slow-release and purification role when there is little rain. When there is heavy rain, the water seepage function of the permeable pavement becomes weaker, and the permeable pavement cannot seep water quickly and drain water insufficiently. Summary of the invention
[0004] The purpose of the invention is to solve the problem that the permeable pavement in the prior art cannot quickly infiltrate and drain water when there is a lot of rain, and to provide a permeable pavement system for sponge cities.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A permeable pavement system for a sponge city, comprising a vertical shaft arranged at the center of a rectangular pit, a surface layer, a base layer, a cushion layer and a water storage layer arranged in sequence from top to bottom in the pit; a water storage layer is provided with a transversely extending water-permeable purified water pipe; a cover plate is provided at the upper end of the vertical shaft, a plurality of water inlet holes are provided on the cover plate, a sewage interception hanging basket corresponding to the cover plate is provided at the upper part of the vertical shaft, and a rainwater overflow pipe is provided in the vertical shaft; the left part of the purified water pipe extends into the vertical shaft, and a connecting pipe with a rectangular cross section is provided on the rainwater overflow pipe;
[0007] A gate mechanism and a water-guiding structure are provided on the connecting pipe, and the gate mechanism is located on the left side of the water-guiding structure; the gate mechanism comprises a gate housing provided on the connecting pipe, and a gate provided in the gate housing; the upper part of the gate is rotatably connected to the gate housing through a rotating shaft, a V-shaped notch is provided on the upper edge of the gate, and a water-passing hole with the same cross-sectional size as the connecting pipe is provided on the lower part of the gate; a first limit stopper and a second limit stopper are provided on the inner side wall of the gate housing, and a first gear rod and a second gear rod are provided on the edge of the gate; a reset spring is provided between the first limit stopper and the first gear rod, and when the second limit stopper contacts the second gear rod, the water-passing hole and the tube hole of the connecting pipe are aligned; the water-guiding structure is in a U-shape opening downward, the left end of the water-guiding structure is connected to the upper part of the gate housing, and the right end of the water-guiding structure is connected to the connecting pipe.
[0008] When there is a lot of rain, a large amount of water passes through the surface layer, base layer, cushion layer and aquifer and enters the purified water pipe and the water guide structure. The water flow impacts the V-shaped notch, and the gate overcomes the elastic force of the return spring and rotates clockwise. When the second limit block contacts the second gear lever, the water hole and the pipe hole of the connecting pipe are aligned. At this time, the water flow through the connecting pipe is the largest, and the water is quickly discharged into the rainwater overflow pipe and the municipal pipe network.
[0009] When there is less rain, the amount of water that passes through the surface layer, base layer, cushion layer and water storage layer into the purified water pipe and the water guide structure is small, the water holes and the pipe holes of the connecting pipe are not aligned, and the water flows from the gap between the water holes and the pipe holes of the connecting pipe to the rainwater overflow pipe, and the water flows slowly.
[0010] Preferably, the purified water pipe comprises an outer pipe and an inner pipe arranged in the outer pipe, a gap is provided between the inner pipe and the outer pipe, a plurality of staggered water permeable openings are provided on the peripheral walls of the inner pipe and the outer pipe, and staggered steel wire brushes are provided on the outer peripheral wall of the inner pipe; the left end of the outer pipe is fixedly connected to the right side wall of the lower part of the shaft through an outer flange, and the left end of the inner pipe is provided with an inner flange;
[0011] A lower sprocket is provided on the inner flange, and the inner flange is rotatably and sealingly connected to the right end of the connecting pipe and the outer flange respectively;
[0012] An upper sprocket wheel corresponding to the lower sprocket wheel is arranged on the upper part of the inner wall of the shaft. The upper sprocket wheel and the lower sprocket wheel are connected by a chain. The upper sprocket wheel is located in the shaft above the sewage interception hanging basket.
[0013] The arrangement of each wire brush enables the garbage in the gap between the inner tube and the outer tube to be brushed off and flow out when the lower sprocket drives the inner tube to rotate. At the same time, the water holes of the inner tube and the outer tube can be unblocked, ensuring that the purified water pipe has good water permeability and water transport functions.
[0014] Before the arrival of the rainy season, the staff used tools to continuously pull the chain, so that the chain drove the lower sprocket and the purified water pipe to rotate together. The rotating purified water pipe removed the garbage blocked on it, ensuring that the purified water pipe has good water permeability, thereby improving the water permeability of the purified water pipe and the performance of transporting rainwater, and improving the water seepage function of the permeable pavement, so that the permeable pavement still maintains good water seepage, purification and drainage functions. When the rainfall is heavy, the water in the permeable pavement can also be quickly discharged.
[0015] Preferably, an upper sprocket height adjustment groove is provided on the inner wall of the vertical shaft; the upper sprocket height adjustment groove includes a vertical slide groove and an arc-shaped slide groove connected to the upper end of the vertical slide groove; the arc-shaped slide groove is provided with a semicircular limiting groove arched downward; one end of the transverse support rod is slidably connected to the upper sprocket height adjustment groove through a slider, and the other end of the transverse support rod is connected to the rotating shaft of the upper sprocket.
[0016] The height adjustment grooves of each upper sprocket are set so that when each transverse support rod is connected to the lower section of the vertical slide groove, the chain can be loosened from the lower sprocket; when each transverse support rod is connected to the semicircular limit groove, the chain can be clamped to the lower sprocket, thereby reducing the fatigue of the chain and increasing the service life of the chain.
[0017] A detachable chain protection plate is provided on the upper part of the shaft wall. The chain protection plate includes a horizontal plate located above the upper sprocket and an arc-shaped side plate connected to the horizontal plate. The arc-shaped side plate is located on the left side of the chain.
[0018] Before the staff uses tools to pull the chain continuously, they first remove the chain protection plate, and then pull the chain. The setting of the chain protection plate can prevent a lot of garbage from accumulating on the chain.
[0019] Preferably, an annular groove is provided on the right end surface of the connecting pipe, a convex ring is provided on the left end surface of the inner flange, the convex ring extends into the annular groove, and a sealing ring is provided between the convex ring and the annular groove.
[0020] The arrangement of the convex ring, the annular groove and the sealing ring enables a good dynamic seal to be formed between the connecting pipe and the inner pipe.
[0021] A convex ring and an annular groove are arranged on the opposite sides of the inner flange and the outer flange. The convex ring extends into the annular groove, and a sealing ring is arranged between the convex ring and the annular groove.
[0022] Corresponding convex rings and annular grooves are arranged on the opposite sides of the inner flange and the outer flange, and a sealing ring is arranged between the convex ring and the annular groove.
[0023] The height of the upper surface of the base is lower than the height of the upper surface of the cover plate, and the bottom of the vertical shaft is connected to the rainwater overflow pipe. Rainwater exceeding the upper surface of the base enters the vertical shaft, and then flows from the vertical shaft to the rainwater overflow pipe.
[0024] Therefore, the present invention has the following beneficial effects:
[0025] When there is a lot of rain, the excess rainwater can be discharged in time. When there is little rain, the rainwater can be released slowly or stopped, so that the permeable pavement always maintains normal water infiltration, purification and drainage functions. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a cross-sectional view of the vertical shaft and the purified water pipe of the present invention;
[0027] Figure 2 It is a schematic diagram of the gate plate and the tube hole of the connecting pipe of the present invention;
[0028] Figure 3 is a top view of the shaft and pit of the present invention;
[0029] Figure 4 is a cross-sectional view of the present invention;
[0030] Figure 5 It is a structural schematic diagram of the upper chain wheel height adjustment groove of the present invention. DETAILED DESCRIPTION
[0031] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0032] like Figure 1-Figure 5 The embodiment shown comprises a vertical shaft 2 arranged at the center of a rectangular pit 1, a surface layer 10, a base layer 20, a cushion layer 30, an aquifer 40 and a rammed soil layer 50 arranged in the pit from top to bottom; a water-permeable purified water pipe 41 extending transversely is provided in the aquifer; a cover plate 11 is provided at the upper end of the vertical shaft, a plurality of water inlet holes are provided on the cover plate, a sewage interception hanging basket 12 corresponding to the cover plate is provided at the upper part of the vertical shaft, and a rainwater overflow pipe 15 is provided in the vertical shaft; the left part of the purified water pipe extends into the vertical shaft, and a connecting pipe 151 with a rectangular cross section is provided on the rainwater overflow pipe;
[0033] A gate mechanism 7 and a water-guiding structure 90 are provided on the connecting pipe, and the gate mechanism is located on the left side of the water-guiding structure; the gate mechanism includes a gate housing 71 provided on the connecting pipe, and a gate 72 provided in the gate housing; the upper part of the gate is rotatably connected to the gate housing through a rotating shaft 70, a V-shaped notch 73 is provided on the upper edge of the gate, and a water-passing hole 74 with the same cross-sectional size as the connecting pipe is provided on the lower part of the gate; a first limit stopper 711 and a second limit stopper 712 are provided on the inner side wall of the gate housing, and a first gear rod 721 and a second gear rod 722 are provided on the edge of the gate; a return spring 723 is provided between the first limit stopper and the first gear rod, and when the second limit stopper contacts the second gear rod, the water-passing hole and the tube hole of the connecting pipe are aligned; the water-guiding structure is in a U-shape opening downward, the left end of the water-guiding structure is connected to the upper part of the gate housing, and the right end of the water-guiding structure is connected to the connecting pipe.
[0034] The purified water pipe includes an outer pipe 411 and an inner pipe 412 arranged in the outer pipe, a gap is provided between the inner pipe and the outer pipe, a plurality of staggered water permeable openings 413 are provided on the peripheral walls of the inner pipe and the outer pipe, and staggered steel wire brushes 414 are provided on the outer peripheral wall of the inner pipe; the left end of the outer pipe is fixedly connected to the right side wall of the lower part of the shaft through an outer flange 4111, and the left end of the inner pipe is provided with an inner flange 4121;
[0035] The inner flange is provided with a lower sprocket 5, and the inner flange is rotatably and sealingly connected to the right end of the connecting pipe and the outer flange respectively;
[0036] An upper sprocket 51 corresponding to the lower sprocket is provided on the upper part of the inner wall of the shaft. The upper sprocket and the lower sprocket are connected by a chain 52. The upper sprocket is located in the shaft above the sewage interception hanging basket.
[0037] An upper sprocket height adjustment groove 8 is provided on the inner wall of the shaft; the upper sprocket height adjustment groove includes a vertical slide groove 81 and an arcuate slide groove 82 connected to the upper end of the vertical slide groove; a semicircular limiting groove 83 arched downward in an arc shape is provided on the arcuate slide groove; one end of a transverse support rod 84 is slidably connected to the upper sprocket height adjustment groove through a slider, and the other end of the transverse support rod is connected to the rotating shaft of the upper sprocket.
[0038] A detachable chain protection plate 9 is provided on the upper part of the shaft wall. The chain protection plate includes a horizontal plate 91 located above the upper sprocket and an arc-shaped side plate 92 connected to the horizontal plate. The arc-shaped side plate is located on the left side of the chain.
[0039] An annular groove is arranged on the right end surface of the connecting pipe, a convex ring is arranged on the left end surface of the inner flange, the convex ring extends into the annular groove, and a sealing ring is arranged between the convex ring and the annular groove.
[0040] The height of the upper surface of the base layer is lower than the height of the upper surface of the cover plate, and the bottom of the shaft is connected with the rainwater overflow pipe.
[0041] The working process of the present invention is as follows:
[0042] When the rainfall is small, the rainfall runoff converges to the surface layer through the ground, and then infiltrates into the cushion layer and aquifer through the base layer. The rainwater is slowly released and purified layer by layer, and the purified rainwater flows into the rainwater overflow pipe and the municipal pipe network through the purified water pipe;
[0043] Before the arrival of the rainy season, the staff loosens the three horizontal support rods from the lower ends of the vertical slide grooves of the three upper sprocket height adjustment grooves, moves the three horizontal support rods to contact the three semicircular limit grooves of the three upper sprocket height adjustment grooves, and fixes the three horizontal support rods to the three semicircular limit grooves, so that the chains are clamped to the upper sprocket and the lower sprocket respectively;
[0044] The staff first uses tools to continuously pull the chain, so that the chain drives the lower sprocket and the purified water pipe to rotate together. The rotating purified water pipe removes the garbage blocking it, ensuring that the purified water pipe has good water permeability, thereby improving the water permeability of the purified water pipe and the performance of transporting rainwater, and improving the water seepage function of the permeable pavement, so that the permeable pavement can still maintain good water seepage, purification and drainage functions when there is more precipitation. The water in the permeable pavement can be quickly discharged into the rainwater overflow pipe; at the same time, the water in the vertical shaft also enters the rainwater overflow pipe for discharge.
[0045] In addition, when it is found that the water seepage function of the permeable pavement has deteriorated, the staff can pull the chain at any time to adjust the water seepage function of the permeable pavement so that the permeable pavement maintains good water seepage, purification and drainage functions.
[0046] When there is a lot of rain, a large amount of water passes through the surface layer, base layer, cushion layer and aquifer and enters the purified water pipe and the water guide structure. The water flow impacts the V-shaped notch, and the gate overcomes the elastic force of the return spring and rotates clockwise. When the second limit block contacts the second gear lever, the water hole and the pipe hole of the connecting pipe are aligned. At this time, the water flow through the connecting pipe is the largest, and the water is quickly discharged into the rainwater overflow pipe and the municipal pipe network.
[0047] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A permeable paving system for a sponge city, characterized in that: The invention comprises a vertical shaft (2) arranged at the center of a rectangular pit (1), a surface layer (10), a base layer (20), a cushion layer (30) and an aquifer (40) arranged in order from top to bottom in the pit; a water-permeable purified water pipe (41) extending transversely is provided in the aquifer; a cover plate (11) is provided at the upper end of the vertical shaft, a plurality of water inlet holes are provided on the cover plate, a sewage interception hanging basket (12) corresponding to the cover plate is provided at the upper part of the vertical shaft, and a rainwater overflow pipe (15) is provided in the vertical shaft; the left part of the purified water pipe extends into the vertical shaft, and a cross-sectional water pipe (41) is provided on the rainwater overflow pipe A connecting pipe (151) having a rectangular surface; a gate mechanism (7) and a water guide structure (90) are provided on the connecting pipe, the gate mechanism being located on the left side of the water guide structure; the gate mechanism comprises a gate housing (71) provided on the connecting pipe, and a gate (72) provided in the gate housing; the upper portion of the gate is rotatably connected to the gate housing via a rotating shaft, the upper edge of the gate is provided with a V-shaped notch (73), and the lower portion of the gate is provided with a water passage hole (74) having the same size as the cross-sectional area of the connecting pipe; a first limit stopper (711) and a second limit stopper (722) are provided on the inner side wall of the gate housing 712), a first stopper (721) and a second stopper (722) are provided on the edge of the gate; a return spring (723) is provided between the first limit stopper and the first stopper, and when the second limit stopper contacts the second stopper, the water hole and the tube hole of the connecting pipe are aligned; the water guide structure is in a downwardly open U-shape, the left end of the water guide structure is connected to the upper part of the gate housing, and the right end of the water guide structure is connected to the connecting pipe; the purified water pipe comprises an outer pipe (411) and an inner pipe (412) provided in the outer pipe, a gap is provided between the inner pipe and the outer pipe, and the peripheral walls of the inner pipe and the outer pipe are A plurality of staggered water permeable openings (413) are provided, and staggered steel wire brushes (414) are provided on the outer peripheral wall of the inner tube; the left end of the outer tube is fixedly connected to the right side wall of the lower part of the shaft through an outer flange (4111), and the left end of the inner tube is provided with an inner flange (4121); a lower sprocket is provided on the inner flange, and the inner flange is rotatably and sealingly connected to the right end of the connecting pipe and the outer flange respectively; an upper sprocket (51) corresponding to the lower sprocket is provided on the upper part of the inner side wall of the shaft, and the upper sprocket and the lower sprocket are connected by a chain (52), and the upper sprocket is located in the shaft above the sewage interception hanging basket.
2. The permeable pavement system of the sponge city according to claim 1 is characterized in that: An upper sprocket height adjustment groove (8) is provided on the inner side wall of the shaft; the upper sprocket height adjustment groove comprises a vertical slide groove (81) and an arcuate slide groove (82) connected to the upper end of the vertical slide groove; a semicircular limit groove (83) arched downward in an arc shape is provided on the arcuate slide groove; one end of a transverse support rod (84) is slidably connected to the upper sprocket height adjustment groove via a slider, and the other end of the transverse support rod is connected to the rotating shaft of the upper sprocket.
3. The permeable pavement system of sponge city according to claim 1 is characterized in that: A detachable chain protection plate (9) is provided on the upper part of the shaft wall, the chain protection plate comprising a horizontal plate (91) located above the upper sprocket and an arc-shaped side plate (92) connected to the horizontal plate, the arc-shaped side plate being located on the left side of the chain.
4. The permeable pavement system of the sponge city according to claim 1, 2 or 3, characterized in that: An annular groove is arranged on the right end surface of the connecting pipe, a convex ring is arranged on the left end surface of the inner flange, the convex ring extends into the annular groove, and a sealing ring is arranged between the convex ring and the annular groove.
5. The permeable pavement system of the sponge city according to claim 1, 2 or 3, characterized in that: The height of the upper surface of the base layer is lower than the height of the upper surface of the cover plate, and the bottom of the shaft is connected with the rainwater overflow pipe.