Emergency control method and device for cascading failures considering multidimensional transient safety
By constructing a dynamic model and a multidimensional transient safety constraint model of the power system, and optimizing the selection of the optimal action, the problem that the emergency control of the power system in the prior art does not consider transient safety is solved, and efficient emergency control of the power system under cascading failures is realized.
Patent Information
- Application Number
- CN202211643411.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-20
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2042-12-20
AI Technical Summary
Existing emergency control strategies fail to effectively consider transient safety in power systems, which may lead to severe transient safety problems when implementing emergency control measures. Furthermore, existing technologies struggle to effectively address the complexity of solving multidimensional transient safety analysis models for cascading power system faults.
By constructing a dynamic model of the power system, obtaining electrical parameters and anticipated propagation paths, establishing a constraint model that considers multidimensional transient safety, generating state space and action space, calculating the system cost of state-action combinations, and optimizing the selection of the optimal action to achieve emergency control.
It achieves the simultaneous guarantee of transient and steady-state safety during emergency control of cascading faults in the power system, and provides efficient and accurate emergency control results.
Smart Images

Figure CN115986770B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power system dispatch automation technology, and in particular to an emergency control method and device for cascading faults that takes into account multi-dimensional transient safety. Background Technology
[0002] In power systems, cascading failures are typically triggered by a simple fault, leading to the shutdown of a series of components due to power flow shifts, system instability, and other reasons, potentially resulting in large-scale blackouts. In recent years, with the increasing grid-connected capacity of renewable energy in power systems, the system's stability margin has gradually become insufficient, increasing the risk of cascading failures. Therefore, during system operation, it is necessary to consider the system's operational safety requirements at each stage of anticipated high-risk cascading failure paths, formulate emergency control strategies for cascading failures, and implement control measures such as generator tripping and load shedding to reduce accident risks.
[0003] Most current emergency control strategies focus on overload-dominated cascading faults, primarily considering how system power flow shifts lead to line power flow overload, thereby altering the probability of line outages and causing line fault evolution mechanisms. The goal is to ensure system voltage and line power flow safety after implementing emergency control measures. However, overload-dominated cascading faults only consider steady-state safety while neglecting transient safety, potentially leading to severe transient safety problems during emergency control implementation. Since power system transient analysis models are essentially represented by complex high-dimensional differential-algebraic equations, which are difficult to solve, research on emergency control of power system cascading faults that considers transient safety is still rare. Summary of the Invention
[0004] This invention provides an emergency control method and apparatus for power cascading faults that takes into account multidimensional transient safety, in order to solve the problem of complex solution of power system transient analysis models in the prior art.
[0005] In a first aspect, embodiments of the present invention provide an emergency control method for cascading failures that takes into account multidimensional transient safety, including:
[0006] Obtain the electrical parameters of each component in the power system and the expected propagation path when a cascading fault occurs in the power system;
[0007] A dynamic model of the power system is constructed, and a safety simulation of the power system is performed.
[0008] Construct a constraint model that takes into account multidimensional transient safety;
[0009] Based on the electrical parameters and the anticipated propagation path, the state space of the power system is generated according to the dynamic model.
[0010] The action space of the power system is generated based on the constraint model;
[0011] Based on the state space and the action space, a state-action combination is constructed, and the system cost corresponding to the state-action combination is calculated and compared to obtain the emergency control result of the cascading faults of the power system.
[0012] As an embodiment of this application, the construction of the dynamic model of the power system and the performance of security simulation of the power system include:
[0013] Establish a simulation model of the motion equations of the generator rotor in the power system:
[0014]
[0015] Among them, M i ω represents the inertial time constant. i D represents the angular velocity of the rotor of the i-th generator. i P represents the damping coefficient. m P represents the mechanical power of the generator. m,i Then P represents the mechanical power of the i-th generator. g P represents the electromagnetic power of the generator. g,i Then r represents the electromagnetic power of the i-th generator. G Indicates the total number of generators;
[0016] Establish a simulation model of the power angle equations for the generators in the power system:
[0017]
[0018] Where, δ i f0 represents the power angle of the i-th generator and f0 represents the rated frequency of the system.
[0019] Establish a simulation model of the excitation winding equations of the generator in the power system:
[0020]
[0021] Among them, E q ′ ,i Let X represent the transient electromotive force of the i-th generator. d,i T represents the d-axis reactance of the i-th generator. d ′ 0,i X represents the d-axis transient time constant of the i-th generator. d ′ ,i V represents the d-axis transient reactance of the i-th generator. i E represents the voltage at the node corresponding to the i-th generator. fd,i This represents the magnetomotive force of the i-th generator;
[0022] Establish a simulation model of the governor-prime mover equations for the generator in the power system:
[0023]
[0024] Where, μ Gi Let F represent the regulation coefficient of the i-th generator, s represent the Laplace operator, and F represent the regulation coefficient of the ith generator. HPi T represents the equivalent high-pressure cylinder power coefficient of the i-th generator. Ri Let f represent the reheat time constant of the i-th generator. i This represents the frequency of the node corresponding to the i-th generator;
[0025] Based on the simulation models of the generator rotor's motion equations, the generator's power angle equations, the generator's excitation winding equations, and the generator's governor-prime mover equations, a dynamic model of the power system is constructed to perform safety simulations of the power system.
[0026] As another embodiment of this application, the construction of the constraint model considering multidimensional transient safety includes:
[0027] Establish the node voltage transient safety constraint model in the aforementioned constraint model:
[0028] V s min ≤V s k ≤V s max ,s=1,2,...,N bus k = 1, 2, ..., m
[0029] Among them, V s k Let V be the voltage amplitude of the s-th node at the k-th stage of the anticipated propagation path. s min V is the minimum voltage at the s-th node. s max N represents the maximum voltage at the s-th node. bus This represents the total number of nodes corresponding to the generator and the load nodes, and m represents the number of stages in the intended propagation path;
[0030] Establish the node frequency transient safety constraint model in the aforementioned constraint model:
[0031]
[0032] Among them, RoCoF s kRoCoF represents the rate of change of the system frequency security index of the s-th node in the k-th stage. max This represents the security threshold corresponding to the rate of change of the system's frequency security index. f represents the lowest frequency point of the system frequency security index for the s-th node in the k-th stage. nadir,min This represents the security threshold corresponding to the lowest frequency point of the system's frequency security index. f represents the quasi-steady-state frequency value of the system frequency security index for the s-th node in the k-th stage. ∞,min This represents the safety threshold corresponding to the quasi-steady-state frequency value of the system's frequency safety index.
[0033] Establish the transient safety constraint model for the generator power angle in the aforementioned constraint model:
[0034]
[0035] in, Let δ be the transient power angle of the i-th generator in the k-th stage. min Let δ be the minimum safe threshold for the power angle of the i-th generator. max Let the maximum safe threshold for the power angle of the i-th generator be . Let be the center of inertia of the power angle of all generators in the power system at stage k.
[0036] As another embodiment of this application, the step of calculating and generating the state space of the power system based on the electrical parameters and the anticipated propagation path according to the dynamic model includes:
[0037] Based on the electrical parameters, the state of each component in the power system is calculated according to the dynamic model;
[0038] Based on the anticipated propagation path, the state of each component in the power system at different stages is calculated using the above-described method for calculating the state of each component in the power system.
[0039] according to Generate the state space of the power system;
[0040] Among them, s k Let k be the state space of the power system in stage k. This represents the increase in active power output of the i-th generator in the k-th stage. This represents the decrease in active power output of the i-th generator in the k-th stage. The active power load shedding amount of the i-th load node in the k-th stage This represents the increase in reactive power output of the i-th generator in the k-th stage. This represents the decrease in reactive power output of the i-th generator in the k-th stage. Let r represent the reactive power load shedding amount of the i-th load node in the k-th stage. L This indicates the total number of load nodes.
[0041] As another embodiment of this application, generating the action space of the power system according to the constraint model includes:
[0042] Based on the constraint model, the states of each component at different stages are discretized to form the actions of each component at different stages.
[0043] according to Generate the action space corresponding to the state space of the power system;
[0044] Among them, a k A represents the action of each component of the power system in stage k. k This represents the action space of the power system in stage k. This represents the action of increasing the active power output of the i-th generator in the k-th stage. This indicates the reduction in active power output of the i-th generator in the k-th stage. This represents the active power load shedding action of the i-th load node in the k-th stage. This represents the action of increasing the reactive power output of the i-th generator in the k-th stage. This indicates the action of reducing the reactive power output of the i-th generator in the k-th stage. This represents the reactive load shedding action of the i-th load node in the k-th stage.
[0045] As another embodiment of this application, the step of constructing a state-action combination based on the state space and the action space, calculating and comparing the system cost corresponding to the state-action combination, and obtaining the cascading fault emergency control result of the power system includes:
[0046] Select the first state of the power system in the state space and match it with the action in the action space corresponding to the first state to obtain a set composed of state-action combinations;
[0047] Calculate the system benefit corresponding to the state-action combination in the set;
[0048] Based on the system benefit corresponding to the state-action combination in the set, select the optimal action corresponding to the first state;
[0049] Calculate the system cost of the optimal action corresponding to the first state, and detect whether the system cost has reached the training objective;
[0050] If the training objective is achieved, the optimal action corresponding to the first state is output, and the emergency control result of the cascading faults of the power system in the first state is obtained.
[0051] If the training objective is not achieved, proceed to the step of "selecting the optimal action corresponding to the first state based on the system benefit corresponding to the state-action combination in the set" and execute the subsequent steps.
[0052] As another embodiment of this application, the calculation of the system benefit corresponding to the state-action combination in the set includes:
[0053] according to Calculate the reward value corresponding to the state-action combination;
[0054] Among them, (s k ,a k ) represents the state-action combination of the power system in the k-th stage, r k (s k ,a k ) represents the reward value corresponding to the state-action combination, p n α represents the probability that the anticipated propagation path will enter the nth stage, β represents the adjustment cost of the generator, γ represents the adjustment cost of the load node, and N represents the penalty factor. X This indicates that the power system is performing action a. k The state after s k The number of constraints that are not satisfied in the constraint model;
[0055] According to Q(s) k ,a k )=(1-λ)Q(s k ,a k )+λ[r k (s k ,a k )+ηmaxQ(s k′ ,a k′ )], calculate the system benefit corresponding to the state-action combination;
[0056] Where Q(s) k ,a k ) represents the system benefit corresponding to the state-action combination, a k′ For state s k′ The actions performed by the power system described herein, where λ represents the learning parameter and η represents the conversion factor.
[0057] As another embodiment of this application, the step of selecting the optimal action corresponding to the first state based on the system benefit corresponding to the state-action combination in the set includes:
[0058] Based on the system reward corresponding to the state-action combination, generate the action sequence corresponding to the maximum value of the system reward;
[0059] The action sequence is sampled to form a low-discrepancy action sequence:
[0060] Φ=[x1,x2,x3,......,x t ]
[0061] Where Φ represents a low-dispersion sequence consisting of multiple actions, x i is the i-th sampled value of the low-dispersion sequence, and t represents the number of actions sampled.
[0062] according to Select the optimal action from the low-difference action sequence;
[0063] Where, p xk This indicates the selection of a sample value x from the low-difference action sequence. k The random probability, ε represents the parameter of the greedy strategy.
[0064] As another embodiment of this application, the step of calculating the system cost of the optimal action corresponding to the first state and detecting whether the system cost has reached the training objective includes:
[0065] according to Calculate the system cost of the optimal action corresponding to the first state;
[0066] Where H represents the system cost corresponding to the first state-action combination;
[0067] according to Detect whether the system cost has reached the training objective;
[0068] Wherein, minH represents the minimum system cost corresponding to the first state-action combination.
[0069] Secondly, embodiments of the present invention provide an emergency control device for cascading failures that considers multidimensional transient safety, comprising:
[0070] The data acquisition module is used to acquire the electrical parameters of each component in the power system and the expected propagation path when a cascading fault occurs in the power system.
[0071] The safety simulation module is used to construct a dynamic model of the power system and perform safety simulation on the power system.
[0072] The constraint module is used to construct constraint models that take into account multidimensional transient safety.
[0073] A state space generation module is used to generate the state space of the power system based on the electrical parameters and the expected propagation path, according to the dynamic model.
[0074] The action space generation module is used to generate the action space of the power system based on the constraint model.
[0075] The optimization module is used to construct state-action combinations based on the state space and the action space, calculate and compare the system costs corresponding to the state-action combinations, and obtain the cascading fault emergency control results of the power system.
[0076] This invention provides an emergency control method and apparatus for cascading faults that considers multidimensional transient safety. By acquiring the electrical parameters of the power system and the expected propagation path of the power system when a cascading fault occurs, a dynamic simulation model of the power system is constructed to calculate the state of the power system at different fault stages. A constraint model considering multidimensional transient safety is also constructed. Based on the dynamic model and the constraint model, the state space and action space of the power system are generated to form a state-action combination. Finally, by calculating and comparing the system costs corresponding to the state-action combinations, the emergency control result of the cascading fault is obtained efficiently and accurately, while ensuring the transient and steady-state safety of the power system during the execution of the emergency control strategy. Attached Figure Description
[0077] To more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0078] Figure 1 This is a flowchart illustrating the implementation of the emergency control method for cascading failures provided in this embodiment of the invention.
[0079] Figure 2 This is a flowchart of calculating and comparing the cost of a state-action combination system provided in an embodiment of the present invention;
[0080] Figure 3 This is a schematic diagram of the structure of the emergency control device for cascading failures provided in an embodiment of the present invention;
[0081] Figure 4 This is a schematic diagram of the terminal provided in an embodiment of the present invention. Detailed Implementation
[0082] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of the invention. However, those skilled in the art will understand that the invention can be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods are omitted so as not to obscure the description of the invention with unnecessary detail.
[0083] To make the objectives, technical solutions, and advantages of the present invention clearer, specific embodiments will be described below in conjunction with the accompanying drawings.
[0084] Figure 1 The implementation flowchart of the cascading failure emergency control method considering multi-dimensional transient safety provided in the embodiments of the present invention is described in detail below:
[0085] Step 101: Obtain the electrical parameters of each component in the power system and the expected propagation path when a cascading fault occurs in the power system.
[0086] Optionally, in this embodiment, obtaining the electrical parameters of each component in the power system may include obtaining the parameters of the power system synchronous generator set, the power system load parameters, and the reliability parameters of each component in the power system.
[0087] Optionally, in this embodiment, obtaining the anticipated propagation path when a cascading fault occurs in the power system may include obtaining the anticipated propagation stages of the cascading fault in the power system, as well as the line fault sets corresponding to different propagation stages.
[0088] Step 102: Construct a dynamic model of the power system and perform a safety simulation of the power system.
[0089] Optionally, this step can be achieved by establishing simulation models of the generator rotor's motion equations, the generator's power angle equations, the generator's excitation winding equations, and the generator's governor-prime mover equations, thereby constructing a dynamic model of the power system for safety simulation.
[0090] Optionally, the simulation model formula for the motion equation of the generator rotor of the power system in this embodiment is as follows:
[0091]
[0092] Among them, M i ω represents the inertial time constant. i D represents the angular velocity of the rotor of the i-th generator. i P represents the damping coefficient. m P represents the mechanical power of the generator. m,iThen P represents the mechanical power of the i-th generator. g P represents the electromagnetic power of the generator. g,i Then r represents the electromagnetic power of the i-th generator. G This indicates the total number of generators.
[0093] Optionally, in this embodiment, the simulation model formula for the power angle equation of the generator in the power system is as follows:
[0094]
[0095] Where, δ i Let f0 represent the power angle of the i-th generator and f0 represent the rated frequency of the system.
[0096] Optionally, in this embodiment, the simulation model formula for the excitation winding equation of the generator in the power system is as follows:
[0097]
[0098] Among them, E q ′ ,i Let X represent the transient electromotive force of the i-th generator. d,i T represents the d-axis reactance of the i-th generator. d ′ 0,i X represents the d-axis transient time constant of the i-th generator. d ′ ,i V represents the d-axis transient reactance of the i-th generator. i E represents the voltage at the node corresponding to the i-th generator. fd,i Let represent the magnetomotive force of the i-th generator.
[0099] Optionally, in this embodiment, the simulation model formula for the governor-prime mover equation of the generator in the power system is as follows:
[0100]
[0101] Where, μ Gi Let F represent the regulation coefficient of the i-th generator, s represent the Laplace operator, and F represent the regulation coefficient of the ith generator. HPi T represents the equivalent high-pressure cylinder power coefficient of the i-th generator. Ri Let f represent the reheat time constant of the i-th generator. i This represents the frequency of the node corresponding to the i-th generator.
[0102] Optional, it can be based on f i =ω i Calculate the frequency of the node corresponding to the i-th generator using 2π.
[0103] Step 103: Construct a constraint model that takes into account multidimensional transient safety.
[0104] Optionally, the constraint model considering multidimensional transient safety constructed in this embodiment includes an equality constraint model and an inequality constraint model. The equality constraints include a power flow equation constraint model and a line outage probability; the inequality constraint models include a generator output constraint model, a generator adjustment constraint model, a load shedding constraint model, a line power constraint model, and a multidimensional transient constraint model.
[0105] Optionally, the power flow equation constraint model in this step includes m development stages. The power flow equation constraints of each development stage correspond to the expected propagation stage when a cascading failure occurs in the power system, i.e.:
[0106]
[0107] Among them, P Gi Let i be the active power output of the i-th generator in the initial state of the power system. Let be the increase in active power output of the i-th generator in the n-th stage. P represents the decrease in active power output of the i-th generator in the n-th stage. Li Let G be the active power load of the i-th load node in the initial state of the power system. ij Let be the real part of the element corresponding to the i-th row and j-th column in the nodal admittance matrix. B represents the real part of the voltage at the i-th load node in the k-th stage. ij f is the imaginary part of the element corresponding to the i-th row and j-th column in the nodal admittance matrix. i k N represents the imaginary part of the voltage at the i-th load node in the k-th stage. bus This represents the total number of nodes corresponding to generators and load nodes in the power system, and m represents the number of stages in the expected propagation path.
[0108]
[0109] Among them, Q Gi Let i be the reactive power output of the i-th generator in the initial state of the power system. Let be the increase in reactive power output of the i-th generator in the n-th stage. Q represents the decrease in reactive power output of the i-th generator in the n-th stage. Li Let be the reactive load of the i-th load node in the initial state of the power system.
[0110] Optionally, in overload-dominated cascading faults, the probability of line disconnection in the k-th stage is determined by the power flowing through the line in the previous stage. The line fault probability constraint model constructed in this step can be based on:
[0111]
[0112] Where, p k Let be the probability of a failure occurring in stage k. This represents the power flowing through the line that is disconnected in stage k during stage (k-1). This represents the rated power of the line that is disconnected in stage k at stage (k-1). This represents the maximum power of the line that is disconnected in stage k at stage (k-1).
[0113] Optionally, the generator output constraint model can be constructed in this step based on:
[0114]
[0115] in, This represents the lower limit of the generator's active power output. This represents the upper limit of the generator's active power output. This represents the lower limit of the generator's reactive power output. This represents the upper limit of the generator's reactive power output.
[0116] Optionally, this step of constructing the generator adjustment model can be based on:
[0117]
[0118] in, This represents the upper limit for the increase in generator active power. This represents the upper limit for the increase in generator reactive power. This represents the upper limit of the reduction in generator active power. This represents the upper limit of the reduction in generator reactive power.
[0119] Optionally, this step of constructing the load shedding constraint model can be based on:
[0120]
[0121] Where, r L This represents the total number of load nodes in the line.
[0122] Optionally, this step of constructing the line power constraint model can be based on:
[0123] P l min ≤P l k ≤P l max l=1,2,...,N line k = 1, 2, ..., m
[0124] Among them, P lmin P is the minimum active power flow on the l-th line. l k For the active power flow of the l-th line in the k-th stage, P l max N represents the maximum active power flow on the l-th line. line This refers to the number of power system lines.
[0125] Optionally, the multidimensional transient constraint model in this embodiment includes a node voltage transient security constraint model, a node frequency transient security constraint model, and a generator bus transient security constraint model.
[0126] Optionally, the node voltage transient safety constraint model in this step of establishing the multidimensional transient constraint model can be based on the following constraint range:
[0127] V i min ≤V i k ≤V i max i = 1, 2, ..., N bus k = 1, 2, ..., m
[0128] Among them, V i k Let V be the voltage amplitude of the i-th node at the k-th stage of the expected propagation path. i min V represents the minimum voltage at the i-th node. i max This represents the maximum voltage at the i-th node.
[0129] Optionally, the node frequency transient safety constraint model in this step of establishing the multidimensional transient constraint model can be based on the following constraint range:
[0130]
[0131] Among them, RoCoF i k RoCoF represents the rate of change of the system frequency security index of the i-th node in the k-th stage. max This represents the safety threshold corresponding to the rate of change of the system's frequency safety index. f represents the lowest frequency point of the system frequency security index for the i-th node in the k-th stage. nadir,min This represents the security threshold corresponding to the lowest frequency point of the system's frequency security index. f represents the quasi-steady-state frequency value of the system frequency security index for the i-th node in the k-th stage. ∞,min This represents the safety threshold corresponding to the quasi-steady-state frequency value of the system's frequency safety index.
[0132] Optionally, the generator power angle transient safety constraint model in this step of establishing the multidimensional transient constraint model can be based on the following constraint range:
[0133]
[0134] in, Let δ be the transient power angle of the i-th generator in the k-th stage. min Let δ be the minimum safe threshold for the power angle of the i-th generator. max Let the maximum safe threshold for the power angle of the i-th generator be . Let be the center of inertia of the power angle of all generators in the power system at stage k.
[0135] Step 104: Based on electrical parameters and the expected propagation path, generate the state space of the power system according to the dynamic model.
[0136] Optionally, this step can be based on the electrical parameters of each component in the power system obtained, and calculate the state of each component in the power system according to the constructed power system dynamic model.
[0137] Furthermore, this step can obtain the state of each component in the power system at different propagation stages of the expected propagation path, based on the method for calculating the state of each component in the power system.
[0138] Furthermore, it can be based on Generate the power system state space at different propagation stages of the anticipated propagation path;
[0139] Among them, s k Let be the state space of the power system in stage k.
[0140] Step 105: Generate the action space of the power system based on the constraint model.
[0141] Optionally, this step can discretize the states of each component in the power system at different stages based on the constraint range in the constraint model to form the corresponding actions of each component at different stages. When discretizing based on the constraint range, the number of actions to be discretized can be selected according to specific actual needs. The more actions discretized, the higher the accuracy of the obtained component actions, but at the same time, more computational costs will be consumed.
[0142] Optionally, in this embodiment, the increase in active power output of the generator in stage k is discretized according to the constraint range of the constraint model, forming the corresponding increase in active power output of the generator in stage k, i.e.:
[0143]
[0144] in, This indicates the action of increasing the active power output of the i-th generator in the k-th stage.
[0145] Optionally, in this embodiment, the reduction in active power output of the generator in stage k is discretized according to the constraint range of the constraint model, forming the corresponding reduction in active power output of the generator in stage k, i.e.:
[0146]
[0147] in, This indicates the reduction in active power output of the i-th generator in the k-th stage.
[0148] Optionally, in this embodiment, the increase in reactive power output of the generator in stage k is discretized according to the constraint range of the constraint model to form the reactive power output increase action of the generator in stage k, that is:
[0149]
[0150] in, This indicates the reactive power increase action of the i-th generator in the k-th stage.
[0151] Optionally, in this embodiment, the reduction in reactive power output of the generator in stage k is discretized according to the constraint range of the constraint model, forming the reactive power output reduction action of the generator in stage k, i.e.:
[0152]
[0153] in, This indicates the reduction of reactive power output of the i-th generator in the k-th stage.
[0154] Optionally, in this embodiment, the active load shedding amount of the load in stage k is discretized according to the constraint range of the constraint model to form the active load shedding action corresponding to the load in stage k, that is:
[0155]
[0156] in, This represents the active load shedding action of the i-th load node in the k-th stage.
[0157] Optionally, in this embodiment, the reactive power load shedding amount of the load in stage k is discretized according to the constraint range of the constraint model to form the reactive power load shedding action corresponding to the load in stage k, that is:
[0158]
[0159] in, This represents the reactive load shedding action of the i-th load node in the k-th stage.
[0160] Furthermore, this step is based on Generate the action space corresponding to the state space of each component in the power system;
[0161] Among them, a k A represents the action of each component in the power system in stage k. k This represents the action space of the power system in stage k.
[0162] Step 106: Construct state-action combinations based on the state space and action space, calculate and compare the system costs corresponding to the state-action combinations, and obtain the emergency control results for cascading faults in the power system.
[0163] Optionally, in step 106, a state-action combination is constructed based on the state space and action space, and the system cost corresponding to the state-action combination is calculated and compared to obtain the emergency control result for cascading faults in the power system. This can include, for example: Figure 2 The steps are shown.
[0164] Step 201: Select the first state of the power system in the state space and match it with the action in the action space corresponding to the first state to obtain a set composed of state-action combinations.
[0165] Optionally, this step can be based on the propagation stage of the power system when a cascading fault occurs, and obtain the state of the power system at this propagation stage from the state space, and take this state as the first state.
[0166] Furthermore, the corresponding action space is determined based on the first state, and the first state is matched and combined with the discrete actions in the action space to obtain a set composed of state-action combinations.
[0167] Step 202: Calculate the system revenue corresponding to the state-action combination in the set.
[0168] Optionally, in this embodiment, the reward value corresponding to the state-action combination can be obtained according to the following calculation method:
[0169]
[0170] Among them, (s k ,a k ) represents the state-action combination of the power system in stage k, r k (s k ,a k ) represents the reward value corresponding to the state-action combination, p nLet N represent the probability that the expected propagation path will enter the nth stage, α represent the adjustment cost of the generator, β represent the adjustment cost of the load node, γ represent the penalty factor, and N represent the probability that the propagation path will enter the nth stage. X Indicates that the power system performs action a k The state after s k ′ The number of constraints that are not satisfied in the constraint model.
[0171] Furthermore, this step can obtain the system benefit corresponding to the state-action combination in the set according to the following calculation method:
[0172] Q(s k ,a k )=(1-λ)Q(s k ,a k )+λ[r k (s k ,a k )+ηmax Q(s k′ ,a k′ )]
[0173] Where Q(s) k ,a k ) represents the system benefit corresponding to the state-action combination, a k′ For state s k′ The actions performed by the power system are denoted by λ, which represents the learning parameter, and η, which represents the conversion factor.
[0174] Step 203: Select the optimal action corresponding to the first state based on the system benefit corresponding to the state-action combination in the set.
[0175] Optionally, based on the system reward corresponding to the state-action combination, generate the action sequence corresponding to the maximum system reward. This step can select the action corresponding to the maximum system reward according to the 1-ε principle to avoid getting trapped in local optima when selecting the optimal action, thus forming a candidate action sequence:
[0176]
[0177] in, denoted as the sequence of actions corresponding to the maximum system reward, argmax represents the function that takes the set of maximum values, and ε represents the parameters of the 1-ε policy, where ε is a positive number less than 1.
[0178] Furthermore, the action sequence is sampled to form a low-discrepancy action sequence. In this embodiment, the Sobol sequence method is selected to sample the action sequence to select actions in the same state, avoiding the uniformity of action sampling results, and forming a low-discrepancy action sequence Φ=[x1,x2,x3,......,x t ];
[0179] Where Φ represents a low-dispersion sequence consisting of multiple actions, x i is the i-th sampled value of the low-dispersion sequence, and t represents the number of actions sampled.
[0180] Furthermore, this step can be based on Select the optimal action from a low-difference action sequence;
[0181] in, This indicates selecting a sample value x from a sequence of low-discrepancy actions. k The random probability.
[0182] Step 204: Calculate the system cost of the optimal action corresponding to the first state, and check whether the system cost meets the training objective.
[0183] Optional, this step can be based on Calculate the system cost of the optimal action corresponding to the first state;
[0184] Where H represents the system cost corresponding to the first state-action combination.
[0185] Furthermore, it can be based on Does the system cost meet the training objective?
[0186] Wherein, minH represents the minimum system cost corresponding to the first state-action combination.
[0187] Optionally, this step may also include checking whether the training count has been reached when setting the training objective.
[0188] Optionally, if the system cost reaches the training objective, step 205 is executed; if the system cost does not reach the training objective, step 206 is executed.
[0189] Step 205: If the training objective is achieved, output the optimal action corresponding to the first state to obtain the emergency control result of the cascading faults of the power system in the first state.
[0190] Optionally, in this embodiment, based on the first state of the propagation stage of the power system, the corresponding optimal action is output, that is, the generator output adjustment amount and load shedding amount of each component of the power system are output, so as to obtain the emergency control result when the power system experiences a cascading failure.
[0191] Step 206: If the training objective is not achieved, proceed to step 201 and execute the subsequent steps.
[0192] Optionally, if the training objective is not achieved, the process jumps to step 201 to redetermine the state and corresponding actions of each component in the power system, updates the system reward value, recalculates the system cost, and finally determines the optimal action corresponding to the power system state until the training objective is achieved.
[0193] This invention provides a dynamic simulation of system components in a power system during a cascading failure to calculate the power system's state at different failure stages. By constructing a constraint model that considers multidimensional transient safety, both transient and steady-state safety of the power system are ensured during the execution of emergency control strategies. Based on the state space of the power system at different failure stages, a corresponding action space is generated according to actual needs, forming a state-action combination. By calculating the system cost corresponding to the state-action combination, the optimal action corresponding to the power system at different failure stages is selected to obtain the emergency control result of the cascading failure.
[0194] It should be understood that the sequence number of each step in the above embodiments does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
[0195] The following are device embodiments of the present invention. For details not described in detail, please refer to the corresponding method embodiments described above.
[0196] Figure 3 A schematic diagram of the cascading failure emergency control device considering multidimensional transient safety provided in an embodiment of the present invention is shown. For ease of explanation, only the parts related to the embodiment of the present invention are shown, and are described in detail below:
[0197] like Figure 3 As shown, the interlocking fault emergency control device 4 includes: a data acquisition module 301, a safety simulation module 302, a constraint module 303, a state space generation module 304, an action space generation module 305, and an optimization module 306.
[0198] The data acquisition module 301 is used to acquire the electrical parameters of each component in the power system and the expected propagation path when a cascading fault occurs in the power system;
[0199] The safety simulation module 302 is used to build a dynamic model of the power system and perform safety simulation on the power system.
[0200] Constraint module 303 is used to construct a constraint model that takes into account multidimensional transient safety;
[0201] The state space generation module 304 is used to calculate and generate the state space of the power system based on electrical parameters and the expected propagation path according to the dynamic model.
[0202] Action space generation module 305 is used to generate the action space of the power system based on the constraint model;
[0203] The optimization module 306 is used to construct state-action combinations based on the state space and action space, calculate and compare the system costs corresponding to the state-action combinations, and obtain the emergency control results of cascading faults in the power system.
[0204] Optionally, the safety simulation module 302 constructs a dynamic model of the power system, which can be used for safety simulation of the power system:
[0205] Establish a simulation model of the motion equations of the generator rotor in the power system:
[0206]
[0207] Among them, M i ω represents the inertial time constant. i D represents the angular velocity of the rotor of the i-th generator. i P represents the damping coefficient. m P represents the mechanical power of the generator. m,i Then P represents the mechanical power of the i-th generator. g P represents the electromagnetic power of the generator. g,i Then r represents the electromagnetic power of the i-th generator. G Indicates the total number of generators;
[0208] Establish a simulation model of the power angle equations for generators in a power system:
[0209]
[0210] Where, δ i f0 represents the power angle of the i-th generator and f0 represents the rated frequency of the system.
[0211] Establish a simulation model of the excitation winding equations of a generator in a power system:
[0212]
[0213] Among them, E q ′ ,i Let X represent the transient electromotive force of the i-th generator. d,i T represents the d-axis reactance of the i-th generator. d ′ 0,i X represents the d-axis transient time constant of the i-th generator. d ′ ,i V represents the d-axis transient reactance of the i-th generator. i E represents the voltage at the node corresponding to the i-th generator. fd,iThis represents the magnetomotive force of the i-th generator;
[0214] Establish a simulation model of the governor-prime mover equations for a generator in a power system:
[0215]
[0216] Where, μ Gi Let F represent the regulation coefficient of the i-th generator, s represent the Laplace operator, and F represent the regulation coefficient of the ith generator. HPi T represents the equivalent high-pressure cylinder power coefficient of the i-th generator. Ri Let f represent the reheat time constant of the i-th generator. i This represents the frequency of the node corresponding to the i-th generator;
[0217] Based on the simulation models of the generator rotor's motion equations, the generator's power angle equations, the generator's excitation winding equations, and the generator's governor-prime mover equations, a dynamic model of the power system is constructed to perform safety simulations of the power system.
[0218] Optionally, when constructing a constraint model that considers multidimensional transient safety, constraint module 303 can be used for:
[0219] Establish the node voltage transient safety constraint model in the constraint model:
[0220] V s min ≤V s k ≤V s max ,s=1,2,...,N bus k = 1, 2, ..., m
[0221] Among them, V s k Let V be the voltage amplitude of the s-th node at the k-th stage of the expected propagation path. s min V is the minimum voltage at the s-th node. s max N represents the maximum voltage at the s-th node. bus This represents the total number of nodes corresponding to the generator and the load nodes, and m represents the number of stages in the expected propagation path.
[0222] Establish the node frequency transient safety constraint model in the constraint model:
[0223]
[0224] in, RoCoF represents the rate of change of the system frequency security index of the s-th node in the k-th stage.max This represents the safety threshold corresponding to the rate of change of the system's frequency safety index. f represents the lowest frequency point of the system frequency security index for the s-th node in the k-th stage. nadir,min This represents the security threshold corresponding to the lowest frequency point of the system's frequency security index. The quasi-steady-state frequency value of the system frequency security index for the s-th node in the k-th stage, f ∞,min This represents the safety threshold corresponding to the quasi-steady-state frequency value of the system's frequency safety index.
[0225] Establish the transient safety constraint model for generator power angle in the constraint model:
[0226]
[0227] in, Let δ be the transient power angle of the i-th generator in the k-th stage. min Let δ be the minimum safe threshold for the power angle of the i-th generator. max Let the maximum safe threshold for the power angle of the i-th generator be . Let be the center of inertia of the power angle of all generators in the power system at stage k.
[0228] Optionally, when the state space generation module 304 generates the state space of the power system based on electrical parameters and the anticipated propagation path according to the dynamic model, it can be used for:
[0229] Based on electrical parameters, the state of each component in the power system is calculated according to a dynamic model;
[0230] Based on the anticipated propagation path, the state of each component in the power system at different stages is calculated using the above-mentioned method for calculating the state of each component in the power system.
[0231] according to Generate the state space of the power system;
[0232] Among them, s k Let k be the state space of the power system in stage k. This represents the increase in active power output of the i-th generator in the k-th stage. This represents the decrease in active power output of the i-th generator in the k-th stage. The active power load shedding amount of the i-th load node in the k-th stage This represents the increase in reactive power output of the i-th generator in the k-th stage. This represents the decrease in reactive power output of the i-th generator in the k-th stage. Let r represent the reactive power load shedding amount of the i-th load node in the k-th stage. L This indicates the total number of load nodes.
[0233] Optionally, when the action space generation module 305 generates the action space of the power system based on the constraint model, it can be used for:
[0234] Based on the constraint model, the states of each component at different stages are discretized to form the corresponding actions of each component at different stages.
[0235] according to Generate the action space corresponding to the state space of the power system;
[0236] Among them, a k A represents the action of each component in the power system in stage k. k This represents the action space of the power system in stage k. This represents the action of increasing the active power output of the i-th generator in the k-th stage. This indicates the reduction in active power output of the i-th generator in the k-th stage. This represents the active power load shedding action of the i-th load node in the k-th stage. This represents the action of increasing the reactive power output of the i-th generator in the k-th stage. This indicates the action of reducing the reactive power output of the i-th generator in the k-th stage. This represents the reactive load shedding action of the i-th load node in the k-th stage.
[0237] Optionally, when the optimization module 306 constructs state-action combinations based on the state space and action space, calculates and compares the system costs corresponding to the state-action combinations, and obtains the emergency control results for cascading faults in the power system, it can be used for:
[0238] Select the first state of the power system in the state space and match it with the action in the action space corresponding to the first state to obtain a set composed of state-action combinations;
[0239] Calculate the system benefit corresponding to the state-action combination in the set;
[0240] Based on the system benefit corresponding to the state-action combination in the set, select the optimal action corresponding to the first state;
[0241] Calculate the system cost of the optimal action corresponding to the first state, and check whether the system cost meets the training objective;
[0242] If the training objective is achieved, the optimal action corresponding to the first state is output, and the emergency control result of the cascading faults of the power system in the first state is obtained.
[0243] If the training objective is not achieved, the process jumps to the step of "selecting the first state of the power system in the state space and matching it with the action in the action space corresponding to the first state to obtain a set composed of state-action combinations" and then executes the subsequent steps.
[0244] Optionally, when the optimization module 306 calculates the system benefit corresponding to the state-action combination in the set, it may include:
[0245] according to Calculate the reward value corresponding to the state-action combination;
[0246] Among them, (s k ,a k ) represents the state-action combination of the power system in stage k, r k (s k ,a k ) represents the reward value corresponding to the state-action combination, p n Let N represent the probability that the expected propagation path will enter the nth stage, α represent the adjustment cost of the generator, β represent the adjustment cost of the load node, γ represent the penalty factor, and N represent the probability that the propagation path will enter the nth stage. X Indicates that the power system performs action a k The state after s k The number of constraints that are not satisfied in the constraint model;
[0247] According to Q(s) k ,a k )=(1-λ)Q(s k ,a k )+λ[r k (s k ,a k )+ηmaxQ(s k ′,a k ′)], calculate the system benefit corresponding to the state-action combination;
[0248] Where Q(s) k ,a k ) represents the system benefit corresponding to the state-action combination, a k ′ represents the state s k The action performed by the power system in ' is represented by λ, where λ represents the learning parameter and η represents the conversion factor.
[0249] Optionally, when the optimization module 306 selects the optimal action corresponding to the first state based on the system benefit corresponding to the state-action combination in the set, it can be used for:
[0250] Based on the system reward corresponding to the state-action combination, generate the action sequence corresponding to the maximum system reward;
[0251] Sampling of action sequences to construct low-discrepancy action sequences:
[0252] Φ=[x1,x2,x3,......,x t ]
[0253] Where Φ represents a low-dispersion sequence consisting of multiple actions, x i is the i-th sampled value of the low-dispersion sequence, and t represents the number of actions sampled.
[0254] according to Select the optimal action from a low-difference action sequence;
[0255] Where, p xk This indicates selecting a sample value x from a sequence of low-discrepancy actions. k The random probability is given by ε, where ε represents the parameters of the greedy strategy.
[0256] Optionally, when the optimization module 306 calculates the system cost of the optimal action corresponding to the first state and checks whether the system cost has reached the training objective, it can be used for:
[0257] according to Calculate the system cost of the optimal action corresponding to the first state;
[0258] Where H represents the system cost corresponding to the first state-action combination;
[0259] according to Does the system cost meet the training objective?
[0260] Wherein, minH represents the minimum system cost corresponding to the first state-action combination.
[0261] The aforementioned cascading fault emergency control device, which considers multidimensional transient safety, acquires the electrical parameters of the power system and the anticipated propagation path of the power system when a cascading fault occurs. It then constructs a dynamic safety simulation model of the power system and a constraint model that considers multidimensional transient safety, generates the state space and corresponding action space of the power system at different fault stages, constructs state-action combinations, and selects the optimal action corresponding to the power system at different fault stages by calculating the system cost corresponding to the state-action combination. This allows for the rapid and accurate acquisition of cascading fault emergency control results, while ensuring the transient and steady-state safety of the power system when adopting emergency control strategies.
[0262] Figure 4 This is a schematic diagram of a terminal provided in an embodiment of the present invention. Figure 4As shown, the terminal 400 in this embodiment includes a processor 401, a memory 402, and a computer program 403 stored in the memory 402 and executable on the processor 401. When the processor 401 executes the computer program 403, it implements the steps in the various cascading fault emergency control method embodiments described above, for example... Figure 1 Steps 101 to 106 are shown. Alternatively, when processor 401 executes computer program 403, it implements the functions of each module / unit in the above-described device embodiments, for example... Figure 3 The functions of modules 301 to 306 are shown.
[0263] For example, computer program 403 can be divided into one or more modules / units, one or more of which are stored in memory 402 and executed by processor 401 to complete the present invention. One or more modules / units can be a series of computer program instruction segments capable of performing a specific function, which describe the execution process of computer program 403 in terminal 400. For example, computer program 403 can be divided into... Figure 3 The modules / units shown are 301 to 306.
[0264] Terminal 400 may include, but is not limited to, processor 401 and memory 402. Those skilled in the art will understand that... Figure 4 This is merely an example of terminal 400 and does not constitute a limitation on terminal 400. It may include more or fewer components than shown, or combine certain components, or different components. For example, the terminal may also include input / output devices, network access devices, buses, etc.
[0265] Processor 401 can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor can be a microprocessor or any conventional processor.
[0266] The memory 402 can be an internal storage unit of the terminal 400, such as the hard disk or RAM of the terminal 400. The memory 402 can also be an external storage device of the terminal 400, such as a plug-in hard disk, smart media card (SMC), secure digital (SD) card, flash card, etc., equipped on the terminal 400. Furthermore, the memory 402 can include both internal storage units and external storage devices of the terminal 400. The memory 402 is used to store computer programs and other programs and data required by the terminal. The memory 402 can also be used to temporarily store data that has been output or will be output.
[0267] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the above-described division of functional units and modules is merely an example. In practical applications, the above functions can be assigned to different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiments can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit. Furthermore, the specific names of the functional units and modules are only for easy differentiation and are not intended to limit the scope of protection of this application. The specific working process of the units and modules in the above system can be referred to the corresponding process in the foregoing method embodiments, and will not be repeated here.
[0268] In the above embodiments, the descriptions of each embodiment have different focuses. For parts that are not described in detail or recorded in a certain embodiment, please refer to the relevant descriptions of other embodiments.
[0269] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementations should not be considered beyond the scope of this invention.
[0270] In the embodiments provided by this invention, it should be understood that the disclosed devices / terminals and methods can be implemented in other ways. For example, the device / terminal embodiments described above are merely illustrative. For instance, the division of modules or units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between devices or units may be electrical, mechanical, or other forms.
[0271] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.
[0272] Furthermore, the functional units in the various embodiments of the present invention can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit.
[0273] If an integrated module / unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, all or part of the processes in the methods of the above embodiments of the present invention can also be implemented by a computer program instructing related hardware. The computer program can be stored in a computer-readable storage medium, and when executed by a processor, it can implement the steps of the various cascading fault emergency control method embodiments described above. The computer program includes computer program code, which can be in the form of source code, object code, executable files, or certain intermediate forms. The computer-readable medium can include: any entity or device capable of carrying computer program code, recording media, USB flash drives, portable hard drives, magnetic disks, optical disks, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media, etc.
[0274] The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included within the protection scope of the present invention.
Claims
1. A method for emergency control of cascading failures considering multidimensional transient safety, characterized in that, include: Obtain the electrical parameters of each component in the power system and the expected propagation path when a cascading fault occurs in the power system; A dynamic model of the power system is constructed, and a safety simulation of the power system is performed. Construct a constraint model that considers multidimensional transient safety; Based on the electrical parameters, the state of each component in the power system is calculated according to the dynamic model; Based on the anticipated propagation path, the states of each component in the power system at different stages are calculated using the above-described method for calculating the states of each component in the power system. according to Generate the state space of the power system; in, For the power system in the first The state space of the stage. Indicates the first The generator in the first The increase in active power output during a given period Indicates the first The generator in the first The amount of active power output decreases during the phase. No. The load node at the ... Active power load shedding during the phase, Indicates the first The generator in the first The increase in reactive power output during the phase. Indicates the first The generator in the first The reduction in reactive power output during the phase. Indicates the first The load node at the ... reactive load shedding during the phase, Indicates the total number of load nodes; Based on the constraint model, the states of each component at different stages are discretized to form the actions of each component at different stages. according to Generate the action space corresponding to the state space of the power system; in, This indicates that each component of the power system is in the [number]th [phase]. The actions of the stage, Indicates that the power system in the first The action space of the stage Indicates the first The generator in the first The increased effort and energy output during each stage of the movement Indicates the first The generator in the first The phase of reducing the effective output of the motion, Indicates the first The load node at the ... Active load shedding action during the phase, Indicates the first The generator in the first Increase the amount of reactive power in the phase of the movement. Indicates the first The generator in the first The phase of reducing reactive power output. Indicates the first The load node at the ... Phase-specific reactive load shedding action; Based on the state space and the action space, a state-action combination is constructed, the system cost corresponding to the state-action combination is calculated and compared, and the cascading fault emergency control result of the power system is obtained. Calculating the system benefit corresponding to the state-action combination includes: according to Calculate the reward value corresponding to the state-action combination; in, Indicates that the power system in the first The state-action combination corresponding to the stage This represents the reward value corresponding to the state-action combination. This indicates that the intended propagation path enters the first... The probability of a stage This indicates the adjustment cost of the generator. This represents the adjustment cost of the load node. Indicates the penalty factor. Indicates that the power system performs an action. The state after The number of constraints that are not satisfied in the constraint model; The system revenue is calculated based on the reward value corresponding to the state-action combination.
2. The emergency control method for cascading failures according to claim 1, characterized in that, The construction of the dynamic model of the power system and the performance of security simulation of the power system include: Establish a simulation model of the motion equations of the generator rotor in the power system: in, Represents the inertial time constant. Indicates the first The angular velocity of the rotor of the generator, Indicates the damping coefficient. Indicates the mechanical power of the generator. Then it means the first The mechanical power of each generator, This indicates the electromagnetic power of the generator. Then it means the first Electromagnetic power of a generator Indicates the total number of generators; Establish a simulation model of the power angle equations for the generators in the power system: in, Indicates the first The power angle of a generator, Indicates the system's rated frequency; Establish a simulation model of the excitation winding equations of the generator in the power system: in, Indicates the first The transient electromotive force of a generator, Indicates the first One generator Axial reactance, Indicates the first One generator shaft transient time constant, Indicates the first One generator Shaft transient reactance, Indicates the first The voltage of the node corresponding to each generator. Indicates the first The magnetomotive force of a generator; Establish a simulation model of the governor-prime mover equations for the generator in the power system: in, Indicates the first The regulation coefficient of each generator. Represents the Laplace operator. Indicates the first The equivalent high-pressure cylinder power coefficient of each generator. Indicates the first The reheat time constant of a generator. Indicates the first The frequency of the node corresponding to each generator; Based on the simulation models of the generator rotor's motion equations, the generator's power angle equations, the generator's excitation winding equations, and the generator's governor-prime mover equations, a dynamic model of the power system is constructed to perform safety simulations of the power system.
3. The emergency control method for cascading failures according to claim 2, characterized in that, The construction of the constraint model considering multidimensional transient safety includes: Establish the node voltage transient safety constraint model in the aforementioned constraint model: in, For the first The node is in the expected propagation path. Voltage amplitude of the stage, For the first The minimum voltage at each node, For the first The maximum voltage at each node, This indicates the total number of generator-corresponding nodes and load nodes. This indicates the number of stages in the intended propagation path; Establish the node frequency transient safety constraint model in the aforementioned constraint model: in, Indicates the first The node at the th The rate of change of the frequency security index of the stage system. This represents the security threshold corresponding to the rate of change of the system's frequency security index. Indicates the first The node at the th The lowest frequency point of the system frequency security index during the phase. This represents the security threshold corresponding to the lowest frequency point of the system's frequency security index. Indicates the first The node at the th The quasi-steady-state frequency value of the system frequency security index during the phase. This represents the safety threshold corresponding to the quasi-steady-state frequency value of the system's frequency safety index. Establish the transient safety constraint model for the generator power angle in the aforementioned constraint model: in, For the first The generator in the first Transient work angle of the phase, For the first The minimum safe threshold for the power angle of a generator. For the first The maximum safe threshold for the power angle of a generator. For all generators in the power system in the first The center of inertia of the stage work angle.
4. The emergency control method for cascading failures according to claim 1, characterized in that, The step of constructing state-action combinations based on the state space and the action space, calculating and comparing the system costs corresponding to the state-action combinations, and obtaining the cascading fault emergency control result of the power system includes: Select the first state of the power system in the state space and match it with the action in the action space corresponding to the first state to obtain a set composed of state-action combinations; Calculate the system benefit corresponding to the state-action combination in the set; Based on the system benefit corresponding to the state-action combination in the set, select the optimal action corresponding to the first state; Calculate the system cost of the optimal action corresponding to the first state, and detect whether the system cost has reached the training objective; If the training objective is achieved, the optimal action corresponding to the first state is output, and the cascading fault emergency control result of the power system in the first state is obtained. If the training objective is not achieved, proceed to the step of "selecting the first state of the power system in the state space and matching it with the action in the action space corresponding to the first state to obtain a set composed of state-action combinations" and execute the subsequent steps.
5. The emergency control method for cascading failures according to claim 4, characterized in that, The calculation of the system revenue based on the reward value corresponding to the state-action combination includes: according to Calculate the system benefit corresponding to the state-action combination; in, This represents the system benefit corresponding to the state-action combination. In the state The actions performed by the power system as described in the document, Represents the learning parameters, This represents the conversion factor.
6. The emergency control method for cascading failures according to claim 5, characterized in that, The step of selecting the optimal action corresponding to the first state based on the system benefit corresponding to the state-action combination in the set includes: Based on the system reward corresponding to the state-action combination, generate the action sequence corresponding to the maximum value of the system reward; The action sequence is sampled to form a low-discrepancy action sequence: in, This represents a low-dispersion sequence consisting of multiple actions. It is the first of the low-dispersion sequences A sample value This indicates the number of actions obtained from the sampling. according to Select the optimal action from the low-difference action sequence; in, This indicates the selection of sample values from the low-difference action sequence. random probability, The parameters represent the greedy strategy.
7. The emergency control method for cascading failures according to claim 6, characterized in that, The step of calculating the system cost of the optimal action corresponding to the first state and detecting whether the system cost has reached the training objective includes: according to Calculate the system cost of the optimal action corresponding to the first state; in, This represents the system cost corresponding to the first state-action combination; according to Detect whether the system cost has reached the training objective; in, This represents the minimum system cost corresponding to the first state-action combination.
8. An emergency control device for cascading failures that considers multidimensional transient safety, characterized in that, include: The data acquisition module is used to acquire the electrical parameters of each component in the power system and the expected propagation path when a cascading fault occurs in the power system. The safety simulation module is used to construct a dynamic model of the power system and perform safety simulation on the power system. The constraint module is used to construct constraint models that take into account multidimensional transient safety. A state space generation module is used to calculate the state of each component in the power system based on the electrical parameters and the dynamic model. Based on the anticipated propagation path, the states of each component in the power system at different stages are calculated using the aforementioned method for calculating the states of each component in the power system; according to... Generate the state space of the power system; wherein, For the power system in the first The state space of the stage. Indicates the first The generator in the first The increase in active power output during a given period Indicates the first The generator in the first The amount of active power output decreases during the phase. No. The load node at the ... Active power load shedding during the phase, Indicates the first The generator in the first The increase in reactive power output during the phase. Indicates the first The generator in the first The reduction in reactive power output during the phase. Indicates the first The load node at the ... reactive load shedding during the phase, Indicates the total number of load nodes; The action space generation module is used to discretize the states of each element at different stages according to the constraint model to form the actions corresponding to each element at different stages; according to Generate the action space corresponding to the state space of the power system; wherein, This indicates that each component of the power system is in the [number]th [phase]. The actions of the stage, Indicates that the power system in the first The action space of the stage Indicates the first The generator in the first The increased effort and energy output during each stage of the movement Indicates the first The generator in the first The phase of reducing the effective output of the motion, Indicates the first The load node at the ... Active load shedding action during the phase, Indicates the first The generator in the first Increase the amount of reactive power in the phase of the movement. Indicates the first The generator in the first The phase of reducing reactive power output. Indicates the first The load node at the ... Phase-specific reactive load shedding action; The optimization module is used to construct state-action combinations based on the state space and the action space, calculate and compare the system costs corresponding to the state-action combinations, and obtain the cascading fault emergency control results of the power system; calculate the system benefits corresponding to the state-action combinations, including: based on Calculate the reward value corresponding to the state-action combination; wherein, Indicates that the power system in the first The state-action combination corresponding to the stage This represents the reward value corresponding to the state-action combination. This indicates that the intended propagation path enters the first... The probability of a stage This indicates the adjustment cost of the generator. This represents the adjustment cost of the load node. Indicates the penalty factor. Indicates that the power system performs an action. The state after The number of constraints that are not satisfied in the constraint model; the system revenue is calculated based on the reward value corresponding to the state-action combination.
Citation Information
Patent Citations
Transient stability prevention and control method for power system embedded with deep belief network
CN111049159A