A tracking interval control method for virtual reconnected high-speed trains based on model prediction

Through the virtual reconnection high-speed train tracking interval control method based on model prediction, the problems of large train tracking intervals and low track resource utilization in high-speed railways are solved, and the effect of improving carrying capacity and operation quality without reducing speed is achieved.

CN116080725BActive Publication Date: 2024-10-15BEIJING JIAOTONG UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310076867.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-01-16
Publication Date
2024-10-15
Estimated Expiration
2043-01-16

AI Technical Summary

Technical Problem

In the existing high-speed railway train operation control system, the train tracking interval is large and the utilization rate of track resources is low. It is difficult to improve the carrying capacity and operation quality without reducing the train operating speed.

Method used

A virtual reconnection high-speed train tracking interval control method based on model prediction is adopted. By constructing a train longitudinal dynamics model, a safety braking model is established, a dynamic programming algorithm is used to calculate a reference curve, and a model predictive control algorithm is used to optimize train interval control to ensure that the train Achieve speed maximization and safe speed limit under the premise of satisfying state and input constraints.

Benefits of technology

It effectively reduces the train running interval, improves the utilization rate of track resources, ensures the safe tracking operation of high-speed trains in virtual reconnection mode, and improves the carrying capacity and operation quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116080725B_ABST
    Figure CN116080725B_ABST
Patent Text Reader

Abstract

The present invention provides a tracking interval control method for a virtual reconnected high-speed train based on model prediction. The method establishes a longitudinal dynamic model of a train under the interference of train parameter errors and operational uncertainties, tracks the interior of the train in a virtual reconnected mode using a "relative distance braking" mode, establishes a high-speed train safety braking model, and calculates the expected tracking interval of the virtual reconnected high-speed train. The train operation optimization curve is calculated offline based on a dynamic programming algorithm and used as a reference curve for a model prediction control algorithm. A distributed model prediction controller suitable for high-speed trains is designed to convert the operation control process of the virtual reconnected train into a constrained optimization control problem. Different prediction models, objective functions and constraints are established for the leading train and the following train according to the braking distance between the leading train and the following train. At each sampling moment, the optimization problem is solved to obtain the control quantity, thereby realizing a complete interval control process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of high-speed rail operation signal control, and in particular to a virtual reconnected high-speed train tracking interval control method based on model prediction. Background Art

[0002] As of the end of 2021, China's high-speed railway operating mileage has exceeded 40,000 kilometers, and my country has formed the world's largest and only high-speed railway operating network.

[0003] High-speed railways are safe, reliable, comfortable, efficient, and environmentally friendly. They play an important supporting and leading role in promoting economic development, accelerating the process of carbon neutrality, promoting coordinated urban development, and serving passenger operations. They are the preferred mode of transportation for the domestic public for medium and long-distance travel. While my country's high-speed railway network has begun to take shape, passenger demand is also growing. High-speed and high-density tracking of trains has become the new normal for high-speed railway operation and management, and the carrying capacity of railway lines needs to be further improved. Therefore, while accelerating the construction of high-speed railways, how to further improve the existing high-speed railway transportation capacity and operation quality from the perspective of operation control is one of the main problems facing high-speed railways.

[0004] The train operation control system is an important guarantee for safe driving and efficient operation. Under the existing train control system block mode, the train tracking interval is large and the track resource utilization rate is low. The block mode of high-speed train virtual reconnection realizes multi-train virtual reconnection operation through train-to-train communication, which has the advantages of flexible group configuration and high track resource utilization rate, and has important research significance and application value. Summary of the invention

[0005] An embodiment of the present invention provides a virtual reconnected high-speed train tracking interval control method based on model prediction, which is used to solve the problems existing in the prior art.

[0006] In order to achieve the above object, the present invention adopts the following technical scheme.

[0007] A virtual reconnected high-speed train tracking interval control method based on model prediction, comprising:

[0008] S1 constructs the train longitudinal dynamics model based on train parameter errors and uncertainty interference;

[0009] S2 tracks the interior of the train in the relative distance braking mode under the virtual reconnection mode based on the train longitudinal dynamics model, obtains train braking data, establishes a high-speed train safety braking model, and calculates the expected tracking interval of the virtual reconnection high-speed train through the high-speed train safety braking model;

[0010] S3 takes into account the train parameters M, a, b, c and external interference G based on the acquired line data.

[0011] Offline calculation of train operation reference curve through dynamic programming algorithm;

[0012] S4 uses the model predictive control algorithm to set the controlled variables of the high-speed train, establish the train state equation and train operation prediction model;

[0013] S5 sets the control optimization target of the leading train as follows: the running speed of the train is the maximum under the premise of satisfying the state and input constraints, and establishes the objective function and constraint conditions of the leading train according to the execution results of steps S1 to S4;

[0014] S6, according to the control optimization target of the leading train set in step S5, sets the control optimization target of the following train as follows: under the condition of meeting the safety speed limit, the speed difference between the following train and the leading train is as small as possible, and the running tracking interval between the following train and the leading train is as close to the expected interval as possible, and establishes the objective function and constraint conditions of the following train;

[0015] S7, based on the execution results of steps S1 to S4, at each sampling moment, solves the control optimization target of the leading train and the control optimization target of the following train through the model predictive controller to obtain the control quantity, and performs interval control on the trains.

[0016] Preferably, step S1 comprises:

[0017] S11 Let i be the i-th train in the formation in the virtual reconnection mode, through the formula

[0018]

[0019] Establish the longitudinal dynamic equation of the i-th train; in formula (1), M i represents the mass of the i-th train, a i represents the running acceleration of the ith train, u i represents the traction or braking force of the i-th train, R i It is a function of train speed and position, representing the train running resistance, including basic resistance f and ramp additional resistance f s and the additional resistance f R , respectively given by the following formulas (2)(3)(4):

[0020] f=a+bv+cv 2 (2)

[0021] f s =i s g(N / t) (3)

[0022]

[0023] In formula (2), a, b, c are the coefficients of the basic running resistance of the train, and v is the current running speed of the train. When the train is running on a slope, the component of gravity in the slope direction is the additional slope resistance of the train. For the convenience of calculation, the slope resistance is converted. In formula (3), i s is the thousandth of the slope of the slope the train is currently on, g is the acceleration of gravity; the resistance generated by the friction between the wheels and the track of the curved track is the additional resistance of the train curve, where A is a constant between 450 and 800, and R is the curve radius of the line;

[0024] S12 pass-through

[0025]

[0026] The longitudinal dynamic equation of the i-th train is established considering the parameter error and the interference of uncertain factors; where r is the train rotation mass coefficient, which is a constant; i s is the current position of the i-th train; u f is the traction coefficient of the train, F t,i is the traction force on the i-th train; u b is the braking coefficient of the train, F b,i is the braking force on the i-th train; p(t) is the parameter error influence, d(t) is the restoring force of the uncertainty factor interference; the traction coefficient and the braking coefficient satisfy the following formula (6):

[0027]

[0028] The parameter error influence p(t) and the uncertainty factor interference recovery force d(t) satisfy the following formula (7):

[0029] |p(t)|≤G p ,|d(t)|≤G d (7); In formula (7), G p is the upper limit of the parameter error influence, G d The upper limit of the recovery capacity is disturbed by uncertain factors and is a normal number.

[0030] Preferably, step S2 comprises:

[0031] S21 Based on the longitudinal dynamics model of the train, a relative distance braking model of a virtual reconnected high-speed train considering the safety envelope is established;

[0032] S22 is based on the relative distance braking mode, through the formula

[0033]

[0034] A calculation model for the tracking distance of adjacent trains in the virtual reconnection mode is established; where d1 and d2 are the safety envelope distances between adjacent trains, L react Indicates the driver's reaction distance when the following train brakes. Indicates the braking distance of the following train, represents the braking distance of the leading train, ΔL represents the distance between the front and rear trains when they are completely stopped, d des Indicates the ideal tracking interval at the moment braking begins.

[0035] Preferably, step S3 comprises:

[0036] S31 pass-through

[0037]

[0038] The optimization problem of virtual reconnection train i is established based on dynamic programming algorithm; where v i Indicates the running speed of the train at the current position, J i represents the optimization problem of the ith train for virtual reconnection, which is the global minimum of the indicator function, q i represents the dynamic programming index function set for virtual reconnected train operation, i represents the current sampling step, N s Indicates the total number of sampling points, q i The specific expression of is as follows:

[0039]

[0040] In formula (10), q i is set as a function of the train speed at step i and step i+1, v lim (s i ) indicates the maximum speed limit of the train when the train is at the current position. Indicates the weight of the current speed deviation from the maximum speed limit, which is a constant greater than zero. The running speed of the high-speed train at step i+1 is v i+1 Through the following formula

[0041]

[0042] Calculate and obtain;

[0043] S32 recursively derives the equation through the final optimization target

[0044]

[0045] Solve the optimization problem of virtual reconnection train i based on dynamic programming algorithm; where, It means that when sampling at the i-th step, the speed at the end of the sub-interval is v i, from step i to step N s The optimal value of the stage, J i+1 (v i+1 ) represents the i+1th step, and the speed at the end of the subinterval is v i+1 When, from step i+1 to step N s The optimal value of the stage of the step. From the last stage, solve the optimal index function of each interval at different terminal speeds until i = 1;

[0046] S33 establishes the following constraint conditions based on the dynamic programming objective function and the actual train operation process:

[0047] u i =u(v i ,v i+1 ) (13-1)

[0048]

[0049] 0≤v i ≤v lim (s i ) (13-3)

[0050]

[0051]

[0052] In the formula, u i represents the traction / braking force on the train at step i, a dr is the maximum acceleration of the train during operation, a br is the maximum braking deceleration, formula (13-2) indicates that the train force needs to meet the power limit; formula (13-3) indicates the train running speed limit, formula (13-4) is the terminal constraint in the dynamic planning process, which is used to indicate that the speed of the front and rear vehicles should be consistent at the end of the virtual reconnected formation, and formula (13-5) indicates the initial condition that formula (13) needs to meet;

[0053] S34 calculates the optimal speed curve v of the high-speed train offline according to the above formulas (9)-(13), combining the train parameters, line information and external interference, which are all known parameters DP , the high-speed train running optimal speed curve v DP As a reference speed curve for virtual reconnected high-speed train based on model predictive control.

[0054] Preferably, step S4 comprises:

[0055] S41 uses the model predictive control algorithm and combines the high-speed train operation process to

[0056] u=uf F t,i (v)-u b F b,i (v) (14)

[0057] The controlled quantity is set to the actual traction force / braking force u of the train; the traction and braking coefficients satisfy formula (6);

[0058] S42 is based on the set actual traction force / braking force u of the train, through the formula

[0059]

[0060]

[0061] The state equation is set as the current running speed of the train, the current position of the train and the comprehensive force of the train; in formula (15-1), v i It is expressed as the speed of the i-th train, which is s i For the derivative of time t; in formula (15-2), F represents the comprehensive braking / traction force of the train, u represents the actual controlled braking / traction force, and the specific calculation method is as shown in formula (14), τ represents the longitudinal dynamic inertia lag constant of the train;

[0062] S43 discretizes equations (14) to (15) to obtain the train operation prediction model equation:

[0063] x=(s,v,F) T (16)

[0064]

[0065] In formula (16), x represents the running state vector of the virtual multiplexed train defined in the prediction model, which is actually the state space expression of the current position, speed and comprehensive controlled force of the train; formula (17) represents the discretized state update equation.

[0066] Preferably, step S5 comprises:

[0067] S51 establishes the objective function of the leading train by setting the control optimization goal of the leading train to maximize the running speed while running smoothly under the premise of satisfying the state and input constraints.

[0068]

[0069] In the formula, J represents the objective function value. According to the requirements of the model predictive control algorithm, the prediction time domain is set to [t, t+N P ],K vl Indicates the weight of the output speed deviating from the maximum speed; K represents the speed value of the preceding vehicle at time t predicted at time k; jl Indicates the weight of the current acceleration rate of change deviating from the maximum value; represents the acceleration change rate of the preceding vehicle at the kth moment predicted at the tth moment, as shown in the following formula (19):

[0070]

[0071] In formula (19), It represents the acceleration change rate of the preceding vehicle at time t predicted at the kth moment, They respectively represent the force conditions (state quantities) of the preceding vehicle at the kth and k+1th moments predicted at the moment t; Formula (19) is used to represent the running stability of the train;

[0072] S52 is based on the model predictive control algorithm and combines the virtual high-speed train operation model to establish the leading train operation constraint model

[0073]

[0074]

[0075]

[0076]

[0077]

[0078] Formula (20-1) represents the state space equation and initial state in formula (16); Formula (20-2) represents the speed constraint; Formula (20-3) represents the train input constraint, including the maximum traction / braking force limit and the maximum traction / braking power limit; Formula (20-4) represents the terminal constraint, where is the upper limit of the reference speed calculated in step 3; Formula (20-5) represents the acceleration change rate limit value related to the state variable in Formula (19).

[0079] Preferably, step S6 comprises:

[0080] S61 establishes the objective function of the following train by setting the control optimization target of the following train as follows: the speed difference between the following train and the leading train is as small as possible and the running tracking interval between the following train and the leading train is as close to the expected interval as possible under the condition of meeting the safety speed limit.

[0081]

[0082] In the formula, K vf represents the weight of the speed difference between the following train and the leading train deviating from the maximum speed, represents the speed value of the preceding vehicle at time t predicted at time k, K represents the speed value of the following vehicle at time k predicted at time t; f Indicates that the current tracking interval deviates from the expected tracking interval weight, d k|t represents the actual interval between the current tracking train and the leading train, as shown in the following formula (22); K jf Indicates the weight of the current acceleration rate of change deviating from the maximum value, represents the acceleration change rate of the following vehicle at the kth moment predicted at the tth moment, which is specifically shown in the following formula (23):

[0083]

[0084] In formula (22), represents the train position at time k predicted by the preceding train at time t, represents the position of the following vehicle at time t predicted at time k, L represents the length of the train,

[0085]

[0086] In formula (23), It represents the acceleration change rate of the following vehicle at the kth moment predicted at the tth moment, They respectively represent the force conditions at the kth and k+1th moments predicted by the following train at the moment t;

[0087] S62 is based on the model predictive control algorithm and combines the virtual high-speed train operation model to establish the following train operation constraint model

[0088]

[0089]

[0090]

[0091]

[0092]

[0093] d des ≤d k|t +e ss (24-6);

[0094] Formula (24-1) is the state space equation and initial state of the following train in Formula (16); Formula (24-2) represents the speed constraint, Formula (24-3) represents the following train input constraint, including the maximum traction / braking force limit and the maximum traction / braking power limit, and Formula (24-4) represents the terminal constraint, where is the upper bound of the reference speed calculated in step 3, equation (24-5) represents the acceleration rate limit associated with the state variable in equation (23), and equation (24-6) represents the safety constraint, where e ss Represents the interval calculation error, which is set as a constant based on experience.

[0095] It can be seen from the technical solutions provided by the above-mentioned embodiments of the present invention that the embodiments of the present invention.

[0096] Additional aspects and advantages of the present invention will be given in part in the following description, which will become obvious from the following description, or may be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0097] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0098] Figure 1 A processing flow chart of a virtual reconnected high-speed train tracking interval control method based on model prediction provided by the present invention;

[0099] Figure 2 A schematic diagram of the implementation principle of a virtual reconnected high-speed train tracking interval control method based on model prediction provided by the present invention;

[0100] Figure 3 A virtual reconnected high-speed train tracking interval control method based on model prediction provided by the present invention is a virtual reconnected high-speed train relative distance braking model considering the safety envelope based on multi-dimensional perception information such as train position, speed, acceleration, etc.;

[0101] Figure 4 A schematic diagram of a specific flow of a high-speed train optimization algorithm based on dynamic programming for a virtual reconnected high-speed train tracking interval control method based on model prediction provided by the present invention;

[0102] Figure 5 A virtual reconnected high-speed train tracking interval control method based on model prediction provided by the present invention and a virtual reconnected train operation control process framework based on model prediction algorithm;

[0103] Figure 6 A schematic diagram of a specific flow chart of a model predictive control algorithm for a virtual reconnected high-speed train tracking interval control method based on model prediction provided by the present invention. DETAILED DESCRIPTION

[0104] The embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be interpreted as limiting the present invention.

[0105] It will be understood by those skilled in the art that, unless expressly stated, the singular forms "one", "said", and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present invention refers to the presence of the features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof. It should be understood that when we refer to an element as being "connected" or "coupled" to another element, it may be directly connected or coupled to the other element, or there may be intermediate elements. In addition, the "connection" or "coupling" used herein may include wireless connection or coupling. The term "and / or" used herein includes any unit and all combinations of one or more associated listed items.

[0106] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by those skilled in the art in the art to which the present invention belongs. It should also be understood that terms such as those defined in common dictionaries should be understood to have meanings consistent with the meanings in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless defined as herein.

[0107] To facilitate understanding of the embodiments of the present invention, several specific embodiments will be further explained below with reference to the accompanying drawings, and each embodiment does not constitute a limitation on the embodiments of the present invention.

[0108] At present, the research on virtual reconnected train tracking interval control technology at home and abroad is still in the initial exploration stage. How to ensure driving safety during operation, how to dynamically adjust the tracking interval between reconnected trains, how to ensure the impact of frequent state transitions between leading trains and following trains on operating efficiency in the reconnected mode, etc., need further research. There is still little research on safe and efficient train operation control technology and specific control theory methods. Therefore, it is of great theoretical and practical significance to carry out research on the tracking interval control method of high-speed trains in the virtual reconnected mode.

[0109] In order to improve the carrying capacity of high-speed railway lines, reduce the train running interval without reducing the train running speed, and ensure the safety of virtual reconnection of high-speed trains, the present invention provides a high-speed train tracking interval calculation method for virtual reconnection. The method mainly includes: considering the interference of train parameter errors and operational uncertainties, establishing a longitudinal dynamic model of the train; based on the dynamic model, establishing a tracking train safety braking model in the virtual reconnection mode, and calculating the expected tracking interval of the virtual reconnection high-speed train; based on the current line data, offline calculating the train operation reference curve based on the dynamic programming algorithm; according to the operation characteristics of the virtual reconnection train, designing a distributed model prediction controller suitable for high-speed trains, converting the operation control process of the virtual reconnection train into a constrained optimization control problem; according to the different control targets of the front and rear vehicles, according to the braking distance between the front and rear vehicles, different prediction models, objective functions and constraints are established for the leading train and the following train respectively; at each sampling time, the optimization problem is solved by the model prediction controller to obtain the control quantity, realize the complete interval control process, realize the tracking interval optimization control in the virtual reconnection operation mode of the high-speed train, and ensure the safe tracking operation of the high-speed train in the virtual reconnection mode.

[0110] See also Figure 1 The present invention provides a virtual reconnected high-speed train tracking interval control method based on model prediction, comprising the following steps:

[0111] S1 constructs the train longitudinal dynamics model based on train parameter errors and uncertainty interference;

[0112] S2 tracks the interior of the train in the relative distance braking mode under the virtual reconnection mode based on the train longitudinal dynamics model, obtains train braking data, establishes a high-speed train safety braking model, and calculates the expected tracking interval of the virtual reconnection high-speed train through the high-speed train safety braking model;

[0113] S3 takes into account the train parameters M, a, b, c and external interference G based on the acquired line data.

[0114] Offline calculation of train operation reference curve through dynamic programming algorithm;

[0115] S4 uses the model predictive control algorithm to set the controlled variables of the high-speed train, establish the train state equation and train operation prediction model;

[0116] S5 sets the control optimization target of the leading train as follows: the running speed of the train is the maximum under the premise of satisfying the state and input constraints, and establishes the objective function and constraint conditions of the leading train according to the execution results of steps S1 to S4;

[0117] S6, according to the control optimization target of the leading train set in step S5, sets the control optimization target of the following train as follows: under the condition of meeting the safety speed limit, the speed difference between the following train and the leading train is as small as possible, and the running tracking interval between the following train and the leading train is as close to the expected interval as possible, and establishes the objective function and constraint conditions of the following train;

[0118] S7, based on the execution results of steps S1 to S4, at each sampling moment, solves the control optimization target of the leading train and the control optimization target of the following train through the model predictive controller to obtain the control quantity, and performs interval control on the trains.

[0119] In the preferred embodiment provided by the present invention, the following process is taken as an example. Assuming that there are two unit trains in the virtual multiplexed vehicle fleet, the entire virtual multiplexed vehicle fleet operates in a leading train-following train mode, that is, the first train in the vehicle fleet is set as the leading train, and the subsequent trains are set as following trains, and on this basis, the queue is expanded to a multi-vehicle formation operation. In the present invention, it is set that the entire virtual multiplexed vehicle fleet has two unit trains and uses the control technology mentioned in the present invention, and the specific implementation includes the following steps:

[0120] Step 1: Establish a train longitudinal dynamics model that takes into account train parameter errors and interference from uncertain factors;

[0121] Specific:

[0122] Step 1-1, establish the longitudinal dynamics model of high-speed train, specifically:

[0123] Assume that i is the i-th train in the formation under the virtual reconnection mode, and the longitudinal dynamic equation of the i-th train is as follows:

[0124]

[0125] Where M i represents the mass of the i-th train, a i represents the running acceleration of the ith train, u i represents the traction or braking force of the i-th train, R i It is a function of train speed and position, representing the train running resistance, including basic resistance f and ramp additional resistance f s and the additional resistance f R , respectively given by the following formulas (2)(3)(4):

[0126] f=a+bv+cv 2 (2)

[0127] f s =i s g(N / t) (3)

[0128]

[0129] In formula (2), a, b, c are the coefficients of the basic running resistance of the train, and v is the current running speed of the train. When the train is running on a slope, the component of gravity in the slope direction is the additional slope resistance of the train. For the convenience of calculation, the slope resistance is converted. In formula (3), i s is the thousandth of the slope of the slope the train is currently on, g is the acceleration of gravity; the resistance generated by the friction between the wheels and the track of the curved track is the additional resistance of the train curve, where A is a constant, usually between 450 and 800, and R is the curve radius of the line.

[0130] Step 1-2, considering the parameter error and the interference of uncertain factors, the longitudinal dynamic equation of the i-th train is as follows (5):

[0131]

[0132] Among them, r is the train rotation mass coefficient, which is a constant; i s is the current position of the i-th train; u f is the traction coefficient of the train, F t,i is the traction force on the i-th train; u b is the braking coefficient of the train, F b,i is the braking force on the i-th train; p(t) is the influence of parameter error; d(t) is the restoring force caused by the interference of uncertain factors.

[0133] Since the traction and braking states of the train cannot occur at the same time, the traction and braking coefficients satisfy the following formula (6):

[0134]

[0135] The parameter error influence p(t) and the uncertainty factor interference recovery force d(t) are bounded and satisfy the following formula (7):

[0136] |p(t)|≤G p ,|d(t)|≤G d (7).

[0137] Among them, G p is the upper limit of the parameter error influence, G d The upper limit of the resilience is disturbed by uncertain factors, and they are all normal numbers;

[0138] Step 2: Based on the above train dynamics model, the “relative distance braking” mode is used to track the interior of the train in the virtual reconnection mode, a high-speed train safety braking model is established, and the expected tracking interval of the virtual reconnection high-speed train is calculated.

[0139] The relative distance braking model considering the safety envelope is established, and the expected tracking interval of the virtual reconnected high-speed train is calculated as follows:

[0140] Step 2-1, establish a virtual high-speed train relative distance braking model considering the safety envelope, such as Figure 3 shown.

[0141] Wherein, v1 represents the running speed of the leading train in the virtual reconnection mode when emergency braking occurs, v2 represents the running speed of the following train in the virtual reconnection mode when the commonly used maximum braking is applied, d1 and d2 are the safety envelope distances between adjacent trains, respectively, and L react Indicates the driver's reaction distance when the following train brakes. Indicates the braking distance of the following train, represents the braking distance of the leading train, ΔL represents the distance between the front and rear trains when they are completely stopped, d des Indicates the ideal tracking interval at the moment braking begins.

[0142] Step 2-2, based on the “relative distance braking” mode, establish a calculation model for the tracking distance of adjacent trains in the virtual reconnection mode, as shown in the following formula (8):

[0143]

[0144] Based on the "relative distance braking" mode, when the leading train applies emergency braking and the following train applies maximum common braking, when both trains stop, they can still maintain a distance of ΔL. It is considered that the distance between the two trains at the beginning of braking is d des is the ideal tracking interval.

[0145] Step 3: Considering that the train parameters M, a, b, c and external interference G are known, the train operation reference curve is calculated offline based on the dynamic programming algorithm according to the current line data.

[0146] On the basis of the above scheme, Figure 4 As shown, the process of offline calculation of the optimal operation curve of the high-speed train in step 3 is as follows:

[0147] Step 3-1: Since the force is set as a function of position in equation (5) in step 1, combined with the dynamic programming algorithm flow, the process to be optimized is divided into stages according to the spatial order. The train operation process is sampled with a step size of Δs. i represents the position of the train at the i-th sampling step, v i Represents the running speed of the train at the current position, and establishes the optimization problem of the virtual reconnection train i based on the dynamic programming algorithm, as shown in the following formula (9):

[0148]

[0149] Among them, J i represents the optimization problem of the ith train for virtual reconnection, which is the global minimum of the indicator function, q i represents the dynamic programming index function set for virtual reconnected train operation, i represents the current sampling step, N s Indicates the total number of sampling points, q i The specific expression of is as follows:

[0150]

[0151] Among them, q i Set as a function of the train speed at step i and step i+1, v lim (s i ) represents the maximum speed limit of the train when the train is at the current position. To ensure the safe running of the train, the index function is set as the difference between the actual running speed of the train and the safe speed limit of the line. It indicates the weight of the current speed deviating from the maximum speed limit, which is usually a constant greater than zero.

[0152] According to the train dynamics model, the trapezoidal formula is used to discretize it to obtain the high-speed train running speed at step i+1, v i+1 The specific expression is shown in the following formula (1):

[0153]

[0154] Step 3-2, solve the optimization problem established above according to the optimality theorem of dynamic programming, and use the inverse method to establish the final optimization target recursive equation as shown in the following formula (12):

[0155]

[0156] in, It means that when sampling at the i-th step, the speed at the end of the sub-interval is v i , from step i to step N s The optimal value of the stage, J i+1 (v i+1 ) represents the i+1th step, and the speed at the end of the subinterval is v i+1 When, from step i+1 to step N s The optimal value of the stage of step. From the last stage, solve the optimal index function of different terminal speeds in each interval until i=1.

[0157] Step 3-3, based on the dynamic programming objective function and combined with the actual train operation process, establish the constraint conditions shown in the following formula (13):

[0158] ui =u(v i ,v i+1 ) (13-1)

[0159]

[0160] 0≤v i ≤v lim (s i ) (13-3)

[0161]

[0162]

[0163] Among them, u i represents the traction / braking force on the train at step i, a dr is the maximum acceleration of the train during operation, a br is the maximum braking deceleration, formula (13-2) indicates that the train force needs to meet the power limit; formula (13-3) indicates the train running speed limit; formula (13-4) is the terminal constraint in the dynamic planning process, indicating that the speed of the front and rear vehicles should be kept consistent at the end of the virtual reconnected formation; formula (13-5) indicates the initial conditions that formula (13) needs to meet.

[0164] Step 3-4, according to the above formulas (9)-(13), when the train parameters, line information and external interference are all known, the optimal speed curve v of the high-speed train is calculated offline. DP , and this speed is used as the reference speed curve of the virtual reconnected high-speed train based on model predictive control.

[0165] Based on the above scheme, according to the model predictive control algorithm process described in step 4, the controlled quantity, state equation and train operation prediction model are set, such as Figure 5 As shown, the process is as follows:

[0166] Step 4-1, according to the model predictive control algorithm flow, combined with the high-speed train operation process, the controlled quantity is set to the actual traction force / braking force of the train, represented by u, as shown in the following formula (14):

[0167] u=u f F t,i (v)-u b F b,i (v) (14)

[0168] Since the traction and braking states of the train cannot occur at the same time, its traction and braking coefficients satisfy the above formula (6).

[0169] Step 4-2, according to the controlled quantity set in 4-1, combined with the running characteristics of the high-speed train, the state equation is set as the current running speed of the train, the current position of the train and the comprehensive force of the train, as shown in the following equation (15):

[0170]

[0171]

[0172] In formula (15-1), v i It is expressed as the speed of the i-th train, which is s i For the derivative with respect to time t; in formula (15-2), F represents the comprehensive braking / traction force of the train, u represents the actual controlled braking / traction force, the specific calculation is shown in formula (14), and τ represents the longitudinal dynamic inertia lag constant of the train.

[0173] Step 4-3: In order to better apply the model predictive control algorithm, the train state equation obtained from the above formula is discretized to obtain the state space equation, which is used as the train prediction model, as shown in the following equations (16) and (17):

[0174] x=(s,v,F) T (16)

[0175]

[0176] In formula (16), x represents the running state vector of the virtual multiplexed train defined in the prediction model, which is actually the state space expression of the current position, speed and comprehensive controlled force of the train; formula (17) represents the discretized state update equation.

[0177] Step 5: Set the control optimization goal of the leading train as: the train runs at the maximum speed under the premise of satisfying the state and input constraints, and establish the objective function and constraint conditions of the leading train;

[0178] Based on the above scheme, the process of designing the target cost function and constraint conditions of the leading train operation based on the model prediction algorithm described in step 5 is as follows:

[0179] Step 5-1, for the leading train in the high-speed train formation in the virtual reconnection mode, it is first clarified that the leading train is not subject to the safety interval constraints during operation. Therefore, the control optimization goal of the leading train is set to maximize the running speed while the train runs smoothly under the premise of satisfying the state and input constraints. The objective function is established as shown in the following formula (18):

[0180]

[0181] In the formula, J represents the objective function value. According to the requirements of the model predictive control algorithm, the prediction time domain is set to [t, t+NP ],K vl The weight representing the deviation of the output speed from the maximum speed (representing the deviation from the equilibrium state and the difference in the control variable); K represents the speed value of the preceding vehicle at time t predicted at time k; jl Indicates the weight of the current acceleration rate of change deviating from the maximum value; represents the acceleration change rate of the preceding vehicle at the kth moment predicted at the tth moment (related to the force on the train), as shown in the following formula (19):

[0182]

[0183] In the formula, It represents the acceleration change rate of the preceding vehicle at time t predicted at the kth moment, They represent the force conditions (state quantities) of the preceding vehicle at the kth and k+1th moments predicted at the tth moment. Formula (19) can be used to represent the running stability of the train.

[0184] Step 5-2, based on the requirements of the model predictive control algorithm and combined with the virtual reconnected high-speed train operation model, the leading train operation constraint model is designed, as shown in the following formula (20):

[0185]

[0186]

[0187]

[0188]

[0189]

[0190] Formula (20-1) represents the state space equation and initial state described in formula (16); Formula (20-2) represents the speed constraint; Formula (20-3) represents the train input constraint, including the maximum traction / braking force limit and the maximum traction / braking power limit; Formula (20-4) represents the terminal constraint, where is the upper limit of the reference speed calculated in step 3; Formula (20-5) represents the acceleration change rate limit value related to the state variable in Formula (19).

[0191] Step 6: Set the control optimization goal of the following train as follows: under the condition of meeting the safety speed limit, the speed difference between the following train and the leading train is as small as possible, and the running tracking interval between the following train and the leading train is as close to the expected interval as possible, and establish the objective function and constraints of the leading train.

[0192] Based on the above scheme, the process of designing the target cost function and constraint conditions of the following train operation based on the model prediction algorithm described in step 6 is as follows:

[0193] Step 6-1, for the following train in the high-speed train formation in the virtual reconnection mode, firstly, it is clarified that its control target is to make the speed difference between it and the leading train as small as possible and the running tracking interval between it and the leading train as close to the expected interval as possible under the condition of meeting the safety speed limit. Then, the objective function is established as shown in the following formula (21):

[0194]

[0195] In the formula, K vf represents the weight of the speed difference between the following train and the leading train deviating from the maximum speed (representing the deviation from the equilibrium state and the difference in the control variables), represents the speed value of the preceding vehicle at time t predicted at time k, K represents the speed value of the following vehicle at time k predicted at time t; f Indicates that the current tracking interval deviates from the expected tracking interval weight, d k|t represents the actual interval between the current tracking train and the leading train, as shown in the following formula (22); K jf Indicates the weight of the current acceleration rate of change deviating from the maximum value, represents the acceleration change rate of the following vehicle at the kth moment predicted at the tth moment (related to the force on the train), as shown in the following formula (23):

[0196]

[0197] In the formula, represents the train position at time k predicted by the preceding train at time t, represents the position of the following vehicle at time t predicted at time k, and L represents the length of the train;

[0198]

[0199] In the formula, It represents the acceleration change rate of the following vehicle at the kth moment predicted at the tth moment, They represent the force conditions (state quantities) at the kth and k+1th moments predicted by the following train at time t. Formula (23) can be used to represent the running stability of the following train.

[0200] Step 6-2, based on the requirements of the model predictive control algorithm and combined with the virtual reconnected high-speed train operation model, the following train operation constraint model is designed, as shown in the following formula (24):

[0201]

[0202]

[0203]

[0204]

[0205]

[0206] d des ≤d k|t +e ss (24-6).

[0207] Formula (24-1) is the state space equation and initial state described in Formula (16) of the following train; Formula (24-2) represents the speed constraint; Formula (24-3) represents the input constraint of the following train, including the maximum traction / braking force limit and the maximum traction / braking power limit; Formula (24-4) represents the terminal constraint, where is the upper limit of the reference speed calculated in step 3; Formula (24-5) represents the acceleration rate limit associated with the state variable in Formula (23); Formula (24-6) represents the safety constraint, where e ss Represents the interval calculation error, which is set as a constant based on experience.

[0208] Step 7: Based on all the above steps, the optimization problem is solved by the model predictive controller to obtain the control quantity and realize the complete interval control process. The specific solution process is as follows: Figure 6 shown.

[0209] In summary, the present invention provides a virtual reconnected high-speed train tracking interval control method based on model prediction, by establishing a train longitudinal dynamics model considering the interference of train parameter errors and operational uncertainties, on the basis of the above train dynamics model, in the virtual reconnected mode, the tracking train adopts the "relative distance braking" mode for tracking, establishes a high-speed train safety braking model, and calculates the expected tracking interval of the virtual reconnected high-speed train, based on the current line data, the train operation optimization curve is calculated offline based on the dynamic programming algorithm, and it is used as a reference curve of the model prediction control algorithm, according to the operation characteristics of the virtual reconnected train, a distributed model prediction controller suitable for high-speed trains is designed, and the operation control process of the virtual reconnected train is converted into a constrained optimization control problem, according to the different control targets of the front and rear vehicles, according to the braking distance between the front and rear vehicles, different prediction models, objective functions and constraints are established for the leading train and the following train, at each sampling time, the optimization problem is solved by the model prediction controller to obtain the control quantity, and a complete interval control process is realized. The present invention can realize the tracking interval optimization control under the virtual reconnected operation mode of the high-speed train, and ensure the safe tracking operation of the high-speed train under the virtual reconnected mode.

[0210] Those skilled in the art can understand that the accompanying drawings are only schematic diagrams of an embodiment, and the modules or processes in the accompanying drawings are not necessarily required to implement the present invention.

[0211] It can be known from the description of the above implementation methods that those skilled in the art can clearly understand that the present invention can be implemented by means of software plus a necessary general hardware platform. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which can be stored in a storage medium such as ROM / RAM, a magnetic disk, an optical disk, etc., and includes a number of instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in the various embodiments of the present invention or certain parts of the embodiments.

[0212] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device or system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. The device and system embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0213] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A virtual reconnected high-speed train tracking interval control method based on model prediction, characterized in that: include: S1 constructs the train longitudinal dynamics model based on train parameter errors and uncertainty interference; S2 tracks the interior of the train in a relative distance braking mode in a virtual reconnection mode based on the longitudinal dynamics model of the train, obtains train braking data, establishes a high-speed train safety braking model, and calculates the expected tracking interval of the virtual reconnection high-speed train through the high-speed train safety braking model; specifically includes: S21, based on the longitudinal dynamics model of the train, establishing a relative distance braking model of a virtual reconnected high-speed train taking into account a safety envelope; S22 is based on the relative distance braking mode, through the formula A calculation model for the tracking distance of adjacent trains in the virtual reconnection mode is established; where d1 and d2 are the safety envelope distances between adjacent trains, L react Indicates the driver's reaction distance when the following train brakes. Indicates the braking distance of the following train, represents the braking distance of the leading train, △L represents the distance between the front and rear trains when they are completely stopped, d des represents the ideal tracking interval at the moment of braking initiation; S3 calculates the train operation reference curve offline through a dynamic programming algorithm based on the acquired line data and considering that the train parameters M, a, b, c and external interference G are known; specifically, it includes: S31 pass-through The optimization problem of virtual reconnection train i is established based on dynamic programming algorithm; where v i Indicates the running speed of the train at the current position, J i represents the optimization problem of the ith train for virtual reconnection, which is the global minimum of the indicator function, q i represents the dynamic programming index function set for virtual reconnected train operation, i represents the current sampling step, N s Indicates the total number of sampling points, q i The specific expression of is as follows: In formula (10), q i is set as a function of the train speed at step i and step i+1, v lim (s i ) indicates the maximum speed limit of the train when the train is at the current position. Indicates the weight of the current speed deviation from the maximum speed limit, which is a constant greater than zero. The running speed of the high-speed train at step i+1 is v i+1 Through the following formula Calculate and obtain; S32 recursively derives the equation through the final optimization target Solve the optimization problem of the virtual reconnection train i based on the dynamic programming algorithm; where, It means that when sampling at the i-th step, the speed at the end of the sub-interval is v i , from step i to step N s The optimal value of the stage, J i+1 (v i+1 ) represents the i+1th step, and the speed at the end of the subinterval is v i+1 When, from step i+1 to step N s The optimal value of the stage of the step is solved from the last stage forward in turn for the optimal index function at different terminal speeds in each interval until i = 1; S33 establishes the following constraint conditions based on the dynamic programming objective function and the actual train operation process: u i =u(v i ,v i+1 ) (13-1) 0≤v i ≤v lim (s i ) (13-3) In the formula, u i represents the traction / braking force on the train at step i, a dr is the maximum acceleration of the train during operation, a br is the maximum braking deceleration, formula (13-2) indicates that the train force needs to meet the power limit; formula (13-3) indicates the train running speed limit, formula (13-4) is the terminal constraint in the dynamic planning process, which is used to indicate that the speed of the front and rear vehicles should be consistent at the end of the virtual reconnected formation, and formula (13-5) indicates the initial condition that formula (13) needs to meet; S34 calculates the optimal speed curve v of the high-speed train offline according to the above formulas (9)-(13), combining the train parameters, line information and external interference, which are all known parameters DP , the high-speed train running optimal speed curve v DP As a reference speed curve for virtual reconnected high-speed trains based on model predictive control; S4 uses the model predictive control algorithm to set the controlled variables of the high-speed train, establish the train state equation and train operation prediction model; S5 sets the control optimization target of the leading train as follows: the running speed of the train is the maximum under the premise of satisfying the state and input constraints, and establishes the objective function and constraint conditions of the leading train according to the execution results of steps S1 to S4; S6, according to the control optimization target of the leading train set in step S5, sets the control optimization target of the following train as follows: under the condition of meeting the safety speed limit, the speed difference between the following train and the leading train is as small as possible, and the running tracking interval between the following train and the leading train is as close to the expected interval as possible, and establishes the objective function and constraint conditions of the following train; S7, based on the execution results of steps S1 to S4, at each sampling moment, solves the control optimization target of the leading train and the control optimization target of the following train through the model predictive controller to obtain the control quantity, and performs interval control on the trains.

2. The method according to claim 1, characterized in that: Step S1 includes: S11 Let i be the i-th train in the formation in the virtual reconnection mode, through the formula Establish the longitudinal dynamic equation of the i-th train; in formula (1), M i represents the mass of the i-th train, a i represents the running acceleration of the ith train, u i represents the traction or braking force of the i-th train, R i It is a function of train speed and position, representing the train running resistance, including basic resistance f and ramp additional resistance f s and the additional resistance f R , respectively given by the following formulas (2)(3)(4): f1+bv+cv 2 (2) f s =i s ·g(N / t) (3) In formula (2), a, b, c are the coefficients of the basic running resistance of the train, and v is the current running speed of the train. When the train is running on a slope, the component of gravity in the slope direction is the additional slope resistance of the train. For the convenience of calculation, the slope resistance is converted. In formula (3), i s is the thousandth of the slope of the slope the train is currently on, g is the acceleration of gravity; the resistance generated by the friction between the wheels and the track of the curved track is the additional resistance of the train curve, where A is a constant between 450 and 800, and R is the curve radius of the line; S12 pass-through The longitudinal dynamic equation of the i-th train is established considering the parameter error and the interference of uncertain factors; where r is the train rotation mass coefficient, which is a constant; i s is the current position of the i-th train; u f is the traction coefficient of the train, F t,i is the traction force on the i-th train; u b is the braking coefficient of the train, F b,i is the braking force on the i-th train; p(t) is the parameter error influence, d(t) is the uncertainty factor interference restoring force; the traction coefficient and braking coefficient satisfy the following formula (6): The parameter error influence p(t) and the uncertainty factor interference recovery force d(t) satisfy the following formula (7): p(t)|≤G p ,|d(t)|≤G d (7); In formula (7), G p is the upper limit of the parameter error influence, G d The upper limit of the recovery capacity is disturbed by uncertain factors and is a normal number.

3. The method according to claim 1, characterized in that Step S4 includes: S41 uses the model predictive control algorithm and combines the high-speed train operation process to u=u f F t,i (v)-u b F b,i (v) (14) The controlled quantity is set to the actual traction force / braking force u of the train; the traction and braking coefficients satisfy formula (6); S42 is based on the set actual traction force / braking force u of the train, through the formula The state equation is set as the current running speed of the train, the current position of the train and the comprehensive force of the train; in formula (15-1), v i It is expressed as the speed of the i-th train, which is s i For the derivative of time t; in formula (15-2), F represents the comprehensive braking / traction force of the train, u represents the actual controlled braking / traction force, and the specific calculation method is as shown in formula (14), τ represents the longitudinal dynamic inertia lag constant of the train; S43 discretizes equations (14) to (15) to obtain the equation of the train operation prediction model: x=(s,v,F) Τ (16) In formula (16), x represents the running state vector of the virtual multiplexed train defined in the prediction model, which is actually the state space expression of the current position, speed and comprehensive controlled force of the train; formula (17) represents the discretized state update equation.

4. The method according to claim 3, characterized in that Step S5 includes: S51 establishes the objective function of the leading train by setting the control optimization goal of the leading train to maximize the running speed while running smoothly under the premise of satisfying the state and input constraints. In the formula, J represents the objective function value. According to the requirements of the model predictive control algorithm, the prediction time domain is set to [t, t+N P ],K vl Indicates the weight of the output speed deviating from the maximum speed; K represents the speed value of the preceding vehicle at time t predicted at time k; jl Indicates the weight of the current acceleration rate of change deviating from the maximum value; represents the acceleration change rate of the preceding vehicle at the kth moment predicted at the tth moment, as shown in the following formula (19): In formula (19), It represents the acceleration change rate of the preceding vehicle at time t predicted at the kth moment, They respectively represent the force conditions (state quantities) of the preceding vehicle at the kth and k+1th moments predicted at the moment t; Formula (19) is used to represent the running stability of the train; S52 is based on the model predictive control algorithm and combines the virtual high-speed train operation model to establish the leading train operation constraint model Formula (20-1) represents the state space equation and initial state described in formula (16); Formula (20-2) represents the speed constraint; Formula (20-3) represents the train input constraint, including the maximum traction / braking force limit and the maximum traction / braking power limit; Formula (20-4) represents the terminal constraint, where is the upper limit of the reference speed calculated in step 3; Formula (20-5) represents the acceleration change rate limit value related to the state variable in Formula (19).

5. The method according to claim 4, characterized in that Step S6 includes: S61 establishes the objective function of the following train by setting the control optimization target of the following train as follows: the speed difference between the following train and the leading train is as small as possible and the running tracking interval between the following train and the leading train is as close to the expected interval as possible under the condition of meeting the safety speed limit. In the formula, K vf represents the weight of the speed difference between the following train and the leading train deviating from the maximum speed, represents the speed value of the preceding vehicle at time t predicted at time k, K represents the speed value of the following vehicle at time t predicted at the kth moment; f Indicates that the current tracking interval deviates from the expected tracking interval weight, d k|t represents the actual interval between the current tracking train and the leading train, as shown in the following formula (22); K jf Indicates the weight of the current acceleration rate of change deviating from the maximum value, represents the acceleration change rate of the following vehicle at the kth moment predicted at the tth moment, which is specifically shown in the following formula (23): In formula (22), represents the train position at time k predicted by the preceding train at time t, represents the position of the following vehicle at time t predicted at time k, L represents the length of the train, In formula (23), It represents the acceleration change rate of the following vehicle at the kth moment predicted at the tth moment, They respectively represent the force conditions at the kth and k+1th moments predicted by the following train at the moment t; S62 is based on the model predictive control algorithm and combines the virtual high-speed train operation model to establish the following train operation constraint model d des ≤d k|t +e ss (24-6); Formula (24-1) is the state space equation and initial state described in Formula (16) of the following train; Formula (24-2) represents the speed constraint, Formula (24-3) represents the following train input constraint, including the maximum traction / braking force limit and the maximum traction / braking power limit, and Formula (24-4) represents the terminal constraint, where is the upper bound of the reference speed calculated in step 3, equation (24-5) represents the acceleration rate limit associated with the state variable in equation (23), and equation (24-6) represents the safety constraint, where e ss Represents the interval calculation error, which is set as a constant based on experience.