Curtain wall keel unit and pre-assembly construction method

By pre-assembling the curtain wall keel pre-assembly unit on the ground, using the design of assembled columns, plug-in columns and connectors, the cumbersome installation of keels and connectors in curtain wall construction is solved, and a safer and more efficient installation process is achieved.

CN116104235BActive Publication Date: 2025-04-29THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310237476.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-14
Publication Date
2025-04-29
Estimated Expiration
2043-03-14

AI Technical Summary

Technical Problem

During curtain wall construction, the installation process of keels and connectors is complicated and poses a major safety hazard.

Method used

A curtain wall keel unit and pre-assembly construction method are provided. By pre-assemblying the keel pre-assembly unit on the ground, the design of assembled columns, plug-in columns and connectors is used to reduce the high-altitude operation steps and improve the installation stability.

Benefits of technology

It effectively reduces installation processes and steps, reduces safety hazards, and improves the installation efficiency and stability of curtain wall keels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116104235B_ABST
    Figure CN116104235B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of curtain wall construction, and specifically relates to a curtain wall keel unit and a pre-assembly construction method, including: a keel pre-assembly unit, the keel pre-assembly unit includes an assembled column, and a limit stop block and a plug column are respectively arranged in the inner cavities at the upper and lower ends of the assembled column; the connecting frame is in a "C" shape with an opening downward, both side surfaces of the connecting frame are inclined outward, the edge of the connecting frame is turned outward to form a buckling portion, and the buckling portion is in a "C" shape with an opening upward and buckles on the side edge of the assembled cross beam; the beneficial effects are: by pre-installing the keel pre-assembly unit on the ground, two keel pre-assembly units at adjacent upper and lower positions are connected through the assembled column and the plug column and kept stable by gravity, and two keel pre-assembly units at adjacent left and right positions are fixed through connecting pieces, thereby effectively reducing the installation process and installation steps and reducing potential safety hazards.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of curtain wall construction, and particularly to a curtain wall keel unit and a pre-assembly construction method. Background Art

[0002] Curtain wall projects are widely used in the construction of building structures such as urban office buildings. With the improvement of the aesthetic requirements of urban buildings, different types of curtain walls have emerged, such as glass curtain walls, stone curtain walls, and combined curtain walls.

[0003] In the prior art, for general frame curtain walls, other components such as vertical keels, horizontal keels, panels, and connectors need to be gradually installed on site.

[0004] However, since the curtain wall construction positions are mostly at high altitudes, the installation procedures of the keels and connectors for the staff are relatively cumbersome, the installation operation is difficult, and there are relatively large potential safety hazards. Therefore, the present invention proposes a curtain wall keel unit and a pre-assembly construction method to solve the above problems. Summary of the Invention

[0005] The purpose of the present invention is to provide a curtain wall keel unit and a pre-assembly construction method to solve the problem that the installation procedures of the curtain wall keels and connectors at high altitudes are relatively cumbersome as proposed in the above background art.

[0006] To achieve the above purpose, the present invention provides the following technical solution: A curtain wall keel unit, comprising:

[0007] A keel pre-assembly unit, the keel pre-assembly unit includes an assembled column, the upper and lower inner cavities of the assembled column are respectively provided with a limit stop block and a plug column, the plug column is inserted into the assembled column, and the side surface of the assembled column is fixedly installed with an assembled cross beam;

[0008] A connector, the connector is located at the end of the assembled cross beam, the connector includes a connecting frame, the connecting frame is in a "C" shape with an open bottom, both side surfaces of the connecting frame are inclined outwards, the edge of the connecting frame is turned outwards to form a buckling part, and the buckling part is in a "C" shape with an open top and buckles on the side edge of the assembled cross beam.

[0009] Preferably, there are four assembled cross beams, and the four assembled cross beams are respectively located at the upper and lower ends of both side surfaces of the assembled column, and the assembled cross beam is perpendicular to the assembled column.

[0010] Preferably, a U-shaped connecting frame is arranged inside the connecting frame, an adjustment slot hole is opened on the surface of the connecting frame, the end of the U-shaped connecting frame penetrates through the adjustment slot hole and tightly fixes two adjacent assembled cross beams, and an elastic cushion block is padded between the surface of the connecting frame and the inner wall of the assembled cross beam, and the elastic cushion block is fixedly bonded to the connecting frame.

[0011] Preferably, a pressing plate is pressed and fitted on the surface of the assembled crossbeam, and the pressing plate is sleeved on the outer side of the end of the U-shaped connecting frame and is pressed and fixed by a fastening nut.

[0012] Preferably, a pre-connected angle steel is provided at one end of the assembled crossbeam close to the assembled column, positioning holes are provided on the top and side surfaces of the pre-connected angle steel, a waist hole is provided on the end surface of the assembled crossbeam, and the pre-connected angle steel and the assembled crossbeam are fixedly connected by bolts.

[0013] Preferably, a reinforcing plate is fixedly provided on the inner side of the pre-connected angle steel, and a tensioning bolt is penetrated through the interior of the assembled column, and two ends of the tensioning bolt respectively fix two pre-connected angle steels.

[0014] Preferably, the limit stop is arranged in a hollow structure, a clamping slot is opened through the side of the limit stop, the limit stop is buckled on the outside of the tightening bolt from top to bottom through the clamping slot, a limiting protrusion is arranged in the middle of the clamping slot, and a guide chamfer is arranged at the lower end opening of the clamping slot.

[0015] Preferably, a mounting boss is fixedly provided on the back of the assembled column, the mounting boss is fixedly connected to the building wall, and wear-resistant rubber strips that fit the curtain wall are provided on both sides of the mounting boss.

[0016] Preferably, a plurality of the pre-assembly keel units are provided, and two vertically adjacent pre-assembly keel units are plug-connected via plug-in columns, and two horizontally adjacent pre-assembly keel units are fixedly connected via connectors.

[0017] A pre-assembly construction method of the curtain wall keel unit according to the above-mentioned method specifically comprises the following steps:

[0018] Step 1: Assemble the keel pre-assembly unit on the ground, fix the pre-connected angle steel to the side of the assembled column by tightening bolts, and fix the plug-in column to the lower end of the assembled column by tightening bolts, and then fix the assembled crossbeam to the pre-connected angle steel to ensure that the assembled crossbeam and the assembled column are fixedly connected, and the limit block is placed from top to bottom into the inner cavity of the upper end of the assembled column under the action of gravity, and buckled on the outside of the tightening bolts;

[0019] Step 2: Hoist the pre-assembly keel unit to the required height, and fix the two adjacent assembly beams through connecting parts, wherein the buckle part at the edge of the connecting frame can be buckled on the edge of the assembly beam to improve the stability of the connection between the two assembly beams, so that the two horizontally adjacent pre-assembly keel units can be spliced ​​together, and the two vertically adjacent pre-assembly keel units can be plug-in connected through the plug-in column and kept fixed under the action of gravity.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] The present invention pre-installs a keel pre-assembly unit on the ground, wherein the keel pre-assembly unit includes an assembly column and an assembly beam fixed to the side of the assembly column. Two keel pre-assembly units located at upper and lower adjacent positions are connected by the assembly column and the plug-in column and are kept stable by gravity. Two keel pre-assembly units located at left and right adjacent positions are fixed by a connecting piece, thereby effectively reducing the installation process and installation steps and reducing safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a three-dimensional schematic diagram of the overall structure of the present invention;

[0023] Figure 2 This is an exploded schematic diagram of the keel pre-assembly unit structure of the present invention;

[0024] Figure 3 It is a three-dimensional schematic diagram of the limit stop block structure of the present invention;

[0025] Figure 4 This is a three-dimensional schematic diagram of the pre-connected angle steel structure of the present invention;

[0026] Figure 5 It is a three-dimensional schematic diagram of the connecting piece structure of the present invention;

[0027] Figure 6 It is a three-dimensional schematic diagram of the connection frame structure of the present invention.

[0028] In the figure: 1. keel pre-assembly unit; 2. Assembled columns; 3. Limit blocks; 4. Plug-in columns; 5. Assembled beams; 6. Connectors; 7. Connecting frames; 8. Buckle joints; 9. U-shaped connecting frames; 10. Adjustment slots; 11. Elastic pads; 12. Pressing plates; 13. Fastening nuts; 14. Pre-connected angle steels; 15. Positioning holes; 16. Waist holes; 17. Reinforced plates; 18. Tension bolts; 19. Snap-in slots; 20. Limiting protrusions; 21. Guide chamfers; 22. Mounting bosses; 23. Wear-resistant rubber strips. DETAILED DESCRIPTION

[0029] In order to make the purpose and technical solution of the present invention clearly and completely described, and the advantages more clearly understood, the embodiments of the present invention are further described in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are part of the embodiments of the present invention, rather than all of the embodiments, and are only used to explain the embodiments of the present invention, and are not used to limit the embodiments of the present invention. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] In the description of the present invention, it should be noted that the terms "center", "middle", "upper", "lower", "left", "right", "inner", "outer", "top", "bottom", "side", "vertical", "horizontal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "one", "first", "second", "third", "fourth", "fifth", "sixth" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0031] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0032] For the purpose of simplicity and illustration, the principles of the embodiments are mainly described by reference to examples. In the following description, many specific details are proposed to provide a thorough understanding of the embodiments. However, it is obvious that for those of ordinary skill in the art, these embodiments may not be limited to these specific details in practice. In some instances, known methods and structures are not described in detail to avoid making these embodiments unnecessarily difficult to understand. In addition, all embodiments can be used in combination with each other.

[0033] See also Figures 1 to 6 , the present invention provides a technical solution:

[0034] Embodiment 1

[0035] A curtain wall keel unit comprises: a keel pre-assembly unit 1 and a connecting piece 6.

[0036] Specifically, the keel pre-assembly unit 1 includes an assembly column 2, and the inner cavities at the upper and lower ends of the assembly column 2 are respectively provided with limit stops 3 and plug-in columns 4, and the plug-in columns 4 are plugged with the assembly columns 2. When two vertically adjacent keel pre-assembly units 1 are spliced, the plug-in columns 4 can be inserted into the inner cavities of the lower assembly columns 2, and rely on gravity to ensure the stable connection of the two keel pre-assembly units 1, and the two keel pre-assembly units 1 are placed in a horizontal direction. The side of the assembly column 2 is fixedly installed with an assembly beam 5;

[0037] Secondly, the connecting member 6 is located at the end of the assembled cross beam 5. The connecting member 6 includes a connecting frame 7 which is in a "C" shape with an opening facing downwards. Both side surfaces of the connecting frame 7 are inclined outwards, and the edge of the connecting frame 7 is folded outwards to form a buckling portion 8. The buckling portion 8 is in a "C" shape with an opening facing upwards and buckles on the side edge of the assembled cross beam 5. When two horizontally adjacent keel pre-assembly units 1 are spliced, the connecting member 6 can fixedly connect two adjacent assembled cross beams 5, thereby strengthening the entire curtain wall keel. The buckling portion 8 buckles on the edge of the assembled cross beam 5 from bottom to top, which can improve the connection stability between the two assembled cross beams 5.

[0038] Embodiment 2

[0039] On the basis of Embodiment 1, in order to reduce the installation process, the present application is provided with four assembled cross beams 5, and the four assembled cross beams 5 are respectively located at the upper and lower ends of both side surfaces of the assembled column 2. The assembled cross beam 5 is perpendicular to the assembled column 2. The assembled column 2 and the assembled cross beam 5 can be pre-assembled on the ground to reduce the operation steps of high-altitude connection and reduce the installation process.

[0040] Embodiment 3

[0041] On the basis of Embodiment 2, in order to improve the connection stability between the two assembled cross beams 5, the present application further has a U-shaped connecting frame 9 provided inside the connecting frame 7. An adjustment slot hole 10 is provided on the surface of the connecting frame 7. The end of the U-shaped connecting frame 9 penetrates through the adjustment slot hole 10 and tightens and fixes two adjacent assembled cross beams 5. An elastic cushion block 11 is padded between the surface of the connecting frame 7 and the inner wall of the assembled cross beam 5. The elastic cushion block 11 is fixedly bonded to the connecting frame 7. The U-shaped connecting frame 9 sequentially penetrates through the connecting frame 7 and the assembled cross beam 5 from bottom to top, ensuring that the connection between the two assembled cross beams 5 is more convenient and stable. Since both side surfaces of the connecting frame 7 are inclined, when the U-shaped connecting frame 9 presses the connecting frame 7 upwards, both side surfaces of the connecting frame 7 can contract inwards. At this time, the buckling portion 8 buckles on the edge of the assembled cross beam 5, which can prevent the side of the assembled cross beam 5 from deforming outwards and affecting the connection stability between the two assembled cross beams 5.

[0042] Embodiment 4

[0043] On the basis of Embodiment 3, in order to fix the U-shaped connecting frame 9, the present application further has a pressing plate 12 tightly attached to the surface of the assembled cross beam 5. The pressing plate 12 is sleeved on the outer side of the end of the U-shaped connecting frame 9 and is pressed and fixed by a fastening nut 13. The pressing plate 12 and the fastening nut 13 are used to fix the U-shaped connecting frame 9 to prevent the U-shaped connecting frame 9 from detaching.

[0044] Embodiment 5

[0045] On the basis of the fourth embodiment, in order to pre-fix the connection between the assembled crossbeam 5 and the assembled column 2, the present application also has a pre-connected angle steel 14 provided at one end of the assembled crossbeam 5 close to the assembled column 2, and the top and side surfaces of the pre-connected angle steel 14 are provided with positioning holes 15, and the end surface of the assembled crossbeam 5 is provided with a waist hole 16. The pre-connected angle steel 14 and the assembled crossbeam 5 are fixedly connected by bolts, so that the assembled crossbeam 5 and the assembled column 2 can be pre-connected and fixed on the ground.

[0046] Embodiment 6

[0047] On the basis of Example 5, in order to fix the pre-connected angle steel 14 to the side of the assembled column 2, the present application also has a reinforcing plate 17 fixedly arranged on the inner side of the pre-connected angle steel 14 to reinforce the strength of the pre-connected angle steel 14 itself, and a tensioning bolt 18 is provided through the interior of the assembled column 2, and the two ends of the tensioning bolt 18 respectively fix the two pre-connected angle steels 14, thereby fixing the pre-connected angle steel 14 to the side of the assembled column 2.

[0048] Embodiment 7

[0049] On the basis of Example 6, in order to install the limit stop 3, the limit stop 3 of the present application is set to a hollow structure, and a clamping slot 19 is opened through the side of the limit stop 3. The limit stop 3 is buckled on the outside of the tightening bolt 18 from top to bottom through the clamping slot 19. A limiting protrusion 20 is set in the middle of the clamping slot 19, and a guide chamfer 21 is set at the lower end opening of the clamping slot 19. Therefore, the limit stop 3 can be stably installed in the upper end inner cavity of the assembly column 2 under the action of gravity. The setting of the limiting protrusion 20 is used to prevent the limit stop 3 from being easily separated from the tightening bolt 18, and the setting of the guide chamfer 21 ensures that the limit stop 3 can be easily buckled on the outside of the tightening bolt 18 through the clamping slot 19.

[0050] Embodiment 8

[0051] On the basis of the seventh embodiment, in order to prevent the curtain wall glass from being damaged, the present application also has a mounting boss 22 fixedly arranged on the back of the assembled column 2, the mounting boss 22 is fixedly connected to the building wall, and wear-resistant rubber strips 23 that fit the curtain wall are arranged on both sides of the mounting boss 2, thereby preventing the curtain wall glass from being squeezed and collided by the assembled column 2 and causing damage.

[0052] Embodiment 9

[0053] On the basis of Example 8, in order to splice the entire curtain wall keel, the present application is provided with multiple keel pre-assembly units 1, and the two vertically adjacent keel pre-assembly units 1 are maintained in plug-in connection through the plug-in column 4, and the two horizontally adjacent keel pre-assembly units 1 are maintained in fixed connection through the connecting piece 6, so as to splice the entire curtain wall keel.

[0054] The present invention also discloses a pre-assembly construction method according to the above-mentioned curtain wall keel unit, which specifically comprises the following steps:

[0055] Step 1: Assemble the keel pre-assembly unit 1 on the ground, fix the pre-connected angle steel 14 to the side of the assembled column 2 by the tightening bolts 18, and fix the plug-in column 4 to the lower end of the assembled column 2 by the tightening bolts 18, and then fix the assembled crossbeam 5 to the pre-connected angle steel 14 to ensure that the assembled crossbeam 5 and the assembled column 2 are fixedly connected, and the limit block 3 is placed from top to bottom into the inner cavity of the upper end of the assembled column 2 under the action of gravity, and buckled on the outside of the tightening bolts 18;

[0056] Step 2: hoist the keel pre-assembly unit 1 to the required height, and fix the two adjacent assembly beams 5 through the connecting piece 6, wherein the buckle 8 at the edge of the connecting frame 7 can be buckled on the edge of the assembly beam 5 to improve the stability of the connection between the two assembly beams 5, so that the two horizontally adjacent keel pre-assembly units 1 can be spliced ​​together, and the two vertically adjacent keel pre-assembly units 1 can be plug-in connected through the plug-in column 4 and kept fixed under the action of gravity.

[0057] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A curtain wall keel unit, characterized in that: Including: A keel pre-assembly unit (1), the keel pre-assembly unit (1) includes an assembly column (2), the upper and lower inner cavities of the assembly column (2) are respectively provided with a limit stop (3) and a plug column (4), the plug column (4) is inserted into the assembly column (2), and an assembly cross beam (5) is fixedly installed on the side surface of the assembly column (2); A connecting piece (6), the connecting piece (6) is located at the end of the assembly cross beam (5), the connecting piece (6) includes a connecting frame (7), the connecting frame (7) is in a "C" shape with an open bottom, the two side surfaces of the connecting frame (7) are inclined outwards, the edge of the connecting frame (7) is turned outwards to form a buckling part (8), the buckling part (8) is in a "C" shape with an open top and buckles on the side edge of the assembly cross beam (5); there are four assembly cross beams (5), and the four assembly cross beams (5) are respectively located at the upper and lower ends of the two side surfaces of the assembly column (2), and the assembly cross beam (5) is perpendicular to the assembly column (2); a U-shaped connecting frame (9) is arranged inside the connecting frame (7), an adjustment slot hole (10) is opened on the surface of the connecting frame (7), the end of the U-shaped connecting frame (9) penetrates through the adjustment slot hole (10) and tightly fixes two adjacent assembly cross beams (5), an elastic cushion block (11) is padded between the surface of the connecting frame (7) and the inner wall of the assembly cross beam (5), and the elastic cushion block (11) is fixedly adhered to the connecting frame (7); a pressing plate (12) is tightly attached to the surface of the assembly cross beam (5), the pressing plate (12) is sleeved on the outer side of the end of the U-shaped connecting frame (9) and is tightly fixed by a fastening nut (13).

2. A curtain wall keel unit according to claim 1, characterized in that: One end of the assembly cross beam (5) close to the assembly column (2) is provided with a pre-connecting angle steel (14), positioning holes (15) are opened on the top surface and the side surface of the pre-connecting angle steel (14), a waist-shaped hole (16) is opened on the end surface of the assembly cross beam (5), and the pre-connecting angle steel (14) and the assembly cross beam (5) are fixedly connected by bolts.

3. A curtain wall keel unit according to claim 2, characterized in that: A reinforcing plate (17) is fixedly arranged inside the pre-connecting angle steel (14), a tension bolt (18) is arranged through the inside of the assembly column (2), and the two ends of the tension bolt (18) respectively fix two pre-connecting angle steels (14).

4. A curtain wall keel unit according to claim 3, characterized in that: The limit stop (3) is arranged in a hollow structure, a clamping slot hole (19) is penetrated through the side surface of the limit stop (3), the limit stop (3) is buckled on the outer side of the tension bolt (18) from top to bottom through the clamping slot hole (19), a limit protrusion (20) is arranged in the middle of the clamping slot hole (19), and a guiding chamfer (21) is arranged at the lower opening of the clamping slot hole (19).

5. The curtain wall keel unit according to claim 4, characterized in that: An installation boss (22) is fixedly arranged on the back surface of the assembly column (2), the installation boss (22) is fixedly connected with the building wall, and wear-resistant rubber strips (23) attached to the curtain wall are arranged on both sides of the installation boss (22).

6. The curtain wall keel unit according to claim 5, characterized in that: The keel pre-assembly units (1) are provided in plurality, and two vertically adjacent keel pre-assembly units (1) are connected by plugging via plugging columns (4), and two horizontally adjacent keel pre-assembly units (1) are fixedly connected via connecting pieces (6).

7. A method for pre-assembling curtain wall keel units according to claim 6, characterized in that: Specifically include the following steps: Step 1: assemble the keel pre-assembly unit (1) on the ground, fix the pre-connected angle steel (14) to the side of the assembled column (2) by tightening bolts (18), and fix the plug-in column (4) to the lower end of the assembled column (2) by tightening bolts (18), and then fix the assembled crossbeam (5) to the pre-connected angle steel (14) to ensure that the assembled crossbeam (5) and the assembled column (2) are fixedly connected, and the limit stopper (3) is placed from top to bottom into the upper end inner cavity of the assembled column (2) under the action of gravity, and is buckled on the outside of the tightening bolts (18); Step 2: hoist the keel pre-assembly unit (1) to a required height, and fix two adjacent assembly beams (5) through a connecting piece (6), wherein the buckle (8) at the edge of the connection frame (7) can buckle on the edge of the assembly beam (5) to improve the stability of the connection between the two assembly beams (5), so that two horizontally adjacent keel pre-assembly units (1) can be spliced ​​together, and two vertically adjacent keel pre-assembly units (1) can be plugged and connected through the plug-in column (4) and kept fixed under the action of gravity.

Citation Information

Patent Citations

  • Beam and stand column connection structure

    CN203961079U

  • Frame curtain wall installation system of closed cavity cross beam

    CN216948952U