Abstract

The present application relates to stone curtain wall aluminum alloy grid mounting component and method, it includes stone board spare and aluminum alloy decoration strip;Aluminum alloy decoration strip includes aluminum alloy pressing plate and sets up the aluminum alloy decoration buckle that buckles on aluminum alloy pressing plate;Between the bottom surface of aluminum alloy pressing plate and the outer surface of stone board spare fills with sealing rubber rubber strip;Aluminum alloy pressing plate is provided with rubber strip notch and long hole, is used for entering sealing rubber rubber strip;When stone board spare is precast in layout, first, according to the installation position of aluminum alloy decoration strip, the back of stone board spare is laid out;Then, the T-shaped sink of stone board spare back is milled;Second, the stone plate through hole is punched in the center of T-shaped sink, and the stone plate through hole corresponds the installation axis of aluminum alloy decoration strip;The present application is reasonable in design, compact in structure and convenient to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to aluminum alloy grille installation components and methods for stone curtain walls. Background Technology

[0002] Currently, aluminum alloy decorative strips can only be fixed to stone curtain wall panels using chemical methods such as structural adhesives. However, this construction process does not meet the required standards and poses significant safety hazards. As a result, aluminum alloy decorative strips cannot be installed on the outer surface of the stone curtain wall, thus failing to achieve the desired decorative design effect.

[0003] Current technology only allows aluminum alloy decorative strips to be bonded to the outer surface of stone curtain walls using structural adhesives. However, curtain walls are highly susceptible to external influences during use, and the structural adhesives used for bonding are prone to aging, losing elasticity, and becoming brittle. This poses a significant safety hazard to the bonded aluminum alloy decorative strips during curtain wall use. Therefore, regulations prohibit the bonding of decorative components to the outer surface of curtain walls. This means that current technology cannot achieve a tight fit between the aluminum alloy decorative strips and the stone panel surface, failing to meet the architect's design requirements.

[0004] To effectively address the problem that existing technologies cannot install aluminum alloy decorative strips on the surface of stone curtain walls, a specialized structural design is adopted to achieve convenient, reliable, and secure installation of aluminum alloy decorative strips on the outer surface of stone curtain walls, satisfying decorative design effects while ensuring safe use.

[0005] To achieve specific decorative effects, solid curtain walls typically feature aluminum alloy decorative strips attached to their outer surface, usually arranged vertically or horizontally. For aluminum single-panel curtain walls, these strips can be directly attached to the aluminum panel surface using self-drilling screws or rivets. However, for stone curtain walls, due to the brittle nature of stone, nails cannot be driven into the stone panels, making it impossible to install aluminum alloy decorative strips on the outer surface. Summary of the Invention

[0006] The technical problem to be solved by the present invention is to provide an aluminum alloy grille installation component and method for stone curtain walls.

[0007] To solve the above problems, the technical solution adopted by the present invention is as follows:

[0008] An aluminum alloy grille installation component for stone curtain walls includes stone panels and aluminum alloy decorative strips;

[0009] The aluminum alloy decorative strip includes an aluminum alloy pressure plate and an aluminum alloy decorative buckle cover that is fastened to the aluminum alloy pressure plate; a sealing rubber strip is filled between the bottom surface of the aluminum alloy pressure plate and the outer surface of the stone slab.

[0010] The aluminum alloy pressure plate is provided with a rubber strip groove and a long strip hole for inserting a sealing rubber strip.

[0011] When laying out and prefabricating stone slabs, firstly, lines are laid out on the back of the stone slabs according to the installation positions of the aluminum alloy decorative strips; then, T-shaped grooves are milled on the back of the stone slabs; secondly, through holes are drilled in the stone slabs at the center of the T-shaped grooves, with the through holes corresponding to the installation axis of the aluminum alloy decorative strips.

[0012] Before installing the stone slabs, use epoxy resin adhesive to bond threaded nylon connectors to pre-drilled square countersunk holes on the back of the stone slabs.

[0013] A method for installing aluminum alloy grilles on stone curtain walls, using aluminum alloy grille installation components for stone curtain walls, the components including stone panels and aluminum alloy decorative strips;

[0014] Step 1: Pre-fabricate the stone slab layout. First, mark the lines on the back of the stone slab according to the installation position of the aluminum alloy decorative strip. Then, mill a T-shaped groove on the back of the stone slab. Next, drill a through hole in the stone slab at the center of the T-shaped groove, with the through hole corresponding to the installation axis of the aluminum alloy decorative strip.

[0015] Step 2: Install the stone slabs by using epoxy resin adhesive to bond the threaded nylon connectors to the pre-made square countersunk holes on the back of the stone slabs.

[0016] Step 3: After the stone panels are attached, first, fill the gaps between the stone panels with foam rods B and apply silicone weather-resistant sealant; then, insert stainless steel screws B into the elongated holes of the aluminum alloy pressure plate and connect them to the stone slab through holes and nylon connectors on the stone panel; finally, fasten the aluminum alloy caps onto the aluminum alloy pressure plate to complete the installation and fixing of the aluminum alloy decorative strip.

[0017] This invention involves welding L50*5mm thick angle steel connectors (hot-dip galvanized) to 10# hot-dip galvanized channel steel columns connected to the structure. The L50*5mm thick angle steel connectors (hot-dip galvanized) have elongated holes. M8*30 stainless steel bolts are used to connect L50*50*5mm hot-dip galvanized angle steel horizontal keels to the L50*5mm thick angle steel connectors (hot-dip galvanized). Then, M8*30 stainless steel bolts are used to connect 4mm aluminum alloy stone hanging parts to the fixed L50*50*5mm hot-dip galvanized angle steel horizontal keels. The position of the stone is adjusted through the elongated holes according to the drawings, and then fixed securely. When laying out the stone at the processing plant, lines are drawn on the back of the stone according to the installation positions of the aluminum alloy decorative strips. T-shaped countersunk grooves are milled on the back of the stone, 6mm deep, with a spacing not exceeding 600mm. Simultaneously, a through hole is drilled in the center of the countersunk holes, with the center of the through hole aligned with the installation axis of the aluminum alloy decorative strip. Before installing the stone panel, threaded nylon connectors are bonded to the square countersunk holes on the back of the stone using epoxy resin adhesive. Because the nylon connectors are flexible, the connection will not damage the stone panel. 7mm wide grooves are cut on the top and bottom sides of the 30mm thick stone. According to the construction drawings, the aluminum alloy S-shaped and E-shaped hanging parts are installed on the top and bottom sides of the stone and fixed with epoxy resin adhesive. The 30mm thick stone is then hung on the installed 4mm aluminum alloy stone hanging parts according to the installation design requirements. The height of the 30mm thick stone is adjusted using M5 adjusting screws. After the stone panels are positioned, ∅8 foam rods are inserted into the gaps between adjacent stone panels and sealed with special weather-resistant sealant for stone. A sealing rubber strip is then inserted into an aluminum alloy pressure plate with elongated holes. M5*50 stainless steel screws are then screwed through the elongated holes in the aluminum alloy pressure plate and the round holes in the stone panels, and into the threaded holes of the 25*25*6 nylon connectors on the back of the stone panel. This fixes the aluminum alloy pressure plate to the installed stone curtain wall panel. Finally, the aluminum alloy clip is fastened onto the aluminum alloy pressure plate installed on the stone panel, completing the installation and fixing of the aluminum alloy decorative strip. This invention employs a specially designed structure that solves the problem of not being able to directly nail aluminum alloy decorative strips to stone panels, and the low safety and reliability of using adhesive aluminum alloy decorative strips, which is not permitted by regulations. This allows for convenient and quick installation of aluminum alloy decorative strips on the outer surface of stone curtain walls, achieving both decorative effect and meeting safety requirements. This invention is reasonably designed, low in cost, sturdy and durable, safe and reliable, simple to operate, time-saving and labor-saving, cost-saving, compact in structure and easy to use. Attached Figure Description

[0018] Figure 1 This is a side view schematic diagram of the present invention.

[0019] Figure 2 This is a partial schematic diagram of the connector of the present invention.

[0020] Figure 3 This is a schematic diagram of a partial installation structure of the galvanized channel steel column of the present invention.

[0021] Figure 4 This is a schematic diagram of the connecting fastener structure of the present invention.

[0022] Figure 5 This is a schematic diagram of the three-dimensional structure of the stone slab of the present invention.

[0023] The components include: 1. Galvanized channel steel column; 2. Angle steel connector I; 3. Hot-dip galvanized angle steel II; 4. Aluminum alloy stone hanging part; 5. Connecting hardware; 6. Epoxy resin adhesive B; 7. Foam rod B; 8. Silicone weather-resistant sealant; 9. Adhesive strip groove; 10. Aluminum alloy S-shaped hanging part; 11. Nylon connector; 12. Hanging middle channel; 13. Stone panel; 14. Stainless steel bolt group B; 15. Long strip hole; 16. Adjusting screw; 17. Stainless steel screw group B; 18. Aluminum alloy pressure plate. 19. Sealing rubber strip; 20. Aluminum alloy decorative buckle cover; 21. Aluminum alloy E-shaped hanging part; 22. Stone slab through hole; 23. Rubber sleeve body; 24. Connecting screw part; 25. Middle section B; 26. Nut part B; 27. Threaded sleeve B; 28. Rear nut part; 29. ​​Male stud sleeve; 30. Rear skirt fin; 31. Front stud head; 32. Spring A; 33. Front support A; 34. Umbrella cap; 35. Positioning hexagonal post; 36. Fastening thread part; 37. Positioning hexagonal hole; 38. T-shaped countersunk groove. Implementation

[0024] like Figure 1-5 As shown, the stone curtain wall aluminum alloy grille installation component of this embodiment includes stone panels 13 and aluminum alloy decorative strips; these are fixedly installed on the outside of the steel structure wall.

[0025] The aluminum alloy decorative strip includes an aluminum alloy pressure plate 18 and an aluminum alloy decorative buckle cover 20 that is fastened to the aluminum alloy pressure plate 18; a sealing rubber strip 19 is filled between the bottom surface of the aluminum alloy pressure plate 18 and the outer surface of the stone panel 13; it uses a snap-fit ​​to achieve quick splicing and uses the rubber strip to achieve sealing and heat preservation.

[0026] The aluminum alloy pressure plate 18 is provided with a rubber strip groove 9 and an elongated hole for inserting a sealing rubber strip 19, thus enabling installation.

[0027] During installation, the stone slab 13 is prefabricated by first marking out the installation position of the aluminum alloy decorative strip on the back of the stone slab 13; then, a T-shaped groove 38 is milled on the back of the stone slab 13; next, a stone slab through hole 22 is drilled at the center of the T-shaped groove 38, corresponding to the installation axis of the aluminum alloy decorative strip; thus achieving alignment. Before installing the stone slab 13, a nylon connector 11 with threaded holes is bonded to the prefabricated square countersunk hole on the back of the stone slab 13 using epoxy resin adhesive; thus achieving installation and fixation. After the stone slab 13 is attached, firstly, foam rods B7 are filled into the gaps of the stone slab 13, and silicone weather-resistant sealant 8 is applied; thus achieving sealing and gap filling.

[0028] Then, stainless steel screws B17 are inserted into the elongated hole of the aluminum alloy pressure plate 18 and connected to the stone slab through hole 22 on the stone slab panel 13 and the nylon connector 11; thus achieving fixation. Afterwards, the aluminum alloy buckle 20 is fastened onto the aluminum alloy pressure plate 18 to complete the installation and fixation of the aluminum alloy decorative strip.

[0029] A galvanized channel steel column 1 is provided on the back of the stone slab 13; angle steel connectors I2 are distributed on the galvanized channel steel column 1; elongated holes 15 are distributed on the angle steel connectors I2; hot-dip galvanized angle steel II3 is overlapped on the angle steel connectors I2 and connected by stainless steel bolt group B14 that passes through the elongated holes 15; an aluminum alloy stone hanging part 4 is installed on the hot-dip galvanized angle steel II3; a right-angle G-shaped part is provided at the end of the aluminum alloy stone hanging part 4;

[0030] The right-angle G-shaped part is connected to the connecting hardware 5 in the T-shaped recess 38 and filled with epoxy resin B6; the connecting hardware 5 includes an upward-facing aluminum alloy S-shaped hanging part 10 and a downward-facing aluminum alloy E-shaped hanging part 21; a hanging intermediate channel 12 is provided between the aluminum alloy S-shaped hanging part 10 and the aluminum alloy E-shaped hanging part 21; the installation connection is achieved through the hardware components.

[0031] The groove of the aluminum alloy S-shaped hanging part 10 engages with the upper end of the aluminum alloy stone hanging part 4. An adjusting screw 16 is provided at the top of the groove of the aluminum alloy S-shaped hanging part 10 to abut against the upper end of the aluminum alloy stone hanging part 4 and to adjust the hanging height of the stone panel 13, thereby realizing height position adjustment.

[0032] As an example, a rubber sleeve 23 is provided on the through hole 22 of the stone slab; the rubber sleeve 23 is an H-structure with a hollow channel; thereby achieving flexible protection and ensuring uniform stress on the stone slab.

[0033] A hexagonal positioning hole 37 is provided on the aluminum alloy stone hanging part 4 or the galvanized channel steel column 1. The hexagonal positioning hole 37 corresponds to the middle channel 12 of the hanging part and communicates with the corresponding stone slab through hole 22. This achieves anti-rotation and anti-loosening.

[0034] A connecting screw section 24 is provided between the positioning hexagonal hole 37 and the corresponding stone slab through hole 22. The connecting screw section 24 includes three sections: A, B, and C. This enables the connection of different components, and the force is borne by the column, thus improving the problem of unreasonable load-bearing capacity in existing improvements.

[0035] In section C, a hexagonal positioning post 35 is provided, with threaded sections C at both ends of the post 35. A fastening threaded part 36 is provided on each threaded section C. The hexagonal positioning post 35 is located in a hexagonal positioning hole 37, and the fastening threaded part 36 is used to clamp the aluminum alloy stone hanging part 4. This achieves a fixed connection, thereby changing the existing load-bearing structure.

[0036] In section B, at least one section is provided with a middle section B25, and a nut section B26 and a rear nut section 28 are slidably fitted on the corresponding middle section B25.

[0037] Nut part B26 has a threaded sleeve B27.

[0038] The hollow rear nut portion 28 has a male stud sleeve 29, and elastically arranged rear skirt fins 30 are distributed around the outer edge of the male stud sleeve 29.

[0039] The internal thread of the threaded sleeve B27 is connected to the male stud sleeve 29. The end face of the threaded sleeve B27 abuts against the inner side wall of the rear skirt fin 30, causing the rear skirt fin 30 to open.

[0040] The rubber sleeve 23 is fitted onto the middle section B25, and the rear skirt fin 30 is located at the stone slab through hole 22; the outer wall of the rear skirt fin 30 has barbs; the stepped surface of the nut part B26 and the stepped surface of the rear nut part 28 clamp the stone slab 13.

[0041] To avoid damage to the stone, this invention achieves tensioning, flexible filling, and sealing.

[0042] In section A, a front stud head 31 is provided, a front support A33 is provided at the base of the front stud head 31, a spring A32 is fitted on the front stud head 31, and an umbrella cap 34 is installed on the front stud head 31; the umbrella cap 34 is used to press and hold onto the aluminum alloy decorative strip or the stone slab 13. When installing large-area, heavy slabs, in order to reduce the weight of the hangers and prevent the slabs from swaying, this invention uses screws for reinforcement, improving the existing structure.

[0043] As a protection for the installation process, the stone curtain wall aluminum alloy grille installation method of this embodiment uses stone curtain wall aluminum alloy grille installation components, the components including stone panels 13 and aluminum alloy decorative strips.

[0044] Step 1: Pre-fabricate the layout of the stone slab 13. First, mark the lines on the back of the stone slab 13 according to the installation position of the aluminum alloy decorative strip. Then, mill a T-shaped groove 38 on the back of the stone slab 13. Next, drill a stone slab through hole 22 at the center of the T-shaped groove 38, with the stone slab through hole 22 corresponding to the installation axis of the aluminum alloy decorative strip.

[0045] Step 2: Install the stone panel 13 by using epoxy resin adhesive to bond the threaded nylon connector 11 to the pre-made square countersunk hole on the back of the stone panel 13.

[0046] Step 3: After the stone panel 13 is attached, firstly, fill the gaps of the stone panel 13 with foam rods B7 and apply silicone weather-resistant sealant 8; then, insert stainless steel screws B17 through the elongated hole of the aluminum alloy pressure plate 18 and connect them to the stone slab through hole 22 on the stone panel 13 and the nylon connector 11; after that, fasten the aluminum alloy cover 20 onto the aluminum alloy pressure plate 18 to complete the installation and fixing of the aluminum alloy decorative strip.

[0047] Perform the following steps;

[0048] After installing the connecting hardware 5 in the stone panel 13, perform the screw fastening step;

[0049] Step S21: A rubber sleeve 23 is provided on the through hole 22 of the stone slab;

[0050] Step S22: First, insert the connecting screw part 24 into the rubber sleeve body 23 and the positioning hexagonal hole 37, and the nut part 28 and the fastening thread part 36 into the middle channel 12 of the hanger; then, in section C, the two fastening thread parts 36 clamp the aluminum alloy stone hanger part 4; in section B, the internal thread of the threaded sleeve B27 is connected to the male stud sleeve 29, and the end face of the threaded sleeve B27 abuts against the inner side wall of the rear skirt fin 30, so that the rear skirt fin 30 opens and is fastened to prevent loosening; in section A, an umbrella cap 34 is installed on the front stud head 31, supported by the spring A32, and filled with sealing strip and / or applied with glue.

[0051] Before step one, step Sa is performed. First, galvanized channel steel column 1 is prefabricated, and angle steel connector I2 is welded onto galvanized channel steel column 1. Then, hot-dip galvanized angle steel II3 is built on angle steel connector I2 and pre-connected by passing stainless steel bolt group B14 through long strip hole 15.

[0052] In step two, the following steps are also performed: First, the connecting hardware 5 is installed into the T-shaped recess 38; then, the connecting hardware 5 is installed at the end of the aluminum alloy stone hanging part 4, and the upper end of the aluminum alloy stone hanging part 4 is abutted by the adjusting screw 16 to adjust the hanging height of the stone panel 13.

[0053] As an example, this invention designs the main structure of the aluminum alloy decorative strip as a two-part combination: an aluminum alloy pressure plate and an aluminum alloy buckle cover. Considering sealing effect and flexible connection, a groove for the adhesive strip is provided on the aluminum alloy pressure plate, allowing the adhesive strip to be inserted into the groove. During stone layout at the processing plant, for connection purposes, lines are laid out on the back of the stone according to the installation position of the aluminum alloy decorative strip. T-shaped countersunk grooves are milled on the back of the stone, with a depth of 6mm and a spacing not exceeding 600mm. Simultaneously, a through hole is drilled in the center of the countersunk hole, with the center of the through hole aligned with the installation axis of the aluminum alloy decorative strip. Before installing the stone panels, threaded nylon connectors can be bonded to the square countersunk holes on the back of the stone using epoxy resin adhesive. After the stone panels of the stone curtain wall are hung, foam rods are filled into the stone gaps, and stone-specific sealant is applied. Then, install the aluminum alloy pressure plate with the sealing rubber strip inserted and the elongated hole drilled. Use M5*50 stainless steel screws to pass through the elongated hole on the aluminum alloy pressure plate and the round hole on the stone panel to connect the aluminum alloy pressure plate to the installed stone panel. Finally, fasten the aluminum alloy cap onto the aluminum alloy pressure plate installed on the stone panel to complete the installation and fixing of the aluminum alloy decorative strip.

[0054] Compared to existing technologies, this invention uses the existing galvanized channel steel column 1 as a carrier, with angle steel connector I2 achieving a fixed welded connection, and hot-dip galvanized angle steel II3 providing an intermediate transition connection, thus facilitating flexible adjustment. Connecting hardware 5 and aluminum alloy stone hanging parts 4 enable hooking onto the stone slabs. Epoxy resin adhesive B6 provides sealing and filling, foam rod B7 provides intermittent heat insulation, silicone weather-resistant sealant 8 provides sealing, adhesive strip groove 9 enables installation, aluminum alloy S-shaped hanging parts 10 provide connection, nylon connector 11 provides threaded connection, and the hanging part's intermediate channel 12 has a central gap to support the stone slab 13. Stainless steel... Bolt group B14 enables connection; elongated hole 15 allows for redundant adjustment; adjusting screw 16 allows for height adjustment of the stone; stainless steel screw group B17 connects the stone; aluminum alloy pressure plate 18 provides foundation connection; sealing rubber strip 19 ensures sealed contact; aluminum alloy decorative buckle cover 20 enables snap-fit ​​connection; aluminum alloy E-shaped hanging part 21 enables hook connection; stone slab through hole 22 is protected by rubber sleeve 23; connecting screw part 24 provides fixation; and anti-loosening fixation is achieved through middle section B25, nut part B26, threaded sleeve B27, rear nut part 28, male stud sleeve 29, and rear skirt fins 30. Protective sealing is achieved at the front stud head 31, spring A32, front support A33, and umbrella cap 34, which can function as a sealing strip. The spring provides support and anti-loosening; positioning hexagonal post 35, fastening thread part 36, and positioning hexagonal hole 37 provide tail support.

[0055] The present invention has been described in detail for the purpose of making the disclosure clearer, and the prior art will not be listed in detail.

[0056] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. It is obvious to those skilled in the art that multiple technical solutions of the present invention can be combined. These modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention. All technical contents not described in detail in the present invention are well-known technologies.

Claims

1. A method for installing aluminum alloy grilles on stone curtain walls, characterized in that: The installation components for the stone curtain wall aluminum alloy grille include stone panels (13) and aluminum alloy decorative strips. The aluminum alloy decorative strip includes an aluminum alloy pressure plate (18) and an aluminum alloy decorative buckle (20) that is fastened to the aluminum alloy pressure plate (18); a sealing rubber strip (19) is filled between the bottom surface of the aluminum alloy pressure plate (18) and the outer surface of the stone panel (13). A rubber strip groove (9) and a long hole are provided on the aluminum alloy pressure plate (18) for inserting a sealing rubber strip (19). When the stone slab (13) is prefabricated, firstly, the lines are laid out on the back of the stone slab (13) according to the installation position of the aluminum alloy decorative strip; then, a T-shaped groove (38) is milled on the back of the stone slab (13); secondly, a stone slab through hole (22) is drilled at the center of the T-shaped groove (38), and the stone slab through hole (22) corresponds to the installation axis of the aluminum alloy decorative strip; Before the stone panel (13) is installed, the nylon connector (11) with threaded holes is bonded to the pre-made square countersunk hole on the back of the stone panel (13) using epoxy resin adhesive. After the stone slabs (13) are hung, firstly, foam rods B (7) are used to fill the gaps in the stone slabs (13), and silicone weather-resistant sealant (8) is applied. Then, stainless steel screw group B (17) is inserted into the elongated hole of the aluminum alloy pressure plate (18) and connected to the nylon connector (11) on the panel of the stone slab (13). Then, fasten the aluminum alloy cover (20) onto the aluminum alloy pressure plate (18) to complete the installation and fixing of the aluminum alloy decorative strip; A galvanized channel steel column (1) is provided on the back of the stone panel (13); an angle steel connector I (2) is distributed on the galvanized channel steel column (1); an elongated hole (15) is distributed on the angle steel connector I (2); a group of stainless steel bolts B (14) is connected to the angle steel connector I (2) by overlapping hot-dip galvanized angle steel II (3) and passing through the elongated hole (15); an aluminum alloy stone hanging part (4) is installed on the hot-dip galvanized angle steel II (3); a right-angle G-shaped part is provided at the end of the aluminum alloy stone hanging part (4); The right-angle G-shaped part is connected to the connecting hardware (5) in the T-shaped recess (38) and filled with epoxy resin adhesive B (6); the connecting hardware (5) includes an upward-facing aluminum alloy S-shaped hanging part (10) and a downward-facing aluminum alloy E-shaped hanging part (21); a hanging intermediate channel (12) is provided between the aluminum alloy S-shaped hanging part (10) and the aluminum alloy E-shaped hanging part (21). The groove of the aluminum alloy S-shaped hanging part (10) engages with the upper end of the aluminum alloy stone hanging part (4). An adjusting screw (16) is provided at the top of the groove of the aluminum alloy S-shaped hanging part (10) to abut against the upper end of the aluminum alloy stone hanging part (4) and to adjust the hanging height of the stone panel (13). A rubber sleeve (23) is provided on the through hole (22) of the stone slab; the rubber sleeve (23) is an H-structure with a hollow channel; A positioning hexagonal hole (37) is provided on the aluminum alloy stone hanging part (4). The positioning hexagonal hole (37) corresponds to the middle channel (12) of the hanging part and is connected to the corresponding stone slab through hole (22). A connecting screw part (24) is provided between the positioning hexagonal hole (37) and the corresponding stone slab through hole (22). The connecting screw part (24) includes three sections: A, B, and C. In section C, a positioning hexagonal post (35) is provided, and threaded sections C are provided at both ends of the positioning hexagonal post (35). A fastening threaded part (36) is provided on the threaded section C. The positioning hexagonal post (35) is located in the positioning hexagonal hole (37), and the fastening threaded part (36) is used to clamp the aluminum alloy stone hanging part (4). In section B, at least one section is provided with a middle section B (25), and a nut section B (26) and a rear nut section (28) are slidably sleeved on the corresponding middle section B (25). Nut part B (26) has threaded sleeve B (27). The hollow rear nut portion (28) has a male stud sleeve (29), and elastically arranged rear skirt fins (30) are distributed around the outer edge of the male stud sleeve (29). The internal thread of the threaded sleeve B (27) is connected to the male stud sleeve (29). The end face of the threaded sleeve B (27) abuts against the inner wall of the rear skirt fin (30), causing the rear skirt fin (30) to open. The rubber sleeve (23) is fitted onto the middle section B (25), and the rear skirt fin (30) is located in the stone slab through hole (22); the outer wall of the rear skirt fin (30) has barbs; the stepped surface of the nut part B (26) and the stepped surface of the rear nut part (28) clamp the stone slab (13). In section A, a front stud head (31) is provided, a front support A (33) is provided at the root of the front stud head (31), a spring A (32) is fitted on the front stud head (31), and an umbrella cap (34) is installed on the front stud head (31); the umbrella cap (34) is used to press and hold on the aluminum alloy decorative strip or the stone panel (13); Step 1: Pre-fabricate the layout of the stone slab (13). First, mark the lines on the back of the stone slab (13) according to the installation position of the aluminum alloy decorative strip. Then, mill a T-shaped groove (38) on the back of the stone slab (13). Next, drill a stone slab through hole (22) at the center of the T-shaped groove (38). The stone slab through hole (22) corresponds to the installation axis of the aluminum alloy decorative strip. Step 2: Install the stone panel (13) by using epoxy resin adhesive to bond the threaded nylon connector (11) to the pre-made square countersunk hole on the back of the stone panel (13). Step 3: After the stone panel (13) is attached, first, fill the gaps of the stone panel (13) with foam rods B (7) and apply silicone weather-resistant sealant (8); then, insert stainless steel screw group B (17) through the long hole of the aluminum alloy pressure plate (18) and connect it with the nylon connector (11) on the panel of the stone panel (13); then, fasten the aluminum alloy buckle (20) on the aluminum alloy pressure plate (18) to complete the installation and fixing of the aluminum alloy decorative strip.

2. The method for installing aluminum alloy grilles on stone curtain walls according to claim 1, characterized in that: Perform the following steps; After installing the connecting hardware (5) in the stone panel (13), perform the screw fastening step; Step S21, a rubber sleeve (23) is provided on the through hole (22) of the stone slab; Step S22: First, insert the connecting screw part (24) into the rubber sleeve body (23) and the positioning hexagonal hole (37), and the nut part (28) and the fastening thread part (36) in the middle channel (12) of the hanger; then, in section C, the two fastening thread parts (36) clamp the aluminum alloy stone hanger part (4); in section B, the internal thread of the threaded sleeve B (27) is connected to the male stud sleeve (29), and the end face of the threaded sleeve B (27) abuts against the inner wall of the rear skirt fin (30), so that the rear skirt fin (30) opens and is fastened to prevent loosening; in section A, an umbrella cap (34) is installed on the front stud head (31), supported by the spring A (32), and filled with sealing strip and / or glue; Before step one, step Sa is performed. First, galvanized channel steel column (1) is prefabricated, and angle steel connector I (2) is welded on the galvanized channel steel column (1). Then, hot-dip galvanized angle steel II (3) is built on the angle steel connector I (2) and pre-connected by inserting stainless steel bolt group B (14) into the long hole (15). In step two, the following steps are also performed: first, the connecting hardware (5) is installed into the T-shaped sink (38); then, the connecting hardware (5) is installed at the end of the aluminum alloy stone hanging part (4) and the upper end of the aluminum alloy stone hanging part (4) is abutted by the adjusting screw (16) to adjust the hanging height of the stone panel (13).