A method for stability control of the outrigger system of a truck crane during operation
By constructing a joint control matrix for load bearing and deformation and a coupled control equation for load equalization, real-time stability control of the outrigger system of a truck crane was achieved, solving the problems of uneven chassis posture and load distribution, and improving safety and operational efficiency.
Patent Information
- Application Number
- CN202211559189.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-06
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2042-12-06
AI Technical Summary
Existing technologies struggle to maintain chassis stability and outrigger load balance in real time during truck crane loading operations, leading to potential overturning accidents and low operational efficiency.
By constructing a joint control matrix for load bearing and deformation, establishing a coupled control equation for geometric level and load equalization, and calculating the outrigger compensation amount in reverse, synchronous control of the outrigger system is achieved, maintaining real-time optimization of chassis attitude and load distribution.
This effectively avoids issues such as outrigger slippage, overloading, and vehicle overturning caused by load migration during operation, thus improving the safety and operational efficiency of truck cranes.
Smart Images

Figure CN116177424B_ABST
Abstract
Description
Technical fields:
[0001] This invention belongs to the field of truck cranes, specifically relating to the control of truck crane outrigger systems. Background technology:
[0002] Special vehicles such as truck cranes and concrete pump trucks rely on outrigger systems as a baseline support platform during operation, leaving the tires completely suspended in the air. Although the chassis is leveled and each outrigger effectively bears the vehicle's load before operation, the lifting, hoisting, luffing, and slewing movements of the superstructure constantly alter its mechanical characteristics, potentially disrupting the chassis's geometry and load distribution. Overturning accidents caused by compromised outrigger system stability are common in engineering operations. Therefore, controlling the outrigger system to maintain real-time chassis geometry stability during operation, while simultaneously optimizing the load distribution of each outrigger, is crucial for improving the safety, reliability, and operational efficiency of special vehicles like truck cranes and concrete pump trucks.
[0003] Currently, those skilled in the art in this field achieve geometric attitude compensation control by monitoring changes in the crane chassis's geometric attitude and then adjusting the outrigger system. For example, Chinese patent CN202110742181.5 discloses an automatic control method for maintaining the attitude of a truck crane chassis during superstructure operations. This invention achieves real-time adjustment of the chassis's geometric attitude through synchronous control of superstructure operations and outrigger compensation, but it is limited to geometric attitude adjustment and does not address the reliability of load distribution.
[0004] With the development of special vehicles, the number of outriggers in outrigger systems has increased from the common four to six, and even more than ten. This has led to a shift in the control of outrigger systems from a first-order statically indeterminate problem to a higher-order statically indeterminate problem. The rigid body-based scheme described in CN202110742181.5 has fundamental errors, making it extremely difficult to actively adjust the geometric attitude of the statically indeterminate outrigger system, hindering its practical application. On the other hand, the operation process causes significant load transfer to the outrigger system. For outrigger systems with four or more outriggers, even under geometrically sound conditions, momentary overturning may occur due to outrigger load-bearing defects. Therefore, implementing synchronous and active control of the outrigger system's geometric attitude and load distribution is essential to solving these problems. Currently, relevant technical solutions are lacking. Summary of the Invention:
[0005] In view of the above-mentioned shortcomings, this invention provides a stability control method for the outrigger system of a truck crane during operation. This strategy first measures the vehicle's load-bearing and deformation joint control matrix to establish a coupled control equation for geometric level and load equalization. Then, based on the outrigger actuation compensation model, it calculates in advance the changes in geometric attitude and outrigger load caused by the center of gravity migration during superstructure operation. Next, with the goal of restoring the chassis attitude to geometric level while the load on each outrigger approaches the theoretical optimal load, it inversely calculates the required outrigger compensation amount. Finally, the controller controls the synchronous implementation of superstructure operation and outrigger compensation actuation. This method can maintain the chassis attitude close to geometric level in real time during operation, while the load distribution of each outrigger approaches the theoretical optimal load in real time, effectively avoiding outrigger malfunctions, overloading, attitude damage, and even vehicle overturning caused by load migration during operation, comprehensively improving the safety and operational efficiency of special vehicles such as truck cranes.
[0006] This invention provides a stability control method for the outrigger system of a truck crane during operation, suitable for attitude and load control of the outrigger system during superstructure operations. The truck crane is controlled by a controller, with a luffing cylinder driving the boom to rise and fall, a slewing mechanism driving the boom to slew, and a telescopic mechanism driving the extension and retraction of each stage of the boom. The operating status of the truck crane is monitored by a measurement system. A sensor measuring the boom luffing angle is installed on the luffing cylinder, a sensor measuring the boom slewing angle is installed on the slewing mechanism, and a sensor measuring the boom extension is installed on the boom. The number of outriggers n in the outrigger system can be any number of four or more. The outrigger system numbering rule is defined as outrigger number 1 being the foremost outrigger on the driver's left side. The other outriggers are assigned serial numbers 2 to n in a counter-clockwise direction; the upper ends of all outriggers are inserted into the mounting holes of the extended crossbeams on the chassis, and the lower ends extend during operation to support the tires until they are off the ground. The structural dimensions and maximum actuation stroke of each outrigger are exactly the same; an attitude sensor measuring the two-dimensional tilt angle of the chassis relative to the horizontal plane is installed at the center of the chassis on which the outrigger system is located; a force sensor and a displacement sensor are installed on each outrigger; before leaving the factory, the outriggers are extended to the working position, the chassis is completely fixed to the ground to suspend the vehicle, and the i-th outrigger is actuated by raising and lowering the outriggers until a unit displacement is generated. The load increment of the outrigger is measured by the force sensor and divided by the unit displacement to obtain the stiffness of the outrigger. The above steps are repeated until the stiffness k of all outriggers is measured. i , i = 1, 2, ..., n; the coordinate system in the stability control method of the outrigger system is defined with the geometric center of the upper surface of the rotary mechanism as the origin. The x-axis is parallel to the ground and points in front of the driver, the y-axis points to the left of the driver, and the z-axis points vertically above the driver. The longitudinal and lateral coordinates of each outrigger are denoted as (x... i y iThe positive direction of the load on each outrigger is in the same direction as the coordinate axis, and the positive direction of the torque and tilt angle is determined by the right-hand rule; in the initial state before operation, the outrigger system has been controlled by the controller to support the truck crane until the tires are suspended, the boom has been moved to the load position, the load has been attached but not yet lifted off the ground, and the operation is characterized by the following steps:
[0007] Step 101: Drive the i-th outrigger to extend vertically, i = 1, 2, ..., n. The displacement sensor measures the displacement in real time until the i-th outrigger generates a unit displacement. During this period, keep the other outriggers from moving actively. The force sensor measures the load increment of each outrigger in order from 1 to n. Divide each load increment by the unit displacement to obtain Δf, and put it into the first row to the nth row of the i-th column of the (n+2)×n matrix shown in Formula 1.
[0008] Meanwhile, the attitude sensor measures the tilt angle increments of the platform around the x-axis and y-axis respectively, and divides each tilt angle increment by the unit displacement to obtain Δθ. xi , Δθ yi And place them sequentially into the (n+2)×n matrix in the (n+2)×n column in the (n+1)th and (n+2)th rows;
[0009] The above operations are performed on each leg in a loop until an (n+2)×n dimensional joint control matrix for load bearing and deformation is constructed.
[0010] Step 102: The attitude sensor measures the two-dimensional tilt angle of the chassis relative to the horizontal plane in the initial state.
[0011] Step 103: Measure the load on each outrigger in the initial state using the longitudinal and transverse coordinates of each outrigger and the force sensor. Calculate the total weight G of the truck crane and the longitudinal and transverse coordinates (x, y) of its center of mass according to the vertical force balance and moment balance around the x and y axes in Formula 2. mc ,y mc ) In Formula 2, F i The load on each outrigger in the initial state;
[0012] Step 104: Let G / n be the expected load distribution, and calculate the theoretical optimal load F for each outrigger using Formula 3. i * i = 1, 2, ..., n Wherein, λ1, λ2, and λ3 are three intermediate parameters involved in the calculation;
[0013] Step 105: Using the load-bearing and deformation joint control matrix, the two-dimensional tilt angle of the chassis relative to the horizontal plane in the initial state, the loads of each outrigger in the initial state, and the theoretical optimal load, a coupled control equation for geometric level and load equalization is constructed, and then the momentum of each outrigger is calculated in reverse. In formula 4, The initial two-dimensional tilt angle is given by m = x, y; F i t The initial loads of each outrigger are: 0 is the ideal tilt angle for adjusting the chassis attitude to a two-dimensional horizontal position; {e i This refers to the momenta required for each outrigger to adjust the chassis attitude to a geometrically level position and for each outrigger to approach its theoretical optimal load.
[0014] Step 106: Control each outrigger to perform actuation leveling according to the actuation amount of each outrigger, then measure the current two-dimensional tilt angle of the chassis and the load of each outrigger, and calculate the load deviation rate between the current load of each outrigger and the theoretical optimal load.
[0015] Step 107: Compare the load deviation rate and the two-dimensional tilt angle with the set load deviation rate threshold ε, respectively. F and tilt angle threshold ε θ Compare and determine whether the conditions for successful synchronization of geometry and load adjustment are met: if yes, proceed to the next step; if no, define the current state as the new initial state and return to step 103.
[0016] Step 108: Determine if the load has not yet been lifted: If yes, define the current state as the new initial state, lift the load, calculate the load weight M, and return to step 103; if no, record the total weight after lifting as G′ and proceed to step 109.
[0017] Step 109: Detect the driver's input commands for hoisting, luffing, slewing, or their combinations. The controller temporarily suspends the corresponding upper-body operations on the truck crane. Based on the current operating status of the truck crane monitored by the measurement system, combined with the driver's commands, and the centroid coordinates (x′) of the truck crane and the load at the next time node after a unit time has been calculated in advance by the centroid coordinate parameterized model,... mc ,y′ mc );
[0018] Step 110, based on the current outrigger load F i The stiffness k of each leg i The coordinates of the centroid (x′) of the truck crane and the load as a whole mc ,y′ mcThe outriggers, which are not on a straight line, are assigned new numbers z, c, and d. According to Formula 5, the outrigger motion compensation model calculates the vertical displacement of each outrigger at the next time node after the unit time. In Formula 5, Δz i N represents the vertical displacement of each leg that will occur at the next time node after the unit time. z N c N d The shape functions of the three legs;
[0019] Step 111, the vertical displacement Δz of each outrigger to be generated i Let i = 1, 2, ..., n. Substitute these values into Formula 6 to calculate in advance the loads on each outrigger and the two-dimensional tilt angle of the chassis at the next time node after the unit time. In Formula 6, F i v k represents the load on each outrigger that will be generated at the next time node after the unit time. i Δz represents the stiffness of each outrigger of the outrigger system. g Defined as the vertical displacement Δz generated by the outrigger with the same longitudinal coordinate as outrigger 1 and the largest lateral span b. h Defined as the vertical displacement generated by the outrigger with the same lateral coordinate as outrigger 1 and the largest longitudinal span L; θ x v θ y v The angle of tilt about the x and y axes that the chassis will produce at the next time node after the unit time;
[0020] Step 112, using the centroid coordinates (x′) of the truck crane and the entire load at the next time node after the unit time. mc ,y′ mc Substitute (x) into Formula 3 mc ,y mc ), calculate the theoretical optimal load F of each leg at the next time node after the unit time. i v* , i = 1, 2, ..., n;
[0021] Step 113: Combine the outrigger loads and chassis two-dimensional tilt angle to be generated at the next time node after the unit time obtained in step 111, and the theoretical optimal load F of each outrigger at the next time node after the unit time obtained in step 112. i v*Substituting into Formula 7 and calculating in reverse, we obtain the required moment of motion of each outrigger at the next time node after the unit time to ensure the chassis attitude is geometrically level and that each outrigger approaches the theoretical optimal load. In formula 7, {e i v} refers to the momenta required for adjusting the chassis to a geometric level and for each outrigger to approach the theoretical optimal load at the next time node after the unit time, i = 1, 2, ..., n; Let m be the angle of tilt about the x and y axes that the chassis will produce at the next time node after the unit time, where m = x, y;
[0022] Step 115: Cyclicly monitor the driver's gear lever operation commands: If the driver still has commands to input, then cyclically execute steps 109 to 115 until the driver turns off the controller.
[0023] Furthermore, the unit displacement mentioned in step 101 ranges from 1% to 5% of the maximum actuation stroke of the outrigger.
[0024] Furthermore, wherein the tilt threshold ε described in step 107 θ Its range is 0.1° to 0.5°.
[0025] Furthermore, according to claim 1, the stability control method for the outrigger system of a truck crane during operation, wherein the load deviation rate in step 106 is calculated using the following formula: The load deviation rate threshold ε F Its range is 5% to 15%.
[0026] Further, wherein, the N mentioned in step 110 z N c N d The following formula can be used for calculation:
[0027] The technical concept of this invention is as follows: Addressing the engineering problem that during the superloading operation of a truck crane after leveling, the constantly changing center of gravity position disrupts the geometric posture and outrigger load distribution, potentially leading to vehicle overturning, the invention first constructs a joint control matrix for the vehicle's load-bearing and deformation to accurately characterize the system's inherent mechanical properties. Secondly, based on the outrigger actuation compensation model, it pre-calculates the changes in chassis geometry and outrigger forces caused by center of gravity migration during superloading operations. Thirdly, with the goal of restoring the chassis to geometrical level while simultaneously bringing each outrigger close to its theoretical optimal load, it reverse-calculates the actuation amounts of each outrigger system required to achieve the aforementioned goal. Finally, the controller synchronously manages the superloading operation and outrigger actuation compensation, achieving real-time control of the chassis geometry and outrigger loads until the superloading process is complete.
[0028] The beneficial effect of this invention lies in its ability to compensate for outrigger movements while performing superstructure operations on truck cranes with any number of outriggers. This compensation effectively maintains the chassis geometry of the truck crane close to horizontal in real time during operation, while simultaneously ensuring that the load distribution of each outrigger approaches the theoretical optimal load. This effectively solves the problems of outrigger malfunction, overload damage, posture disruption, and even vehicle overturning caused by load migration during operation. Attached image description:
[0029] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.
[0030] Figure 1 This is a flowchart of the stability control method for the outrigger system of a truck crane during upper body operation according to the present invention;
[0031] Figure 2 A schematic diagram of the structural features of a truck crane in its initial state, provided for the stability control method of the outrigger system of a truck crane in the upper structure operation of the present invention.
[0032] Figure 3 This is a schematic diagram of the chassis structure features provided for the stability control method of the outrigger system of a truck crane in the upper structure operation of the present invention. Detailed implementation method:
[0033] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments of the six-legged crane. It should be understood that the six-legged crane embodiments described herein are merely illustrative and not intended to limit the invention; the scope of this patent can be extended to crane platforms with any number of outriggers.
[0034] This invention provides a stability control method for the outrigger system of a truck crane during superstructure operations, which solves the shortcomings of existing technologies that truck cranes cannot maintain chassis posture stability in real time and ensure that the load on each outrigger approaches the theoretical optimal load in real time during superstructure operations.
[0035] The stability control method for the outrigger system of a truck crane during upper-body operations of this invention uses, as follows: Figure 2 The structural features of the truck crane are shown, and for the sake of simplicity, the chassis 4 is equivalent to the following: Figure 3 The diagram shows a plane. The truck crane is controlled by a controller. The luffing cylinder 1 drives the boom 2 to lift at a constant angular velocity, and the slewing mechanism 3 drives the boom 2 to rotate at a constant angular velocity. Each stage of the boom 2 is driven by the telescopic mechanism to extend and retract at a constant speed. Each stage of the boom 2 has the same effective length and uniform mass distribution. Higher-level booms overlap and are built into the next-level boom. Displacement sensors measuring the extended length of the boom are installed between each stage of the boom and the next-level boom. The slewing mechanism 3 is equipped with an angle sensor measuring the rotation angle of the boom 2 relative to the longitudinal symmetry plane of the chassis 4. The luffing cylinder 1 is equipped with a displacement sensor measuring its extended length and equivalently calculating the luffing angle of the boom 2. The outriggers 9 in the outrigger system are numbered with the foremost outrigger on the driver's left as L. 1. Assign numbers L2 to L6 to the other outriggers in a counter-clockwise sequence. Insert their upper ends vertically and at the same height into the mounting holes of the extended crossbeam on the chassis 4, with their lower ends supported on the ground. Each outrigger 9 has identical structural dimensions and maximum stroke. Each outrigger 9 is equipped with a force sensor 5 to measure the vertical load of the outrigger 9 and a displacement sensor 6 to measure the actuation of the outrigger 9. Before leaving the factory, extend the outriggers 9 to the working position, completely bind the chassis 4 to the ground to suspend the vehicle, and actuate the i-th outrigger 9 by raising and lowering it until a unit displacement is generated. Measure the load increment of the outrigger 9 using the force sensor 5 and divide it by the unit displacement to obtain the stiffness of the outrigger 9. Repeat the above steps until the stiffness k of all outriggers 9 is measured. i , i = 1, 2, ..., 6; The coordinate system in the stability control method of the outrigger system is defined with the geometric center of the upper surface of the rotary mechanism as the origin. The x-axis is parallel to the ground and points in front of the driver, the z-axis is perpendicular to the top, and the y-axis points to the left of the driver. The longitudinal and lateral coordinates of each outrigger are denoted as (x... i y i The positive directions of torque and tilt angle are determined according to the right-hand rule; a two-dimensional tilt sensor 7 is installed at the center of the chassis 4 where the outrigger system is located to measure the two-dimensional tilt angle of the chassis 4 relative to the reference plane; in the initial state before operation, the outrigger system supports the truck crane to the state of vehicle suspension, the boom has moved to the load position, the load has been attached but has not yet been lifted off the ground.
[0036] This invention discloses a stability control method for the outrigger system of a truck crane during upper-body operations, the control flow of which is as follows: Figure 1 As shown, but in this embodiment, the formulas are reordered and numbered, specifically including the following steps:
[0037] Step 101: Drive the i-th outrigger 9 to extend vertically, i = 1, 2, ..., 6. The displacement sensor 6 measures the displacement in real time until the i-th outrigger 9 generates a unit displacement. During this period, keep the other outriggers 9 from moving actively. The load increment of each outrigger is measured by the force sensor 5 in the order from 1 to 6. Divide each load increment by the unit displacement to obtain Δf, and put it into the first row to the sixth row of the i-th column of the 8×6 matrix shown in Formula 1.
[0038] Simultaneously, the attitude sensor 7 measures the tilt angle increments of the platform around the x-axis and y-axis respectively, and divides each tilt angle increment by the unit displacement to obtain Δθ. xi , Δθ yi And place them sequentially into the 7th and 8th rows of the i-th column of an 8×6 matrix.
[0039] The above operations are performed on each leg in a loop until an 8×6-dimensional joint control matrix for load bearing and deformation is constructed.
[0040] In this embodiment, the unit displacement ranges from 1% to 5% of the maximum actuation stroke of the outrigger 9.
[0041] Step 102: The attitude sensor 7 measures the two-dimensional tilt angle of the chassis relative to the horizontal plane in the initial state.
[0042] Step 103: Using the longitudinal and transverse coordinates of each outrigger and the load on each outrigger 9 under the initial state measured by force sensor 5, calculate the total weight G of the truck crane and the longitudinal and transverse coordinates (x, y) of its center of mass according to the vertical force balance and moment balance around the x and y axes in Formula 2. mc ,y mc ) In Formula 2, F i The loads on each outrigger in the initial state are given.
[0043] Step 104: Let the total weight of each outrigger 9 be distributed equally, i.e., G / n, as the expected load distribution. Calculate the theoretical optimal load F for each outrigger 9 using Formula 3. i * i = 1, 2, ..., 6 Here, λ1, λ2, and λ3 are three intermediate parameters involved in the calculation.
[0044] Step 105: Based on the load-bearing and deformation joint control matrix constructed in Step 101, the two-dimensional tilt angle of the chassis relative to the horizontal plane measured in Step 102, the loads of each outrigger 9 measured in Step 103, and the theoretical optimal loads of each outrigger 9 calculated in Step 104, a coupled control equation for geometric level and load equalization is constructed. Then, the actuation momentum of each outrigger 9 is calculated in reverse. In formula 4, It is the initial two-dimensional tilt angle, m = x, y; F i t The initial loads on each outrigger are 9; 0 represents the ideal tilt angle for adjusting the chassis attitude to a two-dimensional horizontal position; {e i This refers to the amount of momentum required for each outrigger 9 to adjust the chassis 4 to a geometrically level position and for each outrigger 9 to approach its theoretical optimal load.
[0045] Step 106: Control each outrigger 9 to perform actuation leveling according to the actuation amount of each outrigger calculated in step 105, then measure the current two-dimensional tilt angle of the chassis 4 and the load of each outrigger 9, and calculate the load deviation rate between the current load of each outrigger 9 and the theoretical optimal load.
[0046] Step 107: Compare the load deviation rate calculated in step 106 and the measured two-dimensional tilt angle of the chassis with the set load deviation rate threshold ε. F and tilt angle threshold ε θ Compare and determine whether the conditions for successful synchronous adjustment of geometry and load are met: if yes, proceed to the next step; if no, define the current state as the new initial state and jump back to step 103.
[0047] In this embodiment, the tilt threshold ε θ Its range is 0.1° to 0.5°; the calculation formula for the load deviation rate is as follows: The load deviation rate threshold ε F Its range is 5% to 15%.
[0048] Step 108: Determine if the load has not yet been lifted: If yes, define the current state as the new initial state, lift the load, calculate the load weight M, and return to step 103; if no, record the total weight after lifting as G′ and proceed to step 109.
[0049] Step 109: Detect the driver's input commands for hoisting, luffing, slewing, or their combinations. The controller temporarily suspends the corresponding upper-body operations on the truck crane. Based on the current operating status of the truck crane monitored by the measurement system, combined with the driver's commands, and using the centroid coordinate parameterization model of Formula 5 to calculate in advance the centroid coordinates (x′) of the truck crane and the load at the next time node after a unit time interval.mc ,y′ mc ) In Formula 5, m i Let l be the mass of the i-th stage crane boom 2, i = 1 to 6. a The length of boom 2 To achieve the initial luffing angle of the boom 2 for suspending load 8, ω b Let t be the angular velocity of boom 2, with boom 2 rising as positive. b For amplitude-dependent actuation time, l j The horizontal distance from the pivot of boom 2 to the origin is m. b For the mass of counterweight 10, l b The horizontal distance from the counterweight 10 to the origin is given by v. l0 is the initial extension length of the boom 2 at each stage of the lifting load 8. s Let t be the extension and retraction speed of boom 2, with extension as positive. s ω is the extension / retraction time of boom 2, ψ0 is the initial slewing angle of boom 2 to complete the mounting of load 8, and ω is the slewing time of boom 2. h Let t be the angular velocity of the crane boom 2 during rotation. h For the rotational actuation time, m t For chassis quality, x t Let x be the x-axis coordinate of the chassis's center of mass, and y be the y-axis coordinate. t The coordinates of the chassis center of mass are y-axis coordinates. l0 can be measured by a displacement sensor installed between the second-stage and first-stage lifting arms, ψ0 can be measured by a tilt angle sensor on the slewing mechanism 3, and other data can be obtained from the crane structure manual or a 3D model. The chassis referred to here is the entirety of the front cab, the stationary part of the slewing mechanism, and the chassis itself; the counterweight is the entirety of the rear cab, the movable part of the slewing mechanism, and the rear counterweight block. It is worth noting that this formula is only applicable to the structural features shown in the figures of this embodiment. It should be understood that this formula is not intended to be restrictive; any method that can obtain the overall center of mass of the truck crane and the load should be included within the scope of this patent protection.
[0050] Step 110, based on the current load F of each outrigger 9 i The equivalent stiffness k of each outrigger 9 i The coordinates of the centroid of the truck crane and the load being lifted (x′) mc ,y′ mc The outriggers L1, L3, and L6, which are not on the same straight line, are selected as the three outriggers required for shape function calculation. According to Formula 6, the vertical displacement of each outrigger will occur at the next time node after the outrigger motion compensation model has advanced the calculation by one unit time. In Formula 6, Δz iThis represents the vertical displacement of each leg 9 that will occur at the next time node after a unit of time.
[0051] Step 111: Calculate the vertical displacement Δz of each leg at the next time node after the unit time calculated in Step 110. i Substituting into Formula 7, we can calculate the loads on each outrigger 9 and the two-dimensional tilt angle of the chassis 4 at the next time node after the unit time. In Formula 7, F i v The load on each outrigger 9 will be generated at the next time node after the unit time, k i Let θ be the stiffness of each outrigger of the outrigger system. x v θ y v y is the angle of tilt around the x and y axes that chassis 4 will produce at the next time node after a unit time; L is the longitudinal span of the outrigger system; b is the lateral span of the outrigger system.
[0052] Step 112, the centroid coordinates (x′) of the truck crane and the load as a whole will be generated at the next time node after the unit time. mc ,y′ mc Substitute (x) into Formula 3 mc ,y mc The theoretical optimal load F of each leg 9 at the next time node after a unit time is calculated. i v* .
[0053] Step 113: Combine the loads on each outrigger 9 and the two-dimensional tilt angle of the chassis 4 at the next time node after a unit time obtained in Step 111, with the theoretical optimal load F of each outrigger 9 at the next time node after a unit time obtained in Step 112. i v* Substituting into Formula 8 and calculating in reverse, we obtain the required moment of motion of each outrigger at the next time node after a unit time to ensure the geometrical level of chassis 4 and for each outrigger 9 to approach the theoretical optimal load. In formula 8, {e i v That is, the amount of momentum required for each outrigger to adjust the chassis 4 to a geometric level and for each outrigger 9 to approach the theoretical optimal load at the next time node after a unit time. Let m be the angle of tilt around the x and y axes that chassis 4 will produce at the next time node after a unit time, where m = x, y.
[0054] Step 114: The controller controls the truck crane to perform the loading operation per unit time according to the driver's lever instruction, and simultaneously controls each outrigger 9 to perform real-time actuation compensation according to the actuation amount of each outrigger 9 calculated in reverse step 113.
[0055] Finally, it should be noted that the above are merely preferred embodiments of the present invention and the technical principles employed. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and various obvious changes, readjustments, and substitutions can be made without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in detail through the above embodiments, the present invention is not limited to the above embodiments, and may include many other equivalent embodiments without departing from the concept of the present invention, the scope of which is determined by the scope of the appended claims.
Claims
1. A stability control method for an outrigger system of a truck crane during operation, wherein the truck crane is controlled by a controller, a luffing cylinder drives the boom to rise and fall, a slewing mechanism drives the boom to slew, and a telescopic mechanism drives the extension and retraction of each stage of the boom; the operating status of the truck crane is monitored by a measurement system, wherein a sensor for measuring the boom luffing angle is installed on the luffing cylinder, a sensor for measuring the boom slewing angle is installed on the slewing mechanism, and a sensor for measuring the boom extension is installed on the boom; the number of outriggers in the outrigger system is... n It can be any number of four or more outriggers; the numbering rule for the outrigger system is defined as follows: the foremost outrigger on the driver's left is designated as outrigger number 1, and the other outriggers are assigned serial numbers 2 to 10 in a counter-clockwise direction. n The upper ends of all outriggers are inserted into the mounting holes of the extended crossbeams on the chassis, and the lower ends extend during operation to support the tires until they are off the ground. Each outrigger has identical structural dimensions and maximum travel. An attitude sensor measuring the two-dimensional tilt angle of the chassis relative to the horizontal plane is installed at the center of the chassis containing the outrigger system. Each outrigger is equipped with a force sensor and a displacement sensor. Before leaving the factory, the outriggers are extended to the working position, and the chassis is completely fixed to the ground to suspend the vehicle. The outriggers are raised and lowered to lift the tires. i Each outrigger actuates until it produces a unit displacement. The load increment of that outrigger is measured by the force sensor and divided by the unit displacement to obtain the outrigger's stiffness. This process is repeated until the stiffness of all outriggers is measured. k i , i= 1,2, ···, n The coordinate system defined in the stability control method of the outrigger system is established with the geometric center of the upper surface of the rotary mechanism as the origin. x The axis is parallel to the ground and points in front of the driver. y The axis points to the driver's left. z The axis points vertically upwards from the driver. The longitudinal and lateral coordinates of each outrigger are denoted as ( ). x i , y i The positive directions of the loads on each outrigger are in the same direction as the coordinate axes, and the positive directions of the torque and tilt angle are determined by the right-hand rule; in the initial state before operation, the outrigger system has been controlled by the controller to support the truck crane until the tires are suspended in the air, the boom has been moved to the load position, the load has been attached but not yet lifted off the ground, characterized in that, The following steps are included: Step 101, drive the first i One leg extends vertically. i =1,2, ..., n The displacement sensor measures in real time until the first... i Each outrigger produces a unit displacement, ranging from 1% to 5% of its maximum stroke, while other outriggers remain inactive during this period, according to a sequence from 1 to... n The order of measurement is determined by the force sensor measuring the load increment of each outrigger, and each load increment is divided by the unit displacement to obtain the result. And put them into the formula shown in Formula 1 in sequence. n+ 2) ×n dimensional matrix i The first row to the second row of the column n In progress; At the same time, the attitude sensors measure the chassis rotation. x shaft and y The tilt angle increment of the shaft is obtained by dividing each tilt angle increment by the unit displacement. , and put them in sequence ( n+ 2) ×n dimensional matrix i The first of the columns n +1、 n +2 lines; The loop drives each leg to perform the above operations until a (…) is constructed. n+ 2) ×n Joint control matrix of load bearing and deformation in dimension Official 1; Step 102: The attitude sensor measures the two-dimensional tilt angle of the chassis relative to the horizontal plane in the initial state; Step 103: Measure the load on each outrigger in the initial state using the longitudinal and lateral coordinates of each outrigger and the force sensor, and then apply the vertical force balance and circumferential force calculations according to Formula 2. x axis, y The torque balance calculation of the shaft determines the total weight of the truck crane. G and the longitudinal and transverse coordinates of its centroid Official 2; In formula 2, F i The load on each outrigger in the initial state; Step 104, record the total weight equally distributed among all legs, i.e. G / n To determine the expected load distribution, the theoretical optimal load for each outrigger is calculated using Equation 3. F i , i =1,2,···, n Official 3, in, These are the three intermediate parameters that participate in the calculation; Step 105: Using the load-bearing and deformation joint control matrix, the two-dimensional tilt angle of the chassis relative to the horizontal plane in the initial state, the loads of each outrigger in the initial state, and the theoretical optimal load, a coupled control equation for geometric level and load equalization is constructed, and then the momentum of each outrigger is calculated in reverse. Official 4, In formula 4, It is the two-dimensional tilt angle of the initial state. m=x,y ; The initial loads of each outrigger are 0; 0 represents the ideal tilt angle for adjusting the chassis attitude to a two-dimensional horizontal position; e i This refers to the momenta required for each outrigger to adjust the chassis attitude to a geometrically level position and for each outrigger to approach its theoretical optimal load. Step 106: Control each outrigger to perform actuation leveling according to the stated actuation amount, then measure the current two-dimensional tilt angle of the chassis and the load on each outrigger, and calculate the load deviation rate between the current outrigger load and the theoretical optimal load. The load deviation rate is calculated using the following formula: , i =1,2,···, n ; Step 107: Compare the load deviation rate and the two-dimensional tilt angle with the set load deviation rate threshold, respectively. ε F and tilt angle threshold ε θ In comparison, the load deviation rate threshold ε F The range is 5%~15%, and the tilt angle threshold is... ε θ The range is 0.1°~0.5°. Determine whether the conditions for successful synchronous adjustment of geometry and load are met: if yes, proceed to the next step; if no, define the current state as the new initial state and return to step 103. Step 108: Determine if the load has not yet been lifted. If so, define the current state as the new initial state, lift the load, and return to step 103. Record the total weight after lifting as... And the weight of the suspended load is calculated. M If not, proceed to step 109; Step 109: Detect the driver's input of hoisting, luffing, slewing, or a combination thereof. The controller controls the truck crane to temporarily suspend the corresponding upper-body operation. Based on the current operating status of the truck crane monitored by the measurement system, combined with the driver's command, and the centroid coordinates of the truck crane and the load at the next time node after a unit time has been calculated in advance by the centroid coordinate parameterized model,... ; Step 110, based on the current load on each outrigger The stiffness of each leg k i The coordinates of the centroid of the truck crane and the load as a whole. And assign new numbers to any three legs that are not in a straight line. z , c , d According to Formula 5, the outrigger motion compensation model calculates in advance the vertical displacement of each outrigger at the next time node after the unit time. Official 5, In formula 5, This refers to the vertical displacement of each leg that will occur at the next time node after the stated unit time. , , The shape functions of the three legs can be calculated using the following formula: ; Step 111, the vertical displacement of each outrigger to be generated , i =1,2,···, n Substituting into Formula 6, we can calculate in advance the load on each outrigger and the two-dimensional tilt angle of the chassis that will occur at the next time node after the unit time. Official 6, In formula 6, The load on each outrigger will be generated at the next time node after the unit time. The stiffness of each leg of the outrigger system; Defined as the vertical displacement generated by the outrigger with the same longitudinal coordinate as outrigger 1 and the largest lateral span b. Defined as the vertical displacement that the outrigger with the same lateral coordinate as outrigger 1 and the largest longitudinal span L will produce; , The chassis will generate a winding at the next time node after the unit time. x , y The angle of axial tilt; Step 112: The coordinates of the centroid of the truck crane and the entire load at the next time node after the unit time. Substitute into formula 3 Calculate the theoretical optimal load for each leg at the next time node after the unit time. , i =1,2,···, n ; Step 113: Combine the outrigger loads and chassis two-dimensional tilt angle obtained in Step 111 at the next time node after the unit time, with the theoretical optimal load of each outrigger at the next time node after the unit time obtained in Step 112. Substituting into Formula 7 and calculating in reverse, we obtain the required moment of motion of each outrigger at the next time node after the unit time to ensure the chassis attitude is geometrically level and that each outrigger approaches the theoretical optimal load. Official 7, In formula 7, This refers to the amount of momentum required for each outrigger to adjust the chassis to a geometrically level position and for each outrigger to approach its theoretical optimal load at the next time node after the unit time. i =1,2, ..., n ; The chassis will generate a winding at the next time node after the unit time. x , y The angle of axial tilt, m=x,y ; Step 114: The controller controls the truck crane to perform the loading operation at unit time intervals according to the driver's lever command, and simultaneously controls each outrigger to perform real-time motion compensation according to the motion amount of each outrigger described in step 113. Step 115: Cyclicly monitor the driver's gear lever operation commands: If the driver still has commands to input, then cyclically execute steps 109 to 115 until the driver turns off the controller.
Citation Information
Patent Citations
Leveling control method for multi-point supporting platform
CN112859935A
Automatic control method for maintaining posture of automobile crane chassis in loading operation
CN113479780A
Method for controlling pointing attitude of upper mounting point of multi-point supporting platform