Environmentally friendly building construction wall drilling device
By designing an environmentally friendly building construction wall drilling device including anti-tilt plates and positioning columns, the problems of easy tilt and low efficiency of the drilling device in the prior art are solved, a more efficient and accurate drilling process is achieved, and the flatness of the drilling inner wall is improved.
Patent Information
- Application Number
- CN202211602815.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-13
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2042-12-13
AI Technical Summary
The existing drilling devices are prone to tilt during the drilling process, resulting in the drill bit being broken, and the efficiency is low when holding the drilling rig, and the inner wall of the drilling hole is uneven, which affects the installation of the pipeline.
An environmentally friendly building construction wall drilling device is designed, including a drive device, a base, a mount, a suction device and a removable drilling assembly. The drilling assembly achieves accurate positioning and prevents tilt through anti-tilt plates and positioning columns, and improves the smoothness of the inner wall of the drilling through grinding rods.
It effectively avoids the inclination problem during the drilling process, improves the accuracy and efficiency of the drilling, ensures the flatness of the inner wall of the drilling hole, and reduces damage to the pipe.
Smart Images

Figure CN116214734B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wall drilling, in particular to a wall drilling device for environmentally friendly building construction. Background Art
[0002] When drilling holes in building walls, a drilling device is required. The existing drilling device has a drill bit fixed at the axial center of the barrel drill for positioning drilling. However, the drill bit is easily broken when the drill rig is tilted, especially when drilling small holes. The drill rig is generally used directly by hand, which is more likely to cause the drill rig to tilt. In addition, a larger torque is required for drilling with the barrel drill and the drill bit at the same time, which is not conducive to hand-held drilling. A driving device needs to be set up for assistance, which is cumbersome and inefficient. In addition, after the drilling is completed, the inner wall of the hole sometimes becomes uneven, which will cause damage to the pipe placed therein.
[0003] In view of the above problems, the present invention provides an environmentally friendly building construction wall drilling device to solve the above problems. Summary of the invention
[0004] To achieve the above object, the present invention provides the following technical solution: an environmentally friendly building construction wall drilling device, comprising:
[0005] A driving device, which is pre-set on the ground;
[0006] A base, mounted at the output end of the driving device;
[0007] A mounting seat, fixed to one side of the upper end surface of the base;
[0008] a suction device, fixed to the other side of the upper end surface of the base, for collecting waste generated by drilling; and
[0009] The drilling assembly is detachably mounted on the mounting seat, and an output shaft of the drilling rig is fixed on one side of the drilling assembly.
[0010] Further, preferably, the drilling assembly comprises:
[0011] Fixed plate;
[0012] A driving seat is fixed on one side of the fixing plate, and the drilling rig is fixed on a side thereof away from the fixing plate;
[0013] A finishing assembly is rotatably disposed in the fixing plate and connected to an output shaft of the drilling rig;
[0014] A barrel drill, fixed to an end of the finishing assembly away from the fixing plate;
[0015] At least four guide posts are slidably disposed in the fixing plate, and the outer walls of the guide posts are sleeved with compression springs;
[0016] An anti-tilt plate fixed to an end of the guide column away from the fixing plate; and
[0017] The collecting assembly is fixed in the anti-tilt plate, and a avoiding hole for accommodating a barrel drill is provided in the middle of the collecting assembly.
[0018] Further, preferably, a positioning column is fixed at the inner center position of the finishing assembly, and the positioning column is divided into multiple sections of slidable rods, and a return spring is arranged between each section of the slidable rods, and when the multiple sections of the slidable rods are not subjected to external forces, one end of the slidable rods extends out of the anti-roll plate, and a conical head is arranged at one end of the slidable rod extending out of the anti-roll plate.
[0019] Further, preferably, the collecting component comprises:
[0020] A collecting bin, fixed inside the anti-tilt plate;
[0021] a spray head, fixed near the top of the collection bin and connected to an external water supply device; and
[0022] The discharge port is opened at the bottom of the collecting bin and is connected to the suction device by a hose.
[0023] Furthermore, preferably, the interior of the collection bin is trumpet-shaped to prevent liquid from splashing during drilling.
[0024] Further, preferably, the finishing assembly includes:
[0025] A wall drill, rotatably disposed in the fixed plate;
[0026] A plurality of rotating rods are equidistantly arranged, one end of which is rotatably disposed on the drill wall, and a first torsion spring is sleeved on the rotating shaft of the rotating rod; and
[0027] The grinding rod is hinged to the other end of the rotating rod, and a second torsion spring is arranged at the hinge.
[0028] Further, preferably, the first torsion spring and the second torsion spring can make the rotating rod and the grinding rod fit the drill wall when not subjected to external force, and the grinding rod is made of a deformable material, and a grinding pad is fixed to a side thereof away from the drill wall.
[0029] Compared with the prior art, the present invention provides an environmentally friendly building construction wall drilling device, which has the following beneficial effects:
[0030] In the present invention, the anti-roll plate contacts the wall first, so that the drilling angle of the drilling hole can be avoided to be tilted, and the positioning column can be used to accurately locate the position of the hole to be drilled. When drilling a small hole, the drill rig can be directly held manually to perform drilling through the drilling assembly. The anti-roll plate can be used to avoid tilting during drilling, and the positioning column gradually shrinks during drilling, so that the positioning column can be avoided from breaking. The positioning column is always outside the wall, which is convenient for the drilling assembly to detach from the wall. When detaching, the compression spring on the guide column can be used to make the barrel drill detach from the wall. The positioning column can facilitate the detachment of the wall drilled in the barrel drill, and after the drilling is completed, the drilling rig can be reversed to make the rotating rod rotate through centrifugal force, so that the grinding rod contacts the inner wall of the borehole, and grinds it, thereby improving the smoothness of the inner wall of the borehole. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is an overall schematic diagram of an environmentally friendly building construction wall drilling device;
[0032] Figure 2 A schematic diagram of a drilling assembly of an environmentally friendly building construction wall drilling device;
[0033] Figure 3 A schematic diagram of the finishing components of an environmentally friendly building construction wall drilling device;
[0034] In the figure: 1. driving device; 2. base; 3. mounting seat; 4. suction device; 5. drilling assembly; 6. drilling rig; 51. fixing plate; 52. driving seat; 53. finishing assembly; 54. barrel drill; 55. guide column; 56. anti-tilt plate; 571. collecting bin; 572. spraying port; 573. discharge port; 58. positioning column; 531. drilling wall; 532. rotating rod; 533. grinding rod; 534. grinding pad. DETAILED DESCRIPTION
[0035] Reference Figures 1 to 3 The present invention provides a technical solution: an environmentally friendly building construction wall drilling device, comprising:
[0036] A driving device 1 is preset on the ground;
[0037] A base 2, mounted at the output end of the driving device 1;
[0038] A mounting seat 3, fixed to one side of the upper end surface of the base 2;
[0039] A suction device 4, fixed to the other side of the upper end surface of the base 2, for collecting waste generated by drilling; and
[0040] The drilling assembly 5 is detachably mounted on the mounting seat 3, and an output shaft of the drilling machine 6 is fixed to one side of the drilling assembly 5.
[0041] As another embodiment, when drilling a small hole, the drill rig 6 can be directly held manually and drilling can be performed through the drilling assembly 5. The drilling assembly 5 can also avoid tilting during drilling. That is to say, there is no need to use the drive device 1 when drilling a small hole, which improves the drilling efficiency. When drilling a larger hole, the total weight of the drilling assembly 5 and the drill rig 6 is too large. In this case, it needs to be installed on the drive device 1 for use, which improves the diversity of use.
[0042] In this embodiment, the drilling assembly 5 comprises:
[0043] Fixed plate 51;
[0044] The driving seat 52 is fixed on one side of the fixing plate 51, and the drilling machine 6 is fixed on the side thereof away from the fixing plate 51;
[0045] A finishing assembly 53 is rotatably disposed in the fixing plate 51 and connected to the output shaft of the drilling rig 6;
[0046] A barrel drill 54, fixed to one end of the finishing assembly 53 away from the fixing plate 51;
[0047] There are at least four guide posts 55, which are slidably disposed in the fixing plate 51, and whose outer walls are sleeved with compression springs;
[0048] An anti-tilt plate 56 fixed to an end of the guide column 55 away from the fixing plate 51; and
[0049] The collecting assembly is fixed in the anti-tilt plate 56 , and a avoidance hole for accommodating the barrel drill 54 is opened in the middle of the anti-tilt plate 56 .
[0050] As a preferred embodiment, a positioning column 58 is fixed at the inner center position of the finishing component 53, and the positioning column 58 is divided into multiple sections of slidable rods, and a return spring is arranged between each section of the slidable rods, and when the multiple sections of the slidable rods are not subjected to external forces, one end of the slidable rods extends out of the anti-roll plate 56, and a conical head is arranged at one end of the slidable rod extending out of the anti-roll plate 56.
[0051] That is to say, during drilling, the positioning column 58 gradually contracts, which can prevent the positioning column 58 from breaking, and the positioning column 58 is always outside the wall, which is convenient for the drilling assembly 5 to detach from the wall. When detaching, the compression spring on the guide column 55 can also facilitate the detachment of the barrel drill 54 and the finishing assembly 53 from the wall. The reset spring in the positioning column 58 can facilitate the detachment of the barrel drill 54 and the wall drilled in the finishing assembly 53.
[0052] As a preferred embodiment, the collection component includes:
[0053] A collecting bin 571 is fixed inside the anti-tilt plate 56;
[0054] A spray head 572 is fixed near the top of the collection bin 571 and connected to an external water supply device; and
[0055] The discharge port 573 is provided at the bottom of the collecting bin 571 and is connected to the suction device 4 by a hose.
[0056] As a preferred embodiment, the interior of the collection bin 571 is trumpet-shaped to prevent liquid from splashing during drilling.
[0057] It should be noted that when the barrel drill 54 and the finishing assembly 53 are being drilled in and taken out, the spray head 572 is always spraying water, so that the barrel drill 54 can be cooled during drilling and the barrel drill 54 and the finishing assembly 53 can be cleaned during taking out.
[0058] As a preferred embodiment, the finishing assembly 53 includes:
[0059] The drilling wall 531 is rotatably disposed in the fixing plate 51;
[0060] A plurality of rotating rods 532 are equidistantly arranged, one end of which is rotatably disposed on the drilling wall 531, and a first torsion spring is sleeved on the rotating shaft thereof; and
[0061] The polishing rod 533 is hinged to the other end of the rotating rod 532, and a second torsion spring is provided at the hinge.
[0062] That is to say, after the drilling is completed, the drilling machine 6 can be reversed to make the rotating rod 532 rotate through centrifugal force, so that the grinding rod 533 contacts the inner wall of the borehole and grinds it, thereby improving the smoothness of the inner wall of the borehole and avoiding unevenness of the inner wall of the borehole, which may cause damage to the pipe placed therein.
[0063] As a preferred embodiment, the first torsion spring and the second torsion spring can make the rotating rod 532 and the grinding rod 533 fit the drilling wall 531 when not subject to external force, and the grinding rod 533 is made of a deformable material, and a grinding pad 534 is fixed on the side away from the drilling wall 531.
[0064] Specifically, during use, when drilling a small borehole, the drill rig 6 can be directly held manually to drill through the drilling assembly 5. During drilling, the drilling position is first determined by the positioning column 58, and then the anti-tilt plate 56 contacts the wall to avoid tilting. During drilling, the positioning column 58 gradually contracts to prevent the positioning column 58 from breaking when drilling into the wall, and the positioning column 58 is always outside the wall, which is convenient for the drilling assembly 5 to separate from the wall. During separation, the compression spring on the guide column 55 makes it easy for the barrel drill 54 and the tail assembly 53 to separate from the wall. The reset spring of the positioning column 58 makes it easy for the barrel drill 54 and the wall drilled in the tail assembly 53 to separate. After the drilling is completed, the drilling rig 6 is reversed to enable the tail assembly 53 to grind the inner wall of the borehole to improve the smoothness of the inner wall of the borehole. When drilling a large borehole, the drilling assembly 5 and the drill rig 6 can be installed on the driving device 1 to facilitate drilling.
[0065] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An environmentally friendly building construction wall drilling device, characterized in that: include: A driving device (1) is pre-placed on the ground; A base (2) mounted on the output end of the driving device (1); A mounting seat (3) fixed to one side of the upper end surface of the base (2); a suction device (4), fixed to the other side of the upper end surface of the base (2), and used for collecting waste generated by drilling; and A drilling assembly (5) is detachably mounted on the mounting seat (3), and an output shaft of a drilling machine (6) is fixed to one side of the drilling assembly (5); The drilling assembly (5) comprises: Fixed plate (51); A driving seat (52) is fixed on one side of the fixing plate (51), and the drilling machine (6) is fixed on a side thereof away from the fixing plate (51); A finishing assembly (53) is rotatably disposed in the fixing plate (51) and is connected to an output shaft of the drilling rig (6); A barrel drill (54) fixed to an end of the finishing assembly (53) away from the fixing plate (51); At least four guide posts (55) are slidably disposed in the fixing plate (51), and the outer walls of the guide posts are sleeved with compression springs; an anti-tilt plate (56) fixed to an end of the guide column (55) away from the fixing plate (51); and A collecting assembly is fixed in the anti-tilt plate (56), and a clearance hole capable of accommodating a barrel drill (54) is provided in the middle of the collecting assembly; The finishing component (53) comprises: A wall drill (531) rotatably disposed in the fixing plate (51); A plurality of rotating rods (532) are equidistantly arranged, one end of which is rotatably disposed on the drilling wall (531), and a first torsion spring is sleeved on the rotating shaft thereof; and The grinding rod (533) is hinged to the other end of the rotating rod (532), and a second torsion spring is provided at the hinge.
2. The environmentally friendly wall drilling device for building construction according to claim 1, characterized in that: A positioning column (58) is fixed at the center position inside the tail assembly (53), and the positioning column (58) is divided into a plurality of slidable rods, and a return spring is arranged between each of the slidable rods. When the plurality of slidable rods are not subjected to external forces, one end of the slidable rods extends out of the anti-roll plate (56), and a conical head is arranged at one end of the slidable rod extending out of the anti-roll plate (56).
3. The environmentally friendly building construction wall drilling device according to claim 1 is characterized by: The collection component comprises: A collecting bin (571) fixed inside the anti-tilt plate (56); A spray head (572) is fixed near the top of the collection bin (571) and is connected to an external water supply device; and The discharge port (573) is provided at the bottom of the collection bin (571) and is connected to the suction device (4) via a hose.
4. The environmentally friendly building construction wall drilling device according to claim 3 is characterized by: The interior of the collecting chamber (571) is trumpet-shaped, so as to prevent liquid from splashing when drilling.
5. The environmentally friendly building construction wall drilling device according to claim 1, characterized in that: The first torsion spring and the second torsion spring can make the rotating rod (532) and the grinding rod (533) fit the drilling wall (531) when no external force is applied, and the grinding rod (533) is made of a deformable material, and a grinding pad (534) is fixed on a side thereof away from the drilling wall (531).
Citation Information
Patent Citations
House building construction wall drilling machine
CN108515626A
Indoor wall perforating device for constructional engineering
CN210969445U