A method for calculating substation areas and a patrol system in an inspection system

By acquiring substation data to calculate inspection completion time, host computing power, and network bandwidth, a reasonable inspection system was designed, solving the problems of long inspection time, slow transmission, and resource waste, and improving the efficiency and user experience of the inspection system.

CN116308275BActive Publication Date: 2026-11-10XJ ELECTRIC CO LTD +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310232894.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-10
Publication Date
2026-11-10
Estimated Expiration
2043-03-10

AI Technical Summary

Technical Problem

Existing inspection systems fail to effectively calculate inspection time, network bandwidth, and graphics card computing power, resulting in problems such as excessively long inspection times, equipment power depletion, slow transmission speeds, high costs, or wasted resources.

Method used

By acquiring sample data from substations, calculating inspection completion time, host computing power, and network bandwidth, an inspection system that meets the requirements is designed, and hardware resources are rationally allocated to optimize inspection efficiency.

Benefits of technology

It enables accurate calculation of patrol time, improves the user experience and efficiency of the patrol system, reduces resource waste, and lowers operation and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116308275B_ABST
    Figure CN116308275B_ABST
Patent Text Reader

Abstract

This invention relates to a method for calculating substation area measurements and a substation inspection system, belonging to the field of substation operation and maintenance inspection. The invention first acquires data of substation samples within the inspection system's area. Then, based on the acquired data, it calculates at least one of the following: inspection completion time, host computing power, and network bandwidth. The inspection completion time is related to the substation sample acquisition time, sample transmission time, and sample analysis time. The host computing power is obtained based on the number of silent monitoring points and the silent monitoring frequency of the substations in the area. The network bandwidth is obtained based on the number of silent monitoring points, the silent monitoring frequency, and the sample size per unit time. The inspection system is designed based on at least one of the calculated inspection completion time, host computing power, and network bandwidth. This method solves the problem of inspection systems failing to consider inspection time, network bandwidth, and graphics card computing power, thus affecting inspection efficiency or causing resource waste.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a method for calculating substation areas and a substation inspection system, belonging to the field of substation operation and maintenance inspection. Background Technology

[0002] Currently, with the continuous expansion of the power grid, its operation and maintenance scale will also increase exponentially. Equipment inspection is a crucial part of power grid operation and maintenance. Various inspection methods are currently used, including manual inspection and inspection systems. These systems primarily utilize a large number of networked inspection devices such as robotic hosts, drone hosts, and video hosts to conduct inspections of the power grid. However, there are currently no specific methods for calculating the inspection time, network bandwidth, and graphics card computing power of inspection systems for substations of different voltage levels. When specifying maintenance plans, maintenance personnel at substations of different voltage levels cannot accurately calculate the inspection time for inspection tasks, leading to excessively long inspection times and severe power depletion of inspection equipment during inspections, preventing timely recharging. Using lower network bandwidth and graphics card computing power results in slow transmission of inspection files to the inspection host, and also limits audio and video viewing functions, leading to excessively long waiting times when analyzing inspection results images. This severely impacts the user experience and efficiency of the inspection system. Conversely, using higher network bandwidth and graphics card computing power increases maintenance costs and wastes resources. Summary of the Invention

[0003] The purpose of this invention is to provide a method for calculating substation areas and an inspection system in an inspection system, in order to solve the problems of long inspection times, low bandwidth and computing power affecting inspection efficiency, or resource waste and high costs caused by using high bandwidth and computing power, which are not considered in the inspection system.

[0004] To achieve the above objectives, the present invention includes:

[0005] The present invention provides a method for calculating the area of ​​a substation in an inspection system, comprising the following steps:

[0006] 1) Obtain data on substation samples in the area where the inspection system is located, including the number of substations, substation voltage levels, and the number of inspection points;

[0007] 2) Calculate at least one of the following based on the acquired data: inspection completion time, host computing power, and network bandwidth for the area. The inspection completion time is related to the acquired substation sample collection time, sample transmission time, and sample analysis time. The host computing power is obtained based on the number of substations under silent monitoring and the silent monitoring frequency in the area. The network bandwidth is obtained based on the number of silent monitoring points, the silent monitoring frequency, and the sample size per unit time.

[0008] 3) Design the inspection system based on at least one of the calculated inspection completion time, host computing power, and network bandwidth.

[0009] Beneficial Effects: The substation area measurement method in the inspection system of this invention considers the impact of inspection time, host graphics card computing power, and network bandwidth on the inspection process. It calculates the inspection completion time, silent monitoring computing power, and silent monitoring bandwidth, and designs the inspection system based on the calculation results. By calculating the inspection completion time, substation maintenance team members can easily formulate inspection plans and conduct maintenance work on other substations in the same area as the inspection system, and coordinate computing power, bandwidth, and inspection business logic according to the expected inspection completion time. Calculating network bandwidth ensures that inspection result files are uploaded to the inspection host in real time and quickly. Selecting an analysis host that meets the computing power requirements allows for fast and accurate algorithmic analysis of inspection result images and provides analysis results. This facilitates maintenance personnel in selecting hardware configurations that meet performance indicators, rationally allocating bandwidth, improving the user experience of the inspection system, and increasing inspection efficiency.

[0010] Furthermore, the inspection completion time is the sum of the sample collection time, sample transmission time, and sample analysis time.

[0011] Furthermore, the host computing power is:

[0012]

[0013] Mi represents the number of silent monitoring points in the substation, Fi represents the silent monitoring frequency of the substation, and A represents the analysis computing power of the inspection host.

[0014] Beneficial effects: The computing power of the host is determined by the number of silent monitoring points and the silent monitoring frequency of the substation. If the computing power of the host is fixed, the host can perform fast and accurate algorithm analysis of the substation by adjusting the number of silent monitoring points and / or the silent monitoring frequency. If the number of silent monitoring points and the silent monitoring frequency of the substation are fixed, a host with suitable computing power should be selected to ensure that the inspection results can be calculated accurately.

[0015] Furthermore, the network bandwidth of a single substation is: (number of silent monitoring points × silent monitoring frequency) × sample size / time.

[0016] Beneficial effects: The network bandwidth of a single substation is related to the number of silent monitoring points, the silent monitoring frequency, and the sample size per unit time. The number of silent monitoring points × the silent monitoring frequency is the host computing power. The larger the sample, the greater the bandwidth required during transmission.

[0017] Furthermore, the sample acquisition time is determined by the device with the longest acquisition time among the parallel acquisition equipment in a single substation, the sample transmission time is obtained based on the number of various types of samples obtained by the inspection equipment, the size of the corresponding samples, and the bandwidth of the area side or the substation end, and the sample analysis time is obtained based on the number of points of the inspection equipment and the computing power of the analysis host.

[0018] Furthermore, the inspection equipment includes inspection robots, drones, cameras, and voiceprint collection devices.

[0019] Furthermore, the network bandwidth also includes bandwidth for video access and bandwidth for audio access. The video access bandwidth is calculated by determining the network bandwidth of one video stream under the main stream and sub-stream states, and then allocated according to the substation's requirement for the number of main or sub-streams for video access. The audio access bandwidth is calculated by determining the bandwidth of one audio stream based on the size and sampling rate of the acquired audio samples, and then allocated according to the substation's requirement for the number of audio streams.

[0020] Beneficial effects: This invention considers network bandwidth allocation during video and audio access. During video access, it calculates the network bandwidth for one video stream under both main and sub-stream conditions. Based on the required number of main or sub-streams, it calculates the required network bandwidth and allocates it rationally to ensure smooth video access. Similarly, it calculates the bandwidth for one audio stream based on the size and sampling rate of the acquired audio samples. According to the substation's audio stream requirements, it allocates bandwidth for audio access, ensuring smooth audio playback.

[0021] An inspection system according to the present invention includes a processor, the processor being configured to execute program instructions to implement the substation area measurement method in the inspection system as described in any one of the above-described methods.

[0022] Beneficial effects: The inspection system of the present invention is simple in design, including a processor, and can effectively implement the substation area measurement method in the inspection system. It facilitates maintenance personnel to select hardware configurations that meet performance indicators, rationally allocate bandwidth, improve the user experience of the inspection system, and increase inspection efficiency. Attached Figure Description

[0023] Figure 1 This is a structural diagram of the inspection system in a method embodiment of the present invention. Detailed Implementation

[0024] The present invention will now be described in further detail with reference to the accompanying drawings.

[0025] Example of a method for calculating substation area in an inspection system:

[0026] like Figure 1The method for calculating substation area measurements in a patrol system, as shown, first acquires data of substation samples within the patrol system's area. Based on the acquired data, it calculates at least one of the following: patrol completion time, host computing power, and network bandwidth. The patrol completion time is related to the substation sample acquisition time, sample transmission time, and sample analysis time. Host computing power is obtained based on the number of silently monitored substations in the area and the silent monitoring frequency. Network bandwidth is obtained based on the number of silently monitored points, the silent monitoring frequency, and the size of the sample data per unit time. The patrol system is then designed based on at least one of the calculated patrol completion time, host computing power, and network bandwidth. A specific embodiment is as follows:

[0027] 1. Obtain data from substation samples within the area where the inspection system is located.

[0028] Specifically, the substation sample uses substations of different voltage levels as samples. The sample size can be all substations within the jurisdiction, or substations in a portion of the jurisdiction, selected according to the actual situation. Data such as the voltage level of substations in the area under the jurisdiction of the inspection system, the number of substations at different voltage levels, the type of inspection equipment, and the number of inspection locations are obtained. The inspection system in this embodiment is a regional inspection system with functions such as data acquisition, automatic inspection, intelligent analysis, real-time monitoring, intelligent linkage, and remote operation, enabling remote intelligent inspection of multiple substations. The inspection system in this embodiment consists of a regional inspection host, an intelligent analysis host, and inspection equipment. Depending on whether an edge inspection host is deployed at the substation end, it is divided into edge node type and direct access type. The regional inspection host issues control and inspection task instructions, and conducts indoor and outdoor inspections of the substations via the edge inspection host or by directly controlling the inspection equipment. It also receives uploaded inspection data and collected files. Commonly used inspection equipment includes cameras (including infrared thermal imaging), inspection robots, drones, and voiceprint devices.

[0029] Taking 20 substations under the jurisdiction of a certain region as an example for analysis, including 4 substations with a voltage level of 220kV, 6 substations with a voltage level of 110kV and 10 substations with a voltage level of 35kV, the inspection equipment selected in this embodiment includes cameras (including infrared thermal imaging), inspection robots, drones, voiceprint devices, etc., and the specific scale is shown in Table 1:

[0030] Table 1

[0031]

[0032] In 220kV substations, each substation has 2,000 robot inspection points, 500 drone inspection points, 4 voiceprint inspection points, and one video inspection per day. In 110kV substations, each station has 4 voiceprint inspection points, 20 silent monitoring points, and one video inspection per day. In 35kV substations, each station has 4 voiceprint inspection points, 10 silent monitoring points, and one video inspection per day. The visible light images (resolution 1920×1080) obtained by cameras and robots are 1MB each, the visible light images (resolution 4K and above) obtained by drones are 10MB each, the infrared images (resolution 640×512) obtained by drones are 2MB each, and the voiceprint acquisition (in this embodiment, the voiceprint sampling rate is 44.1kHz, the sampling size is 16bit, and the segmentation time is 60 seconds) files are 5MB per channel.

[0033] 2) Calculate at least one of the following parameters for the inspection completion time, host computing power, and network bandwidth of the area based on the acquired data. Then, design the inspection system based on the calculated inspection completion time, host computing power, and network bandwidth.

[0034] The inspection completion time is calculated based on the sample collection time, sample transfer time, sample analysis time, and report generation time. Therefore, the inspection completion time is:

[0035] Inspection completion time = Sample collection time + Sample transfer time + Sample analysis time + Report generation time

[0036] Sample collection time:

[0037] The sample collection time for a substation is mainly related to the type of inspection equipment and the number of inspection points. The inspection and collection efficiency varies depending on the type of equipment. Even with the same type of equipment, the collection time differs depending on the number of inspection points. Therefore, when calculating the sample collection time, each piece of equipment must be considered. However, different equipment can collect data in parallel. The collection time for a single substation is mainly determined by the equipment with the longest collection time. That is, the sample collection time is:

[0038] Sample acquisition time = MAX{Camera acquisition time, Robot acquisition time, Drone acquisition time, Voiceprint acquisition time}

[0039] The camera acquisition time is mainly affected by the number of patrol points, the number of concurrent acquisition channels, and the image capture cycle. In other words, the camera acquisition time is:

[0040] Camera acquisition time = Number of camera patrol points / Number of concurrent acquisition channels × Image capture cycle

[0041] In the formula, the number of concurrent acquisition channels is related to the performance of the inspection host, and is usually set to 10-20 channels. The image capture cycle is related to the pan-tilt rotation speed, and is usually set to 8-15 seconds.

[0042] The data collection time for substation samples using robots needs to consider both the robot's inspection point collection time and charging time; that is, the robot's collection time is the sum of the inspection point collection time and the charging time. The inspection point collection time is determined by the robot's performance parameters, path length, and the number of inspection points. Outdoor wheeled robots can complete routine inspections within 8 hours, while indoor tracked robots can complete routine inspections within 1.5 hours. If the robot performs a task involving many inspection points that exceeds its full-charge operating time, it needs to be charged midway through the task, with a charging time of approximately 2 hours.

[0043] The time required for collecting substation samples using drones is related to the drone's takeoff and landing time, battery replacement or charging time, and the time required for collecting samples at the inspection points.

[0044] Drone data collection time = Drone takeoff and landing time + Battery swapping / charging time + Drone patrol point data collection time

[0045] The time for drone takeoff, landing, and battery swapping or charging is determined by the performance parameters and design of the drone itself. The drone inspection point collection time can be estimated based on the inspection time of each inspection point. In this embodiment, the drone inspection and collection time for every 100 inspection points is 10 minutes.

[0046] The voiceprint acquisition time is determined by the voiceprint sample acquisition time (i.e., sample segmentation time). The voiceprint acquisition device can segment the sample as needed, and the segmentation time can be 5-120 seconds.

[0047] Based on the above embodiments, and assuming a 220kV substation, the estimated time for camera data collection is approximately 1.25 hours (3000 inspection points, 10 concurrent acquisition channels, 15-second image capture cycle), for outdoor wheeled robots it's approximately 8 hours (2000 inspection points), for drones it's approximately 1 hour (10 minutes for takeoff, landing, and battery swapping, 50 minutes for inspection point data collection), and for voiceprint data collection it's approximately 1 minute. After the task is assigned, all inspection equipment at the substation will collect data in parallel, and the estimated time for completing the overall sample collection for this 220kV substation is approximately 8 hours. For a 35kV substation, the estimated time for camera data collection is 0.33 hours (800 inspection points, 10 concurrent acquisition channels, 15-second image capture cycle), and for voiceprint data collection it's approximately 1 minute. After the task is assigned, all inspection equipment at the substation will collect data in parallel, and the estimated time for completing the overall sample collection for this 35kV substation is approximately 0.33 hours.

[0048] Sample transfer time:

[0049] The sample transmission time needs to be analyzed from the perspectives of the regional side, the station side, and the individual station. The transmission time must consider not only the transmitted images but also the network bandwidth used during transmission. In this embodiment, the total transmission time for samples collected at the station side of the regional inspection system ranges from 1.28 hours to 25.5 hours. Based on the access and bandwidth conditions of the substations under the jurisdiction of the regional inspection system, transmission strategies can be optimized, combining parallel and serial transmission.

[0050] From a regional perspective, regional bandwidth is the primary factor limiting sample transmission time. Theoretical calculations for uninterrupted transmission under full load conditions determine the transmission time for completing the sample acquisition during the inspection mission:

[0051] Total sample transmission time min = (Number of visible light images × 1MB + Number of infrared images × 2MB + Number of UAV visible light images × 10MB + Number of voiceprint channels × 5MB) / BW area

[0052] The BW zone represents the bandwidth of the regional remote intelligent inspection system. In practical applications, the size of some acquired visible light images may not be exactly 1MB. To simplify the analysis process, all acquired visible light images are calculated as 1MB. The same applies to files generated by other inspection equipment.

[0053] In a specific embodiment, during routine substation inspections, the images are mainly visible light images (JPG, 1080P), with each image size calculated at 1MB / image. Assuming a main station bandwidth (BW) of 100Mbps, the total time required to transmit 39,000 image samples (once a day, 1MB / image, 57,000MB) and 80 channel voiceprint samples (80 channels from 20 stations, 5MB / channel, 400MB total, once a day) is approximately 1.28 hours.

[0054] From the perspective of the station end, in extreme cases, samples from each substation are uploaded serially. In this case, the station end outgoing bandwidth (BW) becomes the main factor limiting the sample transmission time. The time required to complete the sample transmission for the station inspection task is:

[0055] Total sample transmission time = (Number of visible light images × 1MB + Number of infrared images × 2MB + Number of visible light images from UAV × 10MB + Number of voiceprint channels × 5MB) / BW end

[0056] As can be seen from the formula, assuming the station-end bandwidth (BW) is 5Mbps, 10Mbps, and 20Mbps respectively, the total time required to transmit 39,000 image samples and 80 channel voiceprint samples is approximately 25.51h, 12.76h, and 6.38h.

[0057] From a single-site perspective, the sample transmission time at a single site is affected by the size of the collected sample data and the upload bandwidth at the site, namely:

[0058] Single-station sample transmission time = Single-station sample data volume / BW end

[0059] If the file size of the transmitted image samples and voiceprint samples at a single station is between 820MB (800 images × 1MB / image + 5MB / channel × 4 channels) and 10020MB (5000 images × 1MB / image + 500 UAV visible light images × 10MB + 5MB / channel × 4 channels), the transmission time at a single station is between 0.36h-4.45h, 0.18h-2.23h, and 0.09h-1.11h at 5Mbps, 10Mbps, and 20Mbps, respectively.

[0060] Sample analysis time:

[0061] The time required for sample analysis is related to the number of samples collected by the substations under the jurisdiction of the regional remote intelligent inspection system and the image analysis capabilities of the intelligent analysis host, namely:

[0062] Sample analysis time = (Number of camera patrol points + Number of robot patrol points + Number of drone patrol points) / Computing power of intelligent analysis host

[0063] For example, in this embodiment, the number of image samples generated by inspecting 20 substations once a day is approximately 39,000. Referring to the performance requirements in Q / GDW12164, 64 TOPS ensures that the model running time is no more than 500ms, meaning an image analysis speed of approximately 2 images per second. Therefore, with this computing power, the analysis completion time is approximately 5.41 hours. With 256 TOPS computing power, the analysis completion time is approximately 1.35 hours. If estimated based on a single substation, the analysis time for 5,500 samples from a 220kV substation is between 12 and 46 minutes, and the analysis time for samples from a 35kV substation is 2 to 7 minutes.

[0064] The report generation time is related to the performance of the inspection host and the software system, and the required time is very short and can be ignored.

[0065] This embodiment not only calculates the time required for the inspection but also considers the analytical computing power and network bandwidth of the inspection host under silent monitoring. The computing power requirements under silent monitoring are:

[0066]

[0067] In the formula, Mi represents the number of silent monitoring points in the substation, Fi represents the silent monitoring frequency of the substation (times / minute), and A represents the computing power of the regional inspection host (images / minute). For example, if there are 340 silent monitoring points in 20 substations, and the silent monitoring frequency is uniformly once per minute, then the computing power (photo processing capability) A of the inspection host needs to be able to process 340 or more photos per minute, which means it needs at least three times the computing power of 64 TOPS. Regarding the computing power of the regional inspection system, considering that the analysis time and report generation time after the sample collection and transmission of a single station are expected to be within 30 minutes, and combined with the computing power requirement of 192 TOPS or more for silent monitoring, a regional inspection system with a computing power of 256 TOPS or more can meet the computing requirements of the substation while saving certain costs.

[0068] Regarding network bandwidth, the single substation side needs to consider the requirements for single-station sample data upload within one hour, silent monitoring, video retrieval, voiceprint audio retrieval, and other uplink and downlink information transmission such as signaling. The regional side needs to consider the requirements for concurrent uploading of inspection data from multiple sites during the inspection process, as well as the requirements for multi-site, multi-user audio and video retrieval.

[0069] The bandwidth requirements for a substation under silent monitoring are as follows:

[0070] BW end = (Number of silent monitoring points × Silent monitoring frequency) × Sample size / Time

[0071] In the fully direct access mode, silent monitoring, under extreme conditions, collects sample data once per minute, totaling 1440 samples per monitoring point over 24 hours, for a total of 489,600 samples collected. With a transmission network bandwidth of 100Mbps, sample transmission on the regional side takes 10.88 hours. For a single station, assuming the maximum number of samples (43,200), uploading takes 4.8 hours (station-side bandwidth 20Mbps). With a computing power of 256 TOPS, analysis of the silently monitored samples typically takes approximately 17 hours (approximately 22.67 hours with a computing power of 192 TOPS). Real-time silent monitoring sample transmission at the station (30 samples per minute) requires at least 4Mbps of bandwidth.

[0072] In full edge node mode, edge nodes implement silent screening functionality. Under extreme conditions, silent screening collects sample data once per minute, totaling 1440 samples per monitoring point within 24 hours, for a total of 489,600 samples collected. Assuming 10% of valid samples are uploaded, approximately 24,480 samples are uploaded. With a transmission network bandwidth of 100Mbps, sample transmission on the regional side takes 1.08 hours, and for a single station (maximum number of samples, 4320), it takes 1.92 hours (station-side bandwidth 5Mbps). With 256 TOPS of computing power, analysis of silently monitored samples typically takes approximately 1.7 hours (approximately 2.27 hours with 192 TOPS of computing power). Real-time silent monitoring sample transmission at the station (3 valid silent monitoring point samples per minute) requires at least 0.4Mbps of bandwidth.

[0073] In video viewing mode, the number of cameras that can be viewed simultaneously is closely related to network bandwidth: based on the H.264 main stream, one video stream requires 4Mbps of bandwidth; based on sub-streams, one video stream requires 1Mbps of bandwidth. Considering the linkage between main and auxiliary equipment, one-click sequential control with double confirmation of video, and daily video viewing needs, the system should be able to support 4 main streams or 16 sub-streams, meaning that the network bandwidth per station should be 16Mbps or higher. In practical applications, network bandwidth and the number of cameras that can be viewed simultaneously can be allocated according to the needs of substations and network conditions in different regions.

[0074] In voiceprint access mode, considering a sampling rate of 44.1kHz and a sampling size of 16bit, the bandwidth required for real-time access to station-end audio is approximately 0.67Mbps, and the bandwidth required for accessing 4 channels is approximately 2.69Mbps.

[0075] Therefore, the network bandwidth of the station-side inspection system is 20Mbps or higher, and the area-to-downward bandwidth is 100Mbps or higher. This configuration is more reasonable and can ensure that the inspection result files are quickly uploaded to the inspection host while ensuring smooth playback of audio and video viewing functions.

[0076] Through the above process, by calculating the inspection completion time of the inspection system, substation maintenance team members can formulate inspection plans and carry out maintenance work on other substations in the same area as the inspection system based on the inspection completion time. To shorten the inspection completion time, the inspection logic can be designed to allow multiple inspection devices to conduct inspections in parallel. Computing power, bandwidth, and inspection business logic can be allocated in a coordinated manner according to the expected inspection completion time. By calculating network bandwidth, it can be ensured that inspection result files are uploaded to the inspection host in real time and quickly. By selecting an analysis host that meets the computing power requirements, algorithmic analysis of the inspection result images can be performed quickly and accurately, and analysis results can be provided. This also allows maintenance personnel to select hardware configurations that meet performance indicators, rationally allocate bandwidth, improve the user experience of the inspection system, and increase inspection efficiency.

[0077] Example of a patrol system:

[0078] An inspection system according to this embodiment includes a memory, a processor, and an internal bus. The processor and the memory communicate and exchange data with each other through the internal bus. The memory includes at least one memory capable of storing substation data, inspection completion time calculation methods, host computing power calculation methods, and network bandwidth calculation methods. The processor executes various functional applications and data processing by running software programs and modules stored in the memory, realizing the substation area measurement method in the inspection system described in this embodiment of the invention.

[0079] The processor can be a microprocessor (MCU), a programmable logic device (FPGA), or other processing devices.

[0080] Memory can be any type of memory that uses electrical energy to store information, such as RAM and ROM; it can also be any type of memory that uses magnetic energy to store information, such as hard disks, floppy disks, magnetic tapes, magnetic core memory, magnetic bubble memory, and USB flash drives; it can also be any type of memory that uses optical energy to store information, such as CDs and DVDs; and of course, it can also be other types of memory, such as quantum memory and graphene memory.

[0081] Specific implementation methods have been given above, but the present invention is not limited to the described implementation methods. The basic idea of ​​the present invention lies in the above basic scheme. For those skilled in the art, designing various modified models, formulas, and parameters based on the teachings of the present invention does not require creative effort. Changes, modifications, substitutions, and variations made to the implementation methods without departing from the principles and spirit of the present invention still fall within the protection scope of the present invention.

Claims

1. A method for calculating substation areas in an inspection system, characterized in that, The inspection system includes a regional inspection host, an analysis host, and inspection equipment; the regional inspection host is used to issue control and inspection task instructions and to receive inspection data and collected files sent by all inspection equipment in the area; The analysis host is connected to the regional inspection host and is used to perform algorithmic analysis on the inspection results images; it includes the following steps: 1) Obtain data of substation samples in the area where the inspection system is located. The data includes the number of substations, the voltage level of the substations, and the number of inspection points. The number of inspection points includes the number of camera inspection points, robot inspection points, and drone inspection points. 2) Calculate at least one of the following based on the acquired data: the inspection completion time of the area, the computing power of the area inspection host, and the network bandwidth. The inspection completion time is the sum of the substation sample acquisition time, sample transmission time, and sample analysis time. The sample transmission time is calculated as (number of visible light images × visible light image size + number of infrared images × infrared image size + number of UAV visible light images × UAV visible light image size + number of acoustic fingerprint channels × acoustic fingerprint channel size) / network bandwidth of a single substation. The sample analysis time is calculated as (number of camera inspection points + number of robot inspection points + number of UAV inspection points) / computing power of the analysis host. The computing power of the regional inspection host is: Where i is the number of the i-th substation in the region, n is the total number of substations in the region, and M i F represents the number of silent monitoring points in the substation. i , where A is the frequency of silent monitoring of the substation, and A is the computing power of the regional inspection host. When the substation is a single substation, the network bandwidth is: (number of silent monitoring points × silent monitoring frequency) × sample size / time; 3) Design the inspection system based on the calculated inspection completion time, regional inspection host computing power, and network bandwidth, including: developing an inspection plan based on the inspection completion time, and determining the regional inspection host computing power and network bandwidth.

2. The method for calculating substation areas in the inspection system according to claim 1, characterized in that, The sample collection time is determined based on the longest collection time among the inspection equipment that collects data in parallel in a single substation. The inspection equipment includes cameras, robots, drones, and voiceprint collection equipment.

3. The method for calculating substation areas in the inspection system according to claim 2, characterized in that, The robot's data collection time is the sum of the robot's inspection point data collection time and charging time.

4. The method for calculating substation areas in the inspection system according to claim 2, characterized in that, The camera acquisition time is calculated as the number of camera patrol points / the number of concurrent acquisition channels × the image capture cycle.

5. The method for calculating substation areas in the inspection system according to claim 2, characterized in that, The drone data collection time includes the drone takeoff and landing time, battery swapping / charging time, and drone patrol point data collection time.

6. The method for calculating the substation area in the inspection system according to claim 2, characterized in that, The voiceprint acquisition time is determined by the voiceprint sample acquisition time.

7. The method for calculating substation areas in the inspection system according to claim 1, characterized in that, The network bandwidth also includes bandwidth for video access and bandwidth for audio access. The network bandwidth for one video stream is calculated based on the main stream and sub-stream states, and the video access bandwidth is allocated according to the number of main streams or sub-streams required by the substation. The bandwidth for one audio stream is calculated based on the size and sampling rate of the collected audio samples, and the audio access bandwidth is allocated according to the number of audio streams required by the substation.

8. A patrol system, comprising a processor, characterized in that, The processor is used to execute program instructions to implement the substation area measurement method in the inspection system as described in any one of claims 1-7.

Citation Information

Patent Citations

  • On-line touring system of power transmission line

    CN103488140A

  • Electric power communication station inspection optimizing method

    CN108666928A

  • Edge computing resource scheduling method for substation inspection

    CN113282368A