Construction method of roof heat insulation and waterproofing

By using multi-layered materials and breathable components, the problems of low thermal insulation and waterproofing performance and low durability in roof construction are solved, achieving high-efficiency thermal insulation, waterproofing and structural stability of the thermal insulation and waterproofing layer.

CN116464312BActive Publication Date: 2026-04-10RUIGUANG CONSTR ENG CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-11
Publication Date
2026-04-10

AI Technical Summary

Technical Problem

Existing roof construction methods have poor thermal insulation and waterproofing performance, low durability, and the insulation layer is prone to moisture, mold, and corrosion. They also lack ventilation structures, resulting in weak structures and short service lives.

Method used

The structure employs a multi-layered material configuration, including a lower layer, an isolation frame, rubber and plastic balls, an upper layer, and shelves. It combines anti-slip surfaces, waterproof mesh fabric, and resin mixtures, allowing steam to escape through breathable components. Corrosion-resistant, sun-protective, heat-insulating, and waterproof layers are used to enhance the structure's strength and durability.

Benefits of technology

It improves the roof's thermal insulation and waterproofing performance and service life, prevents the insulation layer from getting damp, deforming, moldy, and rotting, and enhances the structure's strength and durability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116464312B_ABST
    Figure CN116464312B_ABST
Patent Text Reader

Abstract

The application relates to the technical field of roofing construction, in particular to a roofing heat-insulation waterproof construction method, which comprises the following steps: S1, roofing cleaning; S2, damaged surface finishing; S3, expansion screw installation; S4, isolation glue coating; S5, heat-insulation structure laying: S501, lower cushion layer laying; S502, isolation frame installation; S503, rubber plastic ball installation; S504, upper cushion layer laying; S505, layer plate installation; S6, layer plate installation surface treatment: S601, expansion screw finishing; S602, air-permeable piece installation; S7, waterproof structure laying: S701, anti-skid treatment; S702, waterproof mesh cloth laying; S703, resin mixture laying; S8, corrosion prevention operation; and S9, sun protection operation. The application is heat-insulated through the layered arrangement of various materials, is waterproofed through multiple layers of different materials, improves the heat-insulation waterproof performance, repairs the damaged surface before heat-insulation waterproof construction, connects the roofing and the heat-insulation waterproof layer through expansion bolts, discharges steam in the heat-insulation layer through air-permeable pieces, and can dry and sterilize the incoming and outgoing air.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of roofing construction, in particular to a roofing heat insulation and waterproof construction method. BACKGROUND

[0002] Roofing is the outermost peripheral component of a building, used to resist the influence of natural factors such as rain, snow, wind, frost, solar radiation, and temperature changes, to ensure a good use environment inside the building. The roofing should meet the functional requirements of being solid and durable, waterproof, heat-insulating, heat-insulating, fireproof, and resistant to various adverse effects, so that the roofing has the functions of heat insulation and waterproofing.

[0003] A roofing heat insulation and waterproof construction method is disclosed in a Chinese patent (Grant Announcement No. CN112177249A). The construction method includes: treating the roofing panel base layer; setting a bonding layer on the roofing panel base layer; laying a foam glass plate layer on the bonding layer; laying a cement mortar layer on the foam glass plate layer; and constructing a waterproof layer on the cement mortar layer. However, the above method uses a bonding layer, a foam glass plate layer, a mortar layer, and a waterproof layer for heat insulation and waterproofing. This method has little difference in heat insulation and waterproofing performance from the market, and the heat insulation and waterproofing performance is not high. Before production, only the roofing is cleaned, the damaged surface is loose, and the installed cushion layer has the risk of falling off, which is not conducive to the firmness of the heat insulation and waterproof structure. Direct use of SBS waterproofing membrane for waterproofing has low durability, which is not conducive to the service life after construction. There is no ventilation structure, and the steam in the heat insulation layer cannot be discharged. The heat insulation layer is prone to mold and rot, and the circulating air is not treated, which causes the heat insulation and waterproof structure to be damp and deformed. Therefore, the present application provides a roofing heat insulation and waterproof construction method to solve the problems in the background art. SUMMARY

[0004] The present application aims to provide a roofing heat insulation and waterproof construction method to solve the problems in the background art.

[0005] To achieve the above-mentioned purpose, the present application provides the following technical solution: a roofing heat insulation and waterproof construction method, comprising the following steps:

[0006] S1, roofing cleaning: cleaning the debris on the roofing, grinding the roofing, removing the adhered soil and aging layer on the roofing, and using a dust collector to suck the ground powder;

[0007] S2, damaged surface finishing: repairing the damaged surface with concrete and completing the leveling operation of the roofing. After solidification, the roofing is washed with clean water and dried in the air;

[0008] S3, expansion screw installation: drill expansion bolts on the roof, apply anti-rust paint to the outside of the expansion screw, and glue the connection between the screw and the roof installation hole;

[0009] S4, isolation glue coating: wear spiked shoes, use isolation glue to coat the connection between the roof and the expansion screw, coat the roof with isolation glue, dry after the first coating, and dry after the second coating;

[0010] S5, heat insulation structure laying:

[0011] S501, lower cushion layer laying: lay the reed soaked in the corrosion-proof liquid and dried on the upper side of the roof, and limit the reed with the metal mesh;

[0012] S502, isolation frame installation: lay the stainless steel metal frame on the lower cushion layer, and weld the stainless steel metal frame to the expansion screw;

[0013] S503, rubber and plastic ball installation: fill the rubber and plastic ball into the stainless steel metal frame, and fix the rubber and plastic ball to the stainless steel metal frame with steel wire mesh;

[0014] S504, upper cushion layer laying: lay the reed soaked in the corrosion-proof liquid and dried on the upper side of the rubber and plastic ball installation surface, and limit the reed with the metal mesh;

[0015] S505, layer plate installation: fix the metal strip on the expansion screw, adjust the flatness of the fixed metal strip with screws, apply anti-rust paint to the outside of the metal strip, and fix the layer plate to the upper side of the metal strip;

[0016] S6, layer plate installation surface treatment:

[0017] S601, expansion screw trimming: trim the expansion screw higher than the layer plate, polish and cut off the surface, weld a anti-loose cap on the upper side of the cut-off surface, and apply anti-rust paint to the outside of the anti-loose cap;

[0018] S602, air permeable piece installation: drill holes in the layer plate, insert the lower end of the air permeable piece into the interior of the upper cushion layer, and fix it to the layer plate;

[0019] S7, waterproof structure laying:

[0020] S701, anti-slip treatment: pour anti-slip mixture onto the layer plate, and solidify the anti-slip mixture to form an anti-slip surface;

[0021] S702, waterproof mesh cloth laying: apply latex to the anti-slip surface, dry for 6 hours, lay the waterproof mesh cloth on the latex coated surface, brush latex on the upper side of the waterproof mesh cloth, solidify the glue for 12 hours after brushing, and brush the latex again, solidify for 24 hours;

[0022] S703, resin mixture laying: 12 parts of resin, 2 parts of glass fiber, 4 parts of sawdust and 0.1 parts of pigment are mixed to form a resin mixture, the air bubbles in the resin mixture are removed by negative pressure, the resin mixture is laid on the upper side of the grid cloth, the plastic film is covered, the resin mixture is cured by ultraviolet lamp for 35 hours, the plastic film on the upper side of the resin mixture is removed by using a grinding machine, the dust on the upper side of the resin mixture is removed by using clean water, and air drying is performed;

[0023] S8, anticorrosion operation: the mixed anticorrosive paint is sprayed onto the upper side of the resin mixture, and air drying is performed;

[0024] S9, sunscreen operation: varnish is coated on the upper side of the anticorrosive coating, the aluminum foil polyurethane insulation board is fixed to the upper side of the anticorrosive layer by silane polyether resin, and the joints of the aluminum foil polyurethane insulation board are sealed by silane polyether resin.

[0025] As a further aspect of the present application: the damage surface repair process in S2 is as follows: the damage surface due to corrosion and brittleness is excavated, the expansion screw with an outer diameter of 0.5 cm is fixed to the damage surface, the mixed concrete is poured into the damage surface, and the expansion screw protruding from the damage surface is cut off after solidification.

[0026] As a further aspect of the present application: the expansion screw in S3 has an outer diameter of 2.5 cm, and the depth of the expansion screw into the roof is 4 cm.

[0027] As a further aspect of the present application: the height of the expansion screw coated with isolation glue in S4 is 20 cm, and the coating thickness of the roof isolation glue is 5 mm, after the first coating, air drying is performed for 48 hours, and after the second coating, air drying is performed for 48 hours.

[0028] As a further aspect of the present application: the thickness of the lower cushion layer in S5 is 4 cm, the thickness of the isolation frame is 15 cm, the thickness of the upper cushion layer is 4 cm, the thickness of the layer plate is 2.5 cm, and the layer plate is plywood.

[0029] As a further aspect of the present application: the air permeable member in S6 includes a ventilation pipe, an upper support frame, a support rod and a cover, the upper support frame is located at the upper end position of the ventilation pipe, the support rod is located at the upper position of the upper support frame, the cover is located at the upper end position of the support rod, the outer side of the lower end position of the ventilation pipe is provided with a fixing ring, the outer side of the ventilation pipe is provided with an external thread, the outer side of the external thread is provided with a sleeve ring, the inside of the upper end position of the cover is provided with a heating ring, the inside of the lower end position of the cover is provided with a filter screen, the inside of the lower end position of the ventilation pipe is provided with a lower support frame, the lower side of the lower support frame is provided with a light guide cover, the inside of the light guide cover is provided with an ultraviolet lamp, and the upper side of the fixing ring is provided with a fixing screw.

[0030] As a further scheme of the present application: the anti-skid mixture in S7 is prepared by stirring 18 parts of resin, 5 parts of ceramic particles and 5 parts of rubber particles, the particle size of the ceramic particles and the rubber particles is 5mm, the laying thickness of the anti-skid mixture is 8mm, and the laying thickness of the resin mixture is 3.5cm.

[0031] As a further scheme of the present application: the anticorrosive paint in S8 is sprayed three times, the first spraying thickness is 0.5mm, air-drying time is 6 hours, the second spraying thickness is 2.5mm, air-drying time is 12 hours, and the third spraying thickness is 1mm, air-drying time is 12 hours.

[0032] As a further scheme of the present application: the cover is fixed to the upper side of the upper support frame through the support rod, the lower end of the ventilation pipe is inserted into the inside of the upper cushion layer through the layer plate, the lower end of the fixing screw is rotated in the inside of the layer plate through the fixing ring, the fixing ring is fixed to the upper side of the layer plate through the fixing screw, the ventilation pipe is fixed to the upper side of the layer plate through the fixing ring, and the light guide cover is fixed to the inside of the ventilation pipe through the lower support frame.

[0033] Compared with the prior art, the present application has the following beneficial effects:

[0034] The roofing heat insulation and waterproof construction method improves the heat insulation and waterproof performance by using the anti-skid surface, the waterproof mesh cloth and the resin mixture with different materials, protects the heat insulation and waterproof layer by making the outer side of the waterproof outer layer anticorrosive and sun-proof, and improves the service life after construction;

[0035] Before the heat insulation and waterproof construction, the damaged surface is repaired, and the roofing and the heat insulation and waterproof layer are connected through the expansion bolts to increase the firmness of the heat insulation and waterproof structure.

[0036] The vapor in the heat insulation layer is discharged through the air permeable member to avoid mildew and decay in the heat insulation layer, and the air permeable member can dry and sterilize the incoming and outgoing air to avoid deformation of the heat insulation and waterproof structure due to damp. BRIEF DESCRIPTION OF DRAWINGS

[0037] Figure 1 It is a structure diagram of the air permeable member in the roofing heat insulation and waterproof construction method.

[0038] Figure 2 It is a perspective view of the air permeable member in the roofing heat insulation and waterproof construction method.

[0039] In the figure: 1, ventilation pipe; 2, upper support frame; 3, support rod; 4, cover; 5, fixing ring; 6, external thread; 7, sleeve ring; 8, heating ring; 9, filter screen; 10, lower support frame; 11, light guide cover; 12, ultraviolet lamp; 13, fixing screw. Embodiments

[0040] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work fall within the protection scope of the present application.

[0041] In the embodiments of the present application, a construction method of a roof heat insulation waterproof is as follows:

[0042] S1, roof cleaning: cleaning the sundries on the roof, polishing the roof, removing the adhered soil and aging layer on the roof, and sucking the polished powder with a dust collector;

[0043] S2, damaged surface finishing: repairing the damaged surface with concrete and completing the leveling operation of the roof, and after solidification, washing the roof with clean water, and air-drying the roof, the damaged surface repairing process is as follows: removing the damaged surface due to corrosion and brittleness, fixing the expanded bolt with an outer diameter of 0.5 cm to the damaged surface, pouring the mixed concrete to the damaged surface, and cutting off the expanded screw rod protruding from the damaged surface after solidification;

[0044] S3, expanded screw rod installation: drilling the expanded bolt on the roof, coating the anti-rust paint on the outer side of the expanded screw rod, and gluing and fixing the connection between the screw rod and the roof installation hole, the expanded screw rod has an outer diameter of 2.5 cm, and the depth of the expanded screw rod drilled into the roof is 4 cm;

[0045] S4, isolation glue coating: wearing spiked shoes, coating isolation glue on the connection between the roof and the expanded screw rod, and coating isolation glue on the roof, after the first coating, air-drying, after the second coating, air-drying, the height of the expanded screw rod coated with isolation glue is 20 cm, the coating thickness of the roof isolation glue is 5 mm, after the first coating, air-drying for 48 hours, and after the second coating, air-drying for 48 hours;

[0046] S5, heat insulation structure laying:

[0047] S501, lower cushion layer laying: laying the reed dried after soaking in the anti-corrosion liquid on the upper side of the roof, limiting the reed through the metal mesh, and the thickness of the lower cushion layer is 4 cm;

[0048] S502, isolation frame installation: laying the stainless steel metal frame on the lower cushion layer, and welding the stainless steel metal frame to the expanded screw rod, and the thickness of the isolation frame is 15 cm;

[0049] S503, rubber plastic ball installation: filling the rubber plastic ball into the stainless steel metal frame, and fixing the rubber plastic ball into the stainless steel metal frame with the steel wire mesh;

[0050] S504, upper layer laying: the reed that dries after soaking in the preservative solution is laid on the upper side of the rubber ball installation surface, the reed is limited by the metal mesh, the thickness of the upper layer is 4 cm;

[0051] S505, layer plate installation: the metal strip is fixed on the expansion screw, the flatness of the fixed metal strip is adjusted by the screw, the outer side of the metal strip is coated with rust-proof paint, the layer plate is fixed to the upper side of the metal strip, the thickness of the layer plate is 2.5 cm, and the layer plate is plywood;

[0052] S6, layer plate installation surface treatment:

[0053] S601, expansion screw trimming: the expansion screw higher than the layer plate is trimmed, the cutting surface is polished, the anti-removal cap is welded on the upper side of the cutting surface, and the rust-proof paint is coated on the outer side of the anti-removal cap;

[0054] S602, air permeable piece installation: a hole is punched in the layer plate, the lower end of the air permeable piece is inserted into the inside of the upper layer and fixed to the layer plate, the air permeable piece includes a ventilation pipe 1, an upper support frame 2, a support rod 3 and a cover 4, the upper support frame 2 is located at the upper end position of the ventilation pipe 1, the support rod 3 is located at the upper position of the upper support frame 2, the cover 4 is located at the upper end position of the support rod 3, the outer side lower end position of the ventilation pipe 1 is provided with a fixing ring 5, the outer side of the ventilation pipe 1 is provided with an external thread 6, the outer side of the external thread 6 is provided with a sleeve ring 7, a heating ring 8 is installed at the inner upper end position of the cover 4, a filter screen 9 is arranged at the inner lower end position of the cover 4, a lower support frame 10 is arranged at the inner lower end position of the ventilation pipe 1, a light guide cover 11 is installed on the lower side of the lower support frame 10, an ultraviolet lamp 12 is installed in the light guide cover 11, a fixing screw 13 is arranged on the upper side of the fixing ring 5, the cover 4 is fixed to the upper side position of the upper support frame 2 through the support rod 3, the lower end of the ventilation pipe 1 penetrates the layer plate and is inserted into the inside of the upper layer, the lower end of the fixing screw 13 penetrates the fixing ring 5 and rotates in the inner position of the layer plate, the fixing ring 5 is fixed to the upper side position of the layer plate through the fixing screw 13, the ventilation pipe 1 is fixed to the upper side position of the layer plate through the fixing ring 5, the light guide cover 11 is fixed to the inner position of the ventilation pipe 1 through the lower support frame 10, and the working principle of the air permeable piece is that: first, after the layer plate is installed, a hole is punched in the layer plate, the lower end of the ventilation pipe 1 penetrates the layer plate and is inserted into the inside of the upper layer, the fixing screw 13 penetrates the fixing ring 5, the ventilation pipe 1 is fixed to the upper side of the layer plate, a waterproof structure is made, corrosion operation and sun protection operation are performed, the sleeve ring 7 rotates on the outer side of the external thread 6, the sleeve ring 7 is pressed to the upper side of the sun protection layer, the installation of the air permeable piece is completed, the heat insulation layer and the external air circulate through the ventilation pipe 1, the heating ring 8 operates to dry the incoming and outgoing gas, the ultraviolet lamp 12 operates to disperse light through the light guide cover 11 and irradiate the inside of the heat insulation layer for sterilization operation;

[0055] S7, waterproof structure laying:

[0056] S701, anti-skid treatment: pour anti-skid mixture on the layer plate, solidify the anti-skid mixture, and form an anti-skid surface;

[0057] S702, waterproof mesh laying: apply latex to the anti-skid surface, air dry for 6 hours, lay the waterproof mesh on the latex-coated surface, brush latex on the upper side of the waterproof mesh, solidify the brushed glue for 12 hours, brush latex again, and solidify for 24 hours; the anti-skid mixture is prepared by stirring 18 parts of resin, 5 parts of ceramic particles, and 5 parts of rubber particles; the particle size of the ceramic particles and the rubber particles is 5 mm; and the laying thickness of the anti-skid mixture is 8 mm;

[0058] S703, resin mixture laying: take out 12 parts of resin, 2 parts of glass fiber, 4 parts of wood chips, and 0.1 parts of pigment to mix and prepare resin mixture; remove the air bubbles in the resin mixture by negative pressure; lay the resin mixture on the upper side of the mesh; cover with a plastic film; solidify the resin mixture by ultraviolet lamp; solidify for 35 hours; remove the plastic film on the upper side of the resin mixture by using a grinding machine; remove the dust on the upper side of the resin mixture by using clean water; air dry; and the laying thickness of the resin mixture is 3.5 cm;

[0059] S8, corrosion prevention operation: spray the mixed anticorrosive paint on the upper side of the resin mixture, air dry, and spray the anticorrosive paint three times; the first spraying thickness is 0.5 mm, air dry for 6 hours; the second spraying thickness is 2.5 mm, air dry for 12 hours; and the third spraying thickness is 1 mm, air dry for 12 hours;

[0060] S9, sun protection operation: coat varnish on the upper side of the anticorrosive coating; fix the aluminum foil polyurethane insulation board to the upper side of the anticorrosive layer by using silane polyether resin; and seal the joints of the aluminum foil polyurethane insulation board by using silane polyether resin.

[0061] In summary, the steps of the application include roofing cleaning, damaged surface trimming, and expansion screw installation on the isolation glue coating; the roofing cleaning degree is high; the damaged surface is trimmed; the expansion bolt connects the roofing and the thermal insulation waterproof layer; the firmness of the thermal insulation waterproof structure is increased; the thermal insulation waterproof structure is prevented from falling off; the structure is more firm than the layer-to-layer bonding; the thermal insulation is achieved by the lower cushion layer, the isolation frame, the rubber plastic ball, the upper cushion layer, and the layer plate; the waterproof is achieved by the anti-skid surface, the waterproof mesh, and the resin mixture; the thermal insulation and waterproof performance is improved; the rubber plastic ball is located in the isolation frame; the rubber plastic ball and the isolation frame are fixed by the lower cushion layer and the upper cushion layer; the rubber plastic ball is protected; the space between the layers is increased; the thermal insulation performance is improved; the thermal insulation waterproof layer is protected by corrosion prevention and sun protection; the durability of the waterproof layer is improved; the air inlet and outlet operation is completed; the air inlet and outlet are dried and sterilized; the thermal insulation waterproof structure is prevented from being deformed due to moisture; the thermal insulation layer is prevented from being mildewed and rotted; the durability of the construction is further improved; and the problems in the background art are solved.

[0062] It will be apparent to those skilled in the art that the application is not limited to the details of the above-exemplified embodiments and that the present application can be implemented in other particular forms without departing from the spirit or essential characteristics of the present application. The presently disclosed embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the application being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. No reference to an item in the claims to be construed as a disavowal of the item, even if the item is not recited in each claim.

[0063] Furthermore, it should be understood that although the description is made on embodiments, not every embodiment contains only one independent technical solution, and the description manner of the specification is only for the sake of clarity, and the skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be combined appropriately to form other embodiments which can be understood by the skilled in the art.

Claims

1. A method of constructing a roof insulation and waterproofing, characterized by, The steps are as follows: S1, roof cleaning: clean the roof of debris, polish the roof, remove the dirt and aging layer adhered to the roof, and use a dust collector to suck the powder generated during polishing; S2, damage surface finishing: repair the damaged surface with concrete and complete the leveling operation of the roof. After solidification, rinse the roof with clean water and dry the roof; S3, expansion screw installation: drill expansion bolts on the roof, apply anti-rust paint to the outside of the expansion screw, and glue the connection between the screw and the roof installation hole; S4, isolation glue coating: wear spiked shoes and use isolation glue to coat the isolation glue at the connection between the roof and the expansion screw. Coat the isolation glue on the roof, dry it after the first coating, and dry it after the second coating; S5, heat insulation structure laying: S501, lower cushion layer laying: lay the dried straw soaked in the corrosion-proof liquid on the upper side of the roof and limit the straw with the metal mesh; S502, isolation frame installation: lay the stainless steel metal frame on the lower cushion layer and weld the stainless steel metal frame to the expansion screw; S503, rubber ball installation: fill the rubber ball into the stainless steel metal frame, and fix the rubber ball to the stainless steel metal frame with steel wire mesh; S504, upper cushion layer laying: lay the dried straw soaked in the corrosion-proof liquid on the upper side of the rubber ball installation surface and limit the straw with the metal mesh; S505, layer plate installation: fix the metal strip on the expansion screw, adjust the flatness of the fixed metal strip with screws, apply anti-rust paint to the outside of the metal strip, and fix the layer plate to the upper side of the metal strip; S6, layer plate installation surface treatment: S601, expansion screw finishing: remove the expansion screw higher than the layer plate, polish and cut off the surface, weld a anti-escape cap on the upper side of the cut-off surface, and apply anti-rust paint to the outside of the anti-escape cap; S602, air permeable piece installation: drill holes in the layer plate, insert the lower end of the air permeable piece into the interior of the upper cushion layer, and fix it to the layer plate; the air permeable piece comprises a ventilation pipe (1), an upper support frame (2), a support rod (3), and a cover (4), the upper support frame (2) is located at the upper end position of the ventilation pipe (1), the support rod (3) is located at the upper position of the upper support frame (2), the cover (4) is located at the upper end position of the support rod (3), a heating ring (8) is installed at the inner upper end position of the cover (4), a filter screen (9) is arranged at the inner lower end position of the cover (4), a lower support frame (10) is arranged at the inner lower end position of the ventilation pipe (1), a light guide cover (11) is installed on the lower side of the lower support frame (10), and an ultraviolet lamp (12) is installed in the light guide cover (11); S7, waterproof structure laying: S701, anti-skid treatment: pour anti-skid mixture onto the layer plate, and solidify the anti-skid mixture to form an anti-skid surface; S702, waterproof mesh cloth laying: apply latex to the anti-skid surface, dry for 6 hours, lay waterproof mesh cloth on the latex coated surface, brush latex on the upper side of the waterproof mesh cloth, solidify the latex for 12 hours after brushing, and brush the latex again, solidify for 24 hours; S703、Resin mixture laying: take out 12 parts of resin, 2 parts of glass fiber, 4 parts of sawdust and 0.1 parts of pigment to mix into resin mixture, remove the air bubbles inside the resin mixture by negative pressure, lay the resin mixture on the upper side of the mesh cloth, cover with plastic film, cure the resin mixture with ultraviolet lamp, solidify for 35 hours, remove the plastic film on the upper side of the resin mixture with a sander, remove the dust on the upper side of the resin mixture with clean water, air dry; S8, anticorrosive operation: the mixed anticorrosive paint is sprayed on the upper side of the resin mixture, and air dried; S9, sunscreen operation: apply varnish on the upper side of the anticorrosive coating, fix the aluminum foil polyurethane insulation board to the upper side of the anticorrosive layer by silane polyether resin, seal the joints of the aluminum foil polyurethane insulation board with silane polyether resin.

2. The method of claim 1, wherein the method further comprises: The damage surface repair process in S2 is as follows: the damage surface caused by corrosion and brittleness is excavated, the expansion bolt with an outer diameter of 0.5 cm is fixed to the damage surface, the mixed concrete is poured into the damage surface, and the expansion screw protruding from the damage surface is cut off after solidification.

3. The method of claim 1, wherein the method further comprises: The expansion screw in S3 has an outer diameter of 2.5 cm, and the depth of the expansion screw into the roof is 4 cm.

4. The method of claim 1, wherein the method further comprises: In S4, the height of the expansion screw coated with isolation glue is 20 cm, and the coating thickness of the roof isolation glue is 5 mm. After the first coating, it is air dried for 48 hours, and after the second coating, it is air dried for 48 hours.

5. The method of claim 1, wherein the method further comprises: In S5, the thickness of the lower cushion layer is 4 cm, the thickness of the isolation frame is 15 cm, the thickness of the upper cushion layer is 4 cm, the thickness of the layer plate is 2.5 cm, and the layer plate is plywood.

6. The method of claim 1, wherein the method further comprises: The outer lower end of the ventilation pipe (1) is provided with a fixing ring (5), the outer side of the ventilation pipe (1) is provided with an external thread (6), the outer side of the external thread (6) is provided with a sleeve ring (7), and the upper side of the fixing ring (5) is provided with a fixing screw (13).

7. The method of claim 1, wherein the method further comprises: The anti-skid mixture in S7 is made by stirring 18 parts of resin, 5 parts of ceramic particles and 5 parts of rubber particles, the particle size of the ceramic particles and the rubber particles is 5 mm, the laying thickness of the anti-skid mixture is 8 mm, and the laying thickness of the resin mixture is 3.5 cm.

8. The method of claim 1, wherein the method further comprises: The anticorrosive paint in S8 is sprayed three times, the first spraying thickness is 0.5 mm, air dried for 6 hours, the second spraying thickness is 2.5 mm, air dried for 12 hours, and the third spraying thickness is 1 mm, air dried for 12 hours.

9. The method of claim 6, wherein the method further comprises, The cover (4) is fixed to the upper side of the upper support frame (2) through the support rod (3), the lower end of the ventilation pipe (1) penetrates the layer plate and is inserted into the upper cushion layer, the lower end of the fixing screw (13) penetrates the fixing ring (5) and rotates in the inner position of the layer plate, the fixing ring (5) is fixed to the upper side of the layer plate through the fixing screw (13), the ventilation pipe (1) is fixed to the upper side of the layer plate through the fixing ring (5), and the light guide cover (11) is fixed to the inner position of the ventilation pipe (1) through the lower support frame (10).

Citation Information

Patent Citations

  • Roof heat preservation and insulation waterproof construction method

    CN112177249A

  • Roofing thermal-insulating system adopting foam glass boards and construction method thereof

    CN107965097A

  • Waterproof and heat-insulating structure of tiled roof

    CN213741943U

  • High-strength single-layer roof waterproof roll

    CN218176368U