Grid-bonded riprap anti-scour construction method and device based on flow field analysis

Through the gridded cemented riprap anti-scouring construction method based on flow field analysis, a three-dimensional numerical model around the marine structure is established, the marine hydrological environment and geophysical parameters are obtained, and the optimal protective structure parameters are generated to solve the problem of scour in the existing technology. The problem of pit repair being unable to achieve long-term effective protection has been achieved, and the long-term effective protection and construction cost reduction of the gridded cemented riprap anti-scouring structure have been achieved.

CN116522727BActive Publication Date: 2024-10-18CHINA THREE GORGES CORPORATION
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310493134.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-25
Publication Date
2024-10-18
Estimated Expiration
2043-04-25

AI Technical Summary

Technical Problem

The existing scour pit repair technology cannot achieve long-term effective protection goals and cannot adapt to changes in the flow field around marine structures, causing the protective structure to fail under the action of waves and currents.

Method used

Through the gridded cemented riprap anti-scouring construction method based on flow field analysis, a three-dimensional numerical model around the marine structure is established, the marine hydrological environment and geophysical parameters are obtained, the optimal protective structure parameters are generated, the construction plan is optimized, and the protection period is extended. .

Benefits of technology

The long-term effective protection of the gridded cemented riprap anti-scouring structure has been achieved, the construction cost has been reduced, a feasible construction plan has been formed, and the protection period has been extended.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116522727B_ABST
    Figure CN116522727B_ABST
Patent Text Reader

Abstract

The present invention provides a gridded cemented riprap anti-scour construction method and device based on flow field analysis, the method comprising: obtaining marine structure scour pit data and seabed data around the marine structure scour pit; constructing a three-dimensional numerical model based on the marine structure scour pit data and seabed data around the marine structure scour pit; obtaining marine hydrological environment parameters and seabed geophysical and mechanical parameters, assigning parameters to the three-dimensional numerical model based on the marine hydrological environment parameters and seabed geophysical and mechanical parameters, generating a marine structure flow field analysis and calculation model; performing flow field analysis on the marine structure flow field analysis and calculation model, generating optimal protective structure parameters; and constructing a gridded cemented riprap anti-scour structure using the optimal protective structure parameters. The method forms a construction plan with engineering feasibility, realizes the optimization of the construction organization of the gridded cemented riprap anti-scour structure, and prolongs the protection period of the gridded cemented riprap anti-scour structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of gridded cemented riprap anti-scour, and in particular to a gridded cemented riprap anti-scour construction method and device based on flow field analysis. Background Art

[0002] Under the action of waves and currents, the seabed usually has natural scouring and siltation. After the marine structure (pile foundation, barrel foundation) is installed on the seabed, it will cause the flow field around the structure to change, resulting in local scouring of the surface soil of the seabed around the structure, forming scour pits of various shapes. The formation and continuous development of scour pits have a significant impact on the safety of marine structures. At present, commonly used scour protection and scour pit repair measures include riprap protection, sand blanket protection, solidified soil protection, concrete interlocking row protection, bionic grass, gridded cemented riprap anti-scour structure, and single pile foundation anti-scour construction method based on mosaic underwater cemented rockfill.

[0003] For scour pit repair projects, conventional technical solutions and construction methods only consider the current form of the scour pit, and do not consider the formation process and subsequent evolution trend of the scour pit, which results in that after the scour pit repair is completed, only the purpose of short-term effective protection can be achieved, but the goal of long-term effective protection cannot be achieved. The formation process and subsequent evolution trend of the scour pit are closely related to the flow field distribution under natural ocean conditions and the flow field distribution around the structure. The flow field distribution under natural ocean conditions determines whether there is overall scour on the seabed, and the flow field distribution around the structure determines the development of local scour pits on the seabed. There is a superposition effect between overall scour and local scour on the seabed, which is crucial to the selection of scour schemes. For seabeds with overall scouring, the use of rigid or semi-rigid protective structures such as solidified soil and concrete interlocking rows can reduce local scouring to a certain extent, but scouring will inevitably occur at the interface between the protective structure and the seabed until the protective structure is completely destroyed. For protective structures such as riprap, since the interface between the small-size riprap particles and the seabed is a flexible transition, the scouring at the interface between the riprap protective structure and the seabed is not serious. However, since the riprap particles themselves are not stable enough, they will be dispersed or sunk under the coupling of waves and currents, which will cause the protective structure to fail. The gridded bonded riprap anti-scour structure is a protective measure that can better adapt to the overall and local scour of the seabed. However, under the action of waves and currents, there is no mature and feasible solution for the design method and construction process of the gridded bonded riprap anti-scour structure. Although a single pile foundation anti-scour construction method based on mosaic underwater bonded rockfill has proposed an underwater bonding construction method, this construction method does not take into account the actual situation of offshore operations and the influence of wave and current on construction. On the other hand, it does not consider the influence of scour pits on the gridded bonded riprap protective structure and its construction process after the existence of scour pits. Summary of the invention

[0004] Therefore, the technical solution of the present invention mainly solves the defect that the construction method for repairing scour pits cannot achieve long-term and effective protection goals, thereby providing a grid-bonded riprap anti-scour construction method and device based on flow field analysis.

[0005] In a first aspect, an embodiment of the present invention provides a gridded cemented riprap anti-scour construction method based on flow field analysis, comprising:

[0006] Obtaining marine structure scour pit data, seabed elevation data and seabed data around marine structure scour pits;

[0007] Constructing a three-dimensional numerical model based on the marine structure scour pit data, the seabed elevation data and the seabed data around the marine structure scour pit;

[0008] Acquiring ocean hydrological environment parameters and seabed geological physical and mechanical parameters, assigning parameters to the three-dimensional numerical model based on the ocean hydrological environment parameters and the seabed geological physical and mechanical parameters, and generating an ocean structure flow field analysis and calculation model;

[0009] Performing flow field analysis on the marine structure flow field analysis and calculation model to generate optimal protective structure parameters;

[0010] The gridded cemented riprap anti-scour structure is constructed using the optimal protective structure parameters.

[0011] The grid-bonded riprap anti-scour construction method based on flow field analysis provided in the embodiment of the present invention, when constructing the grid-bonded riprap anti-scour structure, by establishing a marine structure flow field analysis calculation model that can carry out flow field analysis around the marine structure, and determining the optimal protection structure parameters through flow field analysis of the marine structure flow field analysis calculation model, the cost is reduced, and the grid-bonded riprap anti-scour structure is constructed using the optimal protection structure parameters, forming a construction plan with engineering feasibility, realizing the optimization of the construction organization of the grid-bonded riprap anti-scour structure, and extending the protection period of the grid-bonded riprap anti-scour structure.

[0012] In combination with the first aspect, in a possible implementation manner, performing flow field analysis on the marine structure flow field analysis calculation model to generate optimal protection structure parameters includes:

[0013] Performing flow field analysis on the marine structure flow field analysis calculation model to generate scour pit evolution data around the marine structure under the action of waves and currents;

[0014] Constructing a numerical model of the protective structure based on the evolution data of the scour pits around the marine structure under the action of the wave and current;

[0015] A flow field analysis is performed on the numerical model of the protective structure to generate optimal protective structure parameters.

[0016] In combination with the first aspect, in another possible implementation, the constructing of a numerical model of a protective structure based on the evolution data of scour pits around the marine structure under the action of the wave and current includes:

[0017] Obtaining the variation law of the depth of the scour pit with the scour duration and the variation law of the range of the scour pit with the scour duration from the evolution data of the scour pit around the marine structure under the action of the wave and current;

[0018] Determine the type of protective structure, protective range, protective thickness and internal structural characteristics based on the variation law of the depth of the scouring pit with the scouring time and the variation law of the range of the scouring pit with the scouring time;

[0019] Selecting the riprap particle size and gradation and the spatial distribution and size of the cemented riprap body from the protection structure, protection range, protection thickness and internal structure characteristics respectively;

[0020] The numerical model of the protective structure is constructed based on the riprap particle size and gradation and the spatial distribution and size of the cemented riprap body.

[0021] In combination with the first aspect, in another possible implementation manner, performing flow field analysis on the numerical model of the protection structure to generate optimal protection structure parameters includes:

[0022] The first determination step: determining the interaction force between the riprap particles and the fluid force acting on the surface of the riprap particles based on the numerical model of the protective structure;

[0023] The second determination step: determining the position and velocity of the riprap particles based on the interaction force between the riprap particles and the fluid force acting on the surface of the riprap particles;

[0024] A third determination step: determining a current fluid force acting on the riprap particle based on the riprap particle position and the riprap particle velocity;

[0025] Iterative loop step: based on the current fluid force acting on the riprap particles, repeat the second determination step and the third determination step until the flow field simulation time step is reached, and the current protective structure data is generated;

[0026] Analysis steps: Analyze the current protection structure data and determine the optimal protection structure parameters based on the analysis results.

[0027] In combination with the first aspect, in another possible implementation manner, determining the current fluid force acting on the riprap particles based on the riprap particle position and the riprap particle velocity includes:

[0028] Using the velocity and position of the riprap particles, the empty region field and the phase region field are updated; wherein the empty region field is used to distinguish between fluid and solid, and the phase region field is used to distinguish between air and water in the fluid;

[0029] Based on the updated empty region field and phase region field, a fluid velocity field is generated using a PISO algorithm, and the fluid velocity field is corrected based on the riprap particle velocity;

[0030] Based on the corrected fluid velocity field, the flow field force on the grid cells occupied by each sphere in the riprap particle is integrated to generate the current fluid force acting on the riprap particle.

[0031] In combination with the first aspect, in another possible implementation manner, the optimal protection structure parameters include:

[0032] The distribution of falling points of riprap particles under the action of wave currents, the pouring concentration of underwater protective agent, the pouring speed of underwater protective agent and the pouring amount of underwater protective agent per unit time, the expansion degree of underwater cementitious material, the yield strength of underwater cementitious material and the viscosity of underwater cementitious material.

[0033] In combination with the first aspect, in another possible implementation, the three-dimensional numerical model includes:

[0034] Marine structures, scour pits of marine structures and the seabed surrounding marine structures.

[0035] In a second aspect, an embodiment of the present invention further provides a gridded cemented riprap anti-scour construction device based on flow field analysis, comprising:

[0036] An acquisition module, used for acquiring marine structure scouring pit data and seabed data around the marine structure scouring pit;

[0037] A construction module, for constructing a three-dimensional numerical model based on the marine structure scour pit data and the seabed data surrounding the marine structure scour pit;

[0038] An assignment module is used to obtain ocean hydrological environment parameters and seabed geological physical and mechanical parameters, and to assign parameters to the three-dimensional numerical model based on the ocean hydrological environment parameters and the seabed geological physical and mechanical parameters to generate an ocean structure flow field analysis and calculation model;

[0039] An analysis module is used to perform flow field analysis on the marine structure flow field analysis calculation model to generate optimal protection structure parameters;

[0040] A determination module is used to construct a gridded cemented riprap anti-scour structure using the optimal protective structure parameters.

[0041] In the third aspect, an embodiment of the present invention further discloses an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the steps of the gridded cemented riprap anti-scour construction method based on flow field analysis as described in the first aspect or any optional embodiment of the first aspect.

[0042] In a fourth aspect, an embodiment of the present invention further discloses a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the gridded cemented riprap anti-scour construction method based on flow field analysis as described in the first aspect or any optional embodiment of the first aspect. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0044] Figure 1 A flow chart of a gridded cemented riprap anti-scour construction method based on flow field analysis provided in an embodiment of the present invention;

[0045] Figure 2 A flowchart of S104 provided in an embodiment of the present invention;

[0046] Figure 3 A flowchart of S1042 provided in an embodiment of the present invention;

[0047] Figure 4 A flowchart of S1043 provided in an embodiment of the present invention;

[0048] Figure 5 A flowchart of S10433 provided in an embodiment of the present invention;

[0049] Figure 6 A schematic diagram of a barrel-shaped foundation scouring pit provided by an embodiment of the present invention;

[0050] Figure 7 A schematic diagram of a barrel-type foundation scour pit after emergency repair provided by an embodiment of the present invention;

[0051] Figure 8 A schematic top view of a barrel-type foundation scour pit after emergency repair provided by an embodiment of the present invention;

[0052] Fig. 9 A schematic diagram of the prediction of scour evolution of a scour pit after emergency repair of a barrel foundation provided by an embodiment of the present invention;

[0053] Fig.10 A top view of the scour evolution prediction of a scour pit after emergency repair of a barrel foundation provided by an embodiment of the present invention;

[0054] Fig.11 A schematic diagram of a gridded cemented riprap protection structure of a scour pit after emergency repair of a barrel foundation provided by an embodiment of the present invention;

[0055] Fig.12 A top view of a gridded cemented riprap protection structure of a scour pit after emergency repair of a barrel foundation provided by an embodiment of the present invention;

[0056] Fig.13 A block diagram of a gridded cemented riprap anti-scour construction device based on flow field analysis provided in an embodiment of the present invention;

[0057] Fig.14 FIG. 4 is a specific example diagram of an electronic device in an embodiment of the present invention. DETAILED DESCRIPTION

[0058] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] In the description of the present invention, it should be noted that the terms "first", "second" and "third" are used for descriptive purposes only and should not be understood as indicating or implying relative importance. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a mechanical connection, or an electrical connection; or it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components, which can be a wireless connection or a wired connection. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0060] The embodiment of the present invention provides a grid-based cemented riprap anti-scour construction method based on flow field analysis, such as Figure 1 As shown, including:

[0061] S101. Acquire marine structure scour pit data and seabed data surrounding the marine structure scour pit.

[0062] Specifically, the scour pit data of the marine structure (including the direction, range and depth of the scour pit) are obtained by scanning the marine structure and the surrounding scour pits through the multi-beam bathymetric system. At the same time, the seabed data around the scour pits of the marine structure (i.e. the distribution and thickness data of the strata around the marine structure) are obtained by combining the seabed geological profile obtained by drilling exploration.

[0063] S102: construct a three-dimensional numerical model based on the marine structure scour pit data and the seabed data around the marine structure scour pit.

[0064] Specifically, based on the design drawings and construction records of the marine structure, the basic structure dimension data is obtained, and a three-dimensional numerical model of the marine structure, the marine structure scour pit and the seabed around the marine structure is established.

[0065] S103, obtaining ocean hydrological environment parameters and seabed geological physical and mechanical parameters, assigning parameters to the three-dimensional numerical model based on the ocean hydrological environment parameters and the seabed geological physical and mechanical parameters, and generating an ocean structure flow field analysis and calculation model.

[0066] Specifically, the three-dimensional numerical model is imported into the wave and current flume numerical calculation program, and the ocean hydrological environment parameters, namely, the wave height, wave period, current velocity of ocean waves and currents, the viscosity of water, surface tension, compressibility of fluid, etc. are taken as input parameters. The seabed geophysical and mechanical parameters, namely, the density, cohesion, internal friction angle of each layer of seabed soil, and the d50 particle size of soil particles are set according to the seabed geological conditions, to form a calculation model that can carry out flow field analysis around marine structures, namely, the marine structure flow field analysis calculation model.

[0067] S104, performing flow field analysis on the above-mentioned marine structure flow field analysis and calculation model to generate optimal protective structure parameters.

[0068] Specifically, the optimal protective structure parameters include: the falling point distribution of riprap particles under the action of wave currents, the pouring concentration of the underwater protective agent, the pouring speed of the underwater protective agent and the pouring amount of the underwater protective agent per unit time, the expansion degree of the underwater cementitious material, the yield strength of the underwater cementitious material and the viscosity of the underwater cementitious material.

[0069] S105. Use the above-mentioned optimal protective structure parameters to construct a gridded cemented riprap anti-scour structure.

[0070] Specifically, the gridded bonded riprap anti-scour structure is constructed by utilizing the distribution of falling points of riprap particles under the action of wave currents, the pouring concentration of the underwater protective agent, the pouring speed of the underwater protective agent and the pouring amount of the underwater protective agent per unit time, the expansion degree of the underwater cementitious material, the yield strength of the underwater cementitious material and the viscosity of the underwater cementitious material.

[0071] The gridded bonded riprap anti-scour construction method based on flow field analysis proposed in this embodiment realizes the selection of targeted scour repair schemes for each marine structure by establishing three-dimensional numerical models of marine structures, scour pits of marine structures and the seabed around marine structures. Since marine structures, scour pits, seabeds and protective structures have mutual influences in actual projects, a marine structure flow field analysis and calculation model capable of conducting flow field analysis around marine structures is established to realize coupling analysis among marine structures, scour pits, seabeds and protective structures, and the optimal protective structure parameters are determined by flow field analysis of the marine structure flow field analysis and calculation model, thereby reducing costs. The gridded bonded riprap anti-scour structure is constructed using the optimal protective structure parameters, thereby forming a construction scheme with engineering feasibility, realizing the optimization of the construction organization of the gridded bonded riprap anti-scour structure, and extending the protection period of the gridded bonded riprap anti-scour structure.

[0072] As an optional embodiment of the present invention, Figure 2 As shown, the above S104, i.e., performing flow field analysis on the above marine structure flow field analysis calculation model to generate optimal protection structure parameters, includes:

[0073] S1041. Perform flow field analysis on the above-mentioned marine structure flow field analysis calculation model to generate evolution data of scour pits around the marine structure under the action of waves and currents.

[0074] S1042. Construct a numerical model of the protective structure based on the evolution data of scour pits around the marine structure under the action of the above-mentioned waves and currents.

[0075] S1043. Perform flow field analysis on the numerical model of the protection structure to generate optimal protection structure parameters.

[0076] Specifically, the three-dimensional numerical model is re-imported into the wave flow flume numerical calculation program to carry out flow field analysis, obtain data such as the riprap retention rate, scour pit depth, and scour pit range in the protective structure, judge the protective effect, and then select the protective structure parameters with the best protective effect, that is, generate the optimal protective structure parameters.

[0077] Furthermore, the calculation module in the wave-current flume numerical calculation program is developed based on the computational fluid dynamics method, discrete element method, finite element method, finite difference method, gridless method, and lattice Boltzmann method. At the same time, the calculation module is coupled and solved (DEM subroutine, CFD subroutine, VOF subroutine, coupling subroutine) during the calculation process, including the coupling of the CFD subroutine and the DEM subroutine. The CFD subroutine simulates the scouring process under the action of wave and current and the fluid force acting on the surface of the riprap particles. The DEM subroutine simulates the movement of the riprap particles under the action of the fluid force and constructs the cementation effect between the riprap particles. The coupling process of the CFD subroutine and the DEM subroutine realizes the simulation of the flow and attachment process of the underwater cementitious material in the riprap particles.

[0078] Furthermore, the above calculation process includes a DEM subroutine, a coupling subroutine, a VOF subroutine and a CFD subroutine, wherein the DEM subroutine is used to establish a riprap particle accumulation body and calculate the interaction between particles, and the CFD subroutine is used to solve the force of the fluid on the particles; in the DEM subroutine solution, the riprap particles exist in the form of particles; but in the CFD subroutine solution, the riprap particles exist in the form of occupying grid space, rather than the particles themselves, and the grid space occupied by the riprap particles is set as an empty area field, and the air and liquid are fluid fields, and the air and liquid are divided into two phase regions at the interface between the two. domain field; during the entire calculation process, the particle position and velocity data calculated by the DEM subroutine are input into the CFD subroutine, and the fluid force acting on the particles calculated by the CFD subroutine is input into the DEM subroutine for cyclic iterative calculation. The coupling subroutine and the VoF subroutine are required in the interactive iterative process between the DEM subroutine and the CFD subroutine. The coupling subroutine maps the riprap particles in the DEM subroutine into the grid space in the CFD subroutine, that is, forming an empty region field; the VoF subroutine updates the phase region field according to the empty region field; and the CFD subroutine performs calculations based on the updated phase region field.

[0079] As an optional embodiment of the present invention, Figure 3 As shown, the above S1042, i.e., constructing a numerical model of a protective structure based on the evolution data of scour pits around the marine structure under the action of the above wave and current, includes:

[0080] S10421. From the evolution data of scour pits around marine structures under the action of the above-mentioned waves and currents, obtain the variation pattern of the depth of the scour pits with the scour duration and the variation pattern of the range of the scour pits with the scour duration.

[0081] S10422. Determine the type of protective structure, protective range, protective thickness and internal structural characteristics based on the variation pattern of the depth of the scour pit with the scour duration and the variation pattern of the range of the scour pit with the scour duration.

[0082] S10423. Select the riprap particle size and grading and the spatial distribution and size of the cemented riprap body based on the above-mentioned protection structure, protection range, protection thickness and internal structure characteristics.

[0083] Specifically, carry out material selection for the protective structure, and determine the riprap particle size and grading, and the spatial distribution and size of the cemented riprap body based on the above-mentioned protective structure, protection range, protection thickness, internal structural characteristics and selected materials.

[0084] S10424. Construct a numerical model of the protective structure based on the riprap particle size and gradation and the spatial distribution and size of the cemented riprap body.

[0085] As an optional embodiment of the present invention, Figure 4 As shown, the above S1043, i.e., the above flow field analysis of the above protection structure numerical model to generate the optimal protection structure parameters, includes:

[0086] S10431. First determination step: determining the interaction force between the riprap particles and the fluid force acting on the surface of the riprap particles based on the above-mentioned numerical model of the protective structure.

[0087] Specifically, the fluid (air and liquid) calculation parameters in the CFD subroutine are set, including velocity, pressure, flow field, etc.; the DEM subroutine is used to create riprap particles (where irregular riprap particles are composed of spheres of different particle sizes), and the riprap particle density, elastic modulus and other parameters are set. At the same time, a riprap particle accumulation body is generated based on the isobaric dissipative system, and a bonding contact bonding model based on the cohesive force model is set between some riprap particles in the riprap particle accumulation body to form a cemented riprap block.

[0088] S10432, second determination step: determining the position and velocity of the riprap particles based on the interaction force between the riprap particles and the fluid force acting on the surface of the riprap particles.

[0089] Specifically, the DEM subroutine is run to calculate the position and velocity of the riprap particles using the interaction force between the riprap particles and the fluid force acting on the surface of the riprap particles using formulas (1) and (2). The position of each sphere in the riprap particles is calculated based on the position and rotation angle of the riprap particles.

[0090]

[0091] In the above formula, m i is the mass of riprap particle i, U i is the velocity of the riprap particles, F i,j is the interaction force between riprap particles i and j, F i,f is the fluid force acting on riprap particle i, I iis the inertia tensor, ω i is the rotation speed, M i,j is the bending moment between riprap particles i and j, M i,f is the bending moment caused by the fluid force acting on the riprap particle i.

[0092] S10433, third determination step: determining the current fluid force acting on the riprap particles based on the riprap particle positions and the riprap particle speeds.

[0093] S10434, loop iteration step: based on the current fluid force acting on the riprap particles, repeat the second determination step and the third determination step until the flow field simulation time step is reached, and the current protection structure data is generated.

[0094] S10435. Analysis step: Analyze the current protection structure data and determine the optimal protection structure parameters based on the analysis results.

[0095] As an optional embodiment of the present invention, Figure 5 As shown, the above S10433, i.e., the third determination step: determining the current fluid force acting on the riprap particles based on the above riprap particle positions and the above riprap particle speeds, includes:

[0096] S104331. Update the empty region field and the phase region field based on the velocity and position of the riprap particles; wherein the empty region field is used to distinguish between fluid and solid, and the phase region field is used to distinguish between air and water in the fluid.

[0097] Specifically, the coupling subroutine is used to update the empty region field, and the VoF subroutine is used to update the phase region field. The position and velocity parameters of the riprap particles are imported into the coupling subroutine to update the empty region field, which is used to distinguish between fluid (air and water) and solid (riprap particles). Then the VoF subroutine is used to update the phase region field to distinguish between air and water in the fluid.

[0098] Furthermore, the phase equation is solved using the updated empty region field based on the fluid velocity field at the last time step of the VoF subroutine, where the expression of the phase equation is as follows:

[0099]

[0100] In the above formula, α1 is the proportion of water in the grid unit, u f is the flow velocity, u c is the preset variable, and c is the coefficient of interface sharpening.

[0101] S104332. Based on the updated empty region field and phase region field, generate a fluid velocity field using the PISO algorithm, and correct the fluid velocity field based on the riprap particle velocity.

[0102] Specifically, in the CFD subroutine, the PISO algorithm (Pressure-Implicit with Splitting of Operators, a non-iterative algorithm for solving coupled velocity and pressure) is used to solve the momentum equation and continuity equation of the multiphase fluid to obtain the fluid velocity field and fluid pressure field. The expression of the momentum equation of the multiphase fluid is as follows:

[0103]

[0104] In the above formula, h is the position vector, ρ f is the combined density of the multiphase fluid, g is the gravitational acceleration, σ is the surface tension coefficient, κ is the surface curvature, and p rgh is the pressure at the particle position in the water, where the calculation formula for the pressure at the particle position in the water is as follows:

[0105] p rgh =p-ρ f gh(5)

[0106] In the above formula, p is the atmospheric pressure.

[0107] Furthermore, the continuity equation for multiphase fluid is as follows:

[0108]

[0109] Furthermore, the calculation formula for correcting the fluid velocity field based on the riprap particle velocity is as follows:

[0110] u s =c v (U i +ω i × ic )(7)

[0111]

[0112] In the above formula, U i is the riprap particle velocity, ω i is the rotation speed, r ic is the positive vector relative to the center of mass, c v is the influence coefficient of particle motion on the fluid, is the fluid velocity before correction, u f1 is the corrected fluid velocity, α f The liquid percentage.

[0113] S104333. Based on the corrected fluid velocity field, the flow field force on the grid cells occupied by each sphere in the riprap particles is integrated to generate the current fluid force acting on the riprap particles.

[0114] Specifically, the flow field force on the grid unit occupied by the sphere is integrated to obtain the current fluid force and bending moment acting on the riprap particles, wherein the calculation formula of the current fluid force acting on the riprap particles is as follows:

[0115]

[0116] Furthermore, the calculation formula for the bending moment acting on the riprap particles is as follows:

[0117]

[0118] Where: F i,f is the fluid force acting on sphere i, M i,f is the bending moment caused by the fluid force acting on sphere i, is the pressure gradient, f IB is the fluid force field, V c is the grid unit volume, α f is the liquid percentage, r is the positive vector relative to the center of mass of the sphere, and τ is the shear stress of the fluid.

[0119] Furthermore, the calculated forces and bending moments are brought back to the second determination step for cyclic iterative calculation.

[0120] The following is a specific example to illustrate the gridded cemented riprap anti-scour construction method based on flow field analysis.

[0121] Embodiment 1:

[0122] In this embodiment, the diameter of the barrel foundation is 32m (meter). Three months after the construction of the barrel foundation is completed, an east-west scouring pit is formed along the wave flow direction within a range of 32m from the center of the barrel foundation. The maximum depth of the scouring pit is 2.8m, and the scouring volume is 3000m 3 (like Figure 6 (as shown); an emergency repair was carried out using conventional riprap construction methods, such as Figure 7 , Figure 8 As shown in the figure, three months after the emergency repair, the scanning found that the riprap particles were mainly outside the scour pit, and the scour pit around the barrel foundation could not be repaired well; among them, 1- barrel foundation, 2- scour pit, 3- first soil layer, 4- second soil layer, 5- riprap protection structure, 6- gridded cemented riprap protection structure, 61- riprap cemented body, 62- loose riprap body.

[0123] The construction method of gridded cemented riprap anti-scour technology based on flow field analysis includes the following steps:

[0124] S1: The marine structure and the scour pits around it were scanned by a multi-beam bathymetric system, and the marine structure, scour pits and the surrounding seabed were reconstructed in three dimensions. A circular scour pit existed within 20 m between the center of the barrel foundation and the riprap body to be repaired urgently. The maximum scour depth of the scour pit was located around the barrel foundation, with a maximum value of 3.5 m.

[0125] S2: The barrel foundation, scour pit, riprap around the scour pit and the seabed are reconstructed in three dimensions to form a numerical model. The numerical model is imported into the developed wave-current flume numerical calculation program, and the silt parameters and clay parameters are assigned to the first and second soil layers of the seabed, respectively.

[0126] S3: The extreme wave and current parameters (flow velocity 1.34m / s, wave height 9m, period 10.5s) with a return period of 50 years were set in the wave and current flume numerical calculation program, and the flow field analysis under natural conditions was carried out to obtain the evolution process of the scour pit without the second repair. The analysis results show that the riprap on the upper part of the riprap body formed by the emergency repair and dumping of the outer periphery of the barrel foundation was dispersed, and the scour pit shape evolved from a ring shape to a strip shape. Therefore, the riprap protection cannot maintain long-term effective protection (such as Fig. 9 and Fig.10 The second repair adopts a grid-bonded riprap protection structure. The first solution is to repair only the circular scour pit, and the protection range in the main direction of the wave flow is 32m, the protection range in the vertical direction of the wave flow is 20m, and the riprap elevation is 0.5m higher than the top of the barrel foundation; the second repair solution is to repair the circular scour pit, locally bond the riprap body of the first emergency repair, and the protection range in the main direction of the wave flow is 32m, the protection range in the vertical direction of the wave flow is 20m, and the riprap elevation is slightly higher than the top of the barrel foundation by 0.5m;

[0127] S4: Flow field analysis was carried out on the two repair schemes under extreme wave and current conditions with a return period of once in 50 years. The analysis results show that the second repair scheme is better than the first repair scheme, while the protection range in the main direction of the wave and current is adjusted to 28m, and the protection range in the main direction perpendicular to the wave and current is still 20m.

[0128] S5: Carry out flow field analysis of the riprap filling process under construction conditions, where the wave flow parameters are (flow velocity 0.68m / s, wave height 0.8m, period 3s). According to the analysis results, the riprap particle size is 50-150mm (millimeter), and the initial filling height is 1-1.5m from the conduit outlet to the bottom of the scouring pit. During the filling process, the conduit height is continuously increased to always maintain the height between the conduit outlet and the riprap accumulation surface at 1-1.5m, that is, the filling height is 1-1.5m;

[0129] S6: Underwater protective agent placement process under construction conditions, where wave and current parameters are (flow rate 0.68m / s, wave height 0.8m, period 3s). According to the analysis results, the concentration of underwater protective agent around the riprap accumulation body after the underwater protective agent is placed is 0.1%-0.2%. After 1-3 minutes of placement, the conditions for starting underwater cementitious material pouring are met;

[0130] S7: Carry out flow field analysis of underwater cementitious material pouring process under construction conditions, wherein the wave flow parameters are (flow velocity 0.68m / s, wave height 0.8m, period 3 seconds). According to the analysis results, the expansion of underwater cementitious material is 280-320mm, and the plastic preservation time is 45-60 minutes (i.e., the expansion loss of underwater cementitious material after 60 minutes is less than 5%). The flow attachment form of underwater cementitious material in the riprap accumulation body is an inverted cone, and the vertical flow depth is greater than the horizontal flow depth.

[0131] S8: According to the construction method formed in steps S5-S7, construction is carried out. First, the grid bonding of the newly dumped riprap is completed, and then the grid bonding of the emergency dumped riprap accumulation is carried out. The bonding degree in the main direction of the wave flow is higher than that in the vertical direction (that is, the pouring amount of underwater cementitious material is larger, and the porosity of the riprap body after bonding is smaller). A grid-type bonded riprap protection structure (such as Fig.11 and Fig.12 shown).

[0132] The embodiment of the present invention also discloses a gridded cemented riprap anti-scour construction device based on flow field analysis, such as Fig.13 As shown, including:

[0133] The acquisition module 131 is used to acquire the marine structure scour pit data and the seabed data around the marine structure scour pit; for details, please refer to the relevant description of S101 in the above method embodiment.

[0134] The construction module 132 is used to construct a three-dimensional numerical model based on the above-mentioned marine structure scour pit data and the above-mentioned marine structure scour pit peripheral seabed data; for details, please refer to the relevant description of step S102 in the above-mentioned method embodiment.

[0135] The assignment module 133 is used to obtain the ocean hydrological environment parameters and the seabed geological physical and mechanical parameters, and assign parameters to the above-mentioned three-dimensional numerical model based on the above-mentioned ocean hydrological environment parameters and the above-mentioned seabed geological physical and mechanical parameters to generate an ocean structure flow field analysis and calculation model; for details, please refer to the relevant description of S103 in the above-mentioned method embodiment.

[0136] The analysis module 134 is used to perform flow field analysis on the above-mentioned marine structure flow field analysis calculation model to generate optimal protection structure parameters; for details, please refer to the relevant description of S104 in the above-mentioned method embodiment.

[0137] The determination module 135 is used to construct the gridded cemented riprap anti-scour structure using the above-mentioned optimal protective structure parameters; for details, please refer to the relevant description of S105 in the above-mentioned method embodiment.

[0138] The gridded bonded riprap anti-scour construction device based on flow field analysis provided by the present invention realizes the selection of targeted scour repair schemes for each marine structure by establishing three-dimensional numerical models of marine structures, scour pits of marine structures and seabeds around marine structures. Since marine structures, scour pits, seabeds and protective structures have mutual influence in actual projects, a marine structure flow field analysis and calculation model capable of carrying out flow field analysis around marine structures is established to realize coupling analysis among marine structures, scour pits, seabeds and protective structures, and optimal protective structure parameters are determined by flow field analysis of the marine structure flow field analysis and calculation model, thereby reducing costs. The gridded bonded riprap anti-scour structure is constructed using the optimal protective structure parameters, thereby forming a construction scheme with engineering feasibility, realizing the optimization of the construction organization of the gridded bonded riprap anti-scour structure, and extending the protection period of the gridded bonded riprap anti-scour structure.

[0139] As an optional embodiment of the present invention, the above-mentioned analysis module 134 includes: a first analysis submodule, which is used to perform flow field analysis on the above-mentioned marine structure flow field analysis calculation model, and generate evolution data of scour pits around the marine structure under the action of waves and currents; a construction submodule, which is used to construct a numerical model of the protective structure based on the evolution data of scour pits around the marine structure under the action of waves and currents; and a second analysis submodule, which is used to perform flow field analysis on the above-mentioned protective structure numerical model, and generate optimal protective structure parameters.

[0140] As an optional embodiment of the present invention, the above-mentioned construction submodule includes: an acquisition unit, which is used to obtain the variation law of the depth of the scour pit with the scouring time and the variation law of the range of the scour pit with the scouring time from the evolution data of the scour pit around the marine structure under the action of the wave and current; a generation unit, which is used to determine the type of protection structure, protection range, protection thickness and internal structure characteristics based on the variation law of the depth of the scour pit with the scouring time and the variation law of the range of the scour pit with the scouring time; a selection unit, which is used to select the riprap particle size and gradation and the spatial distribution and size of the cemented riprap body from the above-mentioned protection structure, protection range, protection thickness and internal structure characteristics respectively; a construction unit, which is used to construct the above-mentioned protection structure numerical model based on the above-mentioned riprap particle size and gradation and the spatial distribution and size of the above-mentioned cemented riprap body.

[0141] As an optional embodiment of the present invention, the second analysis submodule includes: a first determination unit, which is used to determine the interaction force between the riprap particles and the fluid force acting on the surface of the riprap particles based on the numerical model of the protective structure; a second determination unit, which is used to determine the riprap particle position and the riprap particle velocity based on the interaction force between the riprap particles and the fluid force acting on the surface of the riprap particles; a third determination unit, which is used to determine the current fluid force acting on the riprap particles based on the riprap particle position and the riprap particle velocity; a loop iteration unit, which is used to repeat the steps corresponding to the second determination unit and the third determination unit based on the current fluid force acting on the riprap particles until the flow field simulation time step is reached to generate current protective structure data; an analysis unit, which is used to analyze the current protective structure data and determine the optimal protective structure parameters based on the analysis results.

[0142] As an optional embodiment of the present invention, the third determination unit includes: an updating subunit, which is used to update the empty region field and the phase region field using the velocity and position of the riprap particles; wherein the empty region field is used to distinguish between fluid and solid, and the phase region field is used to distinguish between air and water in the fluid; a correction subunit, which is used to generate a fluid velocity field based on the updated empty region field and the phase region field using the PISO algorithm, and to correct the fluid velocity field based on the velocity of the riprap particles; an integration subunit, which is used to integrate the flow field force on the grid cells occupied by each sphere in the riprap particles based on the corrected fluid velocity field, to generate the current fluid force acting on the riprap particles.

[0143] In addition, an embodiment of the present invention further provides an electronic device, such as Fig.14 As shown, the electronic device may include a processor 110 and a memory 120, wherein the processor 110 and the memory 120 may be connected via a bus or in other ways. Fig.14 In the example, the connection through a bus is taken. In addition, the electronic device further includes at least one interface 130, and the at least one interface 130 may be a communication interface or other interface, which is not limited in this embodiment.

[0144] The processor 110 may be a central processing unit (CPU). The processor 110 may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.

[0145] The memory 120, as a non-transitory computer-readable storage medium, can be used to store non-transitory software programs, non-transitory computer executable programs and modules, such as program instructions / modules corresponding to the video synthesis method in the embodiment of the present invention. The processor 110 executes various functional applications and data processing of the processor by running the non-transitory software programs, instructions and modules stored in the memory 120, that is, to implement the gridded cemented riprap anti-scour construction method based on flow field analysis in the above method embodiment.

[0146] The memory 120 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and applications required for at least one function; the data storage area may store data created by the processor 110, etc. In addition, the memory 120 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the memory 120 may optionally include a memory remotely arranged relative to the processor 110, and these remote memories may be connected to the processor 110 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0147] In addition, at least one interface 130 is used for communication between the electronic device and external devices, such as communication with a server, etc. Optionally, at least one interface 130 can also be used to connect external input and output devices, such as a keyboard, a display screen, etc.

[0148] The one or more modules are stored in the memory 120 and when executed by the processor 110, perform the following steps: Figure 1 The grid-bonded riprap anti-scour construction method based on flow field analysis in the illustrated embodiment.

[0149] For details of the above electronic equipment, please refer to Figure 1 The corresponding related descriptions and effects in the illustrated embodiments can be understood and will not be repeated here.

[0150] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, the storage medium can be a disk, an optical disk, a read-only memory (ROM), a random access memory (RAM), a flash memory, a hard disk (HDD) or a solid-state drive (SSD), etc.; the storage medium can also include a combination of the above-mentioned types of memory.

[0151] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A grid-based cemented riprap anti-scour construction method based on flow field analysis, characterized in that: include: Obtaining the data of the scour pit of the marine structure and the seabed data around the scour pit of the marine structure; Constructing a three-dimensional numerical model based on the marine structure scour pit data and the seabed data surrounding the marine structure scour pit; Acquiring ocean hydrological environment parameters and seabed geological physical and mechanical parameters, assigning parameters to the three-dimensional numerical model based on the ocean hydrological environment parameters and the seabed geological physical and mechanical parameters, and generating an ocean structure flow field analysis and calculation model; Performing flow field analysis on the marine structure flow field analysis and calculation model to generate optimal protective structure parameters; Using the optimal protective structure parameters to construct a gridded cemented riprap anti-scour structure; The method of performing flow field analysis on the marine structure flow field analysis calculation model to generate optimal protective structure parameters includes: Performing flow field analysis on the marine structure flow field analysis calculation model to generate scour pit evolution data around the marine structure under the action of waves and currents; Constructing a numerical model of the protective structure based on the evolution data of the scour pits around the marine structure under the action of the wave and current; Performing flow field analysis on the numerical model of the protection structure to generate optimal protection structure parameters; The method of constructing a numerical model of a protective structure based on the evolution data of scour pits around the marine structure under the action of the wave and current includes: Obtaining the variation law of the depth of the scour pit with the scour duration and the variation law of the range of the scour pit with the scour duration from the evolution data of the scour pit around the marine structure under the action of the wave and current; Determine the type of protective structure, protective range, protective thickness and internal structural characteristics based on the variation law of the depth of the scouring pit with the scouring time and the variation law of the range of the scouring pit with the scouring time; Selecting the riprap particle size and gradation and the spatial distribution and size of the cemented riprap body from the protection structure type, protection range, protection thickness and internal structure characteristics; Constructing the numerical model of the protective structure based on the riprap particle size and gradation and the spatial distribution and size of the cemented riprap body; The performing flow field analysis on the numerical model of the protection structure to generate optimal protection structure parameters includes: The first determination step: determining the interaction force between the riprap particles and the fluid force acting on the surface of the riprap particles based on the numerical model of the protective structure; The second determination step: determining the position and velocity of the riprap particles based on the interaction force between the riprap particles and the fluid force acting on the surface of the riprap particles; A third determination step: determining a current fluid force acting on the riprap particle based on the riprap particle position and the riprap particle velocity; Iterative loop step: based on the current fluid force acting on the riprap particles, repeat the second determination step and the third determination step until the flow field simulation time step is reached, and the current protective structure data is generated; Analysis steps: Analyze the current protection structure data and determine the optimal protection structure parameters based on the analysis results.

2. The grid-based cemented riprap anti-scour construction method based on flow field analysis according to claim 1 is characterized in that: The determining of the current fluid force acting on the riprap particles based on the riprap particle positions and the riprap particle speeds includes: Using the velocity and position of the riprap particles, the empty region field and the phase region field are updated; wherein the empty region field is used to distinguish between fluid and solid, and the phase region field is used to distinguish between air and water in the fluid; Based on the updated empty region field and phase region field, a fluid velocity field is generated using a PISO algorithm, and the fluid velocity field is corrected based on the riprap particle velocity; Based on the corrected fluid velocity field, the flow field force on the grid cells occupied by each sphere in the riprap particle is integrated to generate the current fluid force acting on the riprap particle.

3. The grid-bonded riprap anti-scour construction method based on flow field analysis according to claim 1 is characterized in that: The optimal protection structure parameters include: The distribution of falling points of riprap particles under the action of wave currents, the pouring concentration of underwater protective agent, the pouring speed of underwater protective agent and the pouring amount of underwater protective agent per unit time, the expansion degree of underwater cementitious material, the yield strength of underwater cementitious material and the viscosity of underwater cementitious material.

4. The grid-bonded riprap anti-scour construction method based on flow field analysis according to claim 1 is characterized in that: The three-dimensional numerical model comprises: Marine structures, scour pits of marine structures and the seabed surrounding marine structures.

5. A gridded cemented riprap anti-scour construction device based on flow field analysis, characterized in that: include: An acquisition module, used for acquiring marine structure scouring pit data and seabed data around the marine structure scouring pit; A construction module, used to construct a three-dimensional numerical model based on the marine structure scour pit data and the seabed data around the marine structure scour pit; An assignment module is used to obtain ocean hydrological environment parameters and seabed geological physical and mechanical parameters, and to assign parameters to the three-dimensional numerical model based on the ocean hydrological environment parameters and the seabed geological physical and mechanical parameters to generate an ocean structure flow field analysis and calculation model; An analysis module is used to perform flow field analysis on the marine structure flow field analysis calculation model to generate optimal protection structure parameters; A determination module is used to construct a gridded cemented riprap anti-scour structure using the optimal protective structure parameters; The analysis module includes: a first analysis submodule, which is used to perform flow field analysis on the marine structure flow field analysis calculation model to generate the evolution data of the scouring pits around the marine structure under the action of waves and currents; a construction submodule, which is used to construct a numerical model of the protective structure based on the evolution data of the scouring pits around the marine structure under the action of waves and currents; a second analysis submodule, which is used to perform flow field analysis on the numerical model of the protective structure to generate the optimal protective structure parameters; The construction submodule includes: an acquisition unit, which is used to obtain the variation law of the depth of the scour pit with the scour time and the variation law of the range of the scour pit with the scour time from the evolution data of the scour pit outside the marine structure under the action of the wave and current; a generation unit, which is used to determine the protection structure type, protection range, protection thickness and internal structure characteristics based on the variation law of the depth of the scour pit with the scour time and the variation law of the range of the scour pit with the scour time; a selection unit, which is used to select the riprap particle size and gradation and the spatial distribution and size of the cemented riprap body from the protection structure, protection range, protection thickness and internal structure characteristics respectively; a construction unit, which is used to construct the numerical model of the protection structure based on the riprap particle size and gradation and the spatial distribution and size of the cemented riprap body; The second analysis submodule includes: a first determination unit, which is used to determine the interaction force between riprap particles and the fluid force acting on the surface of the riprap particles based on the numerical model of the protective structure; a second determination unit, which is used to determine the riprap particle position and the riprap particle velocity based on the interaction force between the riprap particles and the fluid force acting on the surface of the riprap particles; a third determination unit, which is used to determine the current fluid force acting on the riprap particles based on the riprap particle position and the riprap particle velocity; a loop iteration unit, which is used to repeat the steps corresponding to the second determination unit and the third determination unit based on the current fluid force acting on the riprap particles until the flow field simulation time step is reached to generate current protective structure data; and an analysis unit, which is used to analyze the current protective structure data and determine the optimal protective structure parameters based on the analysis results.

6. An electronic device, characterized in that: comprising a processor and a memory, the memory being coupled to the processor; The memory stores computer-readable program instructions, and when the instructions are executed by the processor, the method according to any one of claims 1 to 4 is implemented.

7. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Spur dike group design method based on big data and field test

    CN113886922A

  • Double-layer heat preservation coring pipe structure design and flow field numerical simulation analysis method

    CN114519290A