Data processing method and device for predicting tunneling resistance
By constructing the physical model and stress balance treatment of excavation construction, the problem of low accuracy of resistance prediction in TBM tunnel boring construction is solved, and the accuracy of resistance prediction is improved.
Patent Information
- Application Number
- CN202310525117.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2043-05-10
AI Technical Summary
The prior art has low accuracy in the TBM tunnel boring construction process, and the interaction between the boring equipment and surrounding rock cannot be fully considered.
By obtaining excavation construction data, a physical model including formations and equipment is constructed, and stress balance pretreatment is performed. The tunnel bore resistance is calculated using the preset resistance prediction model, taking into account the interaction between formations and equipment.
The accuracy of tunnel excavation construction resistance prediction is improved, and a more accurate calculation of resistance during excavation is achieved.
Smart Images

Figure CN116720319B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a data processing method and device for predicting tunnel excavation resistance. Background Art
[0002] Standardization, mechanization and automation of underground engineering construction are the future development trends. In recent years, the number of tunnel projects constructed using full-section hard rock tunnel boring machines (TBMs) has gradually increased. The economy and safety of TBM tunneling are mainly affected by the surrounding rock parameters and tunneling parameters, while the tunneling parameters are restricted by the mechanical properties of the TBM. The mechanical design of the TBM should ensure that it can always provide sufficient mechanical properties during its passage through the predetermined surrounding rock section. Therefore, it is necessary to predict and analyze the resistance encountered during the TBM tunneling process. In the prior art, the resistance during the tunneling process is calculated by calculating the tunnel surrounding rock pressure encountered during the tunneling process. However, due to the lack of consideration of the interaction between the tunneling construction equipment and the surrounding rock in the calculation process, the resistance analysis and prediction during the TBM tunneling construction process has a low accuracy problem.
[0003] Therefore, the existing technology has the problem of low accuracy in resistance prediction during TBM tunneling construction. Summary of the invention
[0004] The main purpose of this application is to provide a data processing method and device for predicting tunnel excavation resistance, so as to solve the problem of low accuracy of resistance prediction in the prior art during TBM tunnel excavation construction, and achieve the technical effect of improving the accuracy of tunnel excavation construction resistance prediction.
[0005] In order to achieve the above-mentioned purpose, in a first aspect of the present application, a data processing method for predicting tunnel excavation resistance is proposed, which is applied to the tunnel excavation construction process. The data processing method comprises:
[0006] Acquire excavation construction data, wherein the excavation construction data is relevant data used to represent the excavation construction process;
[0007] Performing construction processing based on a physical model on the excavation construction data to obtain excavation construction model data, wherein the excavation construction model data is data used to represent a physical model in excavation construction;
[0008] Preprocessing the excavation construction model based on stress balance to obtain stress balance data;
[0009] The excavation resistance calculation process is performed on the stress balance data according to a preset resistance prediction model to obtain tunnel excavation resistance data.
[0010] Optionally, the excavation construction data is processed based on a physical model to obtain the excavation construction model data, including:
[0011] Identify the excavation construction data to obtain first excavation construction data and second excavation construction data, wherein the first excavation construction data is data used to represent the excavation construction stratum, and the second excavation construction data is data used to represent the excavation construction equipment;
[0012] Performing construction processing based on a physical model on the first excavation construction data to obtain first excavation construction model data, wherein the first excavation construction model data is physical model data for representing an excavation construction stratum;
[0013] Performing construction processing based on a physical model on the second excavation construction data to obtain second excavation construction model data, wherein the second excavation construction model data is physical model data for representing excavation construction equipment;
[0014] The excavation construction model data is determined according to the first excavation construction model data and the second excavation construction model data.
[0015] Optionally, the excavation construction model data is preprocessed based on stress balance to obtain stress balance data including:
[0016] Performing identification processing on the excavation construction model data to obtain first excavation construction model data;
[0017] Based on a preset first construction interval, the first excavation construction model data is subjected to physical model segmentation processing to obtain first interval first excavation construction model data, wherein the first interval first excavation construction model data is stratum model data in the preset first construction interval;
[0018] The first tunneling construction model data in the first interval is subjected to stress balance processing to obtain the stress balance data, wherein the stress balance data is stress data to which the stratum model is subjected in the preset first construction interval.
[0019] Optionally, the tunneling resistance data is calculated and processed based on a preset resistance prediction model to obtain tunneling resistance data, including:
[0020] Performing identification processing on the excavation construction model data to obtain second excavation construction model data;
[0021] Performing physical model segmentation processing on the second excavation construction model data according to the preset first construction interval corresponding to the stress balance data to obtain the second excavation construction model data of the first interval, wherein the second excavation construction model data of the first interval is the equipment model data in the preset first construction interval;
[0022] Performing secondary stress balance processing on the second excavation construction model data of the first interval and the first excavation construction model data of the first interval to obtain secondary stress balance data, wherein the secondary stress balance data is stress data to which the equipment model and the stratum model are subjected after the construction equipment is set in the first construction interval;
[0023] The tunneling resistance data is determined according to the secondary stress balance data.
[0024] Optionally, determining the tunneling resistance data according to the secondary stress balance data includes:
[0025] Performing identification processing based on formation characteristics on the secondary stress balance data to obtain formation characteristic data, wherein the formation characteristic data is data used to represent formation surrounding rock characteristics in a preset first construction interval;
[0026] Matching construction feature data corresponding to the stratum feature data in a preset historical construction database, wherein the construction feature data is data used to represent the relationship characteristics of construction parameters of tunneling construction equipment;
[0027] The construction characteristic data is input into a preset resistance prediction model to obtain the tunnel excavation resistance data.
[0028] Optionally, inputting the construction characteristic data into a preset resistance prediction model to obtain the tunnel excavation resistance data includes:
[0029] Identify the construction feature data to obtain first construction feature data and second construction feature data, wherein the first construction feature data is used to represent the contact force data between the first tunneling equipment and the surrounding rock of the formation, and the second construction feature data is used to represent the contact force data between the second tunneling equipment and the surrounding rock of the formation;
[0030] Inputting the first construction characteristic data into a preset first resistance prediction model to obtain first tunnel excavation resistance data, wherein the first tunnel excavation resistance data is used to represent the excavation resistance data encountered by the first excavation equipment during construction;
[0031] Inputting the second construction characteristic data into a preset second resistance prediction model to obtain second tunnel excavation resistance data, wherein the second tunnel excavation resistance data is used to represent the excavation resistance data encountered by the second excavation equipment during construction;
[0032] The tunnel boring resistance data is determined according to the first tunnel boring resistance data and the second tunnel boring resistance data.
[0033] According to a second aspect of the present application, a data processing device for predicting tunnel excavation resistance is provided, which is applied to a tunnel excavation construction process, and the data processing device comprises:
[0034] A data acquisition module, used to acquire excavation construction data, wherein the excavation construction data is relevant data used to represent the excavation construction process;
[0035] A model building module, used for constructing the excavation construction data based on a physical model to obtain excavation construction model data, wherein the excavation construction model data is data used to represent a physical model in excavation construction;
[0036] A model preprocessing module, used for preprocessing the tunneling construction model based on stress balance to obtain stress balance data;
[0037] The resistance prediction module is used to perform tunneling resistance calculation processing on the stress balance data according to a preset resistance prediction model to obtain tunneling resistance data.
[0038] Optionally, the model building module includes:
[0039] an identification module, used to identify the excavation construction data to obtain first excavation construction data and second excavation construction data, wherein the first excavation construction data is data used to represent the excavation construction stratum, and the second excavation construction data is data used to represent the excavation construction equipment;
[0040] A first model building module is used to perform a physical model-based building process on the first excavation construction data to obtain first excavation construction model data, wherein the first excavation construction model data is a physical model data for representing an excavation construction stratum;
[0041] A second model building module is used to perform a physical model-based building process on the second excavation construction data to obtain second excavation construction model data, wherein the second excavation construction model data is a physical model data used to represent excavation construction equipment;
[0042] A model determination module is used to determine the excavation construction model data according to the first excavation construction model data and the second excavation construction model data.
[0043] According to a third aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the above-mentioned data processing method for predicting tunnel excavation resistance.
[0044] According to the fourth aspect of the present application, an electronic device is provided, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor executes the above-mentioned data processing method for predicting tunnel excavation resistance.
[0045] The technical solution provided by the embodiments of the present application may have the following beneficial effects:
[0046] In the present application, by acquiring excavation construction data, wherein the excavation construction data is related data used to represent the excavation construction process; constructing and processing the excavation construction data based on a physical model to obtain excavation construction model data, wherein the excavation construction model data is data used to represent the physical model in the excavation construction; preprocessing the excavation construction model based on stress balance to obtain stress balance data; and performing excavation resistance calculation processing on the stress balance data according to a preset resistance prediction model to obtain tunnel excavation resistance data. By constructing a physical model of the excavation construction process and realizing the prediction of excavation resistance based on the stress balance of the physical model, the problem of low accuracy in the prediction of tunnel excavation construction resistance in the prior art is solved, and the technical effect of improving the accuracy of excavation construction resistance prediction is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:
[0048] Figure 1 A flow chart of a data processing method for predicting tunneling resistance provided in this application;
[0049] Figure 2 A flow chart of a data processing method for predicting tunneling resistance provided in this application;
[0050] Figure 3 A flow chart of a data processing method for predicting tunneling resistance provided in this application;
[0051] Figure 4A flow chart of a data processing method for predicting tunneling resistance provided in this application;
[0052] Figure 5 A schematic diagram of a data processing device for predicting tunneling resistance provided by the present application;
[0053] Figure 6 A schematic diagram of another data processing device for predicting tunnel excavation resistance provided in the present application. DETAILED DESCRIPTION
[0054] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0055] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0056] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.
[0057] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.
[0058] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0059] When performing TBM tunneling construction, the setting of tunneling parameters is restricted by the performance of TBM tunneling equipment. The tunneling resistance is predicted and calculated by calculating the tunnel surrounding rock pressure during the tunneling construction process. The tunneling resistance is calculated only for the tunnel surrounding rock pressure without considering the interaction between the tunneling equipment and the surrounding rock, resulting in a low accuracy rate of resistance analysis prediction during the TBM tunneling construction process. The present application proposes a data processing method for predicting tunneling resistance, which is applied to the tunneling construction process. A physical model including tunneling construction strata and tunneling construction equipment is constructed through tunneling construction data. The constructed construction stratum physical model and construction equipment physical model are subjected to resistance prediction processing based on stress balance to obtain tunneling resistance, thereby realizing the prediction and calculation of tunneling resistance during the tunneling process. In the prediction and calculation process of tunneling resistance, the interaction between the construction stratum physical model and the construction equipment physical model is considered, thereby achieving the technical effect of improving the accuracy rate of tunneling resistance prediction.
[0060] In an optional embodiment of the present application, a data processing method for predicting tunneling resistance is provided. Figure 1 A flow chart of a data processing method for predicting tunnel excavation resistance provided in this application, such as Figure 1 As shown, the method comprises the following steps:
[0061] S101: Acquiring excavation construction data;
[0062] The excavation construction data is relevant data used to represent the excavation construction process. The excavation construction data includes the first excavation construction data and the second excavation construction data, which are respectively used to represent the excavation construction stratum data and the excavation construction equipment data. The excavation construction stratum data includes data used to represent the stratum surrounding rock type, construction stratum depth, etc. The excavation construction equipment data is data used to represent the structure after the excavation construction, the excavation construction working equipment, etc. The structure after the excavation construction can be a tunnel support structure, such as a steel arch frame, shotcrete, anchor rods, etc. The excavation construction working equipment data includes data on the cutter head, tool, shield and construction parameters of the TBM equipment.
[0063] S102: constructing and processing the excavation construction data based on a physical model to obtain excavation construction model data;
[0064] The excavation construction model data is data used to represent the physical model in the excavation construction. A physical model including an excavation stratum model and an excavation equipment model is constructed based on the excavation construction data so that the interaction between the stratum and the excavation equipment can be taken into account during the excavation resistance prediction process to improve the accuracy of the excavation resistance prediction.
[0065] Figure 2 A flow chart of a data processing method for predicting tunnel excavation resistance provided in this application, such as Figure 2 As shown, the method comprises the following steps:
[0066] S201: Identify the excavation construction data to obtain first excavation construction data and second excavation construction data;
[0067] The first excavation construction data is data for indicating the excavation construction stratum, and the second excavation construction data is data for indicating the excavation construction equipment;
[0068] S202: Performing construction processing based on a physical model on the first excavation construction data to obtain first excavation construction model data;
[0069] The first excavation construction model data is a physical model data for representing the excavation construction stratum. The physical model of the excavation construction stratum includes the tunnel space generated by TBM excavation and the surrounding rock medium within a certain range. When the tunnel is shallow, it includes the surface, and when the tunnel is deep, it only includes the surrounding rock medium within a certain depth range.
[0070] S203: Performing construction processing based on the physical model on the second excavation construction data to obtain second excavation construction model data;
[0071] The second excavation construction model data is the physical model data used to represent the excavation construction equipment; the physical model of the excavation construction equipment is a model used to represent the structure where the excavation construction equipment interacts with the surrounding rock of the excavation stratum. When the TBM excavation equipment is excavating, the TBM excavation equipment's tools, cutterheads, shields, etc. interact with the surrounding rock. The physical model of the excavation construction equipment includes physical models corresponding to the tools, cutterheads, shields, etc., and the geometric parameters of the physical model of the excavation construction equipment (including parameters such as size and position relationship) correspond to the physical model of the excavation construction stratum.
[0072] S204: Determine excavation construction model data according to the first excavation construction model data and the second excavation construction model data.
[0073] S103: performing preprocessing based on stress balance on the tunneling construction model to obtain stress balance data;
[0074] Figure 3 A flow chart of a data processing method for predicting tunnel excavation resistance provided in this application, such as Figure 3 As shown, the method comprises the following steps:
[0075] S301: Identify and process the excavation construction model data to obtain first excavation construction model data;
[0076] S302: Performing physical model segmentation processing on the first excavation construction model data based on a preset first construction interval to obtain first excavation construction model data of the first interval;
[0077] The first excavation construction model data of the first interval is the stratum model data in the preset first construction interval. The physical model is segmented according to the stratum surrounding rock type corresponding to the first excavation construction model data, the stratum surrounding rock in the first interval is preset as the first stratum surrounding rock type, the stratum surrounding rock in the second interval is preset as the second stratum surrounding rock type, the first stratum surrounding rock type corresponds to the first excavation construction model data of the first interval, and the second stratum surrounding rock type corresponds to the first excavation construction data of the second interval.
[0078] S303: Perform stress balance processing on the first tunneling construction model data of the first section to obtain stress balance data.
[0079] The stress balance data is the stress data on the formation model in the preset first construction interval. The formation model in the preset first construction interval is subjected to force calculation processing to obtain the force data of the formation model in the preset first construction interval, and the stress balance data is obtained. By performing stress balance processing on the formation model, deformation of the formation model under the action of gravity is avoided.
[0080] S104: performing tunneling resistance calculation processing on the stress balance data according to a preset resistance prediction model to obtain tunneling resistance data.
[0081] Figure 4 A flow chart of a data processing method for predicting tunnel excavation resistance provided in this application, such as Figure 4 As shown, the method comprises the following steps:
[0082] S401: performing identification processing on the excavation construction model data to obtain second excavation construction model data;
[0083] S402: Performing physical model segmentation processing on the second excavation construction model data according to the preset first construction interval corresponding to the stress balance data to obtain the second excavation construction model data of the first interval;
[0084] The second excavation construction model data of the first section is the equipment model data in the preset first construction section;
[0085] S403: performing secondary stress balance processing on the second excavation construction model data of the first section and the first excavation construction model data of the first section to obtain secondary stress balance data;
[0086] The secondary stress balance data is the stress data exerted on the equipment model and the formation model after the construction equipment is set in the first construction interval; in the preset first construction interval, the formation model in the first construction interval is removed, and the equipment model is applied to the first construction interval, and the secondary stress balance processing is performed on the first construction interval after the equipment model is applied to obtain the secondary stress balance data.
[0087] S404: Determine tunneling resistance data according to the secondary stress balance data.
[0088] In an optional embodiment of the present application, a method for determining tunneling resistance data based on secondary stress balance data is provided, the method comprising the following steps:
[0089] The secondary stress balance data is processed based on the formation characteristics to obtain formation characteristic data, wherein the formation characteristic data is data used to represent the formation surrounding rock characteristics in the preset first construction interval; the construction characteristic data corresponding to the formation characteristic data is matched in the preset historical construction database, wherein the construction characteristic data is data used to represent the relationship characteristics of the construction parameters of the tunneling construction equipment; the construction characteristic data is input into the preset resistance prediction model to obtain the tunneling resistance data.
[0090] The stratum characteristic data are data used to represent the characteristics of the surrounding rock of the construction stratum. The preset historical construction database stores the construction parameter relationship characteristics of the construction equipment corresponding to the surrounding rock characteristics of different construction strata. The first construction stratum surrounding rock characteristic corresponds to the first construction equipment parameter relationship characteristic, and the second construction stratum surrounding rock characteristic corresponds to the second construction equipment parameter relationship characteristic. The construction equipment parameter relationship characteristics include the relationship between the thrust and penetration of the construction equipment, the relationship between the friction coefficient between the cutter head of the construction equipment and the surrounding rock, the stress-strain relationship of the surrounding rock, etc.
[0091] During the tunnel excavation construction process, due to the different surrounding rock types in different construction stages, the corresponding construction equipment construction parameter relationship characteristics are matched according to the surrounding rock types in the construction stage, and the tunnel excavation resistance in different stages is predicted according to the corresponding construction equipment construction parameter relationship characteristics to improve the accuracy of tunnel excavation resistance prediction.
[0092] In another optional embodiment of the present application, a method for predicting tunnel excavation resistance data using a resistance prediction model is provided, the method comprising the following steps:
[0093] The construction characteristic data are identified to obtain first construction characteristic data and second construction characteristic data, wherein the first construction characteristic data is used to represent the contact force data between the first tunneling equipment and the surrounding rock of the stratum, and the second construction characteristic data is used to represent the contact force data between the second tunneling equipment and the surrounding rock of the stratum; the first construction characteristic data is input into a preset first resistance prediction model to obtain first tunnel excavation resistance data, wherein the first tunnel excavation resistance data is used to represent the excavation resistance data encountered by the first tunneling equipment during construction; the second construction characteristic data is input into a preset second resistance prediction model to obtain second tunnel excavation resistance data, wherein the second tunnel excavation resistance data is used to represent the excavation resistance data encountered by the second tunneling equipment during construction; and the tunnel excavation resistance data is determined according to the first tunnel excavation resistance data and the second tunnel excavation resistance data.
[0094] During the tunneling construction process of TBM equipment, the TBM equipment cutter, cutterhead, shield, etc. interact with the formation surrounding rock. The TBM equipment cutter, cutterhead, shield, etc. are subjected to different tunneling resistances. The resistances of the cutter, cutterhead, surrounding rock, etc. are calculated separately to determine the tunneling resistance data. The resistance prediction model includes the cutter-surrounding rock cutting action model, the cutterhead-surrounding rock contact action model and the shield-surrounding rock contact action model. According to the above cutter-surrounding rock cutting action model, the cutterhead-surrounding rock contact action model and the shield-surrounding rock contact action model, the tunneling resistance data of the cutter-surrounding rock, the cutterhead-surrounding rock and the shield-surrounding rock are calculated respectively.
[0095] The tool-rock cutting action model is expressed as follows:
[0096]
[0097] Among them, T C is the tunneling resistance torque caused by the cutting action between tool and surrounding rock, M C i is the resistance moment of the i-th single tool in cutting surrounding rock, F NP i is the passive normal force borne by the i-th single tool on its contact surface with the surrounding rock due to the deformation of the surrounding rock at the tunnel face, F NT i is the active normal force caused by the TBM thrust on the contact surface between the i-th single tool and the surrounding rock, L C i is the distance between the i-th tool center and the TBM cutterhead rotation axis, i.e., the tool cutting arm, κ i is the cutting coefficient of the i-th tool.
[0098] The normal displacement-reaction relationship at any point on the cutterhead surface in the tunneling construction equipment model is calculated according to the following formula:
[0099]
[0100] P HP =-k H u HN
[0101] ε F =hp
[0102] Among them, u HN is the normal displacement at any point on the cutterhead surface, with the direction pointing to the tunnel clearance as positive, u F is the normal displacement of the projection point of the point on the tunnel face, and its sign is the same as u HN , P HT is the reaction force applied by the cutterhead to the tunnel face at this point, with pressure as negative and constant, k H is the elastic reaction coefficient of the cutter head, ε F is the gap between the cutter head and the palm face, h is the cutter height, and p is the penetration rate.
[0103] The cutterhead-surrounding rock contact model is expressed as follows:
[0104]
[0105] Among them, T H is the tunneling resistance torque caused by the contact between cutterhead and surrounding rock, f cH is the dynamic friction coefficient between the cutterhead and the surrounding rock, P HP (A) is the passive normal stress borne by the cutterhead-surrounding rock contact surface microelement A due to the deformation of the tunnel face surrounding rock, P HT is the active normal stress on the cutterhead-surrounding rock contact surface caused by the TBM thrust, L H (A) is the distance between the centroid of the cutterhead-surrounding rock contact surface and the rotation axis of the TBM cutterhead. H is the cutterhead-surrounding rock contact area.
[0106] The discrete cutterhead-surrounding rock contact model is expressed as follows:
[0107]
[0108] Where P HP i is the passive normal stress borne by the i-th cutterhead-surrounding rock contact surface unit due to the deformation of the tunnel face surrounding rock, L H i A is the distance between the centroid of the i-th cutterhead-surrounding rock contact surface unit and the TBM cutterhead rotation axis, H i is the unit area of the i-th cutterhead-surrounding rock contact surface.
[0109] In the tunneling equipment model, the normal displacement-reaction relationship at any point on the shield surface is calculated according to the following formula:
[0110]
[0111] P S =-k S u SN
[0112]
[0113] In the formula, u SN is the normal displacement at any point on the shield surface, with the direction pointing to the tunnel clearance as positive, u B is the normal displacement of the projection point of the line connecting this point to the TBM rotation axis on the excavation surface, and the symbol is the same as u SN , P S is the reaction force applied by the shield to the excavation surface at this point, with pressure as negative and constant, k S is the elastic reaction coefficient of the shield, ε B is the gap distance between the shield and the excavation surface, θ B It is the angle between the calculation point and the TBM plumb symmetry plane, with the tunnel crown as 0°.
[0114] The shield-surrounding rock contact model is expressed as follows:
[0115]
[0116] Among them, F S is the friction resistance caused by the contact between shield and surrounding rock, f cS is the dynamic friction coefficient between the shield and the surrounding rock, P S (A) is the passive normal force borne by the shield-rock contact surface microelement A due to the convergence of the excavation surface surrounding rock, A S is the shield-rock contact area.
[0117] The discrete shield-rock contact model is expressed as follows:
[0118]
[0119] Where P S i is the passive normal force borne by the ith shield-rock interface unit due to the convergence of the excavation face surrounding rock, A S i is the unit area of the i-th shield-surrounding rock contact surface.
[0120] During the tunnel excavation construction process, according to the surrounding rock types at different construction stages, the data such as the cutter height, reserved deformation, friction coefficient, surrounding rock stress-strain relationship, TBM thrust and penetration at the current construction stage are obtained, and the excavation resistance is predicted and calculated for different stages to obtain the excavation resistance data of the TBM excavation equipment.
[0121] The cutter height, penetration rate and reserved deformation are used to determine the contact gap between the cutterhead and the tunnel face and the contact gap between the shield and the surrounding rock. The friction coefficient is used to calculate the tunneling resistance torque and the thrust friction. The surrounding rock stress-strain relationship is used to analyze the mechanical equilibrium state. The thrust is used to calculate the active normal force on the contact surface between the cutterhead and the surrounding rock, as shown in the following formula:
[0122]
[0123]
[0124] Where Th is the TBM thrust, B i is the blade width of the i-th tool, R i is the radius of the i-th tool.
[0125] In this application, by constructing a physical model of the excavation stratum and the excavation construction equipment, in the process of tunnel excavation resistance prediction, the interaction relationship between different excavation construction equipment structures and the excavation stratum is analyzed respectively to realize the prediction of tunnel excavation resistance data, thereby improving the accuracy of tunnel excavation resistance prediction.
[0126] In an optional embodiment of the present application, a data processing device for predicting tunnel excavation resistance is provided, which is applied to the tunnel excavation construction process to realize the prediction calculation of the tunnel excavation resistance. Figure 5 A schematic diagram of a data processing device for predicting tunneling resistance provided in this application, such as Figure 5 As shown, the data processing device includes:
[0127] A data acquisition module 51 is used to acquire excavation construction data, wherein the excavation construction data is relevant data used to represent the excavation construction process;
[0128] A model building module 52 is used to build the excavation construction data based on the physical model to obtain excavation construction model data, wherein the excavation construction model data is data used to represent the physical model in the excavation construction;
[0129] A model preprocessing module 53 is used to preprocess the tunneling construction model based on stress balance to obtain stress balance data;
[0130] The resistance prediction module 54 is used to calculate the tunneling resistance of the stress balance data according to a preset resistance prediction model to obtain tunneling resistance data.
[0131] Figure 6 A schematic diagram of another data processing device for predicting tunneling resistance provided by the present application, such as Figure 6 As shown, the data processing device includes:
[0132] An identification module 61 is used to identify the excavation construction data to obtain first excavation construction data and second excavation construction data, wherein the first excavation construction data is data used to represent the excavation construction stratum, and the second excavation construction data is data used to represent the excavation construction equipment;
[0133] A first model building module 62 is used to build the first excavation construction data based on a physical model to obtain first excavation construction model data, wherein the first excavation construction model data is a physical model data for representing the excavation construction stratum;
[0134] A second model building module 63 is used to build the second excavation construction data based on the physical model to obtain second excavation construction model data, wherein the second excavation construction model data is a physical model data for representing the excavation construction equipment;
[0135] The model determination module 64 is used to determine the excavation construction model data according to the first excavation construction model data and the second excavation construction model data.
[0136] The specific manner of executing the operation of each unit in the above embodiment has been described in detail in the embodiment of the method, and will not be elaborated here.
[0137] In summary, in the present application, by acquiring excavation construction data, wherein the excavation construction data is the relevant data used to represent the excavation construction process; constructing and processing the excavation construction data based on the physical model to obtain excavation construction model data, wherein the excavation construction model data is the data used to represent the physical model in the excavation construction; preprocessing the excavation construction model based on stress balance to obtain stress balance data; and performing excavation resistance calculation processing on the stress balance data according to a preset resistance prediction model to obtain tunnel excavation resistance data. By constructing a physical model of the excavation construction process and realizing the prediction of excavation resistance based on the stress balance of the physical model, the problem of low accuracy in the prediction of tunnel excavation construction resistance in the prior art is solved, and the technical effect of improving the accuracy of excavation construction resistance prediction is achieved.
[0138] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0139] Obviously, those skilled in the art should understand that the above-mentioned units or steps of the present application can be implemented by a general-purpose computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, and optionally, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. In this way, the present application is not limited to any specific combination of hardware and software.
[0140] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A data processing method for predicting tunneling resistance, characterized in that: Applied to the tunnel excavation construction process, the data processing method includes: Acquire excavation construction data, wherein the excavation construction data is relevant data used to represent the excavation construction process; Performing construction processing based on a physical model on the excavation construction data to obtain excavation construction model data, wherein the excavation construction model data is data used to represent a physical model in excavation construction; The excavation construction model is preprocessed based on stress balance to obtain stress balance data, including: The excavation construction model data is identified and processed to obtain first excavation construction model data; the first excavation construction model data is physically segmented based on a preset first construction interval to obtain first excavation construction model data for the first interval, wherein the first excavation construction model data for the first interval is stratum model data in the preset first construction interval; the first excavation construction model data for the first interval is subjected to stress balance processing to obtain stress balance data, wherein the stress balance data is stress data to which the stratum model is subjected in the preset first construction interval; The excavation resistance calculation process is performed on the stress balance data according to a preset resistance prediction model to obtain tunnel excavation resistance data, including: The excavation construction model data is identified and processed to obtain second excavation construction model data; the second excavation construction model data is physically segmented according to the preset first construction interval corresponding to the stress balance data to obtain second excavation construction model data of the first interval, wherein the second excavation construction model data of the first interval is the equipment model data in the preset first construction interval; the second excavation construction model data of the first interval and the first excavation construction model data of the first interval are subjected to secondary stress balance processing to obtain secondary stress balance data, wherein the secondary stress balance data is the stress data to which the equipment model and the stratum model are subjected after the construction equipment is set in the first construction interval; the tunnel excavation resistance data is determined according to the secondary stress balance data.
2. The data processing method according to claim 1, characterized in that: The excavation construction data is processed based on the physical model to obtain the excavation construction model data including: Identify the excavation construction data to obtain first excavation construction data and second excavation construction data, wherein the first excavation construction data is data used to represent the excavation construction stratum, and the second excavation construction data is data used to represent the excavation construction equipment; Performing construction processing based on a physical model on the first excavation construction data to obtain first excavation construction model data, wherein the first excavation construction model data is physical model data for representing an excavation construction stratum; Performing construction processing based on a physical model on the second excavation construction data to obtain second excavation construction model data, wherein the second excavation construction model data is physical model data for representing excavation construction equipment; The excavation construction model data is determined according to the first excavation construction model data and the second excavation construction model data.
3. The data processing method according to claim 1, characterized in that: Determining the tunneling resistance data according to the secondary stress balance data includes: Performing identification processing based on formation characteristics on the secondary stress balance data to obtain formation characteristic data, wherein the formation characteristic data is data used to represent formation surrounding rock characteristics in a preset first construction interval; Matching construction feature data corresponding to the stratum feature data in a preset historical construction database, wherein the construction feature data is data used to represent the relationship characteristics of construction parameters of tunneling construction equipment; The construction characteristic data is input into a preset resistance prediction model to obtain the tunnel excavation resistance data.
4. The data processing method according to claim 3, characterized in that: Inputting the construction characteristic data into a preset resistance prediction model to obtain the tunnel excavation resistance data includes: Identify the construction feature data to obtain first construction feature data and second construction feature data, wherein the first construction feature data is used to represent the contact force data between the first tunneling equipment and the surrounding rock of the formation, and the second construction feature data is used to represent the contact force data between the second tunneling equipment and the surrounding rock of the formation; Inputting the first construction characteristic data into a preset first resistance prediction model to obtain first tunnel excavation resistance data, wherein the first tunnel excavation resistance data is used to represent the excavation resistance data encountered by the first excavation equipment during construction; Inputting the second construction characteristic data into a preset second resistance prediction model to obtain second tunnel excavation resistance data, wherein the second tunnel excavation resistance data is used to represent the excavation resistance data encountered by the second excavation equipment during construction; The tunnel boring resistance data is determined according to the first tunnel boring resistance data and the second tunnel boring resistance data.
5. A data processing device for predicting tunneling resistance, characterized in that: Applied to the tunnel excavation construction process, the data processing device comprises: A data acquisition module, used to acquire excavation construction data, wherein the excavation construction data is relevant data used to represent the excavation construction process; A model building module, used for constructing the excavation construction data based on a physical model to obtain excavation construction model data, wherein the excavation construction model data is data used to represent a physical model in excavation construction; The model preprocessing module is used to preprocess the tunneling construction model based on stress balance to obtain stress balance data, including: The excavation construction model data is identified and processed to obtain first excavation construction model data; the first excavation construction model data is physically segmented based on a preset first construction interval to obtain first excavation construction model data for the first interval, wherein the first excavation construction model data for the first interval is stratum model data in the preset first construction interval; the first excavation construction model data for the first interval is subjected to stress balance processing to obtain stress balance data, wherein the stress balance data is stress data to which the stratum model is subjected in the preset first construction interval; The resistance prediction module is used to calculate the tunneling resistance of the stress balance data according to a preset resistance prediction model to obtain tunneling resistance data, including: The excavation construction model data is identified and processed to obtain second excavation construction model data; the second excavation construction model data is physically segmented according to the preset first construction interval corresponding to the stress balance data to obtain second excavation construction model data of the first interval, wherein the second excavation construction model data of the first interval is the equipment model data in the preset first construction interval; the second excavation construction model data of the first interval and the first excavation construction model data of the first interval are subjected to secondary stress balance processing to obtain secondary stress balance data, wherein the secondary stress balance data is the stress data to which the equipment model and the stratum model are subjected after the construction equipment is set in the first construction interval; the tunnel excavation resistance data is determined according to the secondary stress balance data.
6. The data processing device according to claim 5, characterized in that: Model building modules include: an identification module, used to identify the excavation construction data to obtain first excavation construction data and second excavation construction data, wherein the first excavation construction data is data used to represent the excavation construction stratum, and the second excavation construction data is data used to represent the excavation construction equipment; A first model building module is used to perform a physical model-based building process on the first excavation construction data to obtain first excavation construction model data, wherein the first excavation construction model data is a physical model data for representing an excavation construction stratum; A second model building module is used to perform a physical model-based building process on the second excavation construction data to obtain second excavation construction model data, wherein the second excavation construction model data is a physical model data used to represent excavation construction equipment; A model determination module is used to determine the excavation construction model data according to the first excavation construction model data and the second excavation construction model data.
7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the data processing method for predicting tunnel excavation resistance according to any one of claims 1 to 4.
8. An electronic device, characterized in that: include: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor executes the data processing method for predicting tunnel excavation resistance as described in any one of claims 1 to 4.