Method and device for generating feasibility research report based on wind power plant

Through the interaction and automated processing of subsystems in the wind farm feasibility study report generation system, the problem of low report accuracy caused by manual operations is solved, and more accurate and rich report generation is achieved, improving efficiency.

CN119005152APending Publication Date: 2024-11-22WUHUAN GREEN ENERGY (BEIJING) ENGINEERING TECHNOLOGY CO LTD

Patent Information

Application Number
CN202410958862.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

During the generation of existing wind farm feasibility study reports, the accuracy of the report is low due to human operation errors or deviations.

Method used

The feasibility study report generation method based on wind farm is adopted. Through the interaction of two subsystems in the report generation system, the input document data is extracted and logical rules interacted. After the data is generated, the data is added to the preset report template to realize automated report generation.

Benefits of technology

It improves the accuracy of reports, avoids manual operation errors, enhances the richness of data and adapts to scenarios, reduces labor costs, and improves efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005152A_ABST
    Figure CN119005152A_ABST
Patent Text Reader

Abstract

The invention discloses a method and a device for generating a feasibility research report based on a wind power plant, and relates to the technical field of data processing. The method comprises the steps that data information of a corresponding input document is extracted through each subsystem and serves as first data; obtaining generated data obtained after the subsystems interact according to the logic rule, and taking the generated data as second data; and adding the first data and the second data into the preset report template based on the first data and the second data to obtain the feasibility research report. The method is used for realizing the generation function of the feasibility research report based on the wind power plant.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing technology, and in particular to a method and device for generating a feasibility study report based on a wind farm. Background Art

[0002] In the process of preparing a feasibility study report for a wind farm, it is generally necessary to conduct a comprehensive analysis from multiple dimensions such as wind resource evaluation, electrical design, civil engineering design, road design, etc. before generating and producing the feasibility study report. In this process, staff are generally required to collect and count the data from the above multiple dimensions, and then manually summarize, calculate, and judge them, and finally form a plan and draw drawings to form the final feasibility study report for the wind farm.

[0003] At present, the production and generation of conventional wind farm feasibility study reports often rely on manual methods, that is, manual methods are needed to collect and summarize data from multiple dimensions such as wind resource evaluation, electrical design, civil engineering design, and road design. Since manual methods rely on manpower to calculate and summarize data, conventional wind farm feasibility study reports are prone to errors and deviations in the calculation and data transmission process, which in turn affects the accuracy of the final wind farm feasibility study report. Summary of the invention

[0004] The embodiment of the present application provides a method and device for generating a feasibility study report based on a wind farm. The main purpose is to implement a method for generating a feasibility study report based on a wind farm, so as to solve the problem of low accuracy of the feasibility study report due to human operation errors or deviations in the generation process of the existing feasibility study report based on the wind farm.

[0005] In order to solve the above technical problems, the embodiments of the present application provide the following technical solutions:

[0006] In a first aspect, the present application provides a method for generating a feasibility study report based on a wind farm, which is applied to a report generation system, wherein the report generation system includes at least two subsystems, and the subsystems interact with each other according to logical rules. The method includes:

[0007] Extracting data information of the corresponding input document through each of the subsystems as first data;

[0008] Acquire generated data obtained after the subsystems interact according to the logic rule as second data;

[0009] Based on the first data and the second data, they are added to the preset report template to obtain the feasibility study report.

[0010] In a second aspect, the present application further provides a device for generating a feasibility study report based on a wind farm, which is applied to a report generation system, wherein the report generation system includes at least two subsystems, and the subsystems interact with each other according to logical rules. The device includes:

[0011] An extraction unit, used for extracting data information of a corresponding input document through each of the subsystems as first data;

[0012] An acquisition unit, used to acquire generated data obtained after the subsystems interact according to the logic rule as second data;

[0013] An adding unit is used to add the first data and the second data to the preset report template to obtain the feasibility study report.

[0014] In a third aspect, the present application further provides a storage medium, which includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the method for generating a feasibility study report based on a wind farm as described in the first aspect.

[0015] In a fourth aspect, the present application also provides a device for generating a feasibility study report based on a wind farm, the device comprising a storage medium; and one or more processors, the storage medium being coupled to the processor, the processor being configured to execute program instructions stored in the storage medium; when the program instructions are executed, the method for generating a feasibility study report based on a wind farm described in any one of the first aspects is executed.

[0016] By means of the above technical solution, the technical solution provided by this application has at least the following advantages:

[0017] The present application provides a method and device for generating a feasibility study report based on a wind farm. The present application is applied to a report generation system. The report generation system includes at least two subsystems. The subsystems interact according to logical rules. The present application can extract the data information of the corresponding input document through each subsystem as the first data; then, obtain the generated data obtained after the subsystems interact according to the logical rules as the second data; finally, based on the first data and the second data, add them to the preset report template to obtain the feasibility study report, thereby realizing the generation function of the feasibility study report based on the wind farm. Compared with the prior art, in the present application, in the process of generating a feasibility study report based on a wind farm, it can be based on machine automation operation, that is, a method for generating a feasibility study report of a wind farm that can be automatically generated with one click is realized. In this way, when executing the above method, it can get rid of manual dependence, thereby avoiding the occurrence of manual operation errors or deviations. Based on this one-click automatic generation method, it is avoided that these errors and deviations affect the accuracy of the feasibility study report finally generated, so that the accuracy of the report generated by the above method of the present application is greatly improved, and the problem of low accuracy of the feasibility study report caused by the existing manual operation is solved. In addition, in the present application, since the process of generating a feasibility study report is based on the first data and the second data, and the first data is obtained after being extracted from the input document by each subsystem in the report generation system, and the second data is obtained based on the interaction between each subsystem, this means that the data contained in the feasibility study report obtained by the present application can not only be directly and simply extracted and generated from the input document, but can also be generated through interactive communication according to the logical relationship between the subsystems. This ensures that certain data that require multiple functions for combined operations can also be completed based on the interaction of the above-mentioned subsystems. This makes the types and contents of the data involved in the feasibility study report generated by the present application richer, thereby increasing the adaptability scenarios when generating a feasibility study report.

[0018] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] By reading the detailed description below with reference to the accompanying drawings, the above and other purposes, features and advantages of the exemplary embodiments of the present application will become easy to understand. In the accompanying drawings, several embodiments of the present application are shown in an exemplary and non-limiting manner, and the same or corresponding reference numerals represent the same or corresponding parts, wherein:

[0020] Figure 1A flow chart of a method for generating a feasibility study report based on a wind farm provided in an embodiment of the present application is shown;

[0021] Figure 2 A flow chart of another method for generating a feasibility study report based on a wind farm provided in an embodiment of the present application is shown;

[0022] Figure 3 A block diagram showing a composition of a device for generating a feasibility study report based on a wind farm provided in an embodiment of the present application is shown;

[0023] Figure 4 A block diagram showing the composition of another device for generating a feasibility study report based on a wind farm provided in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0024] The exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present application and to fully convey the scope of the present application to those skilled in the art.

[0025] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by technicians in the field to which this application belongs.

[0026] The present application embodiment provides a flow chart of a method for generating a feasibility study report based on a wind farm, such as Figure 1 As shown, the method includes:

[0027] 101. Extract data information of the corresponding input document through each of the subsystems as the first data.

[0028] It should be noted that the method described in this application is applied to a report generation system, which includes at least two subsystems, and each subsystem interacts with each other according to logical rules. In this report generation system, each subsystem interacts with each other according to a logical relationship. The specific logical relationship can be selected based on the actual needs of the user and the generation needs of the feasibility study report, and is not limited here. However, it should be noted that these subsystems can communicate and interact one by one like a chain, or can communicate and interact with each other like a mesh. The communication method and communication process are not limited here, and the actual needs of the user shall prevail.

[0029] When it is necessary to generate a feasibility study report based on a wind farm, since the feasibility study report is a text based on a collection of multiple data contents, different aspects of data must be involved in the generation process, such as wind farm related data, civil engineering data, etc. The form and specific content of data of different dimensions are different. When extracting the data of these input documents, as described in the method of this step, each subsystem extracts the data information of the corresponding input document respectively, that is, different types of data can be extracted by the subsystem corresponding to its type respectively. Of course, in this process, a subsystem can extract data of multiple input documents, or it can be dedicated to extracting data of a certain document. Specifically, the types and quantities of input documents that can be extracted by each subsystem are not limited here, and users can select them based on actual scenarios. For example, when a subsystem is a subsystem specifically used to calculate wind resource conditions, then the subsystem can not only extract relevant input documents involving wind resources, but also data of relevant input documents such as wind turbines. In other words, what kind of input document each subsystem can extract can be related to the specific functions of its subsystem and / or the data type and content that the subsystem can recognize.

[0030] 102. Obtain generated data obtained after the subsystems interact according to the logic rule as second data.

[0031] In the process of generating a feasibility study report for a wind farm, some data cannot be directly determined from the input documents, but may require the data of multiple input documents to be calculated mutually. Here, for such data, it can be obtained through the interaction of logical rules between subsystems based on the method of this step, that is, the second data. For example, data A is required in the feasibility study report, and data A is obtained by accumulating data B in input document 1 and data C in input document 2. Then in this embodiment, data B can be extracted from input document 1 by subsystem 1, and data C can be extracted from input document 2 by 2, and then the two communicate and interact to perform cumulative calculations, and then the required data A is obtained. Of course, in this example, the logical rule for the interactive communication between subsystem 1 and subsystem 2 is addition, and the logical rule is pre-set in the report platform system. In this way, it can be ensured based on the logical rule that each subsystem can automatically interact and operate after extracting certain data, so as to obtain some data that cannot be directly extracted from the input document, but based on interaction and calculation, the function of automatically calculating the data required for certain feasibility study reports is realized.

[0032] 103. Based on the first data and the second data, add them to the preset report template to obtain the feasibility study report.

[0033] After obtaining the first data and the second data, the data information originally recorded in the input document is actually obtained, as well as the data information obtained after interaction and calculation between various subsystems according to logical rules based on these data information. Then, according to these data information, the required feasibility study report can be obtained by adding them to the preset report template, wherein the preset report template can be understood as a template generated based on the actual required feasibility study report, and the various data information in the template is pre-occupied with placeholders or other information. When it is necessary to generate a feasibility study report, the placeholders or other information reserved in each position can be replaced with the specific data content in the first data and the second data, so that the function of adding the first data and the second data to the preset report template can be realized. Of course, the information content that needs to be filled in can also be left blank in advance. When a certain data needs to be filled in, the required data can be extracted from the first data or the second data based on the preset filling logic. Here, the process of how to add the first data and the second data to the preset report template includes but is not limited to the above two methods. The above two methods are only exemplary, and the specific adding process can be selected based on the actual needs of the user. In this way, based on the method described in this embodiment, it is possible to achieve a "one-click" automatic execution effect based on user needs in the process of generating a feasibility study report for a wind farm. That is to say, as long as the user selects the option to generate a report based on his needs, the first data and the second data can be automatically acquired based on the method of the above steps, and a feasibility study report can be generated based on the first data and the second data, thereby avoiding the problem of low accuracy of the feasibility study report obtained due to lack of human experience or operational errors when manually collecting and processing data.

[0034] Furthermore, as a further description and refinement of the above-mentioned embodiment, the present application also provides a method for generating a feasibility study report based on a wind farm, specifically: Figure 2 As shown:

[0035] 201. Extract data information of the corresponding input document through each of the subsystems as the first data.

[0036] Specifically, in this step, the data information of the corresponding input document is extracted by each subsystem as the first data, which can be specifically performed during execution.

[0037] First, a document recognition category of the subsystem is determined, wherein the document recognition category is used to represent the type of document recognition in the input document that the subsystem is capable of.

[0038] Then, the subsystem determines, among the input documents, a document corresponding to the document identification category as a target document;

[0039] Finally, the subsystem extracts the data information required for generating the feasibility study report from the target document as the first data.

[0040] In this embodiment, each subsystem included in the report generation system actually has the function of identifying data in a certain category of input documents. For example, when the user inputs input document A, a subsystem in the report generation system can identify the data content in the current document. Specifically, since different documents in actual applications can be divided into multiple document identification categories, they can be divided according to the content involved in the document. For example, the content of some input documents involves data on relevant wind resources of wind farms, then the document identification category of this type of input document is the wind resource category. Similarly, the corresponding wind farm feasibility study report generation system must also require a subsystem corresponding to this type of document, so the document identification category of this subsystem is also the wind resource category. Here, which subsystem can identify which type of input document can be set based on the actual needs of the user, and no limitation is made here. That is to say, the document identification category that each subsystem can identify can be determined based on the specific settings in the report generation system, which is based on user needs.

[0041] Since the data content involved in the feasibility study report of the wind farm is very complex, it is necessary to input a variety of input documents involving different data information into the report generation system in the process of generating the feasibility study report. After all the input documents involved in the current wind farm project are input, the report generation system, based on the above description, can identify different input documents. At this time, the corresponding category of input documents can be found based on the document identification category that the subsystem can identify, and the corresponding category of documents can be determined as the target document, and then the required data information can be extracted from the target document as the first data. In this way, it is ensured that the functions of multiple subsystems can extract their corresponding input documents respectively, which can not only improve the function of classifying and extracting input document data of multiple categories, but also ensure that when the report generation system has multiple different subsystems, the efficiency of extracting data information from the input documents can be improved by extracting multiple subsystems in parallel, so that the first data can not only be extracted in different categories, but also can ensure parallel execution when the submission is passed, which can improve the generation efficiency of the first data.

[0042] In other specific implementation processes, since the data involved in the feasibility study report may not only include the data recorded in the input document itself, but also may involve data calculated according to some logical rules based on the data recorded in the input document itself, the first data at least includes original document data and calculated data; wherein the original document data is the data originally recorded in the target document; and the calculated data is the data obtained by calculating the original document data according to the built-in rules of the subsystem;

[0043] Based on this, the last step in the above steps, "extracting the data information required for generating the feasibility study report from the target document by the subsystem as the first data", can be specifically performed in the following manner:

[0044] The subsystem collects the original document data in the target document, and / or collects the original document data in the target document and calculates the calculated data according to the built-in rules of the subsystem.

[0045] In this embodiment, each subsystem included in the report generation system not only has the function of identifying data in different types of input documents, but also has certain operation logic. That is to say, after some data of the input document is extracted by the subsystem, some corresponding calculation rules can be triggered and calculations can be performed. Of course, these functions and operation logics are pre-packaged in each subsystem and triggered based on the pre-triggered logic, thus realizing the automatic operation function after the extraction of some data of the input document. For example, when subsystem A extracts the wind measurement data of previous years from input document a, if the built-in rule for calculating the average wind speed is pre-packaged in the subsystem, the built-in rule can be used to accumulate the collected wind measurement data of previous years and calculate the average wind speed. In this way, while subsystem A extracts the wind measurement data of previous years from input document a, it also calculates the average wind speed data based on its built-in rule.

[0046] It should be noted that whether each subsystem is pre-packaged with built-in rules can be set based on user needs, and the specific operation logic and functions of the built-in rules of each subsystem are not limited here. They can all be pre-set and packaged based on the actual needs of the user. There is no limitation here, as long as the functions of the built-in rules set correspond to the input documents that can be extracted.

[0047] Specifically, in some embodiments, since the feasibility study report of a wind farm mainly involves wind resource assessment, civil engineering design, road design, electrical design, technical and economic assessment, and financial assessment, when various input documents are input into the report generation system, they are all documents of these categories. That is to say, the target documents described in the aforementioned embodiments include at least wind resource-related documents, civil engineering-related documents, road-related documents, electrical-related documents, technical and economic-related documents, and financial-related documents.

[0048] Based on this, when the target document is the above-mentioned documents, the aforementioned step of "collecting the original document data in the target document through the subsystem, and / or collecting the original document data in the target document and calculating the calculated data according to the built-in rules of the subsystem" can be performed in turn according to the category of each document using the corresponding subsystem, specifically:

[0049] When the subsystem is a wind resource evaluation subsystem, the original document data is collected in the wind resource related document through the wind resource evaluation subsystem, and / or the original document data is collected in the wind resource related document and calculated according to the built-in rules of the wind resource evaluation subsystem to obtain the calculated data;

[0050] When the subsystem is a civil engineering design subsystem, the original document data is collected from the civil engineering related documents through the civil engineering design subsystem, and / or the original document data is collected from the civil engineering related documents and calculated according to the built-in rules of the civil engineering design subsystem to obtain the calculated data;

[0051] When the subsystem is a road design subsystem, the original document data is collected from the road-related document by the road design subsystem, and / or the original document data is collected from the road-related document and calculated according to the built-in rules of the road design subsystem to obtain the calculated data;

[0052] When the subsystem is an electrical design subsystem, the original document data is collected from the electrical-related document by the electrical design subsystem, and / or the original document data is collected from the electrical-related document and calculated according to the built-in rules of the electrical design subsystem to obtain the calculated data;

[0053] When the subsystem is a technical and economic evaluation subsystem, the original document data is collected from the technical and economic related documents through the technical and economic evaluation subsystem, and / or the original document data is collected from the technical and economic related documents and calculated according to the built-in rules of the technical and economic evaluation subsystem to obtain the calculated data;

[0054] When the subsystem is a financial evaluation subsystem, the original document data is collected in the financial-related documents through the financial evaluation subsystem, and / or the original document data is collected in the financial-related documents and calculated according to the built-in rules of the financial evaluation subsystem to obtain the calculated data.

[0055] In this way, each subsystem extracts the original document data from the corresponding document, and calculates part of the original document data based on its built-in rules to obtain calculated data, which not only ensures the accuracy of the extracted original document data, but also ensures the accuracy of the calculated data calculated based on the original document data. Of course, in this embodiment, the names of the above-mentioned subsystems are only exemplary. In fact, the user can set the name of each subsystem based on his or her own needs. There is no limitation here, and it can be set according to the actual needs of the user.

[0056] Further, as an example of the first data extracted by each of the above subsystems, in this embodiment, the original document data and calculation data that can be extracted by each subsystem can be specifically as follows:

[0057] Among them, for wind resource-related documents, the following specific document contents may be involved, including: site coordinate documents, wind tower data documents, topographic maps, wind turbine inclination documents, planned total capacity documents, current planned capacity documents, rectangular point information documents, circumscribed circle radius documents and site center point documents, etc. The data information that the wind resource evaluation subsystem can extract from wind resource-related documents may include but is not limited to the following, including: mesoscale data multi-year average wind direction frequency, wind tower [highest wind measurement height] height turbulence intensity map, wind farm suitable model, total number of wind turbines, mesoscale multi-year average annual anemometer, wind tower maximum wind speed (5 times average wind speed method), wind tower [selected hub height] wind speed and wind power, (actual) installed capacity, mesoscale cumulative monthly average anemometer, wind tower maximum wind speed (5-day thunderstorm method), wind tower [selected hub height] wind speed and wind energy , basic technical parameters of wind turbines, mesoscale data measuring the maximum wind speed of the wind tower, wind after correction of the wind tower, outlet of wind turbines, mesoscale data cumulative wind rose diagram, wind speed and wind power density annual variation curve of the wind tower [selected hub height], wind direction after correction of the wind tower, statistical analysis of wind energy direction, maximum working current of wind turbines, mesoscale average wind speed in the past 30 years, wind speed and wind power density daily variation curve of the wind tower [selected hub height], prevailing wind energy direction, selected wind turbine capacity, mesoscale average wind speed in the past 10 years, wind tower [selected hub height], wind Power density level, cut-in wind speed, mesoscale data year, wind direction after correction of wind tower, power of selected unit at hub height of wind tower, description of mesoscale cumulative monthly average wind speed, wind rose diagram of each month of wind tower [top two floors], average wind power at hub height of wind tower, main parameters of wind turbine installation, mesoscale cumulative monthly average wind speed histogram, availability of each wind tower [selected hub height] height, suitable model for hub height, wind turbine point coordinate data, long-term correction of wind tower data, wind speed and wind power at each height of each wind tower, number of preliminary plans and number of recommended models, wind turbine tower load data, Table of wind shear index at various heights of wind tower, comprehensive wind shear value of wind tower, enumeration of preliminary scheme description, maximum height for installation and lifting of wind turbine equipment, wind tower [corresponding, comprehensive wind shear value of wind tower, basic wind turbine generator set, total tower volume, hub height parameters of various wind tower comparisons, preferred model for turbulence intensity at height layer, technical performance analysis of wind turbine generator set, quantitative numerical description of energy saving, external shape parameters at [selected hub height] of wind tower, turbulence intensity at [selected hub height] height of wind tower, maximum wind speed once in 50 years, name of selected wind turbine unit, equivalent full load hours and other data.

[0058] For civil engineering related documents, these may involve geological survey reports and seismic parameter zoning documents. The data and information that the civil engineering design subsystem can extract from civil engineering related documents may include but are not limited to the following: rock and soil layer thickness and bearing capacity characteristics table, bearing layer description, amount of abandoned materials after earthwork balance, site seismic peak acceleration, regional geological information, number of waste dumps, basic earthquake intensity of the site, geological conditions and evaluation of the site, total area of ​​the waste dump, characteristic period of seismic response spectrum, regional hydrological conditions, bottom diameter of wind turbine foundation, site category, amount of abandoned materials after earthwork balance, burial depth of wind turbine foundation, design earthquake grouping, number of waste dumps, foundation scheme design description, water and soil corrosiveness, total area of ​​the waste dump, wind turbine foundation diagram, conclusion and evaluation, earthwork quantity statistics table of the main construction sites of the wind farm, foundation detachment area calculation table, foundation treatment keywords, wind turbine foundation engineering quantity table, foundation bearing capacity calculation table, groundwater burial depth, box transformer engineering quantity table, foundation stability review table, booster station selection, wind farm engineering land area table, foundation settlement and inclination rate verification table and other data.

[0059] For the road design subsystem, the data information that can be extracted from the road-related documents may include but is not limited to the following: main road parameters, new road information, new on-site road engineering quantity table, road-related quantity table, new access road information, expanded on-site road engineering quantity table, lifting platform engineering quantity table, new on-site road information, new on-site road engineering quantity table, road path points, expanded road information, road map (on-site), new access road engineering quantity table and other data.

[0060] For the electrical design subsystem, the data and information that can be extracted from the electrical related documents may include but are not limited to the following: main line parameters, line related scales, 35kV collector line direction diagram, line path points, 35kV system single-phase grounding capacitance current, overhead line capacitance current calculation process, 35kV cable line capacitance current, wind turbine grouping number, single-phase grounding capacitance current, collector line length description, single-circuit maximum capacity, 35kV conductor cross-section model, collector box circuit number description, cable branch box number, overhead line conductor model, overhead line conductor model description, ground wire model parameter table, ground wire core number, (overhead) tower quantity list, (overhead) conductor, ground wire material quantity, (overhead) insulator, main hardware and other materials, (overhead) OPGW optical cable part material table, (overhead) structure part material table, (cable) cable material quantity table, electrical primary main equipment list, electrical secondary main equipment material table, communication equipment material table and other data.

[0061] For the technical and economic evaluation subsystem, the data and information that can be extracted from the technical and economic related documents may include but are not limited to the following: total project budget table, construction auxiliary project budget table, equipment and installation project budget table, construction project budget table, other cost budget table, deductible taxes, wind turbine unit price, wind turbine tower unit price, box-type substation, booster station unit price, wind power foundation cost unit price, transmission project, project dynamic investment, static investment per kilowatt, project static investment, dynamic investment per kilowatt, construction project, construction project as a percentage of project static investment, other costs, other costs as a percentage of project static investment, construction auxiliary project, construction auxiliary project as a percentage of project static investment, equipment and installation project, equipment and installation project as a percentage of project static investment, basic reserve, basic reserve as a percentage of project static investment, basic reserve, basic reserve as a percentage of project static investment.

[0062] For the financial evaluation subsystem, the data and information that can be extracted from financial-related documents may include but are not limited to the following: investment plan and capital raising table, total cost and expense table, profit and profit distribution table, loan principal and interest payment plan table, financial cash flow table, project investment cash flow table, project capital cash flow table, balance sheet financial indicator summary table, asset depreciation and amortization estimate table, evaluation report table, sensitivity analysis table, sensitivity analysis description, project total investment use plan and capital raising table, equipment and installation project budget table, construction project budget table, other cost budget table, on-grid electricity price excluding value-added tax, on-grid electricity price including value-added tax, break-even point (production capacity utilization rate), cost per kilowatt-hour, and project investment financial net present value (after income tax).

[0063] 202. Obtain generated data obtained after the subsystems interact according to the logic rule as second data.

[0064] Specifically, in this step, the generated data obtained after the subsystems interact according to the logic rule is obtained as the second data, which can be:

[0065] Determining a starting subsystem based on the logic rules between the subsystems, and inputting demand data into the starting subsystem, wherein the demand data is obtained from the input document;

[0066] The subsystems are controlled to interact according to logic rules, and the interaction results are obtained in the terminal subsystems, and the interaction results are determined as the second data.

[0067] In this embodiment, multiple subsystems have the function of interactive communication, and can pass the results of their operations to other subsystems to complete more complex logical operations. In this case, the second data in this embodiment is actually obtained by operating a "functional combination" formed by multiple subsystems during the generation process. Then, it is necessary to determine which of the multiple subsystems is the starting end and which is the end. Here, there is no limitation on the logical rules for the interaction between multiple subsystems. Users can set it based on different types of data calculation needs. In this way, in the process of generating the second data, after determining the actual subsystem, you can input the data it needs, that is, the demand data, and then run it based on the logical rules between the subsystems. In this way, the results after the interaction are collected at the end, and the second data is determined.

[0068] Based on the method of this step, it can be ensured that as long as the user sets the logical rules in the subsystem in advance, the automatic calculation function of certain data can be realized. It can not only ensure the accurate generation of the second data, but also the automatic execution of the generation process without human intervention. It can also ensure that when certain data require the functions of multiple subsystems to calculate, more complex logical operations can be achieved based on the functions of these subsystems, ensuring that when the feasibility study report of the wind farm is generated, more abundant data content can be added, making the data content of the generated feasibility study report richer and more comprehensive.

[0069] In some specific implementation processes, the subsystems include: a wind resource evaluation subsystem, a civil engineering design subsystem, a road design subsystem, an electrical design subsystem, a technical and economic evaluation subsystem, and a financial evaluation subsystem.

[0070] In this case, the step of controlling the subsystems to interact according to the logic rules, obtaining the interaction results in the terminal subsystem, and determining the interaction results as the second data may be performed in the following specific manner:

[0071] First, the wind turbine model and hub height are determined by the wind resource evaluation subsystem, and the wind turbine model and hub height are sent to the civil engineering design subsystem;

[0072] At the same time, the coordinates of the booster station are determined based on the wind turbine model and the hub height through the civil engineering resource subsystem;

[0073] Afterwards, the wind turbine location is sent to the road design subsystem through the wind resource evaluation subsystem, and the booster station coordinates are sent to the road design subsystem through the civil engineering design subsystem;

[0074] Subsequently, the road design subsystem determines the road path, the topographic map field coordinates, the booster station voltage planning capacity and the road path topographic map field coordinates based on the wind turbine point position and the booster station coordinates, and sends the road path, the topographic map field coordinates, the booster station voltage planning capacity and the road path topographic map field coordinates to the electrical design subsystem;

[0075] Afterwards, the electrical design subsystem generates an electrical quantity table based on the road path, the topographic map field coordinates, the voltage planning capacity of the booster station and the road path topographic map field coordinates, and sends it to the technical and economic evaluation subsystem;

[0076] Afterwards, the technical and economic evaluation subsystem obtains the wind turbine model and power generation calculation table from the wind resource evaluation subsystem, obtains the civil engineering association table from the civil engineering design subsystem, obtains the road association table from the road design subsystem, and receives the electrical quantity meter sent by the electrical design subsystem, and performs an evaluation based on the wind turbine model, the power generation calculation table, the civil engineering association table, the road association table and the electrical quantity meter to obtain the deductible tax and the user-input investment information, and sends the deductible tax and the user-input investment information to the financial evaluation subsystem;

[0077] Finally, the financial evaluation subsystem performs financial result evaluation based on the deductible taxes and the investment information input by the user to obtain a financial evaluation result, and determines the financial evaluation result as the second data; wherein the financial evaluation result is used to characterize the revenue forecast result of the wind farm project corresponding to the input document.

[0078] In this way, a report generation system covering the wind resource evaluation subsystem, civil engineering design subsystem, road design subsystem, electrical design subsystem, technical and economic evaluation subsystem and financial evaluation subsystem is realized to specifically generate the function of wind farm revenue situation. In this process, the machine is operated automatically to avoid the manual operation process, which can ensure the accuracy of the wind farm revenue forecast results.

[0079] 203. Store the first data and the second data in a temporary parameter storage table respectively.

[0080] The parameter temporary storage table is used to store the various data information respectively included in the first data and the second data according to data types.

[0081] Because in some cases, the first data and the second data obtained may not be used immediately to generate a feasibility study report, or there may be different data efficiencies between each other in the process of generating the first data and the second data, then after obtaining the first data and the second data, the currently obtained data can actually be stored in a parameter temporary storage table based on the method of this step, and each type of data in the table can be filled in and recorded according to category. This not only ensures the data preservation problem when the feasibility study report does not need to be generated immediately, but also ensures that it can be traced back from the parameter temporary storage table when it is needed later, so as to avoid comparison and verification when filling errors or abnormalities occur when the feasibility study report is generated later.

[0082] 204. Based on the first data and the second data, add them to the preset report template to obtain the feasibility study report.

[0083] Based on the above steps, it can be known that the method in this embodiment stores both the first data and the second data in the parameter temporary storage table after obtaining them. Based on this, this step is specifically performed as follows:

[0084] In the preset report template, the placeholders for each position are respectively determined, and based on the preset mapping relationship, the data information corresponding to the placeholders is obtained from the parameter temporary storage table, and the placeholders are replaced. When all the placeholders are replaced, the feasibility study report is obtained.

[0085] The preset mapping relationship includes placeholders corresponding to each type of data information in the parameter temporary storage table.

[0086] In this embodiment, the data that needs to be actually filled in the preset report template are replaced by placeholders, and there is a corresponding relationship between the placeholders and each type of data information in the parameter temporary storage table, that is, a mapping relationship. Then, after each type of data is added to the corresponding position of the temporary storage table in the aforementioned steps, each data can be replaced with the placeholder in the preset report template based on the mapping relationship between the placeholder at that position and the data. In this way, when all the placeholders are replaced with the corresponding data, a feasibility study report is obtained. In this way, the function of filling in the template of the feasibility study report by replacing the placeholders is realized, which not only ensures the accuracy of the feasibility study report generation, but also avoids the problems such as mistakes that may be caused by manual operation.

[0087] Furthermore, in this embodiment, artificial intelligence and other model algorithms can also be used to implement feasibility study reports focusing on different dimensions according to the needs of different users. If different users actually require different feasibility study reports for wind farms, or there are differences in the focus of feasibility study reports in different regions or provinces, then in this process, when the first data and the second data have been stored in the parameter temporary storage table in the above steps, it is necessary to use an artificial algorithm model to perform user portrait analysis to analyze which part of the data in the feasibility study report the user is concerned about.

[0088] Specifically, in the process of generating a feasibility study report using the first data and the second data, when the first data and the second data contain a large number of different types of specific data, the artificial algorithm model can be combined to analyze the user input information. For example, when the model is trained based on the region or province in the user input information (assuming that users in different regions or provinces have different focuses on the feasibility study report in this example), then in this step, it is also necessary to collect the geographical location information of the device when the user issues the feasibility study report, so as to infer the province or region where the user is located, and use this as the input information of the artificial algorithm model to determine which specific data in the first data and the second data are required for the subsequent generation of the feasibility study report, and generate the feasibility study report based on these specific data.

[0089] For example, when the first data specifically includes data A, data B and data C, if the user belongs to province A, and the artificial algorithm model knows during training that users belonging to province A generally pay attention to data A and data B, but do not pay attention to data C, then at this time, the model can be used to predict that the feasibility study report actually required by the current user may only focus on data A and data B for the first data part. Then, based on the model, it can be determined that when generating the feasibility study report, only data A and data B are collected in the first data to generate the feasibility study report, without the need to add data C, or when adding data C, it can be filled in the non-critical area or part of the report.

[0090] In this way, in the process of generating a feasibility study report based on the first data and the second data, the specific data of the user's preference is predicted through an artificial algorithm model, so that different users can ensure that when using the "one-click" automated feasibility study report function described in this embodiment, they can make automated preference predictions based on the user's characteristics and generate corresponding feasibility study reports, thereby realizing the function of generating targeted and focused wind farm feasibility study reports based on the characteristics of different users, so that users do not need to browse what they consider to be "non-critical data", which can improve the user experience and make the generation process of the feasibility study report described in this embodiment more intelligent and convenient.

[0091] Furthermore, as a response to the above Figure 1 and Figure 2 In order to realize the method shown, another embodiment of the present application further provides a device for generating a feasibility study report based on a wind farm, which is applied to a report generation system, wherein the report generation system includes at least two subsystems, and the subsystems interact with each other according to logical rules. This device embodiment corresponds to the aforementioned method embodiment. For ease of reading, this device embodiment will no longer repeat the details of the aforementioned method embodiment one by one, but it should be clear that the device in this embodiment can correspond to all the contents of the aforementioned method embodiment. In order to realize a method for generating a feasibility study report based on a wind farm, the device is specifically as follows Figure 3 As shown, the device comprises:

[0092] The extraction unit 31 may be used to extract data information of the corresponding input document through each of the subsystems as the first data;

[0093] An acquisition unit 32 may be used to acquire generated data obtained after the subsystems interact according to the logic rule as second data;

[0094] The adding unit 33 can be used to add the first data and the second data to the preset report template to obtain the feasibility study report.

[0095] Further, such as Figure 4 As shown, the extraction unit 31 includes:

[0096] The first determination module 311 may be used to determine the document recognition category of the subsystem, and the document recognition category may be used to represent the type of document that the subsystem is capable of recognizing in the input document;

[0097] A second determination module 312 may be used to determine, through the subsystem, among the input documents, documents corresponding to the document identification category as target documents;

[0098] The extraction module 313 can be used to extract data information required for generating the feasibility study report from the target document through the subsystem as the first data.

[0099] Further, such as Figure 4 As shown, the first data at least includes original document data and calculated data; wherein the original document data is the data originally recorded in the target document; and the calculated data is the data obtained by calculating the original document data according to the built-in rules of the subsystem;

[0100] The extraction module 313 can be specifically used to collect the original document data in the target document through the subsystem, and / or collect the original document data in the target document and calculate the calculated data according to the built-in rules of the subsystem.

[0101] Further, such as Figure 4 As shown, the target documents at least include wind resource related documents, civil engineering related documents, road related documents, electricity related documents, technical and economic related documents and financial related documents;

[0102] The extraction module 313 may also be specifically used for, when the subsystem is a wind resource evaluation subsystem, collecting the original document data in the wind resource-related document through the wind resource evaluation subsystem, and / or collecting the original document data in the wind resource-related document and calculating the calculated data according to the built-in rules of the wind resource evaluation subsystem;

[0103] The extraction module 313 may also be specifically used for, when the subsystem is a civil engineering design subsystem, collecting the original document data from the civil engineering related documents through the civil engineering design subsystem, and / or collecting the original document data from the civil engineering related documents and calculating the calculated data according to the built-in rules of the civil engineering design subsystem;

[0104] The extraction module 313 may also be specifically used for, when the subsystem is a road design subsystem, collecting the original document data in the road-related document through the road design subsystem, and / or collecting the original document data in the road-related document and calculating the calculated data according to the built-in rules of the road design subsystem;

[0105] The extraction module 313 may also be specifically used for, when the subsystem is an electrical design subsystem, collecting the original document data in the electrical-related document through the electrical design subsystem, and / or collecting the original document data in the electrical-related document and calculating the calculated data according to the built-in rules of the electrical design subsystem;

[0106] The extraction module 313 may also be specifically used for, when the subsystem is a technical and economic evaluation subsystem, collecting the original document data from the technical and economic related documents through the technical and economic evaluation subsystem, and / or collecting the original document data from the technical and economic related documents and calculating the calculated data according to the built-in rules of the technical and economic evaluation subsystem;

[0107] The extraction module 313 can also be specifically used for collecting the original document data in the financial-related documents through the financial evaluation subsystem when the subsystem is a financial evaluation subsystem, and / or collecting the original document data in the financial-related documents and calculating the calculated data according to the built-in rules of the financial evaluation subsystem.

[0108] Further, such as Figure 4 As shown, the acquisition unit 32 can be specifically used to determine the starting subsystem based on the logical rules between the subsystems, and input demand data into the starting subsystem, wherein the demand data is obtained from the input document; and, control the subsystems to interact according to the logical rules, obtain the interaction results in the terminal subsystem, and determine the interaction results as the second data.

[0109] Further, such as Figure 4 As shown, the subsystems include: a wind resource evaluation subsystem, a civil engineering design subsystem, a road design subsystem, an electrical design subsystem, a technical and economic evaluation subsystem, and a financial evaluation subsystem;

[0110] The acquisition unit 32 includes:

[0111] The first control module 321 may be used to determine the wind turbine model and hub height through the wind resource evaluation subsystem, and send the wind turbine model and hub height to the civil engineering design subsystem;

[0112] A second control module 322 may be used to determine the coordinates of the booster station based on the wind turbine model and the hub height through the civil engineering resource subsystem;

[0113] The third control module 323 may be used to send the wind turbine location to the road design subsystem through the wind resource evaluation subsystem, and send the booster station coordinates to the road design subsystem through the civil engineering design subsystem;

[0114] The fourth control module 324 can be used to determine the road path, the topographic map field coordinates, the booster station voltage planning capacity and the road path topographic map field coordinates based on the wind turbine point and the booster station coordinates through the road design subsystem, and send the road path, the topographic map field coordinates, the booster station voltage planning capacity and the road path topographic map field coordinates to the electrical design subsystem;

[0115] A fifth control module 325 may be used to generate an electrical quantity meter through the electrical design subsystem based on the road path, the topographic map field coordinates, the voltage planning capacity of the booster station and the road path topographic map field coordinates, and send the meter to the technical and economic evaluation subsystem;

[0116] The sixth control module 326 can be used to obtain the wind turbine model and the power generation calculation table from the wind resource evaluation subsystem through the technical and economic evaluation subsystem, obtain the civil engineering association table from the civil engineering design subsystem, obtain the road association table from the road design subsystem, and receive the electrical quantity table sent by the electrical design subsystem, and evaluate based on the wind turbine model, the power generation calculation table, the civil engineering association table, the road association table and the electrical quantity table to obtain the deductible tax and the user-input investment information, and send the deductible tax and the user-input investment information to the financial evaluation subsystem;

[0117] The seventh control module 327 can be used to perform financial result evaluation based on the deductible taxes and the investment information input by the user through the financial evaluation subsystem, obtain a financial evaluation result, and determine the financial evaluation result as the second data; wherein the financial evaluation result can be used to characterize the revenue forecast result of the wind farm project corresponding to the input document.

[0118] Further, such as Figure 4 As shown, the device also includes:

[0119] The storage unit 34 may be used to store the first data and the second data in a parameter temporary storage table respectively; wherein the parameter temporary storage table may be used to store the various data information respectively contained in the first data and the second data according to data types;

[0120] The adding unit 33 can be specifically used to determine the placeholder for each position in the preset report template, and based on the preset mapping relationship, obtain the data information corresponding to the placeholder from the parameter temporary storage table, and replace the placeholder, and when the placeholders are all replaced, the feasibility study report is obtained; wherein the preset mapping relationship includes the placeholders corresponding to each type of data information in the parameter temporary storage table.

[0121] In order to achieve the above-mentioned purpose, according to another aspect of the present application, an embodiment of the present application further provides a storage medium, wherein the storage medium includes a stored program, wherein when the program is running, the device where the storage medium is located is controlled to execute the above-mentioned method for generating a feasibility study report based on a wind farm.

[0122] In order to achieve the above-mentioned purpose, according to another aspect of the present application, an embodiment of the present application also provides a device for generating a feasibility study report based on a wind farm, the device comprising a storage medium; and one or more processors, the storage medium is coupled to the processor, and the processor is configured to execute program instructions stored in the storage medium; when the program instructions are run, the above-mentioned method for generating a feasibility study report based on a wind farm is executed.

[0123] The embodiment of the present application provides a method and device for generating a feasibility study report based on a wind farm. The present application is applied to a report generation system. The report generation system includes at least two subsystems. The subsystems interact according to logical rules. The embodiment of the present application can extract the data information of the corresponding input document through each subsystem as the first data; then, obtain the generated data obtained after the subsystems interact according to the logical rules as the second data; finally, based on the first data and the second data, add them to the preset report template to obtain the feasibility study report, thereby realizing the generation function of the feasibility study report based on the wind farm. Compared with the prior art, in the present application, in the process of generating a feasibility study report based on a wind farm, it can be based on machine automation operation, that is, a method for generating a feasibility study report of a wind farm that can be automatically generated with one click is realized. In this way, when executing the above method, it can get rid of manual dependence, thereby avoiding the occurrence of manual operation errors or deviations. Based on this one-click automatic generation method, it is avoided that these errors and deviations affect the accuracy of the feasibility study report finally generated, so that the accuracy of the report generated by the above method of the present application is greatly improved, and the problem of low accuracy of the feasibility study report caused by the existing manual operation is solved. In addition, in the present application, since the process of generating a feasibility study report is based on the first data and the second data, and the first data is obtained after being extracted from the input document by each subsystem in the report generation system, and the second data is obtained based on the interaction between each subsystem, this means that the data contained in the feasibility study report obtained by the present application can not only be directly and simply extracted and generated from the input document, but can also be generated through interactive communication according to the logical relationship between the subsystems. This ensures that certain data that require multiple functions for combined calculations can also be completed based on the interaction of the above-mentioned subsystems. This makes the types and contents of the data involved in the feasibility study report generated by the present application richer, thereby increasing the adaptability scenarios when generating the feasibility study report, thereby reducing labor costs, improving efficiency, and improving the quality of the report.

[0124] The device for generating a feasibility study report based on a wind farm includes a processor and a memory. The extraction unit, acquisition unit, and adding unit are all stored in the memory as program units. The processor executes the program units stored in the memory to implement corresponding functions.

[0125] The processor includes a kernel, and the kernel retrieves the corresponding program unit from the memory. One or more kernels can be set, and a method for generating a feasibility study report based on a wind farm is implemented by adjusting kernel parameters to solve the problem that the accuracy of the feasibility study report is low due to human operation errors or deviations in the generation process of the existing feasibility study report based on the wind farm.

[0126] An embodiment of the present application provides a device for generating a feasibility study report based on a wind farm, the device comprising a storage medium; and one or more processors, the storage medium is coupled to the processor, and the processor is configured to execute program instructions stored in the storage medium; when the program instructions are executed, any of the aforementioned methods for generating a feasibility study report based on a wind farm is executed.

[0127] An embodiment of the present application provides a storage medium, which includes a stored program, wherein when the program is executed, a device where the storage medium is located is controlled to execute the above-mentioned method for generating a feasibility study report based on a wind farm.

[0128] The storage medium may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM, and the memory includes at least one storage chip.

[0129] An embodiment of the present application provides a device, which includes a processor, a memory, and a program stored in the memory and executable on the processor. When the processor executes the program, the following steps are implemented: extracting data information of the corresponding input document through each of the subsystems as the first data; obtaining generated data obtained after the subsystems interact according to logical rules as the second data; and adding the first data and the second data to the preset report template to obtain the feasibility study report.

[0130] Furthermore, the extracting of data information of the corresponding input document by each of the subsystems as the first data includes:

[0131] Determining a document recognition category of the subsystem, wherein the document recognition category is used to characterize the type of document recognition in the input document that the subsystem is capable of;

[0132] Determining, by the subsystem, among the input documents, a document corresponding to the document identification category as a target document;

[0133] The subsystem extracts data information required for generating the feasibility study report from the target document as the first data.

[0134] Furthermore, the first data at least includes original document data and calculated data; wherein the original document data is the data originally recorded in the target document; and the calculated data is the data obtained by calculating the original document data according to the built-in rules of the subsystem;

[0135] The data information required for generating the feasibility study report is extracted from the target document by the subsystem as the first data, including:

[0136] The subsystem collects the original document data in the target document, and / or collects the original document data in the target document and calculates the calculated data according to the built-in rules of the subsystem.

[0137] Furthermore, the target documents at least include wind resource related documents, civil engineering related documents, road related documents, electricity related documents, technical and economic related documents and financial related documents;

[0138] The collecting of the original document data in the target document by the subsystem, and / or the collecting of the original document data in the target document and calculating the calculated data according to the built-in rules of the subsystem include:

[0139] When the subsystem is a wind resource evaluation subsystem, the original document data is collected in the wind resource related document through the wind resource evaluation subsystem, and / or the original document data is collected in the wind resource related document and calculated according to the built-in rules of the wind resource evaluation subsystem to obtain the calculated data;

[0140] When the subsystem is a civil engineering design subsystem, the original document data is collected from the civil engineering related documents through the civil engineering design subsystem, and / or the original document data is collected from the civil engineering related documents and calculated according to the built-in rules of the civil engineering design subsystem to obtain the calculated data;

[0141] When the subsystem is a road design subsystem, the original document data is collected from the road-related document by the road design subsystem, and / or the original document data is collected from the road-related document and calculated according to the built-in rules of the road design subsystem to obtain the calculated data;

[0142] When the subsystem is an electrical design subsystem, the original document data is collected from the electrical-related document by the electrical design subsystem, and / or the original document data is collected from the electrical-related document and calculated according to the built-in rules of the electrical design subsystem to obtain the calculated data;

[0143] When the subsystem is a technical and economic evaluation subsystem, the original document data is collected from the technical and economic related documents through the technical and economic evaluation subsystem, and / or the original document data is collected from the technical and economic related documents and calculated according to the built-in rules of the technical and economic evaluation subsystem to obtain the calculated data;

[0144] When the subsystem is a financial evaluation subsystem, the original document data is collected in the financial-related documents through the financial evaluation subsystem, and / or the original document data is collected in the financial-related documents and calculated according to the built-in rules of the financial evaluation subsystem to obtain the calculated data.

[0145] Further, the obtaining, as the second data, generated data obtained after the subsystems interact according to the logical rules, includes:

[0146] Determining a starting subsystem based on the logic rules between the subsystems, and inputting demand data into the starting subsystem, wherein the demand data is obtained from the input document;

[0147] The subsystems are controlled to interact according to logic rules, and the interaction results are obtained in the terminal subsystems, and the interaction results are determined as the second data.

[0148] Furthermore, the subsystems include: a wind resource evaluation subsystem, a civil engineering design subsystem, a road design subsystem, an electrical design subsystem, a technical and economic evaluation subsystem, and a financial evaluation subsystem;

[0149] The controlling the subsystems to interact according to the logic rules, obtaining the interaction results in the terminal subsystem, and determining the interaction results as the second data includes:

[0150] Determine the wind turbine model and hub height through the wind resource evaluation subsystem, and send the wind turbine model and hub height to the civil engineering design subsystem;

[0151] Determine the coordinates of the booster station based on the wind turbine model and the hub height through the civil engineering resource subsystem;

[0152] The wind turbine location is sent to the road design subsystem through the wind resource evaluation subsystem, and the booster station coordinates are sent to the road design subsystem through the civil engineering design subsystem;

[0153] Determine the road path, the topographic map area coordinates, the booster station voltage planning capacity and the road path topographic map area coordinates based on the wind turbine point and the booster station coordinates by the road design subsystem, and send the road path, the topographic map area coordinates, the booster station voltage planning capacity and the road path topographic map area coordinates to the electrical design subsystem;

[0154] Generate an electrical quantity meter through the electrical design subsystem based on the road path, the topographic map field coordinates, the voltage planning capacity of the booster station and the road path topographic map field coordinates and send it to the technical and economic evaluation subsystem;

[0155] Through the technical and economic evaluation subsystem, the wind turbine model and power generation calculation table are obtained from the wind resource evaluation subsystem, the civil engineering association table is obtained from the civil engineering design subsystem, the road association table is obtained from the road design subsystem, and the electrical quantity meter sent by the electrical design subsystem is received, and an evaluation is performed based on the wind turbine model, the power generation calculation table, the civil engineering association table, the road association table and the electrical quantity meter to obtain the deductible tax and the user-input investment information, and the deductible tax and the user-input investment information are sent to the financial evaluation subsystem;

[0156] The financial evaluation subsystem performs financial result evaluation based on the deductible tax and the investment information input by the user to obtain a financial evaluation result, and determines the financial evaluation result as the second data; wherein the financial evaluation result is used to characterize the revenue forecast result of the wind farm project corresponding to the input document.

[0157] Furthermore, before obtaining the feasibility study report by adding the first data and the second data to the preset report template, the method further includes:

[0158] The first data and the second data are stored in a parameter temporary storage table respectively; wherein the parameter temporary storage table is used to store the various data information respectively contained in the first data and the second data according to the data type;

[0159] The feasibility study report is obtained by adding the first data and the second data to the preset report template, including:

[0160] In the preset report template, a placeholder for each position is determined respectively, and based on a preset mapping relationship, data information corresponding to the placeholder is obtained from the parameter temporary storage table, and the placeholder is replaced, and when all the placeholders are replaced, the feasibility study report is obtained; wherein the preset mapping relationship includes a placeholder corresponding to each type of data information in the parameter temporary storage table.

[0161] The present application also provides a computer program product that can execute corresponding functions, including: extracting data information of corresponding input documents through each of the subsystems as first data; obtaining generated data obtained after interaction between the subsystems according to logical rules as second data; based on the first data and the second data, adding them to the preset report template to obtain the feasibility study report.

[0162] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0163] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0164] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0165] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0166] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0167] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0168] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0169] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0170] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0171] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A method for generating a feasibility study report based on a wind farm. It is characterized in that Applied to a report generation system, the report generation system includes at least two subsystems, the subsystems interact with each other according to logical rules, and the method includes: Extracting data information of the corresponding input document through each of the subsystems as first data; Acquire generated data obtained after the subsystems interact according to the logic rule as second data; Based on the first data and the second data, they are added to the preset report template to obtain the feasibility study report.

2. The method according to claim 1, It is characterized in that The extracting of data information of the corresponding input document by each of the subsystems as the first data includes: Determining a document recognition category of the subsystem, wherein the document recognition category is used to characterize the type of document that the subsystem is capable of recognizing in the input document; Determining, by the subsystem, among the input documents, a document corresponding to the document identification category as a target document; The subsystem extracts data information required for generating the feasibility study report from the target document as the first data.

3. The method according to claim 2, It is characterized in that The first data at least includes original document data and calculated data; wherein the original document data is the data originally recorded in the target document; and the calculated data is the data obtained by calculating the original document data according to the built-in rules of the subsystem; The data information required for generating the feasibility study report is extracted from the target document by the subsystem as the first data, including: The subsystem collects the original document data in the target document, and / or collects the original document data in the target document and calculates the calculated data according to the built-in rules of the subsystem.

4. The method according to claim 3, It is characterized in that The target documents at least include wind resource related documents, civil engineering related documents, road related documents, electrical related documents, technical and economic related documents and financial related documents; The collecting of the original document data in the target document by the subsystem, and / or the collecting of the original document data in the target document and calculating the calculated data according to the built-in rules of the subsystem include: When the subsystem is a wind resource evaluation subsystem, the original document data is collected in the wind resource related document through the wind resource evaluation subsystem, and / or the original document data is collected in the wind resource related document and calculated according to the built-in rules of the wind resource evaluation subsystem to obtain the calculated data; When the subsystem is an electrical design subsystem, the original document data is collected from the electrical-related document by the electrical design subsystem, and / or the original document data is collected from the electrical-related document and calculated according to the built-in rules of the electrical design subsystem to obtain the calculated data; When the subsystem is a civil engineering design subsystem, the original document data is collected from the civil engineering related documents through the civil engineering design subsystem, and / or the original document data is collected from the civil engineering related documents and calculated according to the built-in rules of the civil engineering design subsystem to obtain the calculated data; When the subsystem is a road design subsystem, the original document data is collected from the road-related document by the road design subsystem, and / or the original document data is collected from the road-related document and calculated according to the built-in rules of the road design subsystem to obtain the calculated data; When the subsystem is a project budget subsystem, the original document data is collected from the technical and economic related documents through the technical and economic evaluation subsystem, and / or the original document data is collected from the technical and economic related documents and calculated according to the built-in rules of the technical and economic evaluation subsystem to obtain the calculated data; When the subsystem is a financial evaluation subsystem, the original document data is collected in the financial-related documents through the financial evaluation subsystem, and / or the original document data is collected in the financial-related documents and calculated according to the built-in rules of the financial evaluation subsystem to obtain the calculated data.

5. The method according to claim 1, It is characterized in that The obtaining, as the second data, generated data obtained after the subsystems interact according to the logic rule, includes: Determining a starting subsystem based on the logic rules between the subsystems, and inputting demand data into the starting subsystem, wherein the demand data is obtained from the input document; The subsystems are controlled to interact according to logic rules, and the interaction results are obtained in the terminal subsystems, and the interaction results are determined as the second data.

6. The method according to claim 5, It is characterized in that The subsystems include: wind resource evaluation subsystem, civil engineering design subsystem, road design subsystem, electrical design subsystem, technical and economic evaluation subsystem and financial evaluation subsystem; The controlling the subsystems to interact according to the logic rules, obtaining the interaction results in the terminal subsystem, and determining the interaction results as the second data includes: Determine the wind turbine model and hub height through the wind resource evaluation subsystem, and send the wind turbine model and hub height to the civil engineering design subsystem; Determine the coordinates of the booster station based on the wind turbine model and the hub height through the civil engineering resource subsystem; The wind turbine location is sent to the road design subsystem through the wind resource evaluation subsystem, and the booster station coordinates are sent to the road design subsystem through the civil engineering design subsystem; Determine the road path, the topographic map area coordinates, the booster station voltage planning capacity and the road path topographic map area coordinates based on the wind turbine point and the booster station coordinates by the road design subsystem, and send the road path, the topographic map area coordinates, the booster station voltage planning capacity and the road path topographic map area coordinates to the electrical design subsystem; Generate an electrical quantity meter through the electrical design subsystem based on the road path, the topographic map field coordinates, the voltage planning capacity of the booster station and the road path topographic map field coordinates and send it to the technical and economic evaluation subsystem; Through the technical and economic evaluation subsystem, the wind turbine model and power generation calculation table are obtained from the wind resource evaluation subsystem, the civil engineering association table is obtained from the civil engineering design subsystem, the road association table is obtained from the road design subsystem, and the electrical quantity meter sent by the electrical design subsystem is received, and an evaluation is performed based on the wind turbine model, the power generation calculation table, the civil engineering association table, the road association table and the electrical quantity meter to obtain the deductible tax and the user-input investment information, and the deductible tax and the user-input investment information are sent to the financial evaluation subsystem; The financial evaluation subsystem performs financial result evaluation based on the deductible tax and the investment information input by the user to obtain a financial evaluation result, and determines the financial evaluation result as the second data; wherein the financial evaluation result is used to characterize the revenue forecast result of the wind farm project corresponding to the input document.

7. The method according to claim 1, It is characterized in that Before obtaining the feasibility study report by adding the first data and the second data to the preset report template, the method further includes: The first data and the second data are stored in a parameter temporary storage table respectively; wherein the parameter temporary storage table is used to store the various data information respectively contained in the first data and the second data according to the data type; The feasibility study report is obtained by adding the first data and the second data to the preset report template, including: In the preset report template, a placeholder for each position is determined respectively, and based on a preset mapping relationship, data information corresponding to the placeholder is obtained from the parameter temporary storage table, and the placeholder is replaced, and when all the placeholders are replaced, the feasibility study report is obtained; wherein the preset mapping relationship includes a placeholder corresponding to each type of data information in the parameter temporary storage table.

8. A device for generating a feasibility study report based on a wind farm, It is characterized in that Applied to a report generation system, the report generation system includes at least two subsystems, the subsystems interact with each other according to logical rules, and the device includes: An extraction unit, used for extracting data information of a corresponding input document through each of the subsystems as first data; An acquisition unit, used to acquire generated data obtained after the subsystems interact according to the logic rule as second data; An adding unit is used to add the first data and the second data to the preset report template to obtain the feasibility study report.

9. A storage medium, It is characterized in that The storage medium includes a stored program, wherein when the program is executed, the device where the storage medium is located is controlled to execute the method for generating a feasibility study report based on a wind farm according to any one of claims 1 to 7.

10. A device for generating a feasibility study report based on a wind farm, It is characterized in that The device includes a storage medium; and one or more processors, the storage medium is coupled to the processor, and the processor is configured to execute program instructions stored in the storage medium; when the program instructions are executed, the method for generating a feasibility study report based on a wind farm according to any one of claims 1-7 is executed.

Citation Information

Patent Citations

  • Report processing method and device and terminal device

    CN109359284A

  • Feasibility study report compiling method, ERP system and computer storage medium

    CN111080480A

  • Method and device for inserting placeholder and generating data mapping table, equipment and medium

    CN113822037A

  • Power investment project post-evaluation method and system

    CN115409303A

  • City brain-based one-network-communication case classification method and system

    CN115878807A

Cited By

  • Report automatic generation method and system based on wind power design multi-source engineering data

    CN122221827A