A computer data processing system based on big data analysis

Through the big data analysis system, the rainfall and water accumulation situation is monitored and predicted, travel information is generated and the path is adjusted, which solves the problem of insufficient travel planning in the existing technology, and improves the accuracy and user experience of travel planning.

CN116858277BActive Publication Date: 2024-12-03GUANGZHOU HUASHU CLOUD COMPUTING CO LTD
View PDF 18 Cites 0 Cited by

Patent Information

Application Number
CN202310859609.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-13
Publication Date
2024-12-03
Estimated Expiration
2043-07-13

AI Technical Summary

Technical Problem

The existing technology lacks accurate feedback on road water accumulation at different times and locations in travel planning, resulting in insufficient precise travel planning and ineffective adjustment of routes to avoid water accumulation areas.

Method used

A computer data processing system based on big data analysis was designed, including rainfall monitoring module, water accumulation monitoring module, path planning module and information feedback module. By monitoring and predicting rainfall and water accumulation, initial and planned travel information is generated, and Adjust travel paths based on the predicted data to avoid water accumulation areas.

Benefits of technology

Targeted travel reference data is provided to help users avoid rainwater and road sections with a lot of water accumulation in advance, and improve the accuracy of travel planning and user experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116858277B_ABST
    Figure CN116858277B_ABST
Patent Text Reader

Abstract

The present invention discloses a computer data processing system based on big data analysis, which relates to the technical field of data processing and comprises a main control center, wherein the main control center is communicatively connected with a rainfall monitoring module, a water accumulation monitoring module, a path planning module and an information feedback module; the rainfall monitoring module is used for arranging rainfall monitoring points and obtaining actual rainfall, constructing a rainfall prediction model and obtaining predicted rainfall, the water accumulation monitoring module is used for dividing water accumulation monitoring sections and obtaining actual water accumulation, predicting future water accumulation and obtaining predicted water accumulation, the path planning module is used for obtaining an initial travel path and generating initial travel information, planning the initial travel path to obtain a planned travel path and generating planned travel information, and the information feedback module is used for feeding back the initial travel information and the planned travel information to a user; through the technical solution of the present invention, an effective reference can be provided for user travel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data processing, and in particular to a computer data processing system based on big data analysis. Background Art

[0002] Travel planning refers to arranging the appropriate travel routes and methods to reach the destination. According to the distance of the destination and the available transportation, people can choose the appropriate travel method and use map applications or navigation systems to plan the best route. However, road waterlogging often affects travel. For example, rainy days may cause more waterlogging, which requires corresponding adjustments to travel plans.

[0003] In the existing technology, the travel planning of users often treats the city or road as a whole. However, even different sections of the same city may have different water accumulation conditions at different times, which leads to a lack of accuracy in the travel planning of users. In addition, the existing technology often only provides feedback based on the user's current location, but lacks feedback based on the user's subsequent location. In view of the shortcomings of the existing technology, the present invention provides a computer data processing system based on big data analysis. Summary of the invention

[0004] The object of the present invention is to provide a computer data processing system based on big data analysis.

[0005] The object of the present invention can be achieved by the following technical solutions: A computer data processing system based on big data analysis includes a main control center, and the main control center is communicatively connected with a rainfall monitoring module, a water accumulation monitoring module, a path planning module, and an information feedback module;

[0006] The rainfall monitoring module is used to arrange rainfall monitoring points, monitor current rainfall to obtain actual rainfall, build a rainfall prediction model, and predict future rainfall to obtain predicted rainfall;

[0007] The water accumulation monitoring module is used to divide the water accumulation monitoring section, monitor the current water accumulation amount to obtain the actual water accumulation amount, obtain the current drainage amount, and predict the future water accumulation amount to obtain the predicted water accumulation amount;

[0008] The path planning module is used to obtain a corresponding initial travel path according to the user's current location and target location, and generate corresponding initial travel information, plan the initial travel path according to the predicted water accumulation amount to obtain a corresponding planned travel path, and generate corresponding planned travel information;

[0009] The information feedback module is used to feed back various initial travel information and planned travel information to the user.

[0010] Furthermore, the process of arranging rainfall monitoring points by the rainfall monitoring module includes:

[0011] The location of the current city meteorological station is used as the initial rainfall monitoring point, the shortest distance between each location in the city and the current rainfall monitoring point is obtained, the probability value of each location being selected as the next rainfall monitoring point is obtained, and the location corresponding to the maximum probability value is selected as the next rainfall monitoring point. This step is repeated until several rainfall monitoring points are selected;

[0012] The shortest distance between each rainfall monitoring point and other rainfall monitoring points is obtained, and the total distance between each rainfall monitoring point and other rainfall monitoring points is obtained. The rainfall monitoring point corresponding to the minimum total distance is selected as the total rainfall monitoring point, and other rainfall monitoring points are used as rainfall monitoring sub-points.

[0013] Furthermore, the rainfall monitoring module monitors the current rainfall to obtain the actual rainfall, constructs a rainfall prediction model, and predicts the future rainfall to obtain the predicted rainfall, including:

[0014] According to each rainfall monitoring point and the area it monitors, the city is divided into several rainfall monitoring areas, the forecast rainfall of each rainfall monitoring area in different time periods is obtained through weather forecast, and a collection unit is set at the rainfall monitoring point to obtain the actual rainfall corresponding to the forecast rainfall in different time periods through the collection unit;

[0015] A rainfall prediction model is constructed based on the correspondence between the obtained forecast rainfall and the actual rainfall, the forecast rainfall in the rainfall monitoring area in the subsequent time period is obtained through weather forecast, and the obtained forecast rainfall is input into the rainfall prediction model to obtain the forecast rainfall in the rainfall monitoring area in the subsequent time period.

[0016] Furthermore, the process of dividing the waterlogging monitoring section by the waterlogging monitoring module includes:

[0017] Obtain the distribution of the roads and the corresponding drainage outlets in the current city, take the vehicle driving direction as the positive direction, take the adjacent drainage outlets distributed in the positive direction as the next drainage outlet, and take the adjacent drainage outlets distributed in the reverse direction as the previous drainage outlet;

[0018] The midpoints between the current drain outlet and the previous drain outlet and the next drain outlet are obtained respectively, and the obtained midpoints are marked as drainage midpoints. The drainage midpoints on both sides of the current drain outlet are obtained respectively, and the road between the two drainage midpoints is marked as waterlogging monitoring sections. The same method is used to divide urban roads into several waterlogging monitoring sections connected end to end.

[0019] Furthermore, the process in which the water accumulation monitoring module monitors the current water accumulation to obtain the actual water accumulation, obtains the current drainage, and predicts the future water accumulation to obtain the predicted water accumulation includes:

[0020] A waterlogging monitoring camera and an identification unit are provided, and a road image of the waterlogging monitoring section is collected by the waterlogging monitoring camera, and the collected road image is uploaded to the identification unit for analysis, and the waterlogging situation of the current waterlogging monitoring section is identified by the identification unit to obtain a corresponding waterlogging area and an actual amount of waterlogging;

[0021] A monitoring cycle is set, and a water volume monitoring unit is set at the drain outlet. The discharge volume of the current drain outlet is monitored by the water volume monitoring unit. The rainfall in the next monitoring cycle is predicted by the rainfall prediction model to obtain the corresponding predicted rainfall. The predicted water volume of the water accumulation monitoring section in the next monitoring cycle is obtained based on the obtained predicted rainfall, actual water accumulation and discharge volume.

[0022] Furthermore, the process in which the path planning module obtains a corresponding initial travel path according to the user's current location and target location, and generates corresponding initial travel information includes:

[0023] Setting a navigation unit, obtaining a current location and a target location of a user, constructing a plurality of initial navigation routes through the navigation unit, providing the constructed initial navigation routes to the user for selection, and marking the initial navigation route selected by the user as an initial travel path;

[0024] Obtain all waterlogging monitoring sections on the initial travel path, obtain all rainfall monitoring areas including the initial travel path, obtain rainfall proportions and waterlogging proportions according to the corresponding actual rainfall and actual waterlogging, and set rainfall proportion thresholds and waterlogging proportion thresholds;

[0025] The rainfall ratio, waterlogging ratio and rainfall ratio threshold and waterlogging ratio threshold are compared respectively, and the initial travel path is marked as different states according to the comparison results, and corresponding initial travel information is generated, and the initial travel information includes first travel information, second travel information, third travel information, and fourth travel information.

[0026] Furthermore, the path planning module plans the initial travel path according to the predicted water accumulation to obtain the corresponding planned travel path, and generates the corresponding planned travel information, including:

[0027] Setting a planning unit, obtaining the user's travel vehicle, setting different standard speeds for different vehicles, obtaining the user's real-time location, constructing a plurality of planned navigation routes through the navigation unit, and predicting the user's location on different planned navigation routes in the next time period according to the obtained real-time location and standard speed to obtain different predicted locations;

[0028] Obtain the rainfall monitoring area and waterlogging monitoring section corresponding to the predicted location, and obtain the road coefficient of the predicted location based on the corresponding predicted rainfall and predicted waterlogging, obtain the road coefficients of all predicted locations, select the planned navigation route corresponding to the minimum road coefficient as the planned travel path, and generate corresponding planned travel information.

[0029] Furthermore, the process of the information feedback module feeding back various initial travel information and planned travel information to the user includes:

[0030] A feedback unit is provided, through which initial travel information and planned travel information are fed back to the user, wherein the initial travel information includes first travel information, second travel information, third travel information, and fourth travel information.

[0031] Compared with the prior art, the present invention has the following beneficial effects:

[0032] 1. Divide the city to obtain the corresponding predicted rainfall, and then divide the urban roads. Combined with the drainage volume, the water accumulation in different sections of the road in the future is predicted to obtain the predicted water accumulation volume, which is conducive to obtaining targeted reference data to provide reference for users' travel;

[0033] 2. Before the user travels, different initial travel information is generated for the user based on the rainfall ratio and water accumulation ratio of the initial travel route, which is helpful for providing a reference for the user whether to travel. During the user's travel, the user's location in the next time period is predicted, and the road coefficient of the predicted location is obtained. The road corresponding to the minimum road coefficient is selected as the planned travel route, which is helpful for helping users avoid sections with more rain and water accumulation in advance. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a schematic diagram of the present invention. DETAILED DESCRIPTION

[0035] like Figure 1 As shown, a computer data processing system based on big data analysis includes a main control center, and the main control center is communicatively connected to a rainfall monitoring module, a water accumulation monitoring module, a path planning module, and an information feedback module;

[0036] The rainfall monitoring module is used to arrange rainfall monitoring points, monitor current rainfall to obtain actual rainfall, build a rainfall prediction model, and predict future rainfall to obtain predicted rainfall;

[0037] The water accumulation monitoring module is used to divide the water accumulation monitoring section, monitor the current water accumulation amount to obtain the actual water accumulation amount, obtain the current drainage amount, and predict the future water accumulation amount to obtain the predicted water accumulation amount;

[0038] The path planning module is used to obtain a corresponding initial travel path according to the user's current location and target location, and generate corresponding initial travel information, plan the initial travel path according to the predicted water accumulation amount to obtain a corresponding planned travel path, and generate corresponding planned travel information;

[0039] The information feedback module is used to feed back various initial travel information and planned travel information to the user.

[0040] It should be further explained that, in the specific implementation process, the process of the rainfall monitoring module arranging the rainfall monitoring points includes:

[0041] The location of the current urban meteorological station is used as the initial rainfall monitoring point;

[0042] Obtain the shortest distance between each location in the city and the current rainfall monitoring point, and record the obtained shortest distance as d;

[0043] Obtain the probability value of each location being selected as the next rainfall monitoring point, and record the obtained probability value as P;

[0044] ;

[0045] Select the location corresponding to the maximum probability value as the next rainfall monitoring point, and repeat this step until n rainfall monitoring points are selected;

[0046] Obtain the shortest distance between each rainfall monitoring point and other rainfall monitoring points, and mark the obtained shortest distances as d1, d2, ..., d n-1 ;

[0047] Obtain the total distance between each rainfall monitoring point and other rainfall monitoring points, and mark the obtained total distance as d 总 ;

[0048] ;

[0049] The rainfall monitoring point corresponding to the minimum total distance is selected as the total rainfall monitoring point, and the other rainfall monitoring points are used as sub-rainfall monitoring points;

[0050] The rainfall monitoring points obtained by the method of the present invention can be arranged in a dispersed manner to the greatest extent possible to meet the rainfall monitoring needs of the entire city. The rainfall monitoring point corresponding to the minimum total distance is used as the total rainfall monitoring point, and the other rainfall monitoring points are used as rainfall monitoring sub-points. The rainfall data of all rainfall monitoring sub-points need to be aggregated to the total rainfall monitoring point for unified processing, which is conducive to the centralized processing of rainfall data for the entire city.

[0051] It should be further explained that, in the specific implementation process, the rainfall monitoring module monitors the current rainfall to obtain the actual rainfall, constructs a rainfall prediction model, and predicts the future rainfall to obtain the predicted rainfall. The process includes:

[0052] According to each rainfall monitoring point and the area it monitors, the city is divided into several rainfall monitoring areas, the forecast rainfall of each rainfall monitoring area in different time periods is obtained through weather forecast, and a collection unit is set at the rainfall monitoring point to obtain the actual rainfall corresponding to the forecast rainfall in different time periods through the collection unit;

[0053] A rainfall prediction model is constructed according to the corresponding relationship between the obtained forecast rainfall and the actual rainfall, the obtained forecast rainfall is used as an input value of the rainfall prediction model, and the output value of the rainfall prediction model is used as the predicted rainfall of the input forecast rainfall;

[0054] The rainfall prediction model is trained using the actual rainfall corresponding to the predicted rainfall to achieve continuous optimization of the rainfall prediction model. The predicted rainfall in the rainfall monitoring area in the subsequent time period is obtained through weather forecast, and the obtained predicted rainfall is input into the rainfall prediction model to obtain the predicted rainfall in the rainfall monitoring area in the subsequent time period.

[0055] It should be further explained that, in a specific implementation process, the process of dividing the waterlogging monitoring section by the waterlogging monitoring module includes:

[0056] Obtain the distribution of the roads and the corresponding drainage outlets in the current city, take the vehicle driving direction as the positive direction, take a drainage outlet as an example, take the adjacent drainage outlet distributed in the positive direction as the next drainage outlet, and take the adjacent drainage outlet distributed in the reverse direction as the previous drainage outlet;

[0057] The middle points between the current drain outlet and the previous drain outlet and the next drain outlet are obtained respectively, and the obtained middle points are marked as the drainage midpoints. The drainage midpoints on both sides of the current drain outlet are obtained respectively, and the road between the two drainage midpoints is marked as the water accumulation monitoring section. The middle point of the water accumulation monitoring section is the current drain outlet. Similarly, the same method is used to divide the urban road into several water accumulation monitoring sections connected end to end, and each water accumulation monitoring section has a drain outlet.

[0058] The method of the present invention can achieve detailed division of urban roads, dividing urban roads into several water accumulation monitoring sections with each drainage outlet as the center, so as to realize accurate monitoring of water accumulation in urban roads. One rainfall monitoring area can include multiple water accumulation monitoring sections.

[0059] It should be further explained that, in the specific implementation process, the water accumulation monitoring module monitors the current water accumulation to obtain the actual water accumulation, obtains the current drainage, and predicts the future water accumulation to obtain the predicted water accumulation, including:

[0060] A waterlogging monitoring camera and an identification unit are provided, wherein each waterlogging monitoring section is provided with a waterlogging monitoring camera, and the road image of the waterlogging monitoring section is collected by the waterlogging monitoring camera, and the collected road image is uploaded to the identification unit for analysis, and the waterlogging situation of the current waterlogging monitoring section is identified by the identification unit;

[0061] If it is identified that there is no water accumulation in the current water accumulation monitoring section, the current water accumulation volume of the water accumulation monitoring section is marked as 0; if it is identified that there is water accumulation in the current water accumulation monitoring section, the water accumulation area of ​​the water accumulation monitoring section is obtained according to the road image, and its current water accumulation volume is identified to obtain the corresponding actual water accumulation volume;

[0062] Set the monitoring period T;

[0063] A water volume monitoring unit is set at the drain outlet, and the water volume monitoring unit is used to monitor the current water volume of the drain outlet to obtain the water volume of the drain outlet in the current monitoring period, and the obtained water volume is marked as S 排 ;

[0064] The rainfall prediction model is used to predict the rainfall in the next monitoring period to obtain the corresponding predicted rainfall, and the obtained predicted rainfall is marked as S 降 , and the actual amount of water accumulated is marked as S 积 ;

[0065] According to the obtained predicted rainfall, actual water accumulation and drainage, the predicted water accumulation of the waterlogging monitoring section in the next monitoring period is obtained, and the obtained predicted water accumulation is marked as S 预 ;

[0066] .

[0067] It should be further explained that, in a specific implementation process, the path planning module obtains the corresponding initial travel path according to the user's current location and target location, and generates the corresponding initial travel information in the process including:

[0068] A navigation unit is provided, and a current location of a user is obtained through the navigation unit, and the obtained current location is used as a starting point. The user inputs a target location to be traveled to into the navigation unit, and the input target location is used as an end point. A plurality of initial navigation routes are constructed between the starting point and the end point through the navigation unit, and the constructed initial navigation routes are provided to the user for selection, and the initial navigation route selected by the user is marked as an initial travel path;

[0069] According to the obtained initial travel path, all waterlogging monitoring sections on the initial travel path are obtained, all rainfall monitoring areas containing the initial travel path are obtained, and the corresponding actual rainfall and actual waterlogging are obtained. The rainfall ratio of the rainfall monitoring area with actual rainfall greater than 0 to all rainfall detection areas is obtained, and the obtained rainfall ratio is marked as B 降 , obtain the proportion of waterlogging monitoring sections with actual waterlogging volume greater than 0 to all waterlogging monitoring sections, and mark the obtained waterlogging proportion as B 积 ;

[0070] Set the rainfall ratio threshold y 降 and water accumulation ratio threshold y 积 ;

[0071] When B 降 <y 降 And B 积 <y 积 , marking the initial travel path as a first initial state, and generating first travel information;

[0072] When B 降 <y 降 And B 积 ≥y 积 , marking the initial travel path as a second initial state, and generating second travel information;

[0073] When B 降 ≥y 降 And B 积 <y 积 , marking the initial travel path as a third initial state, and generating third travel information;

[0074] When B 降 ≥y 降 And B 积 ≥y 积 When the initial travel path is marked as a fourth initial state, the fourth travel information is generated.

[0075] It should be further explained that, in the specific implementation process, the path planning module plans the initial travel path according to the predicted water accumulation to obtain the corresponding planned travel path, and generates the corresponding planned travel information, including:

[0076] A planning unit is provided to obtain the user's travel vehicle, and different standard speeds are set for different vehicles, and the user's real-time location is obtained. A plurality of planned navigation routes are constructed between the real-time location and the target location through the navigation unit, and the user's location on different planned navigation routes in the next time period is predicted according to the obtained real-time location and standard speed to obtain different predicted locations;

[0077] Taking a certain predicted location as an example, the rainfall monitoring area and waterlogging monitoring section corresponding to the predicted location are obtained, and the corresponding predicted rainfall and predicted waterlogging are obtained. Road weights are set for the obtained predicted rainfall and predicted waterlogging, and the set road weights are marked as q 降 and q 积 ;

[0078] Obtain a road coefficient of the predicted position, and mark the obtained road coefficient as R;

[0079] ;

[0080] Similarly, the road coefficients of all predicted locations are obtained, the planned navigation route corresponding to the minimum road coefficient is selected as the planned travel path, and the corresponding planned travel information is generated.

[0081] It should be further explained that, in the specific implementation process, the process in which the information feedback module feeds back various initial travel information and planned travel information to the user includes:

[0082] A feedback unit is provided, through which initial travel information and planned travel information are fed back to the user, and the user selects a travel route according to the obtained initial travel information and planned travel information, wherein the initial travel information includes first travel information, second travel information, third travel information, and fourth travel information.

Claims

1. A computer data processing system based on big data analysis, including a main control center, characterized in that: The main control center is communicatively connected with a rainfall monitoring module, a water accumulation monitoring module, a path planning module, and an information feedback module; The rainfall monitoring module is used to arrange rainfall monitoring points, monitor current rainfall to obtain actual rainfall, build a rainfall prediction model, and predict future rainfall to obtain predicted rainfall; The water accumulation monitoring module is used to divide the water accumulation monitoring section, monitor the current water accumulation amount to obtain the actual water accumulation amount, obtain the current drainage amount, and predict the future water accumulation amount to obtain the predicted water accumulation amount; The path planning module is used to obtain a corresponding initial travel path according to the user's current location and target location, and generate corresponding initial travel information, plan the initial travel path according to the predicted water accumulation amount to obtain a corresponding planned travel path, and generate corresponding planned travel information; The information feedback module is used to feed back various initial travel information and planned travel information to the user; The process of arranging rainfall monitoring points by the rainfall monitoring module includes: Obtain the initial rainfall monitoring point, obtain the shortest distance d between each location in the city and the current rainfall monitoring point, and obtain the probability value P of each location being selected as the next rainfall monitoring point; ; Select the location corresponding to the maximum probability value as the next rainfall monitoring point, and repeat this step until several rainfall monitoring points are selected; The process of the rainfall monitoring module monitoring the current rainfall to obtain the actual rainfall, constructing a rainfall prediction model, and predicting the future rainfall to obtain the predicted rainfall includes: Obtaining a corresponding rainfall monitoring area according to a rainfall monitoring point, obtaining the forecast rainfall of the rainfall monitoring area in different time periods through a weather forecast, setting a collection unit, and obtaining the actual rainfall corresponding to the forecast rainfall in different time periods through the collection unit; A rainfall prediction model is constructed based on the predicted rainfall and the actual rainfall, the predicted rainfall in the rainfall monitoring area in the subsequent time period is obtained through weather forecast, and the predicted rainfall is input into the rainfall prediction model to obtain the predicted rainfall in the rainfall monitoring area in the subsequent time period; The process of dividing the waterlogging monitoring section by the waterlogging monitoring module includes: Obtain the distribution of urban roads and drainage outlets, obtain the drainage midpoints between adjacent drainage outlets, take the urban roads between the adjacent drainage midpoints as a waterlogging monitoring section, and divide the urban roads into several waterlogging monitoring sections connected end to end; The process in which the water accumulation monitoring module monitors the current water accumulation amount to obtain the actual water accumulation amount, obtains the current drainage amount, and predicts the future water accumulation amount to obtain the predicted water accumulation amount includes: A waterlogging monitoring camera and a recognition unit are provided, and a road image of the waterlogging monitoring section is collected by the waterlogging monitoring camera, and the collected road image is uploaded to the recognition unit for analysis, and a corresponding waterlogging area and an actual waterlogging amount are obtained according to the analysis result; A water volume monitoring unit is provided, the discharge volume of the current drain outlet is obtained through the water volume monitoring unit, the predicted rainfall of the waterlogging monitoring section is obtained through the rainfall prediction model, and the predicted waterlogging volume of the waterlogging monitoring section is obtained according to the predicted rainfall, the actual waterlogging volume and the discharge volume; The process of the path planning module obtaining the corresponding initial travel path according to the user's current location and target location and generating the corresponding initial travel information includes: Setting a navigation unit, obtaining the current location and target location of the user, constructing a plurality of initial navigation routes through the navigation unit for the user to select, and using the initial navigation route selected by the user as the initial travel path; Obtain all waterlogging monitoring sections on the initial travel path, obtain all rainfall monitoring areas including the initial travel path, obtain rainfall proportions and waterlogging proportions according to corresponding actual rainfall and actual waterlogging, and set rainfall proportion thresholds and waterlogging proportion thresholds; The rainfall ratio, the waterlogging ratio, the rainfall ratio threshold, and the waterlogging ratio threshold are compared respectively, and the initial travel path is marked as different states according to the comparison results, and corresponding initial travel information is generated, including first travel information, second travel information, third travel information, and fourth travel information; The path planning module plans the initial travel path according to the predicted water accumulation to obtain the corresponding planned travel path, and generates the corresponding planned travel information, including: Setting a planning unit, obtaining the user's travel vehicle, setting different standard speeds for different vehicles, obtaining the user's real-time location, constructing a number of planned navigation routes through the navigation unit, and predicting the user's location on different planned navigation routes in the next time period to obtain a predicted location; According to the rainfall monitoring area and waterlogging monitoring section corresponding to the predicted location, the corresponding predicted rainfall and predicted waterlogging are obtained, the road coefficients of all predicted locations are obtained, the planned navigation route corresponding to the minimum road coefficient is selected as the planned travel path, and the corresponding planned travel information is generated.

2. A computer data processing system based on big data analysis according to claim 1, characterized in that: The process of the information feedback module feeding back various initial travel information and planned travel information to the user includes: A feedback unit is provided, through which initial travel information and planned travel information are fed back to the user, wherein the initial travel information includes first travel information, second travel information, third travel information, and fourth travel information.

Citation Information

Patent Citations

  • Basin rainfall monitoring wireless sensor network node optimization layout method

    CN106257948A

  • Meteorological monitoring point selection method based on photovoltaic power generation output clustering

    CN110008982A

  • Road water-logging prediction-based urban route guiding method

    CN110160550A

  • Data processing method suitable for flood prediction system

    CN110414027A

  • Urban waterlogging monitoring and pre-warning system and pre-warning method

    CN110533885A