High-adaptability anti-seepage and intercepting integrated drainage inspection well

By using an integrated anti-seepage lining and an inflatable interception bag structure in the prefabricated drainage inspection well, the problems of leakage and difficulty in interception are solved, achieving efficient water flow control and sealing, and simplifying the construction difficulty.

CN117071712BActive Publication Date: 2025-11-21SHANXI TRAFFIC PLANNING PROSPECTING & DESIGN INST +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311145474.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-06
Publication Date
2025-11-21
Estimated Expiration
2043-09-06

AI Technical Summary

Technical Problem

Existing prefabricated drainage inspection wells are prone to leakage and difficult to intercept flow, and are prone to cracking at pipe connections. Furthermore, existing methods for sealing pipes are not safe and efficient.

Method used

The highly adaptable, seepage-resistant, and integrated drainage inspection well is adopted, including the well body and the seepage-proof integrated lining. It uses an inflatable interception bag structure and a seepage-proof lining, and controls the water flow through the air intake and exhaust vertical pipes and longitudinal pipes. Combined with the asphalt-fiber filling layer and rubber waterstop ring, the sealing performance and interception efficiency are improved.

Benefits of technology

It effectively solved the leakage problem of prefabricated drainage inspection wells, improved the safety and efficiency of interception work, and simplified the operation difficulty of dry trench construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117071712B_ABST
    Figure CN117071712B_ABST
Patent Text Reader

Abstract

The application relates to the technical field of drainage inspection well construction, in particular to a high-adaptability anti-seepage and interception integrated drainage inspection well which solves the problems of easy seepage and difficult interception of the existing prefabricated drainage inspection well. The high-adaptability anti-seepage and interception integrated drainage inspection well comprises a well body part and an anti-seepage integrated lining; the well body part comprises a square well body, a central through hole is formed in the top wall of the square well body, a well shaft is arranged at the upper end hole edge of the central through hole, an air inlet and exhaust vertical pipe is arranged on the well shaft and the central through hole, a valve is arranged on the air inlet and exhaust vertical pipe, and an air inlet and exhaust longitudinal pipe is sealingly connected to the bottom end of the air inlet and exhaust vertical pipe; the anti-seepage integrated lining comprises a well body anti-seepage lining, an upstream anti-seepage lining sleeve pipe and a downstream anti-seepage lining sleeve pipe; the front and rear side walls of the well body anti-seepage lining are double-layer structures, the inner layers of the front and rear side walls are air inflation interception bags, and the two ends of the air inlet and exhaust longitudinal pipe are sealingly connected to the two air inflation interception bags respectively. The application is a prefabricated inspection well integrating anti-seepage and interception.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of drainage inspection well construction, in particular to a high-adaptability anti-seepage and interception integrated drainage inspection well. BACKGROUND

[0002] In municipal pipeline drainage engineering, in order to facilitate the connection of the inspection well and the drainage pipeline, the pipeline access hole reserved in the prefabricated drainage inspection well is usually larger than the outer diameter of the drainage pipeline, and the pipeline access hole is usually sealed by bricks and concrete after the drainage pipeline is inserted into the pipeline access hole of the prefabricated drainage inspection well. However, it is difficult to ensure the sealing quality of the pipeline access hole in actual application, which easily leads to the pipeline access hole becoming the main leakage point in the drainage system; secondly, the filling of the pipeline access hole is rigid, and when the foundation appears uneven settlement, the connection between the prefabricated drainage inspection well and the drainage pipeline is easily cracked, leading to leakage.

[0003] In addition, in municipal pipeline drainage engineering, new pipes are often connected to old pipes or old pipes are often maintained by cleaning, and both of these two types of maintenance require dry trench construction, but the drainage pipeline is often in a state of water flow, so when dry trench construction is required, the pipeline must be sealed. At present, the pipeline is mainly sealed by manually placing a rubber airbag in the drainage inspection well to achieve interception. In actual application, the safety is low, the operation is difficult and the efficiency is low.

[0004] Therefore, it is necessary to invent a high-adaptability anti-seepage and interception integrated drainage inspection well to solve the problems of easy leakage and difficult interception of the existing prefabricated drainage inspection well. SUMMARY

[0005] The present application provides a high-adaptability anti-seepage and interception integrated drainage inspection well to solve the problems of easy leakage and difficult interception of the existing prefabricated drainage inspection well.

[0006] The present application is implemented by using the following technical solutions:

[0007] A high-adaptability anti-seepage and interception integrated drainage inspection well, comprising a well body part and an anti-seepage integrated inner lining;

[0008] The well body part comprises a square well body, a central through hole is formed in the top wall of the square well body, a well shaft is extended and arranged at the upper end hole edge of the central through hole, an air inlet and exhaust vertical pipe is arranged along the vertical direction on the inner side wall of the well shaft and the hole wall of the central through hole, a valve is installed at the top end of the air inlet and exhaust vertical pipe, and an air inlet and exhaust vertical pipe is sealingly connected to the bottom end of the air inlet and exhaust vertical pipe; a plurality of hooks are fixedly arranged along the vertical direction on the inner side wall of the square well body, an upstream pipeline connection port is formed in the bottom of the left side wall of the square well body, and a downstream pipeline connection port is formed in the bottom of the right side wall of the square well body; an upstream drainage pipeline is arranged in the upstream pipeline connection port, and a downstream drainage pipeline is arranged in the downstream pipeline connection port; a left-high-right-low concrete cushion layer is cast on the inner bottom wall of the square well body;

[0009] The anti-seepage integrated liner comprises a well body anti-seepage liner, an upstream anti-seepage liner sleeve in communication with the left side wall of the well body anti-seepage liner, and a downstream anti-seepage liner sleeve in communication with the right side wall of the well body anti-seepage liner; the front and rear side walls of the well body anti-seepage liner are both double-layer structures, and the inner layers of the front and rear side walls are both inflatable cutoff bags; the two ends of the air inlet and outlet vertical pipe are respectively in sealed communication with the two inflatable cutoff bags; the four side edges of the well body anti-seepage liner are all provided with hangers in the vertical direction, a plurality of hanger holes matched with hooks are formed in the hangers, and each hook is hung on a corresponding hanger hole; a center hole is formed in the top wall of the well body anti-seepage liner, an alloy ring is coaxially fixed on the hole edge of the center hole, a plurality of mounting holes are formed in the hole edge of the center hole and the alloy ring in the circumferential direction, an expansion bolt is arranged in each mounting hole, and each expansion bolt is arranged on the lower hole edge of the center hole; the bottom wall of the well body anti-seepage liner is laid on a concrete cushion layer; the upstream anti-seepage liner sleeve and the downstream anti-seepage liner sleeve respectively penetrate the upstream pipeline connecting port and the downstream drainage pipeline connecting port, the penetrating section outer surface of the upstream anti-seepage liner sleeve and the penetrating section outer surface of the downstream anti-seepage liner sleeve are both sleeved with an anti-abrasion washer, and a rubber sealing ring is sleeved on each anti-abrasion washer; the upstream pipeline connecting port and the downstream pipeline connecting port are both filled with an asphalt wool filling layer; the upstream anti-seepage liner sleeve is wrapped on the outer side wall of the upstream drainage pipeline, and the downstream anti-seepage liner sleeve is wrapped on the outer side wall of the downstream drainage pipeline; rubber waterstop rings are sleeved between the upstream anti-seepage liner sleeve and the upstream drainage pipeline and between the downstream anti-seepage liner sleeve and the downstream drainage pipeline; the outer surfaces of the upstream anti-seepage liner sleeve and the downstream anti-seepage liner sleeve are both wrapped with a heat shrinkable sleeve.

[0010] Further, the well body part is a prefabricated drainage inspection well.

[0011] Further, the top end cover of the well shaft is provided with a well cover.

[0012] Further, the air inlet and outlet vertical pipe is fixed on the inner side wall of the well shaft and the hole wall of the center hole through a clamp.

[0013] Further, the rubber sealing ring is a water-swelling rubber sealing ring.

[0014] The present application has reasonable and reliable structure, and effectively solves the problem of easy leakage of the prefabricated drainage inspection well by adding the anti-seepage integrated liner and using the asphalt wool filling between the upstream and downstream drainage pipelines and the square well body; meanwhile, the anti-seepage integrated liner is designed as a structure with a pair of inflatable cutoff bags, and the water flow can be controlled through the control of the air inlet and outlet vertical pipe and the air inlet and outlet vertical pipe connected with the inflatable cutoff bags, which is simple and easy to operate, and significantly improves the efficiency of the cutoff work. BRIEF DESCRIPTION OF DRAWINGS

[0015] Figure 1 is a structural schematic diagram of the present application.

[0016] Figure 2 is the structural schematic diagram of the anti-seepage integrated lining in the application.

[0017] Figure 3 is the plan view of the inflatable cutoff bag in the application when not inflated.

[0018] Figure 4 is the plan view of the inflatable cutoff bag in the application when inflated.

[0019] In the figure: 101-square well body, 102-well shaft, 103-air inlet and exhaust vertical pipe, 104-valve, 105-air inlet and exhaust longitudinal pipe, 106-upstream drainage pipeline, 107-downstream drainage pipeline, 108-concrete cushion, 109-well cover, 201-well body anti-seepage lining, 202-upstream anti-seepage lining sleeve, 203-downstream anti-seepage lining sleeve, 204-inflatable cutoff bag, 205-hanging rack, 206-hanging hole, 207-center hole, 208-mounting hole, 209-rubber sealing ring, 210-asphalt wool filling layer, 211-rubber waterstop, 212-heat shrink sleeve. DETAILED DESCRIPTION

[0020] A high-adaptability anti-seepage cutoff integrated drainage inspection well, comprising a well body part and an anti-seepage integrated lining;

[0021] The well body part comprises a square well body 101, a center through hole is formed in the top wall of the square well body 101, an upper end hole edge of the center through hole is provided with a well shaft 102, an inner side wall of the well shaft 102 and a hole wall of the center through hole are provided with an air inlet and exhaust vertical pipe 103 along the vertical direction, a valve 104 is installed at the top end of the air inlet and exhaust vertical pipe 103, and an air inlet and exhaust longitudinal pipe 105 is sealingly communicated with the bottom end of the air inlet and exhaust vertical pipe 103; a plurality of hooks are fixedly arranged on the inner side wall of the square well body 101 along the vertical direction, an upstream pipeline connecting port is formed in the bottom of the left side wall of the square well body 101, and a downstream pipeline connecting port is formed in the bottom of the right side wall of the square well body 101; an upstream drainage pipeline 106 is arranged in the upstream pipeline connecting port, and a downstream drainage pipeline 107 is arranged in the downstream pipeline connecting port; a left-high-right-low concrete cushion 108 is cast on the inner bottom wall of the square well body 101;

[0022] The anti-seepage integrated liner comprises a well body anti-seepage liner 201, an upstream anti-seepage liner sleeve 202 in communication with the left side wall of the well body anti-seepage liner 201, and a downstream anti-seepage liner sleeve 203 in communication with the right side wall of the well body anti-seepage liner 201; the front and rear side walls of the well body anti-seepage liner 201 are both double-layer structures, and the inner layers of the front and rear side walls are both inflatable cutoff bags 204; the two ends of the air inlet and outlet vertical pipe 105 are respectively in sealed communication with the two inflatable cutoff bags 204; the four side edges of the well body anti-seepage liner 201 are each provided with a hanging rack 205 in the vertical direction, a plurality of hanging holes 206 matched with hooks are formed in the hanging rack 205, and each hook is hung on a corresponding hanging hole 206; a center hole 207 is formed in the top wall of the well body anti-seepage liner 201, an alloy ring is coaxially fixed on the edge of the hole of the center hole 207, and a plurality of mounting holes 208 are formed in the edge of the hole of the center hole 207 and the alloy ring in the circumferential direction; an expansion bolt is arranged in each mounting hole 208, and each expansion bolt is arranged on the lower end of the hole of the center hole; the bottom wall of the well body anti-seepage liner 201 is laid on the concrete cushion 108; the upstream anti-seepage liner sleeve 202 and the downstream anti-seepage liner sleeve 203 respectively penetrate the upstream pipeline connecting port and the downstream drainage pipeline connecting port, and the penetrating section outer surface of the upstream anti-seepage liner sleeve 202 and the penetrating section outer surface of the downstream anti-seepage liner sleeve 203 are each sleeved with an anti-abrasion gasket, and a rubber sealing ring 209 is sleeved on each anti-abrasion gasket; the upstream pipeline connecting port and the downstream pipeline connecting port are each filled with an asphalt wool filling layer 210; the upstream anti-seepage liner sleeve 202 is wrapped on the outer side wall of the upstream drainage pipeline 106, and the downstream anti-seepage liner sleeve 203 is wrapped on the outer side wall of the downstream drainage pipeline 107; a rubber waterstop 211 is sleeved between the upstream anti-seepage liner sleeve 202 and the upstream drainage pipeline 106 and between the downstream anti-seepage liner sleeve 203 and the downstream drainage pipeline 107; and the outer surfaces of the upstream anti-seepage liner sleeve 202 and the downstream anti-seepage liner sleeve 203 are each wrapped with a heat shrinkable sleeve 212.

[0023] During construction, the integrated anti-seepage liner is attached to the inner wall of the square well body 101 using hooks, and the edge of the central hole 207 is fixed to the lower end of the central through hole using expansion bolts. Next, the upstream anti-seepage liner sleeve 202 extends from the upstream pipe connection port, and the downstream anti-seepage liner sleeve 203 extends from the downstream pipe connection port. Anti-wear washers are fitted on the outer surface of the penetration section of both the upstream and downstream anti-seepage liner sleeves 202 and 203, and rubber sealing rings 209 are fitted onto both washers. Then, rubber waterstop rings 211 are fitted onto the surfaces of the upstream and downstream drainage pipes 106 and 107, respectively. The upstream anti-seepage liner sleeve 202 is then wrapped around the outer wall of the upstream drainage pipe 106, and the downstream anti-seepage liner sleeve 203 is wrapped around the outer wall of the downstream drainage pipe 107. Finally, the upstream drainage pipe 106 is installed... Water pipe 106 is inserted into the upstream pipe connection port, and downstream drainage pipe 107 is inserted into the downstream pipe connection port. Then, asphalt-impregnated hemp fiber is used to fill the upstream and downstream pipe connection ports to form an asphalt-impregnated hemp fiber filling layer 210. After that, heat shrinkable sleeves 212 are wrapped around the outer surfaces of the upstream and downstream seepage-proof inner lining sleeves 202 and 203, so that the upstream and downstream seepage-proof inner lining sleeves 202 and 203 are tightly fitted to the upstream drainage pipe 106 and downstream drainage pipe 107 inside them, respectively. Then, air intake and exhaust vertical pipes 103 are installed on the inner wall of the well shaft 102 and the hole wall of the central through hole, and valves 104 are installed on the air intake and exhaust vertical pipes 103. Then, the bottom end of the air intake and exhaust vertical pipe 103 is sealed and connected to the air intake and exhaust longitudinal pipe 105, ensuring that both ends of the air intake and exhaust horizontal pipe 105 are sealed and connected to the two inflatable intercepting bags 204, respectively.

[0024] After being put into use, if it is necessary to dry-treat and seal the upstream drainage pipe 106 and the downstream drainage pipe 107, open valve 104 and use a blower to blow air into the two inflatable intercepting bags 204 through the inlet and outlet vertical pipe 103 and the inlet and outlet longitudinal pipe 105 to make them inflate until the two inflatable intercepting bags 204 are fully fitted together. Then close valve 104 to stop the water flow. When it is necessary to unseal, open valve 104 to release the air in the two inflatable intercepting bags 204, and the two inflatable intercepting bags 204 can be restored to their original state to allow the water to flow normally through the upstream drainage pipe 106 and the downstream drainage pipe 107.

[0025] During construction or maintenance, if workers need to enter the square well body 101, they can use a telescopic ladder to enter.

[0026] As attached Figure 1 As shown, the well body is a prefabricated drainage inspection well.

[0027] As attached Figure 1 As shown, the top of the well shaft 102 is covered with a well cover 109.

[0028] The inlet and exhaust vertical pipe 103 is fixed to the inner side wall of the well shaft 102 and the hole wall of the central through hole by a clamp.

[0029] The rubber sealing ring 209 is a water-swelling rubber sealing ring.

[0030] In the implementation process, the pitch felt filler layer 210 can be replaced by 1:2 micro-expansion cement mortar.

[0031] In the description of the present application, it should be understood that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation of the present application.

[0032] Although embodiments of the present application have been shown and described, it will be understood by those having ordinary skill in the art that various changes, modifications, substitutions and alterations can be made hereto without departing from the principles and spirit of the present application, and the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A high-adaptability anti-seepage intercepting integrated drainage inspection well, characterized in that: The well body part comprises a square well body (101), a top wall of the square well body (101) is provided with a central through hole, an upper end hole edge of the central through hole is extended and provided with a well shaft (102), an inner side wall of the well shaft (102) and a hole wall of the central through hole are vertically provided with an air inlet and exhaust vertical pipe (103), a top end of the air inlet and exhaust vertical pipe (103) is provided with a valve (104), a bottom end of the air inlet and exhaust vertical pipe (103) is sealingly communicated with an air inlet and exhaust vertical pipe (105); a plurality of hooks are vertically and fixedly arranged on an inner side wall of the square well body (101), an upstream pipeline connecting port is arranged on a bottom of a left side wall of the square well body (101), a downstream pipeline connecting port is arranged on a bottom of a right side wall of the square well body (101); an upstream drainage pipeline (106) is arranged in the upstream pipeline connecting port, a downstream drainage pipeline (107) is arranged in the downstream pipeline connecting port; a left-high-right-low concrete cushion layer (108) is cast on an inner bottom wall of the square well body (101); ​ The anti-seepage integrated lining comprises a well body anti-seepage lining (201), an upstream anti-seepage lining sleeve (202) in communication with the left side wall of the well body anti-seepage lining (201), and a downstream anti-seepage lining sleeve (203) in communication with the right side wall of the well body anti-seepage lining (201).

2. The high-adaptive anti-seepage and intercepting integrated drainage inspection well according to claim 1, characterized in that: The well body part is a prefabricated drainage inspection well.

3. The high-adaptive anti-seepage and intercepting integrated drainage inspection well according to claim 1, characterized in that: The top end of the well shaft (102) is provided with a well cover (109).

4. The high-adaptive anti-seepage and intercepting integrated drainage inspection well according to claim 1, characterized in that: The air inlet and outlet vertical pipe (103) is fixed to the inner side wall of the well shaft (102) and the hole wall of the center through hole through a clamp.

5. The high-adaptive anti-seepage and intercepting integrated drainage inspection well according to claim 1, characterized in that: The rubber sealing ring (209) is a water-swelling rubber sealing ring. The well body part is a prefabricated drainage inspection well. The top end of the well shaft (102) is provided with a well cover (109). The air inlet and outlet vertical pipe (103) is fixed to the inner side wall of the well shaft (102) and the hole wall of the center through hole through a clamp. The rubber sealing ring (209) is a water-swelling rubber sealing ring.

Citation Information

Patent Citations

  • A inside lining well structure for bilge well prevention of seepage

    CN206591621U

  • Urban operation sewage pipeline additionally provided with rubber lining

    CN212251523U