Construction methods for reinforcing old dikes in lake areas based on dispersed soil materials

By installing anti-seepage walls, reinforcing the top, and installing toothed retaining walls and composite geomembrane cushions in the old dikes of the dispersed soil lake area, the problem of insufficient anti-seepage performance of the old dikes in the dispersed soil lake area was solved, and the safety and functionality of the dikes were improved.

CN117127552BActive Publication Date: 2026-11-10NANJING WATER CONSERVANCY CONSTR ENG CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202311131753.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-04
Publication Date
2026-11-10
Estimated Expiration
2043-09-04

AI Technical Summary

Technical Problem

The old dikes in the scattered soil lake area have become severely inadequate in terms of seepage prevention after experiencing wind, waves and tides, failing to meet the needs of flood control and production, and posing safety hazards.

Method used

In the old dike, seepage prevention walls were installed, the top of the silty loam dam was reinforced, toothed embankments were installed, and composite geomembrane cushion layers and riprap protective layers were set up. Mixing piles were used to form continuous walls to improve seepage prevention performance.

Benefits of technology

It effectively improved the overall seepage prevention performance of the dike, reduced the seepage flow and the height of the phreatic line, solved the safety hazards of the dike, and ensured the continuous fulfillment of its operational functions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117127552B_ABST
    Figure CN117127552B_ABST
Patent Text Reader

Abstract

This invention provides a construction method for reinforcing old dikes in lake areas based on dispersed soil materials. The method includes: S1, setting up a seepage barrier wall; S2, reinforcing the top of the original silty loam dam body; S3, setting up a toothed embankment; and S4, setting up protection for the lake-facing dike slope. Utilizing the water-blocking properties of the mixing pile seepage barrier wall and the erosion resistance and shear strength of the cohesive soil, a seepage barrier curtain is set up along the central axis of the old dike, while simultaneously covering it with a certain thickness of clay to reduce the seepage flow and phreatic line height. At the same time, the slope protection utilizes riprap for weighting and a composite geomembrane cushion layer for drainage, solving the problem of sliding damage on the water-facing slope. Thus, the seepage resistance of the dike body is improved without the complete demolition and reconstruction of the dike, allowing it to continue to meet operational functions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of old dike reinforcement, and in particular to a construction method for reinforcing old dikes in lake areas based on dispersed soil materials. Background Technology

[0002] According to Article 7.2.1 of the "Code for Design of Dike Engineering" (GB 50286-2013), the soil material for homogeneous earth dikes should preferably be cohesive soil with a clay content of 10% to 35% and a plasticity index of 7 to 20. Special soil materials such as silt, clay with natural moisture content that does not meet the requirements or excessive clay content, miscellaneous fill, frozen soil blocks, expansive soil with poor water stability, and dispersible soil are strictly prohibited from use.

[0003] In some scattered soil-rich lake areas, dike filling mainly relies on hydraulic erosion to form mud and sand fill. The fill material is primarily heavy and medium silty sandy loam, with a clay content ranging from 5.2% to 11.8% and a plasticity index ranging from 4.5 to 9.9, classifying it as non-cohesive soil, which does not meet the requirements of the "Code for Design of Dike Engineering" (SL50286-2013). Furthermore, after decades of resisting wind, waves, and tides, the overall seepage prevention performance of these old dikes is far from meeting the requirements for flood control, protection of residents, and industrial and agricultural production, posing serious safety hazards. Therefore, a reinforcement construction method for old dikes in scattered soil-rich lake areas is proposed to address these issues. Summary of the Invention

[0004] The main objective of this invention is to provide a construction method for reinforcing old dikes in lake areas based on dispersed soil materials, which can overcome the problem of high permeability of old dikes using dispersed soil materials and effectively improve the overall seepage prevention performance of the dikes.

[0005] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is: a construction method for reinforcing old dikes in lake areas based on dispersed soil materials, the method comprising: S1. Install a seepage barrier wall by implanting a seepage barrier wall from the top of the original silty loam dam body; S2. Reinforcement of the top of the original silty loam dam body: Remove the top of the original silty loam dam body and then replace it with cohesive soil to the design height. S3. Set up toothed sills, excavate an installation trench on the lake side of the top cohesive soil, and set up toothed sills in the installation trench. After setting up, backfill the lake side cohesive soil, and then compact the top cohesive soil and the lake side cohesive soil. S4. Set up a lake-facing embankment slope protection, install a composite geomembrane cushion layer on the lake-facing embankment slope, and install a riprap protection layer on the composite geomembrane cushion layer.

[0006] In the preferred embodiment, the seepage barrier wall in step S1 is formed by continuous overlapping of mixing piles.

[0007] In the preferred embodiment, the seepage barrier wall is constructed using a three-head small-diameter deep mixing pile construction machine. The construction process involves two spraying and two mixing operations, forming the wall in one step. Specifically, the mixing system prepares and mixes cement slurry according to the determined water-cement ratio. The prepared cement slurry is then pumped to the mixing and storage tank using a mud pump. The pile driver is positioned and leveled, and then started. When the bottom of the drill bit is at the same elevation as the road surface at the top of the dam, the mixing and sinking process is initiated while the slurry pump delivers slurry. The deep mixing recorder records the drilling depth until the designed depth is reached. Then, the drill bit is raised while slurry is sprayed and mixed until the top of the dam. The deep mixing recorder records the amount of slurry delivered. The slurry pump is then turned off, and the main unit moves along the predetermined direction to repeat the above construction procedure to complete the next hole sequence. This process is repeated continuously until the project is completed, mixing the foundation soil and cement into a uniform underground continuous wall.

[0008] In the preferred embodiment, the mixing pile has a diameter of 0.39m and a length of 6-12m. The piles are continuously overlapped to form a wall, with the thinnest part of the wall thickness not less than 0.22m. The curing agent is 42.5 grade ordinary Portland cement, with a mass ratio of 15%. The water-cement ratio is not less than 1.2, and the permeability coefficient of the wall panel is less than A×10-6cm / s, where 1≤A<5.

[0009] In the preferred embodiment, in step S2, the top of the original silty loam dam body is removed by a backhoe excavator, with a removal height of 1 to 1.5 m.

[0010] In the preferred embodiment, the toothed sill in step S3 has a width of 0.6m and a burial depth of 0.8m, and the excavation depth of the installation trench is 0.8 to 1.5m.

[0011] In the preferred embodiment, the toothed sill includes a toothed sill body disposed at the front end, a connecting plate disposed at the back of the toothed sill body, and a horizontal anchor block disposed on the other side of the connecting plate. The lower front side of the toothed sill body is a slope, wherein the toothed sill body, the connecting plate and the horizontal anchor block are integrally formed by cast-in-place reinforced concrete.

[0012] In the preferred embodiment, the bottom of the toothed dam body is fixed with a vertical anchoring structure pre-embedded in the original silty loam dam body. The vertical anchoring structure includes a hollow anchor body pre-embedded in the original silty loam dam body and a hollow connecting plate set on the top of the hollow anchor body and connected to it. The top of the hollow connecting plate is open. The hollow anchor body and the hollow connecting plate are integrally formed reinforced concrete structures. The vertical bars in the hollow connecting plate extend to its top and are bent into connecting elbows.

[0013] In the preferred embodiment, the construction method of the vertical anchoring structure is as follows: After removing the top of the original silty loam dam body, a hollow anchor body pre-embedded groove is excavated below the preset position of the toothed sill body, and the hollow anchor body is pre-embedded in it. Then, the pre-embedded groove is backfilled. When backfilling the top cohesive soil, the top opening of the hollow connecting plate is sealed with a sealing plate. When excavating the installation groove, the top of the hollow connecting plate and the connecting elbow are dug out, the sealing plate is opened, and the connecting elbow is hooked to the steel reinforcement of the toothed sill body. When pouring the toothed sill body, the concrete enters the cavity of the hollow connecting plate and the hollow anchor body to form a vertical anchoring structure.

[0014] In the preferred embodiment, the composite geomembrane in step S4 consists of two layers of geotextile and one layer of geomembrane, with the middle membrane being 0.4 mm thick, the membrane and the geotextile on both sides being greater than 15 kN / m, and the riprap protective layer being 0.6 m thick.

[0015] This invention provides a construction method for reinforcing old dikes in lake areas based on dispersed soil materials. By utilizing the water-blocking properties of mixing piles and the erosion resistance and shear strength of cohesive soil materials, a seepage-proof curtain is set up along the central axis of the old dike. At the same time, a certain thickness of clay is wrapped around it to reduce the seepage flow and the height of the phreatic line of the dike. Meanwhile, the slope protection is reinforced with riprap and the composite geomembrane cushion layer is used to filter the soil and drain the water, thus solving the problem of sliding damage on the water-facing slope. Therefore, the seepage prevention of the dike body is improved without the premise of complete demolition and reconstruction, and the dike can continue to meet the operational functions. Attached Figure Description

[0016] The present invention will be further described below with reference to the accompanying drawings and embodiments: Figure 1 This is a cross-sectional structural diagram of the reinforcement structure of this invention; Figure 2 This is a structural diagram showing the connection between the toothed retainer and the vertical anchoring structure of the present invention; Figure 3 This is a cross-sectional view of the vertical anchoring structure of the present invention; In the diagram: 1. Original silty loam dam body; 2. Anti-seepage wall; 3. Top cohesive soil; 4. Toothed embankment; 401. Toothed embankment body; 402. Horizontal anchor block; 403. Connecting plate; 5. Lake area side cohesive soil; 6. Composite geomembrane cushion layer; 7. Rockfill protective layer; 8. Vertical anchoring structure; 801. Hollow anchor body; 802. Hollow connecting plate; 803. Connecting elbow. Detailed Implementation

[0017] Example 1 like Figure 1 As shown, a construction method for reinforcing old dikes in lake areas based on dispersed soil materials is described. This method includes: S1. Install a seepage barrier wall. A seepage barrier wall 2 is formed by continuously overlapping mixing piles from the top of the original silty loam dam body 1. The seepage barrier wall 2 is constructed using a three-head small-diameter deep mixing pile construction machine. The excavation and mixing device is mounted on the three vertical column guide rods on the walking or tracked moving pile machine. Multiple excavation and mixing shafts transmit the rotation power to the excavation head below. At the same time, through slurry delivery, air delivery, excavation and mixing, three-dimensional operation and tracking monitoring, the foundation soil and cement are mixed and stirred into a uniform underground continuous wall in the original position. S2. Reinforce the top of the original silty loam dam body 1. Remove 1 to 1.5m of the top of the original silty loam dam body 1 using a backhoe excavator, and then replace it with cohesive soil 3 layer by layer until the design height is reached. S3. Set up toothed sills 4 to resist the impact of water flow. Excavate an installation trench on the lake side of the top cohesive soil 3, with an excavation depth of 0.8 to 1.5m. Set up toothed sills 4 in the installation trench. The toothed sills 4 are 0.6m wide and buried at a depth of 0.8m. After setting up, backfill the lake side cohesive soil 5. Then, compact the top cohesive soil 3 and the lake side cohesive soil 5 to prevent water flow erosion. S4. Set up a lake-facing embankment slope protection. Set up a composite geomembrane cushion layer 6 on the lake-facing embankment slope. The composite geomembrane consists of two layers of fabric and one layer of geomembrane. The thickness of the middle membrane is 0.4 mm. The thickness of the membrane and the geotextile on both sides is greater than 15 kN / m. Set up a riprap protection layer 7 on the composite geomembrane cushion layer 6. The thickness of the riprap is 0.6 m.

[0018] In the preferred embodiment, the seepage barrier 2 is constructed using a three-head small-diameter deep mixing pile construction machine. The construction process involves two spraying and two mixing operations, resulting in one-time wall formation. The specific construction method is as follows: 1. The mixing system prepares and mixes cement slurry according to the determined water-cement ratio, and uses a mud pump to transport the mixed cement slurry to the mixing and storage tank. 2. Position and level the piling machine; 3. When the pile driver is started and the bottom of the drill bit is at the same elevation as the road surface on the top of the dam, the mixing sinks while the grout pump delivers grout and the deep mixing recorder records the drilling depth until the designed depth is reached. 4. Then raise the drill bit and simultaneously spray grout and mix until the top of the dam. The deep mixing recorder records the grout delivery volume. Turn off the grout pump and move the main unit along the predetermined direction. Repeat the above construction procedure to complete the next hole sequence. Continue this operation until the project is completed, and mix the foundation soil and cement to form a uniform underground continuous wall.

[0019] In this embodiment, the construction uses an SP-5 type dual-power high-torque three-drill-bit pile driver. The displacement length in one operation is 0.96m, so the length of the wall unit is 0.96m.

[0020] In the preferred embodiment, the mixing pile has a diameter of 0.39m and a length of 6-12m. The piles are continuously overlapped to form a wall, with the thinnest part of the wall thickness not less than 0.22m. The curing agent is 42.5 grade ordinary Portland cement, with a mass ratio of 15%. The water-cement ratio is not less than 1.2, and the permeability coefficient of the wall panel is less than A×10-6cm / s1≤A<5.

[0021] Example 2 Further explanation in conjunction with Example 1, such as Figure 2-3 The structure shown includes a toothed ledge 4 with a toothed ledge body 401 at the front end, a connecting plate 403 on the back of the toothed ledge body 401, and a horizontal anchor block 402 on the other side of the connecting plate 403. The lower front side of the toothed ledge body 401 is a slope to increase the contact surface with the cohesive soil 5 on the lake side. The toothed ledge body 401, the connecting plate 403 and the horizontal anchor block 402 are integrally formed by cast-in-place reinforced concrete.

[0022] The bottom of the toothed dam body 401 is fixed with a vertical anchoring structure 8 pre-embedded in the original silty loam dam body 1. The vertical anchoring structure 8 includes a hollow anchor body 801 pre-embedded in the original silty loam dam body 1, and a hollow connecting plate 802 set on the top of the hollow anchor body 801 and connected to it. The top of the hollow connecting plate 802 is open. The hollow anchor body 801 and the hollow connecting plate 802 are integrally formed reinforced concrete structures. The vertical bars in the hollow connecting plate 802 extend to its top and are bent into connecting elbows 803.

[0023] The construction method of the vertical anchoring structure 8 is as follows: 1. After removing the top of the original silty loam dam body 1, excavate the hollow anchor body 801 pre-embedded groove below the preset position of the toothed sill body 401, pre-embed the hollow anchor body 801 in it, and then backfill the pre-embedded groove. 2. When backfilling the top cohesive soil 3, use a sealing plate to seal the top opening of the hollow connecting plate 802; 3. When excavating the installation trench, the top of the hollow connecting plate 802 and the connecting elbow 803 are dug out, the sealing plate is opened, and the connecting elbow 803 is hooked to the steel bars of the toothed frame body 401. When pouring the toothed frame body 401, the concrete enters the cavity of the hollow connecting plate 802 and the hollow anchor body 801 to form a vertical anchoring structure.

[0024] This utilizes the horizontal anchoring block 402 and the vertical anchoring structure 8 to form a vertical anchoring force, thereby improving the stability of the toothed sill 4.

[0025] The above embodiments are merely preferred technical solutions of the present invention and should not be considered as limitations on the present invention. The scope of protection of the present invention should be limited to the technical solutions described in the claims, including equivalent substitutions of the technical features described in the claims. That is, equivalent substitutions and improvements within this scope are also within the scope of protection of the present invention.

Claims

1. A construction method for reinforcing old dikes in lake areas based on dispersed soil materials, characterized by: The construction method includes: S1. Install a seepage barrier wall and implant a seepage barrier wall (2) from the top of the original silty loam dam body (1). S2. Reinforce the top of the original silty loam dam body (1). Remove the top of the original silty loam dam body (1) and then replace it with cohesive soil (3) to the design height. S3. Set up a toothed sill (4). Excavate an installation trench on the lake side of the top cohesive soil (3) and set up the toothed sill (4) in the installation trench. After setting up, backfill the lake side cohesive soil (5). Then, compact the top cohesive soil (3) and the lake side cohesive soil (5). The toothed sill (4) includes a toothed sill body (401) set at the front end, a connecting plate (403) set on the back of the toothed sill body (401), and a horizontal anchor block (403) set on the other side of the connecting plate (403). 2) The bottom of the toothed dam body (401) is fixed with a vertical anchoring structure (8) pre-embedded in the original silty loam dam body (1). The vertical anchoring structure (8) includes a hollow anchor body (801) pre-embedded in the original silty loam dam body (1) and a hollow connecting plate (802) set on the top of the hollow anchor body (801) and connected to the hollow anchor body (801). The top of the hollow connecting plate (802) is open. The hollow anchor body (801) and the hollow connecting plate (802) are The integrally formed reinforced concrete structure has vertical bars in the hollow connecting plate (802) extending to the top of the hollow connecting plate (802) and bent into connecting elbows (803). The construction method of the vertical anchoring structure (8) is as follows: after removing the top of the original silty loam dam body (1), excavate the hollow anchor body (801) pre-embedded groove below the preset position of the toothed sill body (401), pre-embed the hollow anchor body (801) in it, and then backfill the pre-embedded groove. When backfilling the top cohesive soil (3), use The sealing plate seals the top opening of the hollow connecting plate (802). When excavating the installation trench, the top of the hollow connecting plate (802) and the connecting elbow (803) are dug out. The sealing plate is opened, and the connecting elbow (803) is hooked to the steel bars of the toothed sill body (401). When the toothed sill body (401) is poured, the concrete enters the cavity of the hollow connecting plate (802) and the hollow anchor body (801) to form a vertical anchoring structure in which the toothed sill (4) is anchored to the original silty loam dam body (1). S4. Set up a lake-facing embankment slope protection, set up a composite geomembrane cushion layer (6) on the lake-facing embankment slope, and set up a riprap protection layer (7) on the composite geomembrane cushion layer (6).

2. The method for reinforcing old dikes in lake areas based on dispersed soil materials according to claim 1, characterized in that: The seepage-proof wall (2) in step S1 is formed by continuous overlapping of mixing piles; The mixing piles have a diameter of 0.39m and a length of 6-12m. The piles are continuously overlapped to form a wall. The wall thickness at the thinnest point is not less than 0.22m. The curing agent is 42.5 grade ordinary Portland cement with a water-cement ratio of not less than 1.

2. The wall permeability coefficient is less than A×10-6cm / s, where 1≤A<5.

3. The method for reinforcing old dikes in lake areas based on dispersed soil materials according to claim 2, characterized in that: The seepage barrier wall (2) is constructed using a three-head small-diameter deep mixing pile construction machine. The construction process is two spraying and two mixing, and one-time wall formation. The specific construction method is as follows: the mixing system prepares and mixes cement slurry according to the determined water-cement ratio, and uses a mud pump to transport the mixed cement slurry to the mixing storage tank. The pile driver is positioned and leveled, and the pile driver is started. When the bottom of the drill bit is at the same elevation as the road surface at the top of the dam, the mixing sinks while the slurry pump delivers slurry, and the deep mixing recorder records the drilling depth until the design depth is reached. Then the drill bit is lifted, and slurry is sprayed and mixed until the top of the dam. The deep mixing recorder records the amount of slurry delivered. The slurry pump is turned off, and the main unit moves along the predetermined direction to start repeating the construction to complete the next hole sequence. This continuous operation continues until the project is completed, and the foundation soil and cement are mixed and stirred into a uniform underground continuous wall.

4. The method for reinforcing old dikes in lake areas based on dispersed soil materials according to claim 1, characterized in that: In step S2, the top of the original silty loam dam body (1) is removed by a backhoe excavator, with a removal height of 1 to 1.5 m.

5. The method for reinforcing old dikes in lake areas based on dispersed soil materials according to claim 1, characterized in that: The lower front side of the toothed sill body (401) is a slope, and the toothed sill body (401), the connecting plate (403) and the horizontal anchor block (402) are integrally formed by cast-in-place reinforced concrete.

6. The construction method for reinforcing old dikes in lake areas based on dispersed soil materials according to claim 1, characterized in that: In step S4, the composite geomembrane cushion layer (6) consists of two layers of fabric and one layer of membrane, with the middle membrane being 0.4 mm thick, and the riprap protection layer (7) having a riprap thickness of 0.6 m.

Citation Information

Patent Citations

  • Multi-stage reinforced soil retaining wall structure and construction method

    CN114016544A

  • Cofferdam reinforcement construction method under overwater island building environment

    CN115874647A

  • Earth and rockfill dam danger removing and reinforcing anti-seepage treatment structure

    CN218405316U