A cast-in-place bored pile construction system and method
By detecting and breaking the anchor bolt location, and using a slag suction device, along with mud replacement and magnetic attraction, to clean up the anchor bolt debris, the problems of unclear anchor bolt location and debris affecting the quality of hole formation were solved, thus achieving efficient bored pile construction.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CITIC CONSTR
- Filing Date
- 2023-08-31
- Publication Date
- 2026-06-23
AI Technical Summary
In the construction of bored piles, the location of unremoved anchor rods is unclear, and the anchor rod debris is difficult to clean, which leads to accelerated wear of the drill bit and damage to the hole wall, affecting the quality of the hole formation.
The anchor bolt location is determined by a detection device, the anchor bolt is broken by a pile driver, and the anchor bolt debris is cleaned up by a slag suction device. The cleaning efficiency is improved by combining mud replacement and magnetic suction.
Accurately determine the location of the anchor bolts and promptly clean up any debris to prevent drill bit wear and hole wall damage, thus ensuring the quality of the borehole.
Smart Images

Figure CN117127592B_ABST