Calculation method and system for various evaluation indicators of armored equipment support effectiveness
By obtaining the status data of armored equipment and sampling, defining and calculating a model of multiple evaluation indicators, it solves the problem of single and poor effectiveness of existing armored equipment evaluation methods, improves the accuracy and adaptability of evaluation, and enhances the performance of armored equipment. Ensure effectiveness evaluation capabilities.
Patent Information
- Application Number
- CN202311358084.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-19
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2043-10-19
AI Technical Summary
The existing armored equipment's support effectiveness evaluation method is single and the evaluation effect is poor. It is difficult to adapt to the needs of modern wartime and affects combat effectiveness and safety.
By obtaining all status data of armored equipment during the support effectiveness simulation cycle, sampling at fixed time intervals, defining multiple evaluation indicators and establishing corresponding calculation models, calculating the index values of various evaluation indicators, including combat readiness rate and repair rate. , detection and maintenance task success rate, occupancy rate, rescue and repair task success rate and energy supply vehicle task success rate.
It improves the accuracy and comprehensiveness of armored equipment support effectiveness assessment, can better adapt to modern wartime needs, and enhances the armored equipment's support effectiveness assessment capability.
Smart Images

Figure CN117236783B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of armored equipment support effectiveness evaluation, and more specifically, to a method and system for calculating various evaluation indicators of armored equipment support effectiveness. Background Art
[0002] The armored equipment support effectiveness evaluation method is a supporting method for comprehensive evaluation of armored equipment operational support. If the armored equipment support effectiveness cannot keep up with the needs of modern warfare, it will affect the generation of combat effectiveness at the least, and will miss opportunities and even lead to more serious consequences at the worst. Therefore, the armored equipment support effectiveness evaluation method is also more comprehensive. In order to have a clear understanding of the task completion of the equipment support system, it is imperative to evaluate the equipment support.
[0003] The existing methods for evaluating the support effectiveness of armored equipment have certain drawbacks when used. The evaluation of armored equipment is relatively simple, the evaluation effect is poor, and the accuracy of the evaluation cannot be greatly improved. Traditional evaluation methods are difficult to adapt to modern wartime needs, are not conducive to people's use, and have brought certain adverse effects to people's use process. Therefore, we propose a method for calculating various evaluation indicators for the support effectiveness of armored equipment. Summary of the invention
[0004] In order to solve at least one of the problems described in the above background technology, the present invention provides a method and system for calculating various evaluation indicators for armored equipment support effectiveness.
[0005] According to one aspect of the present invention, a method for calculating various evaluation indicators for armored equipment support effectiveness is provided, comprising:
[0006] Obtain all status data of armored equipment during the support effectiveness simulation cycle, including the status of support teams, main station equipment, various support equipment, and devices;
[0007] According to customer needs, all status data are sampled at fixed time intervals to obtain sampled data for evaluation;
[0008] Define multiple evaluation indicators for armored equipment support effectiveness, including combat readiness rate of main combat equipment, repair rate of wartime support equipment, success rate of inspection and maintenance tasks under current technical support conditions, occupancy rate of inspection and maintenance equipment, success rate of rescue and repair tasks, success rate of energy supply vehicle tasks, and completion rate of inspection and maintenance tasks under combat conditions;
[0009] Determine the indicator calculation model for each evaluation indicator, and calculate the indicator value of each evaluation indicator based on the indicator calculation model and sampling data.
[0010] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0011] Determine the first indicator calculation model of the combat readiness rate of the main combat equipment, where the expression of the first indicator calculation model is:
[0012]
[0013] According to the first indicator calculation model and sampling data, the indicator value of the combat readiness rate of a certain type of main combat equipment under a certain organization is determined.
[0014] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0015] The second indicator calculation model for determining the repair rate of wartime support equipment, where the expression of the second indicator calculation model is:
[0016]
[0017] Based on the second indicator calculation model and sampling data, the indicator value of the repair rate of wartime support equipment is determined.
[0018] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0019] Determine the third indicator calculation model of the success rate of the inspection and maintenance tasks under the current technical support conditions, where the expression of the third indicator calculation model is:
[0020]
[0021] According to the third indicator calculation model and sampling data, the indicator value of the success rate of the inspection and maintenance tasks under the current technical support conditions is determined.
[0022] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0023] A fourth indicator calculation model for determining the occupancy rate of the detection and maintenance equipment is expressed as follows:
[0024]
[0025] According to the fourth indicator calculation model and the sampling data, an indicator value of the occupancy rate of the inspection and maintenance equipment is determined.
[0026] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0027] The fifth indicator calculation model for determining the success rate of the rescue and repair mission is expressed as follows:
[0028]
[0029] According to the fifth indicator calculation model and sampling data, the indicator value of the success rate of the rescue and repair mission is determined.
[0030] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0031] The sixth indicator calculation model for determining the success rate of the energy supply vehicle mission is expressed as follows:
[0032]
[0033] According to the sixth indicator calculation model and sampling data, the indicator value of the energy supply vehicle mission success rate is determined.
[0034] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0035] The seventh indicator calculation model for determining the completion rate of inspection and maintenance tasks under combat conditions is expressed as follows:
[0036]
[0037] Based on the seventh indicator calculation model and sampling data, determine the indicator value of the inspection and maintenance task completion rate under combat conditions.
[0038] According to another aspect of the present invention, a system for calculating various evaluation indicators for armored equipment support effectiveness is provided, comprising:
[0039] The data acquisition module is used to obtain all status data of the armored equipment during the support effectiveness simulation cycle, where all status data includes the status of the support unit, main station equipment, various support equipment, and equipment;
[0040] The data sampling module is used to sample all status data at fixed time intervals according to customer needs to obtain sampled data for evaluation;
[0041] Evaluation index definition module, used to define multiple evaluation indicators of armored equipment support effectiveness, including combat readiness rate of main combat equipment, repair rate of wartime support equipment, success rate of inspection and maintenance tasks under current technical support conditions, occupancy rate of inspection and maintenance equipment, success rate of rescue and repair tasks, success rate of energy supply vehicle tasks, and completion rate of inspection and maintenance tasks under combat conditions;
[0042] The indicator calculation module is used to determine the indicator calculation model of each evaluation indicator, and calculate the indicator value of each evaluation indicator according to the indicator calculation model and sampling data.
[0043] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the storage medium stores a computer program, and the computer program is used to execute the method described in any one of the above aspects of the present invention.
[0044] According to another aspect of the present invention, an electronic device is provided, comprising: a processor; a memory for storing instructions executable by the processor; the processor is configured to read the executable instructions from the memory and execute the instructions to implement the method described in any one of the above aspects of the present invention.
[0045] The present invention first obtains all status data of armored equipment within a support efficiency simulation cycle, and then samples all status data at fixed time intervals according to customer needs. Secondly, the support efficiency of the armored equipment is evaluated in terms of combat readiness rate, repair rate, detection and maintenance task success rate, occupancy rate, rescue and repair task success rate, energy supply vehicle task success rate and other aspects. The calculation method of various evaluation indicators of the armored equipment is modeled respectively. Finally, the corresponding indicator calculation model and the extracted sampling data are used to calculate the indicator value of each evaluation indicator, so as to facilitate and better obtain data with higher accuracy, and can effectively solve the problems in the background technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:
[0047] Figure 1 It is a flowchart of a method for calculating various evaluation indicators of armored equipment support effectiveness provided by an exemplary embodiment of the present invention;
[0048] Figure 2 is a schematic diagram of a data sampling process provided by an exemplary embodiment of the present invention;
[0049] Figure 3 It is a schematic diagram of the structure of a system for calculating various evaluation indicators of armored equipment support effectiveness provided by an exemplary embodiment of the present invention;
[0050] Figure 4 This is a structure of an electronic device provided by an exemplary embodiment of the present invention. DETAILED DESCRIPTION
[0051] Below, the exemplary embodiments according to the present invention will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments of the present invention, and it should be understood that the present invention is not limited to the exemplary embodiments described here.
[0052] It should be noted that the relative arrangement of components and steps, the numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.
[0053] The purpose of the present invention is to provide a more convenient method, summarize the commonly used external interface implementation methods, integrate the external interfaces of various functions into the same system, and unify the calling methods. In the process of realizing the interface function, after configuring the relevant information of the interface in the system of the integrated interface, the developer does not need to care about the calling method of each interface, but only needs to care about the implementation of business functions other than the interface function, decoupling the interface implementation part into a separate functional system, which is conducive to the later maintenance of the project.
[0054] Figure 1 The figure shows a flow chart of the method for calculating various evaluation indicators of armored equipment support effectiveness provided by the present invention. Figure 1 As shown in the figure, the calculation methods of various evaluation indicators for armored equipment support effectiveness include:
[0055] Step S101: Acquire all status data of armored equipment in the support effectiveness simulation cycle, wherein all status data include the status of the support team, main station equipment, various support equipment, and devices;
[0056] In the embodiment of the present invention, according to the characteristics of the army armored equipment support business, under the traction of the equipment combat mission and the constraints of the support system, in order to achieve the goals of analyzing the armored equipment support business and evaluating the equipment support efficiency, the core processing flow of the armored equipment support simulation is divided into four links. The four links of the core processing flow are specifically described as follows:
[0057] (1) Equipment mission mobilization: First, establish an equipment mission model, that is, a specific training mission / combat mission; by decomposing the mission, determine the equipment requirements for the mission, and according to the principle of equipment scheduling, determine the equipment to be deployed for mission execution, thereby driving the corresponding equipment support activities;
[0058] (2) Equipment maintenance and repair: Simulate the activities under the equipment mission, including the mission profile and the working time of each equipment. According to its established workflow, simulate the implementation of various mission activities. At the same time, accumulate the equipment wear and tear, so as to randomly generate its possible failures according to the reliability index, and drive the corresponding maintenance activities.
[0059] (3) Support analysis and evaluation: Statistical analysis and evaluation of the data recorded during the calculation process. These data include the status of the support team, equipment, various support equipment, and materials during the entire process, so that various time and utilization indicators can be statistically calculated, and in-depth correlation analysis can be performed.
[0060] Step S102: according to customer requirements, all status data are sampled at fixed time intervals to obtain sampled data for evaluation;
[0061] In the embodiment of the present invention, after the simulation is completed and before the indicator evaluation is performed, data sampling for evaluation is required. The sampled data is the sample space data used for indicator calculation and evaluation. Among them, the total sample volume is all the states experienced by each equipment in the simulation cycle after the end of a simulation, which are summarized and analyzed at the minute-level time granularity. When sampling, sampling is performed at fixed time intervals according to customer needs to generate the sample space for evaluation. The sample attributes are mainly the equipment status data and time point data.
[0062] like Figure 2 As shown, the main sampling steps are as follows:
[0063] 1. Composition of the total sample
[0064] The composition of the total sample volume is mainly generated during the deduction process and processed according to the following relationship:
[0065] Organizational structure - Equipment category - Equipment number - Time attribute - Status data
[0066] That is, at each time node, a piece of data about a specific device will be generated. The total number of samples is the simulation period T (hours) * 60 samples.
[0067] (II) Sampling interval generation
[0068] During the evaluation, the state sampling is performed at a fixed time interval t. That is, part of the data is extracted as the evaluation data. Different sampling intervals will generate different sample spaces. Theoretically, the state is most accurate when the time granularity is the largest. However, in order to improve the evaluation efficiency, a certain sampling interval is usually set. For a simulation cycle such as a 1-year training task, the total amount of data generated will be very large, reaching the number of equipment * 5250000 data, and the evaluation time will be greatly reduced. And a large amount of state data is equipment idle.
[0069] (III) Sampling data summary
[0070] The collected data will be written into the sample space, and the data format of the sample space still uses the following structure:
[0071] Organizational structure - Equipment category - Equipment number - Time attribute - Status data
[0072] as input for evaluation.
[0073] Each time sampling is performed, a sample space is generated.
[0074] Step S103: define multiple evaluation indicators of armored equipment support effectiveness, wherein the multiple evaluation indicators include the combat readiness rate of main combat equipment, the repair rate of wartime support equipment, the success rate of inspection and maintenance tasks under current technical support conditions, the occupancy rate of inspection and maintenance equipment, the success rate of rescue and repair tasks, the success rate of energy supply vehicle tasks, and the completion rate of inspection and maintenance tasks under combat conditions.
[0075] In the embodiment of the present invention, the typical combat style of the army (position attack) is used as the background to construct the combat mission process (including maneuver, assembly, assault and other processes) of various types of main combat equipment (main battle tanks, infantry fighting vehicles, self-propelled artillery, etc.) of the synthetic brigade, and the battle damage (light damage, medium damage, heavy damage) events of the main combat equipment during the combat process are used as the task requirements of wartime support equipment to construct a reasonable evaluation index system. This case includes six types of support equipment: rescue and repair vehicles, electromechanical inspection and maintenance vehicles, disassembly and repair vehicles, comprehensive maintenance vehicles, power supply vehicles, and gas source vehicles. Four types of wartime technical support tasks: rescue and repair tasks, inspection and maintenance tasks, energy replenishment tasks, and maintenance tasks.
[0076] For armored equipment, it is planned to construct the following parameter system to evaluate the support effectiveness of armored equipment.
[0077] Table 1 Parameter system for evaluating technical support effectiveness
[0078]
[0079]
[0080] Step S104: determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampling data.
[0081] In the embodiment of the present invention, a simulation method based on discrete events is adopted. Based on statistical principles, the support efficiency index of the support equipment is finally obtained through sampling calculation of the simulation data, providing effective support for the support equipment configuration of the synthetic brigade.
[0082] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0083] Determine the first indicator calculation model of the combat readiness rate of the main combat equipment, where the expression of the first indicator calculation model is:
[0084]
[0085] According to the first indicator calculation model and sampling data, the indicator value of the combat readiness rate of a certain type of main combat equipment under a certain organization is determined.
[0086] In the embodiment of the present invention, the physical meaning of the combat readiness rate index of the main combat equipment is: to evaluate the overall level of equipment integrity of a certain organization (brigade, battalion, company) and its equipment at a certain point in time, reflecting the basic ability of the equipment to be able to fight, that is, to maintain a certain proportion of equipment in a measure that can participate in combat missions at any time.
[0087] The indicator calculation model is as follows:
[0088]
[0089] In the actual application of indicators, due to the different types of main combat equipment and organizational structures, it is necessary to establish an evaluation relationship between organization - main combat equipment type - combat readiness rate. That is, in the evaluation of combat readiness rate, the factors to be evaluated involve XX equipment under XX organization.
[0090] An example of combat readiness assessment is shown in Table 2:
[0091] Table 2 Examples of combat readiness rates
[0092]
[0093] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0094] The second indicator calculation model for determining the repair rate of wartime support equipment, where the expression of the second indicator calculation model is:
[0095]
[0096] Based on the second indicator calculation model and sampling data, the indicator value of the repair rate of wartime support equipment is determined.
[0097] In the embodiment of the present invention, the physical meaning of the indicator of the repair rate of wartime support equipment is: in a typical combat scenario, during a campaign, the proportion of the completed wartime rescue and repair tasks to the total combat damage, reflecting the effectiveness of the wartime support equipment in restoring the combat capability of the main combat equipment.
[0098] The indicator calculation model is as follows:
[0099]
[0100] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0101] Determine the third indicator calculation model of the success rate of the inspection and maintenance tasks under the current technical support conditions, where the expression of the third indicator calculation model is:
[0102]
[0103] According to the third indicator calculation model and sampling data, the indicator value of the success rate of the inspection and maintenance tasks under the current technical support conditions is determined.
[0104] In the embodiment of the present invention, the physical meaning of the indicator of the success rate of the inspection and maintenance task is: reflecting the proportion of equipment inspection and maintenance tasks caused by equipment failures that can be completed by an organization (brigade, battalion, company) in the process of performing daily training tasks under the current technical support conditions.
[0105] Indicator calculation model and derivation process:
[0106] Indicator input items:
[0107] 1) Organizational Structure
[0108] 2) Time phase (simulation cycle): T
[0109] 3) Main combat equipment category: N
[0110] 4) Number of electromechanical inspection and maintenance vehicles: n
[0111] 5) Main combat equipment parameters: mean time between failures (MTBF), failure repair time (MTTR)
[0112] 6) Guaranteed equipment parameters: mean time between failures (MTBF), failure repair time (MTTR)
[0113] 7) Training task schedule
[0114] Under the current organizational structure, the total maintenance time required for various main combat equipment is:
[0115]
[0116] The total maintenance time requirement for all equipment under the current organization is:
[0117]
[0118] The total inspection and maintenance capacity is:
[0119]
[0120] The calculation model of the success rate of the inspection and maintenance task is:
[0121]
[0122] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0123] A fourth indicator calculation model for determining the occupancy rate of the detection and maintenance equipment is expressed as follows:
[0124]
[0125] According to the fourth indicator calculation model and the sampling data, an indicator value of the occupancy rate of the inspection and maintenance equipment is determined.
[0126] In the embodiment of the present invention, the physical meaning of the indicator of the occupancy rate of the detection and maintenance equipment is: the ratio of the current number of detection and maintenance equipment in use to the total number over time.
[0127] The indicator calculation model for detecting the occupancy rate of maintenance equipment is:
[0128]
[0129] Calculation input:
[0130] 1) Total number of testing equipment
[0131] 2) Status list of main combat equipment
[0132] 3) The total number of fault states of main combat equipment at a certain time N (main combat equipment)
[0133] 4) Time granularity
[0134] 5) The total number of electromechanical inspection and maintenance vehicles that can perform tasks N (electromechanical inspection and maintenance vehicles)
[0135] Among them: the total number of electromechanical inspection and maintenance vehicles that can perform tasks should be the total number of electromechanical inspection and maintenance vehicles - 1. In real scenarios, the maximum number of electromechanical inspection and maintenance vehicles under repair should be 1, that is, at most 1 electromechanical inspection and maintenance vehicle is allowed to enter the repair and maintenance state.
[0136]
[0137] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0138] The fifth indicator calculation model for determining the success rate of the rescue and repair mission is expressed as follows:
[0139]
[0140] According to the fifth indicator calculation model and sampling data, the indicator value of the success rate of the rescue and repair mission is determined.
[0141] In the embodiment of the present invention, the physical meaning of the rescue and repair task success rate indicator is: under the battlefield environment, under the current rescue and repair equipment configuration, the ratio of the task volume of the rescue and repair task completed to the total number of serious damages. The indicator reflects the guarantee efficiency of the rescue and repair vehicle under battlefield conditions.
[0142] Indicator calculation model:
[0143]
[0144] Calculation input:
[0145] 1) Combat duration T
[0146] 2) Number of main battle equipment types X
[0147] 3) Number of main combat equipment n i
[0148] 4) Major equipment damage rate μ i
[0149] 5) Severe damage rate of rescue and repair vehicles μ v
[0150] 6) Time requirements for battlefield repair of main combat equipment i
[0151] 7) Number of rescue and repair vehicles N e
[0152] For a single type of equipment, the total amount of severe damage is:
[0153] Number of serious damages N i = Number of main combat equipment n i *Main battle equipment damage rate μ i
[0154] The total battlefield repair time of a single type of equipment is T i =N i *t i
[0155] For the participating troops, the total number of serious losses is:
[0156]
[0157] The total time for battlefield repair Ttotal is:
[0158]
[0159] The total time that the rescue and repair vehicle can perform its mission, Trepair, is:
[0160]
[0161] The success rate of battlefield rescue and repair missions is:
[0162]
[0163] In the actual calculation process, two categories need to be distinguished:
[0164] 1) Mission success rate of 20T rescue and repair vehicle
[0165] 2) Mission success rate of 40T rescue and repair vehicle
[0166] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0167] The sixth indicator calculation model for determining the success rate of the energy supply vehicle mission is expressed as follows:
[0168]
[0169] According to the sixth indicator calculation model and sampling data, the indicator value of the energy supply vehicle mission success rate is determined.
[0170] In the embodiment of the present invention, the physical meaning of the indicator of the energy supply vehicle mission success rate is: reflecting whether the energy supply capability of the energy supply vehicle meets the equipment usage requirements in the combat mission scenario.
[0171] Indicator calculation model:
[0172]
[0173] Indicator calculation process:
[0174] Indicator input:
[0175] 1) Simulation period T
[0176] 2) Number of energy vehicles N
[0177] 3) Maximum number of supplementary equipment supported C
[0178] 4) Main battle equipment type X i
[0179] 5) Number of main combat equipment N i
[0180] 6) Energy recharge time requirement for main combat equipment t1 i
[0181] 7) Energy endurance time of main combat equipment t2 i
[0182] 8) MTBF and MTTR of energy vehicles
[0183] 9) Number of energy vehicles N v
[0184] The total time required for energy replenishment of a single type of main combat equipment T 需i for:
[0185] The number of main combat equipment * the number of replenishment times * the replenishment time requirement (the number of replenishment times is the mission cycle / endurance time) is:
[0186]
[0187] The total time required for energy replenishment is T 总 for:
[0188]
[0189] The total time T that a single energy vehicle can perform a task k for:
[0190]
[0191] The total time that the energy vehicle can perform the task is T 能源 for:
[0192]
[0193] Then the mission success rate of the energy vehicle is:
[0194]
[0195] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0196] The seventh indicator calculation model for determining the completion rate of inspection and maintenance tasks under combat conditions is expressed as follows:
[0197]
[0198] Based on the seventh indicator calculation model and sampling data, determine the indicator value of the inspection and maintenance task completion rate under combat conditions.
[0199] In an embodiment of the present invention, the physical meaning of the indicator of the completion rate of the inspection and maintenance tasks under combat conditions is: in the combat mission, for the inspection and maintenance needs of the medium and light damage of the main combat equipment, the ratio of the number of inspection and maintenance tasks completed by the electromechanical inspection and maintenance vehicles to the total number of maintenance tasks within the combat cycle is evaluated.
[0200] Indicator calculation model:
[0201]
[0202] The calculation process is as follows:
[0203] 1) Indicator calculation parameters:
[0204] 2) Main combat equipment type N
[0205] 3) Number of main combat equipment N i
[0206] 4) Number of electromechanical inspection and maintenance vehicles N Inspection vehicles
[0207] 5) Light damage rate u i
[0208] 6) Medium loss rate v i
[0209] 7) Battlefield inspection and maintenance time t i
[0210] 8) Battlefield inspection and maintenance window time T 窗口
[0211] Total time required for battlefield repairs T 需 = Battle damage rate * equipment quantity * battlefield repair time t1 of the equipment
[0212] T 需 =T 轻损 +T 中损
[0213]
[0214] Total battlefield repair capacity T 总量 for:
[0215] T 总量 =T 窗口 *N 检修车
[0216] The completion rate of the inspection and maintenance tasks under combat conditions is:
[0217]
[0218] To sum up, the present invention first obtains all status data of armored equipment within the support efficiency simulation cycle, and then samples all status data at fixed time intervals according to customer needs. Secondly, the support efficiency of the armored equipment is evaluated in terms of combat readiness rate, repair rate, detection and maintenance task success rate, occupancy rate, rescue and repair task success rate, energy supply vehicle task success rate and other aspects. The calculation method of each evaluation index of the armored equipment is modeled respectively. Finally, the corresponding index calculation model and the extracted sampling data are used to calculate the index value of each evaluation index, which is convenient for better data acquisition with higher accuracy, and can effectively solve the problems in the background technology.
[0219] Exemplary Devices
[0220] Figure 3 FIG. 1 is a schematic diagram of a system for calculating various evaluation indicators of armored equipment support effectiveness provided by an exemplary embodiment of the present invention. Figure 3 As shown, the system 300 includes:
[0221] The data acquisition module 310 is used to acquire all status data of the armored equipment during the support effectiveness simulation cycle, wherein all status data includes the status of the support unit, the main station equipment, and various support equipment and materials;
[0222] The data sampling module 320 is used to sample all status data at fixed time intervals according to customer needs to obtain sampled data for evaluation;
[0223] An evaluation index definition module 330 is used to define multiple evaluation indexes of armored equipment support effectiveness, wherein the multiple evaluation indexes include combat readiness rate of main combat equipment, repair rate of wartime support equipment, success rate of inspection and maintenance tasks under current technical support conditions, occupancy rate of inspection and maintenance equipment, success rate of rescue and repair tasks, success rate of energy supply vehicle tasks, and completion rate of inspection and maintenance tasks under combat conditions;
[0224] The indicator calculation module 340 is used to determine the indicator calculation model of each evaluation indicator, and calculate the indicator value of each evaluation indicator according to the indicator calculation model and the sampling data.
[0225] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0226] Determine the first indicator calculation model of the combat readiness rate of the main combat equipment, where the expression of the first indicator calculation model is:
[0227]
[0228] According to the first indicator calculation model and sampling data, the indicator value of the combat readiness rate of a certain type of main combat equipment under a certain organization is determined.
[0229] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0230] The second indicator calculation model for determining the repair rate of wartime support equipment, where the expression of the second indicator calculation model is:
[0231]
[0232] Based on the second indicator calculation model and sampling data, the indicator value of the repair rate of wartime support equipment is determined.
[0233] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0234] Determine the third indicator calculation model of the success rate of the inspection and maintenance tasks under the current technical support conditions, where the expression of the third indicator calculation model is:
[0235]
[0236] According to the third indicator calculation model and sampling data, the indicator value of the success rate of the inspection and maintenance tasks under the current technical support conditions is determined.
[0237] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0238] A fourth indicator calculation model for determining the occupancy rate of the detection and maintenance equipment is expressed as follows:
[0239]
[0240] According to the fourth indicator calculation model and the sampling data, an indicator value of the occupancy rate of the inspection and maintenance equipment is determined.
[0241] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0242] The fifth indicator calculation model for determining the success rate of the rescue and repair mission is expressed as follows:
[0243]
[0244] According to the fifth indicator calculation model and sampling data, the indicator value of the success rate of the rescue and repair mission is determined.
[0245] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0246] The sixth indicator calculation model for determining the success rate of the energy supply vehicle mission is expressed as follows:
[0247]
[0248] According to the sixth indicator calculation model and sampling data, the indicator value of the energy supply vehicle mission success rate is determined.
[0249] Optionally, determining an indicator calculation model for each evaluation indicator, and calculating an indicator value for each evaluation indicator according to the indicator calculation model and the sampled data, includes:
[0250] The seventh indicator calculation model for determining the completion rate of inspection and maintenance tasks under combat conditions is expressed as follows:
[0251]
[0252] Based on the seventh indicator calculation model and sampling data, determine the indicator value of the inspection and maintenance task completion rate under combat conditions.
[0253] The system for calculating various evaluation indicators for armored equipment support effectiveness of an embodiment of the present invention corresponds to the method for calculating various evaluation indicators for armored equipment support effectiveness of another embodiment of the present invention, which will not be described in detail here.
[0254] Exemplary Electronic Devices
[0255] Figure 4 This is a structure of an electronic device provided by an exemplary embodiment of the present invention. Figure 4As shown, the electronic device 40 includes one or more processors 41 and a memory 42 .
[0256] The processor 41 may be a central processing unit (CPU) or other forms of processing units having data processing capabilities and / or instruction execution capabilities, and may control other components in the electronic device to perform desired functions.
[0257] The memory 42 may include one or more computer program products, and the computer program product may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 41 may run the program instructions to implement the method for information mining of historical change records and / or other desired functions of the software program of each embodiment of the present invention described above. In one example, the electronic device may also include: an input device 43 and an output device 44, and these components are interconnected through a bus system and / or other forms of connection mechanisms (not shown).
[0258] In addition, the input device 43 may also include, for example, a keyboard, a mouse, etc.
[0259] The output device 44 can output various information to the outside, and can include, for example, a display, a speaker, a printer, a communication network and a remote output device connected thereto.
[0260] Of course, to simplify, Figure 4 Only some of the components related to the present invention in the electronic device are shown, and components such as a bus, an input / output interface, etc. are omitted. In addition, according to specific application conditions, the electronic device may also include any other appropriate components.
[0261] Exemplary computer program products and computer-readable storage media
[0262] In addition to the above-mentioned methods and devices, an embodiment of the present invention may also be a computer program product, which includes computer program instructions, which, when executed by a processor, enable the processor to execute the steps of the method according to various embodiments of the present invention described in the above-mentioned "Exemplary Method" section of this specification.
[0263] The computer program product may be written in any combination of one or more programming languages to write program code for performing the operations of the embodiments of the present invention, including object-oriented programming languages such as Java, C++, etc., and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.
[0264] In addition, an embodiment of the present invention may also be a computer-readable storage medium having computer program instructions stored thereon, which, when executed by a processor, enables the processor to execute the steps of the method for information mining of historical change records according to various embodiments of the present invention described in the above “Exemplary Method” section of this specification.
[0265] The computer readable storage medium can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, system or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0266] The basic principle of the present invention is described above in conjunction with specific embodiments. However, it should be pointed out that the advantages, strengths, effects, etc. mentioned in the present invention are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. must be possessed by each embodiment of the present invention. In addition, the specific details disclosed above are only for the purpose of illustration and facilitation of understanding, rather than limitation, and the above details do not limit the present invention to being implemented by adopting the above specific details.
[0267] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system embodiment, since it basically corresponds to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0268] The block diagrams of the devices, systems, equipment, and systems involved in the present invention are only illustrative examples and are not intended to require or imply that they must be connected, arranged, and configured in the manner shown in the block diagram. As will be appreciated by those skilled in the art, these devices, systems, equipment, and systems can be connected, arranged, and configured in any manner. Words such as "including", "comprising", "having", etc. are open words, referring to "including but not limited to", and can be used interchangeably with them. The words "or" and "and" used here refer to the words "and / or" and can be used interchangeably with them, unless the context clearly indicates otherwise. The word "such as" used here refers to the phrase "such as but not limited to", and can be used interchangeably with it.
[0269] The method and system of the present invention may be implemented in many ways. For example, the method and system of the present invention may be implemented by software, hardware, firmware or any combination of software, hardware, firmware. The above order of steps for the method is only for illustration, and the steps of the method of the present invention are not limited to the order specifically described above, unless otherwise specifically stated. In addition, in some embodiments, the present invention may also be implemented as a program recorded in a recording medium, which includes machine-readable instructions for implementing the method according to the present invention. Thus, the present invention also covers a recording medium storing a program for executing the method according to the present invention.
[0270] It should also be noted that in the system, device and method of the present invention, each component or each step can be decomposed and / or recombined. These decompositions and / or recombinations should be regarded as equivalent schemes of the present invention. The above description of the disclosed aspects is provided to enable any technician in the field to make or use the present invention. Various modifications to these aspects are very obvious to those skilled in the art, and the general principles defined here can be applied to other aspects without departing from the scope of the present invention. Therefore, the present invention is not intended to be limited to the aspects shown here, but in accordance with the widest range consistent with the principles and novel features disclosed here.
[0271] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present invention to the forms disclosed herein. Although a number of example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.
Claims
1. A method for calculating various evaluation indicators for armored equipment support effectiveness. It is characterized in that include: Obtain all status data of armored equipment during the support effectiveness simulation cycle, including the status of support teams, main station equipment, various support equipment, and devices; According to customer needs, all status data are sampled at fixed time intervals to obtain sampled data for evaluation; Define multiple evaluation indicators for armored equipment support effectiveness, including combat readiness rate of main combat equipment, repair rate of wartime support equipment, success rate of inspection and maintenance tasks under current technical support conditions, occupancy rate of inspection and maintenance equipment, success rate of rescue and repair tasks, success rate of energy supply vehicle tasks, and completion rate of inspection and maintenance tasks under combat conditions; Determine the indicator calculation model of each evaluation indicator, and calculate the indicator value of each evaluation indicator based on the indicator calculation model and sampling data; Determine the indicator calculation model for each evaluation indicator, and calculate the indicator value of each evaluation indicator based on the indicator calculation model and sampling data, including: Determine the third indicator calculation model of the success rate of the inspection and maintenance tasks under the current technical support conditions, where the expression of the third indicator calculation model is: Determine the index value of the success rate of the inspection and maintenance tasks under the current technical support conditions according to the third index calculation model and sampling data; The physical meaning of the success rate of inspection and maintenance tasks is: the proportion of equipment inspection and maintenance tasks caused by equipment failures that can be completed by an organization in the process of performing daily training tasks under the current technical support conditions; Indicator calculation model and derivation process: Indicator input items: 1) Organizational structure 2)Simulation period: T 3) Number of main combat equipment types: N 4) Number of electromechanical inspection and maintenance vehicles: n 5) Main combat equipment parameters: mean time between failures (MTBF), fault repair time (MTTR) 6) Guaranteed equipment parameters: mean time between failures (MTBF), fault repair time (MTTR) 7) Training task schedule Under the current organizational structure, the total maintenance time required for various main combat equipment is: The total maintenance time requirement for all equipment under the current organization is: The total inspection and maintenance capacity is: The calculation model of the success rate of the inspection and maintenance task is: Determining the indicator calculation model of each evaluation indicator, and calculating the indicator value of each evaluation indicator according to the indicator calculation model and the sampling data, includes: A fourth indicator calculation model for determining the occupancy rate of the detection and maintenance equipment is expressed as follows: Determine the index value of the occupancy rate of the inspection and maintenance equipment according to the fourth index calculation model and the sampling data; The physical meaning of the occupancy rate of detection and maintenance equipment is: the ratio of the current number of detection and maintenance equipment in use to the total number over time; The indicator calculation model for detecting the occupancy rate of maintenance equipment is: Calculation input: 1) Total number of testing equipment 2) Status list of main combat equipment 3) The total number of fault states of main combat equipment at any one time N (主战装备) 4) Time granularity 5) The total number of electromechanical inspection and maintenance vehicles that can perform tasks N (机电检测维修车) Among them: the total number of electromechanical inspection and maintenance vehicles that can perform tasks should be the total number of electromechanical inspection and maintenance vehicles - 1. In real scenarios, the maximum number of electromechanical inspection and maintenance vehicles under repair should be 1, that is, at most 1 electromechanical inspection and maintenance vehicle is allowed to enter the repair and maintenance state; Determining the indicator calculation model of each evaluation indicator, and calculating the indicator value of each evaluation indicator according to the indicator calculation model and the sampling data, includes: The fifth indicator calculation model for determining the success rate of the rescue and repair mission is expressed as follows: Determine the index value of the success rate of the rescue and repair mission according to the fifth index calculation model and sampling data; The physical meaning of the rescue and repair mission success rate indicator is: the ratio of the rescue and repair mission volume to the total number of serious damages under the current rescue and repair equipment configuration in the battlefield environment; the indicator reflects the support efficiency of the rescue and repair vehicle under battlefield conditions; Indicator calculation model: Calculation input: 1) Simulation period T 2) Number of main combat equipment types N 3) Number of main combat equipment n i 4) Major equipment damage rate μ i 5) Severe damage rate of rescue and repair vehicles μ v 6) Time requirements for battlefield repair of main combat equipment i 7) Number of rescue and repair vehicles N e For a single type of equipment, the total number of severe damages is expressed as: Number of serious damages N i = Number of main combat equipment n i *Main battle equipment damage rate μ i The total battlefield repair time of a single type of equipment is T i =N i *t i For the participating troops, the total number of serious losses is: The total time for battlefield repair T is: The total time that the rescue and repair vehicle can perform its mission, Trepair, is: The success rate of battlefield rescue and repair missions is: In the actual calculation process, two categories need to be distinguished: 1) Mission success rate of 20T rescue and repair vehicle 2) Mission success rate of 40T rescue and repair vehicle Determining the indicator calculation model of each evaluation indicator, and calculating the indicator value of each evaluation indicator according to the indicator calculation model and the sampling data, includes: The sixth indicator calculation model for determining the success rate of the energy supply vehicle mission is expressed as follows: Determine the index value of the energy supply vehicle mission success rate based on the sixth index calculation model and sampling data; The physical meaning of the energy supply vehicle mission success rate indicator is: reflecting whether the energy supply capability of the energy supply vehicle meets the equipment usage requirements in the combat mission scenario; Indicator calculation model: Indicator calculation process: Indicator input: 1) Simulation period T 2) Maximum number of supplementary equipment supported C 3) Number of main combat equipment types N 4) Number of main combat equipment n i 5) Energy recharge time requirement for main combat equipment t1 i 6) Energy endurance time of main combat equipment t2 i 7) MTBF and MTTR of energy vehicles 8) Number of energy vehicles N v The total time required for energy replenishment of a single type of main combat equipment T 需i for: The number of main combat equipment * the number of replenishment times * the replenishment time requirement, where the number of replenishment times is the mission cycle / the endurance time is: The total time required for energy replenishment is T 总 for: The total time T that a single energy vehicle can perform a task k for: The total time that the energy vehicle can perform the task is T 能源 for: Then the mission success rate of the energy vehicle is: Determining the indicator calculation model of each evaluation indicator, and calculating the indicator value of each evaluation indicator according to the indicator calculation model and the sampling data, includes: The seventh indicator calculation model for determining the completion rate of inspection and maintenance tasks under combat conditions is expressed as follows: According to the seventh indicator calculation model and sampling data, determine the indicator value of the inspection and maintenance task completion rate under combat conditions; The physical meaning of the indicator of the completion rate of inspection and maintenance tasks under combat conditions is: in combat missions, for the inspection and maintenance needs of medium and light damage of main combat equipment, evaluate the ratio of the number of inspection and maintenance tasks completed by electromechanical inspection and maintenance vehicles to the total number of maintenance tasks during the combat cycle; Indicator calculation model: The calculation process is as follows: 1) Indicator calculation parameters: 2) Number of main combat equipment types N 3) Number of main combat equipment n i 4) Number of electromechanical inspection and maintenance vehicles N 检修车 5) Light damage rate q i 6) Medium loss rate v i 7) Battlefield repair time t of main station equipment i 8) Battlefield inspection and maintenance window time T 窗口 Total time required for battlefield repairs T 需 = Battle damage rate * number of main station equipment * battlefield repair time of main station equipment t i Total battlefield repair capacity T 总量 for: T 总量 =T 窗口 *N 检修车 The completion rate of the inspection and maintenance tasks under combat conditions is: Determining the indicator calculation model of each evaluation indicator, and calculating the indicator value of each evaluation indicator according to the indicator calculation model and the sampling data, includes: Determine the first indicator calculation model of the combat readiness rate of the main combat equipment, where the expression of the first indicator calculation model is: Determine the index value of the combat readiness rate of a certain type of main combat equipment under a certain organization based on the first index calculation model and sampling data; Determining the indicator calculation model of each evaluation indicator, and calculating the indicator value of each evaluation indicator according to the indicator calculation model and the sampling data, includes: The second indicator calculation model for determining the repair rate of wartime support equipment, where the expression of the second indicator calculation model is: Based on the second indicator calculation model and sampling data, the indicator value of the repair rate of wartime support equipment is determined.
