A method, device, equipment and medium for evaluating transient instability of power generation system
By determining the grid connection point voltage and calculating the transient stability margin evaluation value in a multi-machine parallel power generation system, the problem of system transient instability is solved, accurate evaluation and control of system stability is achieved, and the power generation system is ensured power supply stability.
Patent Information
- Application Number
- CN202311210963.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-19
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2043-09-19
AI Technical Summary
In the early stage of the fault stage of the multi-machine parallel power generation system, the fault current is not enough to trigger the longitudinal distance protection or differential protection, and the system lines are complex. Over time, the grid fault worsens, resulting in transient instability and affecting the stability of the power supply. However, Existing technology cannot accurately assess system stability.
By determining the voltage at the grid connection point after the multi-machine parallel power generation system is subject to a preset disturbance, the system is divided into the first cluster (voltage instability) and the second cluster (voltage stability). Based on the current equivalent power of each cluster angle and active power, calculate the transient stability margin evaluation value, determine whether the system is stable, and perform dispatch control or off-grid operation when unstable.
It realizes the accurate stability assessment of the multi-machine parallel power generation system after being disturbed, ensures the transient stability of the system under fault conditions, and avoids the risk of system instability.
Smart Images

Figure CN117254457B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power generation, and in particular to a method, device, equipment and medium for evaluating transient instability of a power generation system. Background Art
[0002] Due to the structure of fully controlled switch devices and the constraints of fault current limiting, the fault current of a multi-machine parallel grid-type power generation system may not be enough to trigger the longitudinal distance protection or differential protection in the early stage of the fault. In addition, the multi-machine parallel grid-type power generation system has complex lines. As time goes by, there is a risk of grid faults worsening, which will lead to transient instability of the system and affect the stability of power supply. However, there is no method in the prior art to accurately evaluate the stability of a multi-machine parallel grid-type power generation system. Summary of the invention
[0003] The purpose of the present invention is to provide a method, device, equipment and medium for evaluating transient instability of a power generation system, determine a transient stability margin evaluation value of a multi-machine parallel grid-connected power generation system, and finally judge whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value, so as to accurately evaluate the stability of the multi-machine parallel grid-connected power generation system after being subjected to a preset disturbance.
[0004] In order to solve the above technical problems, the present invention provides a method for evaluating transient instability of a power generation system, comprising:
[0005] After the multi-machine parallel grid-type power generation system is subjected to a preset disturbance, determining the grid connection point voltages corresponding to a plurality of power generation systems in the multi-machine parallel grid-type power generation system;
[0006] Based on the grid connection point voltage, each of the power generation systems is divided into a first group and a second group; the first group is a group whose grid connection point voltage meets a preset voltage instability condition, and the second group is a group whose grid connection point voltage meets a preset voltage stability condition;
[0007] Determine a transient stability margin assessment value of the multi-machine parallel grid-connected power generation system based on a first current equivalent power angle of the first machine group, a second current equivalent power angle of the second machine group, and a current equivalent active power of the first machine group;
[0008] Whether the multi-machine parallel grid-connected power generation system is stable is determined based on the transient stability margin evaluation value.
[0009] Optionally, dividing each of the power generation systems into a first group and a second group based on the voltage of each grid connection point includes:
[0010] Determine whether the grid connection point voltage is not greater than the threshold voltage;
[0011] If it is not greater than the threshold voltage, it is determined that the power generation system corresponding to the grid connection point voltage belongs to the first machine group;
[0012] If it is greater than the threshold voltage, it is determined that the power generation system corresponding to the grid connection point voltage belongs to the second machine group.
[0013] Optionally, the determining the transient stability margin assessment value of the multi-machine parallel grid-connected power generation system based on the first current equivalent power angle of the first machine group, the second current equivalent power angle of the second machine group, and the current equivalent active power of the first machine group includes:
[0014] Determine a phase difference between current equivalent power angles of the first machine group and the second machine group according to the first current equivalent power angle and the second current equivalent power angle;
[0015] Determine the output power of the first machine group after single machine equivalence based on the phase angle difference, the voltages of each grid connection point, the elements of the node admittance matrix of the first machine group, the equivalent inertia of the first machine group and the equivalent inertia of the second machine group, wherein the first machine group is an equivalent single machine power generation system after single machine equivalence;
[0016] The transient stability margin assessment value of the multi-machine parallel grid-connected power generation system is determined based on the output power of the equivalent single-machine power generation system and the current equivalent active power.
[0017] Optionally, the determining of the transient stability margin assessment value of the multi-machine parallel grid-connected power generation system based on the output power of the equivalent single-machine power generation system and the current equivalent active power includes:
[0018] Determining a current equivalent acceleration area of the first machine group according to the output power of the equivalent single-machine power generation system, the historical equivalent active power of the first machine group, and the current equivalent active power of the first machine group;
[0019] Determining a current equivalent limit resection angle of the first machine group;
[0020] The transient stability margin assessment value of the multi-machine parallel grid-connected power generation system is determined based on the current equivalent acceleration area, the current equivalent limit cut-off angle, the preset angular frequency base value and the equivalent inertia of the equivalent single-machine power generation system.
[0021] Optionally, determining the current equivalent limit resection angle of the first cluster includes:
[0022] Determining a historical equivalent power angle of the first machine group;
[0023] A current equivalent limit cut-off angle of the first machine group is determined according to the historical equivalent power angle, the current equivalent active power and the historical equivalent active power.
[0024] Optionally, judging whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value includes:
[0025] Determining whether the transient stability margin assessment value is greater than a preset assessment value;
[0026] If it is greater than a preset evaluation value, it is determined that the multi-machine parallel grid-connected power generation system is unstable;
[0027] If it is not greater than the preset evaluation value, it is determined that the multi-machine parallel grid-connected power generation system is stable.
[0028] Optionally, after judging whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value, the method further includes:
[0029] If it is determined that the multi-machine parallel grid-type power generation system is unstable, a preset dispatch control is performed on the first machine group to obtain the current new first machine group, and then the process jumps again to the step of determining the transient stability margin assessment value of the multi-machine parallel grid-type power generation system based on the first current equivalent power angle of the first machine group, the second current equivalent power angle of the second machine group, and the current equivalent active power of the first machine group, until a preset cycle end condition is met;
[0030] After the preset cycle end condition is met, if the current multi-machine parallel grid-connected power generation system is still unstable, the multi-machine parallel grid-connected power generation system is controlled to perform off-grid operation.
[0031] In order to solve the above technical problems, the present invention also provides a transient instability assessment device for a power generation system, comprising:
[0032] A first determination unit is used to determine the grid connection point voltages corresponding to a plurality of power generation systems in the multi-machine parallel grid-type power generation system after the multi-machine parallel grid-type power generation system is subjected to a preset disturbance;
[0033] A division unit, configured to divide each of the power generation systems into a first group and a second group based on the grid connection point voltage; the first group is a group whose grid connection point voltage satisfies a preset voltage instability condition, and the second group is a group whose grid connection point voltage satisfies a preset voltage stability condition;
[0034] A second determining unit is used to determine a transient stability margin assessment value of the multi-machine parallel grid-connected power generation system based on a first current equivalent power angle of the first machine group, a second current equivalent power angle of the second machine group, and a current equivalent active power of the first machine group;
[0035] A judging unit is used to judge whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value.
[0036] In order to solve the above technical problems, the present invention further provides an electronic device, comprising:
[0037] Memory for storing computer programs;
[0038] A processor is used to implement the steps of the method for assessing transient instability of a power generation system as described above when executing the computer program.
[0039] In order to solve the above technical problems, the present invention also provides a computer-readable storage medium for storing a computer program, which, when executed by a processor, implements the method for assessing transient instability of a power generation system as described above.
[0040] The purpose of the present invention is to provide a method, device, equipment and medium for evaluating transient instability of a power generation system. After a multi-machine parallel grid-connected power generation system is subjected to a preset disturbance, the grid connection point voltages corresponding to several power generation systems in the multi-machine parallel grid-connected power generation system are first determined, and based on the grid connection point voltages, each power generation system is divided into a first group and a second group, wherein the first group is a group whose grid connection point voltage meets a preset voltage instability condition, and the second group is a group whose grid connection point voltage meets a preset voltage stability condition. Then, based on a first current equivalent power angle of the first group, a second current equivalent power angle of the second group and a current equivalent active power of the first group, a transient stability margin evaluation value of the multi-machine parallel grid-connected power generation system is determined. Finally, based on the transient stability margin evaluation value, whether the multi-machine parallel grid-connected power generation system is stable is judged, and the stability of the multi-machine parallel grid-connected power generation system after being subjected to a preset disturbance is accurately evaluated. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0042] Figure 1 A process flow chart of a method for evaluating transient instability of a power generation system provided by the present invention;
[0043] Figure 2 A schematic diagram of determining the leading machine group of a multi-machine parallel grid-connected power generation system provided by the present invention;
[0044] Figure 3 A specific implementation flow chart of the method for optimizing the control strategy of a group of machines in a multi-machine parallel grid-connected power generation system provided by the present invention;
[0045] Figure 4The working condition 1 provided by the present invention gives the time domain simulation result of the multi-machine parallel grid-type power generation system when the scheduling strategy is not adopted;
[0046] Figure 5 The working condition 2 provided by the present invention gives the time domain simulation results of the multi-machine parallel grid-type power generation system when the first stage scheduling control strategy is adopted;
[0047] Figure 6 The working condition 3 provided by the present invention gives the time domain simulation results of the multi-machine parallel grid-type power generation system when the first and second stage scheduling control strategies are adopted;
[0048] Figure 7 A schematic diagram of the structure of a transient instability assessment device for a power generation system provided by the present invention;
[0049] Figure 8 The present invention provides a schematic structural diagram of an electronic device. DETAILED DESCRIPTION
[0050] The core of the present invention is to provide a method, device, equipment and medium for evaluating the transient instability of a power generation system, determine the transient stability margin evaluation value of a multi-machine parallel grid-connected power generation system, and finally judge whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value, and accurately evaluate the stability of the multi-machine parallel grid-connected power generation system after being subjected to a preset disturbance.
[0051] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0052] Please refer to Figure 1 , Figure 1 A process flow chart of a method for evaluating transient instability of a power generation system provided by the present invention. The method comprises:
[0053] S11: after the multi-machine parallel grid-type power generation system is subjected to a preset disturbance, determining the grid connection point voltages corresponding to a plurality of power generation systems in the multi-machine parallel grid-type power generation system;
[0054] S12: Based on the voltage of each grid connection point, each power generation system is divided into a first group and a second group; the first group is a group whose grid connection point voltage meets a preset voltage instability condition, and the second group is a group whose grid connection point voltage meets a preset voltage stability condition;
[0055] S13: Determine a transient stability margin assessment value of a multi-machine parallel grid-connected power generation system based on a first current equivalent power angle of the first machine group, a second current equivalent power angle of the second machine group, and a current equivalent active power of the first machine group;
[0056] S14: Determine whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin assessment value.
[0057] In the present invention, in order to evaluate the stability of a multi-machine parallel grid-connected power generation system after being subjected to a preset disturbance, it is necessary to first determine the grid connection point voltages corresponding to several power generation systems in the multi-machine parallel grid-connected power generation system, and then distinguish the first machine group that meets the preset voltage instability condition and the second machine group that meets the preset voltage stability condition according to the grid connection point voltages, and then determine the transient stability margin evaluation value of the multi-machine parallel grid-connected power generation system based on the first current equivalent power angle of the first machine group, the second current equivalent power angle of the second machine group and the current equivalent active power of the first machine group, so as to finally judge whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value, and accurately evaluate the stability of the multi-machine parallel grid-connected power generation system after being subjected to a preset disturbance.
[0058] It should be noted that in the normal stage, the multi-machine parallel grid-connected power generation system adopts the normal control strategy CS n The dispatching system monitors the operating status of the multi-machine parallel grid-connected power generation system; when the multi-machine parallel grid-connected power generation system is subjected to a large disturbance, the grid-connected power generation system sends the fault operating status to the dispatching system, and the grid-connected power generation system switches to the fault control strategy CS f The dispatching system obtains different grouping methods through the first dominant group identification, equating the system's severely disturbed group to the S1 group and the rest to the A group. At the same time, it retains some information of all the original multi-parallel systems, further equating the equivalent dual-machine system to the equivalent single-machine infinite system, and further obtains the corresponding critical dispatching time t cr In order to ensure the transient stability of the system under all grouping modes, the minimum critical scheduling time min(t cr ) is the dominant grouping method, and the first-stage dispatching control strategy CS1 is provided for the corresponding grid-forming power generation system of the S1 group; after the second dominant group identification and second-stage dispatching control strategy allocation by the dispatching system, the control strategy of the grid-forming power generation system of the S2 group is switched from CS1 to the second-stage dispatching control strategy CS2. After the third dominant group identification by the dispatching system, due to the limitation of the maximum dispatching time, the grid-forming power generation system of the S3 group no longer switches the dispatching control strategy, but executes the off-grid action instead, and Figure 2 Schematic diagram of fault stage division of multi-machine parallel grid-connected power generation system.
[0059] It should also be noted that if the entire judgment process is added to the scheduling process, the overall process can be summarized as follows: first, real-time measurement and transmission of data such as equivalent angle of attack and angular frequency base value, then triggering the main protection, and after judging that it does not meet the main protection, that is, after being subjected to a large disturbance, sorting the grid-connected inverters of each configuration type according to the power angle, taking the larger m adjacent power angle differences as n grouping methods, and calculating the equivalent value under each grouping method, with t cr1 The minimum grouping method is the dominant grouping method to obtain the critical fault detection time of the system. The subsequent operation is the same as mentioned in this application. After two schedulings, it is determined whether the stage criteria are met. After the second failure to meet the stage criteria, the off-line action is executed. The parameter Figure 3 This is a block diagram of the active power-frequency control link of a multi-machine parallel grid-connected power generation system.
[0060] It should also be noted that the grouping method that causes system instability is called the dominant grouping method. In the dominant grouping method, the synchronization of the grid-connected inverters in the S group and the A group is high, and the injection power of the S group and the A group is shown in the following formula:
[0061]
[0062] Wherein, the subscripts i and j represent the i-th and j-th grid-connected inverters, respectively; δ S is the equivalent power angle of the S-type grid-connected inverter; δ A is the equivalent power angle of the grid-connected inverter of group A; P and U are the system output power and terminal voltage respectively; G ii ,G jj ,G ik ,G ih ,G jk ,G jh ,B ih is the node admittance matrix Y (n+m)×(n+m) elements.
[0063] It should also be noted that, by combining the injection power formulas of the S group and the A group, the equivalent rotor swing equations in the multi-machine system are converted to single-machine equivalents, and the output power expression of the equivalent single-machine system can be obtained:
[0064]
[0065] Among them, G ij , G ik , G jh , B ij , is the element of the node admittance matrix of the multi-machine system; M A 、M S are the equivalent inertias of the A and S groups respectively; U i ,、U j ,、Uk ,、U h is the grid connection point voltage of each grid-type power generation system; P C and P max are the initial value and maximum value of the output power of the equivalent single-machine system respectively; δ is the phase difference between the equivalent power angle of the S group and the equivalent power angle of the A group, that is, the equivalent power angle of the equivalent single-machine system, and γ is the initial value of the equivalent power angle.
[0066] The present embodiment provides a method for evaluating transient instability of a power generation system. After a multi-machine parallel grid-connected power generation system is subjected to a preset disturbance, the grid connection point voltages corresponding to several power generation systems in the multi-machine parallel grid-connected power generation system are first determined. Based on the grid connection point voltages, each power generation system is divided into a first machine group and a second machine group, wherein the first machine group is a machine group whose grid connection point voltage satisfies a preset voltage instability condition, and the second machine group is a machine group whose grid connection point voltage satisfies a preset voltage stability condition. Then, based on a first current equivalent power angle of the first machine group, a second current equivalent power angle of the second machine group, and a current equivalent active power of the first machine group, a transient stability margin evaluation value of the multi-machine parallel grid-connected power generation system is determined. Finally, based on the transient stability margin evaluation value, whether the multi-machine parallel grid-connected power generation system is stable is judged, and the stability of the multi-machine parallel grid-connected power generation system after being subjected to a preset disturbance is accurately evaluated.
[0067] Based on the above embodiments:
[0068] As an optional embodiment, each power generation system is divided into a first group and a second group based on the voltage of each grid connection point, including:
[0069] Determine whether the grid connection point voltage is not greater than the threshold voltage;
[0070] If it is not greater than the threshold voltage, it is determined that the power generation system corresponding to the grid connection point voltage belongs to the first group;
[0071] If it is greater than the threshold voltage, it is determined that the power generation system corresponding to the grid connection point voltage belongs to the second group.
[0072] In the present invention, the first machine group and the second machine group are distinguished based on the relationship between the grid connection point voltage corresponding to each power generation system in the multi-machine parallel grid-connected power generation system and the threshold voltage. When the grid connection point voltage corresponding to the power generation system is not greater than the threshold voltage, it is determined that the power generation system corresponding to the grid connection point voltage belongs to the first machine group, that is, the grid connection point voltage satisfies the preset voltage instability condition; conversely, when the grid connection point voltage corresponding to the power generation system is greater than the threshold voltage, it is determined that the power generation system corresponding to the grid connection point voltage belongs to the second machine group, that is, the grid connection point voltage satisfies the preset voltage stability condition, thereby accurately distinguishing the first machine group and the second machine group.
[0073] As an optional embodiment, determining a transient stability margin assessment value of a multi-machine parallel grid-connected power generation system based on a first current equivalent power angle of a first machine group, a second current equivalent power angle of a second machine group, and a current equivalent active power of the first machine group includes:
[0074] Determine a phase difference between the current equivalent power angles of the first machine group and the second machine group according to the first current equivalent power angle and the second current equivalent power angle;
[0075] Determine the output power of the first machine group after single machine equivalence based on the phase angle difference, the voltage of each grid connection point, the elements of the node admittance matrix of the first machine group, the equivalent inertia of the first machine group and the equivalent inertia of the second machine group, and the first machine group is an equivalent single machine power generation system after single machine equivalence;
[0076] The transient stability margin assessment value of the multi-machine parallel grid-connected power generation system is determined based on the output power of the equivalent single-machine power generation system and the current equivalent active power.
[0077] In the present invention, the phase difference between the current equivalent power angles of the first machine group and the second machine group is first determined according to the first current equivalent power angle and the second current equivalent power angle, and then the output power of the first machine group after single-machine equivalent is determined according to the determined phase difference, the voltage of each grid-connected point, the elements of the node admittance matrix of the first machine group, the equivalent inertia of the first machine group and the equivalent inertia of the second machine group. The first machine group is an equivalent single-machine power generation system after single-machine equivalent, so finally the transient stability margin evaluation value of the multi-machine parallel grid-connected power generation system can be determined based on the output power of the equivalent single-machine power generation system and the current equivalent active power, thereby improving the accuracy of the scheme.
[0078] As an optional embodiment, determining a transient stability margin assessment value of a multi-machine parallel grid-connected power generation system based on the output power of an equivalent single-machine power generation system and the current equivalent active power includes:
[0079] Determine the current equivalent acceleration area of the first machine group according to the output power of the equivalent single-machine power generation system, the historical equivalent active power of the first machine group, and the current equivalent active power of the first machine group;
[0080] Determine the current equivalent limit resection angle of the first machine group;
[0081] The transient stability margin assessment value of the multi-machine parallel grid-connected power generation system is determined based on the current equivalent acceleration area, the current equivalent limit cut-off angle, the preset angular frequency base value and the equivalent inertia of the equivalent single-machine power generation system.
[0082] In the present invention, the current equivalent acceleration area of the first machine group is determined according to the output power of the equivalent single-machine power generation system, the historical equivalent active power of the first machine group and the current equivalent active power of the first machine group, and the current equivalent limit cut-off angle of the first machine group is also determined. Finally, based on the determined current equivalent acceleration area, the current equivalent limit cut-off angle, the preset angular frequency base value and the equivalent inertia of the equivalent single-machine power generation system, the transient stability margin evaluation value of the multi-machine parallel grid-connected power generation system is accurately determined.
[0083] The critical dispatching time of the multi-machine parallel grid-connected power generation system, i.e., the equivalent limit removal time t, is calculated according to the following formula: cr1 (Transient stability margin assessment value actually determined in this application):
[0084]
[0085] Where M is the equivalent inertia of the equivalent single-machine system, ω b is the angular frequency base value, δ0 is the equivalent power angle at the initial moment of the fault detection phase, S acc Characterizes the equivalent acceleration area of the multi-machine parallel grid-connected power generation system during the fault stage, δ cr1 Characterizes the equivalent limiting resection angle.
[0086] The following formula is used as the transient stability criterion for the first-stage dispatch of multi-machine parallel grid-connected power generation system:
[0087]
[0088] Among them, t delay1 is the actual effective delay (preset evaluation value) during the first stage of dispatching. When the multi-machine parallel grid-connected power generation system meets the above stability criteria, it can operate stably after the first stage of dispatching.
[0089] It should also be noted that when the multi-machine parallel grid-connected power generation system does not meet the above stability criteria, the transient instability risk assessment method of the multi-machine parallel grid-connected power generation system in the second stage of scheduling is calculated according to the following formula:
[0090]
[0091] Among them, S dec_eq2 Characterize the equivalent deceleration area of multi-machine parallel grid-connected power generation system considering the second stage dispatch, is the equivalent active power command under the second stage scheduling strategy, S nm2 The value is the transient stability margin assessment value considering the second stage dispatch;
[0092] The equivalent limit cut-off angle δ of the multi-machine parallel grid-connected power generation system is calculated according to the following formula cr2 :
[0093]
[0094] The critical dispatching time of the multi-machine parallel grid-connected power generation system, i.e., the equivalent limit removal time t, is calculated according to the following formula: cr2 (Transient stability margin assessment value actually determined in this application):
[0095]
[0096] The following formula is used as the transient stability criterion for the multi-machine parallel grid-connected power generation system in the second stage of dispatching:
[0097]
[0098] Among them, t delay2 is the actual effective delay in the second stage dispatching process. When the multi-machine parallel grid-connected power generation system meets the above stability criteria, it can operate stably after the second stage dispatching.
[0099] It should also be noted that in actual applications, if the multi-machine parallel grid-connected power generation system still has the risk of instability and does not meet the stability criteria, it will execute the grid-off action after the third critical unit identification.
[0100] It should also be noted that Figure 4 Condition 1 of the present invention gives the time domain simulation results of the multi-parallel grid-connected power generation system when the dispatching strategy is not adopted. When the grid voltage level drops to 0.2pu, the control strategy of the multi-parallel grid-connected power generation system changes from the normal strategy CS n Switch to fault stage control strategy CS f , the active power command values are reduced from 1.0pu, 0.8pu and 0.7pu to 0.3pu, 0.1pu and 0.2pu respectively. The critical dispatch time t of the equivalent single-machine system is calculated cr1 is 70ms, and the fault detection delay is 77ms, that is, t d1 <t cr1 Therefore, the equivalent single-machine system under working condition 1 does not meet the first-stage scheduling criteria, and the system suffers from transient instability.
[0101] Figure 5 Condition 2 of the present invention gives the time domain simulation results of the multi-parallel grid-connected power generation system when the first stage dispatching strategy is adopted. Other conditions are consistent with condition 1. When the grid voltage level drops to 0.2pu, the control strategy of the #1 and #3 grid-connected power generation systems belonging to the S1 group is changed by the fault stage control strategy CS fSwitch to the first stage dispatch control strategy CS1. When the #1 and #3 grid-connected power generation systems of the multi-machine system are divided into the S1 group, under the condition of adopting the first stage dispatch strategy, the critical dispatch time t of the equivalent single-machine system is calculated. cr1 is 94ms, and the fault detection delay is 77ms, that is, t d1 <t cr1 However, under the control of the first-stage dispatch control strategy CS1, the #3 grid-type power generation system still has the risk of instability. After the second dominant group identification, the #3 grid-type power generation system of the multi-machine system is divided into the S2 group, and the critical dispatch time t of the equivalent single-machine system is calculated. cr2 is 150ms, fault detection delay t d2 is 154ms, that is, t d2 >t cr2 Therefore, the equivalent single-machine system under working condition 2 does not meet the second-stage scheduling criterion, and the system suffers from transient instability.
[0102] Figure 6 Condition 3 of the present invention gives the time domain simulation results of the multi-parallel grid-connected power generation system when the first and second stage dispatch strategies are adopted. Other conditions are consistent with condition 2. After the second dominant group identification, the #3 grid-connected power generation system of the multi-machine system is divided into the S2 group. Under the condition of adopting the second stage dispatch strategy, the critical dispatch time t of the equivalent single-machine system is calculated. cr2 is 158ms, and the fault detection delay t d2 is 154ms, that is, t d2 <t cr2 Therefore, the equivalent single-machine system under working condition 2 meets the second-stage dispatching criteria, and the multi-parallel grid-connected power generation system can smoothly complete the smooth transition from the normal operation stage to the fault continuation stage and enter the low voltage ride-through mode.
[0103] As an optional embodiment, determining the current equivalent limit resection angle of the first cluster includes:
[0104] Determine the historical equivalent power angle of the first group;
[0105] The current equivalent limit cut-off angle of the first machine group is determined according to the historical equivalent power angle, the current equivalent active power and the historical equivalent active power.
[0106] In the present invention, the method for determining the current equivalent limit resection angle of the first machine group is to first determine the historical equivalent power angle of the first machine group, and then determine the current equivalent limit resection angle of the first machine group based on the historical equivalent power angle, the current equivalent active power and the historical equivalent active power, so as to ensure that an accurate current equivalent limit resection angle is obtained.
[0107] As an optional embodiment, judging whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value includes:
[0108] Determine whether the transient stability margin assessment value is greater than a preset assessment value;
[0109] If it is greater than the preset evaluation value, the multi-machine parallel grid-connected power generation system is determined to be unstable;
[0110] If it is not greater than the preset evaluation value, the multi-machine parallel grid-connected power generation system is determined to be stable.
[0111] In the present invention, the process of judging whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value is to judge whether the transient stability margin evaluation value is greater than the preset evaluation value. If the transient stability margin evaluation value is greater than the preset evaluation value, the multi-machine parallel grid-connected power generation system is judged to be unstable; conversely, if the transient stability margin evaluation value is not greater than the preset evaluation value, the multi-machine parallel grid-connected power generation system is judged to be stable, thereby achieving accurate judgment on whether the multi-machine parallel grid-connected power generation system is stable.
[0112] It should be noted that after the multi-machine parallel grid-connected power generation system is subjected to a large disturbance, the grid-connected inverters of each grid-connected type are sorted according to the power angle, the larger m adjacent power angle differences are taken as n grouping modes, and the equivalent values under each grouping mode are calculated, and t cr1 The smallest grouping method is used as the dominant grouping method to obtain the critical fault detection time of the system, that is, the preset evaluation value.
[0113] As an optional embodiment, after judging whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value, the method further includes:
[0114] If it is determined that the multi-machine parallel grid-type power generation system is unstable, a preset dispatch control is performed on the first machine group to obtain a current new first machine group, and then the process jumps again to the step of determining a transient stability margin assessment value of the multi-machine parallel grid-type power generation system based on a first current equivalent power angle of the first machine group, a second current equivalent power angle of the second machine group, and a current equivalent active power of the first machine group, until a preset cycle end condition is met;
[0115] After the preset cycle end condition is met, if the current multi-machine parallel grid-connected power generation system is still unstable, the multi-machine parallel grid-connected power generation system is controlled to perform off-grid operation.
[0116] In the present invention, if it is determined that the multi-machine parallel grid-connected power generation system is unstable, the first machine group will also be subjected to preset scheduling control to obtain the current new first machine group, and then the step of determining the transient stability margin evaluation value of the multi-machine parallel grid-connected power generation system based on the first current equivalent power angle of the first machine group, the second current equivalent power angle of the second machine group and the current equivalent active power of the first machine group is repeated until the preset cycle end condition is met. Moreover, after the preset cycle end condition is met, if the current multi-machine parallel grid-connected power generation system is still unstable, the multi-machine parallel grid-connected power generation system is controlled to be off-grid operated, and the first scheduling control is performed, which can change the stability of the entire multi-machine parallel grid-connected power generation system. However, due to the limitation of the preset cycle end condition, the entire scheduling will still end. At this time, the stability of the multi-machine parallel grid-connected power generation system after scheduling can be judged, and the stability of the multi-machine parallel grid-connected power generation system can be more intuitively evaluated.
[0117] Please refer to Figure 7 , Figure 7 This is a schematic diagram of the structure of a transient instability assessment device for a power generation system provided by the present invention. The device comprises:
[0118] A first determination unit 11 is used to determine the grid connection point voltages corresponding to a plurality of power generation systems in the multi-machine parallel grid-connected power generation system after the multi-machine parallel grid-connected power generation system is subjected to a preset disturbance;
[0119] The division unit 12 is used to divide each power generation system into a first group and a second group based on the voltage of each grid connection point; the first group is a group whose grid connection point voltage meets a preset voltage instability condition, and the second group is a group whose grid connection point voltage meets a preset voltage stability condition;
[0120] A second determining unit 13 is used to determine a transient stability margin assessment value of a multi-machine parallel grid-connected power generation system based on a first current equivalent power angle of the first machine group, a second current equivalent power angle of the second machine group, and a current equivalent active power of the first machine group;
[0121] The judging unit 14 is used to judge whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value.
[0122] The power generation system transient instability assessment device provided in this embodiment corresponds to the above method, and therefore has the same beneficial effects as the above method. Therefore, for the embodiments of the power generation system transient instability assessment device, please refer to the description of the embodiments of the method part, which will not be repeated here.
[0123] Please refer to Figure 8 , Figure 8 The present invention provides a schematic diagram of the structure of an electronic device. The electronic device includes:
[0124] A memory 20, used for storing computer programs;
[0125] The processor 21 is used to implement the steps of the above-mentioned method for assessing transient instability of a power generation system when executing a computer program.
[0126] The electronic device provided in this embodiment may include but is not limited to a smart phone, a tablet computer, a laptop computer or a desktop computer.
[0127] Among them, the processor 21 may include one or more processing cores, such as a 4-core processor, an 8-core processor, etc. The processor 21 can be implemented in at least one hardware form of a digital signal processor (DSP), a field-programmable gate array (FPGA), and a programmable logic array (PLA). The processor 21 may also include a main processor and a coprocessor. The main processor is a processor for processing data in the awake state, also known as a central processing unit (CPU); the coprocessor is a low-power processor for processing data in the standby state. In some embodiments, the processor 21 may be integrated with a graphics processing unit (GPU), which is responsible for rendering and drawing the content to be displayed on the display screen. In some embodiments, the processor 21 may also include an artificial intelligence (AI) processor, which is used to process computing operations related to machine learning.
[0128] The memory 20 may include one or more computer-readable storage media, which may be non-transitory. The memory 20 may also include a high-speed random access memory, and a non-volatile memory, such as one or more disk storage devices, flash memory storage devices. In this embodiment, the memory 20 is at least used to store the following computer program 201, wherein, after the computer program is loaded and executed by the processor 21, it can implement the relevant steps of the method for assessing transient instability of the power generation system disclosed in any of the aforementioned embodiments. In addition, the resources stored in the memory 20 may also include an operating system 202 and data 203, etc., and the storage method may be temporary storage or permanent storage. Among them, the operating system 202 may include Windows, Unix, Linux, etc. Data 203 may include, but is not limited to, a method for assessing transient instability of a power generation system, etc.
[0129] In some embodiments, the electronic device may further include a display screen 22 , an input / output interface 23 , a communication interface 24 , a power source 25 , and a communication bus 26 .
[0130] Those skilled in the art will understand that Figure 8 The structure shown in the figure does not constitute a limitation on the electronic device, and may include more or fewer components than shown in the figure.
[0131] The purpose of this embodiment is to provide an electronic device, in which the memory 20 is used to store computer programs, and the processor 21 is used to implement the steps of the above-mentioned method for evaluating transient instability of a power generation system when executing the computer program, so as to make the evaluation process more efficient and accurate.
[0132] The present invention also provides an embodiment corresponding to a computer-readable storage medium, which is used to store a computer program, and when the computer program is executed by a processor, the method for evaluating transient instability of a power generation system as described above is implemented.
[0133] It is understandable that if the method in the above embodiment is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium to execute all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk and other media that can store program code.
[0134] The computer-readable storage medium provided in this embodiment corresponds to the above method, and therefore has the same beneficial effects as the above method. Therefore, for the embodiments of the computer-readable storage medium part, please refer to the description of the embodiments of the method part, which will not be repeated here.
[0135] It should be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0136] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for evaluating transient instability of a power generation system, characterized in that: include: After the multi-machine parallel grid-type power generation system is subjected to a preset disturbance, determining the grid connection point voltages corresponding to a plurality of power generation systems in the multi-machine parallel grid-type power generation system; Based on the grid connection point voltage, each of the power generation systems is divided into a first group and a second group; the first group is a group whose grid connection point voltage meets a preset voltage instability condition, and the second group is a group whose grid connection point voltage meets a preset voltage stability condition; Determine a transient stability margin evaluation value of the multi-machine parallel grid-connected power generation system based on a first current equivalent power angle of the first machine group, a second current equivalent power angle of the second machine group, and a current equivalent active power of the first machine group, wherein the transient stability margin evaluation value is an equivalent limit removal time; Determining whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value; The method of dividing each of the power generation systems into a first group and a second group based on the voltage of each of the grid connection points includes: Determine whether the grid connection point voltage is not greater than the threshold voltage; If it is not greater than the threshold voltage, it is determined that the power generation system corresponding to the grid connection point voltage belongs to the first machine group; If it is greater than the threshold voltage, it is determined that the power generation system corresponding to the grid connection point voltage belongs to the second machine group; The confirmation formula of the equivalent limit removal time is: t cr1 represents the equivalent limit removal time, M is the equivalent inertia of the equivalent single-machine system, ω b is the angular frequency base value, δ0 is the equivalent power angle at the initial moment of the fault detection phase, δ cr1 is the equivalent limiting resection angle.
2. The method for evaluating transient instability of a power generation system according to claim 1, characterized in that: The method of determining the transient stability margin assessment value of the multi-machine parallel grid-connected power generation system based on the first current equivalent power angle of the first machine group, the second current equivalent power angle of the second machine group, and the current equivalent active power of the first machine group includes: Determine a phase difference between current equivalent power angles of the first machine group and the second machine group according to the first current equivalent power angle and the second current equivalent power angle; Determine the output power of the first machine group after single machine equivalence based on the phase angle difference, the voltages of each grid connection point, the elements of the node admittance matrix of the first machine group, the equivalent inertia of the first machine group and the equivalent inertia of the second machine group, wherein the first machine group is an equivalent single machine power generation system after single machine equivalence; The transient stability margin assessment value of the multi-machine parallel grid-connected power generation system is determined based on the output power of the equivalent single-machine power generation system and the current equivalent active power.
3. The method for evaluating transient instability of a power generation system according to claim 2, characterized in that: The determining of the transient stability margin assessment value of the multi-machine parallel grid-connected power generation system based on the output power of the equivalent single-machine power generation system and the current equivalent active power includes: Determining a current equivalent acceleration area of the first machine group according to the output power of the equivalent single-machine power generation system, the historical equivalent active power of the first machine group, and the current equivalent active power of the first machine group; Determining a current equivalent limit resection angle of the first machine group; The transient stability margin assessment value of the multi-machine parallel grid-connected power generation system is determined based on the current equivalent acceleration area, the current equivalent limit cut-off angle, the preset angular frequency base value and the equivalent inertia of the equivalent single-machine power generation system.
4. The method for evaluating transient instability of a power generation system according to claim 3, characterized in that: The determining of the current equivalent limit resection angle of the first machine group includes: Determining a historical equivalent power angle of the first machine group; A current equivalent limit cut-off angle of the first machine group is determined according to the historical equivalent power angle, the current equivalent active power and the historical equivalent active power.
5. The method for evaluating transient instability of a power generation system according to claim 1, characterized in that: The determining whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value includes: Determining whether the transient stability margin assessment value is greater than a preset assessment value; If it is greater than a preset evaluation value, it is determined that the multi-machine parallel grid-connected power generation system is unstable; If it is not greater than the preset evaluation value, it is determined that the multi-machine parallel grid-connected power generation system is stable.
6. The method for evaluating transient instability of a power generation system according to any one of claims 1 to 5, characterized in that: After judging whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value, the method further includes: If it is determined that the multi-machine parallel grid-type power generation system is unstable, a preset dispatch control is performed on the first machine group to obtain the current new first machine group, and then the process jumps again to the step of determining the transient stability margin assessment value of the multi-machine parallel grid-type power generation system based on the first current equivalent power angle of the first machine group, the second current equivalent power angle of the second machine group, and the current equivalent active power of the first machine group, until a preset cycle end condition is met; After the preset cycle end condition is met, if the current multi-machine parallel grid-connected power generation system is still unstable, the multi-machine parallel grid-connected power generation system is controlled to perform off-grid operation.
7. A transient instability assessment device for a power generation system, characterized in that: include: A first determination unit is used to determine the grid connection point voltages corresponding to a plurality of power generation systems in the multi-machine parallel grid-type power generation system after the multi-machine parallel grid-type power generation system is subjected to a preset disturbance; A division unit, configured to divide each of the power generation systems into a first group and a second group based on the grid connection point voltage; the first group is a group whose grid connection point voltage satisfies a preset voltage instability condition, and the second group is a group whose grid connection point voltage satisfies a preset voltage stability condition; a second determining unit, configured to determine a transient stability margin evaluation value of the multi-machine parallel grid-connected power generation system based on a first current equivalent power angle of the first machine group, a second current equivalent power angle of the second machine group, and a current equivalent active power of the first machine group, wherein the transient stability margin evaluation value is an equivalent limit removal time; A judging unit, configured to judge whether the multi-machine parallel grid-connected power generation system is stable based on the transient stability margin evaluation value; The division unit comprises: A judging subunit, used to judge whether the grid connection point voltage is not greater than a threshold voltage; A first determination unit, configured to determine, when the voltage is not greater than a threshold voltage, that the power generation system corresponding to the grid connection point voltage belongs to the first machine group; A second determination unit, configured to determine that the power generation system corresponding to the grid connection point voltage belongs to the second machine group when the voltage is greater than a threshold voltage; The confirmation formula of the equivalent limit removal time is: t cr1 represents the equivalent limit removal time, M is the equivalent inertia of the equivalent single-machine system, ω b is the angular frequency base value, δ0 is the equivalent power angle at the initial moment of the fault detection phase, δ cr1 is the equivalent limiting resection angle.
8. An electronic device, characterized in that: include: Memory for storing computer programs; A processor, configured to implement the steps of the method for assessing transient instability of a power generation system as claimed in any one of claims 1 to 6 when executing the computer program.
9. A computer-readable storage medium, characterized in that: Used to store a computer program, which, when executed by a processor, implements the method for evaluating transient instability of a power generation system as described in any one of claims 1 to 6.
Citation Information
Patent Citations
Analysis method for influence of wind farm access on fault limit cut-off time of multi-machine system
CN109713661A
Transient stability margin evaluation method suitable for renewable energy generation base during low-voltage ride-through period
CN110311415A