A fast-detachable fastener-type steel pipe scaffolding connecting member and its construction method
By using fastener steel pipe scaffolding that can be quickly disassembled, the high cost and fire hazards of the existing embedded steel pipe method are solved, and rapid installation and disassembly are achieved, ensuring construction safety and cost savings.
Patent Information
- Application Number
- CN202311205388.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-09-19
- Publication Date
- 2025-05-30
- Estimated Expiration
- 2043-09-19
AI Technical Summary
The existing embedded steel pipe method has problems such as high production costs, dismantling troubles and fire hazards in the erection of fastener steel pipe scaffolding.
A fast-removable fastener steel pipe scaffolding wall connecting piece is adopted, including a hollow structure cube mold, a fixture, a vertical straight pipe, a first module and a second module. By combining and splicing these components, rapid installation and disassembly are achieved.
It effectively solves the problem that pre-embedded steel pipes cannot be recycled, and is convenient and fast to operate and install, ensures construction safety, and can be reused and saved costs.
Smart Images

Figure CN117266537B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of construction engineering, and particularly relates to a detachable fastener-type steel pipe scaffolding connecting member and a construction method thereof. Background Art
[0002] During the erection of fastener-type steel pipe scaffolds in building construction, the method of embedding steel pipes is to bury a vertical short steel pipe about 25 cm into the beam before concrete pouring, with about 25 cm exposed from the back of the beam. After the concrete pouring is completed, a horizontal long steel pipe is used to connect the vertical pole and the vertical short steel pipe. This is the most commonly used method for connecting wall members at present and can play a role in rigid connection.
[0003] However, the connecting members used in the method of embedding steel pipes have high manufacturing costs and are troublesome to disassemble. For some embedded steel pipe connecting members that cannot be removed with a wrench, most are cut with an open flame, which poses a serious fire hazard. At the same time, the cut surfaces may be uneven, and the steel pipes at the cut parts are prone to rusting later and causing water seepage and other problems, affecting subsequent construction. Summary of the Invention
[0004] In order to solve the above technical problems, the inventors have obtained the technical solution of the present invention through practice and summary. The present invention discloses a detachable fastener-type steel pipe scaffolding connecting member, which is installed in a building structure and includes a cubic formwork. The cubic formwork has a hollow structure and an open upper end, and a fixing member is connected inside it. The length of the fixing member is greater than the height of the cubic formwork. A vertical straight pipe is sleeved outside the fixing member. First modules are provided on both sides of the vertical straight pipe. A second module is provided on the side of the first module opposite to the vertical straight pipe. The second module and the first module are spliced and filled between the vertical straight pipe and the cubic formwork to fix the vertical straight pipe.
[0005] Further preferably, the second module includes a base arranged in a trapezoidal structure and a protrusion connected to the top of the base.
[0006] Further preferably, through holes are formed in the first module, and the protrusions are correspondingly matched with the through holes when the first module and the second module are in the closed mold state.
[0007] Further preferably, the height of the protrusion is greater than the length of the through hole.
[0008] Further preferably, a handle is provided on the fixing member.
[0009] Further preferably, both the cubic formwork and the fixing member are made of rubber materials.
[0010] The present invention also discloses a construction method of a detachable fastener-type steel pipe scaffolding connecting member.
[0011] It includes the following steps:
[0012] S1. First, apply a release agent on the outside of the cubic formwork. Then, pre-embed and fix the cubic formwork with the fixing parts in advance during the installation of the building structure, and then pour concrete;
[0013] S2. Sleeve the vertical straight pipe on the fixing part, and then insert the second modules on both sides of the vertical straight pipe respectively;
[0014] S3. Insert the first modules on the second modules respectively to complete the fixation of the vertical straight pipe;
[0015] S4. Erect a scaffold and connect the horizontal cross bars with the vertical straight pipes;
[0016] S5. During demolition, remove the first modules, the second modules and the vertical straight pipes, hold the fixing parts and pull out the cubic formwork, and finally fill and repair the holes on the building structure.
[0017] Compared with the prior art, the present invention can achieve the following technical effects:
[0018] A detachable fastener-type steel pipe scaffold connecting wall member of the present invention can effectively solve the problem that the embedded steel pipes cannot be recycled, is convenient and fast to operate and install, ensures the construction safety of the fastener-type steel pipe scaffold, can be reused to save costs, and has good use and popularization value. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings required for use in the description of the embodiments or the prior art. Obviously, for those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on these drawings.
[0020] FIG. 1 is a schematic structural diagram of the present invention;
[0021] FIG. 2 is a front view of the present invention;
[0022] FIG. 3 is a side view of the present invention;
[0023] FIG. 4 is a top view of the present invention.
[0024] In the figure: 1. Building structure; 11. Cubic formwork; 2. Fixing part; 3. Vertical straight pipe; 4. First module; 5. Second module; 51. Base; 52. Protrusion; 6. Horizontal cross bar. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0025] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention will be further described in detail below in conjunction with embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0026] The application principle of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0027] Embodiment 1
[0028] As Figures 1-4 shown, a detachable fastener-type steel pipe scaffolding connecting wall member is composed of a cube mold 11, a fixing member 2, a vertical straight pipe 3, a first module 4 and a second module 5. A hole matching the cube mold 11 is opened in the building structure 1. During installation, the cube mold 11 with the fixing member 2 is pre-buried in the hole in advance, which can effectively solve the problem that the pre-buried steel pipe cannot be recycled, and ensure the construction safety of the erection of the fastener-type steel pipe scaffolding while being convenient and fast in operation and installation.
[0029] Among them, the cube mold 11 is provided with a hollow structure, a fixing member 2 is provided at the center of its inner bottom, and the length of the fixing member 2 is greater than the height of the cube mold 11. A handle is provided on the fixing member 2. At the same time, both the cube mold 11 and the fixing member 2 are made of rubber materials; the vertical straight pipe 3 matches the size of the fixing member 2. The first module 4 is arranged on both sides of the vertical straight pipe 3, and the second module 5 is arranged on the side of the first module 4 opposite to the vertical straight pipe 3. The vertical straight pipe 3 is sleeved outside the fixing member 2, and then fixed by the first module 4 and the second module 5.
[0030] The second module 5 is composed of a base 51 and a protrusion 52. The base 51 is provided with a right trapezoidal structure, and the protrusion 52 is fixedly connected to the top of the base 51; at the same time, a through hole is opened on the first module 4. When the first module 4 and the second module 5 are in the closed mold state, the protrusion 52 corresponds and cooperates with the through hole. The second module 5 and the first module 4 are spliced and filled between the vertical straight pipe 3 and the cube mold 11 to fix the vertical straight pipe 3 and the fixing member 2 in the cube mold 11, improving the stability of the overall structure.
[0031] And, the height of the protrusion 52 is greater than the length of the through hole. As the first module 4 and the second module 5 are spliced, the protrusion 52 penetrates through the first module 4 and extends outward by a part.
[0032] Embodiment 2
[0033] A construction method for a detachable fastener-type steel pipe scaffolding connecting wall member is as follows:
[0034] S1. First, apply a release agent to the outside of the cubic formwork 11. Then, pre-embed and fix the cubic formwork 11 with the fixing member 2 in advance during the installation of the building structure 1. Subsequently, pour concrete.
[0035] S2. Slip the vertical straight pipe 3 over the fixing member 2, and then insert the second module 5 on both sides of the vertical straight pipe 3 respectively.
[0036] S3. Insert the first module 4 on the second module 5 respectively to complete the fixation of the vertical straight pipe 3.
[0037] S4. Erect a scaffold and connect the horizontal cross bar 6 with the vertical straight pipe 3.
[0038] S5. During demolition, remove the first module 4, the second module 5 and the vertical straight pipe 3. Hold the fixing member 2 and pull out the cubic formwork 11. Finally, fill and repair the holes on the building structure 1.
Claims
1. A quick-detachable fastener-type steel pipe scaffolding connecting member is installed in a building structure (1). It is characterized in that: It includes a cubic mold (11). The cubic mold (11) has a hollow structure and an open upper end. A fixing member (2) is connected inside it. The length of the fixing member (2) is greater than the height of the cubic mold (11). A vertical straight pipe (3) is sleeved outside the fixing member (2). First modules (4) are arranged on both sides of the vertical straight pipe (3). A second module (5) is arranged on the side of the first module (4) opposite to the vertical straight pipe (3). The second module (5) and the first module (4) are spliced and filled between the vertical straight pipe (3) and the cubic mold (11) to fix the vertical straight pipe (3). The second module (5) includes a base (51) arranged in a trapezoidal structure and a protrusion (52) connected to the top of the base (51). Through holes are formed in the first module (4). When the first module (4) and the second module (5) are in the mold-closing state, the protrusion (52) is correspondingly matched with the through holes. The height of the protrusion (52) is greater than the length of the through holes. A handle is provided on the fixing member (2). Both the cubic mold (11) and the fixing member (2) are made of rubber materials.
2. A construction method of the quick-detachable fastener-type steel pipe scaffolding connecting member according to claim 1, It is characterized in that It includes the following steps: S1. First, apply a release agent on the outside of the cubic mold (11). Then, pre-embed and fix the cubic mold (11) with the fixing member (2) in advance during the installation of the building structure (1). Subsequently, pour concrete. S2. Sleeve the vertical straight pipe (3) on the fixing member (2), and then insert the second modules (5) on both sides of the vertical straight pipe (3) respectively. S3. Insert the first modules (4) on the second modules (5) respectively to complete the fixing of the vertical straight pipe (3). S4. Erect the scaffolding and connect the horizontal crossbars (6) with the vertical straight pipes (3). S5. During demolition, take out the first module (4), the second module (5) and the vertical straight pipe (3), hold the fixing member (2) and pull out the cubic mold (11), and finally fill and repair the holes on the building structure (1).