Slope water hole drilling and sand filling device and construction method thereof
By designing a sand-filling device for opening drainage holes on slopes, and using a platform, insert rod, sleeve, and spiral blade for manual operation, the problems of low construction efficiency and poor quality of drainage holes on slopes were solved, achieving a high-efficiency construction effect without disturbing the stability of the slope.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA FIRST METALLURGICAL GROUP
- Filing Date
- 2023-10-30
- Publication Date
- 2026-06-02
AI Technical Summary
Existing technologies are difficult to implement in terms of slope stability and construction. The opening and sand filling of slope drainage holes are inefficient and of poor quality, and large equipment may disturb slope stability.
Design a slope drainage hole opening and sand filling device, including a platform, insert rod, sleeve, slide tube and spiral blade. The device is operated manually to make precise holes and fill sand. The spiral blade is used to dig holes and transport soil, and then fill sand.
It achieves efficient and precise opening and sand filling of drainage holes, with good construction quality and no disturbance to slope stability.
Smart Images

Figure CN117306560B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of foundation pit slope construction, specifically relating to a slope drainage hole opening and sand filling device and its construction method. Background Technology
[0002] To ensure the stability of the excavated slope, slope protection design is necessary. Slope protection with wire mesh and shotcrete anchors is the most economical and commonly used form of support for excavations. Drainage holes need to be left on the slope to drain water from the soil behind the shotcrete anchor support, preventing soil erosion and slope instability, and ensuring the stability of the shotcrete anchor structure. Currently, the drilling and sand filling of drainage holes on slopes are generally done manually, resulting in low efficiency and poor construction quality. Using large equipment, on the other hand, can easily disturb slope stability. Summary of the Invention
[0003] The purpose of this invention is to provide a device for opening and filling drainage holes with sand on slopes and its construction method. This invention allows for precise and labor-saving opening and filling of drainage holes with sand through manual operation, resulting in high construction efficiency, good quality, and no disturbance to slope stability.
[0004] The technical solution adopted in this invention is:
[0005] A slope drainage hole opening and sand filling device includes a platform; height-adjustable insert rods are distributed around the lower side of the platform; a sleeve is provided at the front of the platform, with the front end of the sleeve extending out of the platform, the middle outer wall hinged to the front side of the platform, and the rear end located below the platform; the upper and lower sides of the sleeve are respectively provided with sand inlet and soil outlet, and both the sand inlet and soil outlet are provided with openable and closable covers; a slide cylinder is provided at the lower middle part of the platform, with the outer wall of the slide cylinder hinged to the lower end of the connecting rod and the rotating part in sequence; a screw is fixed at the upper end of the rotating part, and the screw threadedly passes through the platform; the part of the screw above the platform is provided with a lifting and lowering operation component; a working rod passes through the sleeve, with continuous spiral blades distributed along the line; the front end of the spiral blades is provided with digging teeth, and the outer edge matches the inner wall of the sleeve; a transmission rod passes through the slide cylinder, with the front end of the transmission rod connected to the rear end of the working rod, and the rear end provided with a handle for operating rotation and forward / backward movement.
[0006] Preferably, the lifting operating component includes a turntable and a handle, with the turntable fixed to the screw and the handle fixed to the turntable.
[0007] Preferably, the platform, sleeve, and slide are all provided with an anti-rust coating.
[0008] Preferably, the upper part of the insertion rod is threaded onto the underside of the platform.
[0009] Preferably, the lower end of the insertion rod is pointed.
[0010] The construction method of the above-mentioned slope drainage hole opening and sand filling device is as follows: First, transfer the entire device to the location on the slope where the hole is to be opened, insert the insertion rod into the soil to fix the entire device, and adjust the insertion rod to a suitable height; then, adjust the height of the screw through the lifting operation device, which in turn drives the slide, transmission rod, working rod and sleeve to swing up and down together until the appropriate opening angle is adjusted and then stop; then close the sand inlet and open the soil outlet, operate the handle to make the transmission rod rotate and advance simultaneously, which in turn drives the working rod to rotate and advance simultaneously, and the spiral blade passes through the front The excavator teeth at the end dig a hole forward, and the resulting soil is conveyed backward by the spiral blades until it is discharged from the discharge port. The process stops once the drainage hole is formed. Then, the sand inlet is opened and the discharge port is closed. Sand is poured into the sand inlet. At the same time, the handle is operated to reverse the transmission rod, which in turn drives the working rod to reverse. The sand is conveyed forward by the spiral blades to the front end of the drainage hole. After a period of time, the handle is operated to reverse and retract the transmission rod, which in turn drives the working rod to reverse and retract until the drainage hole is filled with sand. Finally, the drainage pipe is wrapped with permeable cloth and inserted into the sand-filled drainage hole.
[0011] The beneficial effects of this invention are:
[0012] This invention allows for precise and labor-saving opening and sand filling of drainage holes through manual operation, resulting in high construction efficiency, good quality, and no disturbance to slope stability. Attached Figure Description
[0013] Figure 1 This is a perspective view of the slope drainage hole opening and sand filling device in an embodiment of the present invention.
[0014] Figure 2 This is a top view of the slide, transmission rod, working rod, and sleeve after installation in an embodiment of the present invention.
[0015] Figure 3 This is a schematic diagram of the installation of the platform, slide, and transmission rod in an embodiment of the present invention.
[0016] Figure 4 This is a schematic diagram of the working rod in an embodiment of the present invention.
[0017] In the diagram: 1-Working rod; 2-Sleeve; 3-Cover; 4-Sand inlet; 5-Screw; 6-Handle; 7-Turntable; 8-Handle; 9-Transmission rod; 10-Insertion rod; 11-Platform; 12-Soil discharge port; 13-Slide cylinder; 14-Helical blade; 15-Digging teeth; 16-Rotating component; 17-Connecting rod. Detailed Implementation
[0018] The present invention will be further described below with reference to the accompanying drawings and embodiments.
[0019] like Figures 1 to 4As shown, this embodiment discloses a slope drainage hole opening and sand filling device, including a platform 11; adjustable-height insertion rods 10 are distributed around the lower side of the platform 11; a sleeve 2 is provided at the front of the platform 11, the front end of the sleeve 2 extends out of the platform 11, the middle outer wall is hinged to the front side of the platform 11, and the rear end is located below the platform 11; the upper and lower sides of the sleeve 2 are respectively provided with a sand inlet 4 and a soil outlet 12, and both the sand inlet 4 and the soil outlet 12 are provided with an openable and closable cover 3; a sliding cylinder 13 is provided at the lower middle part of the platform 11, and the outer wall of the sliding cylinder 13 is hinged upwards sequentially. The lower end of rod 17 and rotating part 16 is fixed with screw 5 at the upper end of rotating part 16. Screw 5 is threaded through the platform 11. The part of screw 5 above the platform 11 is provided with lifting operation parts. Working rod 1 runs through the sleeve 2. Continuous spiral blades 14 are distributed along the working rod 1. The front end of spiral blade 14 is provided with digging teeth 15 and the outer edge matches the inner wall of sleeve 2. Transmission rod 9 runs through the slide cylinder 13. The front end of transmission rod 9 is connected to the rear end of working rod 1 and the rear end is provided with a handle 8 for operating rotation and forward / backward movement.
[0020] like Figure 1 and Figure 3 As shown, in this embodiment, preferably, the lifting operation component includes a turntable 7 and a handle 6. The turntable 7 is fixed on the screw 5, and the handle 6 is fixed on the turntable 7.
[0021] like Figure 1 As shown, in this embodiment, preferably, the upper part of the insertion rod 10 is threaded onto the lower side of the platform 11.
[0022] like Figure 1 As shown, in this embodiment, preferably, the lower end of the insertion rod 10 is pointed.
[0023] In this embodiment, preferably, the platform 11, sleeve 2 and slide 13 are all provided with anti-rust coating.
[0024] The construction method of the above-mentioned slope drainage hole opening and sand filling device is as follows: First, transfer the entire device to the location of the hole to be opened on the slope. Insert the rod 10 into the soil to fix the entire device and adjust the rod 10 to a suitable height. Then, adjust the height of the screw 5 by using the lifting operation device, which will drive the slide cylinder 13, transmission rod 9, working rod 1 and sleeve 2 to swing up and down together until the appropriate opening angle is reached and then stop. Then, close the sand inlet 4 and open the soil outlet 12. Operate the handle 8 to make the transmission rod 9 rotate and move forward at the same time, which will drive the working rod 1 to rotate and move forward at the same time. The spiral blade 14 passes through the front The excavating teeth 15 at the end dig a hole forward, and the soil produced is conveyed backward by the spiral blades 14 until it is discharged from the discharge port 12. The process stops after the drainage hole is formed. Then, the sand inlet 4 is opened and the discharge port 12 is closed. Sand is put into the sand inlet 4. At the same time, the handle 8 is operated to reverse the transmission rod 9, which in turn drives the working rod 1 to reverse. The sand is conveyed forward by the spiral blades 14 to the front end of the drainage hole. After a period of time, the handle 8 is operated to reverse and retract the transmission rod 9, which in turn drives the working rod 1 to reverse and retract until the sand fills the drainage hole. Finally, the drainage pipe is wrapped with permeable cloth and inserted into the sand-filled drainage hole.
[0025] This invention allows for precise and labor-saving opening and sand filling of drainage holes through manual operation, resulting in high construction efficiency, good quality, and no disturbance to slope stability.
[0026] The embodiments described above are some, but not all, of the embodiments of this application. The detailed description of the embodiments of this application is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.
Claims
1. A method for constructing drainage holes on slopes by filling them with sand, characterized in that: A slope drainage hole opening and sand filling device is adopted. The device includes a platform; adjustable rods are distributed around the lower side of the platform; a sleeve is provided at the front of the platform, with the front end of the sleeve extending out of the platform, the middle outer wall hinged to the front side of the platform, and the rear end located below the platform. The upper and lower sides of the sleeve are respectively provided with sand inlet and soil outlet, and both the sand inlet and soil outlet are provided with openable and closable covers; a slide is provided at the lower middle part of the platform, with the outer wall of the slide being hinged to the lower end of the connecting rod and the rotating part in sequence. The upper end of the rotating part is fixed with a screw, which is threaded through the platform. The part of the screw above the platform is provided with a lifting and lowering operation device; a working rod passes through the sleeve, with continuous spiral blades distributed along the line. The front end of the spiral blades is provided with digging teeth, and the outer edge matches the inner wall of the sleeve; a transmission rod passes through the slide, with the front end of the transmission rod connected to the rear end of the working rod, and the rear end is provided with a handle for operating rotation and forward and backward movement; During construction: First, move the entire device to the location on the slope where the hole is to be drilled. Insert the rod into the soil to fix the entire device and adjust the rod to a suitable height. Then, adjust the height of the screw using the lifting control, which will cause the slide, transmission rod, working rod, and sleeve to swing up and down together until the appropriate drilling angle is reached and then stop. Next, close the sand inlet and open the soil outlet. Operate the handle to make the transmission rod rotate and move forward simultaneously, which in turn drives the working rod to rotate and move forward simultaneously. The spiral blade digs the hole forward through the front digging teeth, and the generated soil is conveyed backward by the spiral blade until it is discharged from the soil outlet. Stop after the drainage hole is formed. Then, open the sand inlet and close the soil outlet, and put sand into the sand inlet. At the same time, operate the handle to reverse the transmission rod, which in turn drives the working rod to reverse. The sand is conveyed forward by the spiral blade to the front end of the drainage hole. After a period of time, operate the handle to reverse and retract the transmission rod, which in turn drives the working rod to reverse and retract until the sand fills the drainage hole and then stops. Finally, wrap the drainage pipe with permeable cloth and insert it into the sand-filled drainage hole.
2. The method for constructing drainage holes and filling them with sand as described in claim 1, characterized in that: The lifting control components include a turntable and a handle. The turntable is fixed to the screw, and the handle is fixed to the turntable.
3. The method for constructing drainage holes and filling them with sand as described in claim 1, characterized in that: The platform, sleeve, and slide are all coated with an anti-rust coating.
4. The method for constructing drainage holes and filling them with sand as described in claim 1, characterized in that: The upper part of the insertion rod is threaded onto the underside of the platform.
5. The method for constructing drainage holes and filling them with sand as described in claim 1, characterized in that: The lower end of the insertion rod is pointed.