An engineering measurement method and engineering target to be measured

By establishing and verifying the overall geometric linear relationship, using conditions and verifying the relationship between measuring points, the spatial geometric parameters of the measuring points to be measured are indirectly calculated, which solves the problem of large measurement errors in engineering measurement and achieves high-precision and low-cost measurement. Effect.

CN117346748BActive Publication Date: 2024-10-18CCCC SECOND HIGHWAY ENG CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311115764.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-31
Publication Date
2024-10-18
Estimated Expiration
2043-08-31

AI Technical Summary

Technical Problem

In engineering surveying, measurement errors are large due to occlusion, long distance and environmental factors during direct measurement. The existing methods are complex and costly, making it difficult to ensure high accuracy.

Method used

By obtaining the spatial geometric parameters of several conditional measuring points, the overall geometric linear relationship is established, the verification measuring points are used to verify and correct the relationship, the spatial geometric parameters of the measuring points to be measured are indirectly calculated, and auxiliary measuring rods are introduced to calculate the parameters of measuring points that are inconvenient to observe. to an observable position.

Benefits of technology

It achieves the acquisition of accurate coordinate parameters of the measurement point to be measured, reduces the difficulty and cost of measurement technology, ensures measurement accuracy, and has good application value and promotion significance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117346748B_ABST
    Figure CN117346748B_ABST
Patent Text Reader

Abstract

The present invention provides an engineering measurement method and an engineering target to be measured, wherein the method is used to measure the spatial geometric parameters of a measuring point to be measured on the engineering target to be measured, obtain the spatial geometric parameters of a plurality of conditional measuring points; establish an overall geometric linear relationship based on the spatial geometric parameters of the plurality of conditional measuring points; in addition, obtain the spatial geometric parameters of a plurality of verification measuring points different from the conditional measuring points, verify the accuracy of the established overall geometric linear relationship based on the spatial geometric parameters of the plurality of verification measuring points; obtain the spatial geometric parameters of the measuring point to be measured based on the verified overall geometric linear relationship. The present invention infers the overall linear relationship through measurable local coordinate parameters, and then calculates the local parameters to be determined through the overall linear relationship. The method has a clear principle and is simple to operate. It can be applied to various engineering practice scenarios that cannot be directly measured, and has good application value and promotion significance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of engineering measurement, and in particular relates to an engineering measurement method and an engineering target to be measured. Background Art

[0002] Engineering surveying is an important part of engineering construction. Accurate measurement results are required as a prerequisite for control and decision-making throughout the entire life cycle of survey and design, construction, operation and maintenance. Engineering surveying first requires calibrating measuring points at appropriate locations, and then setting up measuring instruments for data collection. However, in the actual measurement process, the layout of measuring points and measurement conditions often cannot reach the ideal state. There may be obstructions at the measured location, long measurement distances, and environmental factors that cause the measuring point position to be unable to maintain a stable state. The coordinate information of some key measuring points cannot be directly and accurately obtained, thus affecting construction accuracy and status assessment. At this stage, the above problems are mainly solved in the following two ways:

[0003] One is to improve the measurement accuracy and feasibility of long-distance measurement by purchasing high-precision measuring instruments or developing new measurement systems. However, as the distance between measuring points increases, natural factors such as atmosphere, temperature, and light may amplify measurement errors, which greatly increases the purchase cost of high-precision measuring instruments and system development costs.

[0004] The second method is to use machine recognition technology and mathematical morphology and other analytical methods to estimate the location parameters of the obstruction, or to convert the coordinates of the position to be measured by setting up a complex observation network. However, these methods are too complicated, technically difficult, require many implementation steps, and are difficult to verify in actual accuracy.

[0005] By summarizing the above measurement problems, it is believed that the main reason for the measurement error is that there are too many influencing factors and large interference in the direct measurement process, and the current measurement method cannot guarantee high measurement accuracy. If direct measurement can be avoided, the more accurate overall theoretical geometric relationship can be inferred through the coordinates of locally measurable measuring points, and then the theoretical geometric relationship can be used to infer the parameters of the measured position, the difficulty of measurement technology can be reduced and the measurement accuracy can be improved. Summary of the invention

[0006] In view of this, an embodiment of the present invention provides an engineering measurement method and an engineering target to be measured, by directly measuring the measuring points that are convenient for observation, and using the measured points as known conditions to establish the overall geometric linear relationship between the measurable measuring points and the target measuring points to be measured, and obtaining the spatial geometric parameters of the measuring points to be measured by indirect calculation. The method has a clear principle, simple operation, and great application value and promotion significance.

[0007] A first aspect of the present invention provides an engineering measurement method for measuring the spatial geometric parameters of a measuring point to be measured on an engineering target to be measured, comprising the following steps: S1: obtaining the spatial geometric parameters of a plurality of conditional measuring points; S2: establishing an overall geometric linear relationship based on the spatial geometric parameters of the plurality of conditional measuring points; S3: additionally obtaining the spatial geometric parameters of a plurality of verification measuring points different from the plurality of conditional measuring points, and verifying the accuracy of the overall geometric linear relationship established in S2 based on the spatial geometric parameters of the plurality of verification measuring points; S4: obtaining the spatial geometric parameters of the measuring point to be measured based on the overall geometric linear relationship verified by S3.

[0008] Optionally, the spatial geometric parameters of the plurality of conditional measuring points in step S1 are coordinate parameters of a spatial rectangular coordinate system of the plurality of conditional measuring points.

[0009] Optionally, the establishing of the overall geometric linear relationship based on the spatial geometric parameters of the plurality of conditional measuring points in step S2 specifically includes: taking the spatial geometric parameters of the plurality of conditional measuring points as known boundary conditions, and establishing a theoretical calculation formula that is compatible with the overall geometric linear relationship; and the specific number of the plurality of conditional measuring points is not less than the minimum number of known parameters required to solve the overall geometric linear relationship.

[0010] Optionally, the number of the verification measurement points in step S3 is not less than three, and the spatial geometric parameters of the verification measurement points are coordinate parameters of a spatial rectangular coordinate system of the verification measurement points.

[0011] Optionally, verifying the accuracy of the overall geometric linear relationship established in S2 based on the several verification measuring points in step S3 specifically includes: bringing the several verification measuring points into the overall geometric linear relationship established in S2 based on the spatial geometric parameters of the several conditional measuring points, and judging whether the geometric parameters of the several verification measuring points meet the error requirements.

[0012] Optionally, in step S4, obtaining the spatial geometric parameters of the measuring points to be measured based on the overall geometric linear relationship verified by S3 specifically includes: if the geometric parameters of the several verified measuring points in S3 meet the error requirements, obtaining the spatial geometric parameters of the measuring points to be measured through the overall geometric linear relationship; if the geometric parameters of the several verified measuring points in S3 do not meet the error requirements, analyzing and correcting the overall geometric linear relationship until the error limit requirements are met, and obtaining the spatial geometric parameters of the measuring points to be measured through the corrected overall geometric linear relationship.

[0013] Optionally, in step S3, verifying the accuracy of the overall geometric linear relationship established in S2 based on the plurality of verification measurement points specifically includes: calculating parameter errors of the plurality of verification measurement points, and the specific calculation formula is:

[0014] z 计算 =W(x)

[0015] |z 计算 -z 实测 |<ε

[0016] In the formula, z 计算 To verify the calculated coordinate parameters of the measuring point, z 实测 is the measured coordinate parameter of the verification point, ε is the error limit, W(x) is the linear formula of the overall geometric linear relationship, and x is the position parameter of the verification point.

[0017] Optionally, the method of establishing the overall geometric linear relationship is selected according to the position of the measuring point to be measured on the engineering target to be measured in S4, specifically including: when the calibrated position of the measuring point to be measured is located at a position on the engineering target to be measured that can be directly observed, the overall geometric linear relationship is established directly in combination with the geometric characteristics of the engineering target itself; when the calibrated position of the measuring point to be measured is located at a position on the engineering target to be measured that cannot be directly observed, an auxiliary measuring rod is set, and the measuring point to be measured is spatially associated with the measurable measuring point through the auxiliary measuring rod, and the overall geometric linear relationship is established according to the geometric characteristics of the auxiliary measuring rod.

[0018] Optionally, the auxiliary measuring rod is a rigid part, and one or more of the measuring points to be measured, the verification measuring points and the conditional measuring points can be calibrated in advance on the auxiliary measuring rod; when measuring, the calibrated position of the measuring point to be measured on the auxiliary measuring rod is coincident and fixed with the actual position of the measuring point to be measured on the engineering target to be measured.

[0019] The second aspect of the present invention provides an engineering target to be measured, on which there are measuring points to be measured, and the spatial geometric parameters of the measuring points to be measured are measured using an engineering measurement method, characterized in that: the engineering target to be measured is an engineering structure with an overall geometric linear relationship shape.

[0020] The beneficial effects of the present invention are:

[0021] 1. Use conditional measuring points to determine the overall geometric linear relationship. The linear formula can accurately calculate the spatial position parameters of any measuring point to be measured on the overall geometric linear relationship.

[0022] 2. Introduce auxiliary measuring rods to extend the parameter relationship of measuring points that are inconvenient to observe to observable positions, and use indirect calculation methods to obtain the accurate coordinate parameters of the measuring points to be measured.

[0023] 3. The overall geometric linear relationship can be verified by verifying the measuring points to ensure the accuracy of the overall geometric linear relationship.

[0024] Additional advantages, objects, and features of the present invention will be described in part in the following description, and will become apparent to those skilled in the art after studying the following, or may be learned from the practice of the present invention. The objects and other advantages of the present invention may be realized and obtained by the structures and method steps specifically pointed out in the written description and claims and the accompanying drawings.

[0025] Those skilled in the art will appreciate that the objectives and advantages that can be achieved with the present invention are not limited to the above specific description, and the above and other objectives that can be achieved by the present invention will be more clearly understood from the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The drawings described herein are used to provide a further understanding of the present invention, constitute a part of this application, and do not constitute a limitation of the present invention.

[0027] Figure 1 It is a technical roadmap of the engineering measurement method in the embodiment of the present invention;

[0028] Figure 2 is a schematic diagram of the cable line to be measured in the engineering measurement method in an embodiment of the present invention;

[0029] Figure 3 It is a schematic diagram of the elevation of the formwork to be measured in the engineering measurement method in an embodiment of the present invention;

[0030] Figure 4 It is a schematic diagram of the elevation of the arch ring to be measured in the engineering measurement method in an embodiment of the present invention;

[0031] Figure 5 is a schematic diagram of an auxiliary measuring rod in an engineering surveying method according to an embodiment of the present invention;

[0032] Figure numerals: 1-measurement point to be measured; 2-verification measurement point; 3-conditional measurement point; 4-auxiliary measuring rod; 5-cable to be measured; 6-concrete pouring formwork; 7-pouring concrete; 8-main arch ring; 9-arch column. DETAILED DESCRIPTION

[0033] In order to make the purpose, technical scheme and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments and the accompanying drawings. The schematic embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention. It should also be noted that, in order to avoid blurring the present invention due to unnecessary details, only structures and / or processing steps closely related to the solutions according to the present invention are shown in the accompanying drawings, while other details that are not closely related to the present invention are omitted.

[0034] It should be emphasized that the term “include / comprises” when used herein refers to the presence of features, elements, steps or components, but does not exclude the presence or addition of one or more other features, elements, steps or components.

[0035] The embodiments of the present invention are described in detail and clearly below in conjunction with the accompanying drawings.

[0036] An embodiment of the present invention provides an engineering surveying method for measuring the spatial geometric parameters of a measuring point to be measured on an engineering target to be measured, comprising the following steps: S1: obtaining the spatial geometric parameters of a number of conditional measuring points; S2: establishing an overall geometric linear relationship based on the spatial geometric parameters of the conditional measuring points; S3: additionally obtaining the spatial geometric parameters of a number of verification measuring points different from the conditional measuring points, and verifying the accuracy of the overall geometric linear relationship established in S2 based on the spatial geometric parameters of the verification measuring points; S4: obtaining the spatial geometric parameters of the measuring point to be measured based on the overall geometric linear relationship verified by S3. Figure 1 It can be seen that the conditional measuring points in the present invention are known and measurable local parameters, which can be directly obtained from the engineering target to be measured, or obtained from an additional auxiliary measuring rod. At the same time, the obtained conditional measuring points need to meet the determination conditions in the overall geometric linear relationship and the accuracy conditions in the specific measurement.

[0037] Optionally, the spatial geometric parameters of the plurality of conditional measuring points in step S1 are coordinate parameters of a spatial rectangular coordinate system of the plurality of conditional measuring points.

[0038] Optionally, establishing the overall geometric linear relationship based on the spatial geometric parameters of a number of conditional measuring points in step S2 specifically includes: taking the spatial geometric parameters of the number of conditional measuring points as known boundary conditions, and establishing a theoretical calculation formula that is compatible with the overall geometric linear relationship; the specific number of the number of conditional measuring points is not less than the minimum number of known parameters required to solve the overall geometric linear relationship.

[0039] Optionally, the number of the verification measuring points in step S3 is not less than three, and the spatial geometric parameters of the verification measuring points are coordinate parameters of a spatial rectangular coordinate system of the verification measuring points.

[0040] Optionally, in step S3, verifying the accuracy of the overall geometric linear relationship established in S2 based on several verification measuring points specifically includes: bringing several verification measuring points into the overall geometric linear relationship established in S2 based on the spatial geometric parameters of several conditional measuring points, and judging whether the geometric parameters of the several verification measuring points meet the error requirements.

[0041] Optionally, in step S4, obtaining the spatial geometric parameters of the measuring points to be measured based on the overall geometric linear relationship verified by S3 specifically includes: if the geometric parameters of several verified measuring points in S3 meet the error requirements, obtaining the spatial geometric parameters of the measuring points to be measured through the overall geometric linear relationship; if the geometric parameters of several verified measuring points in S3 do not meet the error requirements, analyzing and correcting the overall geometric linear relationship until the error limit requirements are met, and obtaining the spatial geometric parameters of the measuring points to be measured through the corrected overall geometric linear relationship.

[0042] Optionally, in step S3, verifying the accuracy of the overall geometric linear relationship established in S2 based on a plurality of verification measurement points specifically includes: calculating parameter errors of a plurality of verification measurement points, and the specific calculation formula is:

[0043] z 计算 =W(x) ①

[0044] |z 计算 -z 实测 |<ε ②

[0045] In the formula, z 计算 To verify the calculated coordinate parameters of the measuring point, z 实测 is the measured coordinate parameter of the verification point, ε is the error limit, W(x) is the linear formula of the overall geometric linear relationship, and x is the position parameter of the verification point.

[0046] Optionally, a method for establishing an overall geometric linear relationship is selected according to the position of the measuring point to be measured on the engineering target to be measured in S4, specifically including: when the calibrated position of the measuring point to be measured is located at a position on the engineering target to be measured that can be directly observed, the overall geometric linear relationship is established directly in combination with the geometric characteristics of the engineering target itself; when the calibrated position of the measuring point to be measured is located at a position on the engineering target to be measured that cannot be directly observed, an auxiliary measuring rod is set, and the measuring point to be measured is spatially associated with the measurable measuring point through the auxiliary measuring rod, and the overall geometric linear relationship is established according to the geometric characteristics of the auxiliary measuring rod.

[0047] Optionally, the auxiliary measuring rod is a rigid part, and one or more of the measuring points to be measured, the verification measuring points and the conditional measuring points can be calibrated in advance on the auxiliary measuring rod; when measuring, the calibrated position of the measuring point to be measured on the auxiliary measuring rod coincides and is fixed with the actual position of the measuring point to be measured on the engineering target to be measured.

[0048] Another embodiment of the present invention provides an engineering target to be measured, on which there are measuring points to be measured, and the spatial geometric parameters of the measuring points to be measured are measured using an engineering measurement method, characterized in that the engineering target to be measured is an engineering structure with an overall geometric linear relationship shape.

[0049] The specific implementation of the present invention is described below in conjunction with specific application scenarios:

[0050] Implementation 1:

[0051] like Figure 2 As shown, during the installation of the main cable of a large-span cable structure, there is an extremely high requirement for its linear control accuracy. Generally, the mid-span elevation of the cable 5 to be measured is used as the control reference. However, since the cable structure generally has a large span, a long measurement distance, and is easily affected by wind, resulting in vibration of the measuring point position, which has a great impact on the measurement accuracy. Therefore, the engineering measurement method provided by the embodiment of the present invention is used, and the cable elevation is used as the engineering target to be measured:

[0052] First, calibrate the conditional measuring point 3 at the top of the tower and the position near the tower end that is convenient for observation, and set up a prism to measure the coordinates to obtain the corresponding coordinates (x 0 ,y 0 ,z 0 )、(x 1 ,y 1 ,z 1 )、(x 2 ,y 2 ,z 2 ), substitute it into formula ③ to solve the correlation coefficient. When applied, we are generally only concerned with the relationship between the span position x and the elevation z.

[0053]

[0054] Where a represents the catenary coefficient, B and C represent integral constants related to the boundary conditions. Formula ③ is only used for overall geometric linear relationships that are close to the catenary linear shape. When the linear verification deviation exceeds the limit, other linear formulas with smaller errors should be used instead.

[0055] Select any verification point 2 near the tower end and measure the coordinates as (x 3 ,y 3 ,z 3 ), and x 3 Substitute into formula ③ to obtain the calculated value z 3计算 , if |z 3计算 -z 3 | is less than the error limit, it means that the derived formula meets the engineering requirements. 3计算 -z 3 |If it is greater than the error limit, the measured coordinate accuracy and linear formula need to be analyzed and corrected until the error requirement of formula ② is met.

[0056] Finally, according to the needs of engineering control, the elevation of any position along the span of the main cable can be calculated using formula ③.

[0057] Implementation 2:

[0058] like Figure 3 , Figure 5 As shown, the formwork elevation detection of cast-in-place concrete structure is a key link to ensure the structural linearity. The formwork bottom plate is located below and is often in a blocked state, so it is impossible to perform direct measurement. The formwork elevation measurement is performed using the present invention:

[0059] First, the measuring point 1 to be measured, the verification measuring point 2 and the conditional measuring point 3 are calibrated on the auxiliary measuring rod 4, wherein the calibration positions of the verification measuring point 2 and the conditional measuring point 3 are located above the plane of the cast-in-place structure. The calibration position of the measuring point 1 to be measured on the auxiliary measuring rod 4 is aligned with the upper edge of the template bottom plate. Then, the auxiliary measuring rod 4 is fixed and kept stationary, and a prism is set up to measure the coordinates. In this embodiment, a linear measuring rod is selected for illustration, and the coordinates (x 0 ,y 0 ,z 0 )、(x 1 ,y 1 ,z 1 ), substitute it into formula ④ to solve the correlation coefficient. When applying the formula, we usually only care about the relationship between the lateral position x and the elevation z.

[0060] z=bx+c ④

[0061] Where b represents the slope, c represents the intercept, and formula ④ is only used for the overall geometric linear relationship of the straight line. When the linear verification deviation exceeds the limit, other linear formulas with smaller errors should be used instead.

[0062] The measured coordinates of measurement verification point 2 are (x 2 ,y 2 ,z 2 ), and x 2 Substitute into formula ④ to obtain the calculated value z 2计算 , if |z 2计算 -z 2 | is less than the error limit, it means that the derived formula meets the engineering requirements. 2计算 -z 2 |If it is greater than the error limit, the measured coordinate accuracy and linear formula need to be analyzed and corrected until the error requirement of formula ② is met.

[0063] Finally, according to the needs of engineering control, the horizontal coordinate x of the measuring point 1 to be measured can be calculated by formula ⑤ 3 , and the obtained x 3 Substitute into formula ④ to calculate the elevation z of the measuring point 1 to be measured 3 .

[0064]

[0065] In formula ⑤, x 3 is the horizontal coordinate of the measuring point 1 to be measured, x 1 is the horizontal coordinate of conditional measuring point 3, point 1, x0 is the horizontal coordinate of conditional measuring point 3, point zero, L 01 Indicates the straight-line distance between point zero and point one, L 13 Indicates the straight-line distance between point 1 and the point 1 to be measured.

[0066] Implementation 3:

[0067] Preferably, on the basis of Embodiments 1 and 3, in this embodiment, Figure 4 , Figure 5 As shown, the linear shape of the main arch ring 8 needs to be observed. However, when the water level rises during the flood season and covers part of the main arch ring 8, or when some measuring points of interest cannot be exposed for direct observation due to the silt deposited over the years, the linear elevation of the arch ring is measured by the present invention:

[0068] First, the measuring point 1 to be measured, the verification measuring point 2 and the conditional measuring point 3 are calibrated on the auxiliary measuring rod 4, wherein the calibration positions of the verification measuring point 2 and the conditional measuring point 3 need to be located above the plane of the obstruction. The calibration position of the measuring point 1 to be measured on the auxiliary measuring rod 4 is made to coincide with the position to be measured on the main arch ring 8. Then, the auxiliary measuring rod 4 is fixed and kept stationary, and a prism is set up to measure the coordinates. In this embodiment, a linear measuring rod is selected for illustration, and the coordinates (x 0 ,y 0 ,z 0 )、(x 1 ,y 1 ,z 1 ), substitute it into formula ④ to solve the correlation coefficients b, c. When applying the formula, we usually only care about the relationship between the lateral position x and the elevation z.

[0069] The measured coordinates of measurement verification point 2 are (x 2 ,y 2 ,z 2 ), and x 2 Substitute into formula ③ to obtain the calculated value z 2计算 , if |z 2计算 -z 2 | is less than the error limit, it means that the derived formula meets the engineering requirements. 2计算 -z 2 |If it is greater than the error limit, the measured coordinate accuracy and formula need to be analyzed and corrected until the error requirements between the calculated parameters and the measured parameters are met.

[0070] Finally, according to the needs of engineering control, the horizontal coordinate x of the measuring point 1 to be measured can be calculated by formula ⑤ 3 , and the obtained x 3 Substitute into formula ④ to calculate the elevation z of the measuring point 1 to be measured 3 .

[0071] The present invention indirectly measures the spatial position parameters of the measuring points to be measured based on the geometric parameters of the engineering target to be measured, while ensuring the measurement accuracy, reducing the technical difficulty and construction cost. In addition, the present invention sets an auxiliary rod to reduce the difficulty of observing the measuring points to be measured, solves the problem that the spatial position parameters of the measuring points to be measured cannot be directly obtained in complex environments, and has good significance for the promotion of engineering technology.

[0072] It should be clear that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the embodiments of the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An engineering measurement method for measuring the spatial geometric parameters of a measuring point on an engineering target to be measured. It is characterized in that The following steps are involved: S1: Obtain the spatial geometric parameters of several conditional measuring points; S2: establishing an overall geometric linear relationship based on the spatial geometric parameters of the plurality of conditional measuring points; S3: additionally obtaining spatial geometric parameters of a plurality of verification measuring points different from the plurality of conditional measuring points, and verifying the accuracy of the overall geometric linear relationship established in S2 based on the spatial geometric parameters of the plurality of verification measuring points; S4: Based on the overall geometric linear relationship verified by S3, obtaining the spatial geometric parameters of the measuring point to be measured; The overall geometric linear relationship is established based on the spatial geometric parameters of the plurality of conditional measuring points, including: Taking the spatial geometric parameters of the plurality of conditional measuring points as known boundary conditions, a theoretical calculation formula adapted to the overall geometric linear relationship is established; The specific number of the plurality of conditional measuring points is not less than the minimum number of known parameters necessary to solve the overall geometric linear relationship; Verifying the accuracy of the overall geometric linear relationship established in S2 based on the spatial geometric parameters of the plurality of verification measurement points includes: A plurality of verification measuring points are brought into the overall geometric linear relationship established based on the spatial geometric parameters of the plurality of conditional measuring points in S2, and it is determined whether the geometric parameters of the plurality of verification measuring points meet the error requirements.

2. The method according to claim 1, Features: The spatial geometric parameters of the plurality of conditional measuring points in step S1 are coordinate parameters of the spatial rectangular coordinate system of the plurality of conditional measuring points.

3. The method according to claim 1, Features: The number of the verification measurement points in step S3 is not less than three, and the spatial geometric parameters of the verification measurement points are the spatial rectangular coordinate system coordinate parameters of the verification measurement points.

4. The method according to claim 1, It is characterized in that In step S4, based on the overall geometric linear relationship verified in step S3, obtaining the spatial geometric parameters of the measuring point to be measured specifically includes: If the geometric parameters of the plurality of verification measurement points in S3 meet the error requirements, then the spatial geometric parameters of the measurement points to be measured are obtained through the overall geometric linear relationship; If the geometric parameters of the plurality of verification measuring points in S3 do not meet the error requirements, the overall geometric linear relationship is analyzed and corrected until the error limit requirements are met, and the spatial geometric parameters of the measuring points to be measured are obtained through the corrected overall geometric linear relationship.

5. The method according to claim 1 or 3, It is characterized in that In step S3, verifying the accuracy of the overall geometric linear relationship established in step S2 based on the plurality of verification measurement points specifically includes: Calculate the parameter errors of the several verification measurement points, the specific calculation formula is: z 计算 =W(x) |from 计算 -With 实测 |<ε In the formula, z 计算 To verify the calculated coordinate parameters of the measuring point, z 实测 is the measured coordinate parameter of the verification point, ε is the error limit, W(x) is the linear formula of the overall geometric linear relationship, and x is the position parameter of the verification point.

6. The method according to claim 1, It is characterized in that The method of establishing the overall geometric linear relationship is selected according to the position of the to-be-measured measuring point on the to-be-measured engineering target in S4, specifically including: When the calibrated position of the to-be-measured measuring point is located at a position on the to-be-measured engineering target that can be directly observed, the overall geometric linear relationship is established by directly combining the geometric features of the engineering target itself; When the calibrated position of the measuring point to be measured is located at a position on the engineering target to be measured that cannot be directly observed, an auxiliary measuring rod is set, and the measuring point to be measured is spatially associated with the measurable measuring point through the auxiliary measuring rod, and an overall geometric linear relationship is established according to the geometric characteristics of the auxiliary measuring rod.

7. The method according to claim 6, Features: The auxiliary measuring rod is a rigid part, and one or more of the measuring points to be measured, the verification measuring points and the conditional measuring points can be calibrated in advance on the auxiliary measuring rod; When measuring, the calibrated position of the measuring point to be measured on the auxiliary measuring rod is fixedly coincident with the actual position of the measuring point to be measured on the engineering target to be measured.

8. An engineering target to be measured, wherein there are measuring points to be measured on the engineering target to be measured, and the spatial geometric parameters of the measuring points to be measured are measured using the method described in any one of claims 1 to 7, Features: The engineering target to be measured is an engineering structure having an overall geometric linear relationship shape.