Construction equipment and method for basket arch bridge suspender

The construction equipment, which combines cable cranes and mobile guide rail assemblies, has solved the problems of numerous temporary platforms and poor installation accuracy of suspenders in the traditional basket arch bridge suspender construction, thus achieving efficient and safe suspender installation.

CN117403554BActive Publication Date: 2026-06-09CHINA CONSTR THIRD ENG BUREAU GRP CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA CONSTR THIRD ENG BUREAU GRP CO LTD
Filing Date
2023-11-13
Publication Date
2026-06-09

AI Technical Summary

Technical Problem

Traditional basket arch bridge gantry construction suffers from numerous problems, including the need for temporary work platforms, frequent lateral movement of cable cranes, and poor gantry installation accuracy, resulting in low construction efficiency and insufficient safety.

Method used

The construction equipment, which uses a cable crane and a moving guide rail assembly, enables rapid positioning and installation of the boom through a working platform, clamping device, moving device, and tilt adjustment device.

Benefits of technology

Reducing temporary work platforms improves construction efficiency, lowers safety risks, enables precise installation of suspension rods, and enhances construction quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117403554B_ABST
    Figure CN117403554B_ABST
Patent Text Reader

Abstract

This invention relates to the field of bridge construction technology, and discloses a construction equipment and method for installing suspenders on a basket arch bridge. Since the working platform is connected to a cable crane via a hoisting wire rope, it can be moved to a certain height directly below the suspender installation area using the cable crane without interfering with the arch ribs of the bridge. Because the suspender is mounted on the moving device via a clamping device, it moves to the same height as the working platform. It is only necessary to ensure that the length above the fixed end of the suspender matches the height difference between the working platform and the suspender's installation area on the arch rib. Then, the angle of the suspender's top end is adjusted using an inclination adjustment device to match the inclination angle of the suspender installation point, thereby achieving rapid suspender installation. This not only reduces the need for temporary working platforms at the suspender location, lowering the safety risks of personnel climbing up and down temporary platforms, but also avoids frequent lateral movements of the cable crane, resulting in high construction efficiency.