A self-cleaning cooling tower for grease extraction workshop
By introducing filter plates and a drive mechanism into the cooling tower, timed sewage discharge and backwashing of the cooling tower are realized, solving the problems of cooling tower blockage and difficulty in cleaning, and improving the operating efficiency and reliability of the cooling tower.
Patent Information
- Application Number
- CN202311311963.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-11
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-10-11
AI Technical Summary
Existing cooling towers are prone to corrosion and blockage after prolonged use, and are difficult to clean, especially due to the entry of particles such as iron filings and dust, which can cause pipe blockage.
A self-cleaning cooling tower for an oil leaching workshop was designed. It uses a combination of filter plates, sealing plates and drive mechanisms to purify the cooling water and quickly remove debris through timed sewage discharge and backwashing, thus avoiding blockage.
By regularly draining and backwashing, the occurrence of cooling tower blockage is effectively reduced, the cleaning process is simplified, and the operating efficiency and reliability of the cooling tower are improved.
Smart Images

Figure CN117450811B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of cooling tower technology, specifically to a self-cleaning cooling tower for grease extraction workshops. Background Technology
[0002] A cooling tower is a device that uses water as a circulating coolant to absorb heat from a system and release it into the atmosphere, thereby reducing the water temperature through heat exchange. Cooling towers are widely used in oil refining, chemical, light industry, pharmaceutical, machinery, food processing, power, and nuclear energy industries.
[0003] Existing cooling towers are usually placed outdoors, and the pipes are prone to corrosion after long-term use. Iron filings fall and clog the pipes. In addition, when the exhaust mechanism draws air into the cooling tower, it may bring dust and other particles into the cooling tower. Cooling towers are prone to blockage after long-term use. Currently, dealing with blockages usually requires opening the cooling tower and then clearing the blockage, which is quite difficult.
[0004] Based on this, the present invention designs a self-cleaning cooling tower for oil leaching workshops to solve the above problems. Summary of the Invention
[0005] The purpose of this invention is to provide a self-cleaning cooling tower for oil leaching workshops to solve the problems mentioned in the background art.
[0006] To achieve the above objectives, the present invention provides the following technical solution: a self-cleaning cooling tower for an oil leaching workshop, comprising a tower body, a water inlet pipe, a spray pipe, packing material, and an exhaust mechanism; the water inlet pipe is fixedly connected to the tower body, the spray pipe is located inside the tower body and is fixedly connected to the water inlet pipe; the packing material is located directly below the water inlet pipe; the exhaust mechanism is located directly above the water inlet pipe; and an output mechanism is provided at the bottom of the tower body.
[0007] As a further embodiment of the present invention, the output mechanism includes a connecting pipe and a driving mechanism; the connecting pipe is fixedly connected to the bottom of the tower body and communicates with the interior of the tower body, a filter plate is fixedly connected inside the connecting pipe, the filter plate divides the connecting pipe into a clean water area and a sewage discharge area, the connecting pipe is fixedly connected to a first pipe and a second pipe, the first pipe communicates with the clean water area, and the second pipe communicates with the sewage discharge area; a first sealing plate and a second sealing plate are elastically slidably connected to the inner wall of the connecting pipe; the first sealing plate is located in the clean water area and is used to shield the first pipe; a first baffle is elastically slidably connected to the first sealing plate; the second sealing plate is located in the sewage discharge area and is used to shield the second pipe; the driving mechanism is disposed on the side of the connecting pipe and the tower body.
[0008] As a further embodiment of the present invention, the driving mechanism includes a speed reducer; the speed reducer is fixedly connected to the tower body; the output shaft of the speed reducer is drivenly connected to the ventilation mechanism; a first sprocket is fixedly connected to the bottom end of the output shaft of the speed reducer, the first sprocket is drivenly connected to a second sprocket via a first chain, a first gear is fixedly connected to the rotating shaft of the second sprocket, and the first gear meshes with the second gear; a first incomplete gear is fixedly connected to the rotating shaft of the second gear; the first incomplete gear meshes with a third gear; the first gear, the second gear, and the third gear are all rotatably mounted at the bottom of the tower body; a third sprocket is fixedly connected to the rotating shaft of the third gear, and the third sprocket... A fourth sprocket is connected to the wheel via a second chain drive. A second incomplete gear is fixedly connected to the rotating shaft of the fourth sprocket. The second incomplete gear is rotatably mounted at the bottom of the connecting pipe. A first rack and a second rack are provided on the side of the second incomplete gear, which can mesh with it. The first rack and the second rack are both slidably mounted at the bottom of the connecting pipe. A first traction rope is fixedly connected to the first rack, and the end of the first traction rope away from the first rack passes through the side wall of the connecting pipe and is fixedly connected to the first baffle. A second traction rope is fixedly connected to the second rack, and the end of the second traction rope away from the second rack passes through the side wall of the connecting pipe and is fixedly connected to the second sealing plate.
[0009] It also includes a wedge-shaped limiting block and a wedge-shaped push block; the wedge-shaped limiting block and the wedge-shaped push block are fixedly connected by a fixing rod; the fixing rod is elastically slidably connected to the connecting pipe; the wedge-shaped limiting block is located below the first sealing plate and can be inserted into the first sealing plate; the wedge-shaped push block is located below the second sealing plate and can be driven to move by the second sealing plate.
[0010] As a further embodiment of the present invention, an installation frame is fixedly connected to the inner wall of the connecting pipe. The installation frame is located in the sewage discharge area. A second baffle is elastically slidably connected inside the installation frame. A third traction rope is fixedly connected to the second baffle. The bottom end of the third traction rope is fixedly connected to the top of the second sealing plate.
[0011] As a further embodiment of the present invention, a guide plate is provided inside the tower body. The guide plate is vortex-shaped, and the bottom surface of the guide plate is attached to the inner wall of the bottom surface of the tower body. The connecting pipe is located at the inner center of the guide plate. A third baffle is fixedly connected to the top of the guide plate. The third baffle is rotatably connected to the tower body. A fifth sprocket is fixedly connected to the rotating shaft of the third baffle. The fifth sprocket is connected to a sixth sprocket via a third chain. The sixth sprocket is rotatably connected to the tower body. A first bevel gear is fixedly connected to the rotating shaft of the sixth sprocket. The first bevel gear meshes with a second bevel gear. The rotating shaft of the second bevel gear passes through the side wall of the tower body and extends to the outside of the tower body where a third bevel gear is fixedly connected. The third bevel gear meshes with a fourth bevel gear. The fourth bevel gear is fixedly connected to the rotating shaft of a reducer.
[0012] As a further embodiment of the present invention, a guide platform is fixedly installed at the bottom of the tower body, and the guide plate is located inside the guide platform.
[0013] As a further embodiment of the present invention, a scraper is fixedly connected to the outer side of the guide plate, and the end of the scraper away from the guide plate is in contact with the guide platform.
[0014] As a further embodiment of the present invention, the ventilation mechanism includes a dual-shaft motor, the bottom output shaft of the dual-shaft motor being connected to a reducer for transmission; a seventh sprocket is fixedly connected to the top output shaft of the dual-shaft motor, the seventh sprocket is connected to an eighth sprocket via a fourth chain for transmission, and a fan blade is fixedly connected to the rotating shaft of the eighth sprocket, the fan blade being rotatably mounted to the tower body.
[0015] Compared with the prior art, the beneficial effects of the present invention are:
[0016] 1. This invention enables timed drainage of the cooling tower through the setting of the output mechanism. With the setting of filter plate, first sealing plate, second sealing plate and first baffle, when the cooling water is circulating, the filter plate can intercept impurities in the drainage area. When drainage is required, the cooling water can flow from the clean water area through the filter plate into the drainage area. The impurities can be quickly flushed off the filter plate by backflushing and then discharged from the second pipe. This can quickly clean the impurities and greatly reduce the occurrence of pipe blockage.
[0017] 2. By installing a frame, a second baffle, and a third traction rope, this invention allows the second baffle to move closer to the filter plate when the second sealing plate moves upward to begin the sewage discharge operation. The second baffle closes the top of the sewage discharge area. During the sewage discharge operation, cooling water can only flow from the clean water area through the filter plate into the sewage discharge area. This allows the cooling water to better flush down the debris on the filter plate as it flows through it, resulting in a more thorough cleaning of the debris. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the overall structure of the present invention;
[0019] Figure 2 This is a schematic cross-sectional view of the overall structure of the present invention;
[0020] Figure 3 This is a cross-sectional view of the output mechanism structure of the present invention;
[0021] Figure 4 for Figure 3 Front view in the current state;
[0022] Figure 5 This is a schematic diagram of the overall structure of the present invention (view from below);
[0023] Figure 6 for Figure 5 Enlarged view of a portion of point A in the middle;
[0024] Figure 7 This is a bottom view schematic diagram showing the positional and connection relationships of the guide plate, third baffle, guide platform and scraper plate of the present invention.
[0025] The attached diagram lists the components represented by each number as follows:
[0026] 1. Tower body; 2. Inlet pipe; 3. Spray pipe; 4. Packing material; 5. Connecting pipe; 6. Filter plate; 7. First pipe; 8. Second pipe; 9. First sealing plate; 10. Second sealing plate; 11. First baffle; 12. Reducer; 13. First sprocket; 14. Second sprocket; 15. First gear; 16. Second gear; 17. First incomplete gear; 18. Third gear; 19. Fourth sprocket; 20. Second incomplete gear; 21. First rack; 22. Second rack. 23. First traction rope; 24. Second traction rope; 25. Wedge-shaped limiting block; 26. Wedge-shaped push block; 27. Mounting frame; 28. Second baffle; 29. Third traction rope; 30. Guide plate; 31. Third baffle; 32. Fifth sprocket; 33. Sixth sprocket; 34. First bevel gear; 35. Second bevel gear; 36. Third bevel gear; 37. Fourth bevel gear; 38. Guide platform; 39. Scraper; 40. Dual-shaft motor; 41. Seventh sprocket; 42. Eighth sprocket; 43. Fan blade; 44. Detailed Implementation
[0027] Please see Figure 1-7 The present invention provides a technical solution: a self-cleaning cooling tower for an oil leaching workshop, comprising a tower body 1, a water inlet pipe 2, a spray pipe 3, a packing 4, and an exhaust mechanism; the water inlet pipe 2 is fixedly connected to the tower body 1, the spray pipe 3 is located inside the tower body 1 and is fixedly connected to the water inlet pipe 2; the packing 4 is located directly below the water inlet pipe 2; the exhaust mechanism is located directly above the water inlet pipe 2; and an output mechanism is provided at the bottom of the tower body 1.
[0028] The output mechanism includes a connecting pipe 5 and a driving mechanism; the connecting pipe 5 is fixedly connected to the bottom of the tower body 1 and communicates with the interior of the tower body 1. A filter plate 6 is fixedly connected inside the connecting pipe 5, and the filter plate 6 divides the connecting pipe 5 into a clean water area and a sewage discharge area. The connecting pipe 5 is fixedly connected to a first pipe 7 and a second pipe 8. The first pipe 7 communicates with the clean water area, and the second pipe 8 communicates with the sewage discharge area. A first sealing plate 9 and a second sealing plate 10 are elastically slidably connected to the inner wall of the connecting pipe 5. The first sealing plate 9 is located in the clean water area and is used to block the first pipe 7. A first baffle 11 is elastically slidably connected to the first sealing plate 9. The second sealing plate 10 is located in the sewage discharge area and is used to block the second pipe 8. The driving mechanism is located on the side of the connecting pipe 5 and the tower body 1.
[0029] In specific work, refer to Figure 1-4 Hot water requiring cooling is injected into the spray pipe 3 through the inlet pipe 2, and then the spray pipe 3 sprays the hot water onto the packing 4. Simultaneously, the exhaust mechanism draws air into the tower body 1 from below. Upon contact with the hot water, the air absorbs heat, cooling the water. The cooled water then drips to the bottom of the tower body 1, while the air, having absorbed heat, is discharged from the top of the tower body 1 by the exhaust mechanism. The cooled water dripping to the bottom of the tower body 1 flows into the connecting pipe 5. During the cooling water circulation, the output mechanism operates as follows: Figure 3 and Figure 4 As shown, at this time, the first pipe 7 is connected to the clean water area in the connecting pipe 5, the second sealing plate 10 blocks the second pipe 8, and the first baffle 11 blocks the top of the clean water area; at this time, cooling water will enter the clean water area from the sewage area through the filter plate 6. The filter plate 6 can block impurities mixed in the cooling water, and then the filtered cooling water will enter the first pipe 7 for circulation; after the cooling tower has been working for a certain period of time, the drive mechanism starts to work. The drive mechanism will drive the first baffle 11 to move downward, and the first baffle 11 will drive the first sealing plate 9 to move downward synchronously through the spring until... The first sealing plate 9 blocks the first pipe 7; then the drive mechanism will drive the second sealing plate 10 to move upward, at which point the second pipe 8 is connected to the connecting pipe 5; then the cooling water flowing into the connecting pipe 5 can flow from the clean water area through the filter plate 6 into the sewage area, and then flow into the second pipe 8 for discharge; since debris will accumulate on the side wall of the filter plate 6 located in the sewage area, when the cooling water washes the filter plate 6 from the clean water area, it can easily wash the debris off the filter plate 6, and then the debris can be discharged from the second pipe 8; then the drive mechanism stops working, at which point the second sealing plate 10 will first return to the position of the filter plate 10. Figure 3 and Figure 4 The second pipe 8 is closed at the indicated position, and then the first baffle 11 drives the first sealing plate 9 to move upwards back to its original position. Figure 3As shown in the diagram, the cooling water can then be circulated again for heat exchange. This invention, through the setting of the output mechanism, enables timed drainage of the cooling tower. With the arrangement of the filter plate, the first sealing plate 9, the second sealing plate 10, and the first baffle 11, the filter plate 6 can intercept impurities in the drainage area during cooling water circulation. When drainage is required, cooling water can flow from the clean water area through the filter plate 6 into the drainage area. Backflushing can quickly flush impurities off the filter plate 6, and then discharge them through the second pipe 8, allowing for rapid cleaning of impurities and significantly reducing the occurrence of pipe blockages.
[0030] As a further embodiment of the present invention, the driving mechanism includes a reducer 12; the reducer 12 is fixedly connected to the tower body 1; the output shaft of the reducer 12 is drivenly connected to the exhaust mechanism; a first sprocket 13 is fixedly connected to the bottom end of the output shaft of the reducer 12, the first sprocket 13 is drivenly connected to a second sprocket 14 via a first chain, a first gear 15 is fixedly connected to the rotating shaft of the second sprocket 14, the first gear 15 meshes with a second gear 16; a first incomplete gear 17 is fixedly connected to the rotating shaft of the second gear 16; the first incomplete gear 17 meshes with a third gear 18; the first gear 15, the second gear 16, and the third gear 18 are all rotatably mounted at the bottom of the tower body 1; a third sprocket 19 is fixedly connected to the rotating shaft of the third gear 18, the third sprocket... A fourth sprocket 20 is connected via a second chain drive. A second incomplete gear 21 is fixedly connected to the rotating shaft of the fourth sprocket 20. The second incomplete gear 21 is rotatably mounted at the bottom of the connecting pipe 5. A first rack 22 and a second rack 23 that can mesh with the second incomplete gear 21 are provided on its side. Both the first rack 22 and the second rack 23 are slidably mounted at the bottom of the connecting pipe 5. A first traction rope 24 is fixedly connected to the first rack 22. The end of the first traction rope 24 away from the first rack 22 passes through the side wall of the connecting pipe 5 and is fixedly connected to the first baffle 11. A second traction rope 25 is fixedly connected to the second rack 23. The end of the second traction rope 25 away from the second rack 23 passes through the side wall of the connecting pipe 5 and is fixedly connected to the second sealing plate 10.
[0031] It also includes a wedge-shaped limiting block 26 and a wedge-shaped push block 27; the wedge-shaped limiting block 26 and the wedge-shaped push block 27 are fixedly connected by a fixing rod; the fixing rod is elastically slidably connected to the connecting pipe 5; the wedge-shaped limiting block 26 is located below the first sealing plate 9 and can be inserted into the first sealing plate 9; the wedge-shaped push block 27 is located below the second sealing plate 10 and can be driven to move by the second sealing plate 10.
[0032] In specific work, such as Figures 3-6As shown, when the exhaust mechanism is working, it drives the reducer 12 to work synchronously. The reducer 12 drives the first sprocket 13 to rotate, which in turn drives the second sprocket 14 to rotate via the first chain. The second sprocket 14 drives the first gear 15 to rotate, which in turn drives the second gear 16 to rotate. The second gear 16 then drives the first incomplete gear 17 to rotate synchronously. When the first incomplete gear 17 is not engaged with the third gear 18, the cooling tower circulates cooling water. When the first incomplete gear 17 is engaged with the third gear 18, the cooling tower performs sewage discharge. After the first incomplete gear 17 is engaged with the third gear 18, it drives the third gear 18 to rotate, which in turn drives the third sprocket 19 to rotate. The third sprocket 19 then drives the fourth sprocket 20 to rotate synchronously via the second chain. The fourth sprocket 20 then drives the second incomplete gear 21 to rotate synchronously. Figure 6 As shown, rotating clockwise, the second incomplete gear 21 will first drive the first rack and pinion 22. Figure 6 As shown, the device moves to the right, and the first rack rod 22 will drive the first baffle 11 downward through the first traction rope 24 until the first sealing plate 9 moves to the bottom and blocks the first pipe 7. At this time, the second incomplete gear 20 rotates to mesh with the second rack rod 23. Then, the second incomplete gear 20 continues to rotate and will drive the first baffle 11 downward through the first traction rope 24 (the first sealing plate 9 remains stationary). At the same time, the second incomplete gear 20 will drive the second rack rod 23 to move to the left, and the second rack rod 23 will drive the second sealing plate 10 upward through the second traction rope 25. After the second sealing plate 10 moves upward, the wedge-shaped limiting block 26, the wedge-shaped push block 27, and the fixing rod will move under the elastic force of the spring. Figure 4 As shown, the device moves to the left, and the wedge-shaped limiting block 26 inserts into the first sealing plate 9 to limit its movement. After the second sealing plate 10 moves upward, the second pipe 8 connects with the connecting pipe 5, allowing debris to be discharged from the second pipe 8. When the first incomplete gear 17 rotates to disengage from the third gear 18, the second incomplete gear 21 rotates exactly one revolution back to its initial position. At this time, the second incomplete gear disengages from the second rack 23, and the second sealing plate 10 quickly returns to its initial position under the action of the spring, blocking the second pipe again. When the second sealing plate 10 moves to the initial position, it will drive the wedge-shaped pusher 27 to move to the right by squeezing the inclined surface of the wedge-shaped pusher 27. The wedge-shaped pusher 27 will drive the wedge-shaped limiting block 26 to move to the right synchronously through the fixed rod. When the second sealing plate 10 returns to the initial position, the wedge-shaped limiting block 26 will release the limiting on the first sealing plate 9. Then the first sealing plate 9 will move upward back to the initial position. This can prevent the debris discharged in the second pipe 8 from being sucked back into the connecting pipe 5 due to excessive suction in the first pipe 7, and can ensure that the debris is thoroughly cleaned.
[0033] As a further embodiment of the present invention, an installation frame 28 is fixedly connected to the inner wall of the connecting pipe 5. The installation frame 28 is located in the sewage discharge area. A second baffle 29 is elastically slidably connected inside the installation frame 28. A third traction rope 30 is fixedly connected to the second baffle 29. The bottom end of the third traction rope 30 is fixedly connected to the top of the second sealing plate 10.
[0034] In specific work, such as Figure 3 and Figure 4 As shown, when the cooling water circulates, the second baffle 29 retracts into the mounting frame 28, at which time the spring inside the mounting frame 28 is in a compressed state; when the second sealing plate 10 moves upward to perform the sewage discharge work, the third traction rope 30 will slowly loosen, and then the spring inside the mounting frame 28 will drive the second baffle 29 to move to the left, and the second baffle 29 will slowly close the top of the sewage discharge area. During the sewage discharge work, the cooling water can only flow from the clean water area through the filter plate 6 into the sewage discharge area, which can better flush down the debris on the filter plate 6 when the cooling water flows through the filter plate 6, and can clean the debris more thoroughly.
[0035] As a further embodiment of the present invention, a guide plate 31 is provided inside the tower body 1. The guide plate 31 is vortex-shaped, and the bottom surface of the guide plate 31 is attached to the inner wall of the bottom surface of the tower body 1. The connecting pipe 5 is located at the inner center of the guide plate 31. A third baffle 32 is fixedly connected to the top of the guide plate 31. The third baffle 32 is rotatably connected to the tower body 1. A fifth sprocket 33 is fixedly connected to the rotating shaft of the third baffle 32. The fifth sprocket 33 is connected to a sixth sprocket 34 through a third chain drive. The sixth sprocket 34 is rotatably connected to the tower body 1. A first bevel gear 35 is fixedly connected to the rotating shaft of the sixth sprocket 34. The first bevel gear 35 meshes with a second bevel gear 36. The rotating shaft of the second bevel gear 36 passes through the side wall of the tower body 1 and extends to the outside of the tower body 1 where a third bevel gear 37 is fixedly connected. The third bevel gear 37 meshes with a fourth bevel gear 38. The fourth bevel gear 38 is fixedly connected to the rotating shaft of the reducer 12.
[0036] In specific work, such as Figure 2 and Figure 7As shown, the cooling water falling from the packing 4 will fall onto the third baffle 32, and then slide down the third baffle 32 to the outer perimeter of the guide plate 31. The cooling water will then flow along the guide plate 31 towards the bottom center of the tower body 1. When the reducer 12 is working, it will drive the fourth bevel gear 38 to rotate synchronously. The fourth bevel gear 38 will drive the sixth sprocket 34 to rotate through the third bevel gear 37, the second bevel gear 36, and the first bevel gear 35. The sixth sprocket 34 will rotate through the first bevel gear 35, the second bevel gear 36, and the third bevel gear 37. With the setting of the fourth bevel gear 38, the side wall of the tower body 1 does not need to be opened with excessively large mounting holes, which can prevent the cooling water from being moved out and also prevent dust and other objects from entering the tower body 1; the sixth sprocket 34 will drive the fifth sprocket 33 to rotate through the third chain, and the fifth sprocket 33 will drive the third baffle 32 and the guide plate 31 to rotate synchronously. The rotation of the guide plate 31 can drive the debris accumulated at the bottom of the tower body 1 to flow quickly towards the center of the bottom of the tower body 1, and then flow into the connecting pipe 5, which can speed up the cleaning efficiency of debris in the tower body 1.
[0037] As a further embodiment of the present invention, a guide platform 39 is fixedly installed at the bottom of the tower body 1, and the guide plate 31 is located inside the guide platform 39.
[0038] In actual operation, the cooling water and debris can slide off the guide cylinder 39 into the area that the guide plate 31 can scrape, thanks to the setting of the guide platform 39, which allows the guide plate 31 to work better.
[0039] As a further embodiment of the present invention, a scraper 40 is fixedly connected to the outer side of the guide plate 31, and the end of the scraper 40 away from the guide plate 31 is in contact with the guide platform 39.
[0040] In actual operation, the scraper plate 40 can be set so that the guide plate 31 can better scrape the debris at the bottom of the tower body 1 towards the center.
[0041] As a further embodiment of the present invention, the ventilation mechanism includes a dual-shaft motor 41, the bottom output shaft of the dual-shaft motor 41 being connected to the reducer 12 for transmission; a seventh sprocket 42 is fixedly connected to the top output shaft of the dual-shaft motor 41, the seventh sprocket 42 is connected to an eighth sprocket 43 through a fourth chain for transmission, and a fan blade 44 is fixedly connected to the rotating shaft of the eighth sprocket 43, the fan blade 44 being rotatably mounted to the tower body 1.
[0042] In specific work, such as Figure 2 As shown, the dual-shaft motor 41 drives the seventh sprocket 42 to rotate, the seventh sprocket 42 drives the eighth sprocket 43 to rotate through the fourth chain, the eighth sprocket 43 drives the fan blade 44 to rotate, the fan blade 44 draws cold air from the bottom of the tower body 1 into the tower body 1 and blows the hot air inside the tower body 1 out from the top of the tower body 1.
Claims
1. A self-cleaning cooling tower for an oil leaching workshop, comprising a tower body (1), a water inlet pipe (2), a spray pipe (3), packing material (4), and an exhaust mechanism; characterized in that: The water inlet pipe (2) is fixedly connected to the tower body (1), the spray pipe (3) is located inside the tower body (1) and is fixedly connected to the water inlet pipe (2); the packing (4) is located directly below the water inlet pipe (2); the exhaust mechanism is located directly above the water inlet pipe (2); and an output mechanism is provided at the bottom of the tower body (1). The output mechanism includes a connecting pipe (5) and a driving mechanism; the connecting pipe (5) is fixedly connected to the bottom of the tower body (1) and communicates with the inside of the tower body (1); a filter plate (6) is fixedly connected inside the connecting pipe (5); the filter plate (6) divides the connecting pipe (5) into a clean water area and a sewage discharge area; the connecting pipe (5) is fixedly connected to a first pipe (7) and a second pipe (8); the first pipe (7) communicates with the clean water area, and the second pipe (8) communicates with the sewage discharge area; a first sealing plate (9) and a second sealing plate (10) are elastically slidably connected to the inner wall of the connecting pipe (5); the first sealing plate (9) is located in the clean water area and is used to shield the first pipe (7); a first baffle (11) is elastically slidably connected to the first sealing plate (9); the second sealing plate (10) is located in the sewage discharge area and is used to shield the second pipe (8); the driving mechanism is set on the side of the connecting pipe (5) and the tower body (1); The driving mechanism includes a speed reducer (12); the speed reducer (12) is fixedly connected to the tower body (1); the output shaft of the speed reducer (12) is driven by the exhaust mechanism; a first sprocket (13) is fixedly connected to the bottom end of the output shaft of the speed reducer (12), the first sprocket (13) is driven by a second sprocket (14) through a first chain, a first gear (15) is fixedly connected to the rotating shaft of the second sprocket (14), and the first gear (15) meshes with a second gear (16); a first incomplete gear is fixedly connected to the rotating shaft of the second gear (16). Gear (17); the first incomplete gear (17) meshes with a third gear (18); the first gear (15), the second gear (16), and the third gear (18) are all rotatably mounted at the bottom of the tower body (1); a third sprocket (19) is fixedly connected to the rotating shaft of the third gear (18), and the third sprocket (19) is connected to a fourth sprocket (20) via a second chain drive; a second incomplete gear (21) is fixedly connected to the rotating shaft of the fourth sprocket (20), and the second incomplete gear (21) is rotatably mounted at the bottom of the connecting pipe (5). The second incomplete gear (21) is provided with a first rack (22) and a second rack (23) that can mesh with it; the first rack (22) and the second rack (23) are both slidably installed at the bottom of the connecting pipe (5); the first rack (22) is fixedly connected to a first traction rope (24), and the end of the first traction rope (24) away from the first rack (22) passes through the side wall of the connecting pipe (5) and is fixedly connected to the first baffle (11); the second rack (23) is fixedly connected to a second traction rope (25), the second traction rope ( 25) One end away from the second rack rod (23) passes through the side wall of the connecting pipe (5) and is fixedly connected to the second sealing plate (10); it also includes a wedge-shaped limiting block (26) and a wedge-shaped push block (27); the wedge-shaped limiting block (26) and the wedge-shaped push block (27) are fixedly connected by a fixing rod; the fixing rod is elastically slidably connected to the connecting pipe (5); the wedge-shaped limiting block (26) is located below the first sealing plate (9) and can be inserted into the first sealing plate (9); the wedge-shaped push block (27) is located below the second sealing plate (10) and can be driven to move by the second sealing plate (10).
2. The self-cleaning cooling tower for an oil leaching workshop according to claim 1, characterized in that: An installation frame (28) is fixedly connected to the inner wall of the connecting pipe (5). The installation frame (28) is located in the sewage discharge area. A second baffle (29) is elastically slidably connected inside the installation frame (28). A third traction rope (30) is fixedly connected to the second baffle (29). The bottom end of the third traction rope (30) is fixedly connected to the top of the second sealing plate (10).
3. The self-cleaning cooling tower for an oil leaching workshop according to claim 1, characterized in that: A guide plate (31) is provided inside the tower body (1). The guide plate (31) is vortex-shaped, and the bottom surface of the guide plate (31) is attached to the inner wall of the bottom surface of the tower body (1). The connecting pipe (5) is located at the center of the inner side of the guide plate (31). A third baffle (32) is fixedly connected to the top of the guide plate (31). The third baffle (32) is rotatably connected to the tower body (1). A fifth sprocket (33) is fixedly connected to the rotating shaft of the third baffle (32). The fifth sprocket (33) is connected to a sixth chain through a third chain drive. The sixth sprocket (34) is rotatably connected to the tower body (1). A first bevel gear (35) is fixedly connected to the rotating shaft of the sixth sprocket (34). The first bevel gear (35) meshes with a second bevel gear (36). The rotating shaft of the second bevel gear (36) passes through the side wall of the tower body (1) and extends to the outside of the tower body (1) where a third bevel gear (37) is fixedly connected. The third bevel gear (37) meshes with a fourth bevel gear (38). The fourth bevel gear (38) is fixedly connected to the rotating shaft of the reducer (12).
4. A self-cleaning cooling tower for an oil leaching workshop according to claim 3, characterized in that: The bottom of the tower body (1) is fixedly installed with a guide platform (39), and the guide plate (31) is located inside the guide platform (39).
5. A self-cleaning cooling tower for an oil leaching workshop according to claim 4, characterized in that: A scraper (40) is fixedly connected to the outside of the guide plate (31), and the end of the scraper (40) away from the guide plate (31) is in contact with the guide table (39).
6. A self-cleaning cooling tower for an oil leaching workshop according to claim 1, characterized in that: The exhaust mechanism includes a dual-shaft motor (41), the bottom output shaft of which is connected to a reducer (12) for transmission; a seventh sprocket (42) is fixedly connected to the top output shaft of the dual-shaft motor (41), the seventh sprocket (42) is connected to an eighth sprocket (43) through a fourth chain for transmission, and a fan blade (44) is fixedly connected to the rotating shaft of the eighth sprocket (43), the fan blade (44) being rotatably mounted to the tower body (1).
Citation Information
Patent Citations
Counter-flow cooling tower transformed from cross-flow cooling tower
CN216620723U
Open type circulating cooling water station
CN216977587U
