Unmanned electric loader dispatching system and method for concrete mixing station
By designing an unmanned electric loader scheduling system in a concrete mixing station, using lidar and binocular cameras to detect the remaining material volume in silos and hoppers, and combining it with the Hungarian algorithm for scheduling, the problem of low automation level of aggregate replenishment is solved and the efficiency is improved. Production efficiency and automation levels reduce carbon emissions.
Patent Information
- Application Number
- CN202311320896.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-12
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-10-12
AI Technical Summary
The low level of automation and intelligence in aggregate replenishment in land-based concrete batching plants results in reduced production efficiency and the need for manual participation. Loader drivers also need long periods of concentration and rich experience to ensure smooth production.
An unmanned electric loader scheduling system is designed, including a bin detection module, a hopper detection module and a control module. It uses laser radar and binocular cameras to detect the remaining material volume of the bin and hopper in real time, and generates task instructions through the control module. Combined with the Hungarian algorithm for optimal scheduling of unmanned electric loaders.
It realizes the automation of aggregate replenishment in concrete mixing stations, improves production efficiency, reduces carbon emissions, and reduces the labor intensity and experience requirements for loader drivers.
Smart Images

Figure CN117452887B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete production, and in particular to an unmanned electric loader dispatching system and method for a concrete mixing station. Background Art
[0002] With the continuous increase of infrastructure construction projects in my country, concrete has been widely used. At present, most concrete mixing plants have achieved partial automation of production control, but the level of automation and intelligence in some aspects needs to be improved. For example, the replenishment of aggregates in the production process still requires manual participation, which will increase the difficulty of concrete mixing plant management and reduce production efficiency.
[0003] During the concrete production process, the aggregates in the storage hopper need to be constantly replenished due to production consumption. In traditional land-based concrete mixing plants, loaders are usually used to complete the aggregate replenishment operation. During the operation, the loader driver needs to know in advance what aggregates are stored in each silo and confirm which silo can be used. At the same time, the loader driver must constantly observe the level of aggregates in the hopper. When a hopper needs to be refilled, the loader driver shovels the material from the current position to the designated silo, and then unloads the aggregates into the designated hopper. The current method of replenishing aggregates has high requirements for loader drivers. Not only does it require the driver to maintain a high degree of concentration during the operation and observe the level of the hopper in real time, but it also requires the driver to have rich experience to ensure the smooth progress of concrete production. And due to the uncertainty of concrete production time, it is necessary to configure multiple drivers for a loader to work in shifts.
[0004] In summary, the level of automation and intelligence in aggregate replenishment in onshore concrete mixing needs to be improved, so there is an urgent need for an unmanned electric loader scheduling system and method for a concrete mixing station.
[0005] Chinese patent document CN112756250B describes an online identification and gradation optimization device for cemented sand and gravel particles, but the patent discloses a device and does not study and optimize the relevant scheduling algorithm. Summary of the invention
[0006] The purpose of the present invention is to solve the problem of low level of automation of aggregate replenishment in onshore concrete mixing plants in the above background, and propose an unmanned electric loader scheduling system and method for concrete mixing plants. Among them, 1. An unmanned electric loader scheduling system for concrete mixing plants, characterized in that it includes a silo detection module, a hopper detection module and a control module;
[0007] The silo detection module is responsible for calculating the volume of remaining material in the silo based on the collected data;
[0008] The hopper detection module is responsible for calculating the volume of residual material in the hopper based on the collected data;
[0009] The control module is responsible for receiving and transmitting data from the silo detection module and the hopper detection module.
[0010] In the preferred solution, it also includes a terminal display module, which includes a large display screen and a computer.
[0011] In the preferred solution, the silo detection module includes a laser radar, an edge controller and a DTU module;
[0012] The hopper detection module includes a binocular camera, an edge controller and a DTU module. The hopper detection module outputs the volume data of the remaining material in the hopper in real time;
[0013] The control module includes a server.
[0014] In the preferred solution, the laser radar in the silo detection module is installed directly above the silo so that its scanning range covers the entire silo. The laser radar collects the distance data between the aggregate in the silo and the laser radar, and then the volume of the remaining material in the silo is calculated through the edge controller, and finally transmitted to the control module through the DTU module.
[0015] In the preferred solution, the binocular camera in the hopper detection module is installed directly above the hopper so that its scanning range covers the entire hopper. The binocular camera collects the distance data between the aggregate in the hopper and the binocular camera, and then the volume of the remaining material in the hopper is calculated through the edge controller, and finally transmitted to the control module through the DTU module.
[0016] In the preferred scheme, the control module receives data from the silo detection module, the hopper detection module and the unmanned electric loader and transmits it to the terminal display module, generates tasks based on the volume data of the hopper aggregate residue, and automatically generates job instructions through the unmanned electric loader scheduling algorithm and distributes them to different unmanned electric loaders.
[0017] In the preferred solution, the terminal display module displays the status data of the unmanned electric loader, the volume data of the aggregate residue in the silo and hopper, and the 3D digital model of the concrete mixing station and on-site equipment and facilities, and completes the mapping from the physical entity to the digital model through a data-driven model.
[0018] In the preferred solution, the specific workflow of the system is:
[0019] S10, obtaining basic information of production operations from the MES system, determining the pouring order corresponding to the current concrete production, the number of the silo that has passed the aggregate inspection, and the corresponding information between the hopper and the aggregate;
[0020] S20, real-time detection of the volume of the remaining aggregate in the silo is performed to determine the silos available for current concrete production, and the silos available for production operations are matched one by one with the hoppers;
[0021] S30, real-time detection of the aggregate residual volume of each hopper, when the aggregate residual volume in the hopper numbered i is less than the set threshold, generate a job task, when the total task volume is less than the set threshold, repeat step S30, otherwise jump to step S40;
[0022] S40, the dispatching system communicates with the unmanned electric loader system to determine the number n of unmanned electric loaders that can be dispatched in the current operation queue. When n<2, repeat step S40, otherwise jump to step S50;
[0023] S50, assigning tasks to the unmanned electric loaders that can be dispatched in the current job queue through the unmanned electric loader scheduling algorithm, and jumping to step S30 after all current tasks are assigned.
[0024] The present invention also proposes a method for dispatching an unmanned electric loader for a concrete mixing station, comprising the following steps:
[0025] S11, inputting the work task to be assigned and the status data of the unmanned electric loader, including the location information and the power information;
[0026] S22, establishing a cost consumption model of the unmanned electric loader according to the current state data of the unmanned electric loader and the information of the tasks to be assigned;
[0027] S33, establishing a cost consumption matrix and determining an objective function according to the cost consumption model;
[0028] S44. By solving the objective function through the Hungarian algorithm, the optimal scheduling plan for the unmanned electric loader can be output.
[0029] The beneficial effects of the present invention are as follows: the present invention can detect the residual material volume in the silo hopper in real time, and through the control module, it can realize the task scheduling of the unmanned electric loader according to the above data, and realize the mapping and display of the physical entity to the digital model, which can effectively improve the aggregate replenishment efficiency of the concrete mixing station, improve the concrete production efficiency, and reduce carbon emissions. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 is a system architecture diagram of the present invention;
[0031] Figure 2 is a flow chart of the dispatching system of the present invention;
[0032] Figure 3 It is a flow chart of the scheduling algorithm of the present invention. DETAILED DESCRIPTION
[0033] In order to better understand the present invention, the content of the present invention is further explained below in conjunction with an example, and the scheduling method is not limited to this example. Figure 1 The figure shows the system architecture of an unmanned electric loader dispatching system for a concrete mixing station, which is mainly composed of a silo detection module, a hopper detection module, a control module and a terminal display module. The principles of each module are described as follows:
[0034] Silo detection module: The silo detection module consists of a lidar, an edge controller and a DTU module. The lidar in the module is installed directly above the silo so that its scanning range can cover the entire silo. The lidar collects distance data between the aggregate in the silo and the lidar, and then the edge controller calculates the volume of the remaining material in the silo, and finally transmits it to the control module through the DTU module.
[0035] Hopper detection module: The hopper detection module consists of a binocular camera, an edge controller and a DTU module. The binocular camera in the module is installed directly above the hopper so that its scanning range can cover the entire hopper. The binocular camera collects the distance data between the aggregate in the hopper and the binocular camera, and then the edge controller calculates the volume of the remaining material in the hopper, and finally transmits it to the control module through the DTU module.
[0036] Control module: The control module is composed of a server, which can receive data from the above-mentioned silo detection module, hopper detection module and unmanned electric loader and transmit them to the terminal display module. It can also generate tasks according to the volume data of the hopper aggregate residue, and automatically generate job instructions through the unmanned electric loader scheduling algorithm and distribute them to different unmanned electric loaders.
[0037] Terminal display module: The terminal display module consists of a large display screen and a computer. This module can display the status data of the unmanned electric loader, the volume data of the aggregate residue in the silo hopper, and the 3D digital model of the concrete mixing station and on-site equipment and facilities, and complete the mapping from the physical entity to the digital model through a data-driven model.
[0038] like Figure 1As shown, an unmanned electric loader scheduling system for a concrete mixing station exchanges data with an MES system and an unmanned electric loader system, wherein the MES system provides the above-mentioned scheduling system with basic information on the production operation of the concrete mixing station, such as the switching information of the mixing station, the pouring order information, the qualified information of the silo aggregate, the corresponding information between the hopper and the aggregate, etc.; the unmanned electric loader system is an actuator for aggregate replenishment, and after its target hopper and silo are given, it can complete the "shoveling, loading, transporting, and unloading" operations of the aggregate. The unmanned electric loader system communicates data with the above-mentioned scheduling system, and the communication content mainly includes the above-mentioned scheduling system issuing scheduling instructions to the unmanned electric loader and the unmanned electric loader system uploading its own status information to the scheduling system. The unmanned electric loader is divided into an operating queue and a standby queue, and the number of unmanned electric loaders in the operating queue is determined according to the number of operating mixing stations.
[0039] Figure 2 The following is a system flow chart of an unmanned electric loader dispatching system for a concrete mixing station, and the specific steps are as follows:
[0040] S10, obtaining basic information of production operations from the MES system, determining the pouring order corresponding to the current concrete production, the number of the silo that has passed the aggregate inspection, and the corresponding information between the hopper and the aggregate;
[0041] S20, real-time detection of the volume of the remaining aggregate in the silo is performed to determine the silos available for current concrete production, and the silos available for production operations are matched one by one with the hoppers;
[0042] S30, real-time detection of the aggregate residual volume of each hopper, when the aggregate residual volume in the hopper numbered i is less than m, generate a job task, when the total task volume is less than k, repeat step S3, otherwise jump to step S4;
[0043] S40, the dispatching system communicates with the unmanned electric loader system to determine the number n of unmanned electric loaders that can be dispatched in the current operation queue. When n<2, repeat step S4, otherwise jump to step S5;
[0044] S50, assigning tasks to the unmanned electric loaders that can be dispatched in the current job queue through the unmanned electric loader scheduling algorithm, and jumping to step S3 after all current tasks are assigned.
[0045] The above unmanned electric loader scheduling algorithm is a polling assignment scheduling algorithm based on power. Assume that the number of tasks issued by the current scheduling system is k, the number of loaders that are currently idle and have battery power greater than p% is n, c i,j (t)(i=1,2..,nj=1,2,..,k) represents the cost consumption of the jth task assigned to the i-th loader at time t, [c i,j(t)] is the cost matrix of each task to be assigned and each loader at time t:
[0046]
[0047] Let x i,j (i=1,2..,nj=1,2,..,k) indicates whether the i-th loader accepts the j-th task, then x i,j The values are:
[0048]
[0049] The objective function established is to minimize the total consumption Z(t) of completing all tasks at time t, that is:
[0050]
[0051]
[0052] In the formula, represents the time it takes for loader i to complete task j, It represents the penalty for loader i not completing task j within the specified time, and the above two costs are used to represent the cost estimate of assigning task j to loader i.
[0053] The allocation of the current unmanned electric loader operation tasks can be completed by solving the objective function through the Hungarian algorithm. When the battery power of a certain unmanned electric loader is less than p%, after the loader completes the current operation task, the scheduling system will order the loader to charge, and a loader in the standby queue will be added to the operation queue.
[0054] Figure 3 The flowchart of the scheduling algorithm of the unmanned electric loader is shown, and the specific steps are as follows:
[0055] S11, inputting the work task to be assigned and the status data of the unmanned electric loader, including the location information and the power information;
[0056] S22, establishing a cost consumption model of the unmanned electric loader according to the current state data of the unmanned electric loader and the information of the tasks to be assigned;
[0057] S33, establishing a cost consumption matrix and determining an objective function according to the cost consumption model;
[0058] S44. By solving the objective function through the Hungarian algorithm, the optimal scheduling plan for the unmanned electric loader can be output.
[0059] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An unmanned electric loader dispatching system for a concrete mixing station, characterized in that: It includes a silo detection module, a hopper detection module and a control module; The silo detection module is responsible for calculating the remaining volume of the silo based on the collected data; the silo detection module includes a laser radar, an edge controller, and a DTU module; The hopper detection module is responsible for calculating the volume of the remaining material in the hopper based on the collected data; the hopper detection module includes a binocular camera, an edge controller and a DTU module, and the hopper detection module outputs the volume data of the remaining material in the hopper in real time; The control module is responsible for receiving and transmitting data from the silo detection module and the hopper detection module; the control module includes a server; The laser radar in the silo detection module is installed just above the silo so that its scanning range covers the entire silo. The laser radar collects the distance data between the aggregate in the silo and the laser radar, and then the volume of the remaining material in the silo is calculated through the edge controller, and finally transmitted to the control module through the DTU module; The binocular camera in the hopper detection module is installed just above the hopper so that its scanning range covers the entire hopper. The binocular camera collects the distance data between the aggregate in the hopper and the binocular camera, and then calculates the volume of the remaining material in the hopper through the edge controller, and finally transmits it to the control module through the DTU module; The specific workflow of the system is: S10, obtaining basic information of production operations from the MES system, determining the pouring order corresponding to the current concrete production, the number of the silo that has passed the aggregate inspection, and the corresponding information between the hopper and the aggregate; S20, real-time detection of the volume of the remaining aggregate in the silo is performed to determine the silos available for current concrete production, and the silos available for production operations are matched one by one with the hoppers; S30, real-time detection of the aggregate residual volume of each hopper, when the aggregate residual volume in the hopper numbered i is less than the set threshold, generate a job task, when the total task volume is less than the set threshold, repeat step S30, otherwise jump to step S40; S40, the dispatching system communicates with the unmanned electric loader system to determine the number of unmanned electric loaders that can be dispatched in the current operation queue. When the number of unmanned electric loaders is less than 2, repeat step S40, otherwise jump to step S50; S50, assigning tasks to the unmanned electric loaders that can be dispatched in the current job queue through the unmanned electric loader scheduling algorithm, and jumping to step S30 after all current tasks are assigned.
2. The unmanned electric loader dispatching system for a concrete mixing station according to claim 1 is characterized in that: It also includes a terminal display module, which includes a large display screen and a computer.
3. The unmanned electric loader dispatching system for a concrete mixing station according to claim 2 is characterized in that: The control module receives data from the silo detection module, hopper detection module and unmanned electric loader and transmits it to the terminal display module, generates tasks based on the volume data of the hopper aggregate residue, and automatically generates job instructions through the unmanned electric loader scheduling algorithm and distributes them to different unmanned electric loaders.
4. The unmanned electric loader dispatching system for a concrete mixing station according to claim 2, characterized in that: The terminal display module shows the status data of the unmanned electric loader, the volume data of the aggregate residue in the silo and hopper, and the 3D digital model of the concrete mixing station and on-site equipment and facilities, and completes the mapping from the physical entity to the digital model through a data-driven model.
5. A method for using the unmanned electric loader dispatching system for a concrete mixing station according to claim 1, characterized in that: The following steps are involved: S11, inputting the work task to be assigned and the status data of the unmanned electric loader, including the location information and the power information; S22, establishing a cost consumption model of the unmanned electric loader according to the current state data of the unmanned electric loader and the information of the tasks to be assigned; S33, establishing a cost consumption matrix and determining an objective function according to the cost consumption model; S44. By solving the objective function through the Hungarian algorithm, the optimal scheduling plan for the unmanned electric loader can be output.