The invention relates to a method for the automated
shunting of rail-bound freight wagons in a
shunting yard, comprising the following steps: - detecting the entry of a freight
train into an entry track; - upon detection of entry, activating an
automatic sequence control in which a
rolling speed or
rolling speed profile is determined for individual freight wagons or individual freight wagon sets of the freight
train; - accelerating the individual freight wagons or freight wagon sets in a push-start track and / or on a hump
yard; - setting the determined
rolling speed or rolling speed profile by automated braking of the respective freight wagon or freight wagon set; - distributing the individual freight wagons or freight wagon sets onto different direction tracks.The method according to the invention is characterized in that the entry of the freight
train into the entry track is detected by comparing current
GPS data of the freight train with stored GPS position data of the
shunting facility and / or the entry track, or by detecting the freight train's entry into a
radio signal area in the vicinity of the entry track.