A water circuit control valve assembly, a test water component, and an outlet water controller

By designing a water circuit control valve assembly and utilizing the position switching of a movable control valve core, the cleaning of upstream and downstream pipelines was achieved, solving the problem of mud and sand clogging the valve core in concealed water outlet controllers, and improving installation efficiency and service life.

CN117489823BActive Publication Date: 2026-11-17JOMOO KITCHEN & BATHROOM
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311757818.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-20
Publication Date
2026-11-17
Estimated Expiration
2043-12-20

AI Technical Summary

Technical Problem

In concealed water outlet controllers, dirt and debris such as mud and sand can easily remain in the pipes, causing valve core blockage, affecting service life and potentially damaging the water outlet controller.

Method used

A water circuit control valve assembly was designed, including a fixed body and a movable control valve core. By switching between different positions, the upstream and downstream pipelines can be cleaned and pressure tested, preventing sediment from entering the downstream pipeline.

Benefits of technology

It enables the cleaning of both upstream and downstream pipelines, simplifies the water testing process, improves installation efficiency, avoids valve core clogging, and extends the service life of the water outlet controller.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117489823B_ABST
    Figure CN117489823B_ABST
Patent Text Reader

Abstract

A water circuit control valve assembly, a test assembly, and an outlet controller are disclosed. The water circuit control valve assembly includes: a fixed body and a control valve core movablely mounted on the fixed body; the fixed body is configured to be mounted on a valve seat having an inlet connection hole and an outlet connection hole, the inlet connection hole being connected to an upstream pipeline and the outlet connection hole being connected to a downstream pipeline; wherein, the fixed body is provided with an inlet flow channel and an outlet flow channel, the inlet flow channel having an inlet connecting port and an outlet connecting port, when the fixed body is mounted on the valve seat, the inlet connecting port is connected to the inlet connection hole, and the outlet connecting port is connected to the outlet connection hole; the control valve core is configured to be movable to a first position and a second position; in the first position, the control valve core connects the inlet flow channel and the outlet flow channel and closes the connection between the inlet flow channel and the outlet connection hole; in the second position, the control valve core closes the connection between the inlet flow channel and the outlet flow channel and opens the connection between the inlet flow channel and the outlet connection hole.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This article relates to the field of sanitary ware technology, and in particular to a water circuit control valve assembly, a test water component, and a water outlet controller. Background Technology

[0002] For concealed water outlet controllers (such as shower controllers), during construction and installation, dirt and debris such as mud and sand can easily remain in the pipes, making cleaning inconvenient. When these debris flows into the valve core, they can cause blockages, seriously affecting the service life of the water outlet controller, or even damaging it. Summary of the Invention

[0003] An embodiment of this application provides a water circuit control valve assembly, including: a fixed body and a control valve core movably mounted on the fixed body; the fixed body is configured to be mounted on a valve seat having an inlet connection hole and an outlet connection hole, the inlet connection hole being connected to an upstream pipeline, and the outlet connection hole being connected to a downstream pipeline; wherein,

[0004] The fixed body is provided with an inlet channel and an outlet channel. The inlet channel has an inlet connection port and an outlet connection port. When the fixed body is installed on the valve seat, the inlet connection port is connected to the inlet docking hole, and the outlet connection port is connected to the outlet docking hole.

[0005] The control valve core is configured to move to a first position and a second position. In the first position, the control valve core connects the inlet channel and the outlet channel, and closes the connection between the inlet channel and the outlet connection hole, so that water entering the inlet channel from the upstream pipeline flows out of the outlet channel. In the second position, the control valve core closes the connection between the inlet channel and the outlet channel, and opens the connection between the inlet channel and the outlet connection hole, so that water entering the inlet channel from the upstream pipeline flows out of the downstream pipeline.

[0006] The water control valve assembly provided in the embodiments of this application can be applied to, for example, the testing of a shower outlet controller. By using the water control valve assembly provided in the embodiments of this application for testing, the upstream and downstream pipes can be cleaned separately. The sediment in the upstream pipe can be discharged from the outlet channel of the water control valve assembly first, preventing a large amount of sediment from entering the downstream pipe. After the upstream pipe is cleaned, water is then led out to the downstream pipe for cleaning. Moreover, pressure testing can be performed through the water control valve assembly. The operation is simple. Therefore, the water control valve assembly provided in this application can quickly complete the testing operation of the outlet controller, which is beneficial to improving installation efficiency and solving the problem of sediment in the pipe entering the valve core and damaging the valve core.

[0007] This application provides a water testing assembly, which includes a valve seat and a water circuit control valve group as described above;

[0008] The valve seat is provided with at least one water inlet port and one water outlet port, and is also provided with a water inlet docking hole that is connected to the at least one water inlet port and a water outlet docking hole that is connected to the water outlet port. The upstream pipeline is between each water inlet port and its corresponding water inlet docking hole, and the downstream pipeline is between the water outlet docking hole and the water outlet port.

[0009] The fixed body of the water circuit control valve assembly is installed on the valve seat. At least one water inlet is provided, and each water inlet is connected to a water inlet docking hole. The water outlet is connected to an water outlet docking hole.

[0010] An embodiment of this application also provides a water outlet controller, including the test water component as described above and a water outlet control module for controlling the water outlet flow rate, wherein the water outlet control module is connected to the water outlet port of the valve seat.

[0011] Other features and advantages of this application will be set forth in the following description, and will be apparent in part from the description, or may be learned by practicing the application. Other advantages of this application can be realized and obtained by means of the solutions described in the description and the accompanying drawings. Attached Figure Description

[0012] The accompanying drawings are used to provide an understanding of the technical solutions of this application and constitute a part of the specification. They are used together with the embodiments of this application to explain the technical solutions of this application and do not constitute a limitation on the technical solutions of this application.

[0013] Figure 1 This is a schematic diagram of the structure of a water control valve assembly according to one embodiment of this application;

[0014] Figure 2 for Figure 1 The diagram shows the structure of the water circuit control valve assembly from another angle.

[0015] Figure 3 A bottom view of a water control valve assembly according to one embodiment of this application;

[0016] Figure 4 for Figure 3 The diagram shown is a structural schematic of the water circuit control valve assembly cut along section AA (where the control valve core is in the first position);

[0017] Figure 5 for Figure 3 The diagram shown is a structural schematic of the water circuit control valve assembly cut along section AA (where the control valve core is in the second position);

[0018] Figure 6 for Figure 1 The diagram shown is a structural schematic of the water circuit control valve assembly in a disassembled state.

[0019] Figure 7 This is a schematic diagram of the valve seat structure according to one embodiment of this application;

[0020] Figure 8 This is a schematic diagram of a water control valve assembly installed on a valve seat according to one embodiment of this application;

[0021] Figure 9 This is a schematic diagram showing the connection between the valve seat and the first water outlet control module according to one embodiment of this application.

[0022] Figure 10 This is a schematic diagram of the structure of the test water assembly connected to the first water outlet control module according to one embodiment of this application (wherein the control valve core is in the first position);

[0023] Figure 11 for Figure 10 The diagram shown is a cross-section of the structure along the CC axis.

[0024] Figure 12 This is a schematic diagram of the structure of the test water assembly connected to the first water outlet control module according to one embodiment of this application (wherein the control valve core is in the second position);

[0025] Figure 13 for Figure 12 The diagram shown is a cross-section of the structure along DD.

[0026] Figure 14 This is a schematic diagram of the appearance of the water outlet controller according to one embodiment of this application (appearance during installation and water testing);

[0027] Figure 15 for Figure 14 The diagram shown is a structural schematic of the water outlet controller in a disassembled state.

[0028] Figure 16 This is a schematic diagram of the appearance of the water outlet controller according to one embodiment of this application (appearance during normal use);

[0029] Figure 17 for Figure 16 A cross-sectional view of the water outlet controller shown;

[0030] Figure 18 for Figure 16 The diagram shows a partial cross-sectional view of the water outlet controller.

[0031] Explanation of reference numerals in the attached figures:

[0032] 10-Water circuit control valve assembly; 11-Fixed body; 111-Base; 112-Cylindrical part; 113-Inlet channel; 1131-Inlet connection port; 1132-Outlet connection port; 114-Outlet channel; 115-Sealing ring; 12-Control valve core; 121-First sealing part; 122-Second sealing part; 123-First sealing ring; 124-Second sealing ring; 125-Cylindrical body; 126-Connecting part; 127-Connecting port; 20-Valve seat; 21-Connecting pipe; 211-Inlet port; 22-Seat body; 221-Inlet connection hole; 222-Outlet connection hole; 223-Outlet port; 224-Mounting hole; 23-Stop valve; 25-First panel mounting hole; 26-First fixing hole; 30-First outlet Control module; 31-Inlet; 32-Outlet; 33-Connection port; 36-Second fixing hole; 40-Second water outlet control module; 41-Inlet; 42-Outlet; 46-Third fixing hole; 50-Outlet module; 55-Second panel mounting hole; 56-Fourth fixing hole; 60-Fixing plate; 61-Fixing bolt; 70-Wall-embedded box; 71-Upper box; 72-Lower box; 73-Inlet; 74-First outlet; 75-Level; 80-Protective cover; 90-Thermostatic valve assembly; 100-Control panel; 101-Panel body; 102-First button; 103-Second button; 104-Thermostatic handle; 105-Shower head mounting assembly; 106-Second outlet; M1-Upstream pipe; M2-Downstream pipe. Detailed Implementation

[0033] This application describes several embodiments, but these descriptions are exemplary and not restrictive, and it will be apparent to those skilled in the art that many more embodiments and implementations are possible within the scope of the embodiments described herein. Although many possible combinations of features are shown in the drawings and discussed in the detailed description, many other combinations of the disclosed features are also possible. Unless specifically limited, any feature or element of any embodiment may be used in combination with, or may replace, any feature or element of any other embodiment.

[0034] This application includes and contemplates combinations of features and elements known to those skilled in the art. The embodiments, features, and elements disclosed in this application can also be combined with any conventional features or elements to form unique inventive solutions. Any feature or element of any embodiment can also be combined with features or elements from other inventive solutions to form another unique inventive solution. Therefore, it should be understood that any feature shown and / or discussed in this application can be implemented individually or in any suitable combination. Therefore, the embodiments are not limited except by the limitations imposed by the appended claims and their equivalents. Furthermore, various modifications and changes can be made within the scope of the appended claims.

[0035] Furthermore, in describing representative embodiments, the specification may have presented methods and / or processes as a specific sequence of steps. However, the method or process should not be limited to the specific order of steps described herein, to the extent that it does not depend on such a specific order. As will be understood by those skilled in the art, other sequences of steps are also possible. Therefore, the specific order of steps set forth in the specification should not be construed as a limitation of the claims. Moreover, the claims concerning the method and / or process should not be limited to the steps performed in the written order, and those skilled in the art will readily understand that these orders can be varied and still remain within the spirit and scope of the embodiments of this application.

[0036] Embodiments of this application provide a water circuit control valve assembly 10, such as Figures 1-6 As shown, it includes: a fixed body 11 and a control valve core 12 movably mounted on the fixed body 11; the fixed body 11 is configured to be mounted on a valve seat 20 having an inlet connection hole 221 and an outlet connection hole 222, wherein the inlet connection hole 221 is connected to an upstream pipeline and the outlet connection hole 222 is connected to a downstream pipeline; wherein,

[0037] The fixed body 11 is provided with an inlet channel 113 and an outlet channel 114. The inlet channel 113 has an inlet connection port 1131 and an outlet connection port 1132. When the fixed body 11 is installed on the valve seat 20, the inlet connection port 1131 is connected to the inlet connection hole 221, and the outlet connection port 1132 is connected to the outlet connection hole 222.

[0038] The control valve core 12 is configured to move to a first position and a second position. In the first position, the control valve core 12 connects the inlet channel 113 and the outlet channel 114, and closes the connection between the inlet channel 113 and the outlet connection hole 222, so that water entering the inlet channel 113 from the upstream pipeline flows out of the outlet channel 114. In the second position, the control valve core 12 closes the connection between the inlet channel 113 and the outlet channel 114, and opens the connection between the inlet channel 113 and the outlet connection hole 222, so that water entering the inlet channel 113 from the upstream pipeline flows out of the downstream pipeline.

[0039] The water control valve assembly 10 provided in the embodiments of this application can be applied to, for example, the testing of a shower outlet controller. That is, when installing the outlet controller on a wall, the water control valve assembly 10 is installed on the valve seat 20 of the outlet controller, assembling it into a structure capable of performing a test, so as to conduct a test operation during the installation of the outlet controller, including pipe cleaning and pressure testing. Wherein, for example... Figure 7 As shown, the valve seat 20 has at least one water inlet port 211, and each water inlet port 211 corresponds to a water inlet docking hole 221. Each water inlet port 211 and the corresponding water inlet docking hole 221 are connected to form an upstream pipeline. When the water outlet controller is installed, the water inlet port 211 of the valve seat 20 is connected to the water pipe on the wall, so that the water in the water pipe enters the upstream pipeline of the valve seat 20.

[0040] refer to Figures 10-13 In the embodiment shown, when the water control valve assembly 10 is installed on the valve seat 20 and a test is performed, the control valve core 12 is controlled to be in the first position, such as... Figure 10 and Figure 11 This indicates that the control valve core 12 is in the first position. At this time, water from the upstream pipe M1 (i.e., the pipe upstream of the inlet connection hole 221) can enter the inlet channel 113 of the water control valve group 10 through the inlet connection hole 221 of the valve seat 20 and the inlet connection port 1131 of the water control valve group 10. Figure 11 As indicated by the middle arrow, when the control valve core 12 is in the first position, it connects the inlet channel 113 and the outlet channel 114, and closes the connection between the inlet channel 113 and the outlet connection hole 222. Therefore, the water in the inlet channel 113 flows out from the outlet channel 114, allowing the sediment in the upstream pipeline M1 to be discharged from the outlet channel 114 of the water circuit control valve assembly 10 with the water flow, thus completing the cleaning of the upstream pipeline M1. On the other hand, when the control valve core 12 of the water circuit control valve assembly 10 is in the second position... Figures 12-13The display shows that the control valve core 12 is in the second position. At this time, the control valve core 12 closes the connection between the inlet channel 113 and the outlet channel 114, and opens the connection between the inlet channel 113 and the outlet connection hole 222. Therefore, the water from the upstream pipeline M1 enters the inlet channel 113 of the water control valve group 10 through the inlet connection hole 221 and the inlet connection port 1131, and then enters the downstream pipeline M2 through the outlet connection port 1132 and the outlet connection hole 222. Figure 13 As indicated by the middle arrow, the downstream pipe M2 is connected to a water outlet control module (the first water outlet control module 30 in the figure) for controlling the water flow rate (or controlling the water outlet). Opening the first water outlet control module 30 allows water from the downstream pipe M2 to be discharged, thus completing the cleaning of the downstream pipe M2 and its connected downstream pipes to the valve seat 20. During pressure testing, the control valve core 12 is set to the second position, closing the water outlet channel 114 and preventing water from flowing out of the water control valve assembly 10. The water outlet control module (the first water outlet control module 30 in the figure) is also closed. After all pipes are closed, a pressure test can be performed. After the test is completed, the water control valve assembly 10 is removed from the valve seat 20, and then a temperature control valve assembly or other type of valve assembly for controlling the water flow or temperature is installed on the valve seat 20 to form a normally functioning water outlet controller.

[0041] Therefore, the water control valve assembly 10 provided in this application can clean the upstream pipe M1 and the downstream pipe M2 respectively. The sediment in the upstream pipe M1 can first be discharged from the outlet channel 114 of the water control valve assembly 10, preventing it from entering the downstream pipe M2. After the upstream pipe M1 is cleaned, water is then led out to the downstream pipe M2 for cleaning. Using this water control valve assembly 10 for pipe cleaning is convenient and effectively solves the problem of sediment clogging the valve core in existing technologies. Furthermore, the water control valve assembly 10 can also be used for pressure testing, which is simple to operate. Therefore, using the water control valve assembly 10 provided in this application allows for rapid completion of the water outlet controller's test operation, thereby improving installation efficiency.

[0042] It is understood that the water control valve assembly 10 provided in the embodiments of this application is not limited to water testing. Other suitable devices that can use the water control valve assembly 10 for water control can also use the water control valve assembly 10.

[0043] In one embodiment, such as Figure 2 and Figure 3As shown, the water inlet channel 113 is a groove provided at the bottom of the fixed body 11. The part of the groove that connects with the water inlet docking hole 221 of the valve seat 20 is the water inlet communication port 1131, and the part of the groove that connects with the water outlet docking hole 222 of the valve seat 20 is the water outlet communication port 1132.

[0044] Figure 7 The structure of valve seat 20 in one embodiment is shown. Figure 8 This illustrates the structure of a water control valve assembly 10 installed on a valve seat 20 in one embodiment. When the water control valve assembly 10 is installed on the valve seat 20, the bottom surface of the fixing body 11 is attached to the valve seat 20. The groove is connected to the inlet connection hole 221 and the outlet connection hole 222. The part of the groove that is connected to the inlet connection hole 221 is the inlet connection port 1131, and the part that is connected to the outlet connection hole 222 is the outlet connection port 1132. A sealing ring 115 is provided between the fixing body 11 and the valve seat 20, thereby forming a sealed space around the groove between the fixing body 11 and the valve seat 20.

[0045] In one embodiment, when the control valve core 12 is in the first position, the control valve core 12 is inserted into the water outlet connection hole 222 and blocks the water outlet connection hole 222, such as Figure 10 and Figure 11 The display shows that the control valve core 12 is in the first position. At this time, the water from the upstream pipe M1 enters the inlet port 1131 through the inlet docking hole 221, flows along the inlet channel 113, and then flows out from the outlet channel 114.

[0046] When the control valve core 12 is in the second position, the control valve core 12 blocks the water outlet passage 114. Figure 12 and Figure 13 The display shows the state when the control valve core 12 is in the second position. At this time, the water in the upstream pipe M1 enters the inlet port 1131 through the inlet docking hole 221, flows along the inlet flow channel 113, and then enters the outlet docking hole 222 through the outlet port 1132 and flows out along the downstream pipe M2.

[0047] In one embodiment, such as Figure 1-6 As shown, the fixed body 11 is provided with a mounting hole 1121, and the water outlet channel 114 is formed in the mounting hole 1121. The bottom end of the mounting hole 1121 is connected to the water outlet channel 113. The control valve core 12 is installed in the mounting hole 1121 and is configured to move along the mounting hole 1121 to the first position and the second position.

[0048] The fixing body 11 may include a base 111 for mounting on the valve seat 20 and a cylindrical part 112 disposed on the base 111, wherein the water inlet channel 113 is formed on the base 111 and the mounting hole 1121 is formed in the cylindrical part 112.

[0049] In one example, the control valve core 12 is installed in the mounting hole 1121 by a threaded connection and moves along the mounting hole 1121 by rotation. Of course, the control valve core 12 can also be set to move linearly, and a limiting component can be set to limit the control valve core to a first position and a second position.

[0050] In one example, the control valve core 12 includes a cylindrical body 125 movably mounted within the mounting hole 1121 and a first sealing portion 121 connected to the cylindrical body 125. A first sealing ring 123 may be provided on the outer periphery of the first sealing portion 121. A connecting hole 127 located above the first sealing portion 121 is provided on the wall of the cylindrical body 125.

[0051] When the control valve core 12 is in the first position, the water inlet channel 113 is connected to the water outlet channel 114 through the connecting hole 127, and the first sealing part 121 blocks the water outlet docking hole 222, thereby shutting off the connection between the water inlet channel 113 and the water outlet docking hole 222; when the control valve core 12 moves upward from the first position to the second position, the first sealing part 121 leaves the water outlet docking hole 222 and moves to seal against the hole wall of the mounting hole 1121, thereby opening the water outlet docking hole 222 and blocking the water outlet channel 114.

[0052] In this example, the outer surface of the cylindrical body 125 is provided with threads. The cylindrical body 125 is installed in the mounting hole 1121 of the fixed body 11 by means of threaded connection. By rotating the cylindrical body 125, the control valve core 12 moves up and down along the mounting hole 1121.

[0053] Optionally, a plurality of connecting holes 127 are provided circumferentially on the side wall of the cylindrical body 125. When the cylindrical body 125 is adjusted to the first position by rotating it with a thread, any one of the connecting holes 127 can be connected to the water inlet channel 113. This avoids the situation where the connecting hole 127 cannot be connected to the water inlet channel 113 after the cylindrical body 125 is rotated if only one connecting hole 127 is provided.

[0054] In one example, refer to Figures 4-6The outer side of the cylindrical body 125 is also provided with a second sealing part 122 located above the connecting hole 127. The second sealing part 122 is configured to seal against the side wall of the mounting hole 1121. A second sealing ring 124 can be provided on the outer periphery of the second sealing part 122. The second sealing part 122 maintains a sealing fit with the side wall of the mounting hole 1121 through the second sealing ring 124, thereby preventing fluid from flowing out from the gap between the cylindrical body 125 and the hole wall of the mounting hole 1121. Figure 4-6 As can be seen, multiple connecting holes 127 are provided between the first sealing part 121 and the second sealing part 122, and a connecting part 126 connecting the first sealing part 121 is provided between adjacent connecting holes 127.

[0055] In one embodiment, the water inlet channel 113 is provided with two water inlet ports 1131, which are configured to be connected one-to-one with the two water inlet docking holes 221 provided on the valve seat 20, and the two water inlet ports 211 of the valve seat 20 and the two water inlet ports 1131 respectively form an upstream pipeline M1.

[0056] When the water outlet controller is in the trial water stage, the water circuit control valve assembly 10 is installed on the valve seat 20. The two inlet ports 211 of the valve seat 20 are connected to the hot water pipe and the cold water pipe, respectively. In this way, the water entering the valve assembly 20 from the hot water pipe and the cold water pipe can clean the pipes they flow through. The valve seat 20 can be used to install a thermostatic valve assembly. When the water outlet controller is in normal use, the thermostatic valve assembly is installed on the valve seat 20. The two inlet ports of the thermostatic valve assembly are connected to the two inlet connection holes 221 on the valve seat 20, and the mixed water outlet of the thermostatic valve assembly is connected to the outlet connection hole 221 on the valve seat 20. Thus, hot water and cold water enter the thermostatic valve assembly, mix, and then flow out from the downstream pipe M2 through the outlet connection hole 221.

[0057] Embodiments of this application also provide a water testing component, such as... Figure 7 and Figure 8 As shown, the test water assembly includes a valve seat 20 and a water circuit control valve group 10 as described above.

[0058] The valve seat 20 is provided with at least one inlet port 211 and one outlet port 223, and also with inlet connection holes 221 corresponding to the at least one inlet port 211 and outlet connection holes 222 corresponding to the outlet port 223. Each inlet port 211 and its corresponding inlet connection hole 221 form an upstream pipeline M1, and the outlet connection hole 222 and the outlet port 223 form a downstream pipeline M2. The fixed body 11 of the water circuit control valve group 10 is installed on the valve seat 20. At least one inlet connection port 1131 is provided, each inlet connection port 1131 is connected to an inlet connection hole 221, and the outlet connection port 1132 is connected to an outlet connection hole 222. Optionally, a shut-off valve 23 can also be provided on the valve seat 20 corresponding to each inlet port 211 to control the opening and closing of the upstream pipeline M1 corresponding to each inlet port 211.

[0059] In one embodiment, the valve seat 20 includes a connecting pipe 21 and a seat body 22 connected to the connecting pipe 21; the connecting pipe 21 is provided with the water inlet port 211, and the seat body 22 is provided with the water inlet connection hole 221, the water outlet connection hole 222 and the water outlet port 223; the water circuit control valve assembly 10 is installed on the seat body 22.

[0060] refer to Figure 7 and Figure 8 In the illustrated embodiment, the valve seat 20 includes a connecting pipe 21 and a seat body 22 connected to the connecting pipe. The connecting pipe 21 has two inlet ports 211, and a shut-off valve 23 is provided for each inlet port 211. The shut-off valve 23 is located on the connecting pipe 21. The seat body 22 has an inlet connection hole 221 and an outlet connection hole 222, and internally contains an upstream pipe communicating with the inlet connection hole 221 and a downstream pipe M2 communicating with the outlet connection hole 222. The outlet port 223 is located at the end of the seat body 20 furthest from the connecting pipe 21. The outlet port 223 is used to connect to a water outlet control module, which can control the water flow rate at the outlet. Figure 9 and Figure 10 The diagram shows that the outlet port 223 of the valve seat 20 is connected to the inlet port 31 of the first outlet control module 30. Water from the downstream pipeline M2 of the valve seat 20 enters the first outlet control module 30 from the outlet port 223. The first outlet control module 30 controls the water flow rate of the outlet port 32.

[0061] In other embodiments, it is not limited to setting only two water inlet ports 211. Setting one water inlet port 211 or more water inlet ports 211 can also be used to perform water testing using the water circuit control valve group 10 provided in the embodiments of this application.

[0062] In addition, the valve seat 20 is provided with multiple mounting holes 224, through which the test valve assembly 10 is mounted on the valve seat 20. After the test is completed, the temperature control valve assembly can be mounted on the valve seat 20 through the mounting holes 224.

[0063] The following is based on Figures 10-13 The specific process of conducting a water test using a test water assembly is described in one embodiment.

[0064] In this embodiment, the valve seat 20 includes a connecting pipe 21 and a seat body 22 connected to the connecting pipe 21. The seat body 22 is provided with two inlet connection holes 221 and one outlet connection hole 222. The fixing body 11 of the water circuit control valve assembly 10 is fixed on the seat body 22. The two inlet ports 1131 on the bottom surface of the fixing body 11 are respectively connected to the inlet connection holes 221, and the outlet port 1132 is connected to the outlet connection hole 222. The control valve core 12 of the water circuit control valve assembly 10 is installed in the mounting hole 1121 of the fixing body 11 by means of threaded connection, and can be adjusted to a first position and a second position by rotation.

[0065] The seat 22 is provided with a water outlet port 223, which is connected to the water inlet 31 of the first water outlet control module 30. The water flowing out of the water outlet port 223 of the valve seat 20 enters the first water outlet control module 30, and the water flow rate of the water outlet 32 ​​is controlled by the first water outlet control module 30.

[0066] The connecting pipe 21 has two water inlet ports 211, which are respectively connected to the cold water pipe and the hot water pipe on the wall where the water outlet controller is installed. The connecting pipe 21 is equipped with two shut-off valves 23 corresponding to the water inlet ports 211, so as to control the on / off of the upstream pipeline M1 connected to the water inlet ports 211 through the shut-off valves 23.

[0067] After the pipeline connection is completed, rotate the top of the control valve core 12 so that the control valve core 12 is in the first position, such as... Figures 10-11 In the state shown, the control valve core 12 closes the outlet connection hole 222, and the inlet channel 113 and the outlet channel 114 are connected. The first shut-off valve 23 (referred to here as the first shut-off valve 23) is opened, and the other shut-off valve 23 (referred to here as the second shut-off valve 23; the first and second valves are not in any particular order, but are used for ease of description). Water enters the upstream pipeline M1 of the valve seat 20 from the inlet port 211 corresponding to the first shut-off valve 23, and enters the inlet channel 113 of the water control valve group 10 through the corresponding connected inlet connection hole 221 and inlet connection port 1131. The water in the inlet channel 113 is discharged through the outlet channel 114, completing the cleaning of one side of the upstream pipeline M1. (Refer to...) Figure 11The flow direction is indicated by the middle arrow; the second shut-off valve 23 is opened and the first shut-off valve 23 is closed. Water enters the upstream pipeline M1 of the valve seat 20 from the inlet port 211 corresponding to the second shut-off valve 23, and then enters the inlet channel 113 of the water control valve group 10 through the corresponding connected inlet docking hole 221 and inlet connecting port 1131. Then, the water in the inlet channel 113 is discharged through the outlet channel 114, completing the cleaning of the upstream pipeline M1 on the other side. Of course, both shut-off valves 20 can also be opened at the same time, so that the water entering from the two inlet ports 211 enters the water control valve group 10 from their respective upstream pipelines M1, and then is discharged from the outlet channel 114 of the water control valve group 10.

[0068] Rotate the control valve core 12 to move it to the second position, such as... Figures 12-13 In the state shown, the control valve core 12 closes the outlet flow channel 114, and the inlet flow channel 113 is connected to the outlet connection hole 222. Opening one of the shut-off valves 23 and closing the other shut-off valve 23 (or both shut-off valves 23 are open) allows water to enter the upstream pipeline M1 of the valve seat 20 from the inlet port 211, then enter the inlet flow channel 113, and finally enter the downstream pipeline M2 from the outlet connection hole 222. The water fills the pipeline before the first outlet control module 30. (Refer to...) Figure 13 The flow direction is indicated by the middle arrow. When the first water outlet control module 30 is opened, water will flow out from the outlet 311 of the first water outlet control module 30, completing the cleaning of the downstream pipeline M2 and its subsequent pipelines.

[0069] When the control valve core 12 is in the second position, the first water outlet control module 30 is closed, and water will fill the pipeline before the first water outlet control module 30, thereby allowing pressure testing of the pipeline.

[0070] An embodiment of this application also provides a water outlet controller, including the test water component as described above and a water outlet control module for controlling the water outlet flow rate, wherein the water outlet control module is connected to the water outlet port 223 of the valve seat 20.

[0071] The water outlet control module can be set to one or more, such as Figure 14 and Figure 15 The water outlet controller shown is equipped with a first water outlet control module 30 and a second water outlet control module 40. Of course, it is understandable that more water outlet control modules can be connected to the water outlet port 223 of the valve seat 20 as needed, and various modifications can be made to each water outlet control module and the structure to which it is connected.

[0072] The water outlet controller also includes a pre-embedded box 70 and a fixing plate 60. The valve seat 20 and the water outlet control module are respectively connected to the fixing plate 60 by bolts and installed in the pre-embedded box 70.

[0073] The following is based on Figure 14-15 Describe a water outlet controller in one embodiment, and according to Figures 16-18 Describe the structure of the water outlet controller after the water test is completed, so that it can be used normally.

[0074] refer to Figures 14-15 A water control valve assembly 10 is installed on the valve seat 20. The outlet port 223 of the valve seat 20 is sequentially connected to the first outlet control module 30, the second outlet control module 40, and the outlet module 50. Specifically, the first outlet control module 30 has an inlet 31, an outlet 32, and a connection port 33. The inlet 31 is connected to the outlet port 223 of the valve seat 20, the connection port 33 is connected to the inlet 41 of the second outlet control module 40, and the outlet 42 of the second outlet control module 40 is connected to the outlet module 50. The first outlet control module 30 controls the water flow rate of the outlet 32, and the second outlet control module 40 controls the water flow rate of the outlet 42, thereby controlling the water flow rate of the outlet module 50.

[0075] To install the various modules, the water outlet controller also includes a pre-embedded box 70 and a fixing plate 60. Each module is connected to the fixing plate 60 by bolts, forming a whole installed in the pre-embedded box 70.

[0076] like Figure 15 As shown, the valve seat 20 has a first fixing hole 26, the first water outlet control module 30 has a second fixing hole 36, the second water outlet control module 40 has a third fixing hole 46, and the water outlet module 50 has a fourth fixing hole 56. Multiple fixing bolts 61 pass through the fixing plate 60 and connect to the fixing holes of each module, thereby fixing each module to the fixing plate 60 together, forming a whole installed within the embedded box 70. The embedded box 70 may include an upper box body 71 and a lower box body 72 that can be snapped together. The upper box body 71 and the lower box body 72 may each have mounting grooves for installation with the fixing plate 60. After the upper box body 71 and the lower box body 72 are snapped together, they can be further fixed with glue, thus ensuring that each module and the fixing plate 60 are securely located within the embedded box 70.

[0077] The embedded box 70 is equipped with two water inlets 73 and a first water outlet 74. The two water inlets 73 correspond to the two water inlet ports 211 on the valve seat 20, respectively. The water outlet 32 ​​of the first water outlet control module 30 corresponds to the first water outlet 74, so that the water from the first water outlet module 30 flows out from the first water outlet 74. In addition, a level 75 is also provided on the top of the embedded box 70 to facilitate leveling during installation.

[0078] Additionally, the water outlet controller may include a protective cover 80. When the water outlet controller is installed in the wall, the protective cover 80 is installed at the opening of the embedded box 70 to prevent sediment from entering. When a water test is required, the protective cover 80 is opened to clean the pipeline and perform pressure tests (refer to the description above for pipeline cleaning and pressure testing).

[0079] After the water test is completed, remove the water circuit control valve assembly 10 from the valve seat 20, install the temperature control valve assembly 90 on the valve seat 20, and install the panel 100 on the pre-embedded box 70 so that the water outlet controller can be used normally.

[0080] like Figures 16-18 In the embodiment shown, when the temperature control valve assembly 90 is installed on the valve seat 20, the two inlets of the temperature control valve assembly 90 are respectively connected to the two inlet docking holes 221 of the valve seat 20, and the mixed water outlet of the temperature control valve assembly 90 is connected to the outlet docking hole 222 of the valve seat 20. Water entering from the two inlet ports 211 of the valve seat 20 enters the temperature control valve assembly 90 through the inlet docking holes 211 and mixes. The mixed water of the temperature control valve assembly 90 flows out through the outlet docking hole 222 and flows out from the outlet port 223 in sequence to the first outlet control module 30 and the second outlet control module 40. The first outlet control module 30 can control whether water flows out from the outlet 32, and the second outlet control module 40 controls whether water flows out from the outlet module 50.

[0081] The water outlet controller includes a panel 100 that mates with the pre-embedded box 70. The panel 100 includes a panel body 101, which can be fixed to at least one module by bolts. Figure 17 As shown (and in combination) Figure 15 The valve seat 20 shown in the image has a first panel mounting hole 25 and the water outlet module 50 has a second panel mounting hole 55. The panel body 101 is connected to the first panel mounting hole 25 on the valve seat 20 and the second panel mounting hole 55 on the water outlet module 50 by bolts, thereby fixing the panel body 101 to the valve seat 20 and the water outlet module 50.

[0082] The panel 100 also includes a first button 102 for controlling the first water outlet control module 30 and a second button 103 for controlling the second water outlet control module 40, which are provided on the panel body 101. Both the first water outlet control module 30 and the second water outlet control module 40 include a valve core that is controlled by pressing. Pressing the first button 102 can control the water outlet of the first water outlet control module 30, and pressing the second button 103 can control the water outlet of the second water outlet control module 40.

[0083] The panel 100 is also provided with a temperature control handle 104 for controlling the temperature control valve group 90 and a shower head mounting assembly 105 for installing the shower head. The shower head mounting assembly 105 is provided with a second water outlet 106, and the water outlet of the water outlet module 50 is installed corresponding to the second water outlet 106.

[0084] In addition, when installing panel 100, due to different wall embedment depths, the height of the pre-embedded box 70 protruding from the wall varies when it is installed inside the wall. As needed, the part of the pre-embedded box 70 that protrudes from the wall can be cut off so that panel 100 can be installed close to the wall.

[0085] In the description of this application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicating the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application.

[0086] Furthermore, the terms "first," "second," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first," "second," etc., may explicitly or implicitly include at least one of those features.

[0087] In the description of this application, "multiple" means at least two, such as two, three, etc., unless otherwise expressly and specifically limited.

[0088] In this application, unless otherwise expressly specified and limited, the terms "installation," "connection," "joining," "fixing," etc., should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral part; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal communication of two components or the interaction between two components, unless otherwise expressly limited. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0089] In this application, unless otherwise expressly specified and limited, "above" or "below" the second feature can mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Furthermore, "above," "over," and "on top" of the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.

[0090] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0091] Although embodiments of this application have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting this application. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of this application.

Claims

1. A water circuit control valve assembly, characterized in that, include: A fixed body and a control valve core movably mounted on the fixed body; the fixed body is configured to be mounted on a valve seat having an inlet connection hole and an outlet connection hole, the inlet connection hole being connected to an upstream pipeline and the outlet connection hole being connected to a downstream pipeline; wherein, The fixed body is provided with an inlet channel and an outlet channel. The inlet channel has an inlet connection port and an outlet connection port. When the fixed body is installed on the valve seat, the inlet connection port is connected to the inlet docking hole, and the outlet connection port is connected to the outlet docking hole. The control valve core is configured to move to a first position and a second position. In the first position, the control valve core connects the inlet channel and the outlet channel, and closes the connection between the inlet channel and the outlet connection hole, so that water entering the inlet channel from the upstream pipeline flows out of the outlet channel. In the second position, the control valve core closes the connection between the inlet channel and the outlet channel, and opens the connection between the inlet channel and the outlet connection hole, so that water entering the inlet channel from the upstream pipeline flows out of the downstream pipeline. The water inlet channel is a groove provided at the bottom of the fixed body. The part of the groove that connects with the water inlet connection hole is the water inlet port, and the part of the groove that connects with the water outlet connection hole is the water outlet port.

2. The water circuit control valve assembly according to claim 1, characterized in that, In the first position, the control valve core is configured to extend into the water outlet connection hole to block the water outlet connection hole; and / or, in the second position, the control valve core blocks the water outlet channel.

3. The water circuit control valve assembly according to claim 1, characterized in that, The fixed body is provided with a mounting hole, and the water outlet channel is formed in the mounting hole. The bottom end of the mounting hole is connected to the water outlet channel. The control valve core is installed in the mounting hole and configured to move along the mounting hole to the first position and the second position.

4. The water circuit control valve assembly according to claim 3, characterized in that, The control valve core includes a cylindrical body movably installed in the mounting hole and a first sealing part connected to the cylindrical body, wherein a communicating hole is provided on the wall of the cylindrical body above the first sealing part; When the control valve core is in the first position, the water inlet channel is connected to the water outlet channel through the connecting hole, and the first sealing part blocks the water outlet connection hole; when the control valve core moves upward from the first position to the second position, the first sealing part leaves the water outlet connection hole and moves to seal with the hole wall of the mounting hole, thereby opening the water outlet connection hole and blocking the water outlet channel.

5. The water circuit control valve assembly according to claim 4, characterized in that, The cylindrical body has a plurality of connecting holes arranged circumferentially on its side wall.

6. The water circuit control valve assembly according to claim 4, characterized in that, The outer side of the cylindrical body is also provided with a second sealing part located above the connecting hole, and the second sealing part is configured to seal against the side wall of the mounting hole.

7. The water circuit control valve assembly according to claim 3, characterized in that, The control valve core is installed in the mounting hole by means of a threaded connection and moves along the mounting hole by rotation.

8. The water circuit control valve assembly according to claim 3, characterized in that, The fixing body includes a base for mounting on the valve seat and a cylindrical part disposed on the base, wherein the water inlet channel is formed on the base and the mounting hole is formed on the cylindrical part.

9. The water circuit control valve assembly according to any one of claims 1-8, characterized in that, The water inlet channel is provided with two water inlet ports, which are configured to be connected one-to-one with the two water inlet docking holes provided on the valve seat.

10. A water testing component, characterized in that, The test assembly includes a valve seat and a water circuit control valve group according to any one of claims 1-8; The valve seat is provided with at least one water inlet port and one water outlet port, and is also provided with a water inlet docking hole that is connected to the at least one water inlet port and a water outlet docking hole that is connected to the water outlet port. The upstream pipeline is between each water inlet port and its corresponding water inlet docking hole, and the downstream pipeline is between the water outlet docking hole and the water outlet port. The fixed body of the water circuit control valve assembly is installed on the valve seat. At least one water inlet is provided, and each water inlet is connected to a water inlet docking hole. The water outlet is connected to an water outlet docking hole.

11. The test water assembly according to claim 10, characterized in that, Each valve seat is equipped with a shut-off valve corresponding to each water inlet port, and each shut-off valve is used to control the opening and closing of the corresponding upstream pipeline.

12. The test water assembly according to claim 10 or 11, characterized in that, The valve seat includes a connecting pipe and a seat body connected to the connecting pipe; The connecting pipe is provided with the water inlet port, and the base is provided with the water inlet connection hole, the water outlet connection hole and the water outlet port; the water circuit control valve group is installed on the base.

13. A water outlet controller, characterized in that, It includes a test water assembly according to any one of claims 10-12 and an outlet water control module for controlling the outlet water flow rate, wherein the outlet water control module is connected to the outlet port of the valve seat.

Citation Information

Patent Citations

  • Tap water control box

    CN202927126U

  • Pipe pressure testing method and apparatus

    US20100037681A1