AI Technical Summary

Technical Problem

[0003]斜拉索是斜拉桥的主要受力构件之一;斜拉桥在运营期斜拉索受日照等作用,斜拉索防护层开裂、护套老化、钢丝严重锈蚀、锚具锈蚀等问题,甚至出现拉索断裂的情况;部分拉索由于火烧、撞击等事故也会受到损伤,严重影响斜拉桥的正常使用和安全服役,因此需对拉索进行更换

Benefits of technology

[0035] This invention uses a bridge deck lifting device to transfer the various components of the transfer device stored on the cable tower. For the portal frame and longitudinal jacking device, the elevators involved in the cable tower itself can be used for transfer. This reduces hoisting risks and installation time, and improves the efficiency of cable replacement. It also solves the technical problems of cable-stayed tower end hanging and tower end equipment installation during the operation period, and reduces cable replacement time and traffic interference during the operation period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117536139B_ABST
    Figure CN117536139B_ABST
Patent Text Reader

Abstract

The present application relates to cable-stayed bridge operation period cable replacement technology field, specifically disclose a kind of for large-span cable-stayed bridge operation period cable replacement tool and installation method;Install on cable tower, including installation on cable tower parapet and transport device, with transport device and use cable replacement winch, and it is lifted to the top of tower by transport device, and slidingly installed on transport device and along the longitudinal bridge direction movement of hanger point assembly;The transport device includes longitudinal beam assembly, and bridge deck lifting mechanism is installed on the bridge deck and is used with hanger point and is installed on the bridge deck along the longitudinal bridge direction setting parapet.And its installation method is disclosed, the present application reduces lifting risk and installation time, improves the efficiency of cable replacement;Solve the operation period cable tower end hanging and tower end equipment installation technical problem, reduce the operation period cable replacement time and traffic interference.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of bridge engineering technology, and more specifically, to a tooling and installation method for replacing stay cables during the operation of a long-span cable-stayed bridge. Background Technology

[0002] With my country's economic development, the construction of long-span cable-stayed bridges is increasing.

[0003] The stay cable is one of the main load-bearing components of a cable-stayed bridge. During the operation period, the stay cables are exposed to sunlight and other factors, which can cause problems such as cracking of the cable protection layer, aging of the sheath, severe corrosion of the steel wires and anchorages, and even cable breakage. Some cables may also be damaged due to fire, impact and other accidents, which seriously affect the normal use and safe service of the cable-stayed bridge. Therefore, it is necessary to replace the cables.

[0004] The cable-stayed bridge has large cable forces. Compared with the cable-stayed bridge construction period, due to the lack of large tower cranes and other equipment, the installation of traction equipment, tensioning equipment and tower-end hanging equipment inside the cable-stayed tower is technically difficult and has a long installation period, which will cause long-term disruption to existing traffic. Summary of the Invention

[0005] The technical problem to be solved by the present invention is to provide a tooling and installation method for replacing cable stays during the operation of a long-span cable-stayed bridge;

[0006] The solution adopted by this invention to solve the technical problem is:

[0007] A tooling for cable replacement during the operation of a long-span cable-stayed bridge is installed on the tower. It includes a hoisting device installed on the parapet wall of the tower, a cable replacement winch that works in conjunction with the hoisting device and lifts the cable to the top of the tower via the hoisting device, and a lifting point assembly that is slidably installed on the hoisting device and moves along the longitudinal direction of the bridge. The cable replacement winch is installed on the bridge deck.

[0008] The transport device includes a longitudinal beam assembly mounted on the parapet wall and arranged along the longitudinal direction of the bridge, and a bridge deck lifting mechanism used in conjunction with the lifting points and mounted on the bridge deck.

[0009] In some possible implementations,

[0010] The longitudinal beam assembly includes two sets of parallel longitudinal beams arranged along the longitudinal direction of the bridge, and a connecting assembly for connecting the longitudinal beams and the cable tower.

[0011] The lifting point assembly slides in conjunction with the two sets of longitudinal beams; a longitudinal jacking device for controlling the movement of the lifting point assembly is provided on each set of longitudinal beams.

[0012] In some possible implementations,

[0013] The suspension point assembly includes a crossbeam slidably mounted on the longitudinal beam assembly and a pulley suspension assembly mounted on the crossbeam and arranged vertically.

[0014] In some possible implementations,

[0015] The bridge deck lifting mechanism includes a bridge deck lifting device installed on the bridge deck, a gantry frame slidably installed on the longitudinal beam assembly and used in conjunction with the longitudinal jacking device, and lifting points set on the gantry frame.

[0016] In some possible implementations,

[0017] The crossbeams are in two sets and located on both sides of the tower. The portal frame and the longitudinal jacking device are also in two sets and are set one-to-one with the crossbeams. The portal frame is equipped with a hanging point for use with the bridge deck lifting mechanism. The portal frame is located on the side of the longitudinal jacking device away from the crossbeam.

[0018] In some possible implementations,

[0019] The connecting components include diagonal braces for connecting the longitudinal beams to the outer side of the tower, and legs for connecting the bottom of the longitudinal beams to the core concrete inside the tower.

[0020] In some possible implementations,

[0021] A stopper is provided at the bottom of the longitudinal beam, corresponding to the parapet wall.

[0022] An installation method for replacing stay cables during the operational period of a long-span cable-stayed bridge, based on the above-described method, specifically includes the following steps:

[0023] Step S1: Install the components of the transport device except for the diagonal brace;

[0024] Step S2: Lifting and installing the bridge deck lifting device;

[0025] Step S3: Install the diagonal brace and suspension point components to complete the installation.

[0026] In some possible implementations,

[0027] Step S1 specifically includes the following steps:

[0028] Step S11: Lift the longitudinal beam assembly, longitudinal jacking device, lifting point assembly, and cable replacement winch stored in the tower to the bridge deck;

[0029] Step S12: Installation of longitudinal beam assembly and bridge deck winch.

[0030] In some possible implementations,

[0031] Step S2 specifically includes the following steps:

[0032] Step S21: Using the bridge deck winch as the lifting mechanism and cooperating with the gantry crane, lift the cable-changing winch from the ground to the bridge deck;

[0033] Step S22: Control the gantry crane to move along the longitudinal direction of the bridge using the longitudinal jacking device until it reaches the designated position, and install the cable changing winch on the bridge deck to complete the installation.

[0034] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0035] This invention uses a bridge deck lifting device to transfer the various components of the transfer device stored on the cable tower. For the portal frame and longitudinal jacking device, the elevators involved in the cable tower itself can be used for transfer. This reduces hoisting risks and installation time, and improves the efficiency of cable replacement. It also solves the technical problems of cable-stayed tower end hanging and tower end equipment installation during the operation period, and reduces cable replacement time and traffic interference during the operation period. Attached Figure Description

[0036] Figure 1 This is a schematic diagram of the structure of the present invention after assembly;

[0037] Figure 2 This is a structural schematic diagram of the diagonal brace, longitudinal beam, portal frame, and longitudinal jacking device in this invention.

[0038] Figure 3 This is a schematic diagram of the structure of the cable-changing winch in this invention, which uses a front lifting device in conjunction with a gantry frame to achieve the lifting of the winch.

[0039] Figure 4 This is a schematic diagram of the longitudinal beam and cable-changing winch in this invention;

[0040] Among them: 1-tower, 2-core concrete, 3-outrigger, 4-longitudinal beam, 5-diagonal brace, 6-lifting point assembly, 61-crossbeam, 62-pulley suspension assembly, 7-longitudinal jacking device, 8-shield, 9-cable changer winch, 10-gantry frame, 101-lifting point. Detailed Implementation

[0041] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. The terms "first," "second," and similar terms used in this application do not indicate any order, quantity, or importance, but are merely used to distinguish different components. Similarly, "a" or "one," etc., do not indicate a quantity limitation, but rather indicate the existence of at least one. In the implementation of this application, "and / or" describes the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, or B existing alone. In the description of the embodiments of this application, unless otherwise stated, "multiple" means two or more. For example, multiple positioning posts refer to two or more positioning posts. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0042] The present invention will now be described in detail.

[0043] like Figures 1-4 As shown:

[0044] A tooling for replacing stay cables during the operation of a long-span cable-stayed bridge is installed on a pylon 1. It includes a conveying device installed on the parapet wall of the pylon 1, a cable replacement winch 9 that works in conjunction with the conveying device and lifts the cable to the top of the pylon through the conveying device, and a lifting point assembly 6 that is slidably installed on the conveying device and moves along the longitudinal direction of the bridge. The cable replacement winch 9 is installed on the bridge deck.

[0045] The transport device includes a longitudinal beam 4 assembly mounted on the parapet wall and arranged along the longitudinal direction of the bridge, and a bridge deck lifting mechanism that works in conjunction with the lifting point 101 and is mounted on the bridge deck.

[0046] In this invention, the transfer device is stored inside the tower 1, reducing the risk of hoisting to the top of the tower and the installation time. When in use, the transfer device is installed on the parapet wall at the top of the tower. The cable changing winch 9 is lifted to the bridge deck by the transfer device, and the cable changing is achieved through the cooperation of the transfer device. Compared with other technologies, this invention reduces the risk of hoisting and the installation time, thereby achieving fast and efficient cable changing.

[0047] In some possible implementations,

[0048] The longitudinal beam 4 assembly includes two sets of parallel longitudinal beams 4 arranged along the longitudinal direction of the bridge, and a connecting assembly for connecting the longitudinal beams 4 and the cable tower 1.

[0049] Two sets of longitudinal beams 4 are installed on the parapet wall and arranged longitudinally along the bridge direction, and are connected to the cable tower 1 through connecting components to form a whole;

[0050] The lifting point assembly 6 is slidably engaged with the two sets of longitudinal beams 4; a longitudinal jacking device 7 for controlling the movement of the lifting point assembly 6 is provided on each set of longitudinal beams 4.

[0051] In some possible implementations,

[0052] The connecting components include diagonal braces 5 for connecting the longitudinal beam 4 to the outer side of the tower 1, and legs 3 for connecting the bottom of the longitudinal beam 4 to the core concrete 2 inside the tower 1.

[0053] A plug 8 is provided at the bottom of the longitudinal beam 4, corresponding to the parapet wall.

[0054] It should be noted that the height of the outrigger 3 is the same as the height of the parapet wall set at the top of the tower 1, and the top surfaces of the two are on the same plane. The bottom of the longitudinal beam 4 is installed on the top surface of the outrigger 3 and is supported on the parapet wall by the pad 8.

[0055] The diagonal brace 5 is positioned between the cantilever end of the longitudinal beam 4 and the tower 1, effectively improving the rigidity of the longitudinal beam 4.

[0056] In some possible implementations,

[0057] The lifting point assembly 6 includes a crossbeam 61 slidably mounted on the longitudinal beam 4 assembly and a pulley suspension assembly 62 mounted on the crossbeam 61 and arranged vertically.

[0058] A crossbeam 61 is installed on the top surface of the longitudinal beam 4. A pulley suspension assembly 62 is installed on the crossbeam 61 for connecting one end of the stay cable.

[0059] In some possible implementations,

[0060] The bridge deck lifting mechanism includes a bridge deck lifting device installed on the bridge deck, a gantry hanger 10 slidably installed on the longitudinal beam 4 assembly and used in conjunction with the longitudinal jacking device 7, and a lifting point 101 set on the gantry hanger 10.

[0061] The gantry hanger 10 is installed on the longitudinal beam 4. During the lifting process of the cable changing winch 9, the longitudinal jacking device 7 controls the gantry hanger 10 to move along the length of the longitudinal beam 4, and the cable changing winch 9 transfers it to the designated position.

[0062] During cable replacement, the longitudinal jacking device 7 is connected to the crossbeam 61, driving the crossbeam 61 to move along the longitudinal direction of the bridge. At this time, the longitudinal jacking device 7 will effectively realize the movement of the lifting point assembly 6 in the longitudinal direction of the bridge, assisting in the traction of the stay cables and preventing the stay cables from being pulled or lifted at an angle during the traction process inside the tower.

[0063] The longitudinal beam 4 adopts a modular segmented design, which facilitates storage in the tower and rapid installation during operation; the cable changing winch 9 provides power for the installation of the cable-stayed cables in the cable changing device.

[0064] In some possible implementations,

[0065] The crossbeams 61 are in two sets and located on both sides of the tower 1. The portal frame 10 and the longitudinal jacking device 7 are both in two sets and are arranged one-to-one with the crossbeams 61. The portal frame 10 is provided with hanging points for use with the bridge deck lifting mechanism. The portal frame 10 is located on the side of the longitudinal jacking device 7 away from the crossbeams 61.

[0066] The bottom of the gantry bracket 10 is provided with a triangular support, which improves the stability of the gantry bracket 10 during its movement along the longitudinal bridge direction.

[0067] An installation method for replacing stay cables during the operational period of a long-span cable-stayed bridge, based on the above-described method, specifically includes the following steps:

[0068] Step S1: Install all components of the transport device except for the diagonal brace 5;

[0069] Step S1 specifically includes the following steps:

[0070] Step S11: Lift the longitudinal beam 4 components, longitudinal jacking device 7, lifting point assembly 6, and cable changing winch 9 stored in the tower to the bridge deck;

[0071] Step S12: Installation of longitudinal beam 4 components and bridge deck winch;

[0072] Step S2: Lifting and installing the bridge deck lifting device;

[0073] Step S2 specifically includes the following steps:

[0074] Step S21: Using the bridge deck winch as the lifting mechanism and cooperating with the gantry frame 10, the cable changing winch 9 is lifted from the ground to the bridge deck. At the same time, the bridge deck winch can also lift the tensioning equipment located inside the tower.

[0075] The steel wire rope of the bridge deck winch passes through the lifting point 101 set on the gantry frame 10 and is connected to the cable-changing winch 9 on the ground, which lifts it to the bridge deck.

[0076] Step S22: Control the gantry frame 10 to move along the longitudinal direction of the bridge by the longitudinal jacking device 7 until it reaches the designated position, and install the cable changing winch 9 on the bridge deck;

[0077] Step S3: Install the diagonal brace 5 and the lifting point assembly 6 to complete the installation; the diagonal brace 5 and the lifting point assembly 6 are installed after the cable changing winch 9 is lifted to the bridge deck, which will effectively prevent the diagonal brace 5 and the lifting point assembly 6 from affecting the lifting of the cable changing winch 9;

[0078] Among them, the pulley attachment assembly in the suspension point assembly 6 will be connected to one end of the stay cable to lift the stay cable.

[0079] After installation, the gantry frame 10 is removed, and the longitudinal jacking device 7 is connected to the crossbeam 61. The cable changing winch 9, lifting mechanism, pulley hanging point assembly, and tensioning fixture are used to change the cable.

[0080] This invention is not limited to the specific embodiments described above. The invention extends to any new feature or combination disclosed in this specification, as well as any new method or process step or combination disclosed herein.

[0081] This invention is not limited to the specific embodiments described above. The invention extends to any new feature or combination disclosed in this specification, as well as any new method or process step or combination disclosed herein.

Claims

1. A tooling for replacing stay cables during the operational period of a long-span cable-stayed bridge, installed on the pylon, characterized in that, The system includes a haulage device installed on the parapet wall of the tower, a cable-changing winch used in conjunction with the haulage device to lift the cable to the top of the tower, and a lifting point assembly slidably installed on the haulage device and moving along the longitudinal direction of the bridge. The haulage device includes a longitudinal beam assembly installed on the parapet wall and arranged along the longitudinal direction of the bridge, and a bridge deck lifting mechanism used in conjunction with the lifting point and installed on the bridge deck. The longitudinal beam assembly includes two sets of parallel longitudinal beams arranged along the longitudinal direction of the bridge, and a connecting assembly for connecting the longitudinal beams and the tower. The lifting point assembly is slidably engaged with the two sets of longitudinal beams; a longitudinal jacking device for controlling the movement of the lifting point assembly is provided on each set of longitudinal beams; the bridge deck lifting mechanism includes a bridge deck lifting device installed on the bridge deck, a portal frame slidably installed on the longitudinal beam assembly and used in conjunction with the longitudinal jacking device, and lifting points provided on the portal frame; During the lifting process of the cable-changing winch, the longitudinal jacking device moves the longitudinal beam of the control gantry frame along its length and the cable-changing winch is transferred to the designated position. During cable replacement, the longitudinal jacking device is connected to the crossbeam, driving the crossbeam to move along the longitudinal direction of the bridge.

2. The tooling for replacing stay cables during the operational period of a long-span cable-stayed bridge according to claim 1, characterized in that, The suspension point assembly includes a crossbeam slidably mounted on the longitudinal beam assembly and a pulley suspension assembly mounted on the crossbeam and arranged vertically.

3. The tooling for replacing stay cables during the operation of a long-span cable-stayed bridge according to claim 2, characterized in that, The crossbeams are in two sets and located on both sides of the tower. The portal frame and the longitudinal jacking device are also in two sets and are set one-to-one with the crossbeams. The portal frame is equipped with a hanging point for use with the bridge deck lifting mechanism. The portal frame is located on the side of the longitudinal jacking device away from the crossbeam.

4. The tooling for replacing stay cables during the operational period of a long-span cable-stayed bridge according to claim 1, characterized in that, The connecting components include diagonal braces for connecting the longitudinal beams to the outer side of the tower, and legs for connecting the bottom of the longitudinal beams to the core concrete inside the tower.

5. The tooling for replacing stay cables during the operational period of a long-span cable-stayed bridge according to claim 4, characterized in that, A stopper is provided at the bottom of the longitudinal beam, corresponding to the parapet wall.

6. An installation method for the fixture used for cable replacement during the operational period of a long-span cable-stayed bridge, based on claim 4 or 5, characterized in that, Specifically, the following steps are included: Step S1: Install the components of the transport device except for the diagonal brace; Step S2: Lifting and installing the bridge deck lifting device; Step S3: Install the diagonal brace and suspension point components to complete the installation.

7. The installation method of the tooling for replacing stay cables during the operation of a long-span cable-stayed bridge according to claim 6, characterized in that, Step S1 specifically includes the following steps: Step S11: Lift the longitudinal beam assembly, longitudinal jacking device, lifting point assembly, and cable replacement winch stored in the tower to the bridge deck; Step S12: Installation of longitudinal beam assembly and bridge deck winch.

8. The installation method of the tooling for replacing stay cables during the operation of a long-span cable-stayed bridge according to claim 7, characterized in that, Step S2 specifically includes the following steps: Step S21: Using the bridge deck winch as the lifting mechanism and cooperating with the gantry crane, lift the cable-changing winch from the ground to the bridge deck; Step S22: Control the gantry crane to move along the longitudinal direction of the bridge using the longitudinal jacking device until it reaches the designated position, and install the cable changing winch on the bridge deck to complete the installation.

Citation Information

Patent Citations

  • System and method for hanging stay cable at tower end of height limiting cable-stayed bridge

    CN103147404A

  • Cable hanging system and method for single-column type steel pylon cable-stayed bridge

    CN112575691A

  • And stay cable tower top lifts traction operation platform

    CN211368423U