Port logistics information management system based on cloud platform

By adopting a highly integrated cloud platform architecture and multi-objective ant colony optimization algorithm in the port logistics information management system, the shortcomings of traditional systems in real-time data processing and data security are solved, operational efficiency and security are improved, and more efficient , flexible and sustainable port logistics management.

CN117649088BActive Publication Date: 2024-10-22YANTIAN PORT INT INFORMATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311694821.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2024-10-22
Estimated Expiration
2043-12-12

AI Technical Summary

Technical Problem

Traditional port logistics information management systems lack real-time data processing capabilities, resulting in untimely operational decisions, inefficient resource scheduling and cargo storage planning, and insufficient data security and privacy protection, making them vulnerable to leaks and illegal access.

Method used

Adopting a highly integrated cloud platform architecture, including cloud data center, cloud monitoring center, cloud operation and maintenance center and cloud dispatch center, combined with multi-objective ant colony optimization algorithm and dynamic weight adjustment mechanism, it can realize real-time data processing and monitoring, and improve the efficiency of operational decision-making. Real-time and accurate, and data security is guaranteed through multi-layered security measures.

Benefits of technology

It significantly improves the efficiency, flexibility and sustainability of port logistics management, ensures efficient and safe operations, reduces transportation and storage costs, and enhances adaptability to rapidly changing environments and customer satisfaction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117649088B_ABST
    Figure CN117649088B_ABST
Patent Text Reader

Abstract

The present invention relates to a port logistics information management system based on a cloud platform, which is composed of four core components: a cloud data center, a cloud monitoring center, a cloud operation and maintenance center, and a cloud dispatching center. The cloud data center adopts an advanced architecture design to achieve efficient data processing and storage, providing strong data support for the entire system. The cloud monitoring center and the cloud operation and maintenance center work together to monitor the operating status of the port in real time and manage equipment and resources to ensure smooth and safe operations. The cloud dispatching center optimizes transportation routes and resource allocation by applying a multi-objective ant colony optimization algorithm, combined with real-time feedback and dynamic parameter adjustment mechanisms, effectively improving the efficiency and response speed of port operations. The close collaboration between these components not only enhances the ability of port logistics information processing, but also improves the accuracy of decision-making and the adaptability of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This patent relates to the field of port logistics management technology, especially to a port logistics information management system based on a cloud computing platform. The system adopts a highly integrated cloud platform architecture and makes innovative improvements to the shortcomings of existing port logistics information management systems in real-time data processing, resource scheduling, cargo storage planning, and data security and privacy protection. Background Art

[0002] As global trade continues to grow, ports, as important nodes for cargo transportation, face huge challenges in operational efficiency and management complexity. Traditional port logistics information management systems often lack the ability to deeply analyze real-time data, and thus lack the support of real-time data in resource scheduling and cargo storage planning, resulting in operational decisions that cannot respond to current operating conditions in a timely manner, low efficiency, and difficulty in effectively handling rapidly changing operating conditions, uncertain environmental factors, and diverse customer needs. In addition, these systems have significant deficiencies in data security and privacy protection, and are vulnerable to the risk of data leakage and illegal access.

[0003] To solve these problems, the present invention realizes efficient processing, storage and monitoring of real-time data by constructing a highly integrated cloud platform architecture, including a cloud data center, a cloud monitoring center, a cloud operation and maintenance center and a cloud scheduling center; in particular, by adopting an innovative multi-objective ant colony optimization algorithm, a dynamic weight adjustment mechanism and a real-time feedback loop, the present invention significantly improves the real-time and accuracy of operational decisions, and realizes more efficient, flexible and sustainable port logistics management. Summary of the invention

[0004] This paper presents a cloud-based port logistics information management system, which uses a series of advanced technologies and methods to optimize traditional port logistics information management. The system integrates the cloud dispatch center, cloud data center, cloud monitoring center and cloud operation and maintenance center. Each component forms a tight feedback loop through efficient collaborative work and data sharing mechanism, which plays an important role in improving the efficiency, real-time adaptability and sustainability of port logistics operations and management decisions.

[0005] The purpose of the present invention can be achieved through the following technical solution: A port logistics information management system based on a cloud platform includes the following components:

[0006] The cloud dispatch center applies a multi-objective ant colony optimization algorithm and a dynamic weight adjustment mechanism to intelligently plan the transportation routes and storage strategies of goods. The key role of this component is to dynamically adjust the flow of goods based on the current operating conditions and data analysis, optimize the transportation and storage processes, improve efficiency and reduce costs.

[0007] The cloud data center, as the information processing and analysis core of the system, is responsible for processing and storing a large amount of real-time and historical data from the port. This component helps identify efficiency bottlenecks and potential areas for improvement in operations by analyzing data, providing data-driven insights and suggestions for port management.

[0008] The cloud monitoring center is responsible for real-time monitoring of all aspects of port operations, including but not limited to cargo flow, equipment status, personnel distribution and environmental conditions. Its role is to provide real-time operational information to help other system components respond and adjust quickly to ensure efficient and safe port operations.

[0009] The cloud operation and maintenance center uses real-time data obtained from the cloud monitoring center to perform daily operation and maintenance management. It is responsible for managing the dispatch, maintenance and fault response of equipment, ensuring the optimal configuration of port equipment and personnel, reducing failures and delays, and improving overall operational efficiency and reliability. At the same time, it also undertakes the transportation and dispatch of goods.

[0010] Furthermore, the port logistics information management system includes a cloud dispatching center:

[0011] The problem of dispatching and transporting goods to temporary warehouses, main warehouses or loading areas is regarded as a multi-objective optimization problem. With the shortest path, lowest cost and maximum throughput as the goals, an improved multi-objective ant colony algorithm is used, and its path selection formula is:

[0012]

[0013] Where:

[0014] P ij is the probability of going from path i to j, which represents the possibility of selecting the optimal transportation path calculated by the system based on the current transportation demand, path conditions and resource conditions. This probability is determined by the reliability, distance, cost and throughput of each path based on historical data, thus ensuring that each cargo dispatch is the best decision made after considering all important factors;

[0015] τ ij , τ ik is the reliability of path i to j and path i to k, which not only reflects the historical transportation efficiency of the path, but also includes the reliability and safety record of transportation. Paths that often have delays or accidents will have lower reliability, while paths that often deliver goods on time and safely will have higher reliability;

[0016] σ ij (dist) , σ ik (dist)represents the actual physical distance from path i to j and the actual physical distance from path i to k, which directly affects the transportation time and energy consumption. A shorter path helps to improve transportation efficiency and reduce energy consumption; ij (cost) , σ ik (cost) represents the overall cost of path i to j, including fuel costs, labor costs and potential delay risk costs. Choosing a cost-effective path helps optimize the overall operating cost;

[0017] σ ij (out) , σ ik (out) It represents the cargo throughput from path i to j and the cargo throughput from path i to k. The high-throughput path can ensure the fast and smooth flow of goods in the entire logistics chain, thereby improving the overall operational efficiency and customer satisfaction of the port;

[0018] α is the influence weight of control reliability, which is used to adjust the impact of historical path selection success and efficiency on current decision-making. A higher α value enhances the importance of historical success rate and efficiency in path selection, making the system tend to choose paths that performed well in the past.

[0019] β, γ, and δ are the influence weights of controlling distance, cost, and throughput, respectively. These parameters enable the algorithm to find the optimal path for different operational requirements and conditions.

[0020] Furthermore, the multi-objective ant colony optimization algorithm adopted by the cloud dispatch center combines the reliability update formula of real-time feedback to automatically adjust the reliability based on real-time monitoring data. The reliability update formula is:

[0021] τ ij (new) =(1-ρ)*τ ij (old) +Δτ ij

[0022] Where:

[0023] τ ij (new) and τ ij (old) are the new and old reliabilities on path i to j,

[0024] ρ is the reliability volatility coefficient, which regulates the rate at which reliability decays over time. A high ρ value means that reliability decays rapidly, allowing the system to adapt to new operating conditions more quickly and reduce reliance on outdated information. A low ρ value retains more historical information, allowing decisions to be based more on long-term accumulated data.

[0025] Δτ ijis the reliability adjustment based on real-time monitoring data:

[0026]

[0027] Where:

[0028] Q is a constant used to adjust the reliability increment size;

[0029] L ij is the distance from path i to j;

[0030] T ij is the average transportation delay time of each route collected from historical data;

[0031] C ij is the average transportation cost of the route;

[0032] M ij is the average cargo turnover rate of the route;

[0033] μ1, μ2, and μ3 are weight factors based on historical data.

[0034] Furthermore, the multi-objective scheduling optimization formula adopted by the cloud scheduling center adopts a dynamic weight adjustment scheme to automatically adjust the weight factors (α, β, γ, δ) in the above formula according to the data monitored by the cloud monitoring center:

[0035] Preferably, if a high cargo transportation delay is detected, the path reliability τ is increased. ij The associated weight α is used to strengthen the impact of historical successful paths.

[0036] Preferably, if the congestion level of a path increases, reduce the physical distance σ of the path ij (dist) The weight β encourages the selection of smoother routes.

[0037] Preferably, if the transportation cost increases, increase the path cost σ ij (cost) The weight γ of , encourages the selection of lower-cost paths.

[0038] Preferably, if the throughput increases, increase the path throughput σ ij (out) The weight δ encourages the selection of a path with higher throughput.

[0039] Furthermore, the port logistics information management system includes a cloud data center having a multi-layer structure:

[0040] A. Distributed data receiving layer: This layer is responsible for collecting data from various sources in the port, including real-time logistics activities, equipment status, and environmental monitoring data. Its distributed design ensures the efficiency and reliability of data collection.

[0041] B. Data preprocessing layer: After the data flows into the system, this layer performs preliminary processing on the raw data, such as data cleaning, formatting, and preliminary analysis to ensure data quality and consistency.

[0042] C. Real-time data analysis engine layer: This layer uses advanced data analysis algorithms and machine learning models to conduct in-depth analysis of processed data. It provides users with real-time operational insights and decision support.

[0043] D. User Interaction Interface: This interface directly presents the analysis results and provides user-friendly data visualization and interaction functions, enabling users to easily access and understand the output of data analysis.

[0044] E. Cloud storage layer: provides the system with a large-capacity and high-reliability data storage solution. It not only stores processed data, but also saves historical data, supporting long-term data analysis and trend prediction.

[0045] F. Adaptive network layer: responsible for optimizing network traffic and managing network resources to ensure efficient flow of data between layers and the overall network performance of the system.

[0046] G. Cloud Service Management Layer: This layer manages the allocation and monitoring of cloud resources to support the operational needs of the data center and ensure efficient use of resources.

[0047] H. Security prevention layer: Provides comprehensive security protection measures such as firewalls, intrusion detection and data encryption to protect the data center from security threats.

[0048] Furthermore, the port logistics information management system includes a cloud data center, and its main working process is as follows:

[0049] As the front line of the system, the distributed data receiving layer is responsible for collecting real-time data from various parts of the port, which covers a wide range of information from cargo flow to equipment status. Once the data are collected, they are transmitted to the data pre-processing layer, where the raw data is cleaned, formatted and preliminarily analyzed to ensure its quality and consistency. The preliminarily processed data then flows into the real-time data analysis engine layer, which uses advanced data processing algorithms and machine learning models for in-depth analysis to provide key business insights and decision support. These analysis results are presented through a user interaction interface, which provides intuitive data visualization and interactive functions, allowing users to easily access and interpret data.

[0050] At the same time, the processed data is stored in the cloud storage layer, including not only the latest data but also historical data, supporting the analysis and prediction of long-term trends. The adaptive network layer plays a key role in the entire architecture. It not only optimizes the flow of data between layers, but also manages network resources to ensure efficient data transmission and system stability. The cloud service management layer is responsible for monitoring and allocating cloud resources to support the operation and performance requirements of the data center. Finally, the security layer covers the entire system, providing multi-level security measures including firewalls, intrusion detection and data encryption, ensuring the data security and integrity of the entire system.

[0051] Furthermore, the port logistics information management system includes a cloud monitoring center with the following functions:

[0052] The system can simultaneously collect and analyze data on equipment performance, cargo flow and employee activities. Combined with advanced data processing and analysis technologies, it can provide instant operational insights and predict potential logistics problems; work closely with the cloud data center to share key data and insights to optimize the performance of the port logistics information system; and provide customizable reports, allowing users to generate relevant monitoring reports based on individual needs.

[0053] Furthermore, the port logistics information management system includes a cloud operation and maintenance center with the following functions:

[0054] Responsible for managing and tracking the maintenance cycle and status of port equipment, including arranging regular inspections and maintenance work; quickly responding to and handling operation-related faults and problems, and arranging necessary repairs or equipment replacements; implementing and managing comprehensive security strategies, monitoring system security, and ensuring that all operations comply with industry standards and regulatory requirements; dispatching and transporting cargo, deploying and maintaining equipment according to the plans and needs of the cloud dispatch center; reporting the status of equipment, maintenance activities, and fault handling results to the cloud data center for data analysis and historical records; working closely with the cloud monitoring center to ensure the safety and compliance of port operations.

[0055] Furthermore, the port logistics information management system includes a cloud operation and maintenance center, and the main operation and maintenance workflow is:

[0056] First, status reports and fault notifications are received from port equipment, followed by a detailed analysis of these reports to determine the nature of the problem.

[0057] Based on this analysis, the Cloud Operations Center determines whether the problem is routine maintenance, emergency troubleshooting, or a security-related issue.

[0058] For routine maintenance, the Cloud Operations Center will schedule necessary maintenance activities, and in the event of a fault, emergency repairs will be quickly arranged. If the problem is safety-related, the Cloud Operations Center will immediately implement the necessary safety measures and collaborate with the Cloud Monitoring Center to ensure the safety and compliance of port operations.

[0059] After completing these activities, the cloud operation and maintenance center will update the results of the maintenance, repair or safety activities to the cloud data center and report the latest status of the equipment to the cloud dispatch center.

[0060] In addition, the cloud operation and maintenance center will regularly collaborate with the cloud monitoring center to update and implement security policies to ensure the long-term safe operation of the system.

[0061] Finally, the cloud operation and maintenance center continues to monitor the operating status of the equipment to ensure the continued effectiveness of the measures taken, thereby ensuring the efficient and stable operation of the entire port logistics information management system. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] The present invention will be further described below in conjunction with the accompanying drawings.

[0063] Figure 1 A component collaboration flow chart of the cloud platform-based port logistics information management system of the present invention is shown.

[0064] Figure 2 The diagram shows the architecture of the cloud data center described in the present invention.

[0065] Figure 3 The main operation and maintenance flow chart of the cloud operation and maintenance center described in the present invention is shown.

[0066] Figure 4 The main iteration flow chart of target optimization of the cloud scheduling center described in the present invention is shown. DETAILED DESCRIPTION

[0067] In the embodiments of the present invention, the technical scheme will be described in detail and accompanied with drawings to facilitate the understanding and implementation of the present invention by professionals in the technical field. The description of the embodiments of the present invention will be based on specific configurations and technical selections, but these only represent partial implementations of the present invention and do not limit the overall scope of the present invention.

[0068] The present invention discloses a port logistics information management system based on a cloud platform, including a cloud data center, a cloud monitoring center, a cloud operation and maintenance center, and a cloud dispatching center. Figure 1 As shown, the workflow is as follows:

[0069] Step 1. Logistics information storage

[0070] When the goods arrive at the port, relevant logistics information, such as the type, quantity, destination and expected handling process of the goods, is entered into the system. This information is first received into the cloud data center for pre-processing and storage.

[0071] Step 2. Scheduling planning

[0072] According to the relevant characteristics of the goods and combined with the current real-time operation data, the dispatch planning of the goods (such as storage in temporary sub-warehouses, main warehouses or loading warehouses and planning of transportation routes) and other information are transmitted to the cloud operation and maintenance center, and all data are also transmitted to the cloud monitoring center.

[0073] Step 3. Transportation and Operation

[0074] The cloud operation and maintenance center completes the corresponding transportation work according to the cargo scheduling planning related information received. At the same time, it maintains good operation and maintenance of transportation equipment and transportation personnel, and transmits data to the cloud monitoring center in real time so as to discover safety problems, maintenance problems, etc. as soon as possible and take corresponding measures. In addition, if the transportation equipment is not sufficient to support the scheduling plan, the information will be fed back to the cloud scheduling center to adjust the scheduling plan until the cloud operation and maintenance center is able to support the scheduling plan.

[0075] Step 4. Monitoring and feedback

[0076] The cloud monitoring center monitors logistics and transportation information, warehouse storage information, personnel and equipment operation and maintenance information, and cargo dispatch information in real time. It works closely with the cloud data center to share key data and insights to optimize the performance of the port logistics information system. It provides customizable reports, allowing users to generate relevant monitoring reports based on individual needs. It shares real-time data with the cloud dispatch center to provide feedback for optimizing related algorithms.

[0077] Step 5. Loop Iteration

[0078] By iterating the above process, the transportation and scheduling plans are continuously optimized to improve the overall efficiency of port logistics and ensure the efficiency and responsiveness of port operations.

[0079] Furthermore, the architecture design of the cloud data center included in the port logistics information management system is as follows: Figure 2 As shown:

[0080] A. Distributed data receiving layer

[0081] Features: It consists of multiple independent data receiving units, each of which specializes in processing data from a specific source (such as sensors, logistics systems).

[0082] Connection method: These nodes are connected to the data preprocessing layer through a high-speed network to achieve fast data transmission and preliminary screening.

[0083] B. Data Preprocessing Layer

[0084] Features: Responsible for the preliminary processing of the raw data collected from the receiving nodes, including data cleaning, formatting and preliminary analysis.

[0085] Connection method: The preprocessing layer is connected to the data receiving node and the real-time data analysis engine layer to ensure smooth and efficient processing of data flow.

[0086] C. Real-time data analysis engine layer

[0087] Features: Integrates complex data processing algorithms and machine learning models to analyze processed data in real time and provide immediate operational insights.

[0088] Connection method: Receive processed data from the data preprocessing layer and transmit the analysis results to the user interface and cloud storage layer.

[0089] D. Cloud storage layer

[0090] Features: Provides large-capacity and high-reliability data storage solutions for storing long-term historical data and analysis results.

[0091] Connection method: Connected to the real-time data analysis engine layer and user interaction interface to store and retrieve data.

[0092] E. User Interface

[0093] Features: Provides an intuitive, easy-to-use interface that enables users to access, query, and visualize data and analysis results.

[0094] Connection method: Directly connect to the real-time data analysis engine layer and cloud storage layer to achieve real-time display of data and access to historical data.

[0095] F. Adaptive Network Layer

[0096] Features: Manage the internal network of the data center and optimize the data flow and the use of network resources.

[0097] Connection method: connected to the security prevention layer, cloud service management layer, and distributed data receiving layer.

[0098] G. Cloud Service Management Layer

[0099] Features: Coordinate and manage the computing, storage, and network resources of the cloud platform to ensure efficient use of resources.

[0100] Connection method: Covers the entire data center, connects to all layers and systems, and provides cloud resource monitoring, scheduling, and optimization capabilities.

[0101] H. Security layer

[0102] Features: Includes multiple layers of security measures such as firewalls, intrusion detection systems, and data encryption to protect the data center from external threats.

[0103] Connection method: Covering the entire data center, connecting to all layers and systems, providing comprehensive security protection

[0104] Furthermore, the main workflow of the cloud data center included in the port logistics information management system is:

[0105] As the front line of the system, the distributed data receiving layer is responsible for collecting real-time data from various parts of the port, which covers a wide range of information from cargo flow to equipment status. Once the data are collected, they are transmitted to the data pre-processing layer, where the raw data is cleaned, formatted and preliminarily analyzed to ensure its quality and consistency. The preliminarily processed data then flows into the real-time data analysis engine layer, which uses advanced data processing algorithms and machine learning models for in-depth analysis to provide key business insights and decision support. These analysis results are presented through a user interaction interface, which provides intuitive data visualization and interactive functions, allowing users to easily access and interpret data.

[0106] At the same time, the processed data is stored in the cloud storage layer, including not only the latest data but also historical data, supporting the analysis and prediction of long-term trends. The adaptive network layer plays a key role in the entire architecture. It not only optimizes the flow of data between layers, but also manages network resources to ensure efficient data transmission and system stability. The cloud service management layer is responsible for monitoring and allocating cloud resources to support the operation and performance requirements of the data center. Finally, the security layer covers the entire system, providing multi-level security measures including firewalls, intrusion detection and data encryption, ensuring the data security and integrity of the entire system.

[0107] Furthermore, the port logistics information management system includes a cloud monitoring center with the following functions:

[0108] The system can simultaneously collect and analyze data on equipment performance, cargo flow and employee activities. Combined with advanced data processing and analysis technologies, it can provide instant operational insights and predict potential logistics problems; work closely with the cloud data center to share key data and insights to optimize the performance of the port logistics information system; and provide customizable reports, allowing users to generate relevant monitoring reports based on individual needs.

[0109] Furthermore, the port logistics information management system includes a cloud operation and maintenance center, and its main operation and maintenance processes, such as Figure 3 As shown:

[0110] First, status reports and fault notifications are received from port equipment, followed by a detailed analysis of these reports to determine the nature of the problem.

[0111] Based on this analysis, the Cloud Operations Center determines whether the problem is routine maintenance, emergency troubleshooting, or a security-related issue.

[0112] For routine maintenance, the Cloud Operations Center will schedule necessary maintenance activities, and in the event of a fault, emergency repairs will be quickly arranged. If the problem is safety-related, the Cloud Operations Center will immediately implement the necessary safety measures and collaborate with the Cloud Monitoring Center to ensure the safety and compliance of port operations.

[0113] After completing these activities, the cloud operation and maintenance center will update the results of the maintenance, repair or safety activities to the cloud data center and report the latest status of the equipment to the cloud dispatch center.

[0114] In addition, the cloud operation and maintenance center will regularly collaborate with the cloud monitoring center to update and implement security policies to ensure the long-term safe operation of the system.

[0115] Finally, the cloud operation and maintenance center continues to monitor the operating status of the equipment to ensure the continued effectiveness of the measures taken, thereby ensuring the efficient and stable operation of the entire port logistics information management system.

[0116] Furthermore, the port logistics information management system, the cloud dispatch center it contains, regards the dispatch and transportation of goods to temporary warehouses or main warehouses or loading areas as a multi-objective optimization problem, with the shortest path, lowest cost and maximum throughput as the goals, and adopts an improved multi-objective ant colony algorithm, and its path selection formula is:

[0117]

[0118] Where:

[0119] P ij is the probability of going from path i to j, which represents the possibility of selecting the optimal transportation path calculated by the system based on the current transportation demand, path conditions and resource conditions. This probability is determined by the reliability, distance, cost and throughput of each path based on historical data, thus ensuring that each cargo dispatch is the best decision made after considering all important factors;

[0120] τ ij , τ ik is the reliability of path i to j and path i to k, which not only reflects the historical transportation efficiency of the path, but also includes the reliability and safety record of transportation. Paths that often have delays or accidents will have lower reliability, while paths that often deliver goods on time and safely will have higher reliability;

[0121] σ ij (dist) , σ ik (dist) represents the actual physical distance from path i to j and the actual physical distance from path i to k, which directly affects the transportation time and energy consumption. A shorter path helps to improve transportation efficiency and reduce energy consumption; ij (cost) , σ ik (cost) represents the overall cost of path i to j, including fuel costs, labor costs and potential delay risk costs. Choosing a cost-effective path helps optimize the overall operating cost;

[0122] σ ij (out) , σ ik (out) It represents the cargo throughput from path i to j and the cargo throughput from path i to k. The high-throughput path can ensure the fast and smooth flow of goods in the entire logistics chain, thereby improving the overall operational efficiency and customer satisfaction of the port;

[0123] α is the influence weight of control reliability, which is used to adjust the impact of historical path selection success and efficiency on current decision-making. A higher α value enhances the importance of historical success rate and efficiency in path selection, making the system tend to choose paths that performed well in the past.

[0124] β, γ, and δ are the influence weights of controlling distance, cost, and throughput, respectively. These parameters enable the algorithm to find the optimal path for different operational requirements and conditions.

[0125] Furthermore, the multi-objective ant colony optimization algorithm adopted by the cloud dispatch center combines the reliability update formula of real-time feedback to automatically adjust the reliability based on real-time monitoring data. The reliability update formula is:

[0126] τ ij (new) =(1-ρ)*τ ij (old) +Δ τij

[0127] Where:

[0128] τ ij (new) and τ ij (old) are the new and old reliabilities on path i to j,

[0129] ρ is the reliability volatility coefficient, which regulates the rate at which reliability decays over time. A high ρ value means that reliability decays rapidly, allowing the system to adapt to new operating conditions more quickly and reduce reliance on outdated information. A low ρ value retains more historical information, allowing decisions to be based more on long-term accumulated data.

[0130] Δτ ij is the reliability adjustment based on real-time monitoring data:

[0131]

[0132] Where:

[0133] Q is a constant used to adjust the reliability increment size;

[0134] L ij is the distance from path i to j;

[0135] T ij is the average transportation delay time of each route collected from historical data;

[0136] C ij is the average transportation cost of the route;

[0137] M ij is the average cargo turnover rate of the route;

[0138] μ1, μ2, and μ3 are weight factors based on historical data.

[0139] Furthermore, the multi-objective scheduling optimization formula adopted by the cloud scheduling center adopts a dynamic weight adjustment scheme to automatically adjust the weight factors (α, β, γ, δ) in the above formula according to the data monitored by the cloud monitoring center:

[0140] Preferably, if a high cargo transportation delay is detected, the path reliability τ is increased. ij The associated weight α is used to strengthen the impact of historical successful paths.

[0141] Preferably, if the congestion level of a path increases, reduce the physical distance σ of the path ij (dist) The weight β encourages the selection of smoother routes.

[0142] Preferably, if the transportation cost increases, increase the path cost σ ij (cost) The weight γ of , encourages the selection of lower-cost paths.

[0143] Preferably, if the throughput increases, increase the path throughput σ ij (out) The weight δ encourages the selection of a path with higher throughput.

[0144] In addition, the main iterative process of the improved multi-objective ant colony optimization algorithm is as follows: Figure 4 As shown:

[0145] Step 1. Initialize parameters and pheromones

[0146] At the beginning of the algorithm, initial conditions are set, including setting an initial "reliability" (pheromone strength) for each possible transportation path and determining the number of "virtual freight units" (ants) in the simulated transportation process.

[0147] Step 2. Assign ants to the initial node

[0148] Each virtual freight unit is placed at a starting point in the port, which represents the starting point or processing site of the cargo, such as a cargo warehouse or terminal.

[0149] Step 3. Ants gradually select paths

[0150] Each virtual freight unit selects its next transportation node based on its current "reliability" and other important information (such as transportation distance, cost and cargo throughput), simulating the transportation route selection process of goods in reality.

[0151] Step 4. Collect path data

[0152] During the transportation of the virtual freight unit, the system collects data about the path it takes, such as key operational indicators such as actual transportation distance, related costs and cargo throughput.

[0153] Step 5. Local pheromone renewal

[0154] Based on the actual performance of the path selected by each virtual freight unit (such as transportation efficiency and cost-effectiveness), the "reliability" of the path is updated, and more efficient paths receive higher reliability enhancements.

[0155] Step 6. Dynamically adjust algorithm parameters

[0156] According to the port operation data collected in real time and the current iteration results, the key parameters of the algorithm are dynamically adjusted, such as adjusting the volatilization speed of "reliability" (pheromone strength) or changing the weights of distance, cost, and throughput (the importance of heuristic information).

[0157] Step 7. Global pheromone update

[0158] After a round of iterations, the path selection and collected data of all virtual freight units are integrated to update the global "reliability" (pheromone intensity) to provide more accurate guidance for future path selection.

[0159] Step 8. Check termination conditions

[0160] Check whether the algorithm's end condition is met, which could be a predetermined number of iterations or reaching a solution of a certain quality.

[0161] Step 9. Select the best path

[0162] Once the termination condition is reached, the optimal path is selected from all iterations, that is, the path with the best comprehensive performance in key indicators such as time, cost and throughput.

[0163] Step 10. Output the optimal transportation and scheduling plan

[0164] Finally, the algorithm outputs a specific transportation and scheduling plan based on the selected optimal path, providing decision support for the efficient management of port logistics.

[0165] This process is repeated in iterations until the termination conditions are met, ensuring that the most optimized port logistics scheduling and transportation route solutions are found.

[0166] The present invention introduces a port logistics information management system based on a cloud platform. The system effectively improves the management efficiency and operational effectiveness of port logistics through its four core components - cloud data center, cloud monitoring center, cloud operation and maintenance center and cloud dispatching center, as well as the close collaboration between them.

[0167] In this invention, in addition to describing in detail a cloud platform system architecture with high data sharing and real-time processing and the collaboration mode of each component, several innovative points of the algorithm adopted are specially emphasized, including dynamic parameter adjustment, real-time feedback mechanism and optimization strategy for specific port logistics needs. These innovative points enable the invention to not only effectively cope with the complexity and dynamics of the port logistics system, but also improve the overall operational efficiency, real-time responsiveness and customer satisfaction.

[0168] It should be noted that although some conventional ant colony optimization algorithm parts are not described or presented in detail in this document, this is mainly because these aspects follow the common practices and standard methods of the ant colony optimization algorithm. For these common parts, because they are well-known in the algorithm field, some unnecessary related descriptions are omitted.

[0169] In terms of the scope of protection, the present invention is not limited to the specific implementation methods described herein. On the contrary, the scope of protection of the present invention should be understood to include all reasonable changes, modifications and equivalent implementation methods made according to the content of this document. The scope of protection we apply for is intended to cover all the innovations of the present invention and its possible applications to ensure that our intellectual property rights are fully protected and respected.

Claims

1. The port logistics information management system based on the cloud platform includes a cloud dispatching center, a cloud data center, a cloud monitoring center, and a cloud operation and maintenance center. Its workflow is as follows: Step 1. Logistics information storage When the goods arrive at the port, the relevant logistics information, including the type, quantity, destination and expected handling process of the goods, is entered into the system; this information is first received into the cloud data center for pre-processing and storage; Step 2. Scheduling planning According to the relevant characteristics of the goods and combined with the current real-time operation data, the dispatch planning information of the goods is transmitted to the cloud operation and maintenance center, and all data is also transmitted to the cloud monitoring center; wherein the dispatch planning includes storage in temporary sub-warehouses or main warehouses or loading warehouses and planning of transportation routes; Step 3. Transportation and Operation The cloud operation and maintenance center completes the corresponding transportation work according to the received information related to the cargo dispatch plan. At the same time, it maintains good operation and maintenance of the transportation equipment and transportation personnel, and transmits data to the cloud monitoring center in real time, so as to find safety problems and maintenance problems in the first time and deal with them accordingly. In addition, if the transportation equipment is not sufficient to support the dispatch plan, the information will be fed back to the cloud dispatch center to adjust the dispatch plan until the cloud operation and maintenance center can fully support the dispatch plan. Step 4. Monitoring and feedback The cloud monitoring center monitors logistics and transportation information, warehouse storage information, personnel and equipment operation and maintenance information, and cargo dispatch information in real time, and works closely with the cloud data center to share key data and insights to optimize the performance of the port logistics information system; it provides customizable reports, allowing users to generate relevant monitoring reports based on individual needs; Share real-time data with the cloud dispatch center to provide feedback and optimize related algorithms; Step 5. Loop Iteration Through the above process of repeated iteration, the transportation and scheduling plans are continuously optimized to improve the overall efficiency of port logistics and ensure the efficiency and responsiveness of port operations; The cloud dispatch center adopts an improved multi-objective ant colony optimization algorithm to dispatch and plan transportation routes for goods, considering the shortest path, minimum cost and maximum throughput as optimization objectives. The path selection formula of the algorithm is as follows: Where: is the probability of going from path i to j, which represents the possibility of selecting the optimal transportation path calculated by the system based on the current transportation demand, path conditions and resource conditions. This probability is determined by the reliability, distance, cost and throughput of each path based on historical data, thus ensuring that each cargo dispatch is the best decision made after considering all important factors; is the reliability of path i to j and path i to k, which not only reflects the historical transportation efficiency of the path, but also includes the reliability and safety record of transportation. Paths that often have delays or accidents will have lower reliability, while paths that often deliver goods on time and safely will have higher reliability; It represents the actual physical distance from path i to j and the actual physical distance from path i to k, which directly affects the transportation time and energy consumption. A shorter path helps to improve transportation efficiency and reduce energy consumption. represents the overall cost of path i to j, including fuel costs, labor costs and potential delay risk costs. Choosing a cost-effective path helps optimize the overall operating cost; It represents the cargo throughput from path i to j and the cargo throughput from path i to k. The high-throughput path can ensure the fast and smooth flow of goods in the entire logistics chain, thereby improving the overall operational efficiency and customer satisfaction of the port; It is the influence weight of control reliability, which is used to adjust the influence of historical path selection success and efficiency on current decision-making. The value enhances the importance of historical success rate and efficiency in path selection, making the system tend to choose paths that performed well in the past; They are the influence weights of controlling distance, cost and throughput, which enable the algorithm to find the optimal path for different operational requirements and conditions; The multi-objective ant colony optimization algorithm adopted by the cloud dispatch center combines the reliability update formula of real-time feedback to automatically adjust the reliability based on real-time monitoring data. The reliability update formula is: Where: and are the new and old reliabilities on path i to j, It is the reliability volatility coefficient, which regulates the rate at which reliability decays over time. A high ρ value means that reliability decays rapidly, allowing the system to adapt to new operating conditions more quickly and reduce reliance on outdated information. A low ρ value retains more historical information, allowing decisions to be based more on long-term accumulated data. is the reliability adjustment based on real-time monitoring data: Where: Q is a constant used to adjust the reliability increment size; is the distance from path i to j; is the average transportation delay time of each route collected from historical data; is the average transportation cost of the route; is the average cargo turnover rate of the route; It is a weighting factor based on historical data.

2. The port logistics information management system according to claim 1, Features: The cloud data center workflow is as follows: Step 1. Distributed data reception Collect real-time data from various sensors and systems at the port; Step 2. Data preprocessing Clean, standardize and preliminarily analyze the collected data to ensure its usability and consistency; Step 3. Real-time data analysis Use complex algorithms and machine learning models to conduct in-depth analysis of processed data and provide real-time operational insights; Step 4. User Interaction Provide data visualization and interaction capabilities through the user interface, allowing users to easily access and understand data; Step 5. Cloud Storage Securely store large amounts of real-time and historical data to support long-term data analysis and access; Step 6. Adaptive network management Dynamically optimize network resources and data traffic to ensure efficient and stable data transmission; Step 7. Safety precautions Multi-layer firewalls, intrusion detection and data encryption technologies are used to protect data security.

3. The port logistics information management system according to claim 1, Features: The cloud monitoring center can simultaneously collect and analyze information about equipment performance, cargo flow and Data on employee activities, combined with advanced data processing and analysis technology, provides real-time operational Gain insight and anticipate potential logistics issues.

4. The port logistics information management system according to claim 1, Features: The cloud operation and maintenance center completes the corresponding transportation work according to the received information related to the cargo scheduling plan. At the same time, it maintains good operation and maintenance of the transportation equipment and transportation personnel, and transmits data to the cloud monitoring center in real time, so as to find safety problems and maintenance problems in the first time and deal with them accordingly. In addition, if the transportation equipment is not sufficient to support the scheduling plan, the information will be fed back to the cloud scheduling center to adjust the scheduling plan until the cloud operation and maintenance center can fully support the scheduling plan. Its main operation and maintenance processes are: Step 1: Status report and fault notification reception Receive status reports and fault notifications from port equipment to start the first stage of the operation and maintenance process; Step 2: Analyze the nature of the problem Perform detailed analysis of received status reports and fault notifications to determine the specific nature of the problem; Step 3: Problem Classification Based on the problem nature analysis, the cloud operation and maintenance center determines whether the problem belongs to routine maintenance, emergency fault repair, or security-related issues; Step 4: Schedule regular maintenance activities For issues judged to be routine maintenance, arrange necessary maintenance activities; Step 5: Emergency repair work arrangements Arrange emergency repair work promptly in case of faults; Step 6: Security Issues If the issue is security-related, immediately implement necessary security measures and collaborate with the cloud monitoring center to ensure the security and compliance of port operations; Step 7: Activity results update After completing maintenance, repair or safety activities, update the results to the cloud data center and report the latest status of the equipment to the cloud dispatch center; Step 8: Security policy collaboration and updates Regularly collaborate with the cloud monitoring center to update and implement security policies to ensure the long-term safe operation of the system; Step 9: Continuous Monitoring and Evaluation Continue to monitor the operating status of the equipment to ensure the continued effectiveness of the measures taken and to ensure the efficient and stable operation of the entire port logistics information management system.