A control method to improve the stability of hot head process
By configuring a correspondence table between the target thickness of the strip and the compensation of the hot head, setting the fixed position value of the strip head, and defining the parameters for determining the first coil when changing specifications, the problem of low accuracy of hot head process control when changing steel type, specification, or cooling mode is solved, and production stability is improved.
Patent Information
- Application Number
- CN202311594324.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-27
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-11-27
AI Technical Summary
In the field of hot rolling technology, when changing the steel grade, specification, or cooling mode, the low precision of the hot head process control leads to the low temperature control of the strip head, affecting production stability.
By configuring a correspondence table between the target thickness of the strip and the hot head compensation, setting the fixed position value of the strip head, and defining relevant parameters for determining whether it is the first coil of a new specification, the system can determine the first coil of a new specification based on the strip information and perform hot head compensation control when necessary.
This effectively avoids the problem of low strip head temperature control caused by changes in working conditions or low model accuracy when changing specifications for the first coil, thus improving production stability.
Smart Images

Figure CN117655121B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a control method for improving the stability of hot-rolling processes, belonging to the field of hot rolling technology in the metallurgical industry. Background Technology
[0002] In the field of hot rolling technology, continuously cast slabs go through a heating furnace, a reheating furnace, high-pressure descaling, a width-fixing mill, roughing, finishing, and laminar cooling before finally entering an underground coiler to be coiled. To ensure that the strip head can smoothly enter the coiler, a hot-head process control is often used, which involves increasing the temperature by tens of degrees Celsius for the strip head section, especially for extremely thin strips. This effectively avoids problems such as folding and warping of the strip head in the laminar cooling area, which can prevent smooth coiling. In addition, extremely thick strips are often coiled at low temperatures to ensure the mechanical properties of the strip. However, extremely thick strips may experience difficulties in being gripped by the coiler at low temperatures, so a hot-head process control is often used to ensure smooth coiling.
[0003] The purpose of using the hot-head process in the production of extremely thin or thick strip steel is to ensure that the strip head can be smoothly bitten into the coiler and coiled. However, the control accuracy is often affected by factors such as the accuracy of model calculations, the flow rate of the laminar cooling manifold, the laminar cooling water pressure, the manifold response time, the laminar cooling water temperature and speed prediction. The target value cannot be guaranteed. In particular, when controlling the first coil when changing steel grades, specifications or cooling modes, the control accuracy is difficult to guarantee. If the temperature of the hot-head control area of the strip head is too low, it is easy to cause folding, warping or failure of the coiler to bite the steel, which will lead to steel piling on the coiling or laminar cooling roller table, which is very detrimental to production stability. Summary of the Invention
[0004] The purpose of this invention is to provide a control method to improve the stability of the hot head process. Based on the comparison of strip information, the method determines the first coil when changing specifications, and performs different compensation controls on the hot head according to the target thickness. This effectively avoids the problem of low strip head temperature control and impact on production stability caused by changes in working conditions or low model accuracy when changing specifications for the first coil. It solves the shortcomings of the prior art in the control of the first coil when changing steel type, specification, or cooling mode, where the low accuracy of the hot head process control is detrimental to production stability.
[0005] A control method for improving the stability of the hot head process, applied to the hot continuous strip rolling process, includes the following steps: A correspondence table between the target strip thickness and the hot head compensation is configured; a fixed position value for the strip head is set; and relevant parameters for determining whether it is the first coil of a new specification are used. When the strip is in the first stand of the finishing mill (F1) and the coiling temperature model is calculated for the last time, it is determined whether the current strip is the first coil of a new specification and whether hot head process control is used. If so, the hot head compensation value is obtained based on the target strip thickness h and added to the hot head length range for compensation control. When the fixed position of the strip head passes the high-temperature timer at the finishing mill exit, the relevant parameters for determining whether the current strip is the first coil of a new specification are recorded for use in determining whether the next strip is the first coil of a new specification.
[0006] The aforementioned correspondence table between the target strip thickness and the hot head compensation includes the target strip thickness h and the hot head compensation value Tofs. The larger the thickness, the larger the corresponding hot head compensation value Tofs.
[0007] The value of the fixed position of the strip head is 3-5 meters, which means the position is 3-5 meters away from the strip head.
[0008] The relevant parameters used to determine whether it is the first coil of a new specification include: steel type, thickness layer, winding temperature layer, coil box mode, and cooling mode.
[0009] The criteria for determining the first coil of a new specification include: comparing the steel type, thickness layer, winding temperature layer, coil box mode, and cooling mode of the current strip with those of the previous strip. If any one of these is different, it is determined to be the first coil of a new specification; otherwise, it is not the first coil of a new specification.
[0010] The hot head process control judgment criteria include: if the hot head temperature is greater than zero and the hot head length is greater than zero, it is judged that hot head process control is used; otherwise, it is judged that hot head process control is not used.
[0011] The steel types include 60 types, with 24 thickness layers set according to the target thickness range, and 11 winding temperature layers set according to the target winding temperature range.
[0012] This invention configures a correspondence table between the target thickness of the strip and the hot head compensation, sets the fixed position value of the strip head, and defines relevant parameters for determining whether it is the first coil of a new specification. When the strip is bitten by the F1 bite trigger coiling temperature model for the last calculation, it determines whether the current strip is the first coil of a new specification and whether hot head process control is used. If so, the hot head compensation value is obtained according to the target thickness h of the strip and added to the hot head length range for compensation control. When the fixed position of the strip head passes the high temperature timer at the exit of the finishing mill, the relevant parameters for determining whether the current strip is the first coil of a new specification are recorded for use in determining whether the next strip is the first coil of a new specification.
[0013] The beneficial effects of this invention are as follows: Based on the information comparison of strip steel, this invention determines the first coil when changing specifications, and performs different compensation control on the hot head according to the target thickness. This effectively avoids the problem of low strip head temperature control and impact on production stability caused by changes in working conditions or low model accuracy when changing specifications of the first coil. It solves the shortcomings of the prior art in the control of the first coil when changing steel type, specification or cooling mode, where the low accuracy of hot head process control is detrimental to production stability. Attached Figure Description
[0014] Figure 1 This is a flowchart of the control method according to an embodiment of the present invention. Detailed Implementation
[0015] In an embodiment, the method includes: setting the target strip thickness h and the hot head compensation T. ofs The corresponding table is used to set the value of the fixed position P of the strip head.
[0016] Define the relevant parameters for determining the first coil of a different specification, including the front steel type SGF_Pre, the front thickness layer grt_Pre, the front winding temperature layer CTIdx_Pre, the front winding box mode CB_MODE_Pre, and the front cooling mode CTC_CODE_Pre, and set the initial value to 0.
[0017] When the strip is in the first stand of the finishing mill, during the final calculation of the coiling temperature model triggered by the F1 bite, the current strip information is obtained, including steel type SGF, thickness layer grt, coiling temperature layer CTIdx, coil box mode CB_MODE, cooling mode CTC_CODE, hot head temperature, and hot head length. It is then determined whether the current strip is the first coil of a new specification and whether hot head process control is being used. If so, the hot head compensation value T is obtained based on the target strip thickness h. ofs If the temperature is increased to within the range of the hot head length, compensation control is applied; otherwise, control is applied according to the normal target winding temperature.
[0018] The fixed position of the strip head is determined by the high temperature timer at the finish mill exit. Based on the current strip information, the preceding steel species SGF_Pre, preceding thickness layer grt_Pre, preceding coiling temperature layer CTIdx_Pre, preceding coil box mode CB_MODE_Pre, and preceding cooling mode CTC_CODE_Pre are updated respectively. This is used to determine whether the next strip is the first coil of a different specification when the setting calculation is triggered when the F1 steel bites.
[0019] The target strip thickness h and the hot head compensation T are mentioned. ofs The corresponding table includes: when h < 2.5 mm, T ofs When the temperature is 10℃; and when 2.5 ≤ h < 11.75, T ofs When the temperature is 15℃; when 11.75 ≤ h, T ofsThe temperature is 25℃.
[0020] The preferred position for fixing the strip is 3-5 meters from the head.
[0021] The steel class is a category of steel grades calculated based on the composition of the strip steel or classified artificially. Steels of the same category are defined as a steel class, and the number of steel classes is defined as 60.
[0022] The thickness grade grt is defined based on the target strip thickness h, and includes 24 grades: grt 0 for h < 1.00 mm; grt 1 for 1.20 mm ≤ h < 1.30 mm; grt 2 for 1.30 mm ≤ h < 1.50 mm; grt 3 for 1.50 mm ≤ h < 1.70 mm; grt 4 for 1.70 mm ≤ h < 1.90 mm; grt 5 for 1.90 mm ≤ h < 2.25 mm; grt 6 for 1.90 mm ≤ h < 2.25 mm. When m, the thickness layer grade GRT is 5; when 2.25mm ≤ h < 2.50mm, the thickness layer grade GRT is 6; when 2.50mm ≤ h < 2.75mm, the thickness layer grade GRT is 7; when 2.75mm ≤ h < 3.00mm, the thickness layer grade GRT is 8; when 3.00mm ≤ h < 3.40mm, the thickness layer grade GRT is 9; when 3.40mm ≤ h < 4.00mm, the thickness layer grade GRT is 10; when 4.00mm ≤ h < 5.00mm, the thickness layer grade GRT is... 11; When 5.00mm ≤ h < 6.00mm, the thickness layer grade GRT is 12; When 6.00mm ≤ h < 7.50mm, the thickness layer grade GRT is 13; When 7.50mm ≤ h < 9.00mm, the thickness layer grade GRT is 14; When 9.00mm ≤ h < 10.50mm, the thickness layer grade GRT is 15; When 10.50mm ≤ h < 12.70mm, the thickness layer grade GRT is 16; When 12.70mm ≤ h < 14.00mm, the thickness layer grade GRT is 1 7; When 14.00mm≤h<16.00mm, the thickness layer grade GRT is 18; when 16.00mm≤h<18.00mm, the thickness layer grade GRT is 19; when 18.00mm≤h<20.00mm, the thickness layer grade GRT is 20; when 20.00mm≤h<22.00mm, the thickness layer grade GRT is 21; when 22.00mm≤h<24.00mm, the thickness layer grade GRT is 22; when 24.00mm≤h, the thickness layer grade GRT is 23.
[0023] The winding temperature layer CTIdx is divided according to the target winding temperature CT, and consists of 11 levels, including: when CT < 490℃, the winding temperature layer CTIdx is 0; when 490℃ ≤ CT < 520℃, the winding temperature layer CTIdx is 1; when 520℃ ≤ CT < 550℃, the winding temperature layer CTIdx is 2; when 550℃ ≤ CT < 580℃, the winding temperature layer CTIdx is 3; when 580℃ ≤ CT < 610℃, the winding temperature layer CTIdx is... The winding temperature layer CTIdx is 4 when 610℃≤CT<640℃; 640℃≤CT<670℃ when CTIdx is 6 when CTIdx is 7 ...
[0024] The volume box mode CB_MODE is determined based on whether the volume box is used. If the volume box is used, the volume box mode CB_MODE is 1; otherwise, the volume box mode CB_MODE is 0.
[0025] The cooling mode CTC_CODE is configured according to the use of the laminar cooling manifold, with a total of 300 modes. Each cooling mode CTC_CODE is configured with how the laminar cooling manifold is turned on, the turning sequence, the manifold opening degree, etc., to achieve different cooling speeds and cooling processes.
[0026] The determination of whether the current strip is the first coil of a new specification is based on comparing the current strip's steel type (SGF), thickness layer (grt), coiling temperature layer (CTIdx), coil box mode (CB_MODE), and cooling mode (CTC_CODE) with the previous steel type (SGF_Pre), previous thickness layer (grt_Pre), previous coiling temperature layer (CTIdx_Pre), previous coil box mode (CB_MODE_Pre), and previous cooling mode (CTC_CODE_Pre). If any one of these is not equal, the current strip is determined to be the first coil of a new specification; otherwise, the current strip is determined to be a non-new specification first coil.
[0027] The process of determining whether hot head process control is used involves obtaining the hot head temperature and hot head length. If both the hot head temperature and the hot head length are greater than zero, it is determined that the current strip steel is using hot head process control; otherwise, it is determined that the current strip steel is not using hot head process control.
[0028] This invention provides a control method to improve the stability of the hot-head process, which solves the problem of low control accuracy of the hot-head process in the first coil control when changing steel grades, specifications, or cooling modes, which is detrimental to production stability.
[0029] See Figure 1 The specific steps of the control method in this embodiment of the invention are as follows:
[0030] Step 101: Set the target strip thickness h and the hot head compensation T. ofs The corresponding table is used to set the value of the fixed position P of the strip head.
[0031] Among them, the target thickness h of the strip and the hot head compensation T ofs The corresponding table includes: when h < 2.5 mm, T ofs When the temperature is 10℃; and when 2.5 ≤ h < 11.75, T ofs When the temperature is 15℃; when 11.75 ≤ h, T ofs The temperature is 25℃.
[0032] It is best to fix the strip at the head 3-5 meters.
[0033] Step 102: Define the relevant parameters for judging the first coil of the new specification, including the front steel type SGF_Pre, the front thickness layer grt_Pre, the front winding temperature layer CTIdx_Pre, the front winding box mode CB_MODE_Pre, and the front cooling mode CTC_CODE_Pre, and set the initial value to 0.
[0034] Step 103: When the strip is bitten at the F1 stand of the finishing mill for the last calculation of the coiling temperature model, obtain the current strip information, including steel type SGF, thickness layer grt, coiling temperature layer CTIdx, coil box mode CB_MODE, cooling mode CTC_CODE, hot head temperature, and hot head length. Determine whether the current strip is the first coil of a new specification and whether hot head process control is used. If so, obtain the hot head compensation value T based on the target thickness h of the strip. ofs If the temperature is increased to within the range of the hot head length, compensation control is applied; otherwise, control is applied according to the normal target winding temperature.
[0035] Among them, steel class is a category of steel grades calculated based on the composition of strip steel or classified artificially. Steels of the same category are defined as a steel class, and the number of steel classes is defined as 60.
[0036] Thickness grade GRT is defined based on the target strip thickness h, with 24 categories, including: 0 for h < 1.00 mm; 1 for 1.20 mm ≤ h < 1.30 mm; 2 for 1.30 mm ≤ h < 1.50 mm; 3 for 1.50 mm ≤ h < 1.70 mm; 4 for 1.70 mm ≤ h < 1.90 mm; and 5 for 1.90 mm ≤ h < 2.25 mm. The thickness layer classification GRT is 5 when 2.25mm ≤ h < 2.50mm; 6 when 2.50mm ≤ h < 2.75mm; 7 when 2.75mm ≤ h < 3.00mm; 8 when 3.00mm ≤ h < 3.40mm; 10 when 3.40mm ≤ h < 4.00mm; and 1 when 4.00mm ≤ h < 5.00mm. 1; When 5.00mm ≤ h < 6.00mm, the thickness layer grade GRT is 12; When 6.00mm ≤ h < 7.50mm, the thickness layer grade GRT is 13; When 7.50mm ≤ h < 9.00mm, the thickness layer grade GRT is 14; When 9.00mm ≤ h < 10.50mm, the thickness layer grade GRT is 15; When 10.50mm ≤ h < 12.70mm, the thickness layer grade GRT is 16; When 12.70mm ≤ h < 14.00mm, the thickness layer grade GRT is 1. 7; When 14.00mm≤h<16.00mm, the thickness layer grade GRT is 18; when 16.00mm≤h<18.00mm, the thickness layer grade GRT is 19; when 18.00mm≤h<20.00mm, the thickness layer grade GRT is 20; when 20.00mm≤h<22.00mm, the thickness layer grade GRT is 21; when 22.00mm≤h<24.00mm, the thickness layer grade GRT is 22; when 24.00mm≤h, the thickness layer grade GRT is 23.
[0037] The winding temperature layer CTIdx is divided according to the target winding temperature CT, and there are 11 levels in total, including: when CT < 490℃, the winding temperature layer CTIdx is 0; when 490℃ ≤ CT < 520℃, the winding temperature layer CTIdx is 1; when 520℃ ≤ CT < 550℃, the winding temperature layer CTIdx is 2; when 550℃ ≤ CT < 580℃, the winding temperature layer CTIdx is 3; when 580℃ ≤ CT < 610℃, the winding temperature layer CTIdx is... 4; When 610℃≤CT<640℃, the winding temperature layer CTIdx is 5; When 640℃≤CT<670℃, the winding temperature layer CTIdx is 6; When 670℃≤CT<700℃, the winding temperature layer CTIdx is 7; When 700℃≤CT<730℃, the winding temperature layer CTIdx is 8; When 730℃≤CT<770℃, the winding temperature layer CTIdx is 9; When 770℃≤CT, the winding temperature layer CTIdx is 10.
[0038] The volume box mode CB_MODE is determined based on whether the volume box is used. If the volume box is used, the volume box mode CB_MODE is 1; otherwise, the volume box mode CB_MODE is 0.
[0039] The cooling mode CTC_CODE is configured according to the use of the laminar cooling manifold. A total of 300 modes are set. Each cooling mode CTC_CODE is configured with how the laminar cooling manifold is turned on, the turning sequence, the manifold opening degree, etc., to achieve different cooling speeds and cooling processes.
[0040] To determine whether the current strip is the first coil of a new specification, the steel type (SGF), thickness layer (grt), coiling temperature layer (CTIdx), coil box mode (CB_MODE), and cooling mode (CTC_CODE) of the current strip are compared with the previous steel type (SGF_Pre), previous thickness layer (grt_Pre), previous coiling temperature layer (CTIdx_Pre), previous coil box mode (CB_MODE_Pre), and previous cooling mode (CTC_CODE_Pre), respectively. If any one of these is not equal, the current strip is determined to be the first coil of a new specification; otherwise, the current strip is determined to be a non-new specification first coil.
[0041] The method for determining whether hot head process control is used is as follows: obtain the hot head temperature and hot head length. If the hot head temperature is greater than zero and the hot head length is greater than zero, then the current strip steel is determined to use hot head process control; otherwise, the current strip steel is determined not to use hot head process control.
[0042] Step 104: At the fixed position of the strip head, the high-temperature timer at the finish mill exit is used to update the preceding steel species SGF_Pre, preceding thickness layer grt_Pre, preceding coiling temperature layer CTIdx_Pre, preceding coil box mode CB_MODE_Pre, and preceding cooling mode CTC_CODE_Pre based on the current strip information. This information is used to determine whether the next strip is the first coil of a different specification when the setting calculation is triggered at F1.
[0043] Specific application of this embodiment: In a hot rolling production line, the strip steel production sequence is strip steel 1, strip steel 2, ..., where the information of strip steel 1 includes: steel type 2, target thickness h is 6.0 mm, target coiling temperature CT is 620 °C, no coil box is used, cooling mode is 1, hot head temperature is 0 °C, and hot head length is 0 meters; the information of strip steel 2 includes: steel type 2, target thickness h is 12.10 mm, target coiling temperature CT is 590 °C, no coil box is used, cooling mode is 1, hot head temperature is 30 °C, and hot head length is 10 meters.
[0044] A parameter table for configuring steel type and width control compensation is shown in Table 1.
[0045] Table 1
[0046] Target thickness h (mm) <![CDATA[Heating head compensation value T ofs (°C)]]> H < 2.5 mm 10 2.5mm≤h<11.75mm 15 11.75≤h 25
[0047] The fixed position P of the strip is set to 3-5 meters from the head, preferably 5 meters.
[0048] Define the relevant parameters for determining the first coil of a different specification, including the front steel type SGF_Pre, the front thickness layer grt_Pre, the front winding temperature layer CTIdx_Pre, the front winding box mode CB_MODE_Pre, and the front cooling mode CTC_CODE_Pre, and set the initial value to 0.
[0049] When strip 1 is bitten on the first stand of the finishing mill (F1), triggering the last calculation of the coiling temperature model, the current information of strip 1 is obtained, including: steel type SGF, thickness layer grt, coiling temperature layer CTIdx, coil box mode CB_MODE, cooling mode CTC_CODE, hot head temperature, and hot head length. Among them, steel type SGF is 2; based on the target thickness h of 6.0 mm, the thickness layer grt is determined to be 5; based on the target coiling temperature CT of 620℃, the coiling temperature layer CTIdx is determined to be 5; since the coil box is not used, the coil box mode CB_MODE is 0; the cooling mode CTC_MODE is 1, the hot head temperature is 0℃, and the hot head length is 0 meters.
[0050] Based on the information of strip 1, it is determined whether it is the first coil of the new specification. Based on the fact that the steel species SGF of strip 1 is not equal to the previous steel species SGF_Pre, the thickness layer grt is not equal to the previous thickness layer grt_Pre, the coiling temperature layer CTIdx is not equal to the previous coiling temperature layer CTIdx_Pre, the coil box mode CB_MODE is equal to the previous coil box mode CB_MODE_Pre, and the cooling mode CTC_CODE is not equal to the previous cooling mode CTC_CODE_Pre, it is determined that strip 1 is the first coil of the new specification.
[0051] Furthermore, based on the information of strip 1, it is determined whether hot-head process control is used. Since the hot-head temperature and length are both zero, it can be concluded that strip 1 does not use hot-head process control. Therefore, strip 1 does not require hot-head compensation control and is controlled according to the target coiling temperature of 620℃.
[0052] When the head of strip 1 at fixed position P passes the finishing mill exit pyrometer, i.e., after the finishing mill exit pyrometer detects that strip 1 has passed 5 meters, the information of strip 1 is used to update the preceding steel race SGF_Pre, preceding thickness layer grt_Pre, preceding coiling temperature layer CTIdx_Pre, preceding coil box mode CB_MODE_Pre, and preceding cooling mode CTC_CODE_Pre, respectively.
[0053] SGF_Pre = SGF = 2
[0054] grt_Pre = grt = 5
[0055] CTIdx_Pre=CTIdx=5
[0056] CB_MODE_Pre = CB_MODE = 0
[0057] CTC_CODE_Pre=CTC_CODE=1
[0058] When strip 2 is bitten on the first stand of the finishing mill (F1), triggering the final calculation of the coiling temperature model, the current information of strip 2 is obtained, including: steel type SGF, thickness layer grt, coiling temperature layer CTIdx, coil box mode CB_MODE, cooling mode CTC_CODE, hot head temperature, and hot head length. Among these, steel type SGF is 2; based on the target thickness h of 12.10 mm, the thickness layer grt is determined to be 16; based on the target coiling temperature CT of 590℃, the coiling temperature layer CTIdx is determined to be 4; since the coil box is not used, the coil box mode CB_MODE is 0; the cooling mode CTC_MODE is 1, the hot head temperature is 30℃, and the hot head length is 10 meters.
[0059] Based on the information of strip 2, it is determined whether it is the first coil of the new specification. Based on the fact that the steel species SGF of strip 2 is equal to the previous steel species SGF_Pre, the thickness layer grt is not equal to the previous thickness layer grt_Pre, the coiling temperature layer CTIdx is not equal to the previous coiling temperature layer CTIdx_Pre, the coil box mode CB_MODE is equal to the previous coil box mode CB_MODE_Pre, and the cooling mode CTC_CODE is equal to the previous cooling mode CTC_CODE_Pre, it is determined that strip 1 is the first coil of the new specification.
[0060] Based on the information of strip 2, it is determined whether hot head process control is used. If the hot head temperature is greater than zero and the hot head length is greater than zero, it can be determined that strip 2 uses hot head process control. Therefore, strip 2 needs to be subject to hot head compensation control.
[0061] Based on the target thickness h of strip 2 being 12.10 mm, the hot head compensation value T is obtained. ofs At 25℃, T ofs The compensation control is extended to the length of the hot head, that is, the temperature within 10 meters of the head of the strip is controlled at 590℃+30℃+25℃=645℃. This can effectively reduce the risk of poor hot head effect caused by the control deviation of the first coil when changing specifications, which in turn affects the rolling stability.
[0062] When the head of strip 2 at fixed position P passes the finishing mill exit pyrometer, i.e., after the finishing mill exit pyrometer detects that strip 2 has passed 5 meters, the information of strip 2 is used to update the preceding steel race SGF_Pre, preceding thickness layer grt_Pre, preceding coiling temperature layer CTIdx_Pre, preceding coil box mode CB_MODE_Pre, and preceding cooling mode CTC_CODE_Pre, respectively.
[0063] SGF_Pre = SGF = 2
[0064] grt_Pre = grt = 16
[0065] CTIdx_Pre=CTIdx=4
[0066] CB_MODE_Pre = CB_MODE = 0
[0067] CTC_CODE_Pre=CTC_CODE=1
[0068] The one or more technical solutions provided in the embodiments of the present invention have at least the following beneficial effects:
[0069] This invention provides a control method to improve the stability of the hot-head process. It configures a correspondence table between the target strip thickness and the hot-head compensation, sets the fixed position value of the strip head, and defines relevant parameters for determining whether it is the first coil of a new specification. When the strip is in the first stand of the finishing mill (F1) and the coiling temperature model is calculated for the last time, it determines whether the current strip is the first coil of a new specification and whether hot-head process control is used. If so, the hot-head compensation value is obtained based on the target strip thickness h and added to the hot-head length range for compensation control. When the fixed position of the strip head passes the high-temperature timer at the finishing mill exit, the relevant parameters used to determine whether the current strip is the first coil of a new specification are recorded for use in setting the model for the next strip.
[0070] This invention determines the first coil of a new specification based on information comparison of strip steel, and performs different compensation controls on the hot head according to the target thickness. This effectively avoids the problem of low strip head temperature control due to changes in working conditions or low model accuracy when changing specifications of the first coil, which further affects production stability.
Claims
1. A control method for improving the stability of hot-head process, applied to the hot continuous rolling process of strip steel, characterized in that... The process includes the following steps: A mapping table between the strip target thickness and hot head compensation is configured, setting the fixed position value of the strip head, and defining relevant parameters for determining whether it is the first coil of a new specification; when the strip is bitten at the F1 bite trigger coiling temperature model for the last calculation, it is determined whether the current strip is the first coil of a new specification and whether hot head process control is used. If so, the hot head compensation value is obtained based on the strip target thickness h and added to the hot head length range for compensation control; when the fixed position of the strip head passes the high-temperature timing at the finishing mill exit, the relevant parameters used to determine whether the current strip is the first coil of a new specification are recorded for use in determining whether the next strip is the first coil of a new specification. The aforementioned correspondence table between the target strip thickness and the hot head compensation includes the target strip thickness h and the hot head compensation value T. ofs The greater the thickness, the greater the corresponding thermal head compensation value Tofs; When h < 2.5 mm, T ofs When the temperature is 10℃; and when 2.5 ≤ h < 11.75, T ofs When the temperature is 15℃; when 11.75 ≤ h, T ofs It is 25℃; The relevant parameters used to determine whether it is the first coil of a new specification include: steel type, thickness layer, winding temperature layer, coil box mode, and cooling mode; The criteria for determining the first coil of a new specification include: comparing the steel type, thickness layer, coiling temperature layer, coil box mode, and cooling mode of the current strip with those of the previous strip. If any one of these is different, it is determined to be the first coil of a new specification; otherwise, it is not the first coil of a new specification. The hot head process control judgment criteria include: if the hot head temperature is greater than zero and the hot head length is greater than zero, it is judged that hot head process control is used; otherwise, it is judged that hot head process control is not used.
2. The control method for improving the stability of the hot head process according to claim 1, characterized in that, The value of the fixed position of the strip head is 3-5 meters, which means the position is 3-5 meters away from the strip head.
3. The control method for improving the stability of the hot head process according to claim 1, characterized in that, The steel types include 60 types, with 24 thickness layers set according to the target thickness range, and 11 winding temperature layers set according to the target winding temperature range.
Citation Information
Patent Citations
Flatness subsection control method considering both rolling stability and quality of hot rolling band steel
CN103949481A
Method for improving coiling temperature control accuracy of hot rolled new-variety new-specification band steel
CN104338758A
