Topological network identification method, meter reading method and concentrator for distribution station area

By configuring the target node number information and topology identification method in the distribution area, the topology network of the distribution area is constructed, which solves the problem of inefficiency of the traditional meter reading method, realizes efficient meter reading operation, and directly accesses the terminal meter. Data transfer volume and time are reduced.

CN117675591BActive Publication Date: 2024-10-01NINGXIA LGG INSTR CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202311626507.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-30
Publication Date
2024-10-01
Estimated Expiration
2043-11-30

AI Technical Summary

Technical Problem

The traditional concentrator-based meter reading method is inefficient, especially when there are multiple intermediate nodes. The meter reading information needs to go through a large number of repeated paths, resulting in long meter reading time and affecting efficiency.

Method used

By pre-configuring the number information of the target node in the distribution station area, using the topology identification method, sending meter reading requests to the intermediate nodes, and constructing a topological network through reply messages, reducing the amount and time of data transmission, directly accessing the terminal meters, and improving reading efficiency. table efficiency.

Benefits of technology

It realizes the identification of the topological network and obtains the meter data during the first meter reading, reduces the amount and time of data transmission during subsequent meter reading, improves the efficiency of meter reading, avoids repeated transmission of relay paths, and improves the accuracy of meter reading. and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117675591B_ABST
    Figure CN117675591B_ABST
Patent Text Reader

Abstract

The present invention provides a topological network identification method, a meter reading method and a concentrator for a distribution substation, the meter reading method comprising: obtaining a terminal meter list of terminal meters to be read in the distribution substation; if there are terminal meters to be read for the first time in the terminal meter list, the topological network identification method of the distribution substation is used to identify the topological network of the distribution substation, and the meter data of the corresponding terminal meter is added to the reply message replied by each target node during the identification, so as to realize the meter reading of each terminal meter to be read while obtaining the topological network of the distribution substation; if each terminal meter to be read in the terminal meter list is not the first meter reading, the topological network obtained by the last identification is obtained, and based on the target address of the node where each terminal meter in the topological network is located, a meter data acquisition request is sent to each terminal meter to be read in turn, so as to obtain the meter data of each terminal meter to be read. This scheme can improve the efficiency of meter reading in the distribution substation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of topology identification and electric power technology, and in particular to a topology network identification method, a meter reading method and a concentrator for a distribution station area. Background Art

[0002] With the continuous growth of energy demand and the modernization of power systems, the monitoring and management requirements of power systems are becoming higher and higher. The traditional monitoring and management methods of power systems mainly rely on wired communication networks, but this method has problems such as difficult wiring, high costs and difficult maintenance. In order to solve these problems, concentrator technology came into being. The application of concentrators in power systems has achieved certain results. It can realize real-time monitoring and control of various equipment in the power system, and support functions such as remote monitoring, fault diagnosis and load management of the power system. At the same time, it also provides technical support and guarantee for the intelligent development of power systems. For example, the intelligent meter reading through the concentrator greatly saves manpower and time, and also improves the efficiency of meter reading.

[0003] At present, when reading meters based on concentrators, the concentrator usually sends meter reading information to each terminal meter in turn along the path from the concentrator to the terminal meter, and then obtains the data of each terminal meter. However, this method needs to send meter reading information to each terminal meter in turn every time the meter reading operation is performed, that is, each meter reading needs to be carried out along the path from the concentrator to the terminal meter. The data needs to be transmitted in turn, which takes a lot of time and seriously affects the efficiency of meter reading. In addition, there may be multiple intermediate nodes between the concentrator and each terminal meter, and multiple intermediate nodes or multiple target nodes of terminal meters may be further hung under one intermediate node. In this way, when the concentrator sends meter reading information to the target node of each terminal meter in turn, the meter reading information needs to take a large number of repeated paths. For example, the concentrator is equipped with an intermediate node O, and the intermediate node is equipped with target nodes A, B, and C corresponding to the terminal meters. When the concentrator performs meter reading operations on the terminal meters corresponding to the target nodes A, B, and C, the meter reading information needs to pass through the path from the concentrator to the intermediate node O, which greatly affects the efficiency of meter reading. Moreover, if there are multiple intermediate nodes between the concentrator and the target node, the efficiency of meter reading will be even lower. Summary of the invention

[0004] In view of this, in order to address the above shortcomings, it is necessary to propose a topological network identification method, a meter reading method and a concentrator for a distribution station area to improve the efficiency of meter reading in the distribution station area.

[0005] In a first aspect, the present invention provides a method for identifying a topological network of a distribution substation, wherein the topological network of the distribution substation includes a root node where a concentrator is located, an intermediate node where a relay is located, and a target node where a terminal meter is located; the identification method is applied to the concentrator of the root node, and includes:

[0006] Pre-configure the numbering information of each target node in the distribution area; wherein the numbering information includes a number used to uniquely characterize each terminal meter;

[0007] A target node list of target nodes whose topological relationships need to be determined is formed according to the pre-configured numbering information of each target node;

[0008] For each target node in the target node list whose topological relationship needs to be determined, the following topology identification steps are performed:

[0009] Step 1: Send a data request for meter reading of the current target node to each intermediate node adjacent to the root node, so that each intermediate node forwards it to its own adjacent intermediate node or target node;

[0010] Step 2: Receive a reply message forwarded from a first intermediate node adjacent to the root node; wherein the reply message is generated by replying from a target node in at least one topological path where the first intermediate node is located, and the reply message includes: a destination address of a target node in each of the topological paths and a meter number of a terminal electric meter, as well as a destination address of each intermediate node in each topological path and relay device information;

[0011] Step 3: sequentially determine whether the meter number of the terminal meter corresponding to each target node in the reply message is consistent with the meter number of the terminal meter of the current target node whose topological relationship needs to be determined;

[0012] If yes, then execute steps 1-3 for the next target node whose topological relationship needs to be determined;

[0013] If not, then execute steps 1-3 for the current target node in a loop, and in any round of loops for the same target node, the first intermediate node in step 2 is not the same as the first intermediate node in any previous round of loops;

[0014] After all the steps of topology identification are performed on each target node in the target node list, the topology network of the distribution station area is constructed using the target node of each topology path in each reply message and the destination address of each intermediate node, as well as the node information of the root node itself.

[0015] Preferably, after sending a data request for meter reading of the current target node to each intermediate node adjacent to the root node, the method further includes:

[0016] Start the timer to count;

[0017] If no reply message forwarded by any first intermediate node is received within the first preset time period, a topology identification step is performed for the next target node whose topology relationship needs to be determined.

[0018] Preferably, if there are N intermediate nodes adjacent to the root node, then in step 2, a reply message forwarded from a first intermediate node adjacent to the root node is received, and the first intermediate node is the intermediate node that first receives the reply message returned by the intermediate node adjacent to it or the target node; wherein N≥2, and N is an integer.

[0019] Preferably, after executing the topology identification step for each target node whose topological relationship needs to be determined, the target node list is updated, and when executing the topology identification step for each target node whose topological relationship needs to be determined in the target node list, the updated target node list is used;

[0020] The method for updating the target node list includes:

[0021] The target nodes in each reply message received when performing topology identification on the target node for which the current topological relationship needs to be determined are deleted from the target node list.

[0022] In a second aspect, the present invention provides a method for identifying a topological network of a distribution station area, wherein the topological network of the distribution station area includes a root node where a concentrator is located, an intermediate node where a relay is located, and a target node where a terminal meter is located; the identification method is applied to any one device in the relay of the intermediate node or the terminal meter of the target node, including:

[0023] Receive data information sent by adjacent nodes;

[0024] If the data information is a reply message, the destination address of the current node and the relay device information are added to the data information and sent to the adjacent nodes in the direction leading to the root node;

[0025] If the data information is a data request, determine whether the current node is the target node; if the current node is the target node, generate a reply message using the destination address of the current node and the meter number of the terminal meter, and send it to the node adjacent to the current node; if the current node is not the target node, forward the data information to the adjacent node in the direction of the target node.

[0026] Preferably, if the current node receives multiple data information within a second preset time period, and the multiple data information are all reply messages, the multiple data information are aggregated, and the target address of the current node and the device information of the corresponding relay are attached to the aggregated data information, and then sent to the adjacent nodes in the direction of the root node.

[0027] In a third aspect, the present invention provides a meter reading method for a distribution station area, comprising:

[0028] Get the terminal meter list to be read in the distribution station area;

[0029] If there is a terminal meter to be read for the first time in the terminal meter list, the topological network identification method of the distribution substation described in any one of the first aspect and the second aspect is used to identify the topological network of the distribution substation, and when the topological network identification is performed, the meter data of the corresponding terminal meter is added to the reply message replied by each target node, so as to realize the meter reading operation of each terminal meter to be read while obtaining the topological network of the distribution substation;

[0030] If the terminal meters to be read in the terminal meter list are not being read for the first time, the topological network of the distribution station area identified last time is obtained, and based on the target address of the target node where each terminal meter in the topological network is located, a meter data acquisition request is sent to each terminal meter to be read in the terminal meter list in turn to obtain the meter data of each terminal meter to be read.

[0031] Preferably, after sending a meter data acquisition request to each of the terminal meters to be read, the method further includes:

[0032] Start the timer to perform timing operation;

[0033] If the meter data returned by the terminal meter to be read is not received within the third preset time period, the meter reading operation is performed for the next terminal meter to be read.

[0034] Preferably, after the meter reading operation is completed, if there is an abnormal terminal meter to be read whose meter data has not been read in the terminal meter list, the method further includes:

[0035] Based on the target address of the target node where the abnormal terminal meter to be read is located, cyclically performing a meter reading operation on the abnormal terminal meter to be read M times; M is an integer greater than 1;

[0036] If the meter data returned by the abnormal terminal meter to be read is not obtained in M ​​meter reading operations, the topological network of the distribution station area is updated using the topological network identification method of the distribution station area as described in any one of the first aspect and the second aspect, and the meter reading operation of the abnormal terminal meter to be read is implemented at the same time.

[0037] In a fourth aspect, the present invention provides a concentrator, the concentrator comprising: a storage module, a list determination module, a topology identification module and a topology network construction module;

[0038] The storage module is configured to pre-configure the numbering information of each target node in the distribution station area; wherein the numbering information includes a number for uniquely representing each terminal meter;

[0039] The list determination module is configured to form a target node list of target nodes whose topological relationships need to be determined according to the number information of each target node pre-configured by the storage module;

[0040] The topology identification module is configured to perform the following topology identification operation on each target node in the target node list for which a topological relationship needs to be determined, determined by the list determination module:

[0041] Step 1: Send a data request for meter reading of the current target node to each intermediate node adjacent to the root node, so that each intermediate node forwards it to its own adjacent intermediate node or target node;

[0042] Step 2: Receive a reply message forwarded from a first intermediate node adjacent to the root node; wherein the reply message is generated by replying from a target node in at least one topological path where the first intermediate node is located, and the reply message includes: a destination address of a target node in each of the topological paths and a meter number of a terminal electric meter, as well as a destination address of each intermediate node in each topological path and relay device information;

[0043] Step 3: sequentially determine whether the meter number of the terminal meter corresponding to each target node in the reply message is consistent with the meter number of the terminal meter of the current target node whose topological relationship needs to be determined;

[0044] If yes, then execute steps 1-3 for the next target node whose topological relationship needs to be determined;

[0045] If not, then execute steps 1-3 for the current target node in a loop, and in any round of loops for the same target node, the first intermediate node in step 2 is not the same as the first intermediate node in any previous round of loops;

[0046] The topology network construction module is configured to construct the topology network of the distribution station area using the target node of each topology path in each reply message and the destination address of each intermediate node, as well as the node information of the root node itself, after the topology identification module has performed each step of topology identification on each target node in the target node list.

[0047] It can be seen from the above technical solution that when performing meter reading operation on the distribution station area, if the terminal meter in the distribution station area is the first meter reading, the topological network of the distribution station area is identified by the provided topological network identification method, and the meter data is attached to the reply message in the identification process to realize the meter reading operation on the distribution station area. The identified topological network can be used for subsequent meter reading work. For example, in the subsequent meter reading, the terminal meter to be read can be directly accessed through the destination address of the corresponding terminal meter to be read based on the network topology, thereby realizing the meter reading operation. In this way, there is no need to pass through the relay between the concentrator and the terminal meter, so that the transmission amount and transmission time of the data message can be greatly reduced, and the efficiency of meter reading can be improved. In addition, even if it is the first meter reading operation, the meter data of the corresponding terminal meter can be attached to the reply message returned by each terminal meter when the topological network is identified. In this way, not only the topological network is identified, but also the meter data is obtained in the process of topological network identification. It is not necessary to access each terminal meter separately to obtain the meter data according to the topological identification result after the topological identification, so as to improve the efficiency of meter reading. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 The present invention provides a flow chart of a meter reading method for a distribution station area.

[0049] Figure 2 A schematic diagram of a topology network provided in an embodiment of the present invention.

[0050] Figure 3 A schematic diagram of another topology network provided in an embodiment of the present invention.

[0051] Figure 4 A schematic diagram of a concentrator provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0052] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0053] like Figure 1 As shown, an embodiment of the present invention provides a meter reading method for a distribution station area, and the method may include the following steps:

[0054] Step 101: Obtain a list of terminal meters to be read in the distribution station area;

[0055] Step 102: If there is a terminal meter to be read for the first time in the terminal meter list, the topological network of the distribution area is identified by using the topological network identification method of the distribution area, and when the topological network identification is performed, the meter data of the corresponding terminal meter is added to the reply message replied by each target node, so as to realize the meter reading operation of each terminal meter to be read while obtaining the topological network of the distribution area;

[0056] Step 103: If the terminal meters to be read in the terminal meter list are not being read for the first time, the topological network of the distribution station area identified last time is obtained, and based on the target address of the target node where each terminal meter in the topological network is located, a meter data acquisition request is sent to each terminal meter to be read in the terminal meter list in turn to obtain the meter data of each terminal meter to be read.

[0057] It can be seen from this embodiment that when the first meter reading operation is performed on the terminal meter in the power distribution area, the topological network identification method not only realizes the meter reading operation, but also obtains the topological network of the power distribution area. In this way, in the subsequent meter reading operation, each terminal meter can be directly accessed through the target address of each terminal meter determined by the topological network, and the meter data can be directly obtained from the terminal meter to realize the meter reading operation. In this way, there is no need to pass through several relays between the concentrator and the terminal meter, so that the transmission amount and transmission time of the data message can be greatly reduced, thereby improving the efficiency of meter reading.

[0058] It should be pointed out that in step 103, when directly accessing the terminal meter at the corresponding target node through the destination address, in order to ensure the accuracy of meter reading, the meter number of the current meter to be read should also be checked, that is, it is determined whether the meter number of the current terminal meter to be read is consistent with the meter number of the terminal meter accessed through the destination address. If they are inconsistent, it means that the topological network has changed, and the meter reading operation can be implemented through step 102, that is, the meter reading operation is implemented through topological identification, and the topological network of the distribution station area is updated.

[0059] like Figure 2 As shown, the topological network of the distribution station area in step 102 may include a root node where the concentrator is located, an intermediate node where the relay is located, and a target node where the terminal meter is located. The topological network identification method of the distribution station area can be composed of two aspects: in the first aspect, the topological identification network identification method of the distribution station area is implemented by the concentrator of the root node as the main body; in the other aspect, the topological identification method of the distribution station area is implemented by any one of the relays of the intermediate nodes or the terminal meters of the target nodes as the main body. The topological network identification method of the distribution station area provided by the present invention is described below from these two aspects respectively.

[0060] For the first aspect, the distribution station area topology network identification method can be specifically implemented in the following ways:

[0061] Pre-configure the numbering information of each target node in the distribution area; wherein the numbering information includes a number used to uniquely characterize each terminal meter;

[0062] A target node list of target nodes whose topological relationships need to be determined is formed according to the pre-configured numbering information of each target node;

[0063] For each target node in the target node list whose topological relationship needs to be determined, the following topological identification steps are performed:

[0064] Step 1: Send a data request for meter reading of the current target node to each intermediate node adjacent to the root node, so that each intermediate node forwards it to its own adjacent intermediate node or target node;

[0065] Step 2: Receive a reply message forwarded from a first intermediate node adjacent to the root node; wherein the reply message is generated by replying from a target node in at least one topological path where the first intermediate node is located, and the reply message includes: the destination address of the target node in each topological path and the meter number of the terminal meter, as well as the destination address of each intermediate node in each topological path and relay device information;

[0066] Step 3: determine in turn whether the meter number of the terminal meter corresponding to each target node in the reply message is consistent with the meter number of the terminal meter of the current target node whose topological relationship needs to be determined;

[0067] If yes, then execute steps 1-3 for the next target node whose topological relationship needs to be determined;

[0068] If not, then execute steps 1-3 for the current target node in a loop, and in any round of loops for the same target node, the first intermediate node in step 2 is not the same as the first intermediate node in any previous round of loops;

[0069] After all the steps of topology identification are performed on each target node in the target node list, the topology network of the distribution station area is constructed using the target node of each topological path in each reply message and the destination address of each intermediate node, as well as the node information of the root node itself.

[0070] In this embodiment, the numbering information of each target node in the distribution substation is first stored in the concentrator in advance, and the table number information includes the table number representing each terminal meter. The table number information is usually reported by each power grid according to the actual installation of the meter. For example, for the current distribution substation, the terminal meters at each target node are numbered 0001-1000, and the terminal meters whose topological relationship needs to be determined are determined from the 1000 terminal meters numbered 0001-1000, so that the target nodes where these terminal meters are located constitute a list of target nodes whose topological relationship needs to be determined.

[0071] When performing topology identification for each target node in the target node list, first send a data request for meter reading of the current target node to each intermediate node adjacent to the root node, and then each intermediate node will forward the data request to the adjacent node passing through the target node. It should be pointed out that due to the complex network topology of the distribution station area, the number of intermediate nodes between the root node and each target node is unknown, and the number of intermediate nodes in the topological paths corresponding to different target nodes may also be different. Therefore, the upstream end of an intermediate node may be an intermediate node or a concentrator, and its downstream end may be an intermediate node or a target node, or there may be both intermediate nodes and target nodes.

[0072] In practice, the reply message returned by the terminal meter may not be received due to problems such as the terminal meter not being installed, malfunctioning, or relay malfunctioning. In order to avoid the concentrator frequently sending messages to obtain the reply message returned by the terminal meter in this case, consider starting a timer to count after sending a data request for meter reading of the current target node to each intermediate node adjacent to the root node; if no reply message forwarded by any first intermediate node is received within the first preset time, the topology identification step is performed for the next target node for which the topology relationship needs to be determined, so as to avoid affecting the topology identification efficiency and meter reading efficiency due to long waiting for the reply message.

[0073] Furthermore, after the concentrator sends a data request, it waits for a reply from each target node, that is, it listens to and receives a reply message forwarded from an intermediate node adjacent to the root node. The reply message contains the destination address of the target node in the topological path and the meter number of the terminal meter, as well as the destination address of each intermediate node in the topological path and the relay device information. Figure 3As shown, the intermediate nodes Z1 and Z2 are adjacent to the root node G, the intermediate nodes Z11 and Z12 are adjacent to the downstream end of the intermediate node Z1, the target nodes M111, M112 and M113 are adjacent to the downstream end of Z11, and the target nodes M121 and M122 are adjacent to the downstream end of Z12. When M112 returns a reply message, it will generate a reply message based on the destination address of the M112 target node and the meter number of the terminal meter corresponding to the M112 node and send it to the intermediate node Z11. After receiving the reply message, the intermediate node Z11 will attach the destination address of Z11 to the reply message and forward it to the intermediate node Z1. After receiving the reply message, the intermediate node Z1 will attach the destination address of Z1 to the reply message and forward it to the concentrator. In this way, the topological relationship and topological path of the target node M112 can be clearly and accurately identified.

[0074] After receiving the reply message, it is further determined in sequence whether the table number of the terminal meter corresponding to each target node in the reply message is consistent with the table number of the terminal meter of the current target node whose topological relationship needs to be determined. If consistent, it means that the topological relationship of the current target node is determined and completed, and the topological identification steps 1-3 are further performed for the next target node whose topological relationship needs to be determined. If inconsistent, the topological identification steps 1-3 are cyclically performed for the current target node, and in any one cycle process for the current target node, the first middleware in step 2 is not repeated with the first intermediate node in any previous cycle. For example, when determining the topological relationship of the M112 target node, if the reply message returned by the intermediate node Z2 is received for the first time, but the table number of each terminal meter in the reply message returned by the intermediate node Z2 is inconsistent with the table number of the terminal meter corresponding to the M112 target node, the topological identification step is performed again for the M112 target node, but the reply message returned by other intermediate nodes except the intermediate node Z2 is received in step 2 for the next execution. In this way, after failing to receive a reply message from the corresponding target node in one round of cycles, the reply message forwarded by other first intermediate nodes can be received in the next round of replies, thereby avoiding repeated reception of reply messages returned by the same first intermediate node, which causes the concentrator to be unable to identify the topological relationship of the M112 target node for a long time, affecting the execution efficiency of the system and even causing the system to enter an infinite loop.

[0075] In addition, since the topological paths of each target node are different and the path lengths are not exactly the same, the time taken to return the reply message is also different. Therefore, in this embodiment, if there are N intermediate nodes adjacent to the root node, then in step 2, a reply message forwarded from the first intermediate node adjacent to the root node is received, and the first intermediate node is the intermediate node that first receives the reply message returned by the intermediate node or target node adjacent to it; wherein N≥2, and N is an integer. In this embodiment, each time the concentrator receives a reply message from the first intermediate node, it is the intermediate node that first forwards the reply message among the first intermediate nodes that have not been traversed, so that the time of each cycle can be the shortest, thereby improving the efficiency of topology identification and further improving the efficiency of meter reading.

[0076] It should be noted that, since each reply message received is returned by at least one target node, each reply message includes at least one topological relationship of the target node. Therefore, the topological relationship of some target nodes in the target node list may have been obtained when the topological identification operation is performed for other target nodes, and there is no need to repeat the topological identification operation for these target nodes. Therefore, in one embodiment, after the topological identification step is performed for each target node that needs to determine the topological relationship, the target node list is updated, and when the topological identification step is performed for each target node in the target node list that needs to determine the topological relationship, the updated target node list is used; and when the target node list is updated, the target nodes in each reply message received when the topological identification is performed for the target node that currently needs to determine the topological relationship can be deleted from the target node list. In this way, it is possible to avoid performing topological identification again for the target node whose topological relationship has been determined, greatly reducing the number of topological identifications, improving the efficiency of topological identification, and thus improving the efficiency of meter reading.

[0077] In this way, after the topology identification operation is performed on each target node in the target node list, the topology network of the distribution station area can be constructed using the target node and the destination address of each intermediate node in each topological path in each reply message, as well as the node information of the root node itself.

[0078] For the second aspect, the distribution station area topology network identification method can be specifically implemented in the following ways:

[0079] Receive data information sent by adjacent nodes;

[0080] If the data information is a reply message, the destination address of the current node and the relay device information are attached to the data information and sent to the adjacent nodes in the direction leading to the root node;

[0081] If the data information is a data request, determine whether the current node is the target node; if the current node is the target node, use the destination address of the current node and the meter number of the terminal meter to generate a reply message, and send it to the node adjacent to the current node; if the current node is not the target node, forward the data information to the adjacent node in the direction of the target node.

[0082] In the second aspect, the implementation subject is any device in the relay where the intermediate node is located or the terminal meter where the target node is located. Therefore, after receiving the data information sent by the adjacent node, it is necessary to first determine the type of the data information. If the type of the data information is a reply message, it means that the data information needs to be uplinked, that is, it is sent from the target node to the concentrator. At this time, the destination address of the current node and the device information of the relay need to be attached to the data information and sent uplink, that is, sent to the adjacent node in the direction of the root node. If the type of the data information is a data request, it means that the data information needs to be downlinked, that is, it is sent from the concentrator to the target node. At this time, it is necessary to first determine whether the current node is the target node. If so, the current node needs to generate a reply message with the destination address and the meter number of the terminal meter and send it to the adjacent node, that is, send it uplink in the direction of the root node; if not, it means that the current node is an intermediate node, and the data information is directly forwarded to the adjacent node at the downstream end, that is, forwarded to the adjacent node in the direction leading to the target node.

[0083] In addition, since the downstream end of each intermediate node may be equipped with multiple intermediate nodes or multiple target nodes, data information uploaded by multiple intermediate nodes or target nodes is often received within a period of time. At this time, if the intermediate node forwards data to the upstream end, it is necessary to send these data information through multiple cycles, or some data information will be used as invalid information this time. Therefore, in order to reduce the amount of information transmission and improve the efficiency of topology identification, it is considered to aggregate multiple data information at the intermediate node. Specifically, if the current node receives multiple data information within the second preset time length, and the multiple data information are all reply messages, the multiple data information are aggregated, and the target address of the current node and the corresponding relay device information are attached to the aggregated data information, and then sent to the adjacent node in the direction leading to the root node. In this way, when the downstream end of an intermediate node reports the reply message within one end time, the intermediate node can aggregate these multiple reply messages and its own information into a reply message for uploading, thus reducing the amount of data transmission between the intermediate node and the upstream adjacent node of the intermediate node. Moreover, the entire topology network is very complex. Often a topology path contains multiple intermediate nodes, and multiple target nodes or multiple intermediate nodes are hung under one intermediate node. Through such aggregation, the reduction in data transmission is very objective, which can greatly improve the efficiency of topology identification and meter reading.

[0084] In addition, in the topological network, the lower limit of the amount of data requests is M / d, where M is the total number of nodes excluding the root node, and d is the length of the longest topological path starting from the root. Assuming that all paths in the directed acyclic graph in the topological network are disjoint, only one data request needs to be sent from the root node to the farthest node in each path. Therefore, each data request on each path is answered by a single data reply message. Therefore, the minimum number of disjoint paths is M / d, which is also the minimum amount of data requests. It can be seen that the efficiency of topological identification in this paper depends on the network topology. Therefore, by identifying the topological network and aggregating the data information in the intermediate nodes, the number of data information transmissions and the data transmission time in the topological path are greatly reduced, thereby greatly improving the efficiency of topological identification and meter reading.

[0085] In order to avoid data loss of some nodes in the previously determined topology network, the destination address of the same target node is continuously accessed to obtain meter data, which affects the efficiency of meter reading. Considering that in step 103, after sending a meter data acquisition request to each terminal meter to be read, a timer is further started to perform a timing operation. If the meter data returned by the corresponding terminal meter to be read is not received within the third preset time length, the meter reading operation is performed for the next terminal meter to be read.

[0086] After the meter reading operation is completed, if there are abnormal terminal meters to be read whose meter data has not been read in the terminal meter list, the meter reading operation for these terminal meters can be further implemented in the following ways:

[0087] Based on the target address of the target node where the abnormal terminal meter to be read is located, the meter reading operation is cyclically performed M times on the abnormal terminal meter to be read; M is an integer greater than 1;

[0088] If the meter data returned by the abnormal terminal meter to be read is not obtained in M ​​meter reading operations, the topological network identification method of the distribution station area in any of the above embodiments is used to update the topological network of the distribution station area, and at the same time, the meter reading operation of the abnormal terminal meter to be read is implemented.

[0089] In this embodiment, for the terminal meter that has not been read, first perform M meter reading operations for the terminal meter. If the meter data of the corresponding terminal meter can be received in these M meter reading operations, it means that there is no problem with the topological network, and there may be problems such as communication and system jamming. If the meter data of the corresponding terminal meter is still not received in these M meter reading operations, it means that the topological path corresponding to the terminal meter may be updated. Therefore, consider using the topological network identification method of the distribution station area to identify and update the topological network of the distribution station area, and at the same time realize the meter reading operation of each abnormal terminal meter to be read, to ensure the accuracy and completeness of the meter reading work, and avoid omissions, erroneous readings, etc.

[0090] like Figure 4 As shown, the embodiment of the present invention further provides a concentrator, which may include: a storage module 401, a list determination module 402, a topology identification module 403 and a topology network construction module 404;

[0091] The storage module 401 is configured to pre-configure the numbering information of each target node in the distribution station area; wherein the numbering information includes a number for uniquely representing each terminal meter;

[0092] A list determination module 402 is configured to form a target node list of target nodes whose topological relationships need to be determined according to the number information of each target node pre-configured by the storage module 401;

[0093] The topology identification module 403 is configured to perform the following topology identification operation on each target node for which a topological relationship needs to be determined in the target node list determined by the list determination module 402:

[0094] Step 1: Send a data request for meter reading of the current target node to each intermediate node adjacent to the root node, so that each intermediate node forwards it to its own adjacent intermediate node or target node;

[0095] Step 2: Receive a reply message forwarded from a first intermediate node adjacent to the root node; wherein the reply message is generated by replying from a target node in at least one topological path where the first intermediate node is located, and the reply message includes: the destination address of the target node in each topological path and the meter number of the terminal meter, as well as the destination address of each intermediate node in each topological path and relay device information;

[0096] Step 3: determine in turn whether the meter number of the terminal meter corresponding to each target node in the reply message is consistent with the meter number of the terminal meter of the current target node whose topological relationship needs to be determined;

[0097] If yes, then execute steps 1-3 for the next target node whose topological relationship needs to be determined;

[0098] If not, then execute steps 1-3 for the current target node in a loop, and in any round of loops for the same target node, the first intermediate node in step 2 is not the same as the first intermediate node in any previous round of loops;

[0099] The topology network construction module 404 is configured to construct the topology network of the distribution station area using the target node of each topology path in each reply message and the destination address of each intermediate node, as well as the node information of the root node itself, after the topology identification module 403 has performed each step of topology identification on each target node in the target node list.

[0100] The embodiment of the present invention further provides a relay and a terminal meter, and any relay or terminal meter is configured to perform the following operations:

[0101] Receive data information sent by adjacent nodes;

[0102] If the data information is a reply message, the destination address of the current node and the relay device information are attached to the data information and sent to the adjacent nodes in the direction leading to the root node;

[0103] If the data information is a data request, determine whether the current node is the target node; if the current node is the target node, use the destination address of the current node and the meter number of the terminal meter to generate a reply message, and send it to the node adjacent to the current node; if the current node is not the target node, forward the data information to the adjacent node in the direction of the target node.

[0104] The present specification also provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed in a computer, the computer is caused to execute a method in any one of the embodiments of the present specification.

[0105] The present specification also provides a computing device, including a memory and a processor, wherein the memory stores executable code, and when the processor executes the executable code, the method in any one of the embodiments in the specification is implemented.

[0106] Since the device embodiments provided by the present invention are based on the same inventive concept as the method embodiments of this specification, the specific contents can be found in the description of the method embodiments of this specification and will not be repeated here.

[0107] The modules or units in the device of the embodiment of the present invention can be combined, divided and deleted according to actual needs. The above disclosure is only the preferred embodiment of the present invention, and of course it cannot be used to limit the scope of the rights of the present invention. Those skilled in the art can understand that all or part of the processes of the above embodiment are implemented, and the equivalent changes made according to the claims of the present invention still fall within the scope of the invention.

Claims

1. A meter reading method for a distribution station area, It is characterized in that include: Get the terminal meter list to be read in the distribution area; If there is a terminal meter to be read for the first time in the terminal meter list, the topological network identification method of the distribution substation is used to identify the topological network of the distribution substation, and when the topological network identification is performed, the meter data of the corresponding terminal meter is attached to the reply message replied by each target node, so as to realize the meter reading operation of each terminal meter to be read while obtaining the topological network of the distribution substation; If all the terminal meters to be read in the terminal meter list are not being read for the first time, the topological network of the distribution substation area identified last time is obtained, and based on the target address of the target node where each terminal meter in the topological network is located, a meter data acquisition request is sent to each terminal meter to be read in the terminal meter list in turn to obtain meter data of each terminal meter to be read; Among them, in the topology network identification method of the distribution station area, the topology network of the distribution station area includes a root node where the concentrator is located, an intermediate node where the relay is located, and a target node where the terminal meter is located; the identification method is applied to the concentrator of the root node, including: Pre-configure the numbering information of each target node in the distribution area; wherein the numbering information includes a number used to uniquely characterize each terminal meter; A target node list of target nodes whose topological relationships need to be determined is formed according to the pre-configured numbering information of each target node; For each target node in the target node list whose topological relationship needs to be determined, the following topological identification steps are performed: Step 1: Send a data request for meter reading of the current target node to each intermediate node adjacent to the root node, so that each intermediate node forwards it to its own adjacent intermediate node or target node; Step 2: Receive a reply message forwarded from a first intermediate node adjacent to the root node; wherein the reply message is generated by replying from a target node in at least one topological path where the first intermediate node is located, and the reply message includes: a destination address of a target node in each of the topological paths and a meter number of a terminal electric meter, as well as a destination address of each intermediate node in each topological path and relay device information; Step 3: determining in sequence whether the meter number of the terminal meter corresponding to each target node in the reply message is consistent with the meter number of the terminal meter of the current target node for which the topological relationship needs to be determined; If yes, then execute steps 1-3 for the next target node whose topological relationship needs to be determined; If not, then execute steps 1-3 for the current target node in a loop, and in any round of loops for the same target node, the first intermediate node in step 2 is not the same as the first intermediate node in any previous round of loops; After all the steps of topology identification are performed on each target node in the target node list, the topology network of the distribution station area is constructed using the target node of each topology path in each reply message and the destination address of each intermediate node, as well as the node information of the root node itself.

2. The meter reading method for a distribution station area according to claim 1, It is characterized in that After sending a meter data acquisition request to each of the terminal meters to be read, the method further includes: Start the timer to perform timing operation; If the meter data returned by the terminal meter to be read is not received within the third preset time period, the meter reading operation is performed for the next terminal meter to be read.

3. The meter reading method for the distribution station area according to claim 2, It is characterized in that After the meter reading operation is completed, if there is an abnormal terminal meter to be read whose meter data has not been read in the terminal meter list, the method further includes: Based on the target address of the target node where the abnormal terminal meter to be read is located, cyclically performing a meter reading operation on the abnormal terminal meter to be read M times; M is an integer greater than 1; If the meter data returned by the abnormal terminal meter to be read is not obtained in M ​​meter reading operations, the topological network of the distribution station area is updated using the topological network identification method of the distribution station area, and the meter reading operation of the abnormal terminal meter to be read is implemented at the same time.

4. The meter reading method for a distribution station area according to claim 1, It is characterized in that After sending a data request for meter reading of the current target node to each intermediate node adjacent to the root node, the method further includes: Start the timer to count; If no reply message forwarded by any first intermediate node is received within the first preset time period, a topology identification step is performed for the next target node whose topology relationship needs to be determined.

5. The meter reading method for a distribution station area according to claim 1, It is characterized in that If there are N intermediate nodes adjacent to the root node, then in step 2, a reply message forwarded from a first intermediate node adjacent to the root node is received. The first intermediate node is the intermediate node that first receives the reply message returned by the intermediate node adjacent to it or the target node; wherein N≥2, and N is an integer.

6. The meter reading method for a distribution station area according to claim 1, It is characterized in that After executing the topology identification step for each target node whose topology relationship needs to be determined, the target node list is updated, and when executing the topology identification step for each target node whose topology relationship needs to be determined in the target node list, the updated target node list is used; The method for updating the target node list includes: The target nodes in each reply message received when performing topology identification on the target node for which the current topological relationship needs to be determined are deleted from the target node list.

7. The meter reading method for a distribution station area according to claim 1, It is characterized in that The topological network of the distribution station area includes a root node where a concentrator is located, an intermediate node where a relay is located, and a target node where a terminal meter is located; the identification method is applied to any one device in the relay of the intermediate node or the terminal meter of the target node, including: Receive data information sent by adjacent nodes; If the data information is a reply message, the destination address of the current node and the relay device information are added to the data information and sent to the adjacent nodes in the direction leading to the root node; If the data information is a data request, determine whether the current node is the target node; if the current node is the target node, generate a reply message using the destination address of the current node and the meter number of the terminal meter, and send it to the node adjacent to the current node; if the current node is not the target node, forward the data information to the adjacent node in the direction of the target node.

8. The meter reading method for a distribution station area according to claim 7, It is characterized in that If the current node receives multiple data messages within the second preset time period, and the multiple data messages are all reply messages, the multiple data messages are aggregated, and the target address of the current node and the device information of the corresponding relay are attached to the aggregated data message, and then sent to the adjacent nodes in the direction of the root node.