Methods, devices, equipment and media for decremental configuration of energy storage capacity for new energy transmission.

By constructing an energy storage optimization configuration model and an intermediate variable transfer model, and performing hourly iterative calculations, the problem of low energy storage planning efficiency in existing technologies is solved, achieving more efficient and accurate energy storage capacity configuration and reducing the cost of energy storage systems.

CN117767374BActive Publication Date: 2026-11-10CHINA THREE GORGES CORPORATION +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311845620.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2026-11-10
Estimated Expiration
2043-12-27

AI Technical Summary

Technical Problem

In existing technologies, energy storage capacity prediction and planning methods based on historical power system operation data require long-term data analysis and calculation, which leads to reduced energy storage planning efficiency.

Method used

By constructing an energy storage optimization configuration model, an intermediate variable transfer model, and an energy storage configuration verification model, and performing hourly iterative calculations, the energy storage capacity is optimized to ensure that the model results conform to the actual situation. The most economical energy storage capacity that meets the new energy utilization rate index is obtained through iterative optimization calculations.

Benefits of technology

It significantly improves the efficiency and accuracy of energy storage planning and configuration, optimizes the rationality of energy storage capacity, and reduces the cost of energy storage systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117767374B_ABST
    Figure CN117767374B_ABST
Patent Text Reader

Abstract

This application provides a method, apparatus, equipment, and medium for decremental configuration of energy storage capacity for new energy transmission, comprising: obtaining the required indicators and limiting parameters and inputting them into an energy storage optimization configuration model aimed at calculating the minimum energy storage capacity to obtain the energy storage capacity; inputting the value into an intermediate variable transfer model to obtain the transfer variable; performing iterative calculations using the above two models until the requirements are met to obtain multiple energy storage capacities; obtaining the maximum value; inputting the maximum value and limiting parameters into an energy storage configuration verification model and an intermediate variable transfer model aimed at calculating the maximum new energy consumption to perform iterative calculations until the requirements are met to determine the new energy utilization rate; after determining that the new energy utilization rate does not meet the set threshold, obtaining a calibration value; calculating a decrement value based on the calibration value; performing iterative calculations again using the decrement value until the set threshold is met; and outputting the target energy storage capacity. In this way, a reasonable energy storage capacity can be calculated in an optimized manner, improving the efficiency of capacity configuration.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of new energy power technology, and in particular to a method, apparatus, equipment and medium for configuring new energy transmission and storage capacity in a decreasing manner. Background Technology

[0002] New energy sources are currently the main driving force of the power industry, possessing multiple advantages such as environmental friendliness and renewability. However, these advantages also bring many challenges, such as insufficient controllability, high volatility, and limited regulation capabilities. Effective planning of new energy storage capacity can enable unstable and highly volatile new energy sources to respond quickly and stably to fluctuations in electricity demand, thereby reducing unnecessary risks.

[0003] In existing technologies, a calculation method is constructed to improve the efficiency of energy storage capacity planning for large-scale new energy transmission, so as to ensure that the utilization efficiency of new energy is maximized and the cost of energy storage planning is reduced. This calculation method is usually based on the historical operation data of the power system to predict and plan the capacity.

[0004] However, due to the random fluctuations in new energy sources, in order to ensure that the calculation results are more consistent with the actual situation and obtain more reasonable and effective results, the above method requires data analysis and calculation over a long period of time, resulting in a long solution time and a significant reduction in the efficiency of energy storage planning. Summary of the Invention

[0005] This application provides a method, apparatus, equipment, and medium for decremental configuration of energy storage capacity for new energy transmission, which addresses the problem that existing capacity prediction and planning based on historical power system operating data requires long-term data analysis and calculation, resulting in long solution times and a significant reduction in energy storage planning efficiency.

[0006] In a first aspect, this application provides a method for configuring energy storage capacity in a decreasing manner for new energy transmission, the method comprising:

[0007] The system acquires the target renewable energy utilization rate, theoretical wind power output, theoretical photovoltaic output, and target power load. It then inputs the target renewable energy utilization rate and target power load into a pre-constructed energy storage optimization configuration model to obtain the energy storage capacity for the first cycle. The target power load is the sum of the total unit power, renewable energy output, and charging / discharging power. The objective function of the energy storage optimization configuration model aims to minimize the calculated energy storage capacity. This model constrains renewable energy output and grid transmission requirements. The theoretical wind power output limits the upper limit of wind power output in the energy storage optimization configuration model, and the theoretical photovoltaic output limits the upper limit of photovoltaic output in the same model.

[0008] The energy storage capacity of the first cycle is input into the pre-constructed intermediate variable transfer model to obtain the first transfer variable of the first cycle. The first transfer variable of the first cycle is then input into the pre-constructed energy storage optimization configuration model and the intermediate variable transfer model for iterative calculation until the first calculation requirement of the preset cycle is completed, thereby obtaining multiple energy storage capacities within the preset cycle. The intermediate variable transfer model is used to constrain the energy storage capacity and the unit operating status.

[0009] The maximum value among the multiple energy storage capacities is obtained to determine the target energy storage capacity. This target energy storage capacity and the target power load are then input into a pre-constructed energy storage configuration verification model and an intermediate variable transfer model for iterative calculation until the second calculation requirement of a preset period is met. This yields multiple renewable energy absorption amounts, actual wind power output, and actual photovoltaic output within the preset period. The objective function of the energy storage configuration verification model is to calculate the maximum value of renewable energy absorption. The energy storage configuration verification model also serves to constrain renewable energy output and grid transmission requirements.

[0010] Based on the multiple renewable energy consumption, actual wind power output, and actual photovoltaic output, the renewable energy utilization rate is determined. If the renewable energy utilization rate does not meet the set threshold, the energy storage capacity calibration value is obtained. The difference between the energy storage capacity calibration value and the target energy storage capacity is calculated to obtain a decreasing value. Based on the decreasing value, the calculation is performed again through a pre-constructed energy storage configuration verification model and an intermediate variable transfer model until the renewable energy utilization rate meets the set threshold. The target energy storage capacity is then output. The target energy storage capacity is the sum of the decreasing value and the energy storage capacity calibration value.

[0011] Optionally, the target energy storage capacity and the target power load are input into a pre-constructed energy storage configuration verification model and an intermediate variable transfer model for iterative calculation until the second calculation requirement of a preset period is completed, thereby obtaining multiple new energy consumption, actual wind power output, and actual photovoltaic output within the preset period, including:

[0012] The target energy storage capacity and the target power load are input into a pre-constructed energy storage configuration verification model to obtain the new energy consumption in the first cycle; the theoretical wind power output is also used to limit the upper limit of wind power output in the energy storage configuration verification model; the theoretical photovoltaic output is also used to limit the upper limit of photovoltaic output in the energy storage configuration verification model.

[0013] The renewable energy consumption of the first cycle is input into the pre-constructed intermediate variable transfer model to obtain the second transfer variable of the first cycle. The second transfer variable of the first cycle is then input into the pre-constructed energy storage configuration verification model and intermediate variable transfer model for iterative calculation until the second calculation requirement of the preset cycle is completed, and multiple renewable energy consumption, actual wind power output and actual photovoltaic output within the preset cycle are obtained.

[0014] Optionally, based on the multiple renewable energy consumption volumes, actual wind power output, and actual photovoltaic output, the renewable energy utilization rate is determined, including:

[0015] The sum of multiple renewable energy consumption amounts within the preset period is calculated to obtain the total renewable energy consumption. The sum of multiple actual wind power outputs and actual photovoltaic outputs within the preset period is calculated to obtain the total renewable energy output. The renewable energy utilization rate is calculated based on the total renewable energy consumption amount and the total renewable energy output.

[0016] Optionally, the new energy output includes actual wind power output and actual photovoltaic output; the construction process of the energy storage optimization configuration model includes:

[0017] The new energy power grid is divided into multiple zones, and a first constraint condition is set for the new energy output of each zone; the first constraint condition is that the actual wind power output of each zone is less than or equal to the theoretical wind power output, and the actual photovoltaic output of each zone is less than or equal to the theoretical photovoltaic output.

[0018] The following constraints are set: the second constraint on the output of thermal power units, the third constraint on the operating status of thermal power units, the fourth constraint on the operating status of pumped storage units, the fifth constraint on the power of pumped storage units, the sixth constraint on the storage capacity of pumped storage units, the seventh constraint on the charging and discharging power of lithium batteries, the eighth constraint on the depth of charging and discharging of lithium batteries, and the ninth constraint on the energy storage capacity of lithium batteries, thus forming the constraints for grid transmission requirements.

[0019] Based on the first constraint and the constraint of the power grid transmission requirements, an energy storage optimization configuration model is constructed.

[0020] The second constraint is used to constrain the optimized power of the thermal power unit; the third constraint is used to constrain the start-up and / or shutdown states of multiple units corresponding to the thermal power unit and the time of start-up and / or shutdown of multiple units; the fourth constraint is used to constrain the pumping or discharging state of the pumped storage unit; the fifth constraint is used to constrain the pumping power and discharging power of the pumped storage unit; the sixth constraint is used to constrain the capacity of the pumped storage unit reservoir; the seventh constraint is used to constrain the charging and discharging states of the lithium battery; the eighth constraint is used to constrain the remaining power of the lithium battery; and the ninth constraint is used to constrain the energy storage capacity of the lithium battery.

[0021] Optionally, the formula corresponding to the second constraint is:

[0022]

[0023]

[0024] in, This represents the upper limit of the output of the j-th unit in a thermal power unit; This represents the lower limit of the output of the j-th unit in a thermal power unit; This indicates the operating status of the j-th unit at time t in the s-th cycle of a thermal power unit; This represents the output of the j-th unit at time t in the s-th cycle of a thermal power unit; This represents the optimized power output of the j-th unit at time t in the s-th cycle of a thermal power unit.

[0025] The formula corresponding to the third constraint is:

[0026]

[0027] and,

[0028]

[0029]

[0030] in, This indicates the operating status of the j-th unit in the s-th cycle at time t, where 0 indicates that the unit has been shut down and 1 indicates that the unit is running. This indicates the startup status of the j-th unit in the s-th cycle at time t, where 0 indicates not in startup status and 1 indicates startup status. This indicates the shutdown status of the j-th unit in the s-th cycle at time t, where 0 indicates it is not in a shutdown state and 1 indicates it is in a shutdown state; t+k indicates time t+k, where k is the minimum time step for the unit to start or stop.

[0031] Optionally, the formula corresponding to the fourth constraint is:

[0032]

[0033] in, This indicates the pumping status of the j-th unit at time t in the s-th cycle of the pumped storage unit. This indicates the water release status of the j-th unit at time t in the s-th cycle of the pumped storage unit.

[0034] The formula corresponding to the fifth constraint is:

[0035]

[0036]

[0037] in, This represents the optimized power of the j-th unit at time t in the s-th cycle of the pumped storage unit. This represents the maximum pumping power of the j-th unit in the pumped storage unit; This represents the minimum pumping power of the j-th unit in a pumped storage unit; This represents the maximum water discharge capacity of the j-th pumped storage unit. This represents the minimum water discharge capacity of the j-th pumped storage unit.

[0038] The formula corresponding to the sixth constraint is:

[0039]

[0040] in, This represents the upper limit of the capacity of the j-th unit in a pumped storage hydroelectric power unit; This indicates the lower limit of the capacity of the j-th unit in a pumped storage system. This represents the initial capacity of the j-th pumped storage unit at time t in the s-th cycle.

[0041] Optionally, the formula corresponding to the seventh constraint is:

[0042]

[0043]

[0044]

[0045] in, This indicates the charging state of the battery pack at time t in the s-th cycle, where 0 indicates that it is not charging and 1 indicates that it is charging. This indicates the discharge state of the battery pack at time t in the s-th cycle, where 0 indicates that it is not in the discharge state and 1 indicates that it is in the discharge state. This represents the maximum charging power of the battery pack at time t; This represents the maximum discharge power of the battery pack at time t; This represents the charging and discharging power of the battery pack at time t in the s-th cycle;

[0046] The formula corresponding to the eighth constraint is:

[0047]

[0048] in, This indicates the minimum remaining charge of the battery pack; This indicates the maximum remaining battery capacity of the battery pack; This represents the remaining charge of the battery pack at time t. and Determined based on the application scenario;

[0049] The formula corresponding to the ninth constraint is:

[0050]

[0051] in, This represents the energy storage capacity of the battery pack in the s-th cycle; This indicates the minimum energy storage capacity corresponding to the battery pack; This indicates the maximum energy storage capacity of the battery pack.

[0052] Optionally, the first transitive variables include the optimized power of the thermal power unit, the operating status of the thermal power unit, the optimized power of the pumped storage unit, the operating status of the pumped storage unit, the initial storage capacity of the pumped storage unit, the charging and discharging power of the lithium battery, and the initial capacity of the lithium battery; the construction process of the intermediate variable transitive model includes:

[0053] The optimized power of the thermal power unit is set to meet a first preset condition, and the operating state of the thermal power unit is set to meet a second preset condition; the first preset condition is that the optimized power of the thermal power unit in the current cycle is consistent with the optimized power of the thermal power unit output to the next cycle; the second preset condition is that the operating state, shutdown state and start-up state of each unit in the thermal power unit in the current cycle are consistent with the operating state, shutdown state and start-up state output to the next cycle.

[0054] The optimal power of the pumped storage unit is set to meet a third preset condition, the operating state of the pumped storage unit is set to meet a fourth preset condition, and the initial reservoir capacity of the pumped storage unit is set to meet a fifth preset condition; the third preset condition is that the optimal power of the pumped storage unit in the current cycle is consistent with the optimal power output to the pumped storage unit in the next cycle; the fourth preset condition is that the pumping and discharging states of the pumped storage unit in the current cycle are consistent with the pumping and discharging states output to the pumped storage unit in the next cycle; the fifth preset condition is that the initial reservoir capacity of the pumped storage unit in the current cycle is consistent with the initial reservoir capacity output to the pumped storage unit in the next cycle.

[0055] The charging and discharging power of the lithium battery is set to meet a sixth preset condition, and the initial capacity of the lithium battery is set to meet a seventh preset condition; the sixth preset condition is that the charging and discharging power of the lithium battery in the current cycle is consistent with the charging and discharging power of the lithium battery output to the next cycle; the seventh preset condition is that the energy storage capacity of the lithium battery in the current cycle is consistent with the energy storage capacity of the lithium battery output to the next cycle.

[0056] An intermediate variable transfer model is constructed based on the first preset condition, the second preset condition, the third preset condition, the fourth preset condition, the fifth preset condition, the sixth preset condition, and the seventh preset condition.

[0057] Optionally, the method further includes:

[0058] When it is determined that the utilization rate of the new energy source meets the set threshold, the target energy storage capacity is output.

[0059] Secondly, this application also provides a new energy transmission and energy storage capacity decreasing configuration device, the device comprising:

[0060] The acquisition module is used to acquire the input target renewable energy utilization rate index, wind power theoretical output, photovoltaic theoretical output, and target power load. The target renewable energy utilization rate index and the target power load are input into a pre-constructed energy storage optimization configuration model to obtain the energy storage capacity for the first cycle. The target power load is the sum of the total unit power, renewable energy output, and charging / discharging power. The objective function of the energy storage optimization configuration model aims to minimize the calculated energy storage capacity. The energy storage optimization configuration model is used to constrain renewable energy output and grid transmission requirements. The wind power theoretical output is used to limit the upper limit of wind power output in the energy storage optimization configuration model; the photovoltaic theoretical output is used to limit the upper limit of photovoltaic output in the energy storage optimization configuration model.

[0061] The input module is used to input the energy storage capacity of the first cycle into a pre-constructed intermediate variable transfer model to obtain the first transfer variable of the first cycle, and input the first transfer variable of the first cycle into a pre-constructed energy storage optimization configuration model and a pre-constructed intermediate variable transfer model for iterative calculation until the first calculation requirement of the preset cycle is completed, so as to obtain multiple energy storage capacities within the preset cycle; the intermediate variable transfer model is used to constrain the energy storage capacity and the unit operating status.

[0062] The calculation module is used to obtain the maximum value among the multiple energy storage capacities to obtain the target energy storage capacity. It then inputs the target energy storage capacity and the target power load into a pre-constructed energy storage configuration verification model and intermediate variable transfer model for iterative calculation until the second calculation requirement of a preset period is met, obtaining multiple new energy consumption amounts, actual wind power output, and actual photovoltaic output within the preset period. The objective function of the energy storage configuration verification model is to calculate the maximum value of new energy consumption. The energy storage configuration verification model is also used to constrain new energy output and grid transmission requirements.

[0063] The decrement module is used to determine the renewable energy utilization rate based on the multiple renewable energy absorption volumes, actual wind power output, and actual photovoltaic output. After determining that the renewable energy utilization rate does not meet the set threshold, it obtains the energy storage capacity calibration value, calculates the difference between the energy storage capacity calibration value and the target energy storage capacity to obtain the decrement value, and iterates again based on the decrement value input into the pre-constructed energy storage configuration verification model and intermediate variable transfer model until the obtained renewable energy utilization rate meets the set threshold, and outputs the target energy storage capacity; the target energy storage capacity is the sum of the decrement value and the energy storage capacity calibration value.

[0064] Thirdly, this application provides an electronic device, including: a processor, and a memory communicatively connected to the processor;

[0065] The memory stores computer-executed instructions;

[0066] The processor executes computer execution instructions stored in the memory to implement the method as described in any one of the first aspects.

[0067] Fourthly, this application provides a computer-readable storage medium storing computer-executable instructions that, when executed by a processor, are used to implement the method as described in any one of the first aspects.

[0068] In summary, this application provides a method, apparatus, equipment, and medium for decremental configuration of energy storage capacity for new energy transmission. It utilizes a pre-constructed energy storage optimization configuration model that includes physical constraints on multiple generating units and an intermediate variable transfer model. Under the constraint of determining the new energy utilization rate, it optimizes and calculates the minimum energy storage capacity in each calculation cycle. Furthermore, it selects the maximum energy storage capacity in each calculation cycle as the initial value and uses an energy storage configuration verification model and an intermediate variable transfer model to calculate and verify whether the new energy utilization rate meets a set threshold. Further, through iterative optimization, it obtains the most economical energy storage capacity that meets the new energy utilization rate index. The energy storage optimization configuration model aims to calculate the minimum energy storage capacity; the energy storage configuration verification model aims to calculate the maximum new energy consumption; and the intermediate variable transfer model ensures the continuity of operation of multiple generating units across cycles. Thus, this application's method for optimizing energy storage capacity through three models not only ensures that the model operation results are more consistent with actual conditions but also optimizes and calculates a more reasonable energy storage capacity, significantly improving the efficiency and accuracy of planned configuration capacity. Attached Figure Description

[0069] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application.

[0070] Figure 1 This is a schematic diagram of an application scenario provided by an embodiment of this application;

[0071] Figure 2 A flowchart illustrating a method for configuring energy storage capacity in a decreasing manner for transmitting new energy to other regions, provided in an embodiment of this application;

[0072] Figure 3 A flowchart illustrating a specific method for configuring energy storage capacity for new energy transmission in a decreasing manner, as provided in an embodiment of this application;

[0073] Figure 4 A schematic diagram of a new energy transmission and energy storage capacity decreasing configuration device provided in this application embodiment;

[0074] Figure 5 This is a schematic diagram of the structure of an electronic device provided in an embodiment of this application.

[0075] The accompanying drawings illustrate specific embodiments of this application, which will be described in more detail below. These drawings and descriptions are not intended to limit the scope of the concept in any way, but rather to illustrate the concept of this application to those skilled in the art through reference to particular embodiments. Detailed Implementation

[0076] To facilitate a clear description of the technical solutions in the embodiments of this application, the terms "first" and "second" are used in the embodiments of this application to distinguish identical or similar items with essentially the same function and purpose. For example, "first device" and "second device" are merely used to distinguish different devices and do not limit their order of execution. Those skilled in the art will understand that the terms "first" and "second" do not limit the quantity or execution order, and that "first" and "second" do not necessarily imply that they are different.

[0077] It should be noted that, in this application, the terms "exemplary" or "for example" are used to indicate that something is being described as an example, illustration, or illustration. Any embodiment or design described as "exemplary" or "for example" in this application should not be construed as being more preferred or advantageous than other embodiments or design solutions. Specifically, the use of terms such as "exemplary" or "for example" is intended to present the relevant concepts in a concrete manner.

[0078] In this application, "at least one" means one or more, and "more than one" means two or more. "And / or" describes the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can mean: A alone, A and B simultaneously, or B alone, where A and B can be singular or plural. The character " / " generally indicates that the preceding and following related objects are in an "or" relationship. "At least one of the following" or similar expressions refer to any combination of these items, including any combination of single or plural items. For example, at least one of a, b, or c can mean: a, b, c, ab, ac, bc, or abc, where a, b, and c can be single or multiple.

[0079] New energy sources are currently the main driving force of the power industry, possessing multiple advantages such as environmental protection and renewability. However, new energy also brings significant challenges, such as insufficient controllability, high volatility, and limited regulation capabilities. Effective planning of new energy storage capacity can enable unstable and highly volatile new energy sources to respond quickly and stably to fluctuations in electricity demand, reducing unnecessary risks. Therefore, more refined energy storage capacity configuration can reduce the cost of energy storage systems, improve resource utilization, fully realize the potential of renewable energy, and enhance the economic efficiency of the power system.

[0080] However, the configuration and planning of energy storage systems is a complex engineering problem, facing challenges such as numerous influencing factors and large amounts of data. This poses a significant challenge to the system's computing resources, planning efficiency, and effectiveness. Therefore, there is an urgent need to develop an efficient computing method to ensure that the utilization efficiency of new energy sources is maximized and the cost of energy storage planning is reduced.

[0081] One possible implementation involves configuring the energy storage system by constructing a calculation method to improve the efficiency of energy storage capacity planning for large-scale new energy transmission. This calculation method is typically based on historical power system operating data to predict and plan the capacity.

[0082] However, due to the random fluctuations in new energy sources, in order to ensure that the calculation results are more consistent with the actual situation and obtain more reasonable and effective results, the above method requires data analysis and calculation over a long period of time, resulting in a long solution time and a significant reduction in the efficiency of energy storage planning.

[0083] Understandably, long-term data analysis and computation can lead to a significant decrease in the efficiency of model planning.

[0084] To address the aforementioned issues, this application provides a decreasing energy storage capacity configuration method for new energy transmission. This method is based on a decreasing hourly iterative calculation method for energy storage capacity planning efficiency. Specifically, by pre-constructing an energy storage optimization configuration model that includes physical constraints on multiple units and an intermediate variable transfer model, the minimum energy storage capacity in each calculation cycle is obtained under the constraint of determining the new energy utilization rate. Furthermore, the maximum energy storage capacity in each calculation cycle is selected as the initial value, and the new energy utilization rate is calculated and verified using an energy storage configuration verification model and an intermediate variable transfer model to determine whether the new energy utilization rate meets the set requirements. Furthermore, the most economical energy storage capacity that meets the new energy utilization rate index is obtained through continuous iterative optimization calculations. Among them, the energy storage optimization configuration model aims to calculate the minimum energy storage capacity; the energy storage configuration verification model aims to calculate the maximum new energy consumption. By setting intermediate variable transfer models, the continuity of operation of multiple units across cycles can be guaranteed. Thus, this application uses three models to design and optimize the energy storage capacity. While ensuring that the model operation results are more in line with the actual situation, it can optimize and calculate a more reasonable energy storage capacity, and significantly improve the efficiency and accuracy of the planned configuration capacity.

[0085] For example, Figure 1 This is a schematic diagram of an application scenario provided in an embodiment of this application, such as... Figure 1 As shown, this application scenario can be applied to the planning of energy storage capacity for large-scale renewable energy transmission. This application scenario includes: user terminal equipment 101 and data processing system 102. The data processing system 102 deploys a pre-built energy storage optimization configuration model, an intermediate variable transfer model, and an energy storage configuration verification model. The energy storage optimization configuration model is used to constrain renewable energy output and grid transmission requirements, with the goal of minimizing energy storage capacity. The intermediate variable transfer model is used to constrain energy storage capacity and unit operating status. The energy storage configuration verification model is also used to constrain renewable energy output and grid transmission requirements, but with the goal of maximizing renewable energy consumption.

[0086] Specifically, taking the construction of an energy storage optimization configuration model that includes hourly optimization of physical constraints such as thermal power units, pumped storage units, and lithium batteries as an example, the user's terminal device 101 can input a new energy utilization rate index. Further, after receiving the new energy utilization rate index, the data processing system 102 inputs the new energy utilization rate index into the energy storage optimization configuration model and the intermediate variable model to optimize and calculate the minimum lithium battery energy storage capacity for each calculation cycle throughout the year. Further, the maximum energy storage capacity in each calculation cycle is selected as the target energy storage capacity, and the target energy storage capacity is input into the hourly optimized energy storage configuration verification model and the intermediate variable model to calculate and verify whether the annual new energy utilization rate meets the new energy consumption rate requirement, that is, to set a threshold, and then continuously iterate and optimize to calculate the most economical energy storage capacity that meets the new energy utilization rate index.

[0087] The process involves inputting the renewable energy utilization rate index into the energy storage optimization configuration model to obtain the energy storage capacity for the first week. This first week's capacity is then input into the intermediate variable transfer model to obtain the first transfer variable for the first week. This first transfer variable is further input into both the energy storage optimization configuration model and the intermediate variable transfer model to obtain the first transfer variable for the second week, and so on, iteratively calculating and repeating the calculation until the entire year's calculation is completed, resulting in multiple energy storage capacities for the year. The maximum value among these multiple energy storage capacities is selected as the target energy storage capacity. The target energy storage capacity is then input into the energy storage configuration verification model and the intermediate variable transfer model for iterative calculation until the entire year's calculation is completed. The calculated renewable energy utilization rate is then verified to be greater than or equal to a set threshold. If so, a certain amount of energy storage capacity is reduced, and iterative calculation continues until the calculated renewable energy utilization rate meets the set threshold (i.e., is less than the set threshold). Finally, the target energy storage capacity that meets the set threshold is output; this target energy storage capacity is the most economical energy storage capacity.

[0088] Among them, the new energy utilization rate indicator is the new energy utilization rate that meets the application scenarios and user needs, and is used to determine the target energy storage capacity to be output; the set threshold is a pre-set value used to constrain the total new energy consumption of the base energy storage system.

[0089] It should be noted that the embodiments of this application do not specifically limit the period for each calculation of energy storage capacity and the first transfer variable. It can be one week, two weeks or one month. Optionally, the preset period for iterative calculation can be one year, one quarter or two years, etc. The embodiments of this application do not specifically limit the preset period. The above is just an example.

[0090] Optionally, after the data processing system 102 outputs the target energy storage capacity, it can be sent to the user's terminal device 101 for visual display.

[0091] Optionally, the aforementioned terminal devices can be various electronic devices with a display screen and support web browsing. Terminal devices can also be referred to as terminals, user equipment (UE), mobile stations (MS), mobile terminals (MT), etc. Terminal devices can include mobile phones, smart TVs, wearable devices, smart speakers, smart security devices, smart gateways, tablets, computers with wireless transceiver capabilities, virtual reality (VR) terminal devices, augmented reality (AR) terminal devices, wireless terminals in industrial control, wireless terminals in self-driving, wireless terminals in remote medical surgery, wireless terminals in smart grids, wireless terminals in transportation safety, wireless terminals in smart cities, and wireless terminals in smart homes. These terminal devices include, but are not limited to, smartphones, tablets, laptops, and desktop computers.

[0092] The technical solution of this application and how the technical solution of this application solves the above-mentioned technical problems are described in detail below with specific embodiments. These specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described again in some embodiments. The embodiments of this application will now be described with reference to the accompanying drawings.

[0093] Figure 2 This is a flowchart illustrating a method for configuring energy storage capacity in a decreasing manner for new energy transmission, as provided in an embodiment of this application. Figure 2 As shown, the execution entity of the new energy transmission and energy storage capacity reduction configuration method is a data processing system, and the new energy transmission and energy storage capacity reduction configuration method includes the following steps:

[0094] S201. Obtain the target renewable energy utilization rate index, theoretical wind power output, theoretical photovoltaic output, and target power load. Input the target renewable energy utilization rate index and the target power load into the pre-constructed energy storage optimization configuration model to obtain the energy storage capacity for the first cycle. The target power load is the sum of the total power of the unit, renewable energy output, and charging / discharging power. The objective function of the energy storage optimization configuration model aims to minimize the calculated energy storage capacity. The energy storage optimization configuration model is used to constrain renewable energy output and grid transmission requirements. The theoretical wind power output is used to limit the upper limit of wind power output in the energy storage optimization configuration model. The theoretical photovoltaic output is used to limit the upper limit of photovoltaic output in the energy storage optimization configuration model.

[0095] In this embodiment of the application, the objective function of the energy storage optimization configuration model aims to minimize the total planned capacity of the lithium battery. Therefore, the corresponding formula is:

[0096]

[0097] in, Indicates the energy storage capacity of the lithium battery; This represents the total planned capacity of the lithium battery, i.e., the objective function.

[0098] In this step, the data processing system can obtain the target renewable energy utilization rate index input by the user, as well as the theoretical wind power output input by the user. This serves as the upper limit of wind power output per hour in the energy storage optimization configuration model; and it also serves as the theoretical photovoltaic output obtained from user input. This serves as the upper limit for the hourly photovoltaic output in the energy storage optimization configuration model; furthermore, the target power load also needs to be set. As the hourly load required in the energy storage optimization configuration model, the above data is further input into the energy storage optimization configuration model, and the data of the first cycle is simulated and calculated using a computer to ensure that the output of each unit is within the constraint range, and the planned minimum energy storage capacity for the first cycle is calculated; the formula corresponding to the target power load is:

[0099]

[0100] in, This represents the total power of the units in the nth partition at time t of the sth period, which is the sum of the total power of all conventional units; This represents the target power load of the nth partition at time t in the s-th period; This represents the charging and discharging power of the nth partition at time t in the s-th period; This represents the new energy output of the nth partition at time t in the sth period; t takes values ​​from 1 to 168, which corresponds to one week; the period refers to one week, or it can refer to other predefined periods, and this application does not specifically limit it.

[0101] Optionally, the target renewable energy utilization rate indicator is pre-set and can be set using the following formula, which constrains the weekly renewable energy consumption rate:

[0102]

[0103] This represents the total amount of new energy consumed by the base's energy storage system each week, which is the sum of the new energy output each week. This represents the theoretical new energy output of the nth partition at time t; This indicates the target new energy utilization rate indicator set.

[0104] Thus, based on the above formula, taking one year as an example, the minimum energy storage capacity for 52 weeks can be calculated. It should be noted that all conventional units can refer to thermal power units, pumped storage units, and units in lithium batteries; zoning refers to dividing the power grid into multiple regions according to predefined rules; the predefined rules can refer to differences in regional location, electricity demand, etc., and this application embodiment does not specifically limit these differences.

[0105] Optionally, considering the power transmission between zones, the power load balancing must be done on a zone-by-zone basis. The balancing equation is given by the following formula:

[0106]

[0107] in, Let represent the transmission capacity, i.e., the transmission power, of the i-th transmission line in the n-th partition and the s-th period; while the transmission capacity constraint between regions is expressed by the following formula:

[0108]

[0109] This represents the lower limit of the transmission power of the i-th transmission line; This represents the upper limit of the transmission power of the i-th transmission line; This represents the transmission power of the i-th transmission line. When transmitting power to the outside, it is considered a load, and when transmitting power inward, it is considered a generator.

[0110] Therefore, the energy storage optimization configuration model must satisfy the load curve constraint, that is, the power generated by the clean energy base + the grid-connected power = the channel load curve; where the grid-connected power is a positive number; the grid-connected power is the transmission power transmitted between multiple zones.

[0111] S202. Input the energy storage capacity of the first cycle into the pre-constructed intermediate variable transfer model to obtain the first transfer variable of the first cycle. Then, input the first transfer variable of the first cycle into the pre-constructed energy storage optimization configuration model and the intermediate variable transfer model for iterative calculation until the first calculation requirement of the preset cycle is completed, and obtain multiple energy storage capacities within the preset cycle. The intermediate variable transfer model is used to constrain the energy storage capacity and the unit operating status.

[0112] In this embodiment of the application, the first transmitted variable includes the optimized power of the thermal power unit, the operating status of the thermal power unit, the optimized power of the pumped storage unit, the operating status of the pumped storage unit, the initial reservoir capacity of the pumped storage unit, the charging and discharging power of the lithium battery, and the initial capacity of the lithium battery; the optimized power may refer to the power that can be adjusted and optimized relative to the actual transmission power; the operating status may include the shutdown state, the running state, the non-starting state, the starting state, the shutdown state, and the shutdown state.

[0113] The preset period is a pre-set time period used to calculate energy storage capacity to meet the needs of the scenario. This application embodiment does not limit the specific value corresponding to the preset period, such as one year; the first period can refer to a week, and the first week, or it can refer to the first period of a preset time period, such as the first month, etc. This application embodiment does not specifically limit this.

[0114] In this step, the energy storage capacity of the first cycle is input into the pre-constructed intermediate variable transfer model. The computer is used to extract data variables such as the operating status and energy storage capacity that need to be transferred. Through the transfer of the first transfer variable, the continuity of the unit's operation throughout the year is ensured. Correspondingly, the first transfer variable can also be stored for output.

[0115] Furthermore, the first transmitted variable stored is combined with the previously known parameter constraints, namely the theoretical output of wind power, the theoretical output of photovoltaic power, and the target power load, and then input into the energy storage optimization configuration model again to perform a new cycle of simulation calculation. The computer is used to repeat S202 for iterative calculation until the first calculation requirement of the preset cycle is completed, such as the data simulation calculation requirement for the whole year, and then the minimum energy storage capacity for each cycle of the year is obtained.

[0116] S203. Obtain the maximum value among the multiple energy storage capacities to obtain the target energy storage capacity. Then, input the target energy storage capacity and the target power load into the pre-constructed energy storage configuration verification model and intermediate variable transfer model for iterative calculation until the second calculation requirement of the preset period is completed, and obtain multiple new energy consumption, actual wind power output and actual photovoltaic output within the preset period. The objective function of the energy storage configuration verification model is to calculate the maximum value of new energy consumption. The energy storage configuration verification model is also used to constrain the new energy output and grid transmission requirements.

[0117] In this embodiment of the application, the objective function of the energy storage configuration verification model aims to maximize the absorption of new energy sources, and the corresponding formula is:

[0118]

[0119]

[0120] in, Represent the objective function; This represents the total grid-connected power of new energy sources in each cycle, i.e., the total power of the power grid. This represents the new energy output of the nth partition at time t in the sth period; t takes values ​​from 1 to 168, which corresponds to one week; the period refers to one week, or it can refer to other predefined periods, and this application does not specifically limit it.

[0121] It should be noted that the constraints corresponding to the energy storage configuration verification model include constraints on load curves, new energy output, thermal power units, pumped storage units, lithium battery energy storage, and new energy output, which are the same as those on the energy storage optimization configuration model. The following embodiments only describe the constraints of the energy storage optimization configuration model and do not describe the constraints of the energy storage configuration verification model. For details, please refer to the description of the energy storage optimization configuration model. The only difference between the two is the objective function.

[0122] In this step, the maximum value of the minimum energy storage capacity within a preset period is extracted by computer for verification, i.e.:

[0123]

[0124] in, Indicates the target energy storage capacity. This indicates multiple energy storage capacities within a preset period. In this application, we take a preset period of one year as an example. A year has 52 weeks, so there are 52 energy storage capacities within the preset period.

[0125] Furthermore, the target energy storage capacity is input as a known quantity into the energy storage configuration verification model, serving as the initial value of the energy storage capacity for the model. At the same time, new energy utilization rate indicators were set. This serves as a condition for determining whether the process should continue in a loop calculation; among which, a new energy utilization rate indicator can be set using the following formula:

[0126]

[0127] This represents the total renewable energy consumption of the base's energy storage system, which is the sum of renewable energy output. This represents the theoretical new energy output of the nth partition at time t in the s-th period; This indicates a reset of the new energy utilization rate indicator, i.e., a threshold value, used to constrain the total new energy consumption of the base's energy storage system. Taking one year as an example, it means constraining the new energy utilization rate indicator for the whole year.

[0128] Furthermore, the target energy storage capacity and target power load are input into the pre-constructed energy storage configuration verification model and intermediate variable transfer model, and iterative calculations are performed using a computer until the second calculation requirement of the preset cycle is completed, such as the data simulation calculation requirement for the whole year, thereby obtaining data such as the amount of new energy consumption, actual wind power output, and actual photovoltaic output for each cycle of the year.

[0129] S204. Based on the multiple renewable energy consumption, actual wind power output, and actual photovoltaic output, determine the renewable energy utilization rate. If the renewable energy utilization rate does not meet the set threshold, obtain the energy storage capacity calibration value, calculate the difference between the energy storage capacity calibration value and the target energy storage capacity to obtain a decreasing value, and perform iterative calculation again based on the decreasing value through a pre-constructed energy storage configuration verification model and intermediate variable transfer model until the obtained renewable energy utilization rate meets the set threshold, and output the target energy storage capacity; the target energy storage capacity is the sum of the decreasing value and the energy storage capacity calibration value.

[0130] In this embodiment of the application, the energy storage capacity calibration value is a certain amount of energy storage capacity. The specific value corresponding to the energy storage capacity calibration value is preset in advance, and this embodiment of the application does not make specific limitations on it.

[0131] In this step, based on the renewable energy consumption for each cycle throughout the year, the annual renewable energy consumption is calculated. Simultaneously, based on the actual wind power output and actual photovoltaic power output for the year, the total theoretical renewable energy output for the year is calculated. Furthermore, based on the total annual renewable energy consumption and the total theoretical renewable energy output for the year, the annual renewable energy utilization rate, i.e., the renewable energy utilization rate, is calculated. , This is the utilization rate of new energy sources calculated iteratively hourly.

[0132] Furthermore, the utilization rate of new energy sources is verified, that is, it is checked whether the utilization rate of new energy sources meets the set threshold. If the conditions are not met, that is Then obtain the energy storage capacity calibration value. .

[0133] In this step, the currently planned energy storage capacity will be... Based on this, reduce a certain amount of energy storage capacity calibration value This yields a decreasing value, i.e. For example, when reducing the energy storage capacity calibration value by a certain amount for the first time, the reduction value is the difference between the target energy storage capacity and the energy storage capacity calibration value, i.e. Furthermore, The newly set energy storage capacity is input again into S203, and S203 is repeated to continue the iterative verification until the condition is met. This means that if the new energy utilization rate meets the set threshold, the target energy storage capacity will be output, which is the energy storage capacity planned in the previous test. The cycle ends, and the target energy storage capacity can be understood as the sum of the decreasing value and the energy storage capacity calibration value.

[0134] Therefore, this application embodiment plans the lithium battery energy storage capacity based on the new energy consumption given by the upper layer, and iteratively verifies the planned energy storage capacity based on the lower layer, so as to obtain the most economical energy storage capacity that meets the set threshold, which greatly improves the efficiency of planning and makes the energy storage capacity configuration planning more reasonable. The new energy transmission energy storage capacity decreasing configuration method based on three models can reduce investment and make the data more accurate.

[0135] Optionally, the target energy storage capacity and the target power load are input into a pre-constructed energy storage configuration verification model and an intermediate variable transfer model for iterative calculation until the second calculation requirement of a preset period is completed, thereby obtaining multiple new energy consumption, actual wind power output, and actual photovoltaic output within the preset period, including:

[0136] The target energy storage capacity and the target power load are input into a pre-constructed energy storage configuration verification model to obtain the new energy consumption in the first cycle; the theoretical wind power output is also used to limit the upper limit of wind power output in the energy storage configuration verification model; the theoretical photovoltaic output is also used to limit the upper limit of photovoltaic output in the energy storage configuration verification model.

[0137] The renewable energy consumption of the first cycle is input into the pre-constructed intermediate variable transfer model to obtain the second transfer variable of the first cycle. The second transfer variable of the first cycle is then input into the pre-constructed energy storage configuration verification model and intermediate variable transfer model for iterative calculation until the second calculation requirement of the preset cycle is completed, and multiple renewable energy consumption, actual wind power output and actual photovoltaic output within the preset cycle are obtained.

[0138] In this step, the data processing system can determine the target energy storage capacity and the theoretical wind power output input by the user. This serves as the upper limit of wind power output per hour in the energy storage optimization configuration model; and the theoretical photovoltaic output input by the user. This serves as the upper limit for the hourly output of photovoltaic power in the energy storage optimization configuration model; there is also a pre-set target power load. As the hourly load required in the energy storage optimization configuration model, the above data are input into the energy storage configuration verification model. The computer is used to simulate and calculate the data of the first cycle to ensure that the output of each unit is within the constraint range and to calculate the new energy consumption of the first cycle.

[0139] Furthermore, the renewable energy consumption of the first cycle is input into the intermediate variable transfer model. The computer is used to extract data variables such as the operating status and energy storage capacity that need to be transferred to obtain the second transfer variable. The continuity of the unit's operation throughout the year is ensured through the transfer of the second transfer variable. Correspondingly, the second transfer variable can also be stored for output.

[0140] Furthermore, the stored second transfer variable is input into the energy storage configuration verification model. Combined with the previously known parameter constraints, the computer is used to repeat the above steps for iterative calculation until the second calculation requirement of the preset period is completed, such as the data simulation calculation for the whole year, so as to obtain data such as the amount of new energy consumption, the actual output of wind power and the actual output of photovoltaic power for each period of the year.

[0141] It should be noted that the second passed variable has the same content as the first passed variable, which will not be repeated here.

[0142] Therefore, in this embodiment of the application, the energy storage configuration verification model aims to maximize the amount of new energy consumption and performs hourly simulation and iterative verification of the energy storage configuration capacity to obtain the amount of new energy consumption that meets the new energy utilization rate index, so that the energy storage capacity configuration planning is more reasonable.

[0143] Optionally, based on the multiple renewable energy consumption volumes, actual wind power output, and actual photovoltaic output, the renewable energy utilization rate is determined, including:

[0144] The sum of multiple renewable energy consumption amounts within the preset period is calculated to obtain the total renewable energy consumption. The sum of multiple actual wind power outputs and actual photovoltaic outputs within the preset period is calculated to obtain the total renewable energy output. The renewable energy utilization rate is calculated based on the total renewable energy consumption amount and the total renewable energy output.

[0145] In this step, the sum of multiple renewable energy consumption amounts within a preset period is calculated, and the formula corresponding to the total renewable energy consumption amount is as follows:

[0146]

[0147] in, This represents the total amount of new energy consumption. Further, by calculating the sum of the actual output of wind power and photovoltaic power over a preset period, the formula corresponding to the total new energy output is obtained as follows:

[0148]

[0149]

[0150] in, This represents the total output of new energy sources. This represents the actual renewable energy output of the nth partition at time t in the s-th period. This represents the actual wind power output at time t in the nth partition of the s-th period; This represents the actual photovoltaic output at time t in the nth partition during the sth period.

[0151] Furthermore, based on the total amount of new energy consumption and the total output of new energy, the formula corresponding to the new energy utilization rate is calculated as follows:

[0152]

[0153] Therefore, the embodiments of this application can calculate the utilization rate of new energy sources iteratively on an hourly basis, making the calculation results more consistent with the actual situation and thus improving the accuracy of the calculation.

[0154] Optionally, the new energy output includes actual wind power output and actual photovoltaic output; the construction process of the energy storage optimization configuration model includes:

[0155] The new energy power grid is divided into multiple zones, and a first constraint condition is set for the new energy output of each zone; the first constraint condition is that the actual wind power output of each zone is less than or equal to the theoretical wind power output, and the actual photovoltaic output of each zone is less than or equal to the theoretical photovoltaic output.

[0156] The following constraints are set: the second constraint on the output of thermal power units, the third constraint on the operating status of thermal power units, the fourth constraint on the operating status of pumped storage units, the fifth constraint on the power of pumped storage units, the sixth constraint on the storage capacity of pumped storage units, the seventh constraint on the charging and discharging power of lithium batteries, the eighth constraint on the depth of charging and discharging of lithium batteries, and the ninth constraint on the energy storage capacity of lithium batteries, thus forming the constraints for grid transmission requirements.

[0157] Based on the first constraint and the constraint of the power grid transmission requirements, an energy storage optimization configuration model is constructed.

[0158] The second constraint is used to constrain the optimized power of the thermal power unit; the third constraint is used to constrain the start-up and / or shutdown states of multiple units corresponding to the thermal power unit and the time of start-up and / or shutdown of multiple units; the fourth constraint is used to constrain the pumping or discharging state of the pumped storage unit; the fifth constraint is used to constrain the pumping power and discharging power of the pumped storage unit; the sixth constraint is used to constrain the capacity of the pumped storage unit reservoir; the seventh constraint is used to constrain the charging and discharging states of the lithium battery; the eighth constraint is used to constrain the remaining power of the lithium battery; and the ninth constraint is used to constrain the energy storage capacity of the lithium battery.

[0159] In this embodiment of the application, based on the known premise that the actual output of new energy is less than or equal to the theoretical output curve, the output of new energy is constrained, i.e.

[0160]

[0161]

[0162] in, This represents the actual wind power output at time t in the nth partition of the s-th period. This represents the actual photovoltaic output of the nth partition at time t in the s-th period; This represents the theoretical wind power output of the nth partition at time t in the s-th period. This represents the theoretical photovoltaic output at time t in the s-th period of the n-th partition. It should be noted that the theoretical output of wind power and the theoretical output of photovoltaic power are known values, and the specific values ​​corresponding to them are not limited in the embodiments of this application.

[0163] In this step, the output of thermal power units is constrained, that is, the optimized power of thermal power units is constrained; this is done using the specific expression for the total power of conventional units: The expression for optimizing power can be derived as follows: Furthermore, constraints are imposed on the upper and lower limits of the optimized power, which correspond to the second constraint condition.

[0164] Optionally, the formula corresponding to the second constraint is:

[0165]

[0166]

[0167] in, This represents the upper limit of the output of the j-th unit in a thermal power unit; This represents the lower limit of the output of the j-th unit in a thermal power unit; This indicates the operating status of the j-th unit at time t in the s-th cycle of a thermal power unit; This represents the output of the j-th unit at time t in the s-th cycle of a thermal power unit; This represents the optimized power of the j-th unit at time t in the s-th cycle of a thermal power unit.

[0168] The logic for the start-up and shutdown status of thermal power units and the minimum start-up and shutdown time of thermal power units are constrained, which corresponds to the third constraint condition; the formula for the third constraint condition is:

[0169]

[0170] and,

[0171]

[0172]

[0173] in, This indicates the operating status of the j-th unit in the s-th cycle at time t, where 0 indicates that the unit has been shut down and 1 indicates that the unit is running. This indicates the startup status of the j-th unit in the s-th cycle at time t, where 0 indicates not in startup status and 1 indicates startup status. This indicates the shutdown status of the j-th unit in the s-th cycle at time t, where 0 indicates not in shutdown status and 1 indicates in shutdown status; t+k indicates time t+k, where k is the minimum time step for unit startup or shutdown, and k is a preset value. In this application embodiment, the specific value corresponding to k is not limited.

[0174] Therefore, by constraining the optimized power of thermal power units, the start-up and / or stop states of multiple units corresponding to the thermal power units, and the time of multiple units in the start-up and / or stop states, the energy storage optimization configuration model can better optimize the energy storage capacity and make the planning more reasonable, so as to achieve the desired effect.

[0175] Furthermore, in order to meet the power grid transmission requirements, this application also needs to impose constraints on the pumped storage units, namely, on the pumping or releasing state of the pumped storage units, the pumping power and releasing power of the pumped storage units, and the capacity of the pumped storage unit reservoir.

[0176] Specifically, the pumping or releasing state of the pumped storage unit is constrained, that is, the logical state of pumping and releasing water is constrained, which corresponds to the fourth constraint condition.

[0177] Optionally, the formula corresponding to the fourth constraint is:

[0178]

[0179] in, This indicates the pumping status of the j-th unit at time t in the s-th cycle of the pumped storage unit. This indicates the water release status of the j-th unit at time t in the s-th cycle of the pumped storage unit.

[0180] The pumping power and discharge power of the pumped storage unit are constrained, which corresponds to the fifth constraint condition.

[0181] Optionally, the formula corresponding to the fifth constraint is:

[0182]

[0183]

[0184] in, This represents the optimized power of the j-th unit at time t in the s-th cycle of the pumped storage unit. This represents the maximum pumping power of the j-th unit in the pumped storage unit; This represents the minimum pumping power of the j-th unit in a pumped storage unit; This represents the maximum water discharge capacity of the j-th pumped storage unit. This represents the minimum water discharge capacity of the j-th pumped storage unit.

[0185] It should be noted that the maximum pumping power, minimum pumping power, maximum discharge power, and minimum discharge power are preset values ​​that conform to the actual application scenario, and the specific values ​​corresponding to them are not limited in the embodiments of this application.

[0186] The capacity of the pumped storage unit reservoir is constrained, which corresponds to the sixth constraint condition.

[0187] Optionally, the formula corresponding to the sixth constraint is:

[0188]

[0189] in, This represents the upper limit of the capacity of the j-th unit in a pumped storage hydroelectric power unit; This indicates the lower limit of the capacity of the j-th unit in a pumped storage system. This represents the initial capacity of the j-th pumped storage unit at time t in the s-th cycle.

[0190] It should be noted that the upper and lower capacity limits are preset values ​​that conform to actual application scenarios, and the specific values ​​corresponding to them are not limited in this application embodiment.

[0191] Therefore, by constraining the pumping and releasing states, pumping power, releasing power, and reservoir capacity of the pumped storage unit, the embodiments of this application can enable the energy storage optimization configuration model to better optimize the energy storage capacity and make the planning more reasonable, so as to achieve the desired effect.

[0192] Furthermore, in order to meet the requirements of power grid transmission, the embodiments of this application also need to impose energy storage constraints on the lithium battery, that is, to constrain the charging state, discharging state, remaining power of the lithium battery, and energy storage capacity of the lithium battery.

[0193] Specifically, constraints are imposed on the charging and discharging states of the lithium battery, that is, on the charging and discharging power of the lithium battery, which corresponds to the seventh constraint condition.

[0194] Optionally, the formula corresponding to the seventh constraint is:

[0195]

[0196]

[0197]

[0198] in, This indicates the charging state of the battery pack at time t in the s-th cycle, where 0 indicates that it is not charging and 1 indicates that it is charging. This indicates the discharge state of the battery pack at time t in the s-th cycle, where 0 indicates that it is not in the discharge state and 1 indicates that it is in the discharge state. This represents the maximum charging power of the battery pack at time t; This represents the maximum discharge power of the battery pack at time t; This represents the charging and discharging power of the battery pack at time t in the s-th cycle.

[0199] It should be noted that the maximum charging power and maximum discharging power are preset values ​​that conform to the actual application scenario, and the specific values ​​corresponding to them are not limited in the embodiments of this application.

[0200] The remaining capacity of the lithium battery is constrained, which is equivalent to constraining the depth of charge and discharge of the lithium battery. This corresponds to the eighth constraint condition.

[0201] Optionally, the formula corresponding to the eighth constraint is:

[0202]

[0203] in, This indicates the minimum remaining charge of the battery pack; This indicates the maximum remaining battery capacity of the battery pack; This represents the remaining charge of the battery pack at time t. and Depending on the application scenario, the specific numerical values ​​in this application embodiment are not limited.

[0204] The energy storage capacity of lithium batteries is constrained, which corresponds to the ninth constraint condition.

[0205] Optionally, the formula corresponding to the ninth constraint is:

[0206]

[0207] in, This represents the energy storage capacity of the battery pack in the s-th cycle; This indicates the minimum energy storage capacity corresponding to the battery pack; This indicates the maximum energy storage capacity of the battery pack.

[0208] It should be noted that the minimum and maximum energy storage capacities are preset values ​​that conform to actual application scenarios, and the specific values ​​corresponding to them are not limited in the embodiments of this application.

[0209] Therefore, by constraining the charging state, discharging state, remaining power, and energy storage capacity of the lithium battery, the embodiments of this application can enable the energy storage optimization configuration model to better optimize the energy storage capacity, calculate a more economical energy storage capacity, and make the planning more reasonable to achieve the desired effect.

[0210] In some embodiments, constraints also need to be placed on the timing of power curtailment, since the total curtailed power equals the theoretical renewable energy output minus the actual renewable energy output, i.e.:

[0211]

[0212] Therefore, the constraint condition for energy storage that is only constrained during the time of power abandonment is:

[0213]

[0214] in, This indicates the total power curtailment of the base's energy storage system.

[0215] In summary, by constructing an energy storage optimization configuration model through the first constraint and the grid transmission requirement constraint, the model's operation can be more consistent with the actual situation, improving the model's feasibility, and the optimized calculation yields a more reasonable energy storage capacity than other algorithms.

[0216] Optionally, the first transitive variables include the optimized power of the thermal power unit, the operating status of the thermal power unit, the optimized power of the pumped storage unit, the operating status of the pumped storage unit, the initial storage capacity of the pumped storage unit, the charging and discharging power of the lithium battery, and the initial capacity of the lithium battery; the construction process of the intermediate variable transitive model includes:

[0217] The optimized power of the thermal power unit is set to meet a first preset condition, and the operating state of the thermal power unit is set to meet a second preset condition; the first preset condition is that the optimized power of the thermal power unit in the current cycle is consistent with the optimized power of the thermal power unit output to the next cycle; the second preset condition is that the operating state, shutdown state and start-up state of each unit in the thermal power unit in the current cycle are consistent with the operating state, shutdown state and start-up state output to the next cycle.

[0218] The optimal power of the pumped storage unit is set to meet a third preset condition, the operating state of the pumped storage unit is set to meet a fourth preset condition, and the initial reservoir capacity of the pumped storage unit is set to meet a fifth preset condition; the third preset condition is that the optimal power of the pumped storage unit in the current cycle is consistent with the optimal power output to the pumped storage unit in the next cycle; the fourth preset condition is that the pumping and discharging states of the pumped storage unit in the current cycle are consistent with the pumping and discharging states output to the pumped storage unit in the next cycle; the fifth preset condition is that the initial reservoir capacity of the pumped storage unit in the current cycle is consistent with the initial reservoir capacity output to the pumped storage unit in the next cycle.

[0219] The charging and discharging power of the lithium battery is set to meet a sixth preset condition, and the initial capacity of the lithium battery is set to meet a seventh preset condition; the sixth preset condition is that the charging and discharging power of the lithium battery in the current cycle is consistent with the charging and discharging power of the lithium battery output to the next cycle; the seventh preset condition is that the energy storage capacity of the lithium battery in the current cycle is consistent with the energy storage capacity of the lithium battery output to the next cycle.

[0220] An intermediate variable transfer model is constructed based on the first preset condition, the second preset condition, the third preset condition, the fourth preset condition, the fifth preset condition, the sixth preset condition, and the seventh preset condition.

[0221] In this embodiment of the application, the construction process of the intermediate variable transfer model includes: setting the transfer process for the optimized power of thermal power units, setting the transfer process for the start-up and shutdown states of thermal power units, setting the transfer process for the optimized power of pumped storage units, setting the transfer process for the pumping and discharging logic states of pumped storage units, setting the transfer process for the pumped storage capacity of pumped storage units, setting the transfer process for the charging and discharging power of lithium batteries, and setting the transfer process for the energy storage capacity of lithium batteries.

[0222] Specifically, due to the limitations imposed by ramp-up constraints on thermal power units—meaning that the output of thermal power units cannot change drastically within a certain period—to ensure the continuity of unit operation, the optimized power output of the thermal power units in the current cycle can be stored and output to the next cycle for consideration and calculation in the next cycle.

[0223]

[0224] in, This represents the optimized power output of the thermal power unit from the previous cycle to the optimized power of the j-th unit at time t in the current cycle, and it is stored for later retrieval.

[0225] Due to the physical characteristics of the unit and the constraints of energy consumption and operating costs, thermal power units cannot be frequently started and stopped during operation. Therefore, a certain time interval is required between two start-up and shutdown operations of the same unit, so the constraint of the minimum start-up and shutdown time of thermal power units needs to be considered.

[0226] In some embodiments, the operating status of the thermal power unit in the previous cycle is output to the current cycle by passing variables, for consideration and calculation in the next cycle, that is:

[0227]

[0228] in, This indicates the operating status of the j-th unit at time t in the (s+1)-th cycle, which is the operating status of the j-th unit at time t in the next cycle. This indicates the startup status of the j-th unit at time t in the (s+1)-th cycle, which is the startup status of the j-th unit at time t in the next cycle. This indicates the shutdown status of the j-th unit at time t in the (s+1)-th cycle, which is the shutdown status of the j-th unit at time t in the next cycle.

[0229] Since the transfer function of pumped storage is related to the reservoir capacity, the reservoir capacity at the moment before the last moment of the previous cycle (e.g., if the last moment of cycle s is 168, then the moment before the last moment of cycle s is 165). Furthermore, the output at the moment before the last moment of cycle s minus the output at the last moment equals the remaining reservoir capacity at the last moment of cycle s. The remaining reservoir capacity at the last moment of cycle s equals the reservoir capacity at the beginning of cycle s+1. To ensure the continuity of unit operation, the optimized power generated by the pumped storage units in the previous cycle can be stored and output to the current cycle for retrieval and calculation.

[0230]

[0231] in, This represents the optimized power of the j-th unit at time t in the s-th cycle of the pumped storage unit. This indicates that the optimized power output of the j-th pumped storage unit at time t in the previous cycle is transferred to the current cycle. Correspondingly, This represents the optimized power output of the j-th unit at time t in the next cycle, and it is stored for later retrieval.

[0232] Because pumped storage units are constrained by their physical characteristics, energy consumption, and operating costs during operation, they cannot be frequently started and stopped. Therefore, a certain time interval is required between two start-up and shutdown operations of the same unit, so the minimum start-up and shutdown time constraint of pumped storage units needs to be considered.

[0233] In some embodiments, the operating status of the pumped storage unit from the previous cycle is output to the current cycle by passing variables, for consideration and calculation in the next cycle, i.e.:

[0234]

[0235]

[0236] in, This indicates the pumping status of the j-th unit at time t in the s-th cycle of the pumped storage unit. This indicates that the pumping status output of the j-th pumped storage unit at time t in the previous cycle is transmitted to the current cycle. Correspondingly, This indicates the pumping status of the j-th unit at time t in the next cycle, and stores it for later retrieval. This indicates the water release status of the j-th unit in the s-th cycle at time t. This indicates that the water discharge status of the j-th pumped storage unit at time t in the previous cycle is output to the current cycle. Correspondingly, This indicates the water discharge status of the j-th unit at time t in the next cycle, and stores it for later retrieval.

[0237] Furthermore, the process for transferring pumped storage capacity includes:

[0238]

[0239] in, Let represent the initial capacity of the j-th pumped storage unit at time t in the s-th cycle. This indicates that the initial reservoir capacity output from the pumped storage units in the previous cycle is transferred to the current cycle. This indicates the water discharge status of the j-th unit at time t in the next cycle, and stores it for later retrieval.

[0240] Furthermore, the process for transferring the charging and discharging power of the lithium battery is configured, including:

[0241]

[0242] in, This represents the charging and discharging power at time t in the s-th period, i.e., the energy storage output. This indicates that the charging and discharging power output from the previous cycle is transferred to the current cycle. This represents the charging and discharging power output at time t in the next cycle, and it is stored for later retrieval.

[0243] Furthermore, the process for transferring the energy storage capacity of lithium batteries includes:

[0244]

[0245] This represents the energy storage capacity of the lithium battery at time t in the s-th cycle; This indicates that the energy storage capacity from the previous cycle is output to the current cycle, and correspondingly, This indicates the energy storage capacity at time t in the next cycle, and it is stored for later retrieval.

[0246] Therefore, this application embodiment constructs an intermediate variable transfer model by setting the optimized power of thermal power units, the start-up and shutdown status of thermal power units, the optimized power of pumped storage units, the pumping and discharging logic status of pumped storage units, the pumped storage capacity of pumped storage units, the charging and discharging power of lithium batteries, and the energy storage capacity transfer process of lithium batteries. This ensures the continuity of cross-cycle operation of thermal power units, pumped storage units, and units in lithium batteries, and improves the stability of operation.

[0247] Optionally, the method further includes:

[0248] When it is determined that the utilization rate of the new energy source meets the set threshold, the target energy storage capacity is output.

[0249] In this step, if the calculated annual renewable energy utilization rate is... The conditions are met, that is If the output is the energy storage capacity before iteration, which is the target energy storage capacity, it will be used as the final planned energy storage capacity output, thus completing the optimization process.

[0250] Optionally, after obtaining the final planned energy storage capacity, the energy storage capacity can be visualized for users to view or apply.

[0251] Therefore, the embodiments of this application can be configured to obtain a reasonable energy storage capacity, thereby improving the efficiency of capacity planning and configuration.

[0252] In conjunction with the above embodiments, Figure 3 A flowchart illustrating a specific method for configuring decreasing energy storage capacity for new energy transmission, as provided in this application embodiment, is shown below. Figure 3 As shown, the method for configuring energy storage capacity in a decreasing manner for new energy transmission includes the following steps:

[0253] Step 1: Construct the energy storage optimization configuration model (Model 1), intermediate variable transfer model (Model 2), and energy storage configuration verification model (Model 3) in advance, and set parameter constraints and determine the new energy utilization rate index (target new energy utilization rate index).

[0254] Step 2: Input the above data into Model 1, use a computer to simulate and calculate the data for the first cycle, ensure that the output of each unit is within the constraints, and calculate the planned minimum energy storage capacity for the first cycle.

[0255] Step 3: Input the data of the first cycle calculated in Step 2 into Model 2, use a computer to extract the data variables such as the operating status and energy storage capacity that need to be transmitted, and store the data variables for output.

[0256] Step 4: The parameter constraints in Step 1 and the data variables output by Model 2 in Step 3 are substituted back into Model 1 to perform a new cycle of simulation calculation.

[0257] Step 5: Repeat step 4 until the model simulation for the whole year is completed, obtain the minimum energy storage capacity for each cycle of the year, and use a computer to extract the maximum value of the minimum energy storage capacity for each cycle for verification.

[0258] Step 6: Input the maximum value of the minimum energy storage capacity for each cycle throughout the year into Model 3 as a known quantity, and use it as the initial value of the energy storage capacity of Model 3. At the same time, use the new energy utilization rate index determined in Step 2 as the cycle condition for determining whether the above cycle process should continue.

[0259] Step 7: Input the parameter constraints, initial value of energy storage capacity and newly designed new energy utilization rate index from Step 1 into Model 3, and use a computer to perform simulation calculations on the data of the first cycle to ensure that the output of each unit is within the constraints and calculate the new energy consumption of the first cycle.

[0260] Step 8: Input the renewable energy consumption from Step 7 into Model 2, use a computer to extract data variables such as the operating status and energy storage capacity that need to be transmitted, and store these data variables for output.

[0261] Step 9: Input the data variables from Step 8 into Model 3, and combine them with the previously known parameter constraints. Use a computer to repeat Step 7 and Step 8 for iterative calculation until the data simulation calculation for the whole year is completed, and obtain the amount of new energy consumption for each cycle of the year.

[0262] Step 10: Based on the renewable energy consumption for each cycle throughout the year obtained in Step 9, calculate the total renewable energy consumption for the year and the total theoretical renewable energy output for the year. By calculating the ratio of the total renewable energy consumption for the year to the total theoretical renewable energy output for the year, the renewable energy utilization rate can be obtained.

[0263] Step 11: Determine whether the new energy utilization rate is greater than the set value (set threshold). If not, output the energy storage capacity and new energy utilization rate before iteration. If yes, reduce the energy storage capacity by a certain amount (energy storage capacity calibration value) to obtain the decrement value, and input the decrement value back into step 7. Repeat the above steps to continue the iterative verification until the new energy utilization rate is less than the set threshold.

[0264] Compared with traditional optimization calculation methods, by using the above-mentioned new energy transmission and energy storage capacity decreasing configuration method, the running time and memory usage can be reduced. As shown in Table 1, the calculation efficiency and calculation results of traditional optimization calculation methods and the method of this application are compared.

[0265] Table 1

[0266]

[0267] Among them, Example 1 is the traditional optimization calculation method, and Example 2 is the method of this application. As shown in Table 1, under the premise of ensuring optimization quality, the method of this application greatly reduces the running time and memory usage compared with the traditional optimization calculation method, thereby improving the running efficiency and also improving the optimization quality.

[0268] In the foregoing embodiments, the method for configuring decreasing energy storage capacity for new energy transmission provided in this application has been described. To achieve the functions of the methods provided in the embodiments of this application, the electronic device serving as the execution entity may include hardware structures and / or software modules, implementing the aforementioned functions in the form of hardware structures, software modules, or a combination of hardware structures and software modules. Whether a particular function is executed in the form of hardware structures, software modules, or a combination of hardware structures and software modules depends on the specific application and design constraints of the technical solution.

[0269] For example, Figure 4 This application provides a schematic diagram of a new energy transmission and energy storage capacity reduction configuration device according to an embodiment of the present application. The device 400 includes: an acquisition module 401, an input module 402, a calculation module 403, and a reduction module 404. The acquisition module 401 is used to acquire the input target new energy utilization rate index, wind power theoretical output, photovoltaic theoretical output, and target power load. The target new energy utilization rate index and the target power load are input into a pre-constructed energy storage optimization configuration model to obtain the energy storage capacity for the first cycle. The target power load is the sum of the total power of the generating unit, the new energy output, and the charging and discharging power. The objective function of the energy storage optimization configuration model aims to minimize the calculated energy storage capacity. The energy storage optimization configuration model is used to constrain the new energy output and grid transmission requirements. The wind power theoretical output is used to limit the upper limit of wind power output in the energy storage optimization configuration model. The photovoltaic theoretical output is used to limit the upper limit of photovoltaic output in the energy storage optimization configuration model.

[0270] The input module 402 is used to input the energy storage capacity of the first cycle into a pre-constructed intermediate variable transfer model to obtain the first transfer variable of the first cycle, and input the first transfer variable of the first cycle into a pre-constructed energy storage optimization configuration model and a pre-constructed intermediate variable transfer model for iterative calculation until the first calculation requirement of the preset cycle is completed, so as to obtain multiple energy storage capacities within the preset cycle; the intermediate variable transfer model is used to constrain the energy storage capacity and the unit operating status.

[0271] The calculation module 403 is used to obtain the maximum value among the multiple energy storage capacities to obtain the target energy storage capacity. It then iteratively calculates the target energy storage capacity and the target power load using a pre-constructed energy storage configuration verification model and an intermediate variable transfer model until the second calculation requirement of a preset period is met, thus obtaining multiple new energy consumption amounts, actual wind power output, and actual photovoltaic output within the preset period. The objective function of the energy storage configuration verification model is to calculate the maximum value of new energy consumption. The energy storage configuration verification model is also used to constrain new energy output and grid transmission requirements.

[0272] The decreasing module 404 is used to determine the renewable energy utilization rate based on the multiple renewable energy consumption, actual wind power output, and actual photovoltaic output. After determining that the renewable energy utilization rate does not meet the set threshold, it obtains the energy storage capacity calibration value, calculates the difference between the energy storage capacity calibration value and the target energy storage capacity to obtain the decreasing value, and iterates again based on the decreasing value input to the pre-constructed energy storage configuration verification model and intermediate variable transfer model until the obtained renewable energy utilization rate meets the set threshold, and outputs the target energy storage capacity; the target energy storage capacity is the sum of the decreasing value and the energy storage capacity calibration value.

[0273] Optionally, the calculation module 403 is specifically used for:

[0274] The target energy storage capacity and the target power load are input into a pre-constructed energy storage configuration verification model to obtain the new energy consumption in the first cycle; the theoretical wind power output is also used to limit the upper limit of wind power output in the energy storage configuration verification model; the theoretical photovoltaic output is also used to limit the upper limit of photovoltaic output in the energy storage configuration verification model.

[0275] The renewable energy consumption of the first cycle is input into the pre-constructed intermediate variable transfer model to obtain the second transfer variable of the first cycle. The second transfer variable of the first cycle is then input into the pre-constructed energy storage configuration verification model and intermediate variable transfer model for iterative calculation until the second calculation requirement of the preset cycle is completed, and multiple renewable energy consumption, actual wind power output and actual photovoltaic output within the preset cycle are obtained.

[0276] Optionally, the decreasing module 404 includes a determining unit, the determining unit being used for:

[0277] The sum of multiple renewable energy consumption amounts within the preset period is calculated to obtain the total renewable energy consumption. The sum of multiple actual wind power outputs and actual photovoltaic outputs within the preset period is calculated to obtain the total renewable energy output. The renewable energy utilization rate is calculated based on the total renewable energy consumption amount and the total renewable energy output.

[0278] Optionally, the new energy output includes actual wind power output and actual photovoltaic output; the device 400 further includes a module for constructing an energy storage optimization configuration model; the module for constructing the energy storage optimization configuration model is used for:

[0279] The new energy power grid is divided into multiple zones, and a first constraint condition is set for the new energy output of each zone; the first constraint condition is that the actual wind power output of each zone is less than or equal to the theoretical wind power output, and the actual photovoltaic output of each zone is less than or equal to the theoretical photovoltaic output.

[0280] The following constraints are set: the second constraint on the output of thermal power units, the third constraint on the operating status of thermal power units, the fourth constraint on the operating status of pumped storage units, the fifth constraint on the power of pumped storage units, the sixth constraint on the storage capacity of pumped storage units, the seventh constraint on the charging and discharging power of lithium batteries, the eighth constraint on the depth of charging and discharging of lithium batteries, and the ninth constraint on the energy storage capacity of lithium batteries, thus forming the constraints for grid transmission requirements.

[0281] Based on the first constraint and the constraint of the power grid transmission requirements, an energy storage optimization configuration model is constructed.

[0282] The second constraint is used to constrain the optimized power of the thermal power unit; the third constraint is used to constrain the start-up and / or shutdown states of multiple units corresponding to the thermal power unit and the time of start-up and / or shutdown of multiple units; the fourth constraint is used to constrain the pumping or discharging state of the pumped storage unit; the fifth constraint is used to constrain the pumping power and discharging power of the pumped storage unit; the sixth constraint is used to constrain the capacity of the pumped storage unit reservoir; the seventh constraint is used to constrain the charging and discharging states of the lithium battery; the eighth constraint is used to constrain the remaining power of the lithium battery; and the ninth constraint is used to constrain the energy storage capacity of the lithium battery.

[0283] Optionally, the formula corresponding to the second constraint is:

[0284]

[0285]

[0286] in, This represents the upper limit of the output of the j-th unit in a thermal power unit; This represents the lower limit of the output of the j-th unit in a thermal power unit; This indicates the operating status of the j-th unit at time t in the s-th cycle of a thermal power unit; This represents the output of the j-th unit at time t in the s-th cycle of a thermal power unit; This represents the optimized power output of the j-th unit at time t in the s-th cycle of a thermal power unit.

[0287] The formula corresponding to the third constraint is:

[0288]

[0289] and,

[0290]

[0291]

[0292] in, This indicates the operating status of the j-th unit in the s-th cycle at time t, where 0 indicates that the unit has been shut down and 1 indicates that the unit is running. This indicates the startup status of the j-th unit in the s-th cycle at time t, where 0 indicates not in startup status and 1 indicates startup status. This indicates the shutdown status of the j-th unit in the s-th cycle at time t, where 0 indicates it is not in a shutdown state and 1 indicates it is in a shutdown state; t+k indicates time t+k, where k is the minimum time step for the unit to start or stop.

[0293] Optionally, the formula corresponding to the fourth constraint is:

[0294]

[0295] in, This indicates the pumping status of the j-th unit at time t in the s-th cycle of the pumped storage unit. This indicates the water release status of the j-th unit at time t in the s-th cycle of the pumped storage unit.

[0296] The formula corresponding to the fifth constraint is:

[0297]

[0298]

[0299] in, This represents the optimized power of the j-th unit at time t in the s-th cycle of the pumped storage unit. This represents the maximum pumping power of the j-th unit in the pumped storage unit; This represents the minimum pumping power of the j-th unit in a pumped storage unit; This represents the maximum water discharge capacity of the j-th pumped storage unit. This represents the minimum water discharge capacity of the j-th pumped storage unit.

[0300] The formula corresponding to the sixth constraint is:

[0301]

[0302] in, This represents the upper limit of the capacity of the j-th unit in a pumped storage hydroelectric power unit; This indicates the lower limit of the capacity of the j-th unit in a pumped storage system. This represents the initial capacity of the j-th pumped storage unit at time t in the s-th cycle.

[0303] Optionally, the formula corresponding to the seventh constraint is:

[0304]

[0305]

[0306]

[0307] in, This indicates the charging state of the battery pack at time t in the s-th cycle, where 0 indicates that it is not charging and 1 indicates that it is charging. This indicates the discharge state of the battery pack at time t in the s-th cycle, where 0 indicates that it is not in the discharge state and 1 indicates that it is in the discharge state. This represents the maximum charging power of the battery pack at time t; This represents the maximum discharge power of the battery pack at time t; This represents the charging and discharging power of the battery pack at time t in the s-th cycle;

[0308] The formula corresponding to the eighth constraint is:

[0309]

[0310] in, This indicates the minimum remaining charge of the battery pack; This indicates the maximum remaining battery capacity of the battery pack; This represents the remaining charge of the battery pack at time t. and Determined based on the application scenario;

[0311] The formula corresponding to the ninth constraint is:

[0312]

[0313] in, This represents the energy storage capacity of the battery pack in the s-th cycle; This indicates the minimum energy storage capacity corresponding to the battery pack; This indicates the maximum energy storage capacity of the battery pack.

[0314] Optionally, the first transferred variables include the optimized power of the thermal power unit, the operating status of the thermal power unit, the optimized power of the pumped storage unit, the operating status of the pumped storage unit, the initial reservoir capacity of the pumped storage unit, the charging and discharging power of the lithium battery, and the initial capacity of the lithium battery; the device 400 further includes a module for constructing an intermediate variable transfer model; the module for constructing the intermediate variable transfer model is used for:

[0315] The optimized power of the thermal power unit is set to meet a first preset condition, and the operating state of the thermal power unit is set to meet a second preset condition; the first preset condition is that the optimized power of the thermal power unit in the current cycle is consistent with the optimized power of the thermal power unit output to the next cycle; the second preset condition is that the operating state, shutdown state and start-up state of each unit in the thermal power unit in the current cycle are consistent with the operating state, shutdown state and start-up state output to the next cycle.

[0316] The optimal power of the pumped storage unit is set to meet a third preset condition, the operating state of the pumped storage unit is set to meet a fourth preset condition, and the initial reservoir capacity of the pumped storage unit is set to meet a fifth preset condition; the third preset condition is that the optimal power of the pumped storage unit in the current cycle is consistent with the optimal power output to the pumped storage unit in the next cycle; the fourth preset condition is that the pumping and discharging states of the pumped storage unit in the current cycle are consistent with the pumping and discharging states output to the pumped storage unit in the next cycle; the fifth preset condition is that the initial reservoir capacity of the pumped storage unit in the current cycle is consistent with the initial reservoir capacity output to the pumped storage unit in the next cycle.

[0317] The charging and discharging power of the lithium battery is set to meet a sixth preset condition, and the initial capacity of the lithium battery is set to meet a seventh preset condition; the sixth preset condition is that the charging and discharging power of the lithium battery in the current cycle is consistent with the charging and discharging power of the lithium battery output to the next cycle; the seventh preset condition is that the energy storage capacity of the lithium battery in the current cycle is consistent with the energy storage capacity of the lithium battery output to the next cycle.

[0318] An intermediate variable transfer model is constructed based on the first preset condition, the second preset condition, the third preset condition, the fourth preset condition, the fifth preset condition, the sixth preset condition, and the seventh preset condition.

[0319] Optionally, the device 400 further includes an output module; the output module is used for:

[0320] When it is determined that the utilization rate of the new energy source meets the set threshold, the target energy storage capacity is output.

[0321] The specific implementation principle and effects of the new energy transmission and energy storage capacity decreasing configuration device provided in this application embodiment can be found in the relevant descriptions and effects of the above embodiments, and will not be elaborated further here.

[0322] This application also provides a schematic diagram of the structure of an electronic device. Figure 5 This is a schematic diagram of the structure of an electronic device provided in an embodiment of this application, such as... Figure 5As shown, the electronic device may include: a processor 501 and a memory 502 communicatively connected to the processor; the memory 502 stores a computer program; the processor 501 executes the computer program stored in the memory 502, causing the processor 501 to perform the method described in any of the above embodiments.

[0323] The memory 502 and the processor 501 can be connected via bus 503.

[0324] This application also provides a computer-readable storage medium storing computer program execution instructions, which, when executed by a processor, are used to implement the methods described in any of the foregoing embodiments of this application.

[0325] This application also provides a chip for executing instructions, which is used to perform the methods described in any of the foregoing embodiments executed by an electronic device as described in any of the foregoing embodiments of this application.

[0326] This application also provides a computer program product, which includes a computer program that, when executed by a processor, can implement the methods described in any of the foregoing embodiments executed by an electronic device as described in any of the foregoing embodiments of this application.

[0327] In the several embodiments provided in this application, it should be understood that the disclosed apparatus and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of modules is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple modules or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between apparatuses or modules may be electrical, mechanical, or other forms.

[0328] The modules described as separate components may or may not be physically separate. The components shown as modules may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to implement the solution of this embodiment according to actual needs.

[0329] Furthermore, the functional modules in the various embodiments of this application can be integrated into one processing unit, or each module can exist physically separately, or two or more modules can be integrated into one unit. The unit composed of the above modules can be implemented in hardware or in the form of hardware plus software functional units.

[0330] The integrated modules implemented as software functional modules described above can be stored in a computer-readable storage medium. These software functional modules, stored in a storage medium, include several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) or processor to execute some steps of the methods described in the various embodiments of this application.

[0331] It should be understood that the aforementioned processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), etc. A general-purpose processor can be a microprocessor or any conventional processor. The steps of the method disclosed in the application can be directly manifested as being executed by a hardware processor, or executed by a combination of hardware and software modules within the processor.

[0332] The memory may include high-speed random access memory (RAM) and may also include non-volatile memory (NVM), such as at least one disk storage device, and may also be a USB flash drive, external hard drive, read-only memory, disk or optical disc, etc.

[0333] The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus, etc. Buses can be categorized as address buses, data buses, control buses, etc. For ease of illustration, the buses shown in the accompanying drawings are not limited to a single bus or a single type of bus.

[0334] The aforementioned storage media can be implemented from any type of volatile or non-volatile storage device or a combination thereof, such as Static Random-Access Memory (SRAM), Electrically Erasable Programmable Read-Only Memory (EEPROM), Erasable Programmable Read-Only Memory (EPROM), Programmable Read-Only Memory (PROM), Read-Only Memory (ROM), magnetic storage, flash memory, magnetic disk, or optical disk. The storage media can be any available medium accessible to general-purpose or special-purpose computers.

[0335] An exemplary storage medium is coupled to a processor, enabling the processor to read information from and write information to the storage medium. Alternatively, the storage medium can be an integral part of the processor. Both the processor and the storage medium can reside in application-specific integrated circuits (ASICs). Alternatively, the processor and storage medium can exist as discrete components in an electronic device or host device.

[0336] It should be noted that, for the sake of simplicity, the foregoing method embodiments are all described as a series of actions. However, those skilled in the art should understand that this application is not limited to the described order of actions, as some steps may be performed in other orders or simultaneously according to this application. Furthermore, those skilled in the art should also understand that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily essential to this application.

[0337] It should be further noted that although the steps in the flowchart are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowchart may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the sub-steps or stages of other steps.

[0338] In the above embodiments, the descriptions of each embodiment have their own emphasis. For parts not described in detail in a certain embodiment, please refer to the relevant descriptions of other embodiments. The technical features of the above embodiments can be combined arbitrarily. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as the combination of these technical features does not contradict each other, it should be considered within the scope of this specification.

[0339] Other embodiments of this application will readily occur to those skilled in the art upon consideration of the specification and practice of the invention disclosed herein. This application is intended to cover any variations, uses, or adaptations of this application that follow the general principles of this application and include common knowledge or customary techniques in the art not disclosed herein. The specification and examples are to be considered exemplary only, and the true scope and spirit of this application are indicated by the claims.

[0340] The above description is merely a specific implementation of the embodiments of this application, but the protection scope of the embodiments of this application is not limited thereto. Any changes or substitutions within the technical scope disclosed in the embodiments of this application should be covered within the protection scope of the embodiments of this application. Therefore, the protection scope of the embodiments of this application should be determined by the protection scope of the claims.

Claims

1. A method for configuring energy storage capacity in a decreasing manner for new energy transmission, characterized in that, The method includes: The system acquires the target renewable energy utilization rate, theoretical wind power output, theoretical photovoltaic output, and target power load. It then inputs the target renewable energy utilization rate and target power load into a pre-constructed energy storage optimization configuration model to obtain the energy storage capacity for the first cycle. The target power load is the sum of the total unit power, renewable energy output, and charging / discharging power. The objective function of the energy storage optimization configuration model aims to minimize the calculated energy storage capacity. This model constrains renewable energy output and grid transmission requirements. The theoretical wind power output limits the upper limit of wind power output in the energy storage optimization configuration model, and the theoretical photovoltaic output limits the upper limit of photovoltaic output in the same model. The energy storage capacity of the first cycle is input into the pre-constructed intermediate variable transfer model to obtain the first transfer variable of the first cycle. The first transfer variable of the first cycle is then input into the pre-constructed energy storage optimization configuration model and the intermediate variable transfer model for iterative calculation until the first calculation requirement of the preset cycle is completed, thereby obtaining multiple energy storage capacities within the preset cycle. The intermediate variable transfer model is used to constrain the energy storage capacity and the unit operating status. The maximum value among the multiple energy storage capacities is obtained to obtain the target energy storage capacity. The target energy storage capacity and the target power load are then input into a pre-constructed energy storage configuration verification model and an intermediate variable transfer model for iterative calculation until the second calculation requirement of a preset period is completed, thereby obtaining multiple new energy consumption, actual wind power output, and actual photovoltaic output within the preset period. The objective function of the energy storage configuration verification model is to calculate the maximum value of new energy consumption. The energy storage configuration verification model is also used to constrain new energy output and grid transmission requirements. Based on the multiple renewable energy consumption, actual wind power output, and actual photovoltaic output, the renewable energy utilization rate is determined. If the renewable energy utilization rate does not meet the set threshold, the energy storage capacity calibration value is obtained. The difference between the energy storage capacity calibration value and the target energy storage capacity is calculated to obtain a decrement value. Based on the decrement value, the calculation is performed again through a pre-constructed energy storage configuration verification model and an intermediate variable transfer model until the renewable energy utilization rate meets the set threshold. The target energy storage capacity is then output. The target energy storage capacity is the sum of the decrement value and the energy storage capacity calibration value.

2. The method according to claim 1, characterized in that, The target energy storage capacity and the target power load are input into a pre-constructed energy storage configuration verification model and an intermediate variable transfer model for iterative calculation until the second calculation requirement of the preset period is completed, resulting in multiple new energy consumption, actual wind power output, and actual photovoltaic output within the preset period, including: The target energy storage capacity and the target power load are input into a pre-constructed energy storage configuration verification model to obtain the new energy consumption in the first cycle; the theoretical wind power output is also used to limit the upper limit of wind power output in the energy storage configuration verification model; the theoretical photovoltaic output is also used to limit the upper limit of photovoltaic output in the energy storage configuration verification model. The renewable energy consumption of the first cycle is input into the pre-constructed intermediate variable transfer model to obtain the second transfer variable of the first cycle. The second transfer variable of the first cycle is then input into the pre-constructed energy storage configuration verification model and intermediate variable transfer model for iterative calculation until the second calculation requirement of the preset cycle is completed, and multiple renewable energy consumption, actual wind power output and actual photovoltaic output within the preset cycle are obtained.

3. The method according to claim 1, characterized in that, Based on the aforementioned renewable energy consumption, actual wind power output, and actual photovoltaic power output, the renewable energy utilization rate is determined, including: The sum of multiple renewable energy consumption amounts within the preset period is calculated to obtain the total renewable energy consumption. The sum of multiple actual wind power outputs and actual photovoltaic outputs within the preset period is calculated to obtain the total renewable energy output. The renewable energy utilization rate is calculated based on the total renewable energy consumption amount and the total renewable energy output.

4. The method according to claim 1, characterized in that, The new energy output includes the actual output of wind power and the actual output of photovoltaic power; The construction process of the energy storage optimization configuration model includes: The new energy power grid is divided into multiple zones, and a first constraint condition is set for the new energy output of each zone; the first constraint condition is that the actual wind power output of each zone is less than or equal to the theoretical wind power output, and the actual photovoltaic output of each zone is less than or equal to the theoretical photovoltaic output. The following constraints are set: the second constraint on the output of thermal power units, the third constraint on the operating status of thermal power units, the fourth constraint on the operating status of pumped storage units, the fifth constraint on the power of pumped storage units, the sixth constraint on the storage capacity of pumped storage units, the seventh constraint on the charging and discharging power of lithium batteries, the eighth constraint on the depth of charging and discharging of lithium batteries, and the ninth constraint on the energy storage capacity of lithium batteries, thus forming the constraints for grid transmission requirements. Based on the first constraint and the constraint of the power grid transmission requirements, an energy storage optimization configuration model is constructed. The second constraint is used to constrain the optimized power of the thermal power unit; the third constraint is used to constrain the start-up and / or shutdown states of multiple units corresponding to the thermal power unit and the time of start-up and / or shutdown of multiple units; the fourth constraint is used to constrain the pumping or discharging state of the pumped storage unit; the fifth constraint is used to constrain the pumping power and discharging power of the pumped storage unit; the sixth constraint is used to constrain the capacity of the pumped storage unit reservoir; the seventh constraint is used to constrain the charging and discharging states of the lithium battery; the eighth constraint is used to constrain the remaining power of the lithium battery; and the ninth constraint is used to constrain the energy storage capacity of the lithium battery.

5. The method according to claim 4, characterized in that, The formula corresponding to the second constraint is: in, This represents the upper limit of the output of the j-th unit in a thermal power unit; This represents the lower limit of the output of the j-th unit in a thermal power unit; This indicates the operating status of the j-th unit at time t in the s-th cycle of a thermal power unit; This represents the output of the j-th unit at time t in the s-th cycle of a thermal power unit; This represents the optimized power output of the j-th unit at time t in the s-th cycle of a thermal power unit. The formula corresponding to the third constraint is: and, in, This indicates the operating status of the j-th unit in the s-th cycle at time t, where 0 indicates that the unit has been shut down and 1 indicates that the unit is running. This indicates the startup status of the j-th unit in the s-th cycle at time t, where 0 indicates not in startup status and 1 indicates startup status. This indicates the shutdown status of the j-th unit in the s-th cycle at time t, where 0 indicates it is not in a shutdown state and 1 indicates it is in a shutdown state; t+k indicates time t+k, where k is the minimum time step for the unit to start or stop.

6. The method according to claim 4, characterized in that, The formula corresponding to the fourth constraint is: in, This indicates the pumping status of the j-th unit at time t in the s-th cycle of the pumped storage unit. This indicates the water release status of the j-th unit at time t in the s-th cycle of the pumped storage unit. The formula corresponding to the fifth constraint is: in, This represents the optimized power of the j-th unit at time t in the s-th cycle of the pumped storage unit. This represents the maximum pumping power of the j-th unit in the pumped storage unit; This represents the minimum pumping power of the j-th unit in a pumped storage unit; This represents the maximum water discharge capacity of the j-th pumped storage unit. This represents the minimum water discharge capacity of the j-th pumped storage unit. The formula corresponding to the sixth constraint is: in, This represents the upper limit of the capacity of the j-th unit in a pumped storage hydroelectric power unit; This indicates the lower limit of the capacity of the j-th unit in a pumped storage system. This represents the initial capacity of the j-th pumped storage unit at time t in the s-th cycle.

7. The method according to claim 4, characterized in that, The formula corresponding to the seventh constraint is: in, This indicates the charging state of the battery pack at time t in the s-th cycle, where 0 indicates that it is not charging and 1 indicates that it is charging. This indicates the discharge state of the battery pack at time t in the s-th cycle, where 0 indicates that it is not in the discharge state and 1 indicates that it is in the discharge state. This represents the maximum charging power of the battery pack at time t; This represents the maximum discharge power of the battery pack at time t; This represents the charging and discharging power of the battery pack at time t in the s-th cycle; The formula corresponding to the eighth constraint is: in, This indicates the minimum remaining charge of the battery pack; This indicates the maximum remaining battery capacity of the battery pack; This represents the remaining charge of the battery pack at time t. and Determined based on the application scenario; The formula corresponding to the ninth constraint is: in, This represents the energy storage capacity of the battery pack in the s-th cycle; This indicates the minimum energy storage capacity corresponding to the battery pack; This indicates the maximum energy storage capacity of the battery pack.

8. The method according to claim 1, characterized in that, The first transmitted variables include the optimized power of the thermal power unit, the operating status of the thermal power unit, the optimized power of the pumped storage unit, the operating status of the pumped storage unit, the initial storage capacity of the pumped storage unit, the charging and discharging power of the lithium battery, and the initial capacity of the lithium battery. The construction process of the intermediate variable transfer model includes: The optimized power of the thermal power unit is set to meet a first preset condition, and the operating state of the thermal power unit is set to meet a second preset condition; the first preset condition is that the optimized power of the thermal power unit in the current cycle is consistent with the optimized power of the thermal power unit output to the next cycle; the second preset condition is that the operating state, shutdown state and start-up state of each unit in the thermal power unit in the current cycle are consistent with the operating state, shutdown state and start-up state output to the next cycle. The optimal power of the pumped storage unit is set to meet a third preset condition, the operating state of the pumped storage unit is set to meet a fourth preset condition, and the initial reservoir capacity of the pumped storage unit is set to meet a fifth preset condition; the third preset condition is that the optimal power of the pumped storage unit in the current cycle is consistent with the optimal power output to the pumped storage unit in the next cycle; the fourth preset condition is that the pumping and discharging states of the pumped storage unit in the current cycle are consistent with the pumping and discharging states output to the pumped storage unit in the next cycle; the fifth preset condition is that the initial reservoir capacity of the pumped storage unit in the current cycle is consistent with the initial reservoir capacity output to the pumped storage unit in the next cycle. The charging and discharging power of the lithium battery is set to meet a sixth preset condition, and the initial capacity of the lithium battery is set to meet a seventh preset condition; the sixth preset condition is that the charging and discharging power of the lithium battery in the current cycle is consistent with the charging and discharging power of the lithium battery output to the next cycle; the seventh preset condition is that the energy storage capacity of the lithium battery in the current cycle is consistent with the energy storage capacity of the lithium battery output to the next cycle. An intermediate variable transfer model is constructed based on the first preset condition, the second preset condition, the third preset condition, the fourth preset condition, the fifth preset condition, the sixth preset condition, and the seventh preset condition.

9. The method according to any one of claims 1-8, characterized in that, The method further includes: When it is determined that the utilization rate of the new energy source meets the set threshold, the target energy storage capacity is output.

10. A new energy transmission and energy storage capacity decreasing configuration device, characterized in that, The device includes: The acquisition module is used to acquire the input target renewable energy utilization rate index, wind power theoretical output, photovoltaic theoretical output, and target power load. The target renewable energy utilization rate index and the target power load are input into a pre-constructed energy storage optimization configuration model to obtain the energy storage capacity for the first cycle. The target power load is the sum of the total unit power, renewable energy output, and charging / discharging power. The objective function of the energy storage optimization configuration model aims to minimize the calculated energy storage capacity. The energy storage optimization configuration model is used to constrain renewable energy output and grid transmission requirements. The wind power theoretical output is used to limit the upper limit of wind power output in the energy storage optimization configuration model; the photovoltaic theoretical output is used to limit the upper limit of photovoltaic output in the energy storage optimization configuration model. The input module is used to input the energy storage capacity of the first cycle into a pre-constructed intermediate variable transfer model to obtain the first transfer variable of the first cycle, and input the first transfer variable of the first cycle into a pre-constructed energy storage optimization configuration model and a pre-constructed intermediate variable transfer model for iterative calculation until the first calculation requirement of the preset cycle is completed, so as to obtain multiple energy storage capacities within the preset cycle; the intermediate variable transfer model is used to constrain the energy storage capacity and the unit operating status. The calculation module is used to obtain the maximum value among the multiple energy storage capacities to obtain the target energy storage capacity. It then inputs the target energy storage capacity and the target power load into a pre-constructed energy storage configuration verification model and intermediate variable transfer model for iterative calculation until the second calculation requirement of a preset period is met, obtaining multiple new energy consumption amounts, actual wind power output, and actual photovoltaic output within the preset period. The objective function of the energy storage configuration verification model is to calculate the maximum value of new energy consumption. The energy storage configuration verification model is also used to constrain new energy output and grid transmission requirements. The decrement module is used to determine the renewable energy utilization rate based on the multiple renewable energy absorption volumes, actual wind power output, and actual photovoltaic output. After determining that the renewable energy utilization rate does not meet the set threshold, it obtains the energy storage capacity calibration value, calculates the difference between the energy storage capacity calibration value and the target energy storage capacity to obtain the decrement value, and iterates again based on the decrement value input into the pre-constructed energy storage configuration verification model and intermediate variable transfer model until the obtained renewable energy utilization rate meets the set threshold, and outputs the target energy storage capacity; the target energy storage capacity is the sum of the decrement value and the energy storage capacity calibration value.

11. An electronic device, characterized in that, include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executed instructions; The processor executes computer execution instructions stored in the memory to implement the method as described in any one of claims 1-9.

12. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores computer-executable instructions, which, when executed by a processor, are used to implement the method as described in any one of claims 1-9.