Method, device, electronic device and storage medium for organizing BIM model decomposition structure
Through the hierarchical classification attribute method, the problem of differences in the organization of BIM models in different business scenarios is solved, the rapid organization and management of models in multiple scenarios is realized, the building information needs in multiple scenarios are met, and the data transmission and Management efficiency.
Patent Information
- Application Number
- CN202311603451.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-28
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2043-11-28
AI Technical Summary
During the engineering construction process, BIM models are organized in different ways under different business scenarios, making it difficult to find corresponding relationships between the models at each stage, resulting in duplication of work, difficulty in data transmission, inconvenience in data management, and the inability to implement the full process application of a set of models. question.
Using the hierarchical classification attribute method, create a BIM model through component-level granularity, input and improve the attribute information of the component, set the business scenario name and the number of levels, generate the model organizational structure skeleton, and associate the model organizational structure tree through the component ID to realize the model Flexible organization and management in multiple business scenarios.
It implements a multi-dimensional, multi-level, and high-degree-of-freedom model organization method, solves the needs of multiple business scenarios for different organization methods of models, realizes the rapid organization and management of models in various scenarios and stages, and satisfies the needs of buildings in multiple scenarios. information needs.
Smart Images

Figure CN117828713B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of engineering construction information technology, and in particular relates to a method, device, electronic equipment and storage medium for organizing a decomposition structure of a BIM model. Background Art
[0002] Against the background of the increasing degree of digitization in the field of modern engineering construction, BIM (Building Information Modeling) model, as an efficient information carrier with visualization, coordination, simulation, optimization and accuracy, has a large number of applications in the entire process of engineering construction, including three-dimensional rendering display, fast and accurate quantity calculation, precise planning, virtual construction collaboration, collision detection, etc.
[0003] Due to the different needs of various business tasks for model information acquisition during the engineering construction process, the organization and division methods and division accuracy of BIM models are often different in various business scenarios. For example, in the bridge design stage, when designers create bridge models, they usually split the bridge model in sequence according to the hierarchy of "bridge-bridge span-part-sub-joint-sub-span-structure-component". However, when calculating the engineering quantity, it may be organized and divided according to the hierarchy order and accuracy of the "bridge-sub-joint-sub-span-part-component-material" type. The different organization and division and accuracy of the model in each scenario will make it difficult to find the corresponding relationship between the models in each stage, which will cause trouble for the data management of the model and the transmission and reuse in various scenarios, and thus cannot give full play to the advantages of BIM in coordination and optimization in the whole process of engineering construction.
[0004] Currently, there is no clear model organization and division structure that can simultaneously meet the application requirements of all business scenarios. The most common approach is for each business scenario to independently create a model that meets the requirements according to its own model organization method. However, this approach has the following problems:
[0005] 1) Generate a lot of repetitive work. For the same engineering object, different business systems need to create models, but there must be a lot of duplicate data between the models, such as the model's geometric information, material type, etc., which will inevitably cause a lot of repetitive creation work.
[0006] 2) Data transfer between different stages of the industry and between different business systems at the same stage is difficult. Since each business system only creates models for the needs of its own business scenarios, there will inevitably be differences in the mapping relationship between model organization and corresponding hierarchical data between business systems. Even if a unified data format is used to create models, different mapping relationships between models and corresponding hierarchical data will cause trouble in data transfer and reading.
[0007] 3) The existence of multiple models at the same time is inconvenient for data management. Different models are created for different business scenarios, and the data stored in different models is also different. It is difficult for models to be associated with each other, and multiple sets of model data need to be managed and maintained at the same time, causing inconvenience in data management.
[0008] 4) It is impossible to realize the full-process application of a set of models, and it is difficult to reflect the advantages of BIM. Different businesses create and maintain different models. It is difficult for each business system to coordinate and optimize through the model, and it is impossible to form a unified data source, making it difficult to reflect the advantages of BIM technology in the entire engineering process.
[0009] It can be seen that in the field of information technology of engineering construction, a solution is needed for the organization, division and application of BIM models suitable for the entire process of engineering construction. Summary of the invention
[0010] In order to solve the problem of BIM model organization and division in engineering construction, the present invention adopts a method of setting hierarchical classification attributes, which can be flexibly divided, solving the needs of different model organization methods in multiple business scenarios throughout the entire engineering process.
[0011] A first object of the present invention is to provide a method for organizing a BIM model decomposition structure, comprising the following steps:
[0012] S1. Create a BIM model at the component level, input and complete the attribute information of the component, and the attribute information includes initial attribute information and supplementary attribute information;
[0013] S2. Create a new BIM model organization business scenario and set the business scenario name;
[0014] S3. Set the number of levels of BIM model organization in the business scenario and select the attribute name for each level of classification;
[0015] S4. Generate a model organizational structure skeleton under the business scenario according to the hierarchical and classified attribute names;
[0016] S5. Add components to the terminal nodes of the model organization structure skeleton, record the component ID, display the component name, and generate the model organization structure tree;
[0017] S6. Correspondingly associate components of the model organization structure tree with components of the BIM model through component IDs.
[0018] Furthermore, the creation of a BIM model at the component level granularity, inputting and improving the attribute information of the component, includes:
[0019] 1) Create components of the BIM model, generate component ID and component name, and input component geometry data and initial attribute information.
[0020] 2) Input supplementary attribute information of BIM model components.
[0021] Furthermore, the setting of the number of levels of the BIM model organization in the business scenario and the selection of the attribute name for each level of the hierarchical classification include:
[0022] 1) Set the first-level attribute name. The attribute name can be selected from all required attributes;
[0023] 2) Add the next level and set the attribute name of the next level;
[0024] 3) Continue to add the next level until the decomposition requirements are met;
[0025] 4) When a certain level is no longer needed, it can be deleted and the lower levels will automatically move up.
[0026] Furthermore, the generating of the model organizational structure skeleton in the business scenario according to the hierarchically classified attribute names includes:
[0027] 1) Count the attribute information of all components in the BIM model and find all attribute values under the first-level attribute name;
[0028] 2) Treat each attribute value under the attribute name of the level as a branch under the level;
[0029] 3) Read all attribute values under the next level attribute name, with each attribute value as a sub-branch of the branch;
[0030] 4) Repeat the previous step until all levels of operations are completed to form the organizational structure skeleton of the model.
[0031] The second object of the present invention is to provide a BIM model decomposition structure organization device, which includes the following modules:
[0032] Component creation module: used to create a BIM model at the component level, input and complete the component attribute information, the attribute information includes initial attribute information and supplementary attribute information;
[0033] Scenario creation module: used to create a new BIM model organization business scenario and set the business scenario name;
[0034] Level setting module: used to set the number of levels of BIM model organization in business scenarios and select the attribute name for each level of classification;
[0035] Model organizational structure skeleton generation module: used to generate the model organizational structure skeleton in the business scenario according to the hierarchical and classified attribute names;
[0036] Model organization structure tree generation module: used to add components to the terminal nodes of the model organization structure skeleton, record component IDs, display component names, and generate the model organization structure tree;
[0037] Component association module: used to associate the components of the model organization structure tree with the components of the BIM model through the component ID.
[0038] A third object of the present invention is to provide an electronic device, comprising:
[0039] Memory for storing computer programs;
[0040] The processor is used to execute the program stored in the memory to implement the steps of the method for organizing the decomposition structure of the BIM model described in any one of the above items.
[0041] The fourth object of the present invention is to provide a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, the steps of the method for organizing the decomposition structure of the BIM model are implemented in any one of the above-mentioned steps.
[0042] Beneficial effects of the present invention:
[0043] 1) The present invention provides a multi-dimensional, multi-level, and high-degree-of-freedom model organization method, which solves the needs of multiple business scenarios in the entire engineering process for different model organization methods.
[0044] 2) The present invention can realize the rapid organization, division and management of models in various scenarios and stages, helping to solve the pain points that the current BIM model is not interoperable in multiple scenarios in the actual application process of engineering and cannot achieve multiple uses of one model.
[0045] The method for organizing the decomposition structure of a BIM model of the present invention can quickly decompose the BIM model into multiple scenarios to meet the building information needs in multiple scenarios. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 A step diagram of a method for organizing a decomposition structure of a BIM model according to an embodiment of the present invention;
[0047] Figure 2 It is a composition diagram of a rectangular columnar pier component according to an organization method of a BIM model decomposition structure according to an embodiment of the present invention;
[0048] Figure 3 It is a partial attribute information diagram of a rectangular pier and pile foundation of a method for organizing a decomposition structure of a BIM model according to an embodiment of the present invention;
[0049] Figure 4It is a schematic diagram of supplementing attribute information of a rectangular pier and pile foundation part of a method for organizing a decomposition structure of a BIM model according to an embodiment of the present invention;
[0050] Figure 5 A schematic diagram of the operation of grouping and grading model attributes in the method for organizing the decomposition structure of a BIM model according to an embodiment of the present invention;
[0051] Figure 6 A schematic diagram of a model organization structure skeleton in a method for organizing a BIM model decomposition structure according to an embodiment of the present invention;
[0052] Figure 7 Schematic diagram of a model organization structure tree formed in two business scenarios in the organization method of the BIM model decomposition structure in an embodiment of the present invention. DETAILED DESCRIPTION
[0053] In order to further understand the present invention, preferred embodiments of the present invention are described below in conjunction with examples. However, it should be understood that these descriptions are only for further illustrating the features and advantages of the present invention, rather than limiting the claims of the present invention.
[0054] The present invention provides a BIM model organization method for multiple decomposition structures throughout the entire engineering process, such as Figure 1 As shown, the following steps are included:
[0055] S1. Create a BIM model at the component level, input and complete the attribute information of the component, and the attribute information includes initial attribute information and supplementary attribute information.
[0056] Components are the basic building blocks in Building Information Modeling (BIM). They are a series of structural elements that are interconnected in three-dimensional space and work together to complete the building function. Components can represent building partitions, structural columns, point loads, beams, beam pads, steel bars, sewer pipes, etc. Components have certain shapes and sizes, and also have characteristics such as material, concrete strength and name.
[0057] In the embodiment of the present invention, the BIM model creation process is required to be carried out according to the granularity of the component level. For example, when creating a rectangular column pier, the foundation is a pile foundation, such as Figure 2 As shown, the component granularity level includes 2 piers, 1 bridge column tie beam, 2 foundation abutments, 1 abutment tie beam, 4 pile foundations and 2 cushion layers, a total of 12 components.
[0058] The data of the BIM model includes geometric data and non-geometric attribute data. Geometric data refers to data related to the geometric characteristics of the building model, such as shape, size, etc. Non-geometric attribute data, also known as attribute information, includes the BIM model's location information, material information, construction requirements, category classification, etc., and is usually input in two ways:
[0059] 1) Direct input: directly input as parameters when creating the model, and generated and bound together with the BIM model. For example, location information, material information, etc. can be directly input;
[0060] 2) Supplementary input: After the BIM model is created, the attribute information is added to the model. For example, construction requirements, time information, etc. can be added.
[0061] The attribute information is directly bound to the component. When creating the attribute information, it is required that there is no fixed hierarchical subordinate relationship between the attribute information of the model, that is, the attributes are in a parallel relationship.
[0062] Attribute information is divided into initial attribute information and supplementary attribute information. Initial attribute information is the attribute information input when the BIM component is created, usually in the form of direct input. Supplementary attribute information is the attribute information of the BIM component other than the initial attribute information, which can be gradually input at each stage of the project construction, usually in the form of supplementary hooking.
[0063] During the entire process of engineering construction, as the engineering stage continues to advance, the requirements for the LOD (Level of Development) of the BIM model continue to increase. It is inevitable to continuously increase the attribute information of the model to improve its accuracy to meet the needs of business scenarios. The method of supplementing the input of attribute information becomes an important input method in the later stage.
[0064] The specific operations of step S1 in the embodiment of the present invention are as follows:
[0065] S11. Create components of the BIM model, generate component IDs and component names, and input component geometry data and initial attribute information.
[0066] To create components of a BIM model, you need to enter the following information.
[0067] 1) Component ID.
[0068] When creating components of a BIM model, each component needs to generate an ID code for the corresponding component in accordance with industry coding standards plus actual modeling parameters. Each component ID is unique in the BIM model.
[0069] For example, Figure 3The ID code of a component is "18-04.04.02.00-0010037203001". The first ten digits (excluding separators) are "18-04.04.02.00", which is the code for bridge piers in accordance with the "Uniform Standard for Highway Engineering Information Model" (Q / CCCCGL501-2019). In the second half, "001" represents the bridge number, "0037" represents the joint number, "2" represents the section number, "03" represents the location, and "001" represents the component number.
[0070] 2) Component name.
[0071] The component name is similar to a person's name and can be repeated. The component ID is similar to an ID card number, which is unique and cannot be repeated. The component ID is used by the system program to query and locate the component, while the component name is used for front-end display to facilitate users to query and locate the component. The component is also displayed as the component name in the model organization structure tree.
[0072] The component name generally selects a combination of 2 to 3 attributes. For example, the combination of "component type + component number + pile number" is selected for naming, and the component name is "Pier 1 (K22+66)", where "Pier" is the "component type", "1" is the "component number", and "K22+66" is the "pile number".
[0073] 3) Geometric data.
[0074] Although geometric data is very important for building BIM, it is not used as the basis for the subsequent BIM model organization and classification in the embodiment of the present invention, so it will not be described in detail.
[0075] 4) Initial attribute information.
[0076] Initial attribute information is the attribute information input when the BIM component is created. For example, Figure 3 This is an example of component attribute information. The table also contains component ID and component name, which are used to associate components. Figure 3 It includes multiple attribute information, each of which contains attribute name, attribute group, type, attribute value, whether it is required, etc. Figure 3 The last column of the attribute information listed in is "Required", indicating whether it is required information. The "Required" field of the attribute information is used to distinguish whether the attribute is required or optional. The required attribute can be used for subsequent attribute classification. The attribute group is to group several attributes together. The attributes included in each attribute group have similar properties and functions. For example, several attribute information in the "Identity Information" attribute group are used to record the identity information of components at all levels.
[0077] S12. Input supplementary attribute information of BIM model components.
[0078] As the project progresses, it is necessary to add additional attribute information to the components of the BIM model. According to the LOD accuracy required at different stages of the project construction, input the attribute information required by different business scenarios.
[0079] The supplementary attributes of the input can be divided into bulk attributes and proprietary attributes.
[0080] 1) Batch attributes: Batch attribute values can be prepared through batch processing. When entering the attribute content, the type of attribute information and whether it is a required item are defined at the same time, and then the batch attribute attachment is completed by obtaining the component ID.
[0081] 2) Proprietary attributes: Only add attribute information to a certain component. Proprietary attributes are often the information that cannot become a hierarchical option for subsequent organizational management, such as Figure 4 The attribute information of "Painting Instructions" of the middle pier.
[0082] Figure 4 The following examples give examples of data that need to be supplemented in different business scenarios. The attribute information in the attribute group "design information" can be used for engineering measurement, including concrete consumption, steel consumption, and steel material. The attribute information in the attribute group "construction information" can be used for construction management, such as construction technology, construction method, and construction time. The above attributes can be added uniformly through the batch attribute addition tool. In the construction management process, there is a requirement for the "painting instructions" attribute information for bridge piers, but there is no such requirement for pile foundations. Therefore, the painting instructions are added to the bridge piers as a proprietary attribute using a separate addition tool. Since proprietary attributes are not attributes that all components have, its "Is it required" field is no, so it cannot be used as the basis for subsequent BIM model component organization and management.
[0083] S2. Create a new BIM model organization business scenario and set the business scenario name.
[0084] For each scenario, a corresponding model organization structure tree will be generated later, which corresponds to a way of organizing the BIM model. The model organization structure tree organizes the components in the BIM model in a way expected by the business scenario to form a tree structure, and the terminal node of the tree corresponds to a component. In order to facilitate distinction and memory, set an appropriate scenario name when creating a new scenario. For example, you can set the scenario name to "Design Scenario Classification" to divide the BIM model according to the requirements of engineering design. You can also set the "EBS Decomposition" scenario to divide the BIM model according to the requirements of EBS (Engineering Breakdown Structure) decomposition. Or set the "Bill of Quantities Decomposition" scenario to divide the BIM model according to the requirements of the bill of quantities statistics or billing.
[0085] S3. Set the number of levels of BIM model organization in the business scenario, and select the attribute name for each level of classification.
[0086] In order to meet the needs of BIM model organization in this scenario and realize flexible decomposition of BIM model, follow the steps below:
[0087] 1) Set the first-level attribute name. The attribute name can be selected from all required attributes.
[0088] 2) Add the next level and set the attribute name of the next level.
[0089] 3) Continue to add the next level until the decomposition requirements are met.
[0090] 4) When a certain level is no longer needed, it can be deleted and the lower levels will automatically move up.
[0091] For example, Figure 5 The diagram shows the bridge classification. On the left is the interface for editing scenes and classifications, and on the right is the attribute name options after each level is pulled down, which contains the names of all required attribute information in the BIM model. For the newly created scene named "Design Scene Classification", add the first classification, pull down to select the attribute name for this level of classification, select the required attribute "Bridge Name", and complete the addition of the first level of stratification. Next, follow this method to complete the addition of subsequent levels.
[0092] The embodiment of the present invention can adjust the completed grading, such as reselecting a new attribute name or deleting the level. After deleting a middle level, the number of levels of the subsequent levels is automatically adjusted. Figure 5 In the example, if the third level is deleted, the original fourth level will automatically change to the third level, the fifth level will become the fourth level, and so on. The above method can increase and decrease the levels in the scene without restriction.
[0093] For example, Figure 5 The "design scenario classification" is divided into six levels: 1) "bridge name"; 2) "bridge width"; 3) "part"; 4) "sub-joint"; 5) "sub-span line number"; 6) "structural type". The other scenarios "EBS decomposition" and "bill of quantities decomposition" are different from the "design scenario classification". For BIM model projects with different classification requirements, the requirements can be met by adding new scenarios and classifications, and the definition of scenarios and classifications can have a high degree of freedom.
[0094] S4. Generate a model organizational structure skeleton for the business scenario based on the hierarchical and classified attribute names.
[0095] The model organization structure skeleton is a tree structure formed by dividing the component attributes in the BIM model according to the hierarchical classification attributes. Since it does not yet contain component information, it is the skeleton of the model organization structure tree at this time and is called the model organization structure skeleton.
[0096] After determining the classification of business scenarios, perform the following operations according to the hierarchical order and attribute names of the classification:
[0097] 1) Collect statistics on the attribute information of all components in the BIM model and find all attribute values under the first-level attribute name.
[0098] 2) Treat each attribute value under the attribute name of this level as a branch under this level.
[0099] 3) Read all attribute values under the next level attribute name, with each attribute value as a sub-branch of the branch.
[0100] 4) Repeat the previous step until all levels of operations are completed to form the organizational structure skeleton of the model.
[0101] For example, according to Figure 5 The graded pairs in Figure 3 The pier components are divided as shown in . Figure 5 The attribute classification is "bridge name - bridge span - location - sub-joint - sub-span line number - structure type". The process of generating the model organizational structure skeleton is as follows, Figure 6 As shown:
[0102] 1) Search for the attribute value under the "Bridge Name" attribute in all component information attribute lists. If there is only one "Bridge A", Bridge A will be used as the only branch of the first level of the model organization structure tree.
[0103] 2) Under the "Bridge A" branch, according to the second-level attribute name "Bridge Width", search for all attribute values in the component information list to obtain two types of attribute values, "Left Width" and "Right Width", forming two branches under "Bridge A".
[0104] 3) Similarly, in the "Left Width" branch, all attribute values in the component attribute list under this branch are searched according to the third-level attribute name "Location", and three value types of "Upper Structure", "Lower Structure", and "Subsidiary Structure" are obtained, forming another three branches under the "Left Width" branch. The same three branches are set under the "Right Width". Due to the limited space of the figure, Figure 6 Only the "left panel" is shown.
[0105] 4) And so on, until the last level, a complete six-layer branch skeleton is formed, and the following is obtained: Figure 6 The model organizational structure skeleton is shown.
[0106] S5. Add components to the terminal nodes of the model organization structure skeleton, record the component ID, display the component name, and generate the model organization structure tree.
[0107] The terminal node of the model organization structure skeleton corresponds to an attribute value list, including all attribute values from the tree root to the terminal node. Find the components that meet this attribute value list, divide the components with the same attribute value list into the same terminal node of the model organization structure skeleton, and then display the components under the nodes of the model organization structure skeleton with the component name, generate the model organization structure tree, and record the component ID on the leaf node of the tree.
[0108] For example, the model organization structure skeleton terminal node is "Bridge A-Left span-Substructure-37th joint-129#-Pier", which corresponds to an attribute value list containing six attribute values. Find all components that meet this attribute value. A total of 12 components are found. Read the component ID and component name, and display the component name under the model organization structure skeleton terminal node to form Figure 7 The model organization structure tree shown in the figure on the left.
[0109] It should be noted that after the model organization structure tree is generated, the model organization structure tree can also be reviewed. Check the number of divided components based on the generated model organization structure tree, check whether it can be fully mapped to the components of the BIM model, ensure that the corresponding relationship between the model organization structure tree and the components is not missing or conflicting, and make sure that the division requirements of the business scenario are met.
[0110] When the number of components on the model organization structure tree is inconsistent with the number of division requirements, it is usually because the attribute information used for hierarchical classification is set incorrectly. It is necessary to check whether the attribute information of the components is missing or wrong.
[0111] For example, Figure 2 After the above classification operation, the 12 components in the Figure 7 In the model organization structure tree on the left, all 12 components have appropriate locations without any missing components, and this organizational form meets the requirements for the division of business scenarios.
[0112] S6. Correspondingly associate components of the model organization structure tree with components of the BIM model through component IDs.
[0113] In the process of forming the model organization structure tree in the above steps, the component ID has been stored in the model organization structure tree. Due to the uniqueness of the component ID, the model organization structure tree can easily query the corresponding component through the component ID, thus realizing the corresponding association between the model organization structure tree and the components in the BIM model. Different model organization structure trees can be associated with the same component through the ID.
[0114] For example, Figure 7 A component in the left picture shows that the component name is "Pier 1 (K22+66)", and its corresponding component ID is "18-04.04.02.00-0010037203001". Through this component ID, the components on the model organization structure tree can be matched with the components in the BIM model.
[0115] The embodiment of the present invention can compile a model organization structure tree of a corresponding scenario according to different business scenario requirements. Through the above steps S2-S6, the construction of a model organization structure tree under a business scenario is completed. When it is necessary to establish multiple division scenarios through BIM, for each scenario, steps S2-S6 are repeated to obtain a model organization structure tree under each scenario.
[0116] Figure 7 The figure shows the model organization structure tree of the left and right bridge piers obtained by different scene classifications. The final division result is shown in the figure as component name. The left side shows the model organization structure tree obtained under the design scene classification, and the right side shows the model organization structure tree obtained under the bill of quantities decomposition scene classification. The structure tree on the left is classified into six levels according to "bridge name-bridge span-position-sub-joint-sub-span line number-structure type". All components of each bridge pier are classified together, while the left and right bridge piers are already divided at the second level "bridge span". The model organization structure tree on the right is classified into five levels according to "bridge name-position-sub-joint-bridge span-component type". All components in each bridge pier are no longer classified together, and the left and right bridge piers are separated only at the fourth level of bridge span.
[0117] After generating multiple model organization structure trees, you can freely switch the model organization structure trees to organize and manage the BIM model in different dimensions.
[0118] Use different model organization structure trees to manage BIM models, such as display, hide, delete, and edit. The model organization structure tree displays the component name. Select the component name to find the corresponding component ID, and find the component corresponding to the BIM model through the component ID. The model organization structure tree displays, hides, and edits components by finding and selecting the component by the component ID, and then uses the BIM software's own geometry engine to display, hide, and edit the component. The model organization structure tree can be used as an input port for an operation command. When a component is deleted, the model organization structure tree will automatically refresh, remove the ID and name of the deleted component, and obtain a new model organization structure tree. Different model organization structure trees can perform the above management operations on the BIM model. Switching the model organization structure tree does not produce any substantial operation or impact on the component. It only jumps to a different model organization structure tree page for management.
[0119] When the existing attribute information cannot meet the new scene classification requirements, supplementary attribute information can be added to dynamically organize and manage the BIM model.
[0120] A set of BIM models needs to be applicable to multiple scenarios. The model organization structure tree corresponding to each scenario is classified based on attribute information. Attribute information includes initial attribute information and supplementary attribute information. Supplementary attribute information can be continuously updated and supplemented in the later stage of BIM operation and maintenance. With the progress of the construction project, when the existing attribute information cannot meet the hierarchical classification requirements of the new scenario, new supplementary attribute information can be added to the BIM model, and the name of the newly added supplementary attribute information can be used as the attribute name of the hierarchical classification. Through the above steps, the generation of the model organization tree in the new scenario is completed, and the dynamic organization and management of the BIM model is realized.
[0121] The embodiment of the present invention further provides a BIM model decomposition structure organization device, including the following modules:
[0122] Component creation module: used to create a BIM model at the component level, input and complete the component attribute information, the attribute information includes initial attribute information and supplementary attribute information;
[0123] Scenario creation module: used to create a new BIM model organization business scenario and set the business scenario name;
[0124] Level setting module: used to set the number of levels of BIM model organization in business scenarios and select the attribute name for each level of classification;
[0125] Model organizational structure skeleton generation module: used to generate the model organizational structure skeleton in the business scenario according to the hierarchical and classified attribute names;
[0126] Model organization structure tree generation module: used to add components to the terminal nodes of the model organization structure skeleton, record component IDs, display component names, and generate the model organization structure tree;
[0127] Component association module: used to associate the components of the model organization structure tree with the components of the BIM model through the component ID.
[0128] An embodiment of the present invention further provides an electronic device, including:
[0129] Memory for storing computer programs;
[0130] The processor is used to execute the program stored in the memory to implement the steps of the aforementioned BIM model decomposition structure organization method embodiment.
[0131] For the specific implementation of each step of the method and related explanations, please refer to the embodiment of the method, which will not be repeated here.
[0132] The memory of the electronic device mentioned in this embodiment may include a random access memory (Random Access Memory, RAM), and may also include a non-volatile memory (Non-Volatile Memory, NVM), such as at least one disk memory.
[0133] The above-mentioned processor can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.
[0134] The embodiment of the present invention further provides a computer-readable storage medium, in which a computer program is stored, and when the computer program is executed by a processor, each step of the aforementioned BIM model decomposition structure organization method embodiment is implemented. The specific implementation of each step of the method and related explanations can be found in the embodiment of the method, and will not be repeated here.
[0135] It should be noted that the various embodiments in this specification are described in a related manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.
[0136] In particular, for the device, electronic device, and computer-readable storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiments.
[0137] The above embodiments are only used to help understand the method and core idea of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made to the present invention without departing from the principles of the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
Claims
1. A method for organizing a BIM model decomposition structure, characterized in that: The following steps are involved: S1. Create a BIM model at the component level, input and complete the attribute information of the component, and the attribute information includes initial attribute information and supplementary attribute information; S2. Create a new BIM model organization business scenario and set the business scenario name; S3. Set the number of levels of BIM model organization in the business scenario and select the attribute name for each level of classification, including: 1) Set the first-level attribute name. The attribute name can be selected from all required attributes; 2) Add the next level and set the attribute name of the next level; 3) Continue to add the next level until the decomposition requirements are met; 4) When a certain level is no longer needed, delete it and the lower levels will automatically move up; S4. Generate a model organizational structure skeleton under the business scenario according to the hierarchical and classified attribute names; S5. Add components to the terminal nodes of the model organization structure skeleton, record the component ID, display the component name, and generate the model organization structure tree; S6. Correspondingly associate components of the model organization structure tree with components of the BIM model through component IDs.
2. The method for organizing a BIM model decomposition structure according to claim 1, characterized in that: The BIM model is created at the component level, and the attribute information of the component is input and improved, including: 1) Create components of the BIM model, generate component ID and component name, and input component geometry data and initial attribute information; 2) Input supplementary attribute information of BIM model components.
3. The method for organizing a BIM model decomposition structure according to claim 1, characterized in that: The generating of the model organizational structure skeleton in the business scenario according to the hierarchically classified attribute names includes: 1) Count the attribute information of all components in the BIM model and find all attribute values under the first-level attribute name; 2) Treat each attribute value under the attribute name of the level as a branch under the level; 3) Read all attribute values under the next level attribute name, with each attribute value as a sub-branch of the branch; 4) Repeat the previous step until all levels of operations are completed to form the organizational structure skeleton of the model.
4. A BIM model decomposition structure organization device, characterized in that: Includes the following modules: Component creation module: used to create a BIM model at the component level, input and complete the component attribute information, the attribute information includes initial attribute information and supplementary attribute information; Scenario creation module: used to create a new BIM model organization business scenario and set the business scenario name; Hierarchy setting module: used to set the number of levels of BIM model organization in business scenarios and select the attribute name for each level of classification, including: 1) Set the first-level attribute name. The attribute name can be selected from all required attributes; 2) Add the next level and set the attribute name of the next level; 3) Continue to add the next level until the decomposition requirements are met; 4) When a certain level is no longer needed, delete it and the lower levels will automatically move up; Model organizational structure skeleton generation module: used to generate the model organizational structure skeleton in the business scenario according to the hierarchical and classified attribute names; Model organization structure tree generation module: used to add components to the terminal nodes of the model organization structure skeleton, record component IDs, display component names, and generate the model organization structure tree; Component association module: used to associate the components of the model organization structure tree with the components of the BIM model through the component ID.
5. An electronic device comprising: Memory for storing computer programs; A processor is used to execute the program stored in the memory to implement the method steps described in any one of claims 1-3.
6. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method steps described in any one of claims 1 to 3 are implemented.