Configurable model-based risk assessment method and device

Through a risk assessment method based on a configurable model, it is suitable for risk assessment of different risk assessment objects, solving the problem of a large number of models and difficult management in the existing technology, and achieving flexible configuration and unified management of risk assessment models.

CN117829592BActive Publication Date: 2024-10-29DONGTU TECH (YICHANG) CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202311765990.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-20
Publication Date
2024-10-29
Estimated Expiration
2043-12-20

AI Technical Summary

Technical Problem

In the existing technology, there are a large number of models used for risk identification and assessment, which are inconvenient for unified management and maintenance, and are difficult to adapt to changes in different risk assessment objects and environments.

Method used

Adopting a risk assessment method based on a configurable model, by obtaining the target risk assessment object, determining and configuring the corresponding original model, and generating the configured model for risk assessment, which is suitable for different risk assessment objects and reduces the need to set multiple settings for each object. model requirements.

Benefits of technology

It realizes the flexible configuration and unified management of risk assessment models, improves the applicability and maintenance efficiency of the models, and solves the management difficulties caused by too many models.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117829592B_ABST
    Figure CN117829592B_ABST
Patent Text Reader

Abstract

The present application provides a risk assessment method and device based on a configurable model, wherein the method includes: obtaining a target risk assessment object; determining a target original model corresponding to the target risk assessment object; configuring the target original model according to the target configuration information of the target risk assessment object to obtain a configured model; performing risk assessment on the data to be assessed of the target risk assessment object through the configured model to obtain a target risk level corresponding to the data to be assessed. Through the present application, the technical problem that there are a large number of models for risk identification and assessment in the related art, which is not convenient for unified management and maintenance, can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of security management and control technology, and in particular to a risk assessment method and device based on a configurable model. Background Art

[0002] For enterprises related to production safety, it is very important to accurately identify the sources of danger and their risk characteristics, analyze, evaluate and classify the risks caused by the sources of danger, verify whether the existing control measures are sufficient based on the evaluation results, and finally formulate more reasonable and complete control measures. In the process of production safety, both visible hidden dangers and invisible risks need to be controlled by certain means. The means to be used depend on the possible consequences of the corresponding hidden dangers or risks. It is foreseeable that different evaluation stages and different scenarios (operation activities) will face different hidden dangers or risks, so the evaluation methods to be adopted should be adjusted accordingly to ensure accuracy.

[0003] However, in the prior art, when risk analysis units (i.e., objects that need to be risk assessed) and operating environments are subjected to risk identification and assessment using corresponding risk assessment projects, a fixed assessment scheme is still used; however, due to the inconsistency of risk identification and assessment methods for different risk assessment projects such as risk analysis units and operating environments; at the same time, at different times, due to policy requirements or changes in the risk environment, even the risk assessment methods corresponding to the same risk analysis unit and operating environment need to be adjusted accordingly. In addition, since each risk assessment project needs to correspond to a set of logic, there will be a large number of models used for risk identification and assessment, which is not convenient for unified management and maintenance.

[0004] Therefore, there is a technical problem in the related technology that there are a large number of models used for risk identification and assessment, which makes it difficult to uniformly manage and maintain them. Summary of the invention

[0005] The present application provides a risk assessment method and device based on a configurable model, so as to at least solve the technical problem in the related art that there are a large number of models used for risk identification and assessment, which are not convenient for unified management and maintenance.

[0006] According to one aspect of an embodiment of the present application, a model-based risk assessment method is provided, comprising:

[0007] Obtain the target risk assessment object;

[0008] Determining a target original model corresponding to the target risk assessment object;

[0009] According to the target configuration information of the target risk assessment object, the target original model is configured to obtain a configured model;

[0010] The configured model is used to perform risk assessment on the data to be assessed of the target risk assessment object to obtain a target risk level corresponding to the data to be assessed.

[0011] Optionally, as in the aforementioned method, determining the target original model corresponding to the target risk assessment object includes:

[0012] Get all candidate original models;

[0013] Determine candidate model information corresponding to each candidate original model, wherein the model information includes: application scenario, variable information, and evaluation results;

[0014] The target original model is determined from all the candidate original models by matching the target evaluation information corresponding to the target risk evaluation object with the candidate model information, wherein the evaluation information includes: application scenario, variable information and evaluation result.

[0015] Optionally, as in the aforementioned method, configuring the target original model according to the target configuration information of the target risk assessment object to obtain the configured model includes:

[0016] Obtaining a target configuration operation for configuring the target primitive model;

[0017] In response to the target configuration operation, the target original model is configured according to the target configuration information to obtain the configured model.

[0018] Optionally, as in the aforementioned method, the target configuration information includes at least one of the following:

[0019] Model name, model purpose, variables, weight corresponding to each variable, value corresponding to each variable, influencing factors corresponding to each variable, calculation relationship between different variables, conclusions and control measures corresponding to each conclusion.

[0020] Optionally, as in the aforementioned method, performing risk assessment on the data to be assessed of the target risk assessment object by using the configured model to obtain a target risk level corresponding to the data to be assessed includes:

[0021] Collecting and obtaining the latest data to be evaluated;

[0022] Inputting the data to be evaluated into the configured model to obtain a target conclusion corresponding to the data to be evaluated;

[0023] The target risk level is determined based on the target conclusion.

[0024] Optionally, as in the aforementioned method, configuring the target original model according to the target configuration information of the target risk assessment object to obtain the configured model includes:

[0025] Obtaining a configuration file including the target configuration information;

[0026] Parsing the configuration file to obtain parsed information;

[0027] According to the parsed information, the target original model is configured to obtain the configured model.

[0028] Optionally, as in the aforementioned method, after performing risk assessment on the data to be assessed of the target risk assessment object through the configured model to obtain a target risk level corresponding to the data to be assessed, the method further includes:

[0029] In the case where the target risk assessment object is an operation type, determining candidate control measures corresponding to each candidate risk level in the configured model;

[0030] The target control measures corresponding to the target risk level are determined from all candidate control measures.

[0031] According to another aspect of the embodiment of the present application, a model-based risk assessment device is also provided, including:

[0032] An acquisition module is used to acquire a target risk assessment object;

[0033] A determination module, used to determine a target original model corresponding to the target risk assessment object;

[0034] A configuration module, configured to configure the target original model according to the target configuration information of the target risk assessment object to obtain a configured model;

[0035] The evaluation module is used to perform risk evaluation on the data to be evaluated of the target risk evaluation object through the configured model to obtain a target risk level corresponding to the data to be evaluated.

[0036] According to another aspect of the embodiments of the present application, there is also provided an electronic device, including a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus; wherein the memory is used to store a computer program; and the processor is used to execute the method steps in any of the above embodiments by running the computer program stored in the memory.

[0037] According to another aspect of the embodiments of the present application, a computer-readable storage medium is provided, in which a computer program is stored, wherein the computer program is configured to execute the method steps in any of the above embodiments when executed.

[0038] In an embodiment of the present application, the target original model is configured according to the target configuration information of the target risk assessment object. After obtaining the configured model, the risk assessment is performed on the data to be assessed of the target risk assessment object through the configured model to obtain the target risk level corresponding to the data to be assessed. Therefore, only by configuring the target original model, it can be applied to the risk assessment of different risk assessment objects. There is no need to set a corresponding model for each risk assessment object. This can solve the technical problem in the related art that there are a large number of models for risk identification and assessment, which is not convenient for unified management and maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0040] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0041] Figure 1 is a schematic diagram of a hardware environment of an optional configurable model-based risk assessment method according to an embodiment of the present application;

[0042] Figure 2 is a flow chart of an optional risk assessment method based on a configurable model according to an embodiment of the present application;

[0043] Figure 3 is a schematic diagram of an optional risk assessment method based on a configurable model according to another embodiment of the present application;

[0044] Figure 4 is a functional structure diagram of another optional custom configuration of a computing model according to an embodiment of the present application;

[0045] Figure 5 is a structural block diagram of an optional risk assessment device based on a configurable model according to an embodiment of the present application;

[0046] Figure 6 It is a structural block diagram of an optional electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0047] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0048] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0049] According to one aspect of an embodiment of the present application, a model-based risk assessment method is provided. Optionally, in this embodiment, the above-mentioned model-based risk assessment method can be applied to Figure 1 In the hardware environment composed of terminal 1402 and server 1404 shown in FIG. Figure 1 As shown, server 1404 is connected to terminal 1402 via a network, and can be used to provide services (such as game services, application services, etc.) for the terminal or a client installed on the terminal. A database can be set up on the server or independently of the server to provide data storage services for server 1404.

[0050] The above network may include but is not limited to at least one of the following: wired network, wireless network. The above wired network may include but is not limited to at least one of the following: wide area network, metropolitan area network, local area network, and the above wireless network may include but is not limited to at least one of the following: WIFI (Wireless Fidelity), Bluetooth. The terminal may not be limited to a PC, a mobile phone, a tablet computer, etc.

[0051] The model-based risk assessment method of the embodiment of the present application can be executed by a server, a terminal, or a server and a terminal together. The terminal can also execute the model-based risk assessment method of the embodiment of the present application by a client installed thereon.

[0052] Taking the server executing the model-based risk assessment method in this embodiment as an example, Figure 2 A risk assessment method based on a configurable model provided in an embodiment of the present application includes the following steps:

[0053] Step S101, obtaining a target risk assessment object.

[0054] The model-based risk assessment method in this embodiment can be applied to scenarios where risk identification and assessment need to be performed on risk analysis units (i.e., objects that need to be risk analyzed, such as chemical equipment, materials, etc.), and can also be applied to scenarios where risk identification and assessment need to be performed on working environments; for other types of objects that need to be risk identified and assessed, the above-mentioned model-based risk assessment method is also applicable unless there is a contradiction.

[0055] Specifically, the target risk assessment object may be an object that needs to be risk assessed, for example, it may include: a risk analysis unit, an operating environment, etc. And generally, different target risk assessment objects have different parameters based on which risk assessment is performed.

[0056] Step S102: determining a target original model corresponding to the target risk assessment object.

[0057] Specifically, after determining the target risk assessment object, the target original model can be determined by automatically matching the target risk assessment object, or by selecting from all candidate original models to determine the target original model corresponding to the target risk assessment object.

[0058] Step S103: configuring the target original model according to the target configuration information of the target risk assessment object to obtain a configured model.

[0059] Specifically, after determining the target risk assessment object, target configuration information of the target risk assessment object can be determined. The target configuration information can be information obtained when configuring the target original model in real time, or can be information determined before configuring the target original model.

[0060] The target configuration information may include but is not limited to at least one of the following:

[0061] Model name, model purpose, variables, weight corresponding to each variable, value corresponding to each variable, influencing factors corresponding to each variable, calculation relationship between different variables, conclusions and control measures corresponding to each conclusion.

[0062] Step S104, performing risk assessment on the data to be assessed of the target risk assessment object through the configured model to obtain a target risk level corresponding to the data to be assessed.

[0063] Specifically, after the configured model is obtained according to the target configuration information, the model can be used for risk assessment of the target risk assessment object.

[0064] The data to be assessed of the target risk assessment object can be collected, and then the data to be assessed can be input into the configured model to obtain the target risk level corresponding to the data to be assessed output by the configured model; and the target risk level is also used to indicate the risk level of the target risk assessment object at the moment when the data to be assessed is collected.

[0065] The target risk level may be a level used to indicate the level of risk, such as low risk, average risk, greater risk, and significant risk, etc.

[0066] The method of this embodiment configures the target original model according to the target configuration information of the target risk assessment object, obtains the configured model, and then uses the configured model to perform risk assessment on the data to be assessed of the target risk assessment object to obtain the target risk level corresponding to the data to be assessed; thereby, only by configuring the target original model, it can be applied to the risk assessment of different risk assessment objects; there is no need to set a corresponding model for each risk assessment object; and thus, the technical problem in the related art that there are a large number of models for risk identification and assessment, which is not convenient for unified management and maintenance, can be solved.

[0067] like Figure 3 As shown, as an optional embodiment, as in the above method, determining the target original model corresponding to the target risk assessment object includes the following steps:

[0068] Step S201, obtaining all candidate original models.

[0069] Specifically, all candidate original models may be stored in a target database in advance, and then the target database may be read to obtain all candidate original models.

[0070] Step S202, determining candidate model information corresponding to each candidate original model, wherein the information types in the model information include: application scenario, variable information and evaluation result.

[0071] Specifically, after all candidate original models are determined, the candidate model information corresponding to each candidate original model can be obtained by reading information of each candidate original model.

[0072] In this embodiment, the information types in the model information may include: application scenario (ie, used for risk assessment in a risk assessment unit scenario or an operation scenario), variable information, and assessment results.

[0073] Step S203, by matching the target assessment information corresponding to the target risk assessment object with the candidate model information, a target original model is determined from all candidate original models, wherein the information types in the assessment information include: application scenario, variable information and assessment results.

[0074] Specifically, the target risk assessment object also has corresponding target assessment information, and the information types in the assessment information also include: application scenario, variable information and assessment results.

[0075] Therefore, the target evaluation information can be matched with the candidate model information. When there is candidate model information that is completely consistent with the target evaluation information, the candidate original model corresponding to the candidate model information is directly determined as the target original model.

[0076] When there is no candidate model information that is completely consistent with the target evaluation information, the designated model information with the highest matching degree with the target evaluation information can be determined from all the candidate model information, and the candidate original model corresponding to the designated model information can be determined as the target original model.

[0077] Through the method of this embodiment, a method for determining a target original model is provided, and the efficiency of determining model matching can be effectively improved.

[0078] As an optional embodiment, as in the aforementioned method, configuring the target original model according to the target configuration information of the target risk assessment object to obtain the configured model includes the following steps:

[0079] Get a target configuration operation for configuring a target primitive model;

[0080] In response to the target configuration operation, the target original model is configured according to the target configuration information to obtain a configured model.

[0081] Specifically, the target configuration operation can be received through a preset interactive interface. Through the target configuration operation, the model name, model purpose, variables, weights corresponding to each variable, values ​​corresponding to each variable, influencing factors corresponding to each variable, calculation relationships between different variables, conclusions, and control measures corresponding to each conclusion in the target original model can be configured to obtain a configured model.

[0082] As an optional embodiment, as in the aforementioned method, risk assessment is performed on the data to be assessed of the target risk assessment object through the configured model to obtain the target risk level corresponding to the data to be assessed, including the following steps:

[0083] Collect the latest data to be evaluated;

[0084] Input the data to be evaluated into the configured model to obtain the target conclusion corresponding to the data to be evaluated;

[0085] Determine the target risk level based on the target conclusion.

[0086] Specifically, information can be collected on the target risk assessment object. For example, when the target risk assessment object is a risk assessment unit, parameters related to the target risk assessment object can be collected. For example, when the target risk assessment object is a facility, the data to be evaluated can be the operating parameters of the facility, environmental information (temperature, humidity), etc.; when the target risk assessment object is an operation type, the data to be evaluated can be the operation information of the personnel.

[0087] After obtaining the data to be evaluated, the data to be evaluated can be input into the configured model, and then the configured model can process the data to be evaluated and obtain the corresponding target conclusion.

[0088] After the target conclusion is determined, the target risk level corresponding to the target conclusion can be determined through the preset correspondence between the conclusion and the risk level.

[0089] Through the method of this embodiment, the data to be evaluated can be processed based on the configured model to determine the target risk level corresponding to the data to be evaluated.

[0090] As an optional embodiment, as in the aforementioned method, the target original model is configured according to the target configuration information of the target risk assessment object to obtain a configured model, including:

[0091] Get a configuration file including target configuration information;

[0092] Parse the configuration file to obtain the parsed information;

[0093] The target original model is configured according to the parsed information to obtain a configured model.

[0094] Specifically, the configuration file may be a file containing target configuration information; thus, the parsed information may be obtained by parsing the configuration file.

[0095] The parsed information may include: model name, model purpose, variables, weight corresponding to each variable, value corresponding to each variable, influencing factors corresponding to each variable, calculation relationship between different variables, conclusions and control measures corresponding to each conclusion.

[0096] After obtaining the parsed information, the target original model can be configured based on the parsed information. For example, the target original model can be configured through each sub-information in the parsed information (including: sub-information type, sub-information value). When the target original model has the same type as the sub-information type, the sub-information type is configured through the sub-information value, for example, the model name is set; when the target original model does not exist in the sub-information type, the sub-information is added, for example, a variable is added.

[0097] Through the method of this embodiment, the model can be quickly configured based on the file, thereby further improving the efficiency of the configuration.

[0098] As an optional embodiment, as in the above method, after performing risk assessment on the data to be assessed of the target risk assessment object through the configured model to obtain the target risk level corresponding to the data to be assessed, the method further includes:

[0099] In the case where the target risk assessment object is the operation type, determine the candidate control measures corresponding to each candidate risk level in the configured model;

[0100] Determine the target control measures corresponding to the target risk level among all candidate control measures.

[0101] Specifically, after obtaining the target risk assessment object, it can be determined whether the target risk assessment object is an operation type or a risk analysis unit type.

[0102] When the target risk assessment object is determined to be an operation type, that is, when the risks in the operation process need to be determined in real time, after determining the target risk level, the corresponding target control measures need to be determined.

[0103] In this embodiment, candidate control measures corresponding to each candidate risk level in the configured model can be pre-configured; further, after the target risk level is determined, the target control measures corresponding to the target risk level can be determined.

[0104] Through the method of this embodiment, after determining the target risk level, the corresponding target control measures can also be determined, so as to avoid further increase in risk and thus cause greater safety hazards.

[0105] As described below, an application example of applying any of the aforementioned embodiments is provided, including: custom configuration of computing models and on-demand selection of computing models.

[0106] (1) Custom configuration of the computing model, including:

[0107] The calculation models that may be used in the project are summarized as shown in the following table:

[0108]

[0109]

[0110] After analyzing the commonly used calculation models mentioned above, it is found that different calculation models are different in application scenarios, variables, relationships between variables and results. In order to adapt to known and unknown evaluation method configurations, based on the above table, the model name and purpose (i.e., the model description described in the above table) can be defined; variables and variable weights can be defined; the value of each variable (i.e., the range of possible values) and the influencing factors corresponding to each value (i.e., under each variable, each influencing factor has a corresponding value) can be defined; the calculation method between variables can be adjusted to define the calculation relationship between variables; the conclusions contained in the results and the measures corresponding to the conclusions can be defined; specifically, the functional structure of one optional custom configuration of the calculation model is as follows: Figure 4 shown.

[0111] The bottom layer implements the calculation model according to the calculation relationship preset in the function.

[0112] (2) The calculation model is selected as required:

[0113] After the calculation model is configured, it is necessary to sort out the business functions that will use the calculation model; when designing business functions (i.e., risk assessment objects), it is necessary to fully consider the actual needs of the business and design the way to call the calculation model according to the needs.

[0114] First, the risk level of the risk analysis unit (i.e., one of the target risk assessment objects) is evaluated according to the following steps: 1. Determine the data to be evaluated I (i.e., target assessment information) of the risk analysis unit; 2. Call out all risk identification and assessment models (i.e., candidate original models); 3. By matching the data to be evaluated I with all risk identification and assessment models, the target original model a is determined according to the actual situation of the risk analysis unit (i.e., the situation based on which the target configuration operation is based or the situation based on which the configuration file is generated); 4. Configure the target original model a according to the actual situation to obtain the configured model A; 5. Input the data to be evaluated I into the configured model A to obtain the risk level of the risk analysis unit.

[0115] Secondly, according to the following steps, before performing the special operation, the risk of the special operation (i.e., the target risk assessment object of the operation type) is assessed: 1. Determine the data to be assessed II of the special operation (i.e., the target assessment information); 2. Call out all risk identification and assessment models (i.e., candidate original models); 3. Determine the target original model b according to the actual situation of the special operation (i.e., the situation based on the target configuration operation or the situation based on which the configuration file is generated); 4. By matching the data to be assessed I with all risk identification and assessment models, the target original model b is configured according to the actual situation to obtain the configured model B; 5. The data to be assessed II is input into the configured model B to obtain the risk level of the special operation.

[0116] Optionally, the target original model can be configured in the following manner to obtain a configured model:

[0117] 1.1、Configure the calculation model:

[0118] Optionally, in the project, the configuration function of the calculation model is designed as: model configuration; by clicking the model configuration function, all risk identification and assessment models (i.e., candidate original models) currently preset in the system can be viewed;

[0119] Through the Add button in the interactive interface, you can prioritize the name and purpose of the selected target original model;

[0120] By clicking the Add button corresponding to the influencing factor in the interactive interface, you can add the variables of the target original model and the influencing factors of the variable values;

[0121] Multiple variables can be added as needed; after adding variables, the analysis conclusions can be defined: the degree of danger corresponding to different values, recommended measures, etc.

[0122] After the target original model is configured and saved, the configured model is obtained, and the configured model can be called.

[0123] 1.2 Risk Assessment:

[0124] In the risk assessment task function, click the evaluation button after the corresponding task (i.e., the task of evaluating a certain data to be evaluated, which can be the task of risk assessment of any risk analysis unit); take the evaluation of a certain risk analysis unit (i.e., one of the target risk assessment objects) as an example, first select the risk assessment method (i.e., the configured model after the configuration is completed); the data in the risk assessment method comes from all the calculation models configured in the assessment configuration function, that is, the name corresponding to each configured model can be displayed, so that the user can select the required configured model according to the name;

[0125] After selecting the required configured model, the variables corresponding to the configured model will be displayed; and if the model is different, the interface will switch according to the model;

[0126] After selecting the factors within the corresponding variables (i.e., the variable values ​​corresponding to each variable), the risk level and control measures recommendations corresponding to the risk analysis unit assessment task will be obtained;

[0127] Other business modules can also call the risk assessment model through similar operations.

[0128] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0129] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course it can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM (Read-Only Memory, read-only memory) / RAM (Random Access Memory, random access memory), a disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present application.

[0130] According to another aspect of an embodiment of the present application, a model-based risk assessment device for implementing the above-mentioned model-based risk assessment method is also provided. Figure 5 is a structural block diagram of an optional model-based risk assessment device according to an embodiment of the present application, such as Figure 5 As shown, the device may include:

[0131] Acquisition module 1, used to acquire the target risk assessment object;

[0132] Determination module 2, used to determine the target original model corresponding to the target risk assessment object;

[0133] Configuration module 3, configured to configure the target original model according to the target configuration information of the target risk assessment object to obtain a configured model;

[0134] The evaluation module 4 is used to perform risk evaluation on the data to be evaluated of the target risk evaluation object through the configured model to obtain the target risk level corresponding to the data to be evaluated.

[0135] It should be noted that the acquisition module 1 in this embodiment can be used to execute the above step S101, the determination module 2 in this embodiment can be used to execute the above step S102, the configuration module 3 in this embodiment can be used to execute the above step S103, and the evaluation module 4 in this embodiment can be used to execute the above step S104.

[0136] The device in this embodiment, in addition to the above modules, may also include a module for executing any method in any of the above-mentioned embodiments of the model-based risk assessment method.

[0137] It should be noted that the examples and application scenarios implemented by the above modules and corresponding steps are the same, but are not limited to the contents disclosed in the above embodiments. It should be noted that the above modules as part of the device can be run in Figure 1 In the hardware environment shown, it can be implemented by software or by hardware, wherein the hardware environment includes a network environment.

[0138] According to another aspect of an embodiment of the present application, an electronic device for implementing the above-mentioned model-based risk assessment method is also provided. The electronic device may be a server, a terminal, or a combination thereof.

[0139] According to another embodiment of the present application, there is also provided an electronic device, including: Figure 6 As shown, the electronic device may include: a processor 1501 , a communication interface 1502 , a memory 1503 and a communication bus 1504 , wherein the processor 1501 , the communication interface 1502 , and the memory 1503 communicate with each other via the communication bus 1504 .

[0140] Memory 1503, used for storing computer programs;

[0141] The processor 1501 is used to implement the following steps when executing the program stored in the memory 1503:

[0142] Step S101, obtaining a target risk assessment object.

[0143] Step S102: determining a target original model corresponding to the target risk assessment object.

[0144] Step S103: configuring the target original model according to the target configuration information of the target risk assessment object to obtain a configured model.

[0145] Step S104, performing risk assessment on the data to be assessed of the target risk assessment object through the configured model to obtain a target risk level corresponding to the data to be assessed.

[0146] Optionally, in this embodiment, the above-mentioned communication bus can be a PCI (Peripheral Component Interconnect) bus, or an EISA (Extended Industry Standard Architecture) bus, etc. The communication bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, only one thick line is used in the figure, but it does not mean that there is only one bus or one type of bus. The communication interface is used for communication between the above-mentioned electronic device and other devices.

[0147] The memory may include a random access memory (RAM) or a non-volatile memory (NVM), such as at least one disk memory. Optionally, the memory may also be at least one storage device located away from the aforementioned processor.

[0148] As an example, the memory 1503 may include but is not limited to the acquisition module 1, the determination module 2, the configuration module 3 and the evaluation module 4. In addition, it may also include but is not limited to other module units in the model-based risk assessment device, which will not be repeated in this example.

[0149] The above-mentioned processor can be a general-purpose processor, which can include but not be limited to: CPU (Central Processing Unit), NP (Network Processor), etc.; it can also be DSP (Digital Signal Processor), ASIC (Application Specific Integrated Circuit), FPGA (Field-Programmable Gate Array) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.

[0150] An embodiment of the present application further provides a computer-readable storage medium, the storage medium including a stored program, wherein the method steps of the above method embodiment are executed when the program is run.

[0151] Optionally, in this embodiment, the storage medium may include, but is not limited to, various media that can store program codes, such as a USB flash drive, a ROM, a RAM, a mobile hard disk, a magnetic disk, or an optical disk.

[0152] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.

[0153] If the integrated units in the above embodiments are implemented in the form of software functional units and sold or used as independent products, they can be stored in the above computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for enabling one or more computer devices (which may be personal computers, servers, or network devices, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present application.

[0154] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.

[0155] In the several embodiments provided in the present application, it should be understood that the disclosed client can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.

[0156] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution provided in this embodiment.

[0157] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0158] The above is only a preferred embodiment of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A risk assessment method based on a configurable model, characterized in that: include: Obtain the target risk assessment object; Determining a target original model corresponding to the target risk assessment object; According to the target configuration information of the target risk assessment object, the target original model is configured to obtain a configured model; Performing risk assessment on the data to be assessed of the target risk assessment object through the configured model to obtain a target risk level corresponding to the data to be assessed; Wherein, determining the target original model corresponding to the target risk assessment object includes: Acquire all candidate original models; determine candidate model information corresponding to each candidate original model, wherein the information type in the model information includes: application scenario, variable information, and evaluation result; determine the target original model from all the candidate original models by matching the target evaluation information corresponding to the target risk evaluation object with the candidate model information, wherein the information type in the evaluation information includes: application scenario, variable information, and evaluation result; After performing risk assessment on the data to be assessed of the target risk assessment object through the configured model to obtain the target risk level corresponding to the data to be assessed, the method further includes: when the target risk assessment object is a job type, determining candidate control measures corresponding to each candidate risk level in the configured model; and determining the target control measures corresponding to the target risk level from all candidate control measures; The step of configuring the target original model according to the target configuration information of the target risk assessment object to obtain the configured model includes: obtaining a target configuration operation for configuring the target original model; and in response to the target configuration operation, configuring the target original model according to the target configuration information to obtain the configured model; The target original model is configured according to the target configuration information of the target risk assessment object to obtain a configured model, including: obtaining a configuration file including the target configuration information; parsing the configuration file to obtain parsed information; configuring the target original model according to the parsed information to obtain the configured model, including: configuring the target original model through each sub-information in the parsed information, the sub-information including a sub-information type and a sub-information value, when the target original model has a type that is the same as the sub-information type, the same type is configured through the sub-information value, and when the target original model does not have the same type, the sub-information type and the sub-information value are added to the target original model.

2. The method according to claim 1, characterized in that The target configuration information includes at least one of the following: Model name, model purpose, variables, weight corresponding to each variable, value corresponding to each variable, influencing factors corresponding to each variable, calculation relationship between different variables, conclusions and control measures corresponding to each conclusion.

3. The method according to claim 1, characterized in that: The step of performing risk assessment on the data to be assessed of the target risk assessment object by using the configured model to obtain a target risk level corresponding to the data to be assessed includes: Collecting and obtaining the latest data to be evaluated; Inputting the data to be evaluated into the configured model to obtain a target conclusion corresponding to the data to be evaluated; The target risk level is determined based on the target conclusion.

4. A risk assessment device based on a configurable model, characterized in that: include: An acquisition module is used to acquire a target risk assessment object; A determination module, used to determine a target original model corresponding to the target risk assessment object; A configuration module, configured to configure the target original model according to the target configuration information of the target risk assessment object to obtain a configured model; An evaluation module, used to perform risk evaluation on the data to be evaluated of the target risk evaluation object through the configured model, and obtain a target risk level corresponding to the data to be evaluated; The step of configuring the target original model according to the target configuration information of the target risk assessment object to obtain the configured model includes: obtaining a target configuration operation for configuring the target original model; and in response to the target configuration operation, configuring the target original model according to the target configuration information to obtain the configured model; The target original model is configured according to the target configuration information of the target risk assessment object to obtain a configured model, including: obtaining a configuration file including the target configuration information; parsing the configuration file to obtain parsed information; configuring the target original model according to the parsed information to obtain the configured model, including: configuring the target original model through each sub-information in the parsed information, the sub-information including a sub-information type and a sub-information value, when the target original model has a type that is the same as the sub-information type, the same type is configured through the sub-information value, and when the target original model does not have the same type, the sub-information type and the sub-information value are added to the target original model.

5. An electronic device comprising a processor, a communication interface, a memory and a communication bus, wherein: The processor, the communication interface and the memory communicate with each other via the communication bus, wherein: The memory is used to store computer programs; The processor is configured to execute the method according to any one of claims 1 to 3 by running the computer program stored in the memory.

6. A computer-readable storage medium, characterized in that: The storage medium stores a computer program, wherein the computer program is configured to execute the method according to any one of claims 1 to 3 when executed.

Citation Information

Patent Citations

  • Risk assessment report generation method and device, equipment and storage medium

    CN110619568A

  • Customer risk assessment method and device, readable storage medium and terminal equipment

    CN111950889A

  • Business risk assessment method and device, computer equipment and storage medium

    CN112950218A

  • Risk assessment method and device

    CN114169767A

  • Risk assessment data processing method and device, equipment, medium and program product

    CN114970679A