A real-time evaluation method for subway vehicle status based on online monitoring data

By monitoring the tunnel wall vibration acceleration signal and operation timetable online, and calculating the vehicle status index VSI_num, the problem that the existing technology cannot evaluate the status of the subway vehicle in real time is solved, timely feedback and maintenance of the vehicle status is achieved, and environmental vibration and noise are reduced. question.

CN117842152BActive Publication Date: 2024-11-01BEIJING JIUZHOUYIGUI SHOCK & VIBRATION ISOLATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410006826.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-03
Publication Date
2024-11-01
Estimated Expiration
2044-01-03

AI Technical Summary

Technical Problem

The prior art cannot evaluate the status of subway vehicles in real time, which makes it difficult to detect and deal with abnormal vehicle conditions in a timely manner, further leading to the deterioration of the relationship between the vehicle and the track system.

Method used

Based on the online monitoring data, by setting a vibration detection system on the tunnel wall, the maximum Z vibration level of the tunnel wall vibration acceleration signal is calculated, combined with the train operation timetable and multiple section data, the vehicle status index VSI_num value is calculated, and the vehicle status is evaluated in real time.

Benefits of technology

Real-time feedback on the status of subway vehicles is achieved, timely operation and maintenance and maintenance are improved, environmental vibration and noise problems are reduced, and the stability of the vehicle and track system is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117842152B_ABST
    Figure CN117842152B_ABST
Patent Text Reader

Abstract

The present invention relates to a real-time evaluation method for subway vehicle status based on online monitoring data, comprising: 1) acquiring all tunnel wall vibration acceleration data within one day; 2) calculating the maximum Z vibration level VL of the tunnel wall vibration acceleration signal Z,max ; 3) Match the tunnel wall vibration acceleration data with the train operation schedule to obtain the maximum Z vibration level of the tunnel wall vibration caused by each train; 4) Determine the screening value of the maximum Z vibration level of the tunnel wall vibration of each monitoring section; 5) Count the frequency a of each train exceeding the screening value of each monitoring section in one day num_i And calculate the corresponding single-day probability pr_num; 6) continuously monitor and count the tunnel wall vibration acceleration data over multiple days, and calculate the train vehicle status index VSI_num value; 7) evaluate the vehicle status based on the train vehicle status index VSI_num value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of rail transit, and in particular to a real-time evaluation method for subway vehicle status based on online monitoring data. Background Art

[0002] With the development of economy and technology, urban rail transit has become a common but important mode of transportation in many cities. While the rapid development of urban rail transit has brought convenience to people's travel, the vibration and noise environmental problems it has caused have become increasingly prominent, seriously affecting people's quality of life and work efficiency. The vibration and noise values ​​of urban rail transit are highly correlated with the status of subway vehicles. In order to reduce the environmental vibration and noise problems induced by urban rail transit, subway operating units will regularly inspect and maintain components such as subway vehicle wheels and bogies to avoid abnormal vehicle status exacerbating vibration and noise problems.

[0003] Since the subway runs for a long time every day and has a short working window at night, subway operators mostly use planned maintenance to regularly inspect and repair vehicles. However, the planned maintenance method for subway vehicles cannot feedback the real-time status of the vehicle, making it difficult to detect and handle abnormal conditions of the vehicle in a timely manner, which further deteriorates the relationship between the vehicle and the track system. Summary of the invention

[0004] In view of the fact that there are no evaluation indicators and evaluation methods that reflect the real-time status of vehicles in the industry, the present invention proposes an evaluation method for the dynamic quality of subway vehicles based on real-time monitored tunnel wall vibration acceleration data. This method helps to provide timely feedback on the latest status of subway vehicles, which is of great significance to the operation, maintenance and inspection of vehicles.

[0005] More specifically, the embodiment provides a method for real-time evaluation of subway vehicle status based on online monitoring data, characterized in that it includes:

[0006] 1) Set up a vibration online detection system on the tunnel wall section to monitor and obtain the tunnel wall vibration acceleration data within one day;

[0007] 2) Calculate the maximum Z vibration level VL of the tunnel wall vibration acceleration signal based on the vibration acceleration data in step 1) Z,max , VL z The calculation formula is as follows:

[0008]

[0009]

[0010] Where: a wz is the frequency-weighted RMS acceleration in the Z direction; a fi is the root mean square acceleration of the i-th 1 / 3 octave band; Wi is the weighting factor of the ith 1 / 3 octave band, using W weighting; VL z is the vertical Z vibration level, in dB; a0 is the reference acceleration;

[0011] 3) Match the tunnel wall vibration acceleration data with the train operation schedule to obtain the maximum Z vibration level of the tunnel wall vibration caused by each train;

[0012] 4) Determine the screening value of the maximum Z vibration level of the tunnel wall vibration at each monitoring section;

[0013] 5) Based on the screening value, the frequency a of each train exceeding the screening value in each monitoring section is counted. num_i And calculate the corresponding single-day probability pr_num,

[0014]

[0015] Among them, num is the vehicle number, n is the number of sections counted, s is the total number of trips a vehicle number runs in a day, and a num_i The frequency of a vehicle number exceeding the screening value in one section;

[0016] 6) Continuously monitor and count the tunnel wall vibration acceleration data for multiple days, and calculate to obtain multiple corresponding single-day probabilities pr_num, and then calculate the vehicle status index VSI_num value of each train based on all single-day probabilities pr_num,

[0017]

[0018] Among them, p is the number of days counted, m is the number of days each vehicle number actually drove out among the days counted, and pr_num_j is the single-day probability of each vehicle number in one of the days; and

[0019] 7) Evaluate the vehicle status based on the train vehicle status index VSI_num value.

[0020] According to an embodiment of the present invention, the reference acceleration value is 10 -6 m / s 2 .

[0021] According to an embodiment of the present invention, step 1) includes installing the vibration online monitoring system on at least 5 tunnel wall sections.

[0022] According to an embodiment of the present invention, in step 4), the 80th percentile of the maximum Z vibration level value of the tunnel wall vibration caused by all trains in one day is used as the screening value.

[0023] According to an embodiment of the present invention, the period of time is 1 day, and the multiple time periods counted are 7 days.

[0024] According to an embodiment of the present invention, if the VSI_num value is [0-50], the vehicle state is judged to be normal; if the VSI_num value is (50-80], the vehicle state is judged to be a warning; if the VSI_num value is (80-100], the vehicle state is judged to be an alarm.

[0025] According to an embodiment of the present invention, the section is selected by taking into account influencing factors such as different section types, curve radius, running speed, etc. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A flowchart of a method for real-time evaluation of subway vehicle status based on online monitoring data according to an implementation plan;

[0027] Figure 2 A schematic cross-sectional view of a tunnel wall vibration sensor measuring point of a method for real-time evaluation of a subway vehicle state based on online monitoring data according to an implementation plan;

[0028] Figure 3 It is the Z vibration level curve of the tunnel wall vibration caused by different vehicles according to the real-time evaluation method of the subway vehicle status based on online monitoring data of the implementation scheme;

[0029] Figure 4 The VSI value of each vehicle in a certain time period obtained by a specific embodiment of the method for real-time evaluation of subway vehicle status based on online monitoring data of the present invention;

[0030] Figure 5 for Figure 4 The VSI values ​​of each vehicle in different time periods obtained in the specific embodiment are shown. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] Figure 1 Schematic diagram of the process of real-time evaluation method of subway vehicle status based on online monitoring data according to the implementation scheme. Figure 1 ,The implementation method for real-time evaluation of subway vehicle status based on online ,monitoring data, can firstly set up a vibration online monitoring system on the ,tunnel wall to obtain the information of the vibration acceleration of the tunnel wall.

[0033] More specifically, the system can be, for example, an online monitoring system for vibration and noise in tunnels, which can obtain monitoring data of tunnel walls, roadbeds, tunnel wall vibrations, and trackside noise. Through the steps of front-end sensing equipment deployment, data collection, data analysis, data upload, and data storage, the vibration and noise signals of each train passing through the specified monitoring section can be obtained. The measurement point layout is as follows: Figure 2 As shown in the figure, since the vibration of rails and roadbed fluctuates greatly and the trackside noise is less affected by the differences of vehicles, the tunnel wall vibration acceleration data is selected to feedback the vehicle status of each subway train.

[0034] The back-end processor of the online monitoring system automatically calculates the maximum Z vibration level of each tunnel wall vibration acceleration signal, and identifies the vehicle status of the train based on the maximum Z vibration level of the tunnel wall vibration. The Z vibration level calculation formula is as follows:

[0035]

[0036]

[0037] Where: a wz is the frequency-weighted RMS acceleration in the Z direction; a fi is the root mean square acceleration of the i-th 1 / 3 octave band; W i is the weighting factor of the ith 1 / 3 octave band, using W weighting; VL z is the vertical Z vibration level, in dB; a0 is the reference acceleration, which is 10 -6 m / s 2 .

[0038] The Z-level curves of tunnel wall vibration caused by different trains are quite different, and the difference between the maximum Z-levels is particularly significant, such as Figure 3 As shown, the maximum Z vibration level index of the tunnel wall vibration can be used to identify the vehicle status of the train.

[0039] After that, the tunnel wall vibration acceleration monitoring data is matched with the subway train operation schedule to obtain the maximum Z vibration level caused by each train. The cumulative distribution function is used to determine the 80th percentile of the maximum Z vibration level of the tunnel wall vibration caused by all trains in a certain monitoring section within a period of time (for example, one day), and the 80th percentile is used as the screening value (other appropriate values ​​can also be determined as needed), and the frequency and corresponding probability of each car number exceeding the screening value in the section are counted. The higher the probability of each car being screened out, the higher the probability that the vehicle will cause higher vibration in the section on this day, and the worse the vehicle condition.

[0040] To avoid contingency, online monitoring systems can be arranged in multiple sections of a subway line, for example, the number of sections should not be less than 5, and the sections can be selected by considering factors such as different section types, curve radius, and running speed, such as ordinary roadbed, steel spring floating plate roadbed, vibration damping pad floating plate roadbed, and straight section, large radius curve section, and small radius curve section of trapezoidal sleeper roadbed, etc. Statistics are collected on the screening of each train exceeding the 80th percentile of the maximum Z vibration level of the tunnel wall vibration in each section on a certain day, where the single-day probability (pr_num) is the average probability of each train number causing higher vibration of the tunnel wall in a certain number of specified sections on a certain day, that is:

[0041]

[0042] Among them, num is the vehicle number, n is the number of sections counted, s is the total number of trips made by each vehicle number on that day, and a num_i It is the frequency that a vehicle exceeds the screening value in one section.

[0043] In order to further improve the accuracy of subway vehicle status identification, and considering that each train does not run every day, the above-mentioned one-day screening method is used to calculate the average probability of each vehicle exceeding the maximum Z vibration level screening value of each section vibration acceleration for 7 consecutive days. The VSI_num value is the average of the single-day probability (pr_num) of each vehicle number for 7 consecutive days. VSI is the subway vehicle status index. The VSI value of each train will be automatically updated as the data collected by the online monitoring system accumulates, and can dynamically and real-time feedback the vehicle status of the train, including:

[0044]

[0045] Among them, pr_num_j is the single-day probability of each train number on one of the days, and m is the number of days when each train number actually runs out in the 7 days. If the train does not run on a certain day, pr_num is 0 to avoid errors caused by the number of running away days.

[0046] Based on a large amount of data analysis, it can be set that when the VSI value is in the range of [80, 100], the vehicle condition is poor and is in the alarm stage. The vehicle should be maintained and repaired as soon as possible to avoid further deterioration of the vehicle condition; when the VSI value is in the range of (50, 80], the vehicle condition is good and is in the early warning stage. The frequency of vehicle inspection can be appropriately increased to detect possible vehicle defects as early as possible; when the VSI value is in the range of [0-50], the vehicle condition is excellent and is in the normal stage. The frequency of vehicle inspection can be appropriately reduced, as shown in Table 1 below.

[0047] Table 1 VSI index evaluation criteria

[0048] VSI value range Vehicle status Vehicle maintenance advice 0~50 normal Appropriately reduce the frequency of vehicle inspections 50~80 Early Warning Increase the frequency of vehicle inspections 80~100 alarm The vehicle is in poor condition and needs timely maintenance and repair.

[0049] Specific examples:

[0050] An online monitoring system is arranged at multiple sections of a subway line, and the VSI index is used to analyze the vehicle status of each train on the line. The VSI values ​​of the vehicles on this line in January 2023 are as follows: Figure 4 As shown in the figure, the VSI values ​​between different vehicles vary significantly. The VSI values ​​of most vehicles are small and the vehicle status is relatively stable. The VSI values ​​of a small number of vehicles are large and have reached the warning or even alarm threshold, which is consistent with the actual situation.

[0051] The changes in the train vehicle status of the line in three stages: January, June and October 2023 are analyzed. As shown in the figure, the VSI values ​​of most vehicles in the three stages are close, and the vehicle status changes are not significant, indicating that the vehicle status feedback by the VSI indicator has a high stability; the VSI values ​​of a small number of vehicles vary greatly, and the vehicle status fluctuates significantly, which is related to the maintenance of the vehicle or the deterioration of the wheel condition during the stage.

[0052] The present invention proposes for the first time a method for real-time evaluation of the status of urban rail transit vehicles based on online monitoring data. The method takes into account the operation of trains on ordinary roadbeds, steel spring floating plate roadbeds, vibration damping pad floating plate roadbeds, and trapezoidal sleeper roadbeds in straight sections, large radius curves, and small radius curves. The method counts the overall vehicle status within a cycle of seven consecutive days, with high accuracy and stability. According to the dynamic changes of the vehicle status index VSI value of each train, the vehicle status of all trains on the line can be monitored in real time, and abnormal vehicle status can be fed back in time, which has important reference significance for the maintenance of subway vehicles and tracks.

[0053] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A real-time evaluation method for subway vehicle status based on online monitoring technology, It is characterized in that include: 1) Set up a vibration online monitoring system on the tunnel wall section to monitor and obtain the tunnel wall vibration acceleration data within one day; 2) Calculate the maximum Z vibration level VL of the tunnel wall vibration acceleration signal based on the vibration acceleration data in step 1) Z,max , VL z The calculation formula is as follows: Where: a wz is the frequency-weighted RMS acceleration in the Z direction; a fi is the root mean square acceleration of the i-th 1 / 3 octave band; W i is the weighting factor of the ith 1 / 3 octave band, using W weighting; VL z is the vertical Z vibration level, in dB; a 0 is the reference acceleration; 3) Match the tunnel wall vibration acceleration data with the train operation schedule to obtain the maximum Z vibration level of the tunnel wall vibration caused by each train; 4) Determine the screening value of the maximum Z vibration level of the tunnel wall vibration at each monitoring section; 5) Taking the screening value as the standard, the frequency of each train exceeding the screening value in each monitoring section within one day is counted and the corresponding single-day probability pr_num is calculated, Among them, num is the vehicle number, n is the number of sections counted, s is the total number of trips a vehicle number runs in a day, and a num_i The frequency of a vehicle number exceeding the screening value in one section; 6) Continuously monitor and count the tunnel wall vibration acceleration data for multiple days, and calculate to obtain multiple corresponding single-day probabilities pr_num, and then calculate the vehicle status index VSI_num value of each train based on all single-day probabilities pr_num, Among them, p is the number of days counted, m is the number of days each vehicle number actually drove out during the statistical days, and pr_num_j is the single-day probability of each vehicle number on a certain day during multiple days; and 7) Evaluate the vehicle status based on the train vehicle status index VSI_num value.

2. According to claim 1, a real-time evaluation method for subway vehicle status based on online monitoring technology, Features: The base acceleration value is 10 -6 m / s 2 .

3. According to claim 1, a real-time evaluation method for subway vehicle status based on online monitoring technology, Features: Step 1) includes setting up the vibration online monitoring system on at least 5 tunnel wall sections.

4. According to claim 1, a real-time evaluation method for subway vehicle status based on online monitoring technology, Features: In step 4), the 80th percentile of the maximum Z vibration magnitude of the tunnel wall vibration caused by all trains in one day is used as the screening value.

5. According to claim 1, a real-time evaluation method for subway vehicle status based on online monitoring technology, Features: In step 6), the number of days counted is 7 days.

6. According to claim 1, a real-time evaluation method for subway vehicle status based on online monitoring technology, Features: If the VSI_num value is [0-50], the vehicle status is normal; if the VSI_num value is (50-80], the vehicle status is warning; if the VSI_num value is (80-100], the vehicle status is alarm.

7. A method for real-time evaluation of subway vehicle status based on online monitoring technology according to claim 3, Features: The section is selected taking into account different influencing factors including section type, curve radius and running speed.