An automatic control system for urban water supply based on graph theory

By using a graph theory-based automatic urban water supply management system, user water usage data is monitored and analyzed, user types are classified, and water usage continuity is calculated. This enables targeted and adaptive control of water quality deterioration discharge at the end of the water supply network, solving the problem of lack of targeting and adaptability in existing technologies and improving the stability of water supply quality.

CN117853271BActive Publication Date: 2024-11-05SHENZHEN KERONG SOFTWARE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410142335.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-11-05
Estimated Expiration
2044-01-31

AI Technical Summary

Technical Problem

Existing automatic management and control schemes for urban water supply lack specificity and adaptability in controlling water quality deterioration and discharge at the end of the water supply network, resulting in poor monitoring and control effects.

Method used

By using a graph theory-based automatic urban water supply management system, user water consumption data is monitored and analyzed, users are classified into three categories: abnormal users, abnormal users, and normal users. Water consumption continuity is calculated, and dynamic control is carried out based on the location map of water supply nodes to achieve targeted and adaptive water quality deterioration discharge management.

Benefits of technology

This improved the targeting and adaptability of monitoring and control of water quality deterioration discharge at the end of the water supply network, enhanced the diversity and extensibility of data utilization, and ensured the stability of water supply quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117853271B_ABST
    Figure CN117853271B_ABST
Patent Text Reader

Abstract

The invention discloses an automatic control system for urban water supply based on graph theory, which belongs to the technical field of water supply control. The system classifies the total daily water consumption of different users in the early stage to obtain the corresponding user types, and implements targeted subsequent total daily water consumption tracing, verification, calculation, judgment and classification for abnormal users of type I and type II with abnormal water consumption, so as to determine whether the continuous abnormal water consumption of abnormal users of type I and type II with different abnormal degrees meets the monitoring and control conditions for water quality deterioration emission at the end of the water supply network, so that targeted monitoring and control of water quality deterioration emission at the end of the water supply network can be further implemented for different abnormal users of type I and type II screened in the early stage. The invention is used to solve the technical problem of poor adaptive screening effect of monitoring and control implementation of water quality deterioration emission at the end of the water supply network in the existing solution.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water supply control, and in particular to an automatic urban water supply control system based on graph theory. Background Art

[0002] Urban water supply refers to a public service that provides clean, safe, and stable drinking water, industrial water, etc. to urban residents, industries and other water users; the urban water supply system is mainly composed of water sources, water intake facilities, water pipelines, water treatment facilities, water storage facilities, water distribution pipelines, etc.

[0003] When the existing urban water supply automatic control scheme is implemented, it generally only monitors and controls the water supply status or water supply quality of a certain node. For example, the application number is 201610177448X, and the name is an automatic water discharge device and method for water quality deterioration control at the end of a water supply network based on multi-parameter monitoring. The invention discloses a monitoring system, a data transmission and storage system, and a control and discharge system. The invention is suitable for controlling the water quality deterioration problem caused by low water consumption and long water use intervals of users at the end of urban water supply networks; the device starts discharging before monitoring that the water quality index in the pipeline exceeds the standard until the water quality reaches the preset standard, and obtains water quality information accurately and quickly, which is an effective device for ensuring the safety of water quality at the end of the network; however, the scheme has certain defects. It does not implement data statistics and analysis and screening of the water use of all users in the early stage to obtain target users and normal users, and implements targeted water quality deterioration discharge control at the end of the water supply network for the screened target users, making the existing water quality deterioration discharge control scheme at the end of the water supply network not targeted and adaptive, resulting in poor monitoring and implementation of water quality deterioration discharge at the end of the water supply network and poor adaptive screening effect of control implementation. Summary of the invention

[0004] The purpose of the present invention is to provide an automatic urban water supply control system based on graph theory, which is used to solve the technical problem of poor adaptive screening effect in the monitoring and control implementation of water quality deterioration discharge at the end of the water supply network in the existing solutions.

[0005] The purpose of the present invention can be achieved by the following technical solutions:

[0006] An automatic control system for urban water supply based on graph theory, comprising:

[0007] The user water use data monitoring and processing module is used to implement water use data monitoring and statistics for all users of urban water supply to obtain the total daily water use of users, determine the water use type of the corresponding user by analyzing the total daily water use, and upload the daily water use type of all users to the water supply management and control platform in real time; the water use type includes type I abnormal users, type II abnormal users and normal users;

[0008] The user water use type tracing calculation module is used to verify the stability of abnormal users of the abnormal water use type, and to trace and verify the subsequent daily water consumption of the abnormal users of the first category and the second category after verification, calculate the water use continuity corresponding to the abnormal users of the first category or the second category, and upload it to the water supply control platform in real time; water use continuity is a numerical value that integrates and calculates the subsequent daily water use data of abnormal water users to evaluate and classify their water use continuity impact status;

[0009] The user water use status analysis and control module is used to analyze the continuous impact of water use on different types of users, and dynamically control the water quality deterioration discharge at the end of the water supply network for different types of users based on the analysis results; including:

[0010] Analyze the water use continuous impact status of the first type of abnormal users or the second type of abnormal users according to the water use continuity, and obtain a water use continuous impact analysis data set consisting of first water use continuous impact analysis data corresponding to all the first type of abnormal users and second water use continuous impact analysis data corresponding to the second type of abnormal users;

[0011] Based on the water use continuous impact analysis data set and the water supply node location map, targeted monitoring of the water quality of all Class I abnormal verification users and Class II abnormal verification users and dynamic control of emissions due to water quality deterioration are initiated.

[0012] Preferably, all users who use urban water supply and their corresponding user numbers are obtained, and the daily water consumption of the users is monitored and counted according to the user numbers. The start time point and the end time point of the user's water use are obtained and combined to obtain the water use time period, and the single water consumption corresponding to the water use time period;

[0013] All the user's daily water use time periods and the corresponding single water consumption are sorted and combined in the order of water use time to obtain a daily water use monitoring table;

[0014] When judging and classifying the user's daily water usage through the daily water use monitoring table, all the single water consumption of the user on that day in the daily water use monitoring table is obtained and summed up to obtain the total daily water consumption, and the total daily water consumption is analyzed to determine the water use type corresponding to the user.

[0015] Preferably, when analyzing the total daily water consumption, if the total daily water consumption is zero, a first water consumption anomaly label is generated and the corresponding user is marked as a type of abnormal user;

[0016] If the total daily water consumption is not zero and is less than the total daily water consumption threshold, a second water consumption anomaly label is generated and the corresponding user is marked as a second-class abnormal user.

[0017] Preferably, according to the first water use abnormality label or the second water use abnormality label, the subsequent daily water consumption total amount is traced and verified for the first type of abnormal users or the second type of abnormal users, and when the stability of the label of the first type of abnormal users is verified, if the subsequent daily water consumption total amount of the first type of abnormal users exists and is less than the daily water consumption total amount threshold, the first type of abnormal users are re-marked as second type of abnormal users;

[0018] If the subsequent total daily water consumption of a type of abnormal users exists and is not less than the total daily water consumption threshold, the type of abnormal users will be re-marked as normal users.

[0019] Preferably, the total daily water consumption of the first-class abnormal users or the second-class abnormal users after verification is statistically analyzed and the total daily water consumption is calculated by the formula Calculate and obtain the water use continuity μk corresponding to the first-class abnormal user or the second-class abnormal user; where k=1, 2; μ1 is the first water use continuity corresponding to the first-class abnormal user, and μ2 is the second water use continuity corresponding to the second-class abnormal user; α1 is the historical water use impact factor corresponding to the first-class abnormal user, α2 is the historical water use impact factor corresponding to the second-class abnormal user, β1 is the water use abnormality weight corresponding to the first-class abnormal user, and β2 is the water use abnormality weight corresponding to the second-class abnormal user; Z1i is the subsequent daily total water use of the first-class abnormal user, and Z2i is the subsequent daily total water use of the second-class abnormal user, i=1, 2, 3, ..., n; n is a positive integer, representing the total number of days.

[0020] Preferably, the steps of obtaining the historical water consumption impact factors corresponding to the first-class abnormal users and the second-class abnormal users are as follows: within the monitoring period, respectively counting the total number of first-class abnormal user marks Nk1 and the total number of second-class abnormal user marks Nk2 that appear in the history of the first-class abnormal users and the second-class abnormal users respectively;

[0021] The historical water use impact factor αk corresponding to the first-class abnormal users and the second-class abnormal users is calculated by the formula αk=(Nk1+0.5×Nk2+0.01) / D; where N11 is the total number of first-class abnormal users marked in history corresponding to the first-class abnormal users every day, N21 is the total number of first-class abnormal users marked in history corresponding to the second-class abnormal users every day, N12 is the total number of second-class abnormal users marked in history corresponding to the first-class abnormal users every day, N22 is the total number of second-class abnormal users marked in history corresponding to the second-class abnormal users every day; D is the total number of days corresponding to the monitoring period.

[0022] Preferably, when analyzing the water use continuity impact status of the first type of abnormal users or the second type of abnormal users according to the water use continuity, the first water use continuity corresponding to the first type of abnormal users and the second water use continuity corresponding to the second type of abnormal users are respectively compared and classified with the corresponding first water use continuity threshold and the second water use continuity threshold;

[0023] If the first water use duration is not greater than the first water use duration threshold and the second water use duration is not greater than the second water use duration threshold, a first water use verification abnormality label and a second water use verification abnormality label are generated and the corresponding first-class abnormal users and second-class abnormal users are marked as first-class abnormal verification users and second-class abnormal verification users;

[0024] Otherwise, a first water use verification normal label and a second water use verification normal label are generated.

[0025] Preferably, the first water use verification abnormal label or the first water use verification normal label constitutes the first water use continuous impact analysis data corresponding to a type of abnormal user; the second water use verification abnormal label or the second water use verification normal label constitutes the second water use continuous impact analysis data corresponding to a type of abnormal user;

[0026] The first water use continuous impact analysis data and the second water use continuous impact analysis data corresponding to all the first-category abnormal users and the second-category abnormal users constitute the water use continuous impact analysis data set.

[0027] Preferably, targeted water supply quality monitoring of Class I abnormal verification users and Class II abnormal verification users and dynamic control of emissions from water quality deterioration are enabled based on the first water use verification anomaly label and the second water use verification anomaly label in the water use continuous impact analysis data set and the water supply node location map.

[0028] Preferably, the water supply node location map is constructed by graphing several water supply nodes and pipe networks and corresponding geographical coordinates.

[0029] Compared with the existing solutions, the present invention achieves the following beneficial effects:

[0030] The present invention obtains a daily water use monitoring table by monitoring and counting the daily water consumption of different users and processing and combining them. The total daily water consumption of the user is monitored according to the daily water use monitoring table, and the water use type corresponding to the user on that day is obtained by classification. The overall daily water use situation of different users can be obtained, and reliable local data support can be provided for the subsequent traceability verification and analysis of the differences between different users.

[0031] The present invention classifies the total daily water consumption of different users in the early stage to obtain the corresponding user types, and implements targeted subsequent total daily water consumption traceability verification calculation for the abnormal users of type I and type II with abnormal water consumption. It can not only obtain the subsequent continuous stability of abnormalities after the occurrence of abnormalities corresponding to different user types, but also provide reliable data support for the analysis of dynamic control of water quality deterioration and discharge at the end of the water supply network for different user types in the future, thereby improving the diversity and extension effect of the use of early monitoring and analysis data.

[0032] The present invention judges and classifies the water use continuity calculated from the subsequent water use tracing data of different abnormal users in the early stage, and determines whether the continuous abnormal water use of the first type of abnormal users and the second type of abnormal users with different abnormal degrees meets the water quality deterioration emission monitoring and control conditions at the end of the water supply network, so that the different first type of abnormal users and the second type of abnormal users screened in the early stage can be further targeted. The monitoring and control of water quality deterioration emission at the end of the water supply network is achieved, and the pertinence and adaptability of the implementation of the water quality deterioration emission control plan at the end of the water supply network are achieved, and the monitoring and implementation of water quality deterioration emission at the end of the water supply network and the adaptive effect of the control implementation are improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The present invention will be further described below in conjunction with the accompanying drawings.

[0034] Figure 1 This is a module block diagram of an automatic urban water supply control system based on graph theory in the present invention.

[0035] Figure 2 The flowchart of the present invention is to verify the stability of a class of abnormal user labels.

[0036] Figure 3 It is a flowchart of the working steps of the user water usage status analysis control module in the present invention. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary operation and maintenance personnel in this field without creative work are within the scope of protection of the present invention.

[0038] like Figure 1 As shown, the present invention is an automatic urban water supply control system based on graph theory, including a user water use data monitoring and processing module, a user water use type tracing calculation module, a user water use status analysis control module and a water supply control platform;

[0039] The user water use data monitoring and processing module is used to implement water use data monitoring and statistics for all users of urban water supply to obtain the total daily water use of users, determine the water use type of the corresponding user by analyzing the total daily water use, and upload the daily water use type of all users to the water supply control platform in real time; including:

[0040] Obtain all users of urban water supply and their corresponding user numbers, monitor and count the user's daily water consumption according to the user number, obtain the user's water use start time and end time and combine them to obtain the water use time period, as well as the single water consumption corresponding to the water use time period; the units of the start time point and the end time point are accurate to seconds, and the range of the water use time period is also accurate to seconds;

[0041] All the user's daily water use time periods and the corresponding single water consumption are sorted and combined in the order of water use time to obtain a daily water use monitoring table;

[0042] When judging and classifying the user's daily water usage through the daily water usage monitoring table, all the single water usage of the user on the day in the daily water usage monitoring table is obtained and summed up to obtain the total daily water usage, and the total daily water usage is analyzed to determine the water usage type corresponding to the user;

[0043] If the total daily water consumption is zero, a first water consumption anomaly label is generated and the corresponding user is marked as a type of abnormal user;

[0044] If the total daily water consumption is not zero and is less than the total daily water consumption threshold, a second water consumption abnormality label is generated and the corresponding user is marked as a second-class abnormal user; the total daily water consumption threshold is obtained based on the previous test data of different daily water consumption, and can also be determined based on the existing water quality deterioration control monitoring data at the end of the water supply network, such as the data obtained by the prior art monitoring with application number 201610177448X;

[0045] In addition, the impact of abnormal water use corresponding to the first type of abnormal users is greater than that corresponding to the second type of abnormal users; the first type of abnormal users may be users who do not use water for a long time, and the second type of abnormal users may be users who use water intermittently or use water in small amounts for a long time, such as only using tap water for boiling water or cooking, and using water in ponds in towns for other water use situations;

[0046] If the total daily water consumption is not less than the total daily water consumption threshold, a normal daily water consumption label is generated and the corresponding user is marked as a normal user.

[0047] In an embodiment of the present invention, a daily water consumption monitoring table is obtained by monitoring and counting the daily water consumption of different users and processing and combining them. The total daily water consumption of the user is monitored according to the daily water consumption monitoring table and the water consumption type corresponding to the user on that day is obtained by classification. This can not only obtain the overall daily water consumption of different users, but also provide reliable local data support for the subsequent traceability verification and analysis of the differences between different users.

[0048] The user water use type tracing calculation module is used to verify the stability of abnormal users of the abnormal water use type, and to trace and verify the subsequent daily water consumption of the abnormal users of the first category and the second category after verification, calculate the water use continuity corresponding to the abnormal users of the first category or the second category, and upload it to the water supply control platform in real time; including:

[0049] like Figure 2 As shown, according to the first water use abnormality label or the second water use abnormality label, the subsequent daily water use total amount is traced and verified for the first type of abnormal users or the second type of abnormal users, and when the stability of the label of the first type of abnormal users is verified, if the subsequent daily water use total amount of the first type of abnormal users exists and is less than the daily water use total amount threshold, the first type of abnormal users are re-marked as second type of abnormal users;

[0050] If the subsequent total daily water consumption of a type of abnormal user exists and is not less than the total daily water consumption threshold, the type of abnormal user will be re-marked as a normal user;

[0051] It should be noted that, due to the uncertainty of water use for users who do not use water for a long time or have a low water consumption for a long time, it is necessary to verify the stability of a class of abnormal users, which can improve the accuracy of subsequent data processing and analysis of a class of abnormal users, and can timely and adaptively adjust the labels of a class of abnormal users according to their subsequent water use conditions;

[0052] The total daily water consumption of the first-class abnormal users or second-class abnormal users after verification is calculated and the formula is used to calculate the total daily water consumption of the first-class abnormal users or second-class abnormal users. Calculate and obtain the water use continuity μk corresponding to the first-class abnormal user or the second-class abnormal user; where k = 1, 2; μ1 is the first water use continuity corresponding to the first-class abnormal user, and μ2 is the second water use continuity corresponding to the second-class abnormal user; α1 is the historical water use impact factor corresponding to the first-class abnormal user, α2 is the historical water use impact factor corresponding to the second-class abnormal user, β1 is the water use abnormality weight corresponding to the first-class abnormal user, and β2 is the water use abnormality weight corresponding to the second-class abnormal user. The water use abnormality weight is determined according to the total number of abnormal water quality occurrences of the first-class abnormal user and the second-class abnormal user sample monitored in the previous period; Z1i is the total daily water use of the first-class abnormal user in the subsequent days, and Z2i is the total daily water use of the second-class abnormal user in the subsequent days, i = 1, 2, 3, ..., n; n is a positive integer, indicating the total number of days;

[0053] It should be noted that water use continuity is a numerical value that evaluates and classifies the continuous impact of abnormal water use by integrating and calculating the subsequent daily water use data of abnormal water users. The smaller the water use continuity, the worse the corresponding continuous impact of water use, which is specifically manifested in the greater impact of the deterioration of water quality of the corresponding user's water use.

[0054] The steps for obtaining the historical water use impact factors corresponding to the first type of abnormal users and the second type of abnormal users are as follows:

[0055] During the monitoring period, the unit of the monitoring period is day, which can be specifically 30 days. The total number of times Nk1 and Nk2 of the first-class abnormal user marks corresponding to the first-class abnormal users and the second-class abnormal users appearing in history every day are counted respectively, and the historical water use impact factor αk corresponding to the first-class abnormal users and the second-class abnormal users is calculated by the formula αk=(Nk1+0.5×Nk2+0.01) / D; wherein N11 is the total number of times the first-class abnormal user marks corresponding to the first-class abnormal users appearing in history every day, N21 is the total number of times the first-class abnormal user marks corresponding to the second-class abnormal users appearing in history every day, N12 is the total number of times the first-class abnormal user marks corresponding to the first-class abnormal users appearing in history every day, and N22 is the total number of times the second-class abnormal user marks corresponding to the second-class abnormal users appearing in history every day; D is the total number of days corresponding to the monitoring period;

[0056] In the embodiment of the present invention, by classifying the total daily water consumption of different users in the early stage to obtain the corresponding user types, and implementing targeted subsequent daily water consumption total amount tracing verification and calculation for the abnormal users of type I and type II with abnormal water consumption, it is possible to obtain the subsequent continuous stability of abnormalities after the occurrence of abnormalities corresponding to different user types, and provide reliable data support for the analysis of dynamic control of water quality deterioration and discharge at the end of the water supply network for different user types in the future, thereby improving the diversity and extension effect of the use of early monitoring and analysis data.

[0057] The user water use status analysis and control module is used to analyze the continuous impact of water use on different types of users, and dynamically control the water quality deterioration discharge at the end of the water supply network for different types of users based on the analysis results; including:

[0058] like Figure 3 As shown, when analyzing the water use continuous impact status of the first type of abnormal users or the second type of abnormal users according to the water use continuity, the first water use continuity corresponding to the first type of abnormal users and the second water use continuity corresponding to the second type of abnormal users are respectively compared and classified with the corresponding first water use continuity threshold and the second water use continuity threshold; the first water use continuity threshold and the second water use continuity threshold are determined according to the median of all sample water use continuity corresponding to the sample first type of abnormal users and the sample second type of abnormal users monitored in the early stage;

[0059] If the first water use duration is not greater than the first water use duration threshold and the second water use duration is not greater than the second water use duration threshold, a first water use verification abnormality label and a second water use verification abnormality label are generated and the corresponding first-class abnormal users and second-class abnormal users are marked as first-class abnormal verification users and second-class abnormal verification users;

[0060] Otherwise, a first water use verification normal label and a second water use verification normal label are generated;

[0061] The first water use verification abnormal label or the first water use verification normal label constitutes the first water use continuous impact analysis data corresponding to the first type of abnormal users; the second water use verification abnormal label or the second water use verification normal label constitutes the second water use continuous impact analysis data corresponding to the second type of abnormal users;

[0062] The first water use continuous impact analysis data and the second water use continuous impact analysis data corresponding to all the first-class abnormal users and the second-class abnormal users constitute the water use continuous impact analysis data set;

[0063] Based on the first water use verification abnormality label and the second water use verification abnormality label in the water use continuous impact analysis data set and the water supply node location map, water supply quality monitoring for the first type of abnormal verification users and the second type of abnormal verification users and dynamic control of discharge due to water quality deterioration are started;

[0064] Among them, graph theory is a branch of mathematics that studies the properties of graphs and the relationships in graphs. A graph is a set of nodes (vertices) and edges connecting the nodes. The main goal of graph theory is to study and solve problems related to graphs, such as path search, network flow, shortest path, connectivity, etc.

[0065] The water supply node location map in the embodiment of the present invention is composed of several water supply nodes and pipe networks and corresponding geographical coordinates in the form of a map. Based on the water supply node location map, efficient drainage monitoring and control of Class I abnormal users and Class II abnormal users can be achieved.

[0066] In the implementation of the present invention, by judging and classifying the water use continuity obtained by calculating the subsequent water use tracing data of different abnormal users in the early stage, it is determined whether the continuous abnormal water use of the first type of abnormal users and the second type of abnormal users with different abnormal degrees meets the water quality deterioration emission monitoring and control conditions at the end of the water supply network, so that the different first type of abnormal users and the second type of abnormal users screened in the early stage can be further targeted. The monitoring and control of the water quality deterioration emission at the end of the water supply network is realized, and the pertinence and adaptability of the implementation of the water quality deterioration emission control plan at the end of the water supply network are realized, and the monitoring and implementation of the water quality deterioration emission at the end of the water supply network and the adaptive effect of the control implementation are improved.

[0067] In addition, the formulas involved in the above are all dimensionless and numerical calculations. They are a formula that is closest to the actual situation obtained by collecting a large amount of data and simulating it with simulation software.

[0068] In the several embodiments provided by the present invention, it should be understood that the disclosed system can be implemented in other ways. For example, the above-described embodiments of the invention are only illustrative, for example, the division of modules is only a logical function division, and there may be other division methods in actual implementation.

[0069] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical modules, and may be located in one place or distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0070] In addition, each functional module in each embodiment of the present invention may be integrated into one processing module, or each module may exist physically separately, or two or more modules may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of hardware plus software functional modules.

[0071] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the basic features of the present invention.

[0072] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary operation and maintenance personnel in the field should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. An automatic urban water supply control system based on graph theory, characterized in that: It includes a user water use data monitoring and processing module, which is used to implement water use data monitoring and statistics for all users of urban water supply to obtain the total daily water use of users, determine the water use type of the corresponding user by analyzing the total daily water use, and upload the daily water use type of all users to the water supply management and control platform in real time; the water use type includes type I abnormal users, type II abnormal users and normal users; When analyzing the total daily water consumption, if the total daily water consumption is zero, a first water consumption anomaly label is generated and the corresponding user is marked as a type of abnormal user; If the total daily water consumption is not zero and is less than the total daily water consumption threshold, a second water consumption anomaly label is generated and the corresponding user is marked as a second-class abnormal user; The user water use type tracing calculation module is used to verify the stability of abnormal users of the abnormal water use type, and to trace and verify the subsequent daily water consumption of the abnormal users of the first category and the second category after verification, calculate the water use continuity corresponding to the abnormal users of the first category or the second category, and upload it to the water supply control platform in real time; water use continuity is a numerical value that integrates and calculates the subsequent daily water use data of abnormal water users to evaluate and classify their water use continuity impact status; Among them, according to the first water use abnormality label or the second water use abnormality label, the subsequent daily water consumption total amount is traced and verified for the first type of abnormal users or the second type of abnormal users, and when the stability of the label of the first type of abnormal users is verified, if the subsequent daily water consumption total amount of the first type of abnormal users exists and is less than the daily water consumption total amount threshold, the first type of abnormal users are re-marked as second type of abnormal users; If the subsequent total daily water consumption of a type of abnormal user exists and is not less than the total daily water consumption threshold, the type of abnormal user will be re-marked as a normal user; The total daily water consumption of the first-class abnormal users or second-class abnormal users after verification is calculated and the formula is used to calculate the total daily water consumption of the first-class abnormal users or second-class abnormal users. Calculate and obtain the water use continuity μk corresponding to the first type of abnormal user or the second type of abnormal user; where k = 1, 2; μ1 is the first water use continuity corresponding to the first type of abnormal user, and μ2 is the second water use continuity corresponding to the second type of abnormal user; α1 is the historical water use impact factor corresponding to the first type of abnormal user, α2 is the historical water use impact factor corresponding to the second type of abnormal user, β1 is the water use abnormality weight corresponding to the first type of abnormal user, and β2 is the water use abnormality weight corresponding to the second type of abnormal user; Z1i is the total daily water use of the first type of abnormal user in the subsequent days, and Z2i is the total daily water use of the second type of abnormal user in the subsequent days, i = 1, 2, 3, ..., n; n is a positive integer, indicating the total number of days; The steps for obtaining the historical water use impact factors corresponding to the first-class abnormal users and the second-class abnormal users are as follows: within the monitoring period, the total number of first-class abnormal user marks Nk1 and the total number of second-class abnormal user marks Nk2 that appear in the history of the first-class abnormal users and the second-class abnormal users are counted respectively; The historical water use impact factor αk corresponding to the first-class abnormal users and the second-class abnormal users is calculated by the formula αk=(Nk1+0.5×Nk2+0.01) / D; where N11 is the total number of first-class abnormal user marks corresponding to the first-class abnormal users appearing every day in history, N21 is the total number of first-class abnormal user marks corresponding to the second-class abnormal users appearing every day in history, N12 is the total number of second-class abnormal user marks corresponding to the first-class abnormal users appearing every day in history, and N22 is the total number of second-class abnormal user marks corresponding to the second-class abnormal users appearing every day in history; D is the total number of days corresponding to the monitoring period; When analyzing the water use continuity impact status of the first type of abnormal users or the second type of abnormal users according to the water use continuity, the first water use continuity corresponding to the first type of abnormal users and the second water use continuity corresponding to the second type of abnormal users are respectively compared and classified with the corresponding first water use continuity threshold and second water use continuity threshold; If the first water use duration is not greater than the first water use duration threshold and the second water use duration is not greater than the second water use duration threshold, a first water use verification abnormality label and a second water use verification abnormality label are generated and the corresponding first-class abnormal users and second-class abnormal users are marked as first-class abnormal verification users and second-class abnormal verification users; Otherwise, a first water use verification normal label and a second water use verification normal label are generated; The user water use status analysis and control module is used to analyze the continuous impact of water use on different types of users, and dynamically control the water quality deterioration discharge at the end of the water supply network for different types of users based on the analysis results; including: Analyze the water use continuous impact status of the first type of abnormal users or the second type of abnormal users according to the water use continuity, and obtain a water use continuous impact analysis data set consisting of first water use continuous impact analysis data corresponding to all the first type of abnormal users and second water use continuous impact analysis data corresponding to the second type of abnormal users; Based on the water use continuous impact analysis data set and the water supply node location map, targeted monitoring of the water quality of all Class I abnormal verification users and Class II abnormal verification users and dynamic control of emissions due to water quality deterioration are initiated.

2. The urban water supply automatic control system based on graph theory according to claim 1 is characterized in that: Obtain all users of urban water supply and their corresponding user numbers, monitor and count the user's daily water consumption according to the user number, obtain the user's water use start and end time points and combine them to obtain the water use time period, as well as the single water consumption corresponding to the water use time period; All the user's daily water use time periods and the corresponding single water consumption are sorted and combined in the order of water use time to obtain a daily water use monitoring table; When judging and classifying the user's daily water usage through the daily water use monitoring table, all the single water consumption of the user on that day in the daily water use monitoring table is obtained and summed up to obtain the total daily water consumption, and the total daily water consumption is analyzed to determine the water use type corresponding to the user.

3. The urban water supply automatic control system based on graph theory according to claim 1 is characterized in that: The first water use verification abnormal label or the first water use verification normal label constitutes the first water use continuous impact analysis data corresponding to the first type of abnormal users; the second water use verification abnormal label or the second water use verification normal label constitutes the second water use continuous impact analysis data corresponding to the second type of abnormal users; The first water use continuous impact analysis data and the second water use continuous impact analysis data corresponding to all the first-category abnormal users and the second-category abnormal users constitute the water use continuous impact analysis data set.

4. The automatic urban water supply control system based on graph theory according to claim 3 is characterized in that: Based on the first water use verification anomaly label and the second water use verification anomaly label in the water use continuous impact analysis data set and the water supply node location map, targeted water supply quality monitoring of the first type of abnormal verification users and the second type of abnormal verification users and dynamic control of emissions due to water quality deterioration are enabled.

5. The automatic urban water supply control system based on graph theory according to claim 4 is characterized in that: The water supply node location map is composed of several water supply nodes and pipe networks and the corresponding geographical coordinates in the form of a graph.