Flexible gabion retaining devices for debris flow and loess flow control

By using the nested mesh rings and filling material to control the opening size of the flexible gabion barrier device, the problems of flexibility and resilience of the barrier device in the existing technology have been solved, achieving effective control of debris flow and loess mudflow, and enhancing the applicability and environmental friendliness of the structure.

CN117868056BActive Publication Date: 2026-11-17CHANGAN UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202311782039.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2026-11-17
Estimated Expiration
2043-12-22

AI Technical Summary

Technical Problem

Existing open-type barrier devices have problems in the management of debris flows and loess mudflows, such as the reservoir area being easily filled with solid substances, difficulty in cleaning, poor resilience of barrier function, and poor flexibility in opening size, making them difficult to adapt to disasters with different solid substance compositions.

Method used

The space is enclosed by a mesh and frame formed by nested mesh rings. The opening size of the barrier device is controlled by the filling material. Combined with the connection of inclined cables, horizontal cables, vertical cables and longitudinal cables, a flexible gabion barrier device is formed, which realizes the adjustability of the opening and rapid functional recovery.

Benefits of technology

The applicability and adjustability of the barrier device have been enhanced, allowing for adjustment of the opening size over a wide range, quick restoration of the barrier function, reduced cleaning difficulty, and improved structural robustness and environmental friendliness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117868056B_ABST
    Figure CN117868056B_ABST
Patent Text Reader

Abstract

This invention provides a flexible gabion retaining device for the management of debris flows and loess mudflows, belonging to the field of geological disaster prevention technology. The invention includes a frame for fixing within a ditch; a mesh panel composed of nested mesh rings enclosing the frame; and filler material filling the space enclosed by the mesh panel and frame. This invention utilizes the nested mesh panel and frame to create a space for the filler material, controlling the opening size of the retaining device through the filler material, thus providing strong adjustability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of geological disaster prevention and control technology, and in particular to a flexible gabion barrier device for the management of debris flows and loess mudflows. Background Technology

[0002] Debris flows and loess mudflows are two common types of high-speed, long-distance geological disasters. Debris flows are characterized by their rapid movement and strong impact, causing significant casualties and economic losses. Loess mudflows, which primarily occur on the Loess Plateau, while not as destructive as debris flows, still often threaten the safe operation of infrastructure. Considering that climate change is driving the likelihood of more frequent and intense extreme rainfall events in the future, this will inevitably trigger more debris flows and loess mudflows. Therefore, developing engineering measures to prevent and control these disasters is of great significance.

[0003] The significant difference in material composition between debris flows and loess mudflows lies in their being a mixture of solid and liquid phases. For debris flows, the gradation of solid particles spans a wide range; for loess mudflows, the solid phase is primarily fine-grained. This difference in material composition presents challenges to the design of retaining structures. Closed retaining devices lose their retaining function as the reservoir fills with solid material. To address this issue, open retaining devices have been proposed, allowing some material to pass through for partial containment. However, the retaining function still suffers from loss as the reservoir fills with solid material. Furthermore, the fixed opening size limits the interception of solid material with specific particle sizes, lacking design flexibility. Most importantly, open retaining devices suitable for debris flows are ineffective in controlling loess mudflows because fine-grained solids easily flow out with the liquid phase from the opening, reducing the effectiveness of open retaining devices and hindering loess soil and water conservation.

[0004] For rigid open-type retaining devices, such as pile group retaining devices and slotted dams, the rigidity is high, and once damaged, the repair is difficult; the opening size is fixed, and the adjustability is relatively poor, making it difficult to adapt to disasters with different solid phase material composition characteristics; once silted up by debris flow or loess mudflow, the retaining function is difficult to restore quickly.

[0005] For flexible opening barrier devices, such as flexible protective nets, the opening size is fixed and the adjustability is relatively poor. Once they are silted up by debris flows or loess mudflows, the barrier function is difficult to restore quickly and the restoration is also difficult. They mainly rely on the deformation of the protective net to attenuate the impact force of the disaster, which puts forward higher requirements for the design strength of the steel cables and netting.

[0006] In summary, the open-type barrier devices currently used in this project have the following limitations:

[0007] 1) The reservoir area is easily filled with solid substances, making it difficult to clean and the barrier devices have poor functional recovery.

[0008] 2) Barrier devices are mostly constructed of concrete, which has high rigidity, making reconstruction difficult once damaged;

[0009] 3) The opening size of the barrier device is not flexible and it is difficult to adapt to the changes in the size of solid particles in debris flow and loess mudflow.

[0010] Therefore, it is necessary to develop open-type barrier devices that are adaptable, flexible, and resilient, taking into account the characteristics of the material composition of debris flows and loess mudflows. Summary of the Invention

[0011] In view of this, in order to overcome the above-mentioned shortcomings of existing open-type barrier devices, the present invention provides a flexible gabion barrier device for the control of debris flow and loess mudflow. It forms a space for placing filling material by using a mesh formed by nested mesh rings and a frame. The size of the opening of the barrier device is controlled by the filling material, so that the opening has strong adjustability.

[0012] To achieve the above objectives, the present invention provides the following technical solution:

[0013] A flexible gabion retaining device for debris flow and loess flow control includes:

[0014] A frame, used for fixing within the trench;

[0015] The mesh panel is composed of several nested mesh rings and is enclosed outside the frame;

[0016] The filler material is used to fill the space enclosed by the mesh and the frame.

[0017] The frame is formed by interconnecting horizontal, vertical, and longitudinal cables.

[0018] The number of horizontal, vertical, and longitudinal cables are all four, forming a rectangular frame.

[0019] It also includes a stay cable, one end of which is connected to the horizontal stay cable, the vertical stay cable and the longitudinal stay cable, and the other end is fixed to the bottom of the trench by anchor piles;

[0020] The horizontal, vertical, longitudinal, and diagonal stay cables are fixed together by cable clamps;

[0021] The cable clamp includes:

[0022] A rigid gasket has upper and lower parts, and the horizontal cable, vertical cable, longitudinal cable and diagonal cable are located between the upper and lower rigid gaskets;

[0023] High-strength bolts, which pass through the upper and lower rigid washers, fix the horizontal cable, vertical cable, longitudinal cable and diagonal cable together;

[0024] It also includes a stay cable anchor head and a stay cable adjusting handle, wherein the stay cable anchor head includes:

[0025] An embedded anchor is fixed inside the anchor pile and has a cable through hole and a bolt hole, wherein the cable through hole is for the cable to pass through;

[0026] High-strength bolts are inserted through the bolt holes into the cable through-holes to fix the stay cable;

[0027] The cable adjustment handle includes a shaft and a handle for driving the shaft to rotate. The cable passes through the cable perforation and is wound onto the shaft.

[0028] Preferably, the cross cable is fixed to the sidewall of the trench by a sidewall anchor.

[0029] Preferably, the vertical cable is fixed to the bottom of the trench by a trench bottom anchor.

[0030] The flexible gabion retaining device for debris flow and loess mudflow control provided by this invention uses a mesh formed by nested mesh rings and a frame to enclose a space for placing filling material. Compared with the prior art, it has the following advantages:

[0031] 1) In terms of the form of the barrier device, the barrier device is no longer purely rigid or purely flexible, but is somewhere in between.

[0032] 2) Functional aspects of the barrier device: The size of the barrier device opening is controlled by the packing material, giving it strong adjustability. By controlling the particle size distribution of the packing material, the opening size can be freely adjusted within a wide range, enhancing the adjustability of the structural opening ratio and improving the applicability of the structure. The packing material can mainly use construction waste or slag, enhancing environmental friendliness.

[0033] The structure shows some improvement in rapid functional recovery and robustness compared to existing technologies.

[0034] 3) Regarding the recoverability of the barrier device: Once silted up, there is no need to dredge; a second-level barrier can be quickly constructed directly on the structure or on the leveled and compacted silt.

[0035] 4) The structure's rapid functional recovery and robustness have improved compared to existing technologies. Attached Figure Description

[0036] Figure 1 This is an overall structural diagram of the present invention.

[0037] Figure 2This is the front view of the invention (along the longitudinal direction of the channel).

[0038] Figure 3 This is a cross-sectional view of the invention (perpendicular to the channel sidewall).

[0039] Figure 4 This is a detailed schematic diagram of the connection method between the cable and the mesh ring in this invention.

[0040] Figure 5 This is a detailed schematic diagram of the ring connection method in this invention.

[0041] Figure 6 Schematic diagram of the working principle of anchor piles

[0042] Figure 7 This is a schematic diagram (cross-sectional view) of the multi-layer flexible gabion barrier device of the present invention.

[0043] Figure 8 This is a schematic diagram (cross-sectional view) of the arrayed flexible gabion barrier device of the present invention.

[0044] In the diagram, 1-1, first stay cable; 1-2, second stay cable; 1-3, third stay cable; 1-4, fourth stay cable; 2-1, first horizontal stay cable; 2-2, second horizontal stay cable; 2-3, third horizontal stay cable; 2-4, fourth horizontal stay cable; 3-1, first vertical stay cable; 3-2, second vertical stay cable; 4-1, first longitudinal stay cable; 4-2, second longitudinal stay cable; 4-3, third longitudinal stay cable; 5, net ring; 6, filler; 7, bottom anchor; 8, sidewall anchor; 9, cable clamp; 10, anchor pile; 11, stay cable adjusting handle; 12, stay cable anchor head; 12-1, stay cable perforation; 12-2, embedded anchor; 12-3, high-strength bolt. Detailed Implementation

[0045] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.

[0046] In the description of this invention, it should be noted that the terms "upper," "lower," "inner," "outer," "top / bottom," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing the invention and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0047] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installed," "equipped with," "sleeved / connected," "connected," etc., should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0048] like Figure 1-8 As shown, the present invention provides a flexible gabion barrier device, comprising:

[0049] A frame, used for fixing within the trench;

[0050] The mesh panel is composed of several nested mesh rings 5, which enclose the frame.

[0051] Filler 6 is used to fill the space enclosed by the mesh and the frame.

[0052] In this invention, the frame is formed by interconnecting horizontal cables, vertical cables, and longitudinal cables.

[0053] In this invention, there are four horizontal cables, four vertical cables, and four longitudinal cables, which together form a rectangular frame.

[0054] The flexible gabion barrier device for debris flow and loess flow control provided by the present invention is a single-stage barrier device. For multi-stage barrier devices, multiple single-stage barrier devices are connected in series or in parallel. The single-stage barrier device or multi-stage barrier device is selected according to the different areas to be controlled.

[0055] For a single-stage barrier device, four horizontal cables (first horizontal cable 2-1, second horizontal cable 2-2, third horizontal cable 2-3, and fourth horizontal cable 2-4), four vertical cables (first vertical cable 3-1, second vertical cable 3-2, third vertical cable, and fourth vertical cable), and four longitudinal cables (first longitudinal cable 4-1, second longitudinal cable 4-2, third longitudinal cable 4-3, and fourth longitudinal cable) constitute the basic framework of the flexible barrier device. The mesh is enclosed outside the framework, forming an internal space for accommodating the filler material.

[0056] like Figure 5 As shown, the structure of the mesh is given. The mesh is mainly composed of mesh rings 5. The cable passes through the outermost mesh ring 5, and the inner mesh rings 5 ​​are nested together and tightly connected to each other to provide tension.

[0057] In this invention, a stay cable is also included. One end of the stay cable is connected to the horizontal stay cable, the vertical stay cable and the longitudinal stay cable, and the other end is fixed to the bottom of the ditch by an anchor pile 10. Preferably, there are four stay cables. The four stay cables (namely, the first stay cable 1-1, the second stay cable 1-2, the third stay cable 1-3 and the fourth stay cable 1-4) provide lateral stability for the flexible barrier device and ensure its stability under the impact of debris flow and loess mudflow.

[0058] The anchor pile 10 is preferably a rigid pile with a certain embedment depth, which can be made of reinforced concrete in the project.

[0059] like Figure 4 As shown, in this invention, the horizontal cable, vertical cable, longitudinal cable and diagonal cable are fixed together by cable clamps 9 to enhance the overall integrity.

[0060] In this invention, the cable clamp 9 includes:

[0061] A rigid gasket has upper and lower parts, and the horizontal cable, vertical cable, longitudinal cable and diagonal cable are located between the upper and lower rigid gaskets;

[0062] High-strength bolts, which pass through the upper and lower rigid washers, fix the horizontal cable, vertical cable, longitudinal cable and diagonal cable together;

[0063] Specifically:

[0064] The stay cables, including the horizontal, vertical, and longitudinal cables, are sandwiched between gaskets and secured with pressure using high-strength bolts.

[0065] In this invention, a stay cable anchor head 12 and a stay cable adjusting handle 11 are also included. The stay cable anchor head 12 includes:

[0066] An embedded anchor 12-2 is fixed inside the anchor pile 10 and has a cable through hole 12-1 and a bolt hole, wherein the cable through hole 12-1 is for the cable to pass through;

[0067] A high-strength bolt 12-3 is inserted through the bolt hole into the cable through hole 12-1 to fix the cable.

[0068] The cable adjustment handle 11 includes a shaft and a handle for driving the shaft to rotate. The cable passes through the cable perforation and is wound onto the shaft.

[0069] In this invention, the stay cable anchor head 12 is rigidly connected to the anchor pile 10. The stay cable adjusting handle 11 consists of a handle and a shaft. The handle can rotate around the shaft, and the shaft passes through a pre-drilled hole in the pile body into the anchor pile 10 without a rigid connection. This design ensures that the stay cable adjusting handle 11 is flexible. When the stay cable is connected to different anchor points, the stay cable adjusting handle 11 can move freely, assisting in the installation and fixing of the stay cable. The end of the stay cable first passes through the cable through hole 12-1, and then wraps around the shaft of the stay cable adjusting handle 11. The tension of the stay cable is adjusted by rotating the handle. When the design requirements are met, the rotation of the handle is stopped, and a high-strength bolt 12-3 is inserted. The stay cable is fixed by the compressive force applied by the bolt. Multiple high-strength bolts 12-3 can be used together (only one is shown in the side view here).

[0070] In this invention, the horizontal cable is fixed to the sidewall of the trench by the sidewall anchor 8.

[0071] In this invention, the vertical cable is fixed to the bottom of the trench by the trench bottom anchor 7.

[0072] like Figure 2-3 As shown, a front view and a cross-sectional view are provided, demonstrating the detailed construction of the flexible gabion device along the transverse direction of the ditch. Four horizontal stay cables are embedded in the sidewall of the ditch, and sidewall anchorages 8 are formed at the ends of the stay cables by drilling and grouting to enhance the transverse tensile force; the ends of the four vertical stay cables are embedded in the bottom of the ditch in the same way, and the pull-out resistance is enhanced by bottom anchorages 7.

[0073] In terms of construction sequence, first fix four horizontal cables, four vertical cables, and four longitudinal cables to form the basic framework of the barrier device. Then fix the cables according to the above design requirements. Next, install the lateral and bottom mesh panels. After completion, a box-shaped structure with an open top is formed. Then select filler with appropriate particle size and gradation to fill the hollow body surrounded by the mesh panels. After filling is completed, install the top mesh panels. Thus, a single-stage, single-array flexible gabion device is installed.

[0074] The present invention also provides the application of the above-mentioned flexible gabion barrier device in the prevention and control of geological disasters such as debris flow and loess mudflow.

[0075] The technical solution of the present invention will be clearly and thoroughly described below with reference to specific embodiments.

[0076] Example 1

[0077] like Figure 7The diagram shows a schematic of the first embodiment of the present invention. The installed flexible gabion retaining device is shown in Scenario 1. However, after a debris flow or loess mudflow disaster, the retaining device intercepts the disaster, but a large amount of loose debris accumulates behind it, forming a slope that is eventually completely filled and buried. When another debris flow or loess mudflow disaster occurs, the flow climbs up the slope and rushes out along the top of the retaining device before moving downstream. Thus, the retaining device loses its retaining capacity, as shown in Scenario 2. This is one of the drawbacks of most retaining devices, requiring timely removal of the accumulated silt. Therefore, the transportation and accumulation of silt is also a challenge. Considering this problem, the advantages of the present invention are its simple structure and convenient construction. After compacting the loose silt, a second-level retaining device can be installed on top of the first-level retaining device, or the second-level retaining device can be installed using the flattened and compacted silt as the bottom of the channel. This solves the problems of difficult and slow recovery of the retaining device's function, enhancing its recoverability.

[0078] Example 2

[0079] like Figure 8 The diagram shows a second embodiment of the present invention. Single-stage array barrier devices often fail to achieve satisfactory blocking effects in the face of large-scale debris flows or loess mudflows. Therefore, given the advantages of simple and rapid construction of this invention, multiple barrier arrays can be quickly deployed along the gully to achieve tiered blocking of debris flows or loess mudflows, gradually weakening the scale and destructive force of the disaster.

[0080] The filler material of this invention is controllable. Typically, the size of the mesh rings in a flexible protective net is determined during manufacturing and is difficult to change once installed, resulting in poor adjustability of the opening size. This invention is an open-type barrier device, but the difference lies in that it does not rely on the size of the mesh rings to intercept flowing materials; the opening size is controlled by the filler material, and the mesh ring size is designed only to ensure that the filler material does not leak. The filler material consists of coarse filler with a certain gradation, and the specific selection can be determined according to the local disaster type, offering a wide adjustable range. For disasters like loess mudflows, where the solid phase material is mainly fine-grained, a smaller particle size of the filler material can be selected; while for disasters like debris flows, where the solid phase material has a large particle size range, the design of the filler material can be comprehensively determined based on the material composition of the debris flow and the required interception rate. If a lower interception rate is required, coarse-grained materials are selected; if a higher interception rate is required, fine-grained materials can be selected.

[0081] In this invention, the filler can be waste slag or building materials, etc., without special design requirements, so it is environmentally friendly and cost-effective.

[0082] Furthermore, this invention not only intercepts materials from debris flows and loess mudflows, but also significantly reduces the impact force on the retaining device, lowering the structural strength design requirements. Unlike conventional rigid concrete structures and purely flexible protective structures where the impact force is entirely borne by rigid or flexible bodies, this invention uses filler material, with cables (preferably rigid cables), mesh, and filler material jointly bearing the impact force. The displacement and friction of the filler material under impact also dissipates some of the impact energy. Simultaneously, the rearrangement of filler particles helps avoid localized impact stress concentration, resulting in better protection against debris flows carrying large boulders. Therefore, the robustness of this invention is also quite good.

[0083] The above are merely preferred embodiments of the present invention; however, the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and its improved concept, should be covered within the scope of protection of the present invention.

Claims

1. A flexible gabion retaining device for the control of debris flows and loess mudflows, characterized in that, include: A frame, used for fixing within the trench; The mesh panel is composed of several nested mesh rings and is enclosed outside the frame; The filler material is used to fill the space enclosed by the mesh and the frame. The frame is formed by interconnecting horizontal, vertical, and longitudinal cables. The number of horizontal, vertical, and longitudinal cables are all four, forming a rectangular frame. It also includes a stay cable, one end of which is connected to the horizontal stay cable, the vertical stay cable and the longitudinal stay cable, and the other end is fixed to the bottom of the trench by anchor piles; The horizontal, vertical, longitudinal, and diagonal stay cables are fixed together by cable clamps; The cable clamp includes: A rigid gasket has upper and lower parts, and the horizontal cable, vertical cable, longitudinal cable and diagonal cable are located between the upper and lower rigid gaskets; High-strength bolts, which pass through the upper and lower rigid washers, fix the horizontal cable, vertical cable, longitudinal cable and diagonal cable together; It also includes a stay cable anchor head and a stay cable adjusting handle, wherein the stay cable anchor head includes: An embedded anchor is fixed inside the anchor pile and has a cable through hole and a bolt hole, wherein the cable through hole is for the cable to pass through; High-strength bolts are inserted through the bolt holes into the cable through-holes to fix the stay cable; The cable adjustment handle includes a shaft and a handle for driving the shaft to rotate. The cable passes through the cable perforation and is wound onto the shaft.

2. The flexible gabion barrier device for controlling debris flows and loess mudflows according to claim 1, characterized in that, The horizontal stay cable is fixed to the sidewall of the trench by a sidewall anchor.

3. A flexible gabion retaining device for debris flow and loess mudflow control according to claim 1, characterized in that, The vertical cable is fixed to the bottom of the trench by a trench bottom anchor.

Citation Information

Patent Citations

  • Method for installing passive flexible protective net on reaction wall of experimental site

    CN109736214A

  • Comprehensive treatment method for debris flow

    CN113389162A

  • Point supporting glass clamp of inhaul cable structure

    CN203546986U

  • Ecological solid soil flood control gabion

    CN205653750U