A joint design system for sampling and scheduling driven by perceived error age

By introducing Age of Perceived Error (AoIT) as a comprehensive indicator, the sampling and scheduling process is optimized, which solves the problems of resource waste and insufficient monitoring quality in the existing technology, achieves a balance between resource consumption and estimation cost, and improves monitoring quality and real-time estimation accuracy.

CN117896753BActive Publication Date: 2026-11-17SHANGHAI JIAOTONG UNIV
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410014658.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2026-11-17
Estimated Expiration
2044-01-04

AI Technical Summary

Technical Problem

Existing Information Age (AoI) and estimation error metrics are unable to effectively capture the information content of communication data packets, resulting in wasted resources and insufficient monitoring quality, and an inability to detect abnormal states in physical processes in a timely manner.

Method used

The perceived error age (AoIT) is introduced as a comprehensive indicator. By jointly designing the sampling and scheduling process, the workflow of the sampling unit, communication unit and computing unit is optimized to achieve a balance between resource consumption and estimation cost. The sampling and scheduling algorithm driven by the perceived error age is adopted to avoid unnecessary sampling and resource waste.

Benefits of technology

It improves monitoring quality and real-time estimation accuracy, avoids resource waste, can promptly detect abnormal states in physical processes, and enhances system performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117896753B_ABST
    Figure CN117896753B_ABST
Patent Text Reader

Abstract

This invention discloses a joint design framework for sampling and scheduling driven by the age of perceived error, relating to the field of Industrial Internet of Things (IIoT). It includes a sampling unit, a communication unit, a computing unit, and an evaluation unit. The sampling unit collects physical process state information based on instructions from the evaluation unit. The communication unit transmits the collected state information to the computing unit; the lag in this process is the communication delay. When all measured values ​​arrive at the computing unit, the unit extracts and transforms effective information and sends the state, after further lag calculation delay, to the evaluation unit. The evaluation unit calculates the perceived error age index and evaluates the estimation performance, issuing a sampling decision accordingly. The introduction of this framework and index will help further improve the monitoring quality and real-time estimation capabilities in the IIoT, providing better performance and effectiveness for technological applications.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of industrial Internet of Things (IIoT), and more particularly to a joint design system for sampling and scheduling driven by sensing error age. Background Technology

[0002] With the surge in the number of sensors and devices in the Industrial Internet of Things (IIoT), monitoring quality has become a new focus for technology applications. In IIoT applications, monitors aim to acquire accurate real-time status of physical processes, such as rolling temperature in hot rolling production or the angle curve of moving surfaces in aircraft assembly testing. To achieve this, communication units update timestamped status information over the network to maximize or minimize specific metrics. However, traditional throughput or latency metrics have limitations, leading to the introduction of Age of Information (AoI) to measure information freshness. AoI measures the impact of time delays at the monitor end, and research shows that acquiring fresh information leads to better real-time estimations. Therefore, AoI is widely considered a fundamental performance evaluation metric for communication systems and has been studied in various real-world scenarios.

[0003] As mentioned earlier, the ultimate goal of the communication system discussed is to achieve optimal real-time remote estimation of the process of interest at the destination node. However, AoI (Aspect-Oriented Intelligence) fails to capture the information content of communication data packets or the current knowledge at the destination node. In fact, even if the monitor has sufficient knowledge of the process in question, AoI increases over time, leading to unnecessary penalties. Furthermore, estimation error or mean squared error is another commonly used metric for process monitoring, but it fails to penalize cases where the monitor makes incorrect estimates of the process of interest. In other words, the same penalty applies regardless of how long the destination node remains in an erroneous state. Therefore, a more general system is needed to address the shortcomings of these metrics.

[0004] To address this, we introduce a new performance metric—Age of IncorrectTask (AoIT)—to overcome the shortcomings of AoI and estimation error. AoIT can simultaneously characterize the impact of information delay and estimation error on system performance. Based on this, we propose a novel system that achieves an effective balance between resource consumption and estimation cost through the joint design of sampling and scheduling processes. By optimizing sampling and scheduling strategies, we can minimize AoIT, thereby improving the system's monitoring quality and real-time estimation accuracy. The introduction of this new system and metric will contribute to further improving monitoring quality and real-time estimation capabilities in the Industrial Internet of Things (IIoT), providing better performance and effectiveness for technological applications.

[0005] A literature search revealed that the most similar implementation is Chinese patent application number 202011077538.4, entitled "A Multi-channel Wireless Network Scheduling Method Supporting Information Age Optimization." Its specific approach involves scheduling links on a time-slot basis in a multi-channel wireless network scenario with multiple source nodes and multiple target nodes, using the average information age in the network as the optimization objective. However, the information age index used in this patent cannot capture the content of data packets, potentially leading to unnecessary resource waste. Summary of the Invention

[0006] In view of the above-mentioned deficiencies of the prior art, the technical problem to be solved by the present invention is how to improve the monitoring quality and real-time estimation accuracy of the system.

[0007] To achieve the above objectives, this invention provides a joint design system for sampling and scheduling driven by the age of perceived error, characterized by comprising a sampling unit, a communication unit, a computing unit, and an evaluation unit; the sampling unit collects physical process state information based on instructions from the evaluation unit; the communication unit transmits the collected state information to the computing unit, with the resulting lag being the communication delay; when all measured values ​​arrive at the computing unit, the unit extracts and transforms effective information and sends the state with further lag calculation delay to the evaluation unit; the evaluation unit is used to calculate the perceived error age index and evaluate the estimation performance, and issue a sampling decision accordingly.

[0008] Furthermore, the acquisition unit performs acquisition triggered by the feedback from the evaluation unit; the evaluation unit uses two sub-units, task age and estimation error, and updates the data based on the received state information by performing time delay penalty and information penalty, thereby generating the comprehensive index of perception error age, and outputting a sampling decision instruction based on the estimation performance.

[0009] Furthermore, the perceived error age is used at the remote receiver to simultaneously measure the impact of time delay penalties and information penalties on system performance. It is expressed as an exponential function of the task age and a function of the mean square error of the estimation error, with the following expression: ;in This indicates the age of the system's perceived error. Indicates the system's task age. This represents the estimation error of the system; When the value is close to 1, the evaluation unit exhibits a similar preference for task ages of any size, similar to the distortion of finite-time averaging estimation; conversely, when... When the value significantly exceeds 1, the evaluation unit will place greater emphasis on penalizing high task age; this indicates that the network system under consideration imposes stricter requirements on the high task age of sensor data.

[0010] Furthermore, the system employs a joint design algorithm for sampling and scheduling based on the perceived error age. Sampling decisions are made based on the optimization of the perceived error age. Each sampling unit in the system simultaneously communicates with the evaluation unit. For the network relationships between multiple sampling units, communication units, and computing units in a multi-band and multi-CPU network environment, the system progressively performs joint scheduling of multiple frequency bands and CPU resources. This joint design algorithm based on the perceived error age prevents unnecessary sampling by the sampling units, thus avoiding resource waste. The evaluation unit can calculate time delay penalties and information penalties based on sampling and scheduling information to solve for the value of the perceived error age. For the joint scheduling problem of communication and computing in the network, it is transformed into two convex subproblems, providing a proportionally optimal solution.

[0011] Furthermore, the joint design algorithm specifically includes the following steps:

[0012] Step 1: Obtain the parameters of the system to be sampled and the scheduling system, including the total number of sampling units. The position information of each sampling unit Data packet size and calculated strength The communication unit has available frequency band resources. and computing units available CPU resources and the initial task age of the evaluation unit. estimation error and the tolerable threshold for the age of the perceived error. information;

[0013] Step 2: Calculate the initial perception error age based on the task age and the estimated error;

[0014] Step 3: Determine the age of the current perceived error With the tolerance threshold The relationship between the current perceived error age and the tolerance threshold is determined. If the current perceived error age is greater than or equal to the tolerance threshold, a sampling instruction is issued to the sampling unit, and a communication request is sent. Otherwise, the current time slot is not considered. No sampling is performed;

[0015] Step 4: If there is no communication request, proceed to step 7; otherwise, each measurement value is allocated a communication resource block proportionally based on the data packet size and the square root of the unit transmission rate, thereby transmitting the measurement value.

[0016] Step 5: The calculation unit only performs raw data cleaning and extraction of effective information when all measurement values ​​arrive. Each measurement value is allocated a proportional amount of computing resource blocks based on the size of the data packet and the square root of the calculation intensity, and then the data is fused to obtain state measurement information with time lag, which is then uploaded to the evaluation unit.

[0017] Step 6: Determine if the evaluation unit has received status update data. If there is an update, proceed to the next step; otherwise, go to step 8.

[0018] Step 7: The evaluation unit calculates the task age and the estimation error based on the status update data to obtain the current perception error age information, and then returns to execute step 3 until the monitoring period ends.

[0019] Step 8: The evaluation unit calculates the task age and the estimated error based on historical state data to obtain the current perceived error age information, and then returns to step 3 until the monitoring period ends.

[0020] Furthermore, in step 3, when the sampling unit performs sampling, the system task age... Random Data Packets Communication latency and computational delay Dynamically changing; by averaging the task age δ(t) across various time slots, the relevant average task age can be captured. .

[0021] Furthermore, in step 4, according to the diminishing gain effect, as more communication resources are allocated to a single device, the performance gain (i.e., communication delay gain) decreases. This necessitates allocating communication resources to multiple devices to improve the overall system benefit. According to the analytical form of average task age, the objective function of the communication resource optimization subproblem is minimized if and only if the delays of all devices are close to the arithmetic mean. Therefore, the data packet... Number of communication resource blocks The allocation should be related to the packet size. and unit transmission rate It is directly proportional to the arithmetic square root, and its expression is: The molecule is a data packet. The arithmetic square root, the denominator is all The sum of the square roots of the data packets, since this invention allocates the number of resource blocks, requires multiplying the communication allocation ratio by the total available frequency band resources. .

[0022] Furthermore, in step 5, based on the diminishing gain effect, as more computing resources are allocated to a device, the computing latency gain decreases. According to the analytical form of average task age, the objective function of the computing resource optimization subproblem is minimized if and only if the computing latency of all devices is close to the arithmetic mean; therefore, the data packet... Number of computing resource blocks The allocation should be related to the data packet size. and calculated strength It is directly proportional to the arithmetic square root, and its expression is: The molecule is a data packet. The arithmetic square root, the denominator is all The sum of the arithmetic square roots of the data packets, since this invention allocates the number of resource blocks, requires multiplying the calculated allocation ratio by the total available CPU resources. .

[0023] Furthermore, in step 7, when status information is updated, the task age... The sampling timestamp of the latest status information received by the evaluation unit. The difference from the current time is expressed as: The estimation error The difference between the estimated value and the true value made by the evaluation unit based on the latest received state information is expressed as follows: ,in The system matrix is ​​represented by a constant matrix. It is white Gaussian noise with zero mean and a covariance matrix. .

[0024] Furthermore, in step 8, when no status information is updated, the task age... To increment the task's age by one from the previous time step, the expression is: The estimation error The difference between the estimated value and the true value made by the evaluation unit based on historical data.

[0025] The present invention has the following technical effects:

[0026] (1) The joint design system proposed in this invention systematically reveals the coupling relationship between units. Through the optimization of comprehensive indicators, the overall performance is improved, which can better meet the needs of industrial network systems and help to further improve monitoring quality.

[0027] (2) The new comprehensive index proposed in this invention can not only avoid unnecessary waste of resources caused by the target node sampling even though it has a complete understanding of the source node's state, but also better evaluate whether the physical process is running normally, which helps to detect abnormalities and adjust strategies in time, and avoid non-fault shutdowns.

[0028] (3) The joint design algorithm proposed in this invention adopts the comprehensive index of perceived error age, which can realize the joint design of sampling, communication and computing, help the deployment of joint design system, and achieve an effective balance between resource consumption and system performance.

[0029] The following will further explain the concept, specific structure, and technical effects of the present invention in conjunction with the accompanying drawings, so as to fully understand the purpose, features, and effects of the present invention. Attached Figure Description

[0030] Figure 1 A preferred embodiment of the present invention is a schematic diagram of a sampling and scheduling joint design system for remote estimation;

[0031] Figure 2 This is a schematic diagram illustrating different index variations in a preferred embodiment of the present invention;

[0032] Figure 3 This is a flowchart of the joint design system of a preferred embodiment of the present invention;

[0033] Figure 4 This is a flowchart of a preferred embodiment of the sampling and scheduling joint design algorithm based on age with perceptual error. Detailed Implementation

[0034] The following description, with reference to the accompanying drawings, illustrates several preferred embodiments of the present invention to make its technical content clearer and easier to understand. The present invention can be embodied in many different forms, and the scope of protection of the present invention is not limited to the embodiments mentioned herein.

[0035] In the accompanying drawings, components with the same structure are indicated by the same numerical designation, and components with similar structures or functions are indicated by similar numerical designations. The dimensions and thicknesses of each component shown in the drawings are arbitrary, and the present invention does not limit the dimensions and thicknesses of each component. To make the illustrations clearer, the thickness of some components has been appropriately exaggerated in the drawings.

[0036] Figure 1This is a schematic diagram of a joint design system for sampling and scheduling for remote estimation. The joint design system includes a sampling unit, a communication unit, a computing unit, and an evaluation unit. The sampling unit is used to collect physical process state information. This unit consists of multiple geographically dispersed sensors jointly monitoring the state of the same physical process, and the state collection is triggered based on feedback from the evaluation unit. The communication unit is used to transmit the collected state information to the computing unit. The communication latency in this process is related to the sensor data packet size, the distance to the computing unit, and the allocated communication resource blocks. When the computing unit receives all the measurement values, it extracts and fuses the effective information and sends it to the evaluation unit. The computation latency in this process depends on the sensor data packet size, computational complexity, and allocated computing resource blocks, and is the maximum value of the computation latency of all sensors. The evaluation unit is used to calculate the perception error age index and evaluate the estimation performance. In particular, the evaluation unit adopts two sub-units: task age and estimation error. Based on the received state information, it performs time delay penalties and information penalties to update the data, thereby generating a comprehensive index of perception error age, which is used to evaluate the estimation performance and make sampling decisions.

[0037] Figure 2 This is a diagram illustrating the changes in different metrics, including sub-graphs for five main metrics. To better understand our work, we will focus on a specific scenario of send-receive pair communication. More specifically, the actual values ​​of the sender's (source node's) observation process. Its state is shown in subgraph (1), and it sends state update notifications to the receiver (destination node) via the network. Based on the last received update, the destination node constructs an estimate of the process, using... This is illustrated in subgraph (2). Time is considered discrete and normalized to the time slot duration. The transmitter determines when to notify the destination node process by employing a communication strategy designed to minimize the average of a specific penalty function. .

[0038] The subgraph (3) represents the task age. The value of is the current time minus the generation timestamp of the last successfully received data packet. Based on this definition, we can observe that task age can capture the time lag of the state on the destination node, and therefore it is often used as a time lag penalty function to achieve timely information updates. However, as can be seen from subgraph (3), the task age always increases over time, regardless of whether the destination node estimate knows the true state of the source node. The above observation clearly reveals the shortcomings of the task age penalty function, namely that any relevant metric used in a remote estimation process must more meaningfully capture its information content and the receiver's current knowledge.

[0039] The subgraph (4) represents the estimation error. The value is the difference between the estimated value of the destination node and the true value of the source node. The main drawback of this error penalty function is that it fails to capture the increasingly larger penalty effect that should occur over time in a sustained erroneous state; that is, the long-term average error loss caused by a sudden error is the same as the loss caused by several isolated errors of the same duration. However, this is not always the case in reality; in many applications, the longer the destination node holds the erroneous information, the greater the penalty. Taking machine overheating as an example, it is well known that the effects of sustaining machine overheating become more severe over time. Therefore, this should be reflected in the adopted penalty function and should be considered one of its key design features.

[0040] The subgraph (5) represents the perceived error age, which is a composite function of the task age and the estimation error, expressed as follows: As mentioned earlier, when the destination node fully grasps the state of the source node, that is... If the process state changes but the destination node is in an error state, no penalty will be imposed; The penalty increases over time, requiring state updates to arrive as quickly as possible. The perceived error age can simultaneously characterize the impact of time delay penalties and information penalties on the system, significantly compensating for the deficiencies of task age and estimation error.

[0041] Figure 3 This is a flowchart of the joint design system workflow. The evaluation unit makes a sampling decision in each time slot and sends a sampling command. When the sampling unit returns positive response data, sampling occurs. Simultaneously, communication requests are sent to the communication and computation units, and joint design of communication and computation is performed based on the returned response data, completing state communication, data cleaning, and effective information extraction. The evaluation unit updates the system's perceived error age based on the returned state information with scheduling delays, serving as the basis for the sampling decision. This joint design system avoids resource waste caused by sampling when the evaluation unit has perfectly tracked the physical process. Furthermore, by using the perceived error age as a comprehensive indicator, it can better assess the progress of the physical process, enabling timely detection of anomalies and strategy adjustments.

[0042] Figure 4 The flowchart of the sampling and scheduling joint design algorithm based on the age of perceptual error includes the following steps:

[0043] Step 1: Obtain the parameters of the system to be sampled and the scheduling system, such as the total number of sampling units. Location information of each sampling unit Data packet size and calculated strength Available frequency band resources for communication units and computing units available CPU resources and the initial task age of the assessment unit. estimation error And the tolerable threshold for perceived error age Information such as;

[0044] Step 2: Calculate the initial perceived error age ;

[0045] Step 3: Determine the age of the current perceived error Is it greater than or equal to the tolerable threshold? If the condition is met, proceed to step 4; otherwise, do not sample the current time slot and proceed to step 7.

[0046] Step 4: Issue the sampling command And send a communication request;

[0047] Step 5: Based on data packet size and unit transmission rate If the arithmetic square root is used to proportionally allocate communication resource blocks, then... ;

[0048] Step 6: Based on data packet size and calculated strength If the arithmetic square root is used to proportionally allocate communication resource blocks, then... ;

[0049] Step 7: Determine if there is any status update data. If there is, proceed to step 8; otherwise, proceed to step 9.

[0050] Step 8: Calculate the task age based on the state estimation data. and estimation error In order to obtain age information of perceived error ;

[0051] Step 9: Calculate the task age based on historical status data. and estimation error In order to obtain age information of perceived error ;

[0052] The algorithm determines whether the monitoring period has ended. If the condition is not met, it returns to step 3; otherwise, the algorithm terminates. The preferred embodiments of the present invention have been described in detail above. It should be understood that those skilled in the art can make numerous modifications and variations based on the concept of the present invention without creative effort. Therefore, all technical solutions that can be obtained by those skilled in the art based on the concept of the present invention through logical analysis, reasoning, or limited experimentation on the basis of existing technology should be within the scope of protection defined by the claims.

Claims

1. A joint design system for sampling and scheduling driven by perceived error age, characterized in that, It includes a sampling unit, a communication unit, a calculation unit, and an evaluation unit. The sampling unit collects physical process state information based on the instructions of the evaluation unit. The communication unit transmits the collected state information to the calculation unit, and the resulting delay is the communication latency. When all measured values ​​arrive at the calculation unit, the unit extracts and transforms effective information and sends the state with further delay calculation to the evaluation unit. The evaluation unit is used to calculate the perception error age index and evaluate the estimation performance, and makes a sampling decision accordingly. The perceived error age index is a comprehensive performance index that simultaneously measures the time delay penalty and information penalty of state information. It is expressed as an exponential function of task age and a function of the mean square error of estimation error, with the following expression: ;in This indicates the age of the system's perceived error. Indicates the system's task age. This represents the estimation error of the system; As a weighting adjustment coefficient, when it is close to 1, the evaluation unit exhibits a similar preference for task ages of any size, similar to finite-time averaging estimation distortion; conversely, when... When the value significantly exceeds 1, the evaluation unit will place greater emphasis on penalizing high task age; this indicates that the network system under consideration imposes stricter requirements on high task age of sensor data.

2. The age-driven sampling and scheduling joint design system for perceptual error as described in claim 1, characterized in that, The sampling unit collects data triggered by feedback from the evaluation unit. The evaluation unit uses two sub-units: task age and estimation error. It updates the data based on the received state information by applying time delay penalties and information penalties, thereby generating a comprehensive index of perceived error age. Based on the estimation performance, it outputs a sampling decision instruction.

3. The age-driven sampling and scheduling joint design system for perceived error as described in claim 2, characterized in that, The perceived error age is used to simultaneously measure the impact of time delay penalty and information penalty on system performance at the remote receiver.

4. The age-driven sampling and scheduling joint design system for perceived error as described in claim 3, characterized in that, This system employs a joint design algorithm for sampling and scheduling based on the perceived error age. Sampling decisions are made based on the optimization of the perceived error age. Each sampling unit in the system communicates simultaneously with the evaluation unit. Considering the network relationships between multiple sampling units, communication units, and computing units in a multi-band and multi-CPU network environment, the system progressively performs joint scheduling of multiple frequency bands and CPU resources. This joint design algorithm based on the perceived error age prevents unnecessary sampling by the sampling units, thus avoiding resource waste. The evaluation unit can calculate time delay penalties and information penalties based on sampling and scheduling information to solve for the value of the perceived error age. For the joint scheduling problem of communication and computing in a network, it is transformed into two convex subproblems, and the proportionally optimal solution is given.

5. The age-driven sampling and scheduling joint design system for perceived error as described in claim 4, characterized in that, The joint design algorithm specifically includes the following steps: Step 1: Obtain the parameters of the system to be sampled and the scheduling system, including the total number of sampling units. The position information of each sampling unit Data packet size and calculated strength The communication unit has available frequency band resources. and computing units available CPU resources and the initial task age of the evaluation unit. estimation error and the tolerable threshold for the age of the perceived error. information; Step 2: Calculate the initial perception error age based on the task age and the estimated error; Step 3: Determine the age of the current perceived error With the tolerance threshold The relationship between the current perceived error age and the tolerance threshold is determined. If the current perceived error age is greater than or equal to the tolerance threshold, a sampling instruction is issued to the sampling unit, and a communication request is sent. Otherwise, the current time slot is not considered. No sampling is performed; Step 4: If there is no communication request, proceed to step 7; otherwise, each measurement value is allocated a communication resource block proportionally based on the data packet size and the square root of the unit transmission rate, thereby transmitting the measurement value. Step 5: The calculation unit only performs raw data cleaning and extraction of effective information when all measurement values ​​arrive. Each measurement value is allocated a proportional amount of computing resource blocks based on the size of the data packet and the square root of the calculation intensity, and then the data is fused to obtain state measurement information with time lag, which is then uploaded to the evaluation unit. Step 6: Determine if the evaluation unit has received status update data. If there is an update, proceed to the next step; otherwise, go to step 8. Step 7: The evaluation unit calculates the task age and the estimation error based on the status update data to obtain the current perception error age information, and then returns to execute step 3 until the monitoring period ends. Step 8: The evaluation unit calculates the task age and the estimated error based on historical state data to obtain the current perceived error age information, and then returns to step 3 until the monitoring period ends.

6. The age-driven sampling and scheduling joint design system for perceived error as described in claim 5, characterized in that, In step 3, when the sampling unit performs sampling, the system task age... Random Data Packet Communication latency and computational delay Dynamically changing; by averaging the task age δ(t) across various time slots, the relevant average task age can be captured. .

7. The age-driven sampling and scheduling joint design system for perceived error as described in claim 6, characterized in that, In step 4, according to the diminishing gain effect, as more communication resources are allocated to a device, the performance gain decreases, where the performance gain refers to the communication latency gain. This necessitates allocating communication resources to multiple devices to improve the overall system benefit. According to the analytical form of average task age, the objective function of the communication resource optimization subproblem is minimized if and only if the latency of all devices is close to the arithmetic mean. Therefore, the data packet... Number of communication resource blocks The allocation should be related to the packet size. and unit transmission rate It is directly proportional to the arithmetic square root, and its expression is: The molecule is a data packet. The arithmetic square root, the denominator is all The sum of the square roots of the data packets, since this invention allocates the number of resource blocks, requires multiplying the communication allocation ratio by the total available frequency band resources. .

8. The age-driven sampling and scheduling joint design system for perceived error as described in claim 7, characterized in that, In step 5, based on the diminishing gain effect, as more computing resources are allocated to a device, the computing latency gain decreases. According to the analytical form of average task age, the objective function of the computing resource optimization subproblem is minimized if and only if the computing latency of all devices is close to the arithmetic mean. Therefore, the data packet... Number of computing resource blocks The allocation should be related to the data packet size. and calculated strength It is directly proportional to the arithmetic square root, and its expression is: The molecule is a data packet. The arithmetic square root, the denominator is all The sum of the arithmetic square roots of the data packets, since this invention allocates the number of resource blocks, requires multiplying the calculated allocation ratio by the total available CPU resources. .

9. The age-driven sampling and scheduling joint design system for perceived error as described in claim 8, characterized in that, In step 7, when status information is updated, the task age... The sampling timestamp of the latest status information received by the evaluation unit. The difference from the current time is expressed as: The estimation error The difference between the estimated value and the true value made by the evaluation unit based on the latest received state information is expressed as follows: ,in The system matrix is ​​represented by a constant matrix. It is white Gaussian noise with zero mean and a covariance matrix. .

10. The age-driven sampling and scheduling joint design system for perceptual error as described in claim 9, characterized in that, In step 8, when no status information is updated, the task age... To increment the task's age by one from the previous time step, the expression is: The estimation error The difference between the estimated value and the true value made by the evaluation unit based on historical data.

Citation Information

Patent Citations

  • A Multi-Channel Wireless Network Scheduling Method Supporting Information Age Optimization

    CN112203307B