By establishing an uncertainty model of residential user participation and response volume, and using Monte Carlo sampling and African vulture optimization algorithms, the problem of power system supply and demand imbalance caused by uncertainty in residential demand response is solved, and the security and safety of the power system are improved. Economy.

CN117913782BActive Publication Date: 2024-10-18STATE GRID HUBEI ELECTRIC POWER RES INST +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311637057.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-01
Publication Date
2024-10-18
Estimated Expiration
2043-12-01

AI Technical Summary

Technical Problem

The existing technology has response differences and uncertainties in residential demand response research, which affects the safety and economy of demand response projects. Moreover, the traditional source-following load generator mechanism is no longer applicable and it is difficult to effectively cope with new developments. The imbalance between power supply and demand caused by fluctuations in energy output.

Method used

By establishing an uncertainty model of residential user participation and response, Monte Carlo sampling is used to calculate the total demand response load, and a power grid optimization dispatch model is constructed based on the African vulture optimization algorithm to determine the optimal demand response incentive value to optimize grid dispatch. .

Benefits of technology

It effectively reduces the risk losses caused by uncertainty in the demand response process, improves the safety and operating economy of the power system, and ensures the balance between power supply and demand.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117913782B_ABST
    Figure CN117913782B_ABST
Patent Text Reader

Abstract

A method and system for optimizing power grid dispatching considering the uncertainty of residents' demand response, the method comprising: establishing a residential user participation uncertainty model; establishing a residential user response quantity uncertainty model; calculating the total demand response load considering the uncertainty of residents' demand response based on the participation uncertainty model and the response quantity uncertainty model; establishing a power grid optimization dispatching model considering the uncertainty of residents' demand response based on the total demand response load considering the uncertainty of residents' demand response, taking the lowest comprehensive operation cost of the power grid as the goal, and determining the constraint conditions of the power grid optimization dispatching model; solving the power grid optimization dispatching model using the African vulture optimization algorithm to obtain the optimal demand response incentive value. The participation uncertainty and response quantity uncertainty of residents in the demand response process are finely modeled, which can reduce the safety risks and economic risks caused by user response uncertainty during the execution of demand response projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power demand response, and in particular to a power grid optimization dispatching method and system taking into account the uncertainty of residents' demand response. Background Art

[0002] At present, the electricity consumption of residential users is constantly rising, which increases the load supply pressure of the power grid. At the same time, the scale of new energy grid connection is increasing, and the new power system is being built at an accelerated pace. However, the output of new energy is highly volatile, making the imbalance of power supply and demand a normal state. Therefore, the traditional power generation mechanism of source following load is no longer applicable, and the research on demand response technology of source-load interaction has ushered in a boom.

[0003] However, current research on residential demand response is mostly focused on deterministic research, which has large errors compared with the differences and uncertainties in the actual responses of residential users, and will affect the safety and economy of the actual implementation of demand response projects. Summary of the invention

[0004] The purpose of the present invention is to solve the deficiencies of the above-mentioned prior art, thereby providing a power grid optimization dispatching method that takes into account the uncertainty of residents' demand response, and constructing a power grid optimization dispatching model by finely modeling the participation degree and response amount of residents' demand response, and obtaining at least one power grid optimization dispatching method that takes into account the uncertainty of residents' demand response, so as to solve the problem of response capacity deviation caused by user response uncertainty during the implementation of existing demand response projects, thereby improving the safety and economic operation of the power system. It can effectively reduce the series of risk losses caused by uncertainty in the demand response process.

[0005] The purpose of the present invention is also to provide a system for implementing the power grid optimization scheduling method taking into account the uncertainty of residents' demand response as described in the above technical solution.

[0006] A method for optimizing power grid dispatch considering uncertainty of residents' demand response comprises the following steps:

[0007] Step S1: Establishing the uncertainty model of resident user participation;

[0008] Step S2: Establishing uncertainty model of residential user response quantity;

[0009] Step S3: Based on the participation uncertainty model and the response quantity uncertainty model, the total demand response load considering the uncertainty of residents' demand response is calculated;

[0010] Step S4: Based on the total demand response load considering the uncertainty of residents' demand response in step S3, with the goal of minimizing the comprehensive operation cost of the power grid, a power grid optimization dispatching model considering the uncertainty of residents' demand response is established, and the constraint conditions of the power grid optimization dispatching model are determined;

[0011] Step S5: Use the African vulture optimization algorithm to solve the power grid optimization dispatching model, obtain the optimal demand response incentive value, determine the unit output, and form an optimal dispatching method.

[0012] In step S1, a residential user participation uncertainty model is established. The specific steps are as follows:

[0013] Step S11: Collecting family background information of the resident user, the family background information specifically includes family income, education level and average age of the user's family members;

[0014] Step S12: The family background information in step S11 is converted into the user's family income influence coefficient δ I , the influence coefficient of user's education level δ E and the average age of the user's family members, the influence coefficient δ A The three are used to calculate the uncertainty index δ of the user's sensitivity to incentives (indicating the uncertainty of the user's willingness to participate in demand response under incentive stimulation), and the calculation formula is:

[0015]

[0016]

[0017]

[0018]

[0019] Among them, I, I ε are the household income of residential users and the threshold of the user’s sensitivity to demand response incentives affected by the household income level. When the user’s household income exceeds the threshold I ε After that, its influence coefficient is regarded as a constant minimum value. Indicates that the user is extremely insensitive to incentives; 0≤α1<α2<α3≤1, E1, E2, E3 are the user's education level thresholds, increasing from low to high; 0≤α4<1, A, A ε are the average age and age threshold of family members of residential users, respectively;

[0020] Step S13: Based on the uncertainty index of user sensitivity to incentives obtained in step S12, a user participation uncertainty model based on dynamic changes in incentives is established, and its calculation formula is as follows:

[0021]

[0022] Among them, δ(x), δ m are the threshold points x when the user's incentive is x and when the incentive is the dominant factor mid Uncertainty sensitivity index at x low 、x up They represent the critical incentive level point and saturation incentive level point for users to participate in demand response respectively; α and β are uncertainty parameters of the user's incentive sensitivity index δ that changes with the incentive level x, which obey the normal distribution and α<β<1.

[0023] In step S2, the uncertainty model of the residential user response quantity is established, and the specific steps are as follows:

[0024] Step S21: Establishing the user demand response power incentive elasticity coefficient:

[0025]

[0026]

[0027] Among them, e ii 、e ij They represent the self-elastic coefficient and mutual elastic coefficient respectively; Q i , ΔQ i are the original power consumption and power consumption change of the user in period i; x i 、x j are the incentives for time periods i and j respectively; e ii 、e ij The value of can be obtained by investigating the behavior characteristics of local loads and expert experience;

[0028] Step S22: Establishing a user's electricity comfort model for temperature control load, electric vehicle load, and washing machine load:

[0029]

[0030]

[0031]

[0032] Among them, λ TL , EV and λ zy are the uncertainty indexes of the user's electricity comfort for temperature control load, electric vehicle load and washing machine load respectively; ΔT set ΔT is the change in the temperature setting value of the temperature control load; set,max The maximum adjustable temperature that the user can accept under incentive stimulation; SOCout , SOC plan are the state of charge values ​​of electric vehicles when they are off-grid when users participate in demand response and when users do not participate in demand response; T zy,on0 、T zy,on1 are the working start time of the transferable load before and after demand response, respectively; T zy,de,max is the maximum transfer time of the device; TL , EV and λ zy The value of is obtained by Monte Carlo sampling; ΔT set,max , SOC plan 、T zy,on0 and T zy,de,max The value of follows a normal distribution and is obtained by Monte Carlo sampling;

[0033] Step S23: Based on the user demand response power incentive elasticity coefficient and the power consumption comfort model, a user response uncertainty model based on the user power consumption comfort is established:

[0034] ΔQ i =Q i,TL ×λ TL ×e ii × i +(Q i,EV ×λ EV +Q i,zy ×λ zy )×e ij × j

[0035]

[0036]

[0037] Among them, ΔQ i is the uncertain value of the user's response; Q i,TL , Q i,EV and Q i,zy are the power consumption of the user's original temperature control load, electric vehicle load and other transferable loads in period i; P i , A i are the original electricity price at the user side, the demand response electricity price and the compensation incentive during period i; P j , A j They are the original electricity price at the user side, the demand response electricity price and the compensation incentive during period j respectively.

[0038] In step S3, based on the participation uncertainty model and the response uncertainty model, the total demand response load considering the uncertainty of residents' demand response is calculated. The specific steps are as follows:

[0039] Step S31: Obtain the α and β values ​​of the user engagement uncertainty model of each user based on Monte Carlo sampling, and then calculate the engagement δ(x) of each user when the incentive is x according to the user engagement uncertainty model in step S13;

[0040] Step S32: Obtaining ΔT of each user based on Monte Carlo sampling set,max , SOC plan 、T zy,on0 and T zy,de,max value, and then calculate the λ of each user in step S22 TL , EV and λ zy Then, according to the user response uncertainty model in step S23, the response value ΔQ of each user based on his / her own electricity comfort is calculated. i ;

[0041] Step S33: Calculate the demand response load of each user:

[0042] ΔP n,FL,i =δ(x)×ΔQ i

[0043] Among them, ΔP n,FL,i is the flexible load demand response of user n in time period i; δ(x) is the user's demand response participation when the incentive is x; ΔQ i It is the response value of the user based on his / her own electricity comfort level;

[0044] Step S34: Calculate the total load of all residential users' demand response considering the uncertainty of user demand response:

[0045]

[0046] Among them, ΔP FL,i is the total demand response load of all users in period i; N is the number of residential users; ΔP n,FL,i is the flexible load demand response of user n in time period i.

[0047] ΔT of each user set , SOC out and T zy,on1 The value of is related to the user's family situation, commuting time and other personalized factors, and its value is taken as the average value of the corresponding data in the historical demand response of each user.

[0048] In step S4, the power grid optimization dispatch model is:

[0049]

[0050] Where T is the number of scheduling time periods; N G is the number of conventional units; f(P G,j,t )=a j +b j P G,j,t +c j (P G,j,t ) 2 is the power generation cost of unit j in period t, P G,j,t is the output value of the jth generator set in period t, a j , b j 、c j are cost coefficients, whose values ​​are obtained by fitting the historical actual operating costs of local generators; u j,t and u j,t-1 are the state variables of unit j in period t and period t-1, 1 for startup state and 0 for shutdown state; S j is the start-up and shutdown cost of unit j, and its value is obtained from historical operation data; C w and P w c,u t r are the unit wind curtailment cost and the wind curtailment capacity in period t; C hb,t and ΔP FL,t It is the total load of unit electricity reduction red envelope incentive and residents' flexible load demand response in period t.

[0051] In step 4, the preset conditions and constraints of the power grid optimization dispatching model are determined, specifically:

[0052] Calculate the amount of electricity to be supplied in each period within the preset date according to the load forecast curve and wind power output curve within the preset date;

[0053] According to the amount of electricity to be supplied in each period within the preset date, the constraints of the power grid optimization scheduling model are determined, including: system constraints, conventional unit constraints, and flexible resource capacity constraints.

[0054] Step S5 is specifically as follows:

[0055] The African vulture optimization algorithm is used to traverse and optimize the power grid optimization dispatching model under different red envelope incentives, output the optimal red envelope incentive value, and output the corresponding decision value, that is, the optimal power grid dispatching method.

[0056] A system for the power grid optimization dispatching method considering the uncertainty of residents' demand response described in the above technical solution comprises:

[0057] An information data collection module, which is used to collect family background information of resident users and local historical demand response data. The family background information includes three types of information: family income, education level, and average age of user family members;

[0058] An establishment module, wherein the establishment module is used to establish an uncertainty model of resident user participation and response amount, and a power grid optimization dispatch model;

[0059] A parameter sampling module, wherein the parameter sampling module has a Monte Carlo sampling function and is used to randomly sample a series of uncertain parameters of residential users;

[0060] A calculation module, the calculation module is used to calculate the individual participation degree, individual response amount and total demand response load of the resident users;

[0061] and a solution module, wherein the solution module has a built-in African vulture optimization algorithm for solving the power grid optimization dispatching model and outputting the optimal red envelope incentive value and the optimal decision.

[0062] The beneficial effects of the present invention are as follows: the present invention collects factors that affect the uncertainty in the process of residents' demand response, establishes a refined model of residents' demand response participation and response quantity uncertainty, samples the uncertainty parameters through Monte Carlo, obtains the differential response value of each user, and then accumulates and sums to obtain the total demand response load of all users, establishes a power grid optimization scheduling model with the lowest comprehensive power grid operation cost, traverses and optimizes the user's demand response incentive value, outputs the optimal incentive value and decision, thereby obtaining at least one power grid optimization scheduling method that considers the uncertainty of residents' demand response, and the optimized scheduling method can ensure the balance of electricity supply and demand, so as to solve the problem of response capacity deviation caused by user response uncertainty during the implementation of existing demand response projects, thereby improving the safety and economy of the power system. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] Figure 1 A schematic flow chart of a method for optimizing power grid dispatching taking into account uncertainty in residents' demand response according to the present invention;

[0064] Figure 2 It is a structural schematic diagram of a power grid optimization dispatching decision system considering the uncertainty of residents' demand response according to the present invention. DETAILED DESCRIPTION

[0065] The present invention will be explained below with reference to the accompanying drawings.

[0066] refer to Figure 1 , a grid optimization dispatching method considering the uncertainty of residents’ demand response, the steps are as follows:

[0067] Step S1: Establishing the uncertainty model of resident user participation;

[0068] The specific steps include:

[0069] Step S11: Collecting family background information of resident users, including family income, education level and average age of family members of users;

[0070] Step S12: The family background information in step S11 is converted into the user's family income influence coefficient δ I , the influence coefficient of user's education level δ E and the average age of the user's family members, the influence coefficient δ A The three are used to calculate the uncertainty index δ of the user's sensitivity to incentives (indicating the uncertainty of the user's willingness to participate in demand response under incentive stimulation), and the calculation formula is:

[0071]

[0072]

[0073]

[0074]

[0075] Among them, I, I ε are the household income of residential users and the threshold of the user’s sensitivity to demand response incentives affected by the household income level. When the user’s household income exceeds the threshold I ε After that, its influence coefficient is regarded as a constant minimum value. Indicates that the user is extremely insensitive to incentives; 0≤α1<α2<α3≤1, E1, E2, E3 are the user's education level thresholds, increasing from low to high; 0≤α4<1, A, A ε are the average age and age threshold of family members of residential users respectively; the above parameter values ​​can be obtained based on historical experience;

[0076] Step S13: Based on the uncertainty index of user sensitivity to incentives obtained in step S12, a user participation uncertainty model based on dynamic changes in incentives is established, and its calculation formula is as follows:

[0077]

[0078] Among them, δ(x), δ m are the threshold points x when the user's incentive is x and when the incentive is the dominant factor mid Uncertainty sensitivity index at x low 、x up They represent the critical incentive level and saturation incentive level for users to participate in demand response respectively; x mid 、x low and x upThe values ​​of can be obtained by investigating the actual demand response behavior characteristics of local residents; α and β are uncertainty parameters of the user's incentive sensitivity index δ that changes with the incentive level x, which obeys the normal distribution, and α<β<1, and is obtained based on Monte Carlo sampling.

[0079] Step S2: Establishing uncertainty model of residential user response quantity;

[0080] The specific steps include:

[0081] Step S21: Establishing the user demand response power incentive elasticity coefficient:

[0082]

[0083]

[0084] Among them, e ii 、e ij They represent the self-elastic coefficient and mutual elastic coefficient respectively; Q i , ΔQ i are the original power consumption and power consumption change of the user in period i; x i 、x j are the incentives for time periods i and j respectively; e ii 、e ij The value of can be obtained by investigating the behavior characteristics of local loads and expert experience;

[0085] Step S22: Establishing a user's electricity comfort model for temperature control loads, electric vehicle loads, and other transferable loads:

[0086]

[0087]

[0088]

[0089] Among them, λ TL , EV and λ zy are the uncertainty indexes of users’ electricity comfort for temperature control load, electric vehicle load and other transferable loads; ΔT set ΔT is the change in the temperature setting value of the temperature control load; set,max The maximum adjustable temperature that the user can accept under incentive stimulation; SOC out , SOC plan are the state of charge values ​​of electric vehicles when they are off-grid when users participate in demand response and when users do not participate in demand response; T zy,on0 、T zy,on1 are the working start time of the transferable load before and after demand response, respectively; Tzy,de,max is the maximum transfer time of the device; ΔT set,max , SOC plan 、T zy,on0 and T zy,de,max The value of follows a normal distribution and is obtained by Monte Carlo sampling;

[0090] Step S23: Establishing a user response uncertainty model based on user electricity comfort:

[0091] ΔQ i =Q i,TL ×λ TL ×e ii × i +(Q i,EV ×λ EV +Q i,zy ×λ zy )×e ij × j

[0092]

[0093]

[0094] Among them, ΔQ i is the uncertain value of the user's response; Q i,TL , Q i,EV and Q i,zy are the power consumption of the user's original temperature control load, electric vehicle load and other transferable loads in period i; P i , A i are the original electricity price at the user side, the demand response electricity price and the compensation incentive during period i; P j , A j They are the original electricity price at the user side, the demand response electricity price and the compensation incentive during period j respectively.

[0095] Step S3: Based on the participation uncertainty model and the response quantity uncertainty model, the total demand response load considering the uncertainty of residents' demand response is calculated;

[0096] The specific steps include:

[0097] Step S31: Obtain the α and β values ​​of the user engagement uncertainty model of each user based on Monte Carlo sampling, and then calculate the engagement δ(x) of each user when the incentive is x according to the engagement model in step S13;

[0098] Step S32: Obtaining ΔT of each user based on Monte Carlo sampling set,max , SOC plan、T zy,on0 and T zy,de,max Value; ΔT of each user set , SOC out and T zy,on1 The value of is related to the user's family situation, commuting time and other personalized factors, and its value is taken as the average value of the corresponding data in the historical demand response of each user; the λ of each user is calculated according to the power comfort model in step S22 TL , EV and λ zy Calculate the response value ΔQ of each user based on their own electricity comfort according to the response model in step S23 i ;

[0099] Step S33: Calculate the demand response load of each user. The calculation process is as follows:

[0100] ΔP n,FL,i =δ(x)×ΔQ i

[0101] Among them, ΔP n,FL,i is the flexible load demand response of user n in time period i; δ(x) is the user's demand response participation when the incentive is x; ΔQ i It is the response value of the user based on his / her own electricity comfort level;

[0102] Step S34: Calculate the total load of all residential users' demand response considering the uncertainty of user demand response. The specific calculation process is as follows:

[0103]

[0104] Among them, ΔP FL,i is the total demand response load of all users in period i; N is the number of residential users; ΔP n,FL,i is the flexible load demand response of user n in time period i.

[0105] Step S4: Based on the total demand response load considering the uncertainty of residents' demand response in step 3, with the goal of minimizing the comprehensive operation cost of the power grid, a power grid optimization dispatching model considering the uncertainty of residents' demand response is established, and the constraint conditions of the power grid optimization dispatching model are determined;

[0106] The power grid optimization dispatch model is:

[0107]

[0108] Where T is the number of scheduling time periods, with an interval of 1 hour and a value of 24; N G is the number of conventional units; is the power generation cost of unit j in period t, aj , b j 、c j are cost coefficients, whose values ​​can be obtained by fitting the historical actual operating costs of local generators; u j,t and u j,t-1 are the state variables of unit j in period t and period t-1, 1 for startup state and 0 for shutdown state; S j is the start-up and shutdown cost of unit j, and its value can be obtained from historical operation data; C w and are the unit wind curtailment cost and the wind curtailment capacity in period t respectively; C hb,t and ΔP FL,t It is the total load of unit electricity reduction red envelope incentive and residents' flexible load demand response in period t.

[0109] The goal of establishing a grid optimization dispatching model that takes into account the uncertainty of residents' demand response with the goal of minimizing the comprehensive operation cost of the grid is to also include:

[0110] According to the load forecast curve and wind power output curve within the preset date, the amount of electricity to be supplied in each period within the preset date is calculated. The specific calculation is as follows:

[0111] P need,t =P load,t -P w,t

[0112] Among them, P need,t , P load,t and P w,t They are the system power supply, load forecast value and wind power output forecast value in period t within the preset date;

[0113] According to the amount of electricity to be supplied in each period within the preset date, the final grid optimization dispatching model is determined, and the constraint conditions are determined, including: system constraints, conventional unit constraints, and flexible resource capacity constraints:

[0114] System constraints:

[0115]

[0116] Among them, P G,j,t is the output value of the jth generator set in period t; P load,t and P w,t are the load forecast value and wind power output forecast value in period t respectively; ΔP FL,t is the reduction amount of residents' flexible load in period t;

[0117] Conventional unit constraints:

[0118]

[0119] Among them, P G,j,min and P G,j,max are the minimum and maximum output values ​​of the jth generator set respectively; R G,j,up and R G,j,down They are the upper and lower spinning reserves of the jth generator set respectively; and are the continuous operation time and continuous shutdown time of the jth generator set before time period t, respectively; and are the minimum continuous operation time and minimum continuous shutdown time of the jth generator set respectively;

[0120] Flexible resource capacity constraints:

[0121] 0≤ΔP FL,t ≤P FL,t

[0122] Among them, ΔP FL,t and P FL,t is the total load of residents' flexible load demand response and the total flexible load in period t.

[0123] Step S5: using the African vulture optimization algorithm to solve the power grid optimization dispatching model to obtain the optimal demand response incentive value;

[0124] Specifically:

[0125] The decision variables are set as the operating status and output value of each generator set in each scheduling time period;

[0126] The African vulture optimization algorithm is used to traverse the optimization model under different red envelope incentives to find the best solution, output the optimal red envelope incentive value, and output the corresponding decision value to obtain the power grid optimization scheduling method.

[0127] For further explanation please refer to Figure 2 , Figure 2 It is a structural diagram of a power grid optimization dispatch decision system considering the uncertainty of residents' demand response, including an information data acquisition module, an establishment module, a parameter sampling module, a calculation module and a solution module;

[0128] Among them, the information data collection module is used to collect family background information of resident users and local historical demand response data. The family background information specifically includes three types of information: family income, education level and average age of user family members; the establishment module is used to establish an uncertainty model of resident user participation and response amount, as well as a power grid optimization scheduling model; the parameter sampling module has a Monte Carlo sampling function, which is used to randomly sample a series of uncertainty parameters of resident users; the calculation module is used to calculate the individual participation, individual response amount and total demand response load of resident users; the solution module has a built-in African vulture optimization algorithm, which is used to solve the power grid optimization scheduling model and output the optimal red envelope incentive value and the optimal decision.

[0129] The present invention also provides an embodiment for verifying a grid optimization dispatching method proposed by the present invention that considers the uncertainty of residents' needs to respond. The embodiment takes a typical summer day as an example, and the grid needs to issue a user load reduction instruction to reduce the peak load of the grid. The three family background information of the resident user's family income, education level and user age are taken from the China Family Tracking Survey (CFPS) data set. According to the research results of relevant domestic and foreign literature, the parameters of the resident user incentive sensitivity index are set as shown in the following table:

[0130]

[0131] Therefore, the different incentive sensitivity index values ​​δ of each resident user based on the family background information can be calculated according to step S12; mid 、x low and x up Take 1.5 yuan / kW·h, 1 yuan / kW·h and 3 yuan / kW·h respectively; Further, the α and β values ​​of each user are obtained based on Monte Carlo sampling, and the engagement degree δ(x) of each user is calculated according to the engagement degree model in step S13;

[0132] Refer to the research results of domestic and foreign literature and set the user's self-elasticity coefficient e ii is -0.2, the mutual elastic coefficient e ij is 0.033; set and Furthermore, ΔT of each user is obtained based on Monte Carlo sampling. set,max , SOC plan 、T zy,on0 and T zy,de,max Value; ΔT of each user set , SOC out and T zy,on1The value of is related to the user's family situation, commuting time and other personalized factors. Its value is taken as the average value of the corresponding data in the historical demand response of each user. Then, the λ of each user is calculated according to the power comfort model in step S22. TL , EV and λ zy The response value ΔQ of each user based on their own electricity comfort is further calculated according to the response value model in step S23. i ; According to step S33, calculate the demand response load of each user ΔP n,FL,i , further calculate the total demand response load of all residential users ΔP according to step S34 FL,i ;

[0133] In addition, this embodiment uses the data of a 10-machine system and a wind farm to construct a power grid optimization dispatching model that takes into account the uncertainty of residents' demand response. The parameters of the 10-machine system are shown in the following table:

[0134]

[0135] The wind farm contains 250 wind turbines. The maximum output of each wind turbine is 2MW, and the total maximum output is 500MW. The day-ahead wind power forecast is: [400, 500, 500, 400, 400, 400, 400, 300, 400, 400, 300, 200, 200, 0, 0, 200, 200, 200, 300, 400, 400, 400, 400, 400 0,400]MW; the original load forecast value of the system is: [715,778,880,980,1018,1120,1195,1225,1350,1405,1460,1500,1380,1285,1205,1090,1000,1100,1200,1400,1280,1105,845,800]MW;

[0136] The African vulture optimization algorithm is used to traverse the optimization model, and the traversal incentive range is [x low ,x up ], that is, [1,3] yuan, with a step size of 0.1 yuan; taking the load reduction during the noon peak period of a preset date as an example, some and optimal simulation results are shown in the following table:

[0137]

[0138] It can be seen from the simulation results that when the incentive is 1.7 yuan, the total demand response load of residential users reaches 97.38MW. At this time, the second expensive unit that must be turned on when the incentive is 1.6 yuan can be turned off, which reduces a lot of startup costs and operating costs. The total operating cost of the system reaches the lowest value, which is 268,060 yuan. Accordingly, the grid optimization dispatching strategy in this case is: units 1 and units 3-10 are turned on, and unit 2 is turned off. Since unit 1 has the highest power generation cost, the output value of unit 1 is 450.62MW, and other generating units maintain maximum output. The demand response incentive value announced to residential users in the demand response market is 1.7 yuan / kW·h.

[0139] The above disclosure is only a preferred embodiment of the present invention, which certainly cannot be used to limit the scope of rights of the present invention. Ordinary technicians in this field can understand that to implement all or part of the processes of the above embodiments, certain improvements and modifications can be made without departing from the principles of the present invention, but these improvements and modifications can be regarded as equivalent changes made by the claims of the present invention and still fall within the scope covered by the invention.

Claims

1. A method for optimizing power grid dispatch considering the uncertainty of residents’ demand response, It is characterized in that The following steps are involved: Step S1: Establishing the uncertainty model of resident user participation; Step S2: Establishing uncertainty model of residential user response quantity; Step S3: Based on the participation uncertainty model and the response quantity uncertainty model, the total demand response load considering the uncertainty of residents' demand response is calculated; Step S4: Based on the total demand response load considering the uncertainty of residents' demand response, with the goal of minimizing the comprehensive operation cost of the power grid, a power grid optimization dispatching model considering the uncertainty of residents' demand response is established, and the constraint conditions of the power grid optimization dispatching model are determined; Step S5: using the African vulture optimization algorithm to solve the power grid optimization dispatching model, obtain the optimal demand response incentive value, determine the unit output, and form an optimal dispatching method; In step S1, a residential user participation uncertainty model is established. The specific steps are as follows: Step S11: Collecting family background information of the resident user, the family background information specifically includes family income, education level and average age of the user's family members; Step S12: The family background information in step S11 is converted into the user's family income influence coefficient δ I , the influence coefficient of user's education level δ E and the average age of the user's family members, the influence coefficient δ A The three are used together to calculate the uncertainty index δ of the user's sensitivity to incentives, which represents the uncertainty of the user's willingness to participate in demand response under incentive stimulation. The calculation formula is: Among them, I, I ε are the household income of residential users and the threshold of the user’s sensitivity to demand response incentives affected by the household income level. When the user’s household income exceeds the threshold I ε After that, its influence coefficient is regarded as a constant minimum value. Indicates that the user's sensitivity to incentives is extremely low; 0≤α 1 <α 2 <α 3 ≤1, E 1 、E 2 、E 3 is the user's education level threshold, increasing from low to high; 0≤α 4 <1, A, A ε are the average age and age threshold of family members of residential users, respectively; Step S13: Based on the uncertainty index of user sensitivity to incentives obtained in step S12, a user participation uncertainty model based on dynamic changes in incentives is established, and its calculation formula is as follows: Among them, δ(x), δ m are the threshold points x when the user's incentive is x and when the incentive is the dominant factor mid Uncertainty sensitivity index at x low 、x up They represent the critical incentive level and saturation incentive level of users participating in demand response respectively; α and β are uncertainty parameters of the user's incentive sensitivity index δ changing with the incentive level x, which obeys the normal distribution and α<β<1; The uncertainty model of residential user response quantity is established. The specific steps are as follows: Step S21: Establishing the user demand response power incentive elasticity coefficient: Among them, e ii 、e ij They represent the self-elastic coefficient and mutual elastic coefficient respectively; Q i , ΔQ i are the original power consumption and power consumption change of the user in period i; x i 、x j are the incentives for period i and period j respectively; e ii 、e ij The value of can be obtained by investigating the behavior characteristics of local loads and expert experience; Step S22: Establishing a user's electricity comfort model for temperature control load, electric vehicle load, and washing machine load: Among them, λ TL , EV and λ zy are the uncertainty indexes of the user's electricity comfort for temperature control load, electric vehicle load and washing machine load respectively; ΔT set ΔT is the change in the temperature setting value of the temperature control load; set,max The maximum adjustable temperature that the user can accept under incentive stimulation; SOC out , SOC plan are the state of charge values ​​of electric vehicles when they are off-grid when users participate in demand response and when users do not participate in demand response; T zy,on0 , T zy,on1 are the working start time of the transferable load before and after demand response, respectively; T zy,de,max is the maximum transfer time of the device; TL , EV and λ zy The value of is obtained by Monte Carlo sampling; ΔT set,max , SOC plan , T zy,on0 and T zy,de,max The value of follows a normal distribution and is obtained by Monte Carlo sampling; Step S23: Based on the user demand response power incentive elasticity coefficient and the power consumption comfort model, a user response uncertainty model based on the user power consumption comfort is established: ΔQ i =Q i,TL ×λ TL ×e ii ×x i +(Q i,EV ×λ EV +Q i,zy ×λ zy )×e ij ×x j Among them, ΔQ i is the uncertain value of the user's response; Q i,TL , Q i,EV and Q i,zy are the power consumption of the user’s original temperature control load, electric vehicle load and washing machine load during period i; P i , A i are the original electricity price at the user side, the demand response electricity price and the compensation incentive during period i; P j , A j They are the original electricity price at the user side, the demand response electricity price and the compensation incentive during period j respectively.

2. A method for optimizing power grid dispatch considering uncertainty of residents' demand response according to claim 1, It is characterized in that In step S3, based on the participation uncertainty model and the response uncertainty model, the total demand response load considering the uncertainty of residents' demand response is calculated. The specific steps are as follows: Step S31: Obtain the α and β values ​​of the user engagement uncertainty model of each user based on Monte Carlo sampling, and then calculate the engagement δ(x) of each user when the incentive is x according to the user engagement uncertainty model in step S13; Step S32: Obtaining ΔT of each user based on Monte Carlo sampling set,max , SOC plan , T zy,on0 and T zy,de,max value, and then calculate the λ of each user in step S22 TL , EV and λ zy Then, according to the user response uncertainty model in step S23, the response value ΔQ of each user based on his / her own electricity comfort is calculated. i ; Step S33: Calculate the demand response load of each user: ΔP n,FL,i =δ(x)×ΔQ i Where ΔP n,FL,i is the flexible load demand response of user n in time period i; δ(x) is the user's demand response participation when the incentive is x; ΔQ i It is the response value of the user based on his / her own electricity comfort level; Step S34: Calculate the total load of all residential users' demand response considering the uncertainty of user demand response: Where ΔP FL,i is the total demand response load of all users in period i; N is the number of residential users; ΔP n,FL,i is the flexible load demand response of user n in time period i.

3. A method for optimizing power grid dispatch considering uncertainty of residents' demand response according to claim 2, It is characterized in that ΔT of each user set , SOC out and T zy,on1 The value of is related to the user's family situation and personalized factors such as commuting time, and is taken as the average value of the corresponding data in the historical demand responses of each user.

4. A method for optimizing power grid dispatching considering uncertainty of residents' demand response according to claim 1, 2 or 3, It is characterized in that In step S4, the power grid optimization dispatch model is: Where T is the number of scheduling time periods; N G is the number of conventional units; f(P G,j,t )=a j +b j P G,j,t +c j (P G,j,t ) 2 is the power generation cost of unit j in period t, P G,j,t is the output value of the jth generator set in period t, a j 、b j 、c j are cost coefficients, whose values ​​are obtained by fitting the historical actual operating costs of local generators; u j,t and u j,t-1 are the state variables of unit j in period t and period t-1, 1 for startup state and 0 for shutdown state; S j is the start-up and shutdown cost of unit j, and its value is obtained from historical operation data; C w and are the unit wind curtailment cost and the wind curtailment capacity in period t respectively; C hb,t and ΔP FL,t They are the unit electricity reduction red envelope incentive and the total load of residents' flexible load demand response in period t respectively.

5. A method for optimizing power grid dispatching considering uncertainty of residents' demand response according to claim 4, It is characterized in that In step 4, the preset conditions and constraints of the power grid optimization dispatching model are determined, specifically: Calculate the amount of electricity to be supplied in each period within the preset date according to the load forecast curve and wind power output curve within the preset date; According to the amount of electricity to be supplied in each period within the preset date, the constraints of the power grid optimization scheduling model are determined, including: system constraints, conventional unit constraints, and flexible resource capacity constraints.

6. A method for optimizing power grid dispatch considering uncertainty of residents' demand response according to claim 1, It is characterized in that Step S5 is specifically as follows: The African vulture optimization algorithm is used to traverse and optimize the power grid optimization dispatching model under different red envelope incentives, output the optimal red envelope incentive value, and output the corresponding decision value, that is, the optimal power grid dispatching method.

7. A system for implementing a power grid optimization dispatching method considering uncertainty of residents' demand response as described in any one of claims 1 to 6, It is characterized in that include: An information data collection module, which is used to collect family background information of resident users and local historical demand response data. The family background information includes three types of information: family income, education level, and average age of user family members; An establishment module, wherein the establishment module is used to establish an uncertainty model of resident user participation and response amount, and a power grid optimization dispatch model; A parameter sampling module, wherein the parameter sampling module has a Monte Carlo sampling function and is used to randomly sample a series of uncertain parameters of residential users; A calculation module, the calculation module is used to calculate the individual participation degree, individual response amount and total demand response load of the resident users; and a solution module, wherein the solution module has a built-in African vulture optimization algorithm for solving the power grid optimization dispatching model and outputting the optimal red envelope incentive value and the optimal decision.

Citation Information

Patent Citations

  • Power grid safety optimization dispatching method considering demand response

    CN106712005A