A method for acidizing and fracturing carbonate reservoirs and its application

By designing artificial main fractures and using drilling and fracturing tools to form branch fractures in carbonate reservoirs, the problem of uncertainty in the propagation of artificial fractures in the existing technology is solved, and a more efficient carbonate reservoir is achieved. Renovation and oil and gas recovery efficiency.

CN117967265BActive Publication Date: 2024-10-11CHINA UNIV OF PETROLEUM (BEIJING)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410022880.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-08
Publication Date
2024-10-11
Estimated Expiration
2044-01-08

AI Technical Summary

Technical Problem

The expansion direction and length of artificial fractures in existing acid fracturing technology are difficult to manually control, leading to uncertainty in carbonate reservoir stimulation and reducing stimulation efficiency.

Method used

Design the extension direction and length of the artificial main fracture, use a drilling and fracturing tool that integrates drilling and acid fracturing to drill the artificial main fracture in the wellbore, seal it with an open-hole packer and then inject fracturing fluid to create the fracture, forming a Branch cracks are then subjected to penetrating acid fracturing treatment.

Benefits of technology

It achieves artificial control of the extension direction and length of main fractures in fracture-cavity carbonate reservoirs, connects more holes, forms a fracture network, expands the fracturing control area, saves cost and time, and avoids reservoir stress and existing fractures. interference.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117967265B_ABST
    Figure CN117967265B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of downhole fracturing and acidizing in oil fields, and discloses a carbonate reservoir acidizing and fracturing method and its application, comprising: (1) designing the extension direction and extension length of an artificial main fracture according to a target fracture-cavity reservoir and a wellbore structure after completion, lowering a drilling and acid fracturing integrated drilling and fracturing tool, and drilling in the wellbore according to the designed starting position and extension direction of the artificial main fracture to obtain the artificial main fracture; (2) using the open hole packer to seal the artificial main fracture, injecting fracturing fluid into the artificial main fracture to hold pressure and form fractures, and obtaining a branch fracture I; (3) performing permeation acid fracturing treatment on the branch fracture I to obtain a branch fracture II. The scheme of the present invention can artificially control the direction and length of the main fracture, connect more fracture-cavity reservoirs to construct complex fractures, and save time and cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of downhole fracturing and acidizing in oil fields, and in particular to a carbonate reservoir acidizing and fracturing method and application thereof. Background Art

[0002] Acid fracturing technology is an effective means to increase the production of carbonate reservoirs and has become a necessary and essential means for the effective development of oil reservoirs. At present, in the acid fracturing of carbonate reservoirs, it is necessary to control the expansion direction and angle of artificial fractures to connect as many fracture-cavity reservoirs as possible, expand the scope of transformation, and improve the pertinence of fracturing transformation. At the same time, it is also necessary to avoid the interference of multiple fractures or reservoir heterogeneity on the expansion of artificial fractures. However, in the current acid fracturing technology, the expansion of artificial fractures is determined by geological factors and cannot be intervened and controlled by artificial means, resulting in uncertainty in acid fracturing transformation and reducing the transformation efficiency. Summary of the invention

[0003] The purpose of the present invention is to overcome the above-mentioned problems existing in the prior art and to provide a carbonate reservoir acid fracturing method which can artificially control the direction and length of the main fracture, connect more fracture-cavity reservoirs to construct complex fractures, and save time and cost.

[0004] In order to achieve the above object, the first aspect of the present invention provides a carbonate reservoir acid fracturing method, comprising the following steps:

[0005] (1) designing the extension direction and extension length of the artificial main fracture according to the target fracture-cavity reservoir and the wellbore structure after completion, running a drilling and acid fracturing integrated drilling and fracturing tool, and drilling in the wellbore according to the designed initiation position and extension direction of the artificial main fracture to obtain the artificial main fracture;

[0006] Along the direction of entering the well, the drilling and fracturing tools are, from bottom to top, PDC drill bit, downhole motor, flexible drilling tool, open hole packer, and combined acid fracturing string;

[0007] (2) using the open hole packer to seal the artificial main fracture, injecting fracturing fluid into the artificial main fracture to hold pressure and create fractures, thereby obtaining branch fractures I;

[0008] (3) Performing an acid fracturing treatment on the branch fracture I to obtain a branch fracture II.

[0009] The second aspect of the present invention provides application of the method described in the first aspect in the field of oil and gas field exploitation.

[0010] The technical solution provided by the present invention has at least the following advantages:

[0011] (1) The technical solution provided by the present invention can artificially control the extension direction and extension length of the main fracture in the fracture-cavity carbonate reservoir. The direction and length of the main fracture are designed according to the pore distribution state of the target fracture-cavity reservoir, so that more pores and natural fractures can be connected to form a fracture network, and the fracturing control area can be expanded without being disturbed by reservoir stress and existing fractures.

[0012] (2) The technical solution provided by the present invention uses a drilling fracturing tool to artificially create a main fracture, and after the drill bit drills into the main fracture design requirement, the drilling is stopped without drilling, and the open hole packer in the drilling fracturing tool is directly used to seal the artificial main fracture, and then the pressure is held to create the fracture, and cementing is not required, which saves cost and time compared with traditional fracturing.

[0013] (3) The technical solution provided by the present invention preferably uses small-sized drilling tools to artificially create main fractures, which can effectively prevent wellbore collapse and is also easier to carry out acidizing transformation.

[0014] (4) In the technical solution provided by the present invention, the acid liquid is pumped into the integrated drilling acid fracturing pipe string by the ground equipment, reaches the water eye of the drill bit through the pipeline, and finally reaches the branch fractures under the control of the artificial main fracture, so that the acid can be evenly injected into the fractures, and the acid liquid can be directly sprayed at the fracture tip, so that the acid etching effect is better. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the design of an artificial main crack according to a preferred specific embodiment of the present invention;

[0016] Figure 2 It is a schematic diagram of a drilling and fracturing tool assembly according to a preferred specific embodiment of the present invention;

[0017] Figure 3 It is a schematic diagram of the effect of a preferred specific implementation scheme of the present invention.

[0018] Description of Reference Numerals

[0019] 1 is the guide anchor; 2 is the PDC drill bit; 3 is the downhole motor; 4 is the flexible drilling tool; 5 is the open hole packer; 6 is the combined acid fracturing string;

[0020] 7 and 10 are both wellbores; 8 and 11 are both artificial main fractures; 9 and 12 are both branch fractures. DETAILED DESCRIPTION

[0021] The endpoints and any values ​​of the ranges disclosed in this article are not limited to the precise ranges or values, and these ranges or values ​​should be understood to include values ​​close to these ranges or values. For numerical ranges, the endpoint values ​​of each range, the endpoint values ​​of each range and the individual point values, and the individual point values ​​can be combined with each other to obtain one or more new numerical ranges, which should be considered as specifically disclosed in this article.

[0022] It should be noted that before implementing the technical solution provided by the present invention, it is necessary to perform open hole completion on the target fracture-cavity reservoir to obtain a wellbore. The present invention has no particular limitation on the specific operation of the open hole completion. Those skilled in the art may choose to implement it according to technical means known in the art. The present invention will not go into details here, and those skilled in the art should not understand it as a limitation on the present invention.

[0023] The present invention predicts the location of fracture-cavity reservoirs based on seismic inversion and ant tracking modeling technology; measures the development characteristics of natural fractures by imaging logging, core observation and other means; and establishes a fine three-dimensional geostress model of the whole-well periphery to determine the distribution and size of geostress by adopting a regional-local-single-well, first large and then small, step-by-step constraint method. Then, according to the geographical location characteristics of the target fracture-cavity reservoir, the distribution characteristics of holes and natural fractures, the distribution and size of geostress, the extension direction and extension length of the artificial main fracture are designed to connect as many natural fractures and holes as possible to improve production efficiency.

[0024] As mentioned above, the first aspect of the present invention provides a carbonate reservoir acid fracturing method, comprising the following steps:

[0025] (1) designing the extension direction and extension length of the artificial main fracture according to the target fracture-cavity reservoir and the wellbore structure after completion, running a drilling and acid fracturing integrated drilling and fracturing tool, and drilling in the wellbore according to the designed initiation position and extension direction of the artificial main fracture to obtain the artificial main fracture;

[0026] Along the direction of entering the well, the drilling and fracturing tools are, from bottom to top, PDC drill bit, downhole motor, flexible drilling tool, open hole packer, and combined acid fracturing string;

[0027] (2) using the open hole packer to seal the artificial main fracture, injecting fracturing fluid into the artificial main fracture to hold pressure and create fractures, thereby obtaining branch fractures I;

[0028] (3) Performing an acid fracturing treatment on the branch fracture I to obtain a branch fracture II.

[0029] The PDC drill bit described in the present invention refers to a polycrystalline diamond composite drill bit.

[0030] Preferably, in step (1), the outer diameter of the PDC drill bit is 152-171.4 mm, more preferably 152 mm.

[0031] Preferably, in step (1), the outer diameter of the downhole motor is 127-139.7 mm, more preferably 127 mm. The inventors of the present invention have found in their research that the use of a PDC drill bit under this preferred condition can effectively prevent wellbore collapse, is more conducive to subsequent fracturing and acidizing, forms a complex seam network, and improves the extraction efficiency of oil and gas energy.

[0032] Preferably, in step (1), along the direction of entering the well, the flexible drilling tool in the drilling and fracturing tool includes, from bottom to top, a measuring short section, a weighted drill pipe short section, and a common drill pipe short section.

[0033] Preferably, the length of each short section included in the flexible drilling tool is 300-500 mm.

[0034] In the present invention, the length of the flexible drilling tool is determined according to the length of the designed artificial main crack. Figure 2 In the figure, the black part refers to the guide anchor 1, the red part refers to the PDC drill bit 2, the blue part refers to the downhole motor 3, the green part refers to the flexible drilling tool 4, the rose red part refers to the open hole packer 5, and the gray part refers to the combined acid fracturing string 6. Figure 2 As shown, the drilling and fracturing tools are assembled according to the designed length of the artificial main fracture. Along the direction of entering the well, from bottom to top, they are PDC drill bit 2, downhole motor 3, flexible drilling tool 4, open hole packer 5, and combined acid fracturing pipe string 6. When the PDC drill bit drills to the design requirement of the artificial main fracture, drilling is stopped and drilling is not started to ensure that the open hole packer 5 is located inside the newly constructed artificial main fracture and close to the starting position of the artificial main fracture. The open hole packer 5 is started by throwing a ball to form a closed space in the main fracture, and then the pressure holding and fracture making are carried out to obtain the branch fracture I.

[0035] Preferably, in step (1), the combined acid fracturing tubing string is an integrated drilling and acid fracturing tubing string, and an elastic straightening device is installed on the combined acid fracturing tubing string.

[0036] In the present invention, the drilling and fracturing tool is also connected to ground equipment, which includes a drilling rig, a mud pump, a fracturing pump vehicle, etc. When preparing an artificial main fracture, the mud pump is turned on, and the drilling fluid is used to drive the downhole motor to rotate at a high speed to break the rock and drill to form the artificial main fracture. Those skilled in the art can select the required ground equipment according to the technical means known in the art, and the present invention will not be repeated here, and those skilled in the art should not be understood as limiting the present invention.

[0037] According to a preferred specific implementation, in step (1), the method further includes: firstly lowering a guide anchor according to the wellbore structure, determining the lowering depth and direction of the guide anchor in the wellbore according to the designed initiation position and extension direction of the artificial main fracture, and then lowering the drilling and fracturing tool to perform drilling to obtain the artificial main fracture.

[0038] Figure 3 The following diagram shows the effect of the designed stratum. The related technical and scientific terms described are the common definitions or meanings understood by the technical professionals in the field of this application. Figure 3 As shown, the PDC drill bit of the present invention needs to perform side drilling in the wellbore 7 or the wellbore 10 to obtain an artificial main fracture 8 or an artificial main fracture 11, and then continue to perform fracturing and acidizing on the basis of the artificial main fracture to obtain a branch fracture 9 or a branch fracture 12. The present invention preferably uses a bevel anchor mechanism technology to achieve side drilling. In the technical solution provided by the present invention, the window opening angle of the PDC drill bit can be close to 90 degrees, extending perpendicular to the direction of the wellbore. The length of the artificial main fracture of the present invention can reach 70 meters, and the direction is fixed, and will not be disturbed by reservoir stress or existing fractures.

[0039] The present invention has no particular limitation on the specific type and displacement of the fracturing fluid used. Those skilled in the art can select the fracturing fluid according to the types of fracturing fluid known in the art, and determine the fracturing fluid displacement according to the actual conditions of the target fracture-cavity reservoir, as long as the expected branch fractures can be successfully fractured. The present invention exemplarily provides a preferred specific implementation manner in the following text, which should not be construed as a limitation to the present invention by those skilled in the art.

[0040] Preferably, in step (2), the conditions for holding pressure to create fractures are controlled so that the number of the branch fractures I is ≥ 3. After the artificial main fracture is constructed, the drilling fracturing tool is stopped in the fracture, the tail of the fracture is sealed with an open hole packer, and fracturing fluid is injected to hold pressure in the artificial main fracture to open the natural fracture and form the branch fractures I.

[0041] The present invention has no particular restrictions on the number of fracturing pump trucks required for the pressure-holding and fracture-forming in step (2) and the pressure resistance of the pipeline. Those skilled in the art can determine them based on the predicted maximum fracturing pressure. As long as the number of branch fractures I required by the present invention can be achieved, the present invention will not be elaborated herein and those skilled in the art should not interpret this as a limitation on the present invention.

[0042] Preferably, in step (3), the permeable acid fracturing treatment is performed by alternately injecting acid solution and the fracturing fluid.

[0043] Preferably, the alternating injection is performed 3-5 times.

[0044] The present invention has no particular limitation on the specific type and displacement of the acid fluid used. Those skilled in the art can select the acid fluid according to the types of acid fluid known in the art, and determine the displacement of the acid fluid according to the actual conditions of the target fracture-cavity reservoir. The present invention exemplarily provides a preferred specific implementation manner in the following text, which should not be construed as a limitation to the present invention by those skilled in the art.

[0045] The present invention has no particular restrictions on the injection time and injection amount of the alternating injection. The injection time can be adjusted according to actual conditions, and the time of each injection can be between a few minutes and a few hours, depending on factors such as the depth of the wellbore, formation conditions and operation requirements. The determination of the injection amount requires comprehensive consideration of factors such as the size of the wellbore, geological conditions, fracture design requirements and liquid properties. The setting of the injection amount should allow the fracturing fluid and acid to fully cover and penetrate into the branch fractures to achieve the desired fracturing and acidizing effects. The specific injection amount can be tested and adjusted according to actual conditions. The present invention will not be repeated here, and those skilled in the art should not be construed as limiting the present invention.

[0046] Figure 3 It is a schematic diagram of the effect of acid fracturing carbonate reservoirs to obtain artificial main fractures and branch fractures by using the technical solution provided by the present invention. The present invention improves the traditional fracturing technology to control the expansion direction of the main fracture, improve the communication ability of natural fractures, and optimize the distribution of acid. The present invention does not need to control the PDC drill bit to drill in different directions. After determining the direction, it drills in a straight line to obtain artificial main fractures. It does not need cementing. It can directly perform fracturing and acid treatment without drilling after drilling is completed to obtain branch fractures, which greatly shortens the engineering cycle, saves time, and improves the efficiency of fracturing.

[0047] As mentioned above, the second aspect of the present invention provides the application of the method described in the first aspect in the field of oil and gas field exploitation.

[0048] The present invention will be described in detail below by way of examples. In the following examples, unless otherwise specified, the raw materials and equipment are all commercially available.

[0049] PDC drill bit: 152mm outer diameter, purchased from Jianghan Petroleum Drill Bit Co., Ltd., non-standard customized model;

[0050] Downhole motor: The outer diameter is 127mm, purchased from Jianghan Petroleum Drill Bit Co., Ltd., and the model is non-standard customization;

[0051] Flexible drilling tools: 175 flexible drill string short sections, each with a length of 400 mm and an outer diameter of 89 mm, purchased from Shanghai Keyan Energy Technology Co., Ltd., model API SPEC7;

[0052] Open hole packer: OD 127 mm, length 500 mm, purchased from Sinopec Jianghan Petroleum Engineering Co., Ltd., model Y211-157-120 / 50;

[0053] Combined acid fracturing pipe column: outer diameter 88.9mm, pressure resistance 100MPa, N80 steel grade, purchased from Shanghai Keyan Energy Technology Co., Ltd., model 3 1 / 2″ tubing string.

[0054] Slippery water: 0.3wt% guar gum, 0.02wt% pH adjuster, 0.1wt% bactericide, and the balance is water;

[0055] Gelling acid: 20wt% HCl, 0.7wt% gelling agent, 2.0wt% high temperature corrosion inhibitor, 1.0wt% iron ion stabilizer, 1.0wt% demulsifier, and the balance is water;

[0056] Fracturing fluid: 0.5wt% guar gum, 0.02wt% pH regulator, 1.0wt% demulsifier, 0.5wt% temperature stabilizer, 0.1wt% bactericide, and the balance is water;

[0057] Ground cross-linking acid: 20wt% HCl, 0.7wt% thickener, 2.0wt% corrosion inhibitor, 1.0wt% demulsifier, 1.0wt% iron ion stabilizer, 0.7wt% cross-linking agent, 0.2wt% conditioner, 0.02wt% breaker, and the balance is water; wherein, cross-linking agent: LK-12 organic titanium (A): LK-12 organic titanium (B) = 2:1, cross-linking ratio 0.6%.

[0058] Example 1

[0059] Figure 1 The applicable geological background and advantages of this embodiment are described. The relative position relationship of each structural component of the design case is based on Figure 2 It is described by the layout method, such as: front, back, top, bottom, left, right, etc. Figure 1 The directions are described in the format of "north at the top, south at the bottom, west on the left, east on the right".

[0060] Figure 1 The geological conditions of this embodiment are explained. After the carbonate reservoir well is drilled, the direction of the maximum horizontal principal stress is 45 degrees north-east. Therefore, conventional fracturing methods are used, and the main fractures expand along the direction of the maximum horizontal principal stress, that is, 45 degrees north-east and its diagonal direction. However, the oil and gas reservoirs are located at 30 degrees south-east, which is not on the expansion path of the main fractures, and cannot be communicated using conventional fracturing methods. Therefore, it is necessary to adopt the method of the present invention to make the expansion direction of the main fracture 30 degrees south-east, and at the same time construct secondary complex fractures to communicate as many reservoirs as possible in the non-principal stress direction.

[0061] The specific steps are as follows:

[0062] S1: Open hole completion: Open hole completion is carried out on the target fracture-cavity reservoir, and the completion section is deep drilled to provide space for later gravel filling to obtain the wellbore;

[0063] S2: Determine the extension direction and length of the main fracture: predict the location of the fracture-cavity reservoir based on seismic inversion and ant tracking modeling technology; measure the development characteristics of natural fractures through imaging logging, core observation and other means; establish a detailed three-dimensional geostress model of the whole-well periphery to determine the distribution and size of geostress by adopting the regional-local-single-well, first large and then small, and step-by-step constraints; then design the extension direction and extension length of the artificial main fracture based on the geographical location characteristics of the target fracture-cavity reservoir, the distribution characteristics of pores and natural fractures, and the distribution and size of geostress, so as to connect as many natural fractures and pores as possible;

[0064] S3: Run the guide anchor: Run the guide anchor to the bottom of the open hole completion wellbore to a depth of 5,820 meters, with the direction of the anchor 30 degrees south-east of the wellbore; use the whipstock anchor mechanism technology for open hole sidetracking to achieve the sidetracking of the PDC drill bit in the open hole section;

[0065] S4: Drilling and fracturing tools: Drilling and acid fracturing integrated drilling and fracturing tools are installed. Along the direction of entering the well, the drilling and fracturing tools are as follows from bottom to top: PDC drill bit, downhole motor, flexible drill string, open hole packer, combined acid fracturing string; the combined acid fracturing string is equipped with an elastic straightening device, and the drilling and fracturing tools are connected to the drilling rig, mud pump, fracturing pump vehicle and other ground equipment; the designed length of the artificial main fracture is about 80 meters, so 175 flexible drill string short sections are connected to form a flexible drilling tool, and then two open hole packers are connected to ensure the reliability of isolation;

[0066] S5: Directional drilling with PDC drill bit: When the main fracture is drilled toward 30 degrees south-east, the mud pump pumps in drilling fluid to drive the downhole motor to rotate the PDC drill bit at high speed to break the rock and drill. When the pipe string is lowered to 80 meters, indicating that the drilling length has reached 80 meters, drilling is stopped and the artificial main fracture is obtained;

[0067] S6: Sealing and creating fractures: Throwing a ball to start the open hole packer, closing the annular space between the drilling tool and the artificial main fracture, so that the artificial main fracture forms a closed space; closing the wellhead blowout preventer, connecting the ground high-pressure pipeline and the fracturing pump truck;

[0068] S7: Pump in 50m 3 Slippery water (pre-liquid, displacement 3m 3 / min)、100m 3 Gel acid (displacement 5m 3 / min)、50m3 Slippery water (displacement greater than 3m 3 / min)、460m 3 Fracturing fluid (displacement greater than 5.5m 3 / min)、400m 3 Ground cross-linked acid (displacement greater than 6.5m 3 / min)、100m 3 Slippery water (displacement fluid, displacement greater than 5.5m 3 / min); the injected liquid enters the closed artificial main fracture through the water hole of the PDC drill bit, and creates new branch fractures through pressure accumulation in the fracture to expand the scope of formation transformation; the carbonate rock is etched with acid to ensure the conductivity of the fracture;

[0069] S8: After the injection is completed, stop pumping, measure the pump stop pressure, and start draining. Use a 10-12mm nozzle to drain. If the pressure drops quickly, you can further increase the nozzle to release the spray. The residual acid is returned to the formation to the standard of formation fluid discharge and formation fluid, and all the construction injection liquid is discharged;

[0070] S9: Unseal and withdraw the drill: lift the drill bit to release the seal of the open hole packer and remove the tool from the well.

[0071] The preferred embodiments of the present invention are described in detail above, but the present invention is not limited thereto. Within the technical concept of the present invention, the technical solution of the present invention can be subjected to a variety of simple modifications, including the combination of various technical features in any other suitable manner, and these simple modifications and combinations should also be regarded as the contents disclosed by the present invention and belong to the protection scope of the present invention.

Claims

1. A carbonate reservoir acid fracturing method, characterized in that: The following steps are involved: (1) designing the extension direction and extension length of the artificial main fracture according to the target fracture-cavity reservoir and the wellbore structure after completion, running a drilling and acid fracturing integrated drilling and fracturing tool, and drilling in the wellbore according to the designed initiation position and extension direction of the artificial main fracture to obtain the artificial main fracture; Along the direction of entering the well, the drilling and fracturing tools are, from bottom to top, PDC drill bit, downhole motor, flexible drilling tool, open hole packer, combined acid fracturing string; the outer diameter of the PDC drill bit is 152-171.4 mm; (2) using the open hole packer to seal the artificial main fracture, injecting fracturing fluid into the artificial main fracture to hold pressure and create fractures, thereby obtaining branch fractures I; (3) Performing an acid fracturing treatment on the branch fracture I to obtain a branch fracture II.

2. The method according to claim 1, characterized in that In step (1), the outer diameter of the downhole motor is 127-139.7 mm.

3. The method according to claim 1 or 2, characterized in that: In step (1), along the direction of entering the well, the flexible drilling tool in the drilling and fracturing tool includes, from bottom to top, a measuring short section, a weighted drill pipe short section, and a common drill pipe short section.

4. The method according to claim 1 or 2, characterized in that: In step (1), the combined acid fracturing pipe string is an integrated drilling and acid fracturing pipe string, and an elastic straightening device is installed on the combined acid fracturing pipe string.

5. The method according to claim 1 or 2, characterized in that: In step (1), the method further includes: firstly lowering a guide anchor according to the wellbore structure, determining the lowering depth and direction of the guide anchor in the wellbore according to the designed initiation position and extension direction of the artificial main fracture, and then lowering the drilling and fracturing tool to perform drilling to obtain the artificial main fracture.

6. The method according to claim 1 or 2, characterized in that: In step (2), the pressure holding and crack forming conditions are controlled so that the number of branch cracks I is ≥ 3.

7. The method according to claim 1 or 2, characterized in that: In step (3), the permeation acid fracturing treatment is performed by alternately injecting acid solution and the fracturing fluid.

8. The method according to claim 7, characterized in that In step (3), the alternating injection is performed 3-5 times.

9. Application of the method according to any one of claims 1 to 8 in the field of oil and gas field exploitation.