Quantitative derivation method of hierarchical model for online evaluation of concrete dam operating performance

Through online evaluation of the vertical and horizontal evaluation methods of the hierarchical model, combined with monitoring data and diagnostic methods, the problem of operational performance analysis of concrete dams is solved and a more systematic and accurate safety assessment is achieved.

CN117972841BActive Publication Date: 2024-10-11HOHAI UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410104570.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-10-11
Estimated Expiration
2044-01-24

AI Technical Summary

Technical Problem

Existing technology makes it difficult to conduct timely and comprehensive analysis of the operating performance of concrete dams. Especially under the combined influence of multiple factors, traditional monitoring data analysis is difficult to achieve the overall operational safety evaluation of concrete dams.

Method used

This paper proposes a quantitative derivation method for the hierarchical model of online evaluation of concrete dam operating performance. Through evaluation in the vertical and horizontal dimensions, combined with monitoring data, diagnostic methods, evaluation indicators and key parts, a comprehensive evaluation matrix is ​​constructed to achieve rapid intelligence of concrete dams. Evaluate.

Benefits of technology

It improves the systematicness, comprehensiveness and accuracy of the safety evaluation of the operational performance of concrete dams, provides a more reliable online evaluation method, and ensures the timeliness and accuracy of the safety evaluation of concrete dams.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117972841B_ABST
    Figure CN117972841B_ABST
Patent Text Reader

Abstract

The present invention proposes a quantitative derivation method for a hierarchical model of online evaluation of concrete dam operation status, which relates to the technical field of dam operation safety monitoring and management. The logical framework of the quantitative derivation of the concrete dam operation status is mainly divided into two aspects: a longitudinal dimension and a transverse dimension. The longitudinal dimension is the main line of the longitudinal evaluation of the online evaluation hierarchical model, which objectively reflects the analysis ideas of the concrete dam from the local to the whole and from the details to the whole from the six levels of monitoring data, diagnostic methods, monitoring items, evaluation indicators, key parts and overall engineering; the transverse dimension is a set of elements for evaluating the operation status of the concrete dam, and the importance comparison between the evaluation elements at the same level is carried out, and the correlation relationship between the elements at the same level is established. Thus, through the operation status evaluation of the longitudinal dimension and the transverse dimension, the rapid intelligent evaluation of the operation status of the concrete dam is realized, and the safety evaluation of the operation status of the concrete dam is made more systematic, comprehensive, accurate and reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of dam operation safety monitoring and management, and in particular to a method and device for quantitatively deriving a hierarchical model for online evaluation of concrete dam operation performance. Background Art

[0002] With the enrichment of dam monitoring technology and the increase in the frequency of automated monitoring, monitoring data has not only increased significantly in quantity, but also continued to grow in dimension. The current dam safety evaluation is mainly based on post-operation periodic evaluation, that is, after the dam has been in operation for a period of time (week, month, quarter, year, etc.), the dam condition monitoring data and on-site inspection data during the period are compiled, and statistical models or other models are established at key measurement points of dam deformation, seepage, stress strain and temperature monitoring items, and the trend of data changes at typical measurement points in key areas is analyzed. Combined with the experience and judgment of on-site operation and maintenance personnel and hydraulic technical experts, the dam operation safety is analyzed and evaluated.

[0003] The operation of concrete dams is affected by multiple factors such as load, structural type, topographic and geological conditions, and physical and mechanical properties of materials. It is difficult to make a timely and comprehensive analysis of the overall operation status of concrete dams by relying solely on traditional monitoring data analysis methods. Therefore, a more reliable quantitative derivation method for the hierarchical model of online evaluation of the operation status of concrete dams is urgently needed. Summary of the invention

[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.

[0005] To this end, the first purpose of the present invention is to propose a quantitative derivation method for a hierarchical model for online evaluation of the operating performance of a concrete dam, which can achieve rapid and intelligent evaluation of the operating performance of the concrete dam through operating performance evaluation in longitudinal and transverse dimensions, and make the safety evaluation of the operating performance of the concrete dam more systematic, comprehensive, accurate and reliable.

[0006] The second purpose of the present invention is to provide a quantitative derivation device for a hierarchical model for online evaluation of the operating performance of a concrete dam.

[0007] A third objective of the present invention is to provide an electronic device.

[0008] A fourth object of the present invention is to provide a non-transitory computer-readable storage medium storing computer instructions.

[0009] A fifth object of the present invention is to provide a computer program product.

[0010] To achieve the above-mentioned purpose, the first embodiment of the present invention proposes a quantitative derivation method of a hierarchical model for online evaluation of the operating performance of a concrete dam, the method comprising:

[0011] Acquire an online hierarchical model for judging the operating state of the concrete dam and a safety evaluation set representing the operating state of the concrete dam;

[0012] The monitoring data layer is used to obtain basic data on the operation status of concrete dams, which consists of engineering safety monitoring data, patrol inspection defect data and geophysical detection results data;

[0013] The diagnostic method layer is used to establish a first membership matrix of basic data and safety evaluation sets included in each similar evaluation indicator sub-item according to the evaluation indicators established by the evaluation indicator layer, and to construct a comprehensive evaluation matrix of evaluation indicator sub-items according to the first membership matrix and a first weight matrix for assigning weights to the degree of concern about the operating performance of the concrete dam according to each similar evaluation indicator sub-item;

[0014] The evaluation index layer is used to determine the evaluation index in combination with the structural characteristics of the concrete dam and the evaluation of the working condition, and to establish the evaluation index sub-item comprehensive evaluation matrix corresponding to the same type of evaluation index sub-items contained in each evaluation index and the second membership matrix of the safety evaluation set, so as to construct the evaluation index comprehensive evaluation matrix based on the second membership matrix and the second weight matrix with the same degree of attention and equal weight for each evaluation index item;

[0015] The monitoring project layer is used to obtain the evaluation index comprehensive evaluation matrix corresponding to the evaluation index included in each monitoring project, and establish the third membership matrix of the evaluation index comprehensive evaluation matrix and the safety evaluation set, so as to construct the monitoring project comprehensive evaluation matrix based on the third membership matrix and the third weight matrix with the same degree of attention and equal weight for various monitoring projects;

[0016] The key part layer is used to obtain the monitoring item comprehensive evaluation matrix corresponding to the monitoring items included in each key part, and establish the fourth membership matrix of the monitoring item comprehensive evaluation matrix and the safety evaluation set, so as to construct the key part comprehensive evaluation matrix based on the fourth membership matrix and the fourth weight matrix with the same degree of attention and equal weight for each key part;

[0017] According to the comprehensive evaluation matrix of each key part, the overall operating performance of the concrete dam in the overall engineering layer is determined.

[0018] To achieve the above-mentioned purpose, the second embodiment of the present invention proposes a device for quantitatively deriving a hierarchical model for online evaluation of the operating performance of a concrete dam, the device comprising:

[0019] An acquisition module, used for acquiring an online evaluation hierarchical model of the concrete dam operation state and a safety evaluation set representing the concrete dam operation state;

[0020] The monitoring data layer is used to obtain basic data on the operation status of concrete dams, which consists of engineering safety monitoring data, patrol inspection defect data and geophysical detection results data;

[0021] The diagnostic method layer is used to establish a first membership matrix of basic data and safety evaluation sets included in each similar evaluation indicator sub-item according to the evaluation indicators established by the evaluation indicator layer, and to construct a comprehensive evaluation matrix of evaluation indicator sub-items according to the first membership matrix and a first weight matrix for assigning weights to the degree of concern about the operating performance of the concrete dam according to each similar evaluation indicator sub-item;

[0022] The evaluation index layer is used to determine the evaluation index in combination with the structural characteristics of the concrete dam and the evaluation of the working condition, and to establish the evaluation index sub-item comprehensive evaluation matrix corresponding to the same type of evaluation index sub-items contained in each evaluation index and the second membership matrix of the safety evaluation set, so as to construct the evaluation index comprehensive evaluation matrix based on the second membership matrix and the second weight matrix with the same degree of attention and equal weight for each evaluation index item;

[0023] The monitoring project layer is used to obtain the evaluation index comprehensive evaluation matrix corresponding to the evaluation index included in each monitoring project, and establish the third membership matrix of the evaluation index comprehensive evaluation matrix and the safety evaluation set, so as to construct the monitoring project comprehensive evaluation matrix based on the third membership matrix and the third weight matrix with the same degree of attention and equal weight for various monitoring projects;

[0024] The key part layer is used to obtain the monitoring item comprehensive evaluation matrix corresponding to the monitoring items included in each key part, and establish the fourth membership matrix of the monitoring item comprehensive evaluation matrix and the safety evaluation set, so as to construct the key part comprehensive evaluation matrix based on the fourth membership matrix and the fourth weight matrix with the same degree of attention and equal weight for each key part;

[0025] The determination module is used to determine the overall operating performance of the concrete dam in the overall engineering layer based on the comprehensive evaluation matrix of each key part.

[0026] To achieve the above-mentioned purpose, the third aspect of the present invention proposes an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method described in the first aspect.

[0027] In order to achieve the above-mentioned purpose, the fourth aspect of the present invention proposes a non-transitory computer-readable storage medium storing computer instructions, where the computer instructions are used to enable the computer to execute the method described in the first aspect.

[0028] The embodiments of the present invention provide a method, device, electronic device and storage medium for quantitatively deriving a hierarchical model for online evaluation of the operating performance of a concrete dam. The logical architecture for quantitatively deriving the operating performance of a concrete dam is mainly divided into two aspects: a vertical dimension and a horizontal dimension. The vertical dimension is the main line for evaluating the vertical evaluation of the online evaluation hierarchical model. It objectively reflects the analysis ideas of the concrete dam from the local to the whole and from the details to the whole from the six levels of monitoring data, diagnostic methods, monitoring items, evaluation indicators, key parts and overall engineering. The horizontal dimension is a set of elements for evaluating the operating performance of a concrete dam. It compares the importance of each evaluation element at the same level and establishes the correlation between the elements at the same level. Thus, through the evaluation of the operating performance in the vertical and horizontal dimensions, a rapid and intelligent evaluation of the operating performance of the concrete dam is achieved, and the safety evaluation of the operating performance of the concrete dam is made more systematic, comprehensive, accurate and reliable.

[0029] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0031] Figure 1 A schematic diagram of a flow chart of a quantitative derivation method for a hierarchical model for online evaluation of the operating performance of a concrete dam provided by an embodiment of the present invention;

[0032] Figure 2 A schematic diagram of a hierarchical model for online evaluation of the operating performance of a concrete dam provided by an embodiment of the present invention;

[0033] Figure 3 A schematic flow chart of another method for quantitatively deriving a hierarchical model for online evaluation of operating performance of a concrete dam provided by an embodiment of the present invention;

[0034] Figure 4 An overview of a path from a special operating condition to a diagnostic method sub-item provided in an embodiment of the present invention;

[0035] Figure 5 An implementation example diagram of a quantitative derivation method for a hierarchical model for online evaluation of the operating performance of a concrete dam provided by an embodiment of the present invention;

[0036] Figure 6 A schematic diagram of the structure of a quantitative derivation device for a hierarchical model for online evaluation of concrete dam operating performance provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0037] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0038] It should be noted that the acquisition, storage, use, and processing of data in the technical solution of the present invention are in compliance with the relevant provisions of national laws and regulations.

[0039] The following describes the quantitative derivation method and device for the online evaluation hierarchical model of the concrete dam operating performance according to an embodiment of the present invention with reference to the accompanying drawings.

[0040] Figure 1 The present invention provides a flow chart of a quantitative derivation method of a hierarchical model for online evaluation of the operation performance of a concrete dam provided in an embodiment of the present invention. The hierarchical model for online evaluation of the operation performance of a concrete dam includes a monitoring data layer, a diagnostic method layer, an evaluation index layer, a monitoring project layer, a key part layer, and an overall engineering layer, wherein:

[0041] like Figure 1 As shown in the figure, the overall engineering layer is the target of online evaluation of the operating performance of concrete dams and is used to conduct a comprehensive assessment of the overall operating performance of concrete dams.

[0042] like Figure 1 As shown in the figure, the key parts layer is the focus of the online evaluation of the operating performance of the concrete dam. The key parts can be determined based on the calculation analysis in the design stage of the concrete dam, or the cluster analysis of the long-term operation monitoring data. The key parts layer analyzes the special evaluation results of the deformation, seepage, stress-strain, and temperature monitoring effect derived from the monitoring project layer, and the key parts are mainly distributed in the upper dam body, middle dam body, riverbed dam section dam heel, riverbed dam section dam toe, dam foundation, and the defect distribution areas of the long-term project operation;

[0043] like Figure 1 As shown, the monitoring project layer is the associated medium for online evaluation of the operating performance of concrete dams. According to the relevant specifications for the design and safety monitoring of concrete dams, the deformation, seepage, stress-strain and temperature monitoring effect quantities are comprehensively analyzed;

[0044] like Figure 1As shown in the figure, the evaluation index layer is the process center of the online evaluation of the operating performance of the concrete dam. Four types of evaluation indicators, namely deformation, seepage, stress-strain and temperature, are set corresponding to the deformation, seepage, stress-strain and temperature monitoring effect quantities of the concrete dam operating safety in the monitoring project layer. Among them, under each type of evaluation indicator, there are further two indicator formulation methods: one is to calculate the evaluation indicators based on the same type of multi-measurement point combination calculation of structural characteristics; the other is a multi-type multi-measurement point partition comprehensive evaluation indicator based on data-driven;

[0045] Optionally, the same type of multi-measurement point combination calculation evaluation indicators under the deformation evaluation indicators are subdivided into vertical distribution of dam foundation deformation, overall horizontal displacement of dam body, coordination of dam body horizontal displacement, overall deflection of dam section, overall settlement of dam body, micro-deformation between dam layers, overall opening and closing of foundation surface, overall opening and closing of structural joints, etc. In addition, there are comprehensive evaluation indicators of multi-type and multi-measurement point data used for deformation zoning monitoring.

[0046] Optionally, the same type of multi-measurement point combination calculation evaluation indicators under the seepage evaluation index are subdivided into overall uplift pressure reduction of dam foundation, overall anti-sliding stability of dam foundation, seepage pressure gradient of dam foundation structural joints, seepage amplitude in key areas, seepage zoning monitoring, etc. In addition, there are multi-type and multi-measurement point data comprehensive evaluation indicators used for seepage zoning monitoring.

[0047] Optionally, the same type of multi-measurement point combination calculation evaluation indicators under the stress-strain evaluation indicators are subdivided into vertical distribution of dam foundation stress, overall horizontal stress of the dam body, overall stress in the vertical beam direction, amplitude of strain measurement points in special parts, etc. In addition, there are multi-type multi-measurement point data comprehensive evaluation indicators used for stress-strain zoning monitoring.

[0048] like Figure 1 As shown in the figure, the diagnostic method layer is the core of the analysis for online evaluation of the operating performance of concrete dams. Based on the periodic effects of reservoir water and temperature loads during the operation of concrete dams and the changes in the internal structure and materials of concrete dams, the monitoring effect quantity analysis of the same type of multiple points or multiple types of multiple points is carried out according to the combined calculation of the same type of multiple measuring points and the comprehensive evaluation indicators of multiple types of multiple measuring points proposed in the evaluation index layer.

[0049] Optionally, for the evaluation indicators under the deformation monitoring project, diagnostic methods such as vertical distribution of dam foundation deformation, overall horizontal displacement of dam body, coordination of horizontal displacement of dam body, overall deflection of dam section, overall settlement of dam body, micro-deformation between dam layers, overall opening and closing of foundation surface, overall opening and closing of structural joints, and deformation zoning monitoring are proposed; for the evaluation indicators under the seepage monitoring project, diagnostic methods such as overall uplift pressure reduction of dam foundation, overall anti-sliding stability of dam foundation, seepage pressure gradient of structural joints, seepage amplitude of key areas, and seepage zoning monitoring are proposed; for the evaluation indicators under the stress-strain monitoring project, diagnostic methods such as vertical distribution of dam foundation stress, overall horizontal stress of dam body, overall stress in vertical beam direction, amplitude of strain measuring points in special parts, and stress-strain zoning monitoring are proposed; for the evaluation indicators under the temperature monitoring project, specific diagnostic methods include dam foundation temperature change, dam body temperature gradient, and other diagnostic methods.

[0050] like Figure 1 As shown in the figure, the monitoring data layer is the information base for online evaluation of the operating status of concrete dams, including engineering safety monitoring, patrol inspection defect data and geophysical detection results data.

[0051] Optionally, the basic data include engineering safety monitoring data, patrol inspection defect data, and geophysical detection results data, among which the engineering safety monitoring data mainly include the monitoring data of various measuring points such as deformation, seepage, stress and strain, such as plumb lines, multi-point displacement meters, static level displacement meters, unidirectional or bidirectional crack gauges, piezometers, pressure tubes, water measuring weirs, unidirectional strain gauges, multi-directional strain gauge groups, anchor stress gauges, and rebar gauges; the patrol inspection defect data mainly include cracks, joint misalignment, seepage, calcification precipitates found on the dam top or upstream and downstream dam surfaces and corridors inside the dam, as well as cavitation and erosion of flow holes in the dam body, and other defect data with potential risks and further development trends; the geophysical detection results data mainly include results data with potential risks and that require continuous attention, which are discovered using various technical inspection or measurement methods such as sound waves, images, lasers, and electromagnetic waves.

[0052] Figure 2 A flowchart of a method for quantitatively deriving a hierarchical model for online evaluation of the operating performance of a concrete dam provided by an embodiment of the present invention is provided.

[0053] like Figure 1 As shown, the method comprises the following steps:

[0054] Step 101, obtaining an online evaluation hierarchical model for the operation performance of a concrete dam and a safety evaluation set representing the operation performance of the concrete dam.

[0055] In some embodiments, Figure 2 A schematic diagram of a layered model for online evaluation of the operating performance of a concrete dam provided by an embodiment of the present invention is shown in FIG. Figure 2As shown in the figure, the hierarchical model for online evaluation of the operating performance of concrete dams includes monitoring data layer, diagnostic method layer, evaluation index layer, monitoring project layer, key parts layer, and overall engineering layer, among which:

[0056] like Figure 2 As shown in the figure, the overall engineering layer is the target of online evaluation of the operating performance of concrete dams and is used to conduct a comprehensive assessment of the overall operating performance of concrete dams.

[0057] like Figure 2 As shown in the figure, the key parts layer is the focus of the online evaluation of the operating performance of the concrete dam. The key parts can be determined based on the calculation analysis in the design stage of the concrete dam, or the cluster analysis of the long-term operation monitoring data. The key parts layer analyzes the special evaluation results of the deformation, seepage, stress-strain, and temperature monitoring effect derived from the monitoring project layer, and the key parts are mainly distributed in the upper dam body, middle dam body, riverbed dam section dam heel, riverbed dam section dam toe, dam foundation, and the defect distribution areas of the long-term project operation;

[0058] like Figure 2 As shown, the monitoring project layer is the associated medium for online evaluation of the operating performance of concrete dams. According to the relevant specifications for the design and safety monitoring of concrete dams, the deformation, seepage, stress-strain and temperature monitoring effect quantities are comprehensively analyzed;

[0059] like Figure 2 As shown in the figure, the evaluation index layer is the process center of the online evaluation of the operating performance of the concrete dam. Four types of evaluation indicators, namely deformation, seepage, stress-strain and temperature, are set corresponding to the deformation, seepage, stress-strain and temperature monitoring effect quantities of the concrete dam operating safety in the monitoring project layer. Among them, under each type of evaluation indicator, there are further two indicator formulation methods: one is to calculate the evaluation indicators based on the same type of multi-measurement point combination calculation of structural characteristics; the other is a multi-type multi-measurement point partition comprehensive evaluation indicator based on data-driven;

[0060] Optionally, the same type of multi-measurement point combination calculation evaluation indicators under the deformation evaluation indicators are subdivided into vertical distribution of dam foundation deformation, overall horizontal displacement of dam body, coordination of dam body horizontal displacement, overall deflection of dam section, overall settlement of dam body, micro-deformation between dam layers, overall opening and closing of foundation surface, overall opening and closing of structural joints, etc. In addition, there are comprehensive evaluation indicators of multi-type and multi-measurement point data used for deformation zoning monitoring.

[0061] Optionally, the same type of multi-measurement point combination calculation evaluation indicators under the seepage evaluation index are subdivided into overall uplift pressure reduction of dam foundation, overall anti-sliding stability of dam foundation, seepage pressure gradient of dam foundation structural joints, seepage amplitude in key areas, seepage zoning monitoring, etc. In addition, there are multi-type and multi-measurement point data comprehensive evaluation indicators used for seepage zoning monitoring.

[0062] Optionally, the same type of multi-measurement point combination calculation evaluation indicators under the stress-strain evaluation indicators are subdivided into vertical distribution of dam foundation stress, overall horizontal stress of the dam body, overall stress in the vertical beam direction, amplitude of strain measurement points in special parts, etc. In addition, there are multi-type multi-measurement point data comprehensive evaluation indicators used for stress-strain zoning monitoring.

[0063] like Figure 2 As shown in the figure, the diagnostic method layer is the core of the analysis for online evaluation of the operating performance of concrete dams. Based on the periodic effects of reservoir water and temperature loads during the operation of concrete dams and the changes in the internal structure and materials of concrete dams, the monitoring effect quantity analysis of the same type of multiple points or multiple types of multiple points is carried out according to the combined calculation of the same type of multiple measuring points and the comprehensive evaluation indicators of multiple types of multiple measuring points proposed in the evaluation index layer.

[0064] Optionally, for the evaluation indicators under the deformation monitoring project, diagnostic methods such as vertical distribution of dam foundation deformation, overall horizontal displacement of dam body, coordination of horizontal displacement of dam body, overall deflection of dam section, overall settlement of dam body, micro-deformation between dam layers, overall opening and closing of foundation surface, overall opening and closing of structural joints, and deformation zoning monitoring are proposed; for the evaluation indicators under the seepage monitoring project, diagnostic methods such as overall uplift pressure reduction of dam foundation, overall anti-sliding stability of dam foundation, seepage pressure gradient of structural joints, seepage amplitude of key areas, and seepage zoning monitoring are proposed; for the evaluation indicators under the stress-strain monitoring project, diagnostic methods such as vertical distribution of dam foundation stress, overall horizontal stress of dam body, overall stress in vertical beam direction, amplitude of strain measuring points in special parts, and stress-strain zoning monitoring are proposed; for the evaluation indicators under the temperature monitoring project, specific diagnostic methods include dam foundation temperature change, dam body temperature gradient, and other diagnostic methods.

[0065] like Figure 2 As shown in the figure, the monitoring data layer is the information base for online evaluation of the operating status of concrete dams, including engineering safety monitoring, patrol inspection defect data and geophysical detection results data.

[0066] Optionally, the basic data include engineering safety monitoring data, patrol inspection defect data, and geophysical detection results data, among which the engineering safety monitoring data mainly include the monitoring data of various measuring points such as deformation, seepage, stress and strain, such as plumb lines, multi-point displacement meters, static level displacement meters, unidirectional or bidirectional crack gauges, piezometers, pressure tubes, water measuring weirs, unidirectional strain gauges, multi-directional strain gauge groups, anchor stress gauges, and rebar gauges; the patrol inspection defect data mainly include cracks, joint misalignment, seepage, calcification precipitates found on the dam top or upstream and downstream dam surfaces and corridors inside the dam, as well as cavitation and erosion of flow holes in the dam body, and other defect data with potential risks and further development trends; the geophysical detection results data mainly include results data with potential risks and that require continuous attention, which are discovered using various technical inspection or measurement methods such as sound waves, images, lasers, and electromagnetic waves.

[0067] In other embodiments, the safety evaluation set representing the operating status of the concrete dam is formulated based on the current specifications for concrete dam safety management and a multi-field evaluation set, wherein the safety evaluation set is divided into four levels, including normal, basically normal, slightly abnormal, and abnormal.

[0068] Optionally, the safety evaluation set is defined and described in combination with a human health standard evaluation set, a student test score evaluation set, and current specifications for concrete dam safety management, but is not limited thereto.

[0069] Specifically, for the human health standard evaluation set: Currently, the diagnosis of human health status is generally divided into four situations: "healthy", "basic health", "poor health", and "poor health". Therefore, the human health standard evaluation set Va is divided into four levels:

[0070] Va=[V1,V2,V3,V4]=[healthy, mostly healthy, poor health, poor health]

[0071] Regarding the student test score evaluation set: When school teachers judge the quality of student test scores, in addition to the specific scores, they generally divide the grading levels into four categories: "excellent", "good", "pass", and "fail". Based on the above viewpoint, the student test score evaluation set Vb is divided into five levels:

[0072] Vb=[V1,V2,V3,V4]=[Excellent, Good, Pass, Fail]

[0073] According to the current regulations on concrete dam safety management, the safety level of concrete dams is divided into Class A normal dams, Class A- normal dams, Class B sick dams, and Class C dangerous dams. Based on the experience of regular inspections of the operation safety of various types of water conservancy and hydropower dams over the years, except for a few concrete dams that are identified as sick dams (Class B) and dangerous dams (Class C), the vast majority of concrete dams are normal dams (Class A or A-). Combined with the analysis of evaluation sets of multi-domain knowledge such as human health standards, student test scores, and current regulations on dam safety management, the division of the safety evaluation set of concrete dams follows the principles of being compatible with the concrete dam status classification defined in relevant standards and specifications, and being compatible with multiple types of objects such as engineering structures and monitoring projects. Referring to the evaluation set division ideas of the above-mentioned human health standard evaluation set, student test score evaluation set, current regulations on concrete dam safety management, etc., the safety evaluation set Vc is divided into:

[0074] Vc=[VA, VA-, VB, VC]=[normal, almost normal, slightly abnormal, abnormal]

[0075] In addition, assuming that the basic data of a group of concrete dams only contain random errors, the standard deviation is calculated and processed, and the classification interval is determined according to the probability distribution. The probability of taking values ​​outside (μ-3σ, μ+3σ) is less than 0.3%, which is a low-probability event. Therefore, values ​​outside this interval can be considered abnormal, where μ is the mean and σ is the standard deviation.

[0076] Step 102, the monitoring data layer is used to obtain basic data on the operating performance of the concrete dam, which is composed of engineering safety monitoring data, patrol inspection defect data and geophysical detection results data.

[0077] Among them, according to the principle of "use as much as possible", as much basic data as possible can be pushed to the evaluation index layer for calculation. The basic data of each node in the monitoring data layer have the same importance and equal weight.

[0078] Step 103, the diagnostic method layer is used to establish a first membership matrix of basic data and safety evaluation sets included in each similar evaluation indicator sub-item according to the evaluation indicators established by the evaluation indicator layer, and to construct a comprehensive evaluation matrix of the evaluation indicator sub-items based on the first membership matrix and the first weight matrix for assigning weights to the degree of concern about the operating performance of the concrete dam based on the first weight matrix and each similar evaluation indicator sub-item.

[0079] Optionally, when the evaluation indicators are specifically refined into deformation, seepage, stress-strain, and temperature, the evaluation indicators under the deformation monitoring project shall be specifically refined into the vertical distribution of dam foundation deformation, the overall horizontal displacement of the dam body, the coordination degree of the horizontal displacement of the dam body, the overall deflection of the dam section, the overall settlement of the dam body, the overall opening and closing of the foundation surface, the overall opening and closing of the structural joints, and the deformation zoning monitoring and other diagnostic methods; the evaluation indicators under the seepage monitoring project shall be specifically refined into the overall uplift pressure reduction coefficient of the dam foundation, the seepage pressure gradient of the structural joints, the seepage amplitude of key areas, and the seepage zoning monitoring and other diagnostic methods; the evaluation indicators under the stress-strain monitoring project shall be specifically refined into the vertical distribution of dam foundation stress, the overall horizontal stress of the dam body, the overall stress in the vertical beam direction, the amplitude of strain measuring points in special parts, and the stress-strain zoning monitoring and other diagnostic methods; the evaluation indicators under the temperature monitoring project shall be specifically refined into the temperature change of the dam foundation and the temperature gradient of the dam body.

[0080] Among them, the first membership matrix is ​​V j , the first weight matrix is ​​W j In the case of j Can be:

[0081]

[0082] in:

[0083] W j =[w j1 ,wj2 ,…,w ji ]

[0084]

[0085] Where V jiA , 、V jiB 、V jiC are respectively the concrete dam operation safety evaluation set V corresponding to the i-th similar evaluation index sub-item A 、V A - 、V B 、V C The calculated value, w ji Assign a weight to the i-th similar evaluation index sub-item regarding the degree of concern about the operating performance of the concrete dam.

[0086] Step 104, the evaluation index layer is used to determine the evaluation index in combination with the structural characteristics of the concrete dam and the working condition evaluation, and to establish the evaluation index sub-item comprehensive evaluation matrix corresponding to the same type of evaluation index sub-items contained in each evaluation index and the second membership matrix of the safety evaluation set, so as to construct the evaluation index comprehensive evaluation matrix based on the second membership matrix and the second weight matrix with the same degree of attention and equal weight for each evaluation index item.

[0087] Optionally, four types of evaluation indicators, including deformation, seepage, stress-strain and temperature, are set. Under each type of evaluation indicator, there are further two indicator formulation methods: one is to calculate the evaluation indicators based on the same type of multi-measurement point combination according to the structural characteristics; the other is a multi-type multi-measurement point partition comprehensive evaluation indicator based on data-driven.

[0088] Among them, the same type of multi-measurement point combination calculation evaluation indicators under the deformation evaluation index are subdivided into vertical distribution of dam foundation deformation, overall horizontal displacement of dam body, coordination degree of horizontal displacement of dam body, overall deflection of dam section, overall settlement of dam body, overall opening and closing degree of foundation surface, overall opening and closing degree of structural joints, etc., in addition, there are multi-type multi-measurement point data comprehensive evaluation indicators used for deformation zoning monitoring; the same type of multi-measurement point combination calculation evaluation indicators under the seepage evaluation index are subdivided into overall uplift pressure reduction coefficient of dam foundation, seepage pressure gradient of structural joints, seepage amplitude in key areas, seepage zoning monitoring, etc., in addition, there are multi-type multi-measurement point data comprehensive evaluation indicators used for seepage zoning monitoring; the same type of multi-measurement point combination calculation evaluation indicators under the stress-strain evaluation index are subdivided into vertical distribution of dam foundation stress, overall horizontal stress of dam body, overall stress in vertical beam direction, amplitude of strain measurement points in special parts, etc., in addition, there are multi-type multi-measurement point data comprehensive evaluation indicators used for stress-strain zoning monitoring; temperature dam foundation temperature gradient, dam body temperature gradient and other heterogeneous evaluation index items.

[0089] Among them, the second membership matrix is ​​V z, the second weight matrix is ​​W z In the case of z Can be:

[0090]

[0091] in,

[0092] W z =[w z1 ,w z2 ,…,w zi ]

[0093]

[0094] Where V ziA 、V ziA- 、V ziB 、V ziC The security evaluation set V corresponding to the i-th evaluation index is A 、V A - 、V B 、V C The calculated value of w zi is the weight value of the i-th evaluation index, w z1 =w z2 =…=w z i.

[0095] Step 105, the monitoring project layer is used to obtain the comprehensive evaluation matrix of evaluation indicators corresponding to the evaluation indicators included in each monitoring project, and establish a third membership matrix of the comprehensive evaluation matrix of evaluation indicators and the safety evaluation set, so as to construct a comprehensive evaluation matrix of monitoring projects based on the third membership matrix and the third weight matrix with the same degree of attention and equal weight for various monitoring projects.

[0096] Among them, the third membership matrix is ​​V m , the third weight matrix is ​​W m In the case of m Can be:

[0097]

[0098] in,

[0099] W m =[w m1 ,w m2 ,…,w mi ]

[0100]

[0101] Where V miA 、VmiA- 、V miB 、V miC The security evaluation set V corresponding to the i-th monitoring project is A 、V A - 、V B 、V C The calculated value of w mi is the weight value of the i-th monitoring item, w z1 =w z2 =…=w z i.

[0102] Step 106, the key part layer is used to obtain the monitoring item comprehensive evaluation matrix corresponding to the monitoring items included in each key part, and establish the fourth membership matrix of the monitoring item comprehensive evaluation matrix and the safety evaluation set, so as to construct the key part comprehensive evaluation matrix based on the fourth membership matrix and the fourth weight matrix with the same degree of attention and equal weight for each key part.

[0103] Among them, the fourth membership matrix is ​​V q , the fourth weight matrix is ​​W q In the case of q Can be:

[0104]

[0105] in:

[0106] W q =[w q1 ,w q2 ,…,w qi ]

[0107]

[0108] Where V qiA 、V qiA- 、V qiB 、V qiC The safety evaluation set V corresponding to the i-th key part is A 、V A - 、V B 、V C The calculated value of w qi is the weight value of the i-th key part, w z1 =w z2 =…=w z i.

[0109] Step 107, determining the overall operating performance of the concrete dam in the overall engineering layer according to the comprehensive evaluation matrix of each key part.

[0110] The quantitative derivation method of the hierarchical model for online evaluation of the operating performance of concrete dams in the embodiment of the present invention and the logical framework for quantitative derivation of the operating performance of concrete dams are mainly divided into two aspects: the vertical dimension and the horizontal dimension. The vertical dimension is the main line of the vertical evaluation of the online evaluation hierarchical model, and objectively reflects the analysis ideas of the concrete dam from the local to the whole and from the details to the whole from the six levels of monitoring data, diagnostic methods, monitoring items, evaluation indicators, key parts, and overall projects; the horizontal dimension is a set of elements for evaluating the operating performance of concrete dams, and compares the importance of each evaluation element at the same level, and establishes the correlation between the elements at the same level. Thus, through the evaluation of the operating performance in the vertical and horizontal dimensions, a rapid and intelligent evaluation of the operating performance of the concrete dam is achieved, and the safety evaluation of the operating performance of the concrete dam is made more systematic, comprehensive, accurate and reliable.

[0111] In order to clearly explain the above embodiment, Figure 3 A schematic flow chart of another method for quantitatively deriving a hierarchical model for online evaluation of operating performance of a concrete dam provided in an embodiment of the present invention.

[0112] Step 301, obtaining an online evaluation hierarchical model of the operating performance of the concrete dam and a safety evaluation set representing the operating performance of the concrete dam, wherein the online evaluation hierarchical model includes a monitoring data layer, a diagnostic method layer, an evaluation index layer, a monitoring project layer, a key part layer, and an overall engineering layer.

[0113] Step 302, the monitoring data layer is used to obtain basic data on the operating performance of the concrete dam through engineering safety monitoring, hydraulic inspection, and geophysical detection and monitoring methods.

[0114] It should be noted that the specific implementation of step 301 to step 302 can be found in the description of the relevant embodiments of the present invention, and will not be repeated here.

[0115] Step 303, the diagnostic method layer is used to obtain the time series data of the combined calculation of the same type of multi-measurement point basic data of each similar evaluation indicator sub-item and the comprehensive diagnosis of the multi-type multi-measurement point partition basic data according to the evaluation index established in the evaluation index layer, which is specifically refined into deformation, seepage, stress-strain, and temperature, and according to the principle of maximum membership.

[0116] Optionally, the calculation results of all previous times in the diagnosis method layer (the combined calculation of basic data of multiple measuring points of the same type for each sub-item of the same evaluation index, and the data results of comprehensive diagnosis of basic data of multiple types and multiple measuring points in different partitions) are quantitatively evaluated using correlation coefficients according to the principle of maximum membership. As time accumulates, the correlation coefficients of all previous times form long sequence data, generating long-term accumulated time series data.

[0117] Step 304: Establish a first membership matrix with the safety evaluation set through time series data comparative analysis and the Rhineda criterion.

[0118] In some embodiments, an implementation method of establishing a first membership matrix with a safety evaluation set through comparative analysis of time series data and the Rhineda criterion may be to quantitatively evaluate the time series data using correlation coefficients, and to obtain long sequence data formed by successive correlation coefficients as time accumulates; and to establish a correspondence between the long sequence data and the safety evaluation set through the Rhineda criterion as the first membership matrix.

[0119] Specifically, the method of adaptive fitting and analysis of time series data based on machine learning can be used to realize comparative analysis of time series data, automatically optimize and dynamically match time series data fitting models and their parameters, including the following steps: a time series data adaptive fitting model library; a method for automatic configuration of time series data analysis models and parameters; and time series data adaptive fitting and analysis steps.

[0120] Optionally, in the adaptive fitting model library for time series data, nine models including polynomial fitting, mean fitting, least squares fitting, multilayer perceptron, LSTM, LSTM based on attention mechanism, random forest, differential autoregressive moving average model and GCN graph convolutional neural network are selected to construct the adaptive fitting model library for time series data. Among them, polynomial fitting is a simple curve fitting algorithm; mean fitting is to find the average value of data, which is used for time series data with small amplitude; least squares fitting finds the best function matching of data by minimizing the sum of squares of errors; multilayer perceptron, LSTM and LSTM based on attention mechanism are all neural network models, which can obtain more accurate prediction values ​​for large amounts of data analysis, especially for time series data; differential autoregressive moving average model is a more commonly used model for time series prediction in statistical models. GCN graph convolutional neural network aims to extend convolution to the graph field and effectively extract spatiotemporal features for prediction. Integrate multiple types of models into the model library to provide support for accurate fitting of long-term accumulated correlation coefficient time series data.

[0121] Optionally, the time series data analysis model and parameter automatic configuration method includes: on the basis of building a time series data adaptive fitting model library, comparing the correlation coefficient r of each similar evaluation indicator sub-item over time t The time series data formed is used for model optimization and parameter training. To prevent overfitting during model training, no exception processing is performed and missing data is not considered. For model optimization and parameter training, the model in the model library is adaptively fitted using long-sequence data, and the R-squared value is used to evaluate the model fitting accuracy. The hyperparameter group of the model is a vector containing all the parameters that need to be trained for the model. The number of elements in the vector of different models is different. Taking LSTM as an example, it is necessary to set a hyperparameter group including the number of neurons in the input layer, the number of neurons in the hidden layer, the name of the loss function, the name of the optimizer, the number of iterations, the batch size, the size of the validation set, etc.

[0122] The model automatic matching method is as follows:

[0123] Configure parameters for each model and calculate its R-squared value, and select the model with the largest R-squared value to configure it to the corresponding evaluation indicator sub-item of the same type.

[0124] The number and value range of each model parameter are set in advance and divided into two cases: no parameters and parameters. In the case of no parameters, no parameters are trained. In the case of parameters, G1 hyperparameter value groups are randomly generated and input into the model training together with the acquired long sequence data to obtain G1 R-squared values. G1 (hyperparameter value groups, R-squared values) are input into the proxy model training, where the proxy model is randomly selected. Then, G2 hyperparameter value groups are randomly generated and input into the proxy model to obtain G2 R-squared values, where the default value of G1 is 1000 and the default value of G2 is 2000, which are adjusted according to the actual situation. Finally, the one with the largest R-squared value is selected from the G1+G2 hyperparameter value groups as the optimal parameter and assigned to the corresponding model.

[0125] Input the sequence data of the correlation coefficient of the diagnostic method sub-item to all models in the model library in turn. Each model needs to be trained G1+G2 times, and each time The result is calculated by formula (1). Each model is first configured with its parameter value according to the hyperparameter group with the largest R-squared value, and then the R-squared values ​​of each model are compared, and the one with the largest R-squared value is selected as the correlation coefficient fitting model of the diagnostic method sub-item.

[0126]

[0127] Where j represents the nth matching model, j = 1, 2, ..., n, is the ith predicted value, is the average value, The model with the maximum value configures the sub-item of the same type of evaluation index.

[0128] Select representative diagnostic method sub-items (similar evaluation index sub-items) to configure the model and its parameters, and then traverse the five randomly selected diagnostic method sub-items in turn to obtain the diagnostic method sub-item T i The previous n data (t i1 ,...,t in ), and all configured diagnostic method sub-items T j Calculate the data similarity, where the similarity calculation uses the method of morphological similarity distance of formula 2:

[0129]

[0130] Where, t ik This is the diagnostic method sub-item T iThe correlation coefficient of the kth day, t jk This is the diagnostic method sub-item T j The correlation coefficient of the kth day is obtained by Calculate the Euclidean distance by Calculate the Manhattan distance by Calculate the absolute value of the sum of the correlation coefficient differences for the day. Select D MSD The diagnostic method sub-item with the smallest value is taken as the similar diagnostic method sub-item. MSD ≤S, directly configure the prediction model of the diagnosis method sub-item that is the same as the similar diagnosis method sub-item, otherwise re-match the best model.

[0131] The prediction model is updated every month, and the R-square value of the correlation coefficient of the diagnostic method sub-item of the month is calculated and compared with the R-square value of the initial configuration stage of the model. If it is greater than or equal to the R-square value of the initial configuration stage, the configuration model remains unchanged; if it is less than the initial R-square value and the difference between the two is within 0.02, the original hyperparameter group (v1, v2, ..., v n ) in each parameter v i The value range is [0.5v i ,1.5v i ], and then randomly select values ​​from them to generate G hyperparameter value groups, input them into the original prediction model together with the correlation data sequence value, compare the R square value, and select the hyperparameter group with the largest value to update the original prediction model parameters; otherwise, re-match the model according to the above method. If the updated prediction model is still the original model, consider that the model library needs to add a new model.

[0132] Optionally, the time series data adaptive fitting and analysis step includes two stages: offline and online. Specifically, in the offline stage, the matching model and parameter training are preferably performed, and the long sequence r after the result values ​​of each diagnostic method sub-item (same evaluation index sub-item) are compared. t Adapt the optimal fitting model and its parameters; in the online stage, carry out data fitting calculation and evaluation, mainly conducting data fitting calculation evaluation and regular evaluation of data with different time series delays, as well as regular model suitability checks and re-adaptation.

[0133] In the offline stage, we first randomly select the r values ​​of two diagnostic method sub-items for each diagnostic method sub-item. t Construct a test set, use the model self-matching method to adjust and configure the best fitting model and its parameters, and after the test set completes the model and parameter matching, traverse the diagnostic method sub-items in turn to calculate r t , the remaining diagnostic method sub-items r t The process lines are evaluated for morphological similarity with the test set. If the similarity evaluation conditions are met, the model and parameters of the test set are used. If the similarity evaluation conditions are not met, model matching is performed separately.

[0134] After each diagnostic method sub-item completes the model and parameter matching work, it enters the online stage data fitting calculation and evaluation work step, and selects the r of each diagnostic method sub-item t , perform data fitting calculation, and compare it with the r of the day t The calculated values ​​are compared to preliminarily analyze the changes in the current diagnostic method sub-items. When the model reaches the update setting time, the model is evaluated for accuracy. Models that meet the accuracy setting conditions remain unchanged, otherwise they are re-matched.

[0135] Step 305, establishing an operation safety knowledge graph for concrete dams, wherein the operation safety knowledge graph includes special working conditions, close-range strong earthquakes, major floods, extreme low temperatures, concrete dams, key parts, vertical distribution evaluation indicators of dam foundation deformation, overall horizontal displacement evaluation indicators of dam body, overall horizontal stress evaluation indicators of dam body, overall uplift pressure reduction evaluation indicators of dam foundation, deformation-related measuring points, seepage-related measuring points, and stress-strain-related measuring points as object nodes at both ends of the operation safety knowledge graph triple, and includes inclusion and performance evaluation as the association relationship between the operation safety knowledge graph triple.

[0136] In some embodiments, special working conditions, close-range strong earthquakes, major floods, extreme low temperatures, concrete dams, key parts, dam foundation deformation vertical distribution evaluation indicators, dam body overall horizontal displacement evaluation indicators, dam body overall horizontal stress evaluation indicators, dam foundation overall uplift pressure reduction evaluation indicators, deformation-related measuring points, seepage-related measuring points, and stress-strain-related measuring points are used as object nodes at both ends of the operation safety knowledge graph triple, and inclusion and performance evaluation are used as the association relationship between the operation safety knowledge graph triple to establish the operation safety knowledge graph of concrete dams. The main relationship types can be shown in Table 1.

[0137] Table 1 Main relationship types of the knowledge graph of concrete dam operation safety

[0138]

[0139]

[0140] In this embodiment, the user item For special conditions, the target item is all the diagnostic method sub-items (each similar evaluation indicator sub-item), M and N refer to the number of user items and target items respectively, and the triple relationship in the graph constitutes several paths between them. Where e1=u,e L =i,(e l ,r l ,e l+1) is the lth triplet in p, l represents the number of triples in the path, and an overview diagram of the path from special working conditions to diagnostic method sub-items is established, such as Figure 4 shown.

[0141] Figure 4 Multiple paths from special working conditions to diagnostic method sub-items are marked, and different paths imply different combination semantics between special working conditions and diagnostic method sub-items. The recommendation model (Reasoning Over Knowledge Graph Paths for Recommendation, KPRN) is used to derive the operational safety knowledge graph of concrete dams and evaluate the importance scores of each diagnostic method sub-item under special working conditions. The KPRN model takes each user item as input and outputs a weight score as the user item's special working condition's attention to the target item diagnostic method sub-item. The model mainly includes a knowledge embedding layer, an LSTM layer, and a pooling layer.

[0142] Among them, the knowledge embedding layer: for a given path pk, each entity in the path is encoded into an entity value and an entity type embedding vector, represented as e l ∈R d , e′ l ∈R d , d is the embedding vector dimension. The relationship type between entities is additionally introduced to embed r l ∈R d , expressing different semantic information between entity relationships. In this model, different relationships determine the encoding content of different knowledge perception paths, which helps the model to deeply understand the degree of interaction between special working conditions and the overall horizontal displacement of a typical elevation dam. Therefore, the encoding layer has a certain degree of interaction between the path p k =[e1,r1,e2,...,r L-1 ,e L ] for encoding.

[0143] LSTM layer: contains three gated neural networks, forget gate, input gate and output gate. In addition, LSTM also contains a channel information, which only contains a small number of linear operations to ensure that the information remains unchanged during the transmission process. Among them, the forget gate determines the information discarded at each stage, and reads the input information x of this step t And the output h of the previous step t-1 , outputs a value from 0 to 1 to determine the ratio of information to be discarded, calculated by formula (3); the input gate determines the ratio of new information added to the current state, calculated by formulas (4) and (5); the output gate determines the output value h based on the current state t , calculated by equations (6) and (7):

[0144] f t =σ(W f [ht-1 ,x t ]+b f ) (3)

[0145] i t =σ(W i [h t-1 ,x t ]+b i ) (4)

[0146]

[0147] o t =σ(W o [h t-1 ,x t ]+b o ) (6)

[0148] h t =o t *tanh(C t ) (7)

[0149] Where σ represents the sigmoid function.

[0150] In the KPRN model, LSTM connects the entity type, entity value, and relationship embedding vector of the knowledge embedding layer as the input vector to obtain the vector h L , replacing all previous input information [e1,r1,e2,...,e L-1 ,r L-1 ], calculated by formula (8); in order to calculate the interaction score between the special working condition and the diagnostic method sub-item, two fully connected layers are used to project the final state into the prediction score, which is calculated by formula (9):

[0151]

[0152]

[0153] In the formula, Represents the vector concatenation operation, W1 T , They are the trainable matrices for the first and second layers respectively.

[0154] Pooling layer: Perform pooling operation based on the contribution of the path to the model user item preference, aggregate all path scores, and calculate them through formula (10); finally predict the user item-target item score and calculate it through formula (11):

[0155]

[0156]

[0157] Where γ is a hyperparameter that controls each exponent, and σ represents the sigmoid activation function.

[0158] For the special working condition of user item u, the target item i∈I is a certain diagnostic method sub-item, and I is the diagnostic method included in all evaluation indicators. Based on the knowledge graph of concrete dam operation safety, the attention level of all diagnostic method sub-items is judged, and the attention level scores of all diagnostic method sub-items are obtained, which are used as the source of weight calculation. For each diagnostic method sub-item, the sum of its own score and the scores of all diagnostic method sub-items of the same level indicators is taken for normalization, as the weight value of the diagnostic method sub-item for online evaluation of concrete dam performance, and calculated by formula (12):

[0159]

[0160] In the formula, w ui is the sub-item weight value, and I' is the set of similar evaluation indicators to which i belongs.

[0161] Step 306, by running the security knowledge graph, weights are assigned to each similar evaluation indicator sub-item to obtain a first weight matrix, and a comprehensive evaluation matrix of the evaluation indicator sub-items is constructed based on the first membership matrix and the first weight matrix.

[0162] Optionally, weights are assigned to the degree of concern about the operating performance of concrete dams for each similar evaluation indicator sub-item through the operation safety knowledge graph to obtain a first weight matrix, and based on the first membership matrix and the first weight matrix, a comprehensive evaluation matrix of evaluation indicator sub-items is constructed. One implementation method can be to determine various special working conditions of key parts of the operating performance of concrete dams, where special working conditions include close-range strong earthquakes, severe floods, and extreme low temperatures; select close-range strong earthquakes, severe floods, and extreme low temperatures as input user items of the operation safety knowledge graph, drive the operation safety knowledge graph through special working conditions, activate the affected evaluation indicators, calculate the weight scores of the evaluation indicator sub-items under each similar evaluation indicator under the special working conditions, so as to obtain the first weight matrix; and construct a comprehensive evaluation matrix of evaluation indicator sub-items based on the first membership matrix and the first weight matrix.

[0163] Step 307, the evaluation index layer is used to determine the evaluation index in combination with the structural characteristics of the concrete dam and the working condition evaluation, and to establish the evaluation index sub-item comprehensive evaluation matrix corresponding to the same type of evaluation index sub-items contained in each evaluation index and the second membership matrix of the safety evaluation set, so as to construct the evaluation index comprehensive evaluation matrix based on the second membership matrix and the second weight matrix with the same degree of attention and equal weight for each evaluation index item.

[0164] Step 308, the monitoring project layer is used to obtain the comprehensive evaluation matrix of evaluation indicators corresponding to the evaluation indicators included in each monitoring project, and establish a third membership matrix of the comprehensive evaluation matrix of evaluation indicators and the security evaluation set, so as to construct a comprehensive evaluation matrix of monitoring projects based on the third membership matrix and the third weight matrix with the same degree of attention and equal weight for various monitoring projects.

[0165] Step 309, the key part layer is used to obtain the monitoring item comprehensive evaluation matrix corresponding to the monitoring items included in each key part, and establish the fourth membership matrix of the monitoring item comprehensive evaluation matrix and the safety evaluation set, so as to construct the key part comprehensive evaluation matrix based on the fourth membership matrix and the fourth weight matrix with the same degree of attention and equal weight for each key part.

[0166] Step 310, determining the overall operating performance of the concrete dam in the overall engineering layer according to the comprehensive evaluation matrix of each key part.

[0167] The embodiment of the present invention provides a quantitative derivation method for the hierarchical model of online evaluation of the operating performance of concrete dams, and a hierarchical framework for evaluating the operating performance of concrete dams composed of logical layers such as monitoring data, diagnostic methods, evaluation indicators, monitoring items, key parts, and overall engineering. On this basis, a knowledge graph is introduced to assign weights to the importance differences of each diagnostic method sub-item, and a safety evaluation criterion for the diagnostic method sub-item is established, as well as a matching adaptive analysis model for time series data for quantitative analysis; a hierarchical evaluation matrix and a step-by-step derivation mechanism for the hierarchical framework for evaluating the operating performance of concrete dams are proposed to achieve rapid and intelligent evaluation of the operating performance of concrete dams that integrates structural analysis and data-driven.

[0168] In summary, in order to better understand the present invention, the present invention also proposes an implementation example diagram of a quantitative derivation method for online evaluation of a hierarchical model for the operation performance of a concrete dam, as shown in FIG. Figure 5As shown, the monitoring data layer obtains basic data (monitoring / inspection / geophysical data), and the diagnostic method layer establishes various similar evaluation index sub-items according to the evaluation indicators established by the evaluation indicator layer. Among them, the evaluation indicators include deformation evaluation indicators, seepage evaluation indicators, stress-strain evaluation indicators, and temperature evaluation indicators. The deformation evaluation indicators include a variety of heterogeneous evaluation indicators (vertical distribution of dam foundation deformation, overall horizontal displacement of dam body, coordination degree of dam body horizontal displacement, overall deflection of dam section, overall opening and closing degree of foundation surface, overall opening and closing degree of structural joints, and deformation zoning monitoring); the overall horizontal displacement of dam body includes: the overall horizontal displacement of dam body at a certain elevation, and the coordination degree of dam body horizontal displacement includes: the coordination degree of the overall horizontal displacement of dam body at a certain elevation. The evaluation indicator layer is inspected by inspection and geophysical inspection of concrete dam structure. Characteristics and working conditions are evaluated, evaluation indicators (deformation, seepage, strain, temperature) are determined, each monitoring item (diagnostic object) monitored by the monitoring item layer and the key parts monitored by the key part layer are obtained, and finally the overall state of the concrete dam (high arch dam) in the overall engineering layer is determined. In addition, for the monitoring data layer, diagnostic method layer, evaluation indicator layer, monitoring item layer, key part layer and overall engineering layer, the weight analysis results of the evaluation indicator sub-items are applied to the derivation of each level of analysis. Specifically, the fuzzy analysis is used to determine the membership and the hierarchical analysis is used to determine the weights of the evaluation indicator sub-items. The elements at the same level of the online evaluation hierarchical model can obtain a membership matrix. Finally, the evaluation level (evaluation matrix) of the operating performance to each evaluation level is obtained according to the maximum membership principle.

[0169] In order to realize the above-mentioned embodiment, the present invention further proposes a quantitative derivation device for a hierarchical model for online evaluation of the operation performance of a concrete dam, wherein the hierarchical model for online evaluation of the operation performance of a concrete dam comprises a monitoring data layer, a diagnostic method layer, an evaluation index layer, a monitoring project layer, a key part layer, and an overall engineering layer, wherein:

[0170] The overall engineering layer is the target of online evaluation of the concrete dam operation performance and is used to conduct a comprehensive evaluation of the overall operation performance of the concrete dam;

[0171] The key parts layer is the focus of the online evaluation of the operating performance of the concrete dam. The key parts can be determined based on the calculation analysis in the design stage of the concrete dam, or the cluster analysis of the long-term operation monitoring data. The key parts layer analyzes the special evaluation results of the deformation, seepage, stress-strain, and temperature monitoring effect derived from the monitoring project layer, and the key parts are mainly distributed in the upper dam body, middle dam body, riverbed dam section dam heel, riverbed dam section dam toe, dam foundation, and the defect distribution area of ​​the long-term concern of the project operation;

[0172] The monitoring project layer is the associated medium for online evaluation of the operating performance of the concrete dam. According to the relevant specifications for the design and safety monitoring of the concrete dam, the deformation, seepage, stress-strain and temperature monitoring effect quantities are comprehensively analyzed;

[0173] The evaluation index layer is the process center of the online evaluation of the operation performance of the concrete dam. Four types of evaluation indicators, namely deformation, seepage, stress-strain and temperature, are set corresponding to the deformation, seepage, stress-strain and temperature monitoring effect quantities of the operation safety of the concrete dam in the monitoring project layer. Among them, under each type of evaluation indicator, there are further divided into two indicator formulation methods: one is to calculate the evaluation indicators of the same type of multi-measurement point combination according to the structural characteristics; the other is a multi-type multi-measurement point partition comprehensive evaluation indicator based on data-driven;

[0174] The diagnostic method layer is the core of the online evaluation of the operating performance of concrete dams. Based on the periodic effects of reservoir water and temperature loads during the operation of concrete dams and the changes in the internal structure and materials of concrete dams, the monitoring effect quantity analysis of multiple points of the same type or multiple types of points is carried out according to the combined calculation of multiple measuring points of the same type and the comprehensive evaluation indicators of multiple measuring points of multiple types proposed in the evaluation index layer.

[0175] The monitoring data layer is the information base for online evaluation of the operating status of concrete dams, including engineering safety monitoring, patrol inspection defect data and geophysical detection results data.

[0176] Figure 6 A schematic diagram of the structure of a quantitative derivation device for a hierarchical model for online evaluation of concrete dam operating performance provided by an embodiment of the present invention.

[0177] like Figure 6 As shown, the quantitative derivation device 60 for online evaluation of the hierarchical model of concrete dam operating performance includes: an acquisition module 61 and a determination module 62.

[0178] An acquisition module 61 is used to acquire an online evaluation hierarchical model of the concrete dam operation state and a safety evaluation set representing the concrete dam operation state, wherein the online evaluation hierarchical model includes a monitoring data layer, a diagnostic method layer, an evaluation index layer, a monitoring project layer, a key part layer, and an overall engineering layer;

[0179] The monitoring data layer is used to obtain basic data on the operation status of concrete dams through engineering safety monitoring, hydraulic inspection, and geophysical detection and monitoring methods;

[0180] The diagnostic method layer is used to establish a first membership matrix of basic data and safety evaluation sets included in each similar evaluation indicator sub-item according to the evaluation indicators established by the evaluation indicator layer, and to construct a comprehensive evaluation matrix of evaluation indicator sub-items according to the first membership matrix and a first weight matrix for assigning weights to the degree of concern about the operating performance of the concrete dam according to each similar evaluation indicator sub-item;

[0181] The evaluation index layer is used to determine the evaluation index in combination with the structural characteristics of the concrete dam and the evaluation of the working condition, and to establish the evaluation index sub-item comprehensive evaluation matrix corresponding to the same type of evaluation index sub-items contained in each evaluation index and the second membership matrix of the safety evaluation set, so as to construct the evaluation index comprehensive evaluation matrix based on the second membership matrix and the second weight matrix with the same degree of attention and equal weight for each evaluation index item;

[0182] The monitoring project layer is used to obtain the evaluation index comprehensive evaluation matrix corresponding to the evaluation index included in each monitoring project, and establish the third membership matrix of the evaluation index comprehensive evaluation matrix and the safety evaluation set, so as to construct the monitoring project comprehensive evaluation matrix based on the third membership matrix and the third weight matrix with the same degree of attention and equal weight for various monitoring projects;

[0183] The key part layer is used to obtain the monitoring item comprehensive evaluation matrix corresponding to the monitoring items included in each key part, and establish the fourth membership matrix of the monitoring item comprehensive evaluation matrix and the safety evaluation set, so as to construct the key part comprehensive evaluation matrix based on the fourth membership matrix and the fourth weight matrix with the same degree of attention and equal weight for each key part;

[0184] The determination module 62 is used to determine the overall operating performance of the concrete dam in the overall engineering layer according to the comprehensive evaluation matrix of each key part.

[0185] Furthermore, in a possible implementation of an embodiment of the present invention, the safety evaluation set representing the operating status of the concrete dam is formulated based on the current specifications for concrete dam safety management and an evaluation set divided into multiple fields, wherein the safety evaluation set is divided into four levels, including normal, basically normal, slightly abnormal, and abnormal.

[0186] Furthermore, in a possible implementation of the embodiment of the present invention, the diagnostic method layer includes:

[0187] The acquisition submodule is used for the diagnostic method layer to obtain the time series data of the combined calculation of the same type of multi-measurement point basic data of each similar evaluation indicator sub-item and the comprehensive diagnosis of the multi-type multi-measurement point partition basic data according to the maximum membership principle according to the evaluation index established in the evaluation index layer, which is specifically refined into deformation, seepage, stress strain, and temperature;

[0188] The first construction submodule is used to establish a first membership matrix with the safety evaluation set through time series data comparative analysis and Rhineda criterion;

[0189] The second construction submodule is used to establish an operation safety knowledge graph of a concrete dam, wherein the operation safety knowledge graph includes special working conditions, close-range strong earthquakes, major floods, extreme low temperatures, concrete dams, key parts, vertical distribution evaluation indicators of dam foundation deformation, overall horizontal displacement evaluation indicators of the dam body, overall horizontal stress evaluation indicators of the dam body, overall uplift pressure reduction evaluation indicators of the dam foundation, deformation-related measuring points, seepage-related measuring points, and stress-strain-related measuring points as object nodes at both ends of the operation safety knowledge graph triple, and includes inclusion and performance evaluation as the association relationship between the operation safety knowledge graph triple;

[0190] The third construction submodule is used to assign weights to each similar evaluation indicator sub-item through the operation safety knowledge graph to obtain a first weight matrix, and to construct a comprehensive evaluation matrix of the evaluation indicator sub-items based on the first membership matrix and the first weight matrix.

[0191] Further, in a possible implementation manner of the embodiment of the present invention, the first construction submodule is used to, specifically:

[0192] The time series data is quantitatively evaluated by correlation coefficients, and as time accumulates, long sequence data formed by previous correlation coefficients is obtained;

[0193] Through the Rhineda criterion, the corresponding relationship between the long sequence data and the safety evaluation set is established as the first membership matrix.

[0194] Further, in a possible implementation manner of the embodiment of the present invention, the third construction submodule is used to, specifically:

[0195] Determine the various special working conditions of the key parts of the concrete dam operation performance, including close-range strong earthquakes, major floods, and extreme low temperatures;

[0196] Select close-range strong earthquakes, extreme floods, and extreme low temperatures as input user items of the operation safety knowledge graph, drive the operation safety knowledge graph through the special working conditions, activate the affected evaluation indicators, and calculate the weight scores of the evaluation indicator sub-items under each similar evaluation indicator under the special working condition to obtain a first weight matrix;

[0197] A comprehensive evaluation matrix of evaluation index sub-items is constructed according to the first membership matrix and the first weight matrix.

[0198] It should be noted that the above explanation of the method embodiment is also applicable to the device of this embodiment, and will not be repeated here.

[0199] The quantitative derivation device of the hierarchical model for online evaluation of the operating performance of concrete dams in the embodiment of the present invention and the logical framework for quantitative derivation of the operating performance of concrete dams are mainly divided into two aspects: the vertical dimension and the horizontal dimension. The vertical dimension is the main line of the vertical evaluation of the online evaluation hierarchical model, and objectively reflects the analysis ideas of the concrete dam from the local to the whole and from the details to the whole from the six levels of monitoring data, diagnostic methods, monitoring items, evaluation indicators, key parts, and overall projects; the horizontal dimension is a set of elements for evaluating the operating performance of concrete dams, and compares the importance of each evaluation element at the same level, and establishes the correlation between the elements at the same level. Thus, through the evaluation of the operating performance in the vertical and horizontal dimensions, a rapid and intelligent evaluation of the operating performance of the concrete dam is achieved, and the safety evaluation of the operating performance of the concrete dam is made more systematic, comprehensive, accurate and reliable.

[0200] In order to implement the above embodiment, the present invention further provides an electronic device, including:

[0201] at least one processor; and

[0202] a memory communicatively connected to the at least one processor; wherein,

[0203] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can perform the aforementioned method.

[0204] In order to implement the above embodiment, the present invention further proposes a non-transitory computer-readable storage medium storing computer instructions, where the computer instructions are used to enable the computer to execute the above method.

[0205] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0206] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0207] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.

[0208] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0209] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0210] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0211] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0212] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A quantitative derivation method for a hierarchical model for online evaluation of concrete dam operating performance, characterized in that: The online evaluation hierarchical model for the operation performance of concrete dams includes a monitoring data layer, a diagnostic method layer, an evaluation index layer, a monitoring project layer, a key part layer, and an overall engineering layer, wherein: The overall engineering layer is the target of online evaluation of the concrete dam operation performance and is used to conduct a comprehensive evaluation of the overall operation performance of the concrete dam; The key parts layer is the focus of the online evaluation of the operating performance of the concrete dam. The key parts can be determined based on the calculation analysis in the design stage of the concrete dam, or the cluster analysis of the long-term operation monitoring data. The key parts layer analyzes the special evaluation results of the deformation, seepage, stress-strain, and temperature monitoring effect derived from the monitoring project layer, and the key parts are mainly distributed in the upper dam body, middle dam body, riverbed dam section dam heel, riverbed dam section dam toe, dam foundation, and the defect distribution area of ​​the long-term concern of the project operation; The monitoring project layer is the associated medium for online evaluation of the operating performance of the concrete dam. According to the relevant specifications for the design and safety monitoring of the concrete dam, the deformation, seepage, stress-strain and temperature monitoring effect quantities are comprehensively analyzed; The evaluation index layer is the process center of the online evaluation of the operation performance of the concrete dam. Four types of evaluation indicators, namely deformation, seepage, stress-strain and temperature, are set corresponding to the deformation, seepage, stress-strain and temperature monitoring effect quantities of the operation safety of the concrete dam in the monitoring project layer. Among them, under each type of evaluation indicator, there are further divided into two indicator formulation methods: one is to calculate the evaluation indicators of the same type of multi-measurement point combination according to the structural characteristics; the other is a multi-type multi-measurement point partition comprehensive evaluation indicator based on data-driven; The diagnostic method layer is the core of the online evaluation of the operating performance of concrete dams. Based on the periodic effects of reservoir water and temperature loads during the operation of concrete dams and the changes in the internal structure and materials of concrete dams, the monitoring effect quantity analysis of multiple points of the same type or multiple types of points is carried out according to the combined calculation of multiple measuring points of the same type and the comprehensive evaluation indicators of multiple measuring points of multiple types proposed in the evaluation index layer. The monitoring data layer is the information base for online evaluation of the operating status of concrete dams, including engineering safety monitoring, inspection defect data and geophysical detection results data; The method further comprises: Acquire an online hierarchical model for judging the operating state of the concrete dam and a safety evaluation set representing the operating state of the concrete dam; The monitoring data layer is used to obtain basic data on the operation status of concrete dams, which consists of engineering safety monitoring data, patrol inspection defect data and geophysical detection results data; The diagnostic method layer is used to establish a first membership matrix of basic data and safety evaluation sets included in each similar evaluation indicator sub-item according to the evaluation indicators established by the evaluation indicator layer, and to construct a comprehensive evaluation matrix of evaluation indicator sub-items according to the first membership matrix and a first weight matrix for assigning weights to the degree of concern about the operating performance of the concrete dam according to each similar evaluation indicator sub-item; The evaluation index layer is used to determine the evaluation index in combination with the structural characteristics of the concrete dam and the evaluation of the working condition, and to establish the evaluation index sub-item comprehensive evaluation matrix corresponding to the same type of evaluation index sub-items contained in each evaluation index and the second membership matrix of the safety evaluation set, so as to construct the evaluation index comprehensive evaluation matrix based on the second membership matrix and the second weight matrix with the same degree of attention and equal weight for each evaluation index item; The monitoring project layer is used to obtain the evaluation index comprehensive evaluation matrix corresponding to the evaluation index included in each monitoring project, and establish the third membership matrix of the evaluation index comprehensive evaluation matrix and the safety evaluation set, so as to construct the monitoring project comprehensive evaluation matrix based on the third membership matrix and the third weight matrix with the same degree of attention and equal weight for various monitoring projects; The key part layer is used to obtain the monitoring item comprehensive evaluation matrix corresponding to the monitoring items included in each key part, and establish the fourth membership matrix of the monitoring item comprehensive evaluation matrix and the safety evaluation set, so as to construct the key part comprehensive evaluation matrix based on the fourth membership matrix and the fourth weight matrix with the same degree of attention and equal weight for each key part; According to the comprehensive evaluation matrix of each key part, the overall operating performance of the concrete dam in the overall engineering layer is determined.

2. The method according to claim 1, characterized in that The safety evaluation set representing the operating status of the concrete dam is formulated based on the current specifications for concrete dam safety management and an evaluation set divided into multiple fields, wherein the safety evaluation set is divided into four levels, including normal, basically normal, slightly abnormal, and abnormal.

3. The method according to claim 1, characterized in that The diagnostic method layer is used to establish a first membership matrix of basic data and safety evaluation sets included in each similar evaluation indicator sub-item according to the evaluation indicators established by the evaluation indicator layer, and to construct a comprehensive evaluation matrix of evaluation indicator sub-items according to the first membership matrix and the first weight matrix for assigning weights to the degree of concern about the operating performance of the concrete dam according to each similar evaluation indicator sub-item, including: The diagnostic method layer is used to obtain the time series data of the combined calculation of the same type of multi-measurement point basic data of each similar evaluation indicator sub-item and the comprehensive diagnosis of the multi-type multi-measurement point partition basic data according to the evaluation indicators established in the evaluation indicator layer, which are specifically refined into deformation, seepage, stress strain, and temperature according to the principle of maximum membership; The first membership matrix with the safety evaluation set is established through comparative analysis of time series data and Rhineda criterion; Establishing a knowledge graph of concrete dam operation safety, wherein the operation safety knowledge graph includes special working conditions, close-range strong earthquakes, major floods, extreme low temperatures, concrete dams, key parts, vertical distribution evaluation indicators of dam foundation deformation, overall horizontal displacement evaluation indicators of dam body, overall horizontal stress evaluation indicators of dam body, overall uplift pressure reduction evaluation indicators of dam foundation, deformation-related measuring points, seepage-related measuring points, and stress-strain-related measuring points as object nodes at both ends of the triple of the operation safety knowledge graph, and includes inclusion and performance evaluation as the association relationship between the triple of the operation safety knowledge graph; The operational safety knowledge graph is used to assign weights to each similar evaluation indicator sub-item to obtain a first weight matrix, and a comprehensive evaluation matrix for the evaluation indicator sub-items is constructed based on the first membership matrix and the first weight matrix.

4. The method according to claim 3, characterized in that The first membership matrix of the safety evaluation set is established by comparing and analyzing the time series data and the Rhineda criterion, including: The time series data is quantitatively evaluated by correlation coefficients, and as time accumulates, long sequence data formed by previous correlation coefficients is obtained; Through the Rhineda criterion, the corresponding relationship between the long sequence data and the safety evaluation set is established as the first membership matrix.

5. The method according to claim 3, characterized in that: The weights of the evaluation index sub-items of the same type are assigned through the operation safety knowledge graph to obtain a first weight matrix, and a comprehensive evaluation matrix of the evaluation index sub-items is constructed according to the first membership matrix and the first weight matrix, including: Determine the various special working conditions of the key parts of the concrete dam operation performance, including close-range strong earthquakes, major floods, and extreme low temperatures; Select close-range strong earthquakes, extreme floods, and extreme low temperatures as input user items of the operation safety knowledge graph, drive the operation safety knowledge graph through the special working conditions, activate the affected evaluation indicators, and calculate the weight scores of the evaluation indicator sub-items under each similar evaluation indicator under the special working condition to obtain a first weight matrix; A comprehensive evaluation matrix of evaluation index sub-items is constructed according to the first membership matrix and the first weight matrix.

6. A quantitative derivation device for online evaluation of hierarchical model of concrete dam operation performance, characterized in that: The online evaluation hierarchical model of the concrete dam operating performance includes a monitoring data layer, a diagnostic method layer, an evaluation index layer, a monitoring project layer, a key part layer, and an overall engineering layer, wherein: The overall engineering layer is the target of online evaluation of the concrete dam operation performance and is used to conduct a comprehensive evaluation of the overall operation performance of the concrete dam; The key parts layer is the focus of the online evaluation of the operating performance of the concrete dam. The key parts can be determined based on the calculation analysis in the design stage of the concrete dam, or the cluster analysis of the long-term operation monitoring data. The key parts layer analyzes the special evaluation results of the deformation, seepage, stress-strain, and temperature monitoring effect derived from the monitoring project layer, and the key parts are mainly distributed in the upper dam body, middle dam body, riverbed dam section dam heel, riverbed dam section dam toe, dam foundation, and the defect distribution area of ​​the long-term concern of the project operation; The monitoring project layer is the associated medium for online evaluation of the operating performance of the concrete dam. According to the relevant specifications for the design and safety monitoring of the concrete dam, the deformation, seepage, stress-strain and temperature monitoring effect quantities are comprehensively analyzed; The evaluation index layer is the process center of the online evaluation of the operation performance of the concrete dam. Four types of evaluation indicators, namely deformation, seepage, stress-strain and temperature, are set corresponding to the deformation, seepage, stress-strain and temperature monitoring effect quantities of the operation safety of the concrete dam in the monitoring project layer. Among them, under each type of evaluation indicator, there are further divided into two indicator formulation methods: one is to calculate the evaluation indicators of the same type of multi-measurement point combination according to the structural characteristics; the other is a multi-type multi-measurement point partition comprehensive evaluation indicator based on data-driven; The diagnostic method layer is the core of the online evaluation of the operating performance of concrete dams. Based on the periodic effects of reservoir water and temperature loads during the operation of concrete dams and the changes in the internal structure and materials of concrete dams, the monitoring effect quantity analysis of multiple points of the same type or multiple types of points is carried out according to the combined calculation of multiple measuring points of the same type and the comprehensive evaluation indicators of multiple measuring points of multiple types proposed in the evaluation index layer. The monitoring data layer is the information base for online evaluation of the operating status of concrete dams, including engineering safety monitoring, inspection defect data and geophysical detection results data; The device comprises: An acquisition module, used for acquiring an online evaluation hierarchical model of the concrete dam operation state and a safety evaluation set representing the concrete dam operation state; The monitoring data layer is used to obtain basic data on the operation status of concrete dams, which consists of engineering safety monitoring data, patrol inspection defect data and geophysical detection results data; The diagnostic method layer is used to establish a first membership matrix of basic data and safety evaluation sets included in each similar evaluation indicator sub-item according to the evaluation indicators established by the evaluation indicator layer, and to construct a comprehensive evaluation matrix of evaluation indicator sub-items according to the first membership matrix and a first weight matrix for assigning weights to the degree of concern about the operating performance of the concrete dam according to each similar evaluation indicator sub-item; The evaluation index layer is used to determine the evaluation index in combination with the structural characteristics of the concrete dam and the evaluation of the working condition, and to establish the evaluation index sub-item comprehensive evaluation matrix corresponding to the same type of evaluation index sub-items contained in each evaluation index and the second membership matrix of the safety evaluation set, so as to construct the evaluation index comprehensive evaluation matrix based on the second membership matrix and the second weight matrix with the same degree of attention and equal weight for each evaluation index item; The monitoring project layer is used to obtain the evaluation index comprehensive evaluation matrix corresponding to the evaluation index included in each monitoring project, and establish the third membership matrix of the evaluation index comprehensive evaluation matrix and the safety evaluation set, so as to construct the monitoring project comprehensive evaluation matrix based on the third membership matrix and the third weight matrix with the same degree of attention and equal weight for various monitoring projects; The key part layer is used to obtain the monitoring item comprehensive evaluation matrix corresponding to the monitoring items included in each key part, and establish the fourth membership matrix of the monitoring item comprehensive evaluation matrix and the safety evaluation set, so as to construct the key part comprehensive evaluation matrix based on the fourth membership matrix and the fourth weight matrix with the same degree of attention and equal weight for each key part; The determination module is used to determine the overall operating performance of the concrete dam in the overall engineering layer based on the comprehensive evaluation matrix of each key part.

7. The device according to claim 6, characterized in that The safety evaluation set representing the operating status of the concrete dam is formulated based on the current specifications for concrete dam safety management and an evaluation set divided into multiple fields, wherein the safety evaluation set is divided into four levels, including normal, basically normal, slightly abnormal, and abnormal.

8. The device according to claim 6, characterized in that The diagnostic method layer includes: The acquisition submodule is used for the diagnostic method layer to obtain the time series data of the combined calculation of the same type of multi-measurement point basic data of each similar evaluation indicator sub-item and the comprehensive diagnosis of the multi-type multi-measurement point partition basic data according to the maximum membership principle according to the evaluation index established in the evaluation index layer, which is specifically refined into deformation, seepage, stress strain, and temperature; The first construction submodule is used to establish a first membership matrix with the safety evaluation set through time series data comparative analysis and Rhineda criterion; The second construction submodule is used to establish an operation safety knowledge graph of a concrete dam, wherein the operation safety knowledge graph includes special working conditions, close-range strong earthquakes, major floods, extreme low temperatures, concrete dams, key parts, vertical distribution evaluation indicators of dam foundation deformation, overall horizontal displacement evaluation indicators of the dam body, overall horizontal stress evaluation indicators of the dam body, overall uplift pressure reduction evaluation indicators of the dam foundation, deformation-related measuring points, seepage-related measuring points, and stress-strain-related measuring points as object nodes at both ends of the operation safety knowledge graph triple, and includes inclusion and performance evaluation as the association relationship between the operation safety knowledge graph triple; The third construction submodule is used to assign weights to each similar evaluation indicator sub-item through the operation safety knowledge graph to obtain a first weight matrix, and to construct a comprehensive evaluation matrix of the evaluation indicator sub-items based on the first membership matrix and the first weight matrix.

9. The device according to claim 8, characterized in that The first building block is used, specifically, to: The time series data is quantitatively evaluated by correlation coefficients, and as time accumulates, long sequence data formed by previous correlation coefficients is obtained; Through the Rhineda criterion, the corresponding relationship between the long sequence data and the safety evaluation set is established as the first membership matrix.

10. The device according to claim 8, characterized in that The third building block is used, specifically, to: Determine the various special working conditions of the key parts of the concrete dam operation performance, including close-range strong earthquakes, major floods, and extreme low temperatures; Select close-range strong earthquakes, extreme floods, and extreme low temperatures as input user items of the operation safety knowledge graph, drive the operation safety knowledge graph through the special working conditions, activate the affected evaluation indicators, and calculate the weight scores of the evaluation indicator sub-items under each similar evaluation indicator under the special working condition to obtain a first weight matrix; A comprehensive evaluation matrix of evaluation index sub-items is constructed according to the first membership matrix and the first weight matrix.

11. A non-transitory computer-readable storage medium storing computer instructions, characterized in that: The computer instructions are used to cause the computer to execute the method according to any one of claims 1-5.

12. A computer program product, characterized in that The invention comprises a computer program which, when executed by a processor, implements the method according to any one of claims 1 to 5.