Dynamic management method of architectural design process based on BIM

Through the BIM-based dynamic management method of the architectural design process, the clustering algorithm is used to analyze the construction progress, and combined with the LOF anomaly detection algorithm, the problem of insufficient screening of the changes in construction progress speed in different stages by the LOF algorithm is solved, and the accuracy of the construction progress anomaly detection is improved. , to ensure the stability of construction progress.

CN118014288BActive Publication Date: 2024-10-11北京清水爱派建筑设计股份有限公司
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410187375.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-10-11
Estimated Expiration
2044-02-20

AI Technical Summary

Technical Problem

The LOF anomaly detection algorithm does not adequately detect changes in construction progress speeds at different stages, resulting in detection errors and being unable to effectively prevent construction progress delays.

Method used

Adopting a BIM-based dynamic management method for the architectural design process, by obtaining the construction progress and total construction progress of each building sub-project, using a clustering algorithm to analyze the reference curve segments, calculating the similarity of the clusters, obtaining the degree of construction anomalies, and based on Possibility of LOF anomaly detection algorithm to correct construction progress.

Benefits of technology

It improves the accuracy of construction progress abnormality detection, detects construction abnormalities in time, avoids affecting the overall construction progress, and ensures the stability of the construction progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118014288B_ABST
    Figure CN118014288B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of data processing technology, and in particular to a method for dynamic management of building design processes based on BIM. The method comprises: obtaining the construction progress and total construction progress of sub-projects and real-time sub-projects and their corresponding reference building sub-projects through big data; obtaining the similarity of several clusters according to the reference building sub-projects, and obtaining the similarity of the reference building sub-projects, thereby obtaining the degree of construction anomaly of the real-time building sub-projects; obtaining the possibility that the construction progress of the day is an abnormal construction progress according to the influence degree between the reference building sub-projects and the degree of construction anomaly of the real-time building sub-projects; obtaining a correction factor, correcting the possibility that the construction progress of the day is an abnormal construction progress according to the correction factor, judging the anomaly according to the corrected result and managing it. The present invention can timely discover construction anomalies and timely correct alarms during the construction process to avoid affecting the overall construction progress.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data processing, and in particular to a method for dynamic management of architectural design processes based on BIM. Background Art

[0002] In the pre-construction stage, managers can use BIM technology to realize virtual design and scenario simulation to clarify the specific requirements of construction progress, construction quality, etc., and then optimize the design and construction process, reduce construction risks, and effectively improve project quality and construction efficiency. Secondly, with the help of BIM technology, engineering and technical personnel can collect engineering data such as building scale, project location, and construction period in real time. By using BIM technology to analyze these data, the construction team can adjust and optimize resource allocation plans in a timely manner, reduce material and manpower waste, and further improve project construction efficiency. Finally, with the support of BIM technology, managers can realize dynamic management and real-time monitoring of the construction site, laying the foundation for the comprehensive implementation of construction site management measures.

[0003] During the construction phase, it is necessary to detect anomalies in the construction progress to prevent delays in the construction progress and prevent it from being completed within the specified time. The LOF anomaly detection algorithm is commonly used in anomaly detection algorithms. This algorithm cannot make a good distinction between changes in the speed of construction progress at different stages, which may lead to detection errors. Summary of the invention

[0004] In order to solve the technical problem of the LOF anomaly detection algorithm identifying errors in the construction progress speed at different stages, the present invention provides a dynamic management method for the building design process based on BIM. The technical solution adopted is as follows:

[0005] The present invention proposes a dynamic management method for architectural design process based on BIM, which comprises the following steps:

[0006] Obtain the daily construction progress and total construction progress of each building sub-project;

[0007] The construction subproject currently under construction is recorded as a real-time construction subproject, and a reference construction subproject and a corresponding reference construction subproject analysis curve of each real-time construction subproject are obtained; the reference construction subproject analysis curve is divided into a number of reference curve segments; all reference curve segments of each reference construction subproject analysis curve are classified using a clustering algorithm to obtain a number of cluster clusters; the similarity of the cluster clusters is obtained according to the difference in the number of reference curve segments and the difference in construction progress between the cluster clusters; the similarity of the reference construction subproject is obtained according to the similarity of the cluster clusters; the similarity of the real-time construction subproject and the reference construction subproject is obtained according to the method for obtaining the similarity of the reference construction subproject, and the degree of construction abnormality of the real-time construction subproject is obtained according to the similarity between the real-time construction subproject and the reference construction subproject and the difference in time under the total construction progress;

[0008] Obtain a reference project for the real-time project, and obtain the degree of influence between the reference building subprojects based on the data points of abnormal construction progress of the reference building subproject in the reference project; obtain the possibility that the current day's construction progress of the real-time building subproject is an abnormal construction progress based on the degree of influence between the reference building subprojects and the degree of abnormal construction of the real-time building subproject;

[0009] A construction progress correction factor is obtained based on the daily construction progress and the predicted construction progress; and the possibility that the construction progress of the day is an abnormal construction progress is corrected according to the construction progress correction factor; when the possibility is greater than the preset abnormal threshold, the construction progress is confirmed to be abnormal, and the dynamic management of architectural design is completed at this time.

[0010] Preferably, the method for obtaining the daily construction progress and total construction progress of each building sub-project is:

[0011] Use BIM to obtain the total construction progress of the building every day. The model is composed of multiple feature points. The total construction progress is the ratio of the number of feature points of the model corresponding to the day to the number of feature points corresponding to the model after the building is completed; the difference between the total construction progress of each day and the total construction progress of the previous day is taken as the daily construction progress.

[0012] Preferably, the method for obtaining the reference building sub-project and the corresponding reference building sub-project analysis curve of each real-time building sub-project is:

[0013] For each real-time building sub-project, similar building sub-projects are obtained in the historical database through big data technology and recorded as similar building sub-projects;

[0014] For all similar building sub-projects corresponding to a real-time building sub-project, a clustering algorithm is used to cluster them. The clustering distance is the absolute value of the difference in the construction area of ​​the similar building sub-projects. All similar building sub-projects are divided into multiple clusters, and the mean of the construction area of ​​each cluster is calculated. The mean of the construction area of ​​each cluster is compared with the construction area of ​​the real-time building sub-project. The cluster with the smallest difference is used as the standard cluster of the real-time building sub-project, and the similar building sub-projects in the standard cluster are used as reference building sub-projects of the real-time building sub-project.

[0015] The reference building sub-project corresponds to a reference building sub-project analysis curve. The horizontal axis of the reference building sub-project analysis curve is time, in days, and the vertical axis is the construction progress.

[0016] Preferably, the method of using a clustering algorithm to classify all reference curve segments of each reference building sub-project analysis curve to obtain a plurality of cluster clusters is:

[0017] For each reference curve segment, the mean of the construction progress of all data points in the reference curve segment is taken as the average construction progress of the reference curve segment;

[0018] For each reference curve segment, the construction progress of two adjacent data points is subtracted to obtain the construction change of the two data points, and the average of all the construction changes in the reference curve segment is taken as the average construction change of the reference curve segment;

[0019] The average construction progress and average construction change of each reference curve segment constitute a two-dimensional point. For each reference building sub-project analysis curve, all two-dimensional points are clustered, and the clustering distance is the Euclidean distance of the two-dimensional points. After clustering, several clusters are obtained, and the elements in the clusters are reference curve segments.

[0020] Preferably, the method for obtaining the similarity of clusters according to the difference in the number of reference curve segments and the difference in construction progress between clusters is:

[0021] ,

[0022] In the formula, represents the difference in the mean construction progress between clusters, Represents the difference in the mean of construction changes between clusters, represents the absolute value of the difference in the number of reference curve segments between clusters, represents the linear normalization function, Indicates the similarity between two clusters.

[0023] Preferably, the method for obtaining the similarity of the reference building sub-items according to the similarity of the clusters is:

[0024] For any two reference building sub-projects, the Hungarian algorithm is used to obtain the matching relationship between the clusters of the reference building sub-projects, and the two matching clusters are regarded as a matching group;

[0025] Each matching group corresponds to two clusters. The similarity between the two clusters of the matching group is calculated, and the similarities corresponding to all matching groups are accumulated and recorded as the first cumulative sum. For any two reference building sub-projects, the absolute value of the difference in the number of clusters of the two reference building sub-projects is obtained, and the product of the first cumulative sum and the absolute value of the difference in the number of clusters is taken as the similarity of the two reference building sub-projects.

[0026] Preferably, the method for obtaining the degree of construction abnormality of the real-time construction sub-project according to the similarity between the real-time construction sub-project and the reference construction sub-project and the time difference under the total construction progress is:

[0027] The total construction progress of the reference building subproject is adjusted to be the same as the real-time total construction progress, and the time of the reference building subproject at this time is obtained. The product of the absolute value of the difference between the time of the real-time building subproject and the reference building subproject when the total construction progress is the same and the similarity between the real-time building subproject and the reference building subproject is recorded as the first product. The first products of the real-time building subproject and all its corresponding reference building subprojects are accumulated and recorded as the construction abnormality degree of the real-time building subproject.

[0028] Preferably, the method of obtaining the reference project of the real-time project and obtaining the influence degree between the reference building sub-projects according to the data points of abnormal construction progress of the reference building sub-projects in the reference project is:

[0029] For any two real-time building sub-projects in a real-time project, if there is a reference building sub-project in the same project among the reference building sub-projects corresponding to the two real-time building sub-projects, then the same project is the reference project of the real-time project. The LOF anomaly detection algorithm is used to obtain the data points of abnormal construction progress of the reference building sub-project in the reference project, and the average time of all data points of abnormal construction progress of each reference building sub-project is recorded as the first time mean;

[0030] ,

[0031] In the formula, The absolute value of the difference between the number of data points with abnormal construction progress between the a-th reference building subproject and the b-th reference building subproject of the c-th reference project, represents the absolute value of the difference between the first-time means of the a-th reference building sub-project and the b-th reference building sub-project of the c-th reference project, represents the number of reference projects that have both the a-th reference building subproject and the b-th reference building subproject, represents the linear normalization function, Indicates the impact degree of the ath reference building sub-project and the bth reference building sub-project.

[0032] Preferably, the method for obtaining the possibility that the current construction progress of the real-time construction sub-project is an abnormal construction progress according to the influence degree between the reference construction sub-projects and the construction abnormality degree of the real-time construction sub-project is:

[0033] Record any one of the building sub-projects in the real-time project as a target real-time building sub-project. If there is a correlation between the target real-time building sub-project and the other real-time building sub-projects, record the target real-time building sub-project and the other real-time building sub-projects as a correlation pair.

[0034] ,

[0035] In the formula, Indicates the impact degree of the a-th reference building sub-project and the b-th reference building sub-project, represents the construction abnormality degree of the real-time building sub-project corresponding to the a-th reference building sub-project, represents the construction abnormality degree of the real-time building sub-project corresponding to the b-th reference building sub-project, e represents the number of related pairs of the real-time building sub-project corresponding to the a-th reference building sub-project, represents the linear normalization function, It indicates the possibility that the construction progress of the real-time construction subproject corresponding to the a-th reference construction subproject on the same day is an abnormal construction progress, wherein the real-time construction subproject corresponding to the a-th reference construction subproject is the target real-time construction subproject.

[0036] Preferably, the method of obtaining the construction progress correction factor based on the daily construction progress and the predicted construction progress; and correcting the possibility that the construction progress of the day is an abnormal construction progress according to the construction progress correction factor is:

[0037] The construction progress and predicted construction progress of each day from the first day of the real-time construction sub-project to the predicted completion time are accumulated and recorded as the construction cumulative value. The difference between 1 and the construction cumulative value is processed using an exponential function with a natural constant as the base. The processed result is linearly normalized, and the normalized value is the construction progress correction factor.

[0038] The LOF anomaly detection algorithm is used to calculate the outliers of the real-time construction sub-projects of the day. The possibility that the construction progress of the day is an abnormal construction progress and the mean of the outliers are recorded as the first mean, and the product of the construction progress correction factor and the first mean is recorded as the corrected possibility that the construction progress of the day is an abnormal construction progress.

[0039] The present invention has the following beneficial effects: the present invention obtains historically similar construction data by extracting the features of construction data, obtains the correlation between construction progresses of different sub-category projects, and obtains the current construction progress anomaly correction factor according to the time prediction algorithm, thereby correcting the anomaly detection result obtained using the LOF anomaly detection algorithm, greatly increasing the accuracy of the anomaly detection result using the algorithm, making it possible to timely discover construction anomalies and make alarm corrections in a timely manner during the construction process, thereby avoiding the possibility of affecting the overall construction progress and ensuring the progress of the building construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0041] Figure 1 A flow chart of a method for dynamic management of building design processes based on BIM provided by an embodiment of the present invention;

[0042] Figure 2 A flowchart for implementing a method for dynamic management of building design processes based on BIM is provided in one embodiment of the present invention. DETAILED DESCRIPTION

[0043] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of the BIM-based building design process dynamic management method proposed by the present invention, its specific implementation method, structure, features and effects, in conjunction with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0044] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0045] The specific scheme of the dynamic management method of building design process based on BIM provided by the present invention is described in detail below with reference to the accompanying drawings.

[0046] See also Figure 1 , which shows a flow chart of a method for dynamic management of building design process based on BIM provided by an embodiment of the present invention, the method comprising the following steps:

[0047] Step S001, obtaining the daily construction progress and total construction progress of each building sub-project.

[0048] BIM uses the information data of construction projects as the basis of the model, which can simulate the real state of the building. There are multiple building sub-projects in each construction project. For each building sub-project, the total construction progress of the building is obtained every day based on BIM. The total construction of the day is the ratio of the number of feature points of the model corresponding to the building sub-project every day to the model after the building is completed. The difference between the total construction progress of each day and the total construction progress of the previous day is taken as the daily construction progress.

[0049] At this point, the daily construction progress was obtained.

[0050] Step S002, obtaining a real-time building sub-project, and its corresponding reference building sub-project and reference building sub-project analysis curve; dividing the reference building sub-project analysis curve into a number of reference curve segments; classifying the curve segments to obtain a number of clusters; obtaining the similarity of the clusters based on the feature differences between the clusters; obtaining the similarity of the reference building sub-project based on the similarity of the clusters; obtaining the degree of construction abnormality of the real-time building sub-project based on the similarity between the real-time building sub-project and the reference building sub-project and the time difference under the total construction progress.

[0051] This embodiment monitors the progress of construction sub-projects in real time, analyzes the daily project progress, and analyzes according to the historical progress to obtain the abnormality of the current project progress, and analyzes according to the abnormal situation to obtain the possibility of delay in the current project progress, and supervises the current project according to the finally obtained possibility of project delay, thereby avoiding the occurrence of project delay, wherein whether the project is delayed is achieved by using the existing LOF anomaly detection algorithm, and the existing anomaly detection algorithm has certain defects, that is, when the same parameters are used to deal with different scenarios, different anomaly detection results may be obtained, so the present invention is based on the analysis of the construction progress of similar historical projects, so as to correct the obtained abnormal results, so as to obtain more accurate anomaly detection results, thereby avoiding misjudgment and causing project delay.

[0052] For each building sub-project, similar building sub-projects are obtained from the historical database through big data and recorded as similar building sub-projects. For example, the painting project in building decoration is a building sub-project, and the waterproofing project is a building sub-project. Because the construction speed of the same building sub-project is different at different stages during the construction process, the direct use of the LOF anomaly detection algorithm cannot obtain the true anomaly. Therefore, the similar building sub-projects of each building sub-project are analyzed. For each similar building sub-project, a similar building sub-project analysis curve is obtained from the beginning to the end of the similar building sub-project. The horizontal axis of the similar building sub-project analysis curve is time, in days, and the vertical axis is the construction progress.

[0053] For the same kind of similar building sub-projects, a clustering algorithm is used to classify them. The clustering algorithm used is the DBSCAN clustering algorithm. The clustering distance is the difference in construction volume. In this embodiment, the construction volume is the building area after the building is completed. The building volume can also be used. The difference in construction volume is the absolute value of the difference in construction area between two similar building sub-projects. The DBCASN clustering algorithm is used to cluster the same kind of similar building sub-projects to obtain several project clusters. For each cluster, the mean of the construction volume of the reference building sub-project is calculated and compared with the current building sub-project. The closest cluster is the standard cluster of the current building sub-project.

[0054] For each similar building sub-project in the standard cluster, it is used as the reference building sub-project of the current building sub-project. The reference building sub-project in the standard cluster is similar to the current building sub-project, wherein each reference building sub-project corresponds to a reference building sub-project analysis curve. For each reference building sub-project analysis curve, DBSCAN clustering is used to cluster all data points in the reference building sub-project analysis curve, and the clustering distance is the Euclidean distance between the data points, thereby completing the division of the reference building sub-project analysis curve. The reference building sub-project analysis curve is divided into several reference curve segments, wherein the clustering algorithm can be set by the implementer.

[0055] For each reference curve segment, the mean of the construction progress of all data points in the reference curve segment is taken as the average construction progress of the reference curve segment. For each reference curve segment, the construction progress of two adjacent data points is subtracted to obtain the construction change of the two data points. The mean of all construction changes in the reference curve segment is taken as the average construction change of the reference curve segment.

[0056] For each reference curve segment, let it be represented by the average construction progress and the average construction change, that is, each reference curve segment corresponds to a two-dimensional point, the first value of the two-dimensional point is the average construction progress, and the second point is the average construction change. Each two-dimensional point is recorded as a reference two-dimensional point, and DBSCAN clustering is performed on the reference two-dimensional points corresponding to all reference curve segments in each reference building sub-project analysis curve. The clustering distance is the Euclidean distance between the reference two-dimensional points, thereby completing the classification of the reference two-dimensional points, that is, for the classification of the reference curve segments, each category is recorded as a cluster cluster, and the mean of the average construction progress of all reference curve segments of each cluster cluster is recorded as the mean construction progress, and the mean of the average construction change of all reference curve segments of each cluster cluster is recorded as the mean construction change.

[0057] For the reference building sub-project analysis curves corresponding to any two reference building sub-projects, the similarity of the clusters is obtained according to the difference in the number of reference curve segments between clusters, the average construction progress of the reference curve segments, and the difference in the average construction change. The formula is as follows:

[0058] ,

[0059] In the formula, represents the difference in the mean construction progress between clusters, Represents the difference in the mean of construction changes between clusters, represents the absolute value of the difference in the number of reference curve segments between clusters, represents the linear normalization function, Indicates the similarity of two clusters. The closer the number of elements in the two clusters, the The smaller the value, the closer the distribution of the construction time of the data segments in the two clusters is. The smaller the value, the smaller the difference in the average daily construction progress of the data segments in the two clusters. The smaller it is, the smaller the difference in the average daily construction progress change corresponding to the data segments in the two clusters is. The larger it is, the more similar the two clusters are.

[0060] For two reference building sub-projects, the Hungarian algorithm is used to obtain the matching relationship between the clusters of the reference building sub-projects. The two matching clusters are taken as a matching group. The similarity of the clusters is calculated for the matching clusters. The similarity of the reference building sub-projects is obtained through the similarity of the clusters. The formula is as follows:

[0061] ,

[0062] In the formula, represents the absolute value of the difference in the number of clusters of the two reference building sub-projects, Represents the similarity between the two clusters corresponding to the i-th matching group, Indicates the number of matching groups. Indicates the similarity of two reference building sub-projects.

[0063] The current construction subproject is recorded as a real-time construction subproject. Since there is basically no delay at the beginning of the project, and generally, the delay will occur after the project continues for a period of time, in this embodiment, if the total construction progress of the real-time construction subproject exceeds 10%, a reference construction subproject is selected from the standard cluster of the real-time construction subproject, and the total construction progress of the reference construction subproject is obtained according to the total construction progress of the real-time construction subproject; for example, if the total construction progress of the real-time construction subproject is 50%, then the total construction progress of the reference construction subproject is set to 50%; under the same total construction progress, the similarity between the real-time construction subproject and the reference construction subproject is obtained according to the method for obtaining the similarity of the reference construction subproject; under the same total construction progress, the time difference between the real-time construction subproject and the reference construction subproject is calculated, thereby obtaining the construction abnormality degree of the real-time construction subproject, and the formula is as follows:

[0064] ,

[0065] In the formula, represents the similarity between the real-time building sub-item and the j-th reference building sub-item in the standard cluster, represents the absolute value of the time difference between the real-time construction sub-project and the j-th reference construction sub-project in the standard cluster under the same total construction progress, Indicates the number of reference building sub-items in the standard cluster corresponding to the real-time building sub-item, Indicates the degree of abnormality of the construction of the real-time construction subproject. The more similar the real-time construction subproject is to the reference construction subproject, and the greater the difference in time under the same total construction progress, the greater the possibility that the construction progress of the current real-time construction subproject is abnormal.

[0066] At this point, the degree of construction abnormality of the real-time building sub-project is obtained.

[0067] Step S003, obtaining a reference project for the real-time project, and obtaining the degree of influence between the reference building subprojects based on the data points of abnormal construction progress of the reference building subprojects in the reference project; and obtaining the possibility that the current day's construction progress of the real-time building subproject is an abnormal construction progress based on the degree of influence between the reference building subprojects and the degree of construction abnormality of the real-time building subproject.

[0068] Since there are correlations between different construction sub-projects, if problems occur in some construction sub-projects, the corresponding remaining construction sub-projects cannot be completed. Therefore, correlation analysis is performed based on historical data.

[0069] For a real-time project, select any two real-time construction sub-projects, and use the intersection of the standard clusters of the two real-time construction sub-projects to obtain several reference projects. Each reference project also has reference construction sub-projects of two real-time construction sub-projects. For example: the first real-time construction sub-project has 1, 2, 3, 4, 5, 6, 7; the other real-time construction sub-project has 2, 4, 6, 7, 8; then the intersection of the two is 2, 4, 6, 7, that is, there are three reference projects that have reference construction sub-projects of two real-time construction sub-projects. For each reference construction sub-project, use the LOF anomaly detection algorithm to obtain data points with abnormal construction progress, calculate the average time of all data points with abnormal construction progress for each reference construction sub-project, and record it as the first time mean, thereby calculating the correlation between construction sub-projects.

[0070] The formula for the degree of influence between building sub-projects is as follows:

[0071] ,

[0072] In the formula, The absolute value of the difference between the number of data points with abnormal construction progress between the a-th reference building subproject and the b-th reference building subproject of the c-th reference project, represents the absolute value of the difference between the first-time means of the a-th reference building sub-project and the b-th reference building sub-project of the c-th reference project, represents the number of reference projects that have both the a-th reference building subproject and the b-th reference building subproject, represents the linear normalization function, Indicates the degree of influence of the a-th reference building sub-project and the b-th reference building sub-project. When the two reference building sub-projects have abnormalities, the number of abnormalities is similar, and the corresponding abnormality time is closer, the greater the impact of the construction progress between the two projects.

[0073] According to the above method, the influence degree between the two reference building sub-projects is obtained, and any building sub-project in the real-time project is recorded as the target real-time building sub-project. If there is a correlation between the target real-time building sub-project and the other real-time building sub-projects, the target real-time building sub-project and the other real-time building sub-projects are recorded as a correlation pair. In the real-time project, according to the influence degree of the target real-time building sub-project and the reference building sub-projects corresponding to the other real-time building sub-projects, and the construction abnormality degree of the target real-time building sub-project and the other real-time building sub-projects, the method for obtaining the possibility that the construction progress of the target real-time building sub-project on the same day is an abnormal construction progress is as follows:

[0074] ,

[0075] In the formula, Indicates the impact degree of the a-th reference building sub-project and the b-th reference building sub-project, represents the construction abnormality degree of the real-time building sub-project corresponding to the a-th reference building sub-project, represents the construction abnormality degree of the real-time building sub-project corresponding to the b-th reference building sub-project, e represents the number of related pairs of the real-time building sub-project corresponding to the a-th reference building sub-project, represents the linear normalization function, It indicates the possibility that the construction progress of the real-time construction subproject corresponding to the a-th reference construction subproject on the same day is an abnormal construction progress, wherein the real-time construction subproject corresponding to the a-th reference construction subproject is the target real-time construction subproject.

[0076] Step S004, obtaining a construction progress correction factor based on the daily construction progress and the predicted construction progress; correcting the abnormal construction progress according to the correction factor, and judging the abnormality and managing it according to the possibility that the corrected construction progress of the day is an abnormal construction progress.

[0077] Since the construction progress is abnormal, it may not only be caused by the slow construction progress, but also because the construction of the detected project is faster than expected. Therefore, the target real-time construction sub-project is analyzed. For each real-time construction sub-project, the real-time construction sub-project analysis curve is predicted according to the curve trend prediction method to obtain the expected completion time and the predicted construction progress every day. Based on this, the construction progress correction factor is obtained. The formula is as follows:

[0078] ,

[0079] In the formula, represents the construction progress of the target real-time building sub-project on the tth day, Indicates the predicted completion time, represents an exponential function with a natural constant as base, represents the linear normalization function, Indicates the construction progress correction factor. If the target real-time construction sub-project has not yet reached the tth day, the predicted construction progress on the tth day is used to represent the construction progress on the tth day. The smaller the construction progress correction factor, the more time there is for construction.

[0080] For the real-time construction sub-project analysis curve corresponding to the target real-time construction sub-project, the LOF anomaly detection algorithm is used to obtain the abnormal value of the day, thereby obtaining the possibility that the corrected construction progress of the day is an abnormal construction progress. The formula is as follows:

[0081] ,

[0082] In the formula, represents the construction progress correction factor, represents the outlier value of the target real-time building sub-project on the day, Indicates the possibility that the construction progress of the target real-time building sub-project on the current day is abnormal. Indicates the possibility that the corrected construction progress for the day is an abnormal construction progress.

[0083] In this embodiment, the abnormal threshold is set to 0.8. When the possibility that the corrected construction progress of the day is an abnormal construction progress is greater than the abnormal threshold, it means that the construction progress of the day is abnormal. The abnormal information is submitted to the staff, and the staff performs corresponding management. The specific implementation process of building management is as follows: Figure 2 shown.

[0084] It should be noted that the sequence of the above embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0085] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

Claims

1. A dynamic management method for architectural design process based on BIM, characterized in that: The method comprises the following steps: Obtain the daily construction progress and total construction progress of each building sub-project; The construction subproject currently under construction is recorded as a real-time construction subproject, and a reference construction subproject and a corresponding reference construction subproject analysis curve of each real-time construction subproject are obtained; the reference construction subproject analysis curve is divided into a number of reference curve segments; all reference curve segments of each reference construction subproject analysis curve are classified using a clustering algorithm to obtain a number of cluster clusters; the similarity of the cluster clusters is obtained according to the difference in the number of reference curve segments and the difference in construction progress between the cluster clusters; the similarity of the reference construction subproject is obtained according to the similarity of the cluster clusters; the similarity of the real-time construction subproject and the reference construction subproject is obtained according to the method for obtaining the similarity of the reference construction subproject, and the degree of construction abnormality of the real-time construction subproject is obtained according to the similarity between the real-time construction subproject and the reference construction subproject and the difference in time under the total construction progress; Obtain a reference project of the real-time project, and obtain the influence degree between the reference building sub-projects according to the data points of abnormal construction progress of the reference building sub-project in the reference project; obtain the possibility that the construction progress of the real-time building sub-project on the same day is abnormal construction progress according to the influence degree between the reference building sub-projects and the abnormal construction degree of the real-time building sub-project; A construction progress correction factor is obtained based on the daily construction progress and the predicted construction progress; and the possibility of the construction progress of the day being an abnormal construction progress is corrected according to the construction progress correction factor; when the possibility is greater than a preset abnormal threshold, the construction progress is confirmed to be abnormal, and the dynamic management of architectural design is completed at this time; The method for obtaining the possibility that the current construction progress of the real-time construction sub-project is an abnormal construction progress according to the influence degree between the reference construction sub-projects and the construction abnormality degree of the real-time construction sub-project is: Record any one of the building sub-projects in the real-time project as a target real-time building sub-project. If there is a correlation between the target real-time building sub-project and the other real-time building sub-projects, record the target real-time building sub-project and the other real-time building sub-projects as a correlation pair. , In the formula, Indicates the impact degree of the a-th reference building sub-project and the b-th reference building sub-project, represents the construction abnormality degree of the real-time building sub-project corresponding to the a-th reference building sub-project, represents the construction abnormality degree of the real-time construction sub-project corresponding to the b-th reference construction sub-project, e represents the number of related pairs of the real-time construction sub-project corresponding to the a-th reference construction sub-project, represents the linear normalization function, It indicates the possibility that the construction progress of the real-time construction subproject corresponding to the a-th reference construction subproject on the same day is an abnormal construction progress, wherein the real-time construction subproject corresponding to the a-th reference construction subproject is the target real-time construction subproject.

2. The method for dynamic management of architectural design process based on BIM according to claim 1, characterized in that: The method for obtaining the daily construction progress and total construction progress of each building sub-project is: Use BIM to obtain the total construction progress of the building every day. The model is composed of multiple feature points. The total construction progress is the ratio of the number of feature points of the model corresponding to the day to the number of feature points corresponding to the model after the building is completed; the difference between the total construction progress of each day and the total construction progress of the previous day is taken as the daily construction progress.

3. The BIM-based building design process dynamic management method according to claim 1, characterized in that: The method for obtaining the reference building sub-project and the corresponding reference building sub-project analysis curve of each real-time building sub-project is: For each real-time building sub-project, similar building sub-projects are obtained in the historical database through big data technology and recorded as similar building sub-projects; For all similar building sub-projects corresponding to a real-time building sub-project, a clustering algorithm is used to cluster them. The clustering distance is the absolute value of the difference in the construction area of ​​the similar building sub-projects. All similar building sub-projects are divided into multiple clusters, and the mean of the construction area of ​​each cluster is calculated. The mean of the construction area of ​​each cluster is compared with the construction area of ​​the real-time building sub-project. The cluster with the smallest difference is used as the standard cluster of the real-time building sub-project, and the similar building sub-projects in the standard cluster are used as reference building sub-projects of the real-time building sub-project. The reference building sub-project corresponds to a reference building sub-project analysis curve. The horizontal axis of the reference building sub-project analysis curve is time, the unit is day, and the vertical axis is the construction progress.

4. The BIM-based building design process dynamic management method according to claim 1, characterized in that: The method of using a clustering algorithm to classify all reference curve segments of each reference building sub-project analysis curve to obtain a number of cluster clusters is: For each reference curve segment, the mean of the construction progress of all data points in the reference curve segment is taken as the average construction progress of the reference curve segment; For each reference curve segment, the construction progress of two adjacent data points is subtracted to obtain the construction change of the two data points, and the average of all the construction changes in the reference curve segment is taken as the average construction change of the reference curve segment; The average construction progress and average construction change of each reference curve segment constitute a two-dimensional point. For each reference building sub-project analysis curve, all two-dimensional points are clustered, and the clustering distance is the Euclidean distance of the two-dimensional points. After clustering, several clusters are obtained, and the elements in the clusters are reference curve segments.

5. The BIM-based building design process dynamic management method according to claim 4, characterized in that: The method for obtaining the similarity of clusters according to the difference in the number of reference curve segments and the difference in construction progress between clusters is: , In the formula, represents the difference in the mean construction progress between clusters, Represents the difference in the mean of construction changes between clusters, represents the absolute value of the difference in the number of reference curve segments between clusters, represents the linear normalization function, Indicates the similarity between two clusters.

6. The BIM-based building design process dynamic management method according to claim 1, characterized in that: The method for obtaining the similarity of the reference building sub-items according to the similarity of the clusters is: For any two reference building sub-projects, the Hungarian algorithm is used to obtain the matching relationship between the clusters of the reference building sub-projects, and the two matching clusters are regarded as a matching group; Each matching group corresponds to two clusters. The similarity between the two clusters of the matching group is calculated, and the similarities corresponding to all matching groups are accumulated and recorded as the first cumulative sum. For any two reference building sub-projects, the absolute value of the difference in the number of clusters of the two reference building sub-projects is obtained, and the product of the first cumulative sum and the absolute value of the difference in the number of clusters is taken as the similarity of the two reference building sub-projects.

7. The method for dynamic management of architectural design process based on BIM according to claim 1, characterized in that: The method for obtaining the construction abnormality degree of the real-time construction sub-project according to the similarity between the real-time construction sub-project and the reference construction sub-project and the time difference under the total construction progress is: The total construction progress of the reference building subproject is adjusted to be the same as the real-time total construction progress, and the time of the reference building subproject at this time is obtained. The product of the absolute value of the difference between the time of the real-time building subproject and the reference building subproject when the total construction progress is the same and the similarity between the real-time building subproject and the reference building subproject is recorded as the first product. The first products of the real-time building subproject and all its corresponding reference building subprojects are accumulated and recorded as the construction abnormality degree of the real-time building subproject.

8. The BIM-based building design process dynamic management method according to claim 1, characterized in that: The method for obtaining the reference project of the real-time project and obtaining the influence degree between the reference building sub-projects according to the data points of abnormal construction progress of the reference building sub-project in the reference project is: For any two real-time building sub-projects in a real-time project, if there is a reference building sub-project in the same project among the reference building sub-projects corresponding to the two real-time building sub-projects, then the same project is the reference project of the real-time project. The LOF anomaly detection algorithm is used to obtain the data points of abnormal construction progress of the reference building sub-project in the reference project, and the average time of all data points of abnormal construction progress of each reference building sub-project is recorded as the first time mean; , In the formula, The absolute value of the difference between the number of data points with abnormal construction progress between the a-th reference building subproject and the b-th reference building subproject of the c-th reference project, represents the absolute value of the difference between the first-time means of the a-th reference building sub-project and the b-th reference building sub-project of the c-th reference project, represents the number of reference projects that have both the a-th reference building subproject and the b-th reference building subproject, represents the linear normalization function, Indicates the impact degree of the ath reference building sub-project and the bth reference building sub-project.

9. The method for dynamic management of architectural design process based on BIM according to claim 1, characterized in that: The method of obtaining the construction progress correction factor based on the daily construction progress and the predicted construction progress; and correcting the possibility that the construction progress of the day is an abnormal construction progress according to the construction progress correction factor is: The construction progress and predicted construction progress of each day from the first day of the real-time construction sub-project to the predicted completion time are accumulated and recorded as the construction cumulative value. The difference between 1 and the construction cumulative value is processed using an exponential function with a natural constant as the base. The processed result is linearly normalized, and the normalized value is the construction progress correction factor. The LOF anomaly detection algorithm is used to calculate the outliers of the real-time construction sub-projects of the day. The possibility that the construction progress of the day is an abnormal construction progress and the mean of the outliers are recorded as the first mean, and the product of the construction progress correction factor and the first mean is recorded as the corrected possibility that the construction progress of the day is an abnormal construction progress.

Citation Information

Patent Citations

  • Visual management method for project progress information based on project structure tree

    CN115481884A

  • Intelligent building construction information collection and analysis method and system based on BIM

    CN116308203A

  • Project progress management method and system based on BIM and AI large model

    CN117494292A

  • Smart field management system through 3D digitization of construction site and analysis of virtual construction image

    KR101988356B1

  • Abnormal Construction Measurement Data Detection Method and System with Correlation Analysis

    KR1020170078038A