Deep hole loose and shaped blasting and subsequent filling mining method for steeply inclined fractured ore body
The deep-hole loosening shaped charge blasting followed by backfilling mining method solves the problems of high difficulty and poor safety in recovering steeply inclined and crushed ore bodies, and achieves efficient and safe ore recovery and production. It simplifies the operation process and reduces ore loss and damage to the ore body caused by blasting vibration.
Patent Information
- Application Number
- CN202410309227.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2044-03-19
AI Technical Summary
The recovery of steeply inclined and fractured ore bodies is difficult, the production capacity of the mining area is low, and the operation is unsafe. Existing technologies are complex to operate and lack safety, resulting in serious losses of ore resources.
The deep-hole loosening shaped charge blasting followed by backfilling mining method involves constructing downward deep holes in segmented rock drilling roadways, using shaped charge tubes and explosive cartridges for loosening blasting, and leaving the collapsed ore in the stope. After mining is completed, the ore is released and backfilled in a unified manner, forming a complete rock drilling operation space and ventilation circuit, reducing the damage to the ore body caused by blasting vibration.
It effectively reduces the consumption of explosives per unit, reduces the damage to the ore body caused by blasting vibration, improves the production capacity and safety of the mining area, simplifies operations, reduces the ore dilution rate, and improves mining efficiency and safety reliability.
Smart Images

Figure CN118030071B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of metal mining technology, and in particular to a deep-hole loosening shaped charge blasting followed by backfilling mining method for steeply inclined fractured ore bodies, suitable for use in steeply inclined ore bodies with fractured rock. Background Technology
[0002] In the process of mining and utilizing mineral resources, the limitations of rock drilling equipment often prevent the extraction of steeply inclined and fractured ore bodies, or make it impossible to extract them under safe conditions. This results in significant losses of ore resources. How to recover such ore bodies and extend the service life of mines is one of the key focuses of mining technology work. Previously, the main method for recovering "fractured" ore bodies was shallow-hole drilling and blasting. This method is labor-intensive, inefficient, and has poor safety, and several safety accidents have occurred in recent years. With the development of mining machinery manufacturing, safe, efficient, and adaptable drilling and blasting equipment suitable for complex conditions has made significant progress. Therefore, researching new mining methods using advanced equipment to maximize the recovery of mineral resources has become a key issue in current mining technology research.
[0003] To address the aforementioned issues, Chinese patent CN 110905509 B discloses a "deep-hole ore-keeping mining method for thin-vein steeply dipping ore bodies." This method is suitable for ore bodies with relatively regular shapes and stable rock, but it involves a large amount of mining work, requires drill rod connections during deep-hole construction, and is complex to operate, making it unsuitable for fractured ore bodies. CN 107829739 A discloses a "mining method for steeply dipping thin ore veins," which mainly uses shallow-hole ore-keeping. If the hanging wall and ore body of the steeply dipping ore body are all fractured, workers need to enter the mining area and work in exposed spaces for extended periods, resulting in poor safety. 111042818A discloses "A method for mining a steeply dipping thin tungsten vein with unstable surrounding rock," which uses a static ore-holding method for the pre-mining and cutting engineering structure, and adopts a bottom-up, layered advancement method with a layer height of 1.6-2.2m. It uses shallow-hole ore extraction. If the ore body and surrounding rock conditions are poor, workers still need to enter the mining area and work in exposed space for extended periods, resulting in poor safety. CN112727463A discloses "A mechanized backfilling mining method for steeply dipping thin tungsten veins under weak rock conditions," which uses inclined ramp development and segmented transportation. The mining preparation method, which involves roadway connections and ore pass extraction, involves recovering the ore body layer by layer from bottom to top. A single-heading excavation method is used to complete the bottom-pull approach extraction, utilizing the goaf formed by the bottom-pull approach as a free-face downward-pressing ore body. The lower footing waste rock is scraped and expanded with non-cemented backfill to form the bottom layer, and high-strength cemented backfill is poured to form the surface layer. This is supplemented by efficient rock drilling with drilling rigs, rapid support with shotcrete rigs, and centralized ore extraction with loaders. This method has high mechanization intensity and can reduce individual labor intensity. However, due to the fractured ore and rock, the support is limited, and drilling and ore extraction must be carried out in the exposed space of the stope, resulting in poor safety. In other words, the publicly disclosed patents generally suffer from problems such as high difficulty in ore body recovery, low stope production capacity, poor operational safety, and poor mine leanness indicators. Furthermore, they are complex to operate, have low practical value, and poor safety reliability.
[0004] Therefore, it is of great significance to develop a deep-hole loosening and energy-concentrated blasting mining method followed by backfilling for mining steeply inclined and fractured ore bodies. Summary of the Invention
[0005] The objective of this invention is to overcome the shortcomings of the prior art and provide a deep-hole loosening shaped charge blasting followed by backfilling mining method for steeply inclined fractured ore bodies. This method can reduce the difficulty of ore body recovery, improve the production capacity and operational safety of the mining area, and also simplify operation, have high practical value and good safety and reliability.
[0006] The objective of this invention is achieved through the following technical solution:
[0007] This deep-hole loosening and focused blasting followed by backfilling mining method for steeply inclined fractured ore bodies addresses issues related to ore recovery, stope production capacity, operational safety, and mine leanness. The fractured ore body is the target for mining. Sectional roadways, ore extraction access roads, and loading veins are constructed at the bottom of the stope to serve as ore extraction channels. The mined ore is transported out via staged transport roadways. A pre-mining ramp is constructed outside the vein in the footwall of the stope, connecting to the footwall and footwall of the ore body via a ramp connecting roadway. Along-vein roadways are constructed at the bottom of the stope via the ramp connecting roadway. In the middle of the stope, sectioned drilling roadways are constructed near the footwall of the ore body within the ramp connecting roadway, thus forming a complete mining system. Rock working space and ventilation circuit; downward segmented deep holes are constructed near the footwall boundary of the ore body in the segmented rock drilling roadway. A shaped charge tube with three shaped charge slots made of PVC material is installed in the deep hole. Explosive cartridges are loaded into the shaped charge tube for shaped charge blasting. The broken ore body is debrided by loosening blasting with the vein roadway and segmented rock drilling roadway as the free face. The debrided ore is left in the stope by the ore retention method before the previous segment blasting to protect the hanging wall and prevent the hanging wall from collapsing and increasing ore dilution. After the stope is mined out, the ore in the stope is released evenly at once and transported out through the ore pass. Then it is backfilled to form a backfill body.
[0008] Compared with the prior art, the present invention has the following advantages or effects:
[0009] (1) Because the loosening blasting method is adopted, the explosive consumption can be reduced by more than 30%, and the ore collapse can be satisfied, reducing the damage of blasting vibration to the upper and lower walls of the ore body.
[0010] (2) At the same time, since a simple energy-concentrating device is used for blasting, the energy generated by the blasting is used to form a high-speed shock wave jet in the direction of the energy-concentrating groove, which increases the blasting shock wave in the direction of the energy-concentrating groove. Therefore, it can increase the blasting effect on the broken ore body and reduce the damage of blasting vibration to the upper and lower plates of the ore body.
[0011] (3) In addition, since the ore after blasting is retained by the ore retention method before the previous section blasting, the hanging wall of the ore body can be protected and the ore dilution can be reduced.
[0012] (4) In addition, due to the use of loosening blasting, the consumption of explosives can be reduced by more than 30%, and the ore can be caving and the damage of blasting vibration to the upper and lower walls of the ore body can be reduced.
[0013] (5) Furthermore, since the ore after blasting is retained by the ore retention method before the previous section blasting, the hanging wall of the ore body can be protected and the ore dilution can be reduced.
[0014] In summary, this invention has the advantages of simple operation, high practical value, safety and reliability, and can ensure safety and efficiency in all aspects such as mining preparation and tunneling, rock drilling and blasting, and subsequent ore extraction, as well as high ore recovery rate. Attached Figure Description
[0015] Figure 1 This is a front view schematic diagram of the stope layout for a deep-hole loosening shaped charge blasting followed by backfilling mining method for steeply inclined fractured ore bodies proposed in this invention.
[0016] Figure 2 for Figure 1 The diagram shows a top-down view of the mining area layout.
[0017] Figure 3 For Figure 1 The diagram shows a side view of the mining area layout.
[0018] Figure 4 This is a top view schematic diagram of the blasting borehole arrangement of the present invention.
[0019] Figure 5 for Figure 4 The diagram shows a side view of the layout of the blasting holes.
[0020] Figure 6 This is a three-dimensional schematic diagram of the simplified shaped charge blasting device of the present invention.
[0021] Figure 7 for Figure 6 The diagram shows a simplified shaped charge structure.
[0022] The symbols in the attached diagram represent:
[0023] 1. Segmented roadway 2. Ore exit roadway 3. Passage 4. Inclined connecting roadway 5. Blasting hole 6. Loading cross-vein stage 7. Transport level roadway 8. Backfill 9. Preparatory ramp 10. Fractured ore body 11. Segmented drilling roadway 12. Along-vein roadway
[0024] The present invention will now be described in further detail with reference to the accompanying drawings. Detailed Implementation
[0025] Reference Figures 1-7The deep-hole loosening and focused blasting followed by backfilling mining method for steeply inclined fractured ore bodies addresses issues such as recovery of steeply inclined fractured ore bodies, stope production capacity, operational safety, and mine depletion. The fractured ore body (10) is the target for mining. A segmented roadway (1), an ore extraction route (2), and a loading vein (6) are constructed at the bottom of the stope as the ore extraction channels. The mined ore is transported out via a staged transport roadway (7). A mining ramp (9) is constructed outside the vein in the footwall of the stope. A connecting roadway (4) passes through the footwall and footwall of the ore body, connecting to the fractured ore body (10). A vein-along roadway (12) is constructed at the bottom of the stope via the connecting roadway (4). A segmented drilling roadway (11) is constructed in the middle of the stope near the footwall of the ore body via the connecting roadway (4). This creates a complete drilling operation space and ventilation circuit in the mining area. A downward segmented deep hole is constructed in the segmented drilling roadway (11) near the lower boundary of the ore body. A shaped charge tube made of PVC material with three shaped charge slots is installed in the deep hole. Explosive cartridges are loaded into the shaped charge tube for shaped charge blasting. The vein roadway (12) and the segmented drilling roadway (11) are used as free surfaces. The broken ore body (10) is collapsed by loosening blasting. The collapsed ore is left in the stope by the ore retention method before the previous segmented blasting to protect the hanging wall and prevent the hanging wall from collapsing and causing the ore to become more dilute. After the mining is completed, the ore in the mining area is released evenly at once and transported out through the chute (3). Then it is filled to form a filling body (8).
[0026] The specific process steps and conditions of this invention can be further described as follows:
[0027] A certain thickness of pillar needs to be left between the mining areas. After the mining is completed, the mining areas need to be backfilled to prevent the sidewalls from collapsing and causing rock bursts that could pose a safety hazard.
[0028] The mining area is 40-60m high and 20-60m long.
[0029] The drilling method adopts a downward "I" shaped arrangement of blast holes (5). The ore is broken off by loosening blasting. The hole spacing of the blasting is 0.5-0.7 times that of conventional blasting, and the charge is 35%-50% of the conventional blasting charge. This method can break off the ore and reduce the damage of blasting vibration to the upper and lower walls of the ore body.
[0030] The shaped charge blasting involves filling the shaped charge tube with emulsion explosive and then inserting it into the borehole (5) for detonation. The energy generated by the blasting forms a high-speed shock wave jet in the direction of the shaped charge groove, increasing the blasting shock wave in the direction of the shaped charge groove. This can increase the blasting effect on the broken ore body (10) and reduce the damage to the upper and lower plates of the ore body.
[0031] The segmented drilling tunnel (11) is filled with a shaped charge tube containing emulsion explosives. The inter-hole micro-delay detonator is used for inter-hole micro-delay detonation, which can significantly reduce the amount of explosives detonated at the same time. The blasting vibration can be more dispersed in time and space, and the damage of the blasting vibration to the upper and lower walls of the ore body can also be reduced. The inter-hole micro-delay blasting arrangement takes the lower vein tunnel (12) as the free surface, and so on. The micro-delay time is 25 to 50 milliseconds.
[0032] The shaped charge tube is prepared in advance, and tied to the flexible rod in sections at certain intervals. The direction of the shaped charge groove is parallel to the bottom plate away from the ore body and connected by detonating cord. The whole tube is inserted into the hole according to the direction of the shaped charge groove before detonation.
[0033] The spacing between the rows of blast holes (5) is 1.0 to 1.4 m. The hole spacing of blast holes (5) is equal to the thickness of the ore body. The hole diameter is 50 to 70 mm and the hole depth is 8 to 15 m. In addition, casing is used to protect the blast holes (5) as appropriate according to the on-site construction conditions.
[0034] The mining area requires the use of remote-controlled shovels to ensure the safety of personnel and equipment. After mining is completed, the resulting voids are filled.
[0035] Example
[0036] A mining company's gold-producing metal mine has a highly fractured ore body and hanging wall, making mining and cutting difficult and requiring support. Mining the ore blocks is challenging because the hanging wall and ore body are both unstable. Using conventional ore-holding methods, the exposed area of the mining face gradually increases as the mining face advances, making it difficult to guarantee the safety of the mining operation.
[0037] Using the method of the present invention, such as Figures 1-3As shown, the broken ore body (10) is taken as the target for mining. Sectional roadways (1) and ore access roads (2) are constructed at the bottom of the mining area as the channels for ore extraction. A mining ramp (9) is constructed outside the vein in the footwall of the mining area. The ramp connecting roadway (4) passes through the footwall and footwall of the ore body and connects with the broken ore body (10). A vein roadway (12) is constructed at the bottom of the mining area through the ramp connecting roadway. In the middle of the mining area, a section rock drilling roadway (11) is constructed near the footwall of the ore body through the ramp connecting roadway. To create a complete drilling operation space and ventilation circuit in the mining area, deep sub-sections are constructed near the footwall boundary of the ore body in the sub-section drilling roadway (11). Targeted explosive charges are loaded into the deep holes. Using the vein roadway (12) and the sub-section drilling roadway (11) as free faces, loosening blasting is used to break down the fractured ore body (10). The ore that falls is left in the stope using the ore-holding method before the previous sub-section blasting to protect the hanging wall and prevent it from collapsing. As ore dilution increases, after the mining is completed, the ore in the mining area will be released evenly at once and transported out through the ore pass (3); a certain thickness of pillar needs to be left between mining areas, and the mining area needs to be backfilled after mining is completed to avoid the collapse of the mining sidewalls and the formation of rock bursts that could cause safety hazards; the mining area is 40-60m high and 20-60m long, and can be adjusted according to the actual production situation; the drilling hole layout is a downward "I" shaped hole layout, and the ore is extracted using a loose drilling method. Dynamic blasting is used to cavitate ore. The hole spacing is generally 0.5-0.7 times that of conventional blasting, and the charge is generally 35%-50% of that in conventional blasting. This blasting method can both achieve ore caving and reduce the damage to the hanging wall and footwall of the ore body caused by blasting vibration. Targeted blasting uses a simple shaped charge device. The emulsion explosive is filled into the shaped charge device before being inserted into the borehole for detonation. The shaped charge device is mainly formed by a PVC shaped charge tube and includes three shaped charge slots (see...). Figure 6 The energy generated by the blast forms a high-speed shock wave jet in the direction of the shaped charge groove, increasing the blast shock wave in that direction. This enhances the blasting effect on the fractured ore body and reduces damage to the hanging wall and footwall of the ore body. In segmented drilling roadways, shaped charge explosives are loaded into the holes, and micro-delay detonators are used for inter-hole micro-delay sequential detonation. This sequential detonation technique significantly reduces the amount of explosives detonated simultaneously, and the blasting vibrations are more dispersed in time and space, reducing the damage to the hanging wall and footwall of the ore body. The inter-hole micro-delay blasting arrangement is based on the lower vein roadway as the free surface, and so on. The micro-delay time is generally 25-50 milliseconds. The pre-prepared shaped charge explosives are tied to flexible rods at certain intervals. Figure 7The blasting system, connected by detonating cord, is installed into the borehole according to the direction of the shaped charge (which should be parallel to and away from the footwall of the ore body) before detonation. The spacing between blast holes is 1.0–1.4 m, the hole spacing is equal to the ore body thickness, the hole diameter is 50–70 mm, and the hole depth is 8–15 m. Depending on the on-site construction conditions, casing is used as needed to protect the blast holes from damage. A remote-controlled loader is used for ore extraction in the mining area to ensure the safety of personnel and equipment. After ore extraction is completed, the resulting voids are filled.
[0038] As described above, the present invention can be well implemented. The above embodiments are only the best implementations of the present invention, but the implementation of the present invention is not limited to the above embodiments. Other changes, modifications, substitutions, combinations, and simplifications made without departing from the spirit and principle of the present invention should be considered equivalent substitutions and are all included within the protection scope of the present invention.
Claims
1. A method for mining steeply inclined, fractured ore bodies using deep-hole loosening and shaped charge blasting followed by backfilling, characterized in that... The broken ore body (10) is taken as the target for mining. The bottom of the mining area is constructed with segmented roadways (1), ore exit roadways (2) and ore loading cross-sections (6) as the channels for ore extraction. The mined ore is transported out through stage transport roadways (7). A mining ramp (9) is constructed outside the vein in the footwall of the mining area. The ramp connecting roadway (4) passes through the footwall and footwall of the ore body and connects with the broken ore body (10). The bottom of the mining area is constructed with a vein roadway (12) through the ramp connecting roadway (4). In the middle of the mining area, a segmented drilling roadway (11) is constructed near the footwall of the ore body through the ramp connecting roadway (4) to form a complete drilling operation space and ventilation circuit in the mining area. Downward segmented blast holes are constructed near the footwall boundary of the ore body in the segmented drilling roadway (11). The blast holes are arranged in a downward "I" shape (5). The ore is broken off by loosening blasting, with a spacing of 1.0 to 1.4 m. (5) The hole spacing is the thickness of the ore body, the hole diameter is 50-70mm, the hole depth is 8-15m, and a shaped charge tube made of PVC material containing three shaped charge slots is installed in the blast hole. Explosive cartridges are loaded into the shaped charge tube for shaped charge blasting. The shaped charge tube is tied to the soft rod in sections at a certain distance. The direction of the shaped charge slot is parallel to the footwall away from the ore body and connected by detonating cord. The whole tube is loaded into the hole according to the direction of the shaped charge slot and then detonated. The vein roadway (12) and the section drilling roadway (11) are the free surfaces. The broken ore body (10) is collapsed by loosening blasting. The collapsed ore is left in the stope by the ore retention method before the previous section blasting to protect the hanging wall and prevent the hanging wall from collapsing and increasing the ore dilution. After the mining is completed, the ore in the mining area is released evenly at once and transported out through the chute (3). Then it is filled to form a filling body (8).
2. The method according to claim 1, characterized in that: A certain thickness of pillars should be left between the mining areas to be filled after the mining is completed, in order to prevent the sidewalls of the mining area from collapsing and causing rock bursts that could pose a safety hazard.
3. The method according to claim 1 or 2, characterized in that: The mining area is 40-60m high and 20-60m long.
4. The method according to claim 1, characterized in that: The shaped charge blasting involves filling the shaped charge tube with emulsion explosive and then inserting it into the borehole (5) for detonation. The energy generated by the blasting forms a high-speed shock wave jet in the direction of the shaped charge groove, increasing the blasting shock wave in the direction of the shaped charge groove.
5. The method according to claim 1, characterized in that: The segmented rock drilling tunnel (11) is filled with a shaped charge tube containing emulsion explosives. The micro-delay detonator is used for inter-hole micro-delay detonation, with a micro-delay time of 25 to 50 milliseconds.
6. The method according to claim 1, characterized in that: Use casing to protect the blast holes as needed based on the on-site construction conditions (5).
7. The method according to claim 1, characterized in that: The mining area requires the use of remote-controlled shovels to ensure the safety of personnel and equipment. After mining is completed, the resulting voids will be filled in.
Citation Information
Patent Citations
Method for exploiting steeply-inclined thin ore veins
CN107829739A
Deep-hole mining method for thin-vein steeply dipping ore bodies
CN110905509B
Mining method for steep narrow vein tungsten ore body with unstable surrounding rock
CN111042818A
Mechanized filling mining method for steeply inclined thin vein under soft rock stratum condition
CN112727463A
Medium-length hole shrinkage caving mining method for steeply-inclined thin-to-medium-thickness broken ore body
CN115539042A