Image realization control method and system based on the fusion of BIM and GIS engine

By establishing a unified data platform in construction project management and using multi-level shelling and section filling algorithms to process BIM models, we solve the problem of combining BIM and GIS engines, achieve efficient loading and smooth display of BIM models, and support refined management and geography. Location information operation improves the management efficiency of construction projects.

CN118037948BActive Publication Date: 2024-10-25SOUTHWEST DESIGN & RES INST OF CIVIL AVIATION AIRPORT CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311872445.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-25
Estimated Expiration
2043-12-29

AI Technical Summary

Technical Problem

In the existing technology, BIM and GIS engines are not effectively combined, resulting in the inability to achieve refined management of 3D models and complete display of geographical location information in construction project management, resulting in uncontrollable data conversion quality and the need for system development interfaces, which affects the construction Project decision support and operation and maintenance management.

Method used

By establishing a unified data platform, multi-level shelling algorithms are used to process BIM models, including model segmentation, primary shelling, multi-level refinement, level of detail management and LOD management. Combined with the section filling algorithm, the integration of BIM and GIS data is realized. Fusion and visual rendering ensure data fluency and accuracy.

Benefits of technology

It successfully solved the problems of model browsing delays, freezes and flashes, improved the loading efficiency and fluency of BIM models, realized the integration of business functions of BIM and GIS engines, supported refined management and business operations of geographical location information, and improved Management efficiency of construction projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118037948B_ABST
    Figure CN118037948B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of image processing technology, and relates to an image realization control method and system based on the fusion of BIM and GIS engine. The method includes processing BIM model, establishing a unified data platform, and associating the building model information in the BIM model with the geographical location information in the GIS model; the processing of the BIM model includes the model segmentation stage, the primary shell extraction stage, the multi-level refinement stage, the detail level management stage, the LOD management stage and the visual rendering stage. The present invention adopts a multi-level shell extraction algorithm to improve the fluency of BIM model data, so that the model can be displayed completely and smoothly; the business functions of the BIM engine and the GIS engine are integrated, and the user can perform the geographical location information business function operation on the construction project through the GIS engine, and view the building information through the BIM engine model information on the fusion platform to achieve refined management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of image processing, and in particular, relates to an image realization control method and system based on the fusion of BIM and GIS engine. Background Art

[0002] BIM (Building Information Modeling) is a building model based on various relevant information data of construction projects. It simulates the real information of buildings through digital information simulation. It is an integrated process built on the basis of design, construction, operation coordination and project information. By using BIM, unified information can be innovated, designed and drawn out of the project throughout the process. It can also be better communicated through realistic simulation and architectural visualization, so that all parties involved in the project can understand the basic information of the project such as construction period, real-time on-site conditions, cost and environmental impact.

[0003] GIS (Geographic Information System or Geo-Information system) is a spatial information system. It is a technical system that collects, stores, manages, calculates, analyzes, displays and describes the geographical distribution data in the whole or part of the earth's surface (including the atmosphere) with the support of computer hardware and software systems.

[0004] Currently, there is no good combination of GIS and BIM engines on the market. In the field of construction projects, we not only need to display and integrate the geographic location information of the GIS large scene, but also need to refine BIM to solve some cost estimation and three-dimensional business operations, such as collision detection and viewing the geographic location information around the project BIM.

[0005] (1) Most of the market is based on separate BIM and GIS engines, without combining the two to display and standardize business;

[0006] (2) BIM needs to be combined with 3D GIS. In the process of construction project management, especially in infrastructure construction, such as roads, tunnels, and bridges, the application of BIM technology often needs to exchange information in combination with topography. The entire life cycle of BIM, from design, construction to operation and maintenance, is aimed at the BIM monomer refined model, but it is impossible to separate it from the surrounding macro-geographical environment elements. 3D GIS has been committed to the research of macro-geographical environment, providing various spatial query and spatial analysis functions, and in the operation and maintenance stage of BIM, 3D GIS can provide decision support for it. Therefore, BIM needs 3D GIS;

[0007] (3) 3D GIS needs to be combined with BIM. For 3D GIS, BIM data is another important data source for 3D GIS, which can enable 3D GIS to move from macro to micro and realize refined management. On the other hand, the integration with BIM data enables 3D GIS to move from outdoor to indoor and realize integrated indoor and outdoor management. In the overall construction project management, it plays a huge role in decision-making support from the overall planning and design and construction.

[0008] At present, the mainstream BIM engines on the market are all independently integrated with business and engine display, and are not well integrated with BIM data for display. For example, most GIS geographic location information of U3D and Unity engines is missing, and the business is independently developed on GIS system, and there is no integration of 3D BIM design, construction, completion and operation and maintenance data to assist construction project management.

[0009] At present, there are two main ways to integrate BIM and GIS data. One is to organize the data of BIM models according to the IFC (Industry Foundation Classes) standard through an intermediate interactive format, or convert it into a format supported by mature 3D engines such as OBJ, DirectX, and OSG, and the GIS system can read it directly. The advantage is that the conversion is simple. Generally, BIM software supports the export of data in IFC, OBJ and other formats, and the ready-made conversion interface can be used directly. The disadvantage is that there is data loss and the quality of data conversion is uncontrollable. The other is to use plug-ins to call the data interface provided by the platform for secondary development from the bottom layer to achieve the integration of BIM and GIS data. The advantage of this method is that the quality of data conversion is controllable and the data can meet the application requirements of engineering projects. The disadvantage is that a set of interface tools need to be developed for different GIS platforms, and there must be sufficient understanding of the data structure of BIM and GIS platforms, and a complete set of system development is required. Summary of the invention

[0010] In order to solve the above technical problems, the present invention provides an image realization control method and system based on the fusion of BIM and GIS engine.

[0011] In a first aspect, the present invention provides an image realization control method based on the fusion of BIM and GIS engine, including processing the BIM model, establishing a unified data platform, and associating the building model information in the BIM model with the geographic location information in the GIS model;

[0012] Processing of BIM models, including:

[0013] Model segmentation stage, primary shelling stage, multi-level refinement stage, detail level management stage, LOD management stage and visual rendering stage;

[0014] The model segmentation phase includes:

[0015] Divide the original BIM model into a number of first geometric units;

[0016] A primary shelling algorithm is used for each first geometric unit to remove local details of the 3D BIM model and the internal structure of the 3D BIM model, retaining key shapes and volumes;

[0017] The three-dimensional BIM model after primary shell extraction is divided again to obtain a number of second geometric units;

[0018] Primary shelling stage: each second geometric unit is simplified using an iterative shelling algorithm to retain key detail parameters;

[0019] Multi-level refinement stage:

[0020] Classify detail parameters according to importance and level, formulate evaluation criteria for detail parameters, and the evaluation criteria are used to define the importance of detail parameters;

[0021] Establishing several hierarchical classifications of detail parameters according to their importance;

[0022] Detail level management stage: the level classification of detail parameters is sorted according to importance and functionality. The higher the level classification of detail parameters, the stronger the importance and functionality of the detail parameters, and vice versa.

[0023] LOD management stage: geometric parameter data is allocated to the hierarchical classification of detail parameters to describe the geometric complexity of the hierarchical classification of detail parameters;

[0024] LOD allocation is performed according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy. The viewpoint distance allocation strategy allocates LOD based on the distance between the observer and the model. The outermost components of each division level are rendered in color to generate the shell corresponding to each division level, thereby obtaining the LOD structure.

[0025] Visualization rendering stage: Visualize the input data of the BIM model based on the LOD structure.

[0026] In a second aspect, the present invention provides an image realization control system based on the fusion of BIM and GIS engine, including:

[0027] The data platform is used to associate the building model information in the BIM engine with the geographic location information in the GIS engine; the data platform includes a BIM model processing unit, which is used to process the BIM model;

[0028] The BIM model processing unit includes a model segmentation unit, a primary shell extraction unit, a multi-level refinement unit, a detail level management unit, a LOD management unit and a visual rendering unit;

[0029] Model segmentation unit, used to:

[0030] Divide the original BIM model into a number of first geometric units;

[0031] A primary shelling algorithm is used for each first geometric unit to remove local details of the 3D BIM model and the internal structure of the 3D BIM model, retaining key shapes and volumes;

[0032] The three-dimensional BIM model after primary shell extraction is divided again to obtain a number of second geometric units;

[0033] Primary shell element, used to: simplify each second geometry element using an iterative shelling algorithm, retaining key detail parameters;

[0034] Multi-level refinement elements for:

[0035] Classify detail parameters according to importance and level, formulate evaluation criteria for detail parameters, and the evaluation criteria are used to define the importance of detail parameters;

[0036] Establishing several hierarchical classifications of detail parameters according to their importance;

[0037] The detail level management unit is used to: sort the level classification of the detail parameters according to importance and functionality. The higher the level classification of the detail parameters, the stronger the importance and functionality of the detail parameters, and vice versa.

[0038] The LOD management unit is used to: allocate geometric parameter data to the hierarchical classification of detail parameters, so as to describe the geometric complexity of the hierarchical classification of detail parameters;

[0039] LOD allocation is performed according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy. The viewpoint distance allocation strategy allocates LOD based on the distance between the observer and the model. The outermost components of each division level are rendered in color to generate the shell corresponding to each division level, thereby obtaining the LOD structure.

[0040] The visualization rendering unit is used to: perform visualization rendering on the input data of the BIM model according to the LOD structure.

[0041] Based on the above technical solution, the present invention can also be improved as follows.

[0042] Furthermore, local details include preset components and equipment, surface textures smaller than the set size, surface materials, redundant attributes and parameters, redundant document links, and geometric features; key detail parameters include the building's key geometric information, components and equipment, room layout and functional zoning, important attributes and parameters, connection relationships, main appearance and decoration, and key timing and progress information.

[0043] Furthermore, the method also includes processing the surface of the three-dimensional BIM model using a section filling algorithm, including viewpoint setting, section generation, contour filling, multi-section synthesis and rendering display:

[0044] Viewpoint setting includes: determining the observation point, i.e., the viewing position, according to the coordinates of the observer in the three-dimensional scene, and then determining the observation direction according to the direction of the observer's viewpoint toward the observation point;

[0045] Cross-section generation includes: projecting the three-dimensional object onto a plurality of parallel cross-sections according to the viewpoint direction, and generating cross-section profiles of the plurality of parallel cross-sections in the viewpoint direction;

[0046] Contour filling, including: performing solid filling operation on the contour of each section;

[0047] Multi-section synthesis, including: sorting the depth buffer of the filling results on each section, rendering all the sections to be synthesized into the depth buffer, and sorting the depth information; after the depth sorting, drawing the sections in depth order; sequentially synthesizing the sections arranged in depth order together to form an image with a solid surface texture;

[0048] Rendering and displaying, including: rendering and displaying the synthesized image to present a solid filling effect of the three-dimensional object when observed from different viewing angles.

[0049] Furthermore, a solid filling operation is performed on the contour of each cross section, including: using a depth buffer algorithm to fill the internal area according to the geometric information of the contour.

[0050] Furthermore, a depth buffer algorithm is used to fill the internal area according to the geometric information of the contour, including:

[0051] Allocate a pixel frame buffer the same size as the drawing screen;

[0052] In cross-section mode, draw the front side of the model once, fill each pixel position on the screen with the pixel point of the front side, and increase the corresponding value by 1;

[0053] In cross-section mode, draw the reverse side of the model once, fill each pixel position on the screen with the reverse pixel point, and reduce the corresponding value by 1;

[0054] Draw the model and compare each pixel with A. If the value is 0, the number of front and back sides is the same. If the value is greater than 0, it is the front side and no filling is required. If it is a negative number, the back side is exposed and needs to be filled. Set the position as the fill color.

[0055] Furthermore, LOD allocation is performed according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy. The principle of the viewpoint distance allocation strategy is to allocate LOD based on the distance between the observer and the model. The farther the distance between the observer and the model, the lower level LOD is used; the closer the distance between the observer and the model, the higher level LOD is used.

[0056] Furthermore, before the model segmentation stage, data organization, data storage, and data expression are unified;

[0057] Unified data organization, including: establishing mappings between layers and layers, reference files and feature sets, and assembly files and files between BIM models and GIS models;

[0058] Unified data storage, including: unified storage of BIM model structured and unstructured data;

[0059] Unified data expression, including: using mapping to represent local materials of BIM models and GIS models.

[0060] The beneficial effects of the present invention are as follows: the present invention adopts a multi-level shell extraction algorithm, which successfully solves the problems of delay, freeze, flash and lazy loading during model browsing, so that even in a large scene, the amount of cached data can be effectively reduced, the fluency of BIM model data is greatly improved, and the loading efficiency is greatly improved, so that the model can be displayed completely and smoothly; by supporting the business development integration of BIM engine functions, the BIM model is loaded into the GIS engine scene, and the business functions of the BIM engine and the GIS engine are integrated. Users can use the GIS engine to perform geographic location information business function operations on construction projects, and view building information through BIM engine model information on the fusion platform to achieve refined management. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 A flowchart of processing a BIM model provided in Embodiment 1 of the present invention;

[0062] Figure 2 A specific flow chart for processing a BIM model provided in Example 1 of the present invention;

[0063] Figure 3 A flow chart of processing a three-dimensional BIM model using a section filling algorithm provided in Example 1 of the present invention;

[0064] Figure 4This is a schematic diagram of a BIM model processing unit provided in Example 2 of the present invention. DETAILED DESCRIPTION

[0065] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0066] Example 1

[0067] As an example, Figure 1 As shown, in order to solve the above technical problems, this embodiment provides an image realization control method based on the fusion of BIM and GIS engine, including processing the BIM model, establishing a unified data platform, and associating the building model information in the BIM model with the geographical location information in the GIS model;

[0068] Processing of BIM models, including:

[0069] Model segmentation stage, primary shell extraction stage, multi-level refinement stage, detail level management stage, LOD management stage and visual rendering stage; the specific process is as shown in the attached Figure 2 shown.

[0070] The model segmentation phase includes:

[0071] Divide the original BIM model into a number of first geometric units;

[0072] A primary shelling algorithm is used for each first geometric unit to remove local details of the 3D BIM model and the internal structure of the 3D BIM model, retaining key shapes and volumes;

[0073] The three-dimensional BIM model after primary shell extraction is divided again to obtain a number of second geometric units;

[0074] Primary shelling stage: each second geometric unit is simplified using an iterative shelling algorithm, retaining key detail parameters; each geometric unit is applied with a primary shelling algorithm to remove some details of the 3D BIM model and the internal structure of the 3D BIM model, retaining the main shape and volume; the removed details and internal structures include: secondary components and equipment, local details, etc. Optionally, local details include preset components and equipment, surface textures smaller than the set size, as well as surface materials, redundant attributes and parameters, redundant document links, and geometric features; key detail parameters include key geometric information of the building, components and equipment, room layout and functional zoning, important attributes and parameters, connection relationships, main appearance and decoration, key timing and progress information.

[0075] The specific contents of local details are as follows:

[0076] (1) Small components or details: such as carvings, decorations, small pipes, small beams or columns on buildings;

[0077] (2) Surface textures and subtle geometric features of buildings: such as textures on walls, small patterns on floors, tiles on roofs, etc.

[0078] (3) Equipment and devices inside the building: such as elevators, stairs, piping systems, etc.

[0079] (4) Fine structural elements: such as small supporting structures, connectors, small equipment, etc.

[0080] By using the primary shelling algorithm, these details will be simplified or removed, thereby reducing the complexity of the model, improving computational efficiency, and reducing the amount of data storage. Ultimately, the key shapes and overall volumes of buildings or objects are retained to meet the needs of specific applications. The effect is more prominent in applications such as large-scale urban modeling or performance analysis.

[0081] Multi-level refinement stage:

[0082] Classify detail parameters according to importance and level, formulate evaluation criteria for detail parameters, and the evaluation criteria are used to define the importance of detail parameters;

[0083] Establishing several hierarchical classifications of detail parameters according to their importance;

[0084] In the multi-level refinement stage, the BIM model after primary shelling is divided again to obtain smaller geometric units, and an iterative shelling algorithm is applied to each small geometric unit. The iterative shelling algorithm is to repeat the shelling process multiple times, each time using the previous shelling process for iterative shelling, and gradually reduce the clipping ratio in each new iteration process, so as to clip the model in a smaller range, so as to retain the main details and simplify the model. The main details to be retained include but are not limited to: key geometric information, main components and equipment, room layout and functional division, important attributes and parameters, connection relationships, main appearance and decoration, key timing and progress information, etc.

[0085] Detail level management stage: The level classification of detail parameters is sorted according to importance and functionality. The higher the level classification of detail parameters, the stronger the importance and functionality of detail parameters, and vice versa. The detail level management stage first classifies details according to their importance and level, such as main structure, secondary structure, decorative surface layer, decorative texture, etc., and then formulates evaluation standards based on geometric complexity, functionality, contribution to the overall structure, etc., and defines the importance of details according to the evaluation standards to achieve the purpose of establishing different detail levels. The established detail level is divided into multiple detail levels according to the evaluation standards. Each detail level decreases layer by layer according to importance, functionality, etc. The higher the level of detail, the stronger its importance and functionality, and the lower its geometric complexity. The lower the level of detail, the higher its geometric complexity, but the lower its importance and functionality. Then, according to user needs and display requirements, dynamically switch to the corresponding detail level.

[0086] LOD management stage: geometric parameter data is allocated to the hierarchical classification of detail parameters to describe the geometric complexity of the hierarchical classification of detail parameters;

[0087] LOD allocation is performed according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy. The principle of the viewpoint distance allocation strategy is to allocate LOD based on the distance between the observer and the model; the outermost components of each division level are rendered in color to generate the shell corresponding to each division level to obtain the LOD structure.

[0088] Specifically, in the LOD management stage, firstly, the corresponding model geometry data is allocated through the detail level classification determined in the detail level management stage, such as the lower the detail level, the higher the complexity of the geometry parameters; secondly, LOD allocation according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy can achieve the best display effect at different distances. The viewpoint distance allocation principle allocates LOD based on the distance between the observer and the model. The farther the distance, the lower the LOD level is used; the closer the distance, the higher the LOD level is used.

[0089] Visualization rendering stage: Visualize the input data of the BIM model based on the LOD structure.

[0090] Apply rendering methods such as LOD rendering and frustum culling to optimize the visualization of the model and ensure smooth display at various viewing angles and distances.

[0091] In practical application, multi-level refinement, detail level management and LOD management are the key steps of the multi-level shelling algorithm. The specific process is as follows:

[0092] Multi-level refinement: traverse the vertices of all building components in the BIM data and determine the octree boundary through the vertices;

[0093] Calculate the maximum division level of the octree, and use the octree algorithm to divide the BIM space boundary into different levels according to the maximum division level of the BIM model richness, obtain a number of space units corresponding to each division level from the BIM model level to 0, and associate the BIM building components with the model space units;

[0094] Detail level management: determine the outermost space unit corresponding to each BIM model division level, and record the building components associated with the outermost space unit as the outermost components;

[0095] LOD management: color rendering is performed on each outermost component of each division level, a rough shell corresponding to the division level is generated, an octree LOD structure is obtained, and visual rendering of the BIM data is performed based on the LOD structure.

[0096] The multi-level shell extraction algorithm solves the problem of lightweight BIM models. The algorithm that uses graphics to process the surface of three-dimensional models, such as the section filling algorithm, can obtain better BIM model effects without affecting the fluency:

[0097] The multi-level shell extraction algorithm removes redundant details and hierarchical information in the model in an orderly manner. The algorithm allows users to load data at a specific level on demand, successfully avoiding problems such as traditional models being too large, slow loading speeds, and model freezes. It not only achieves efficient data management in the BIM workflow, but also provides users with a smoother and faster model interaction experience, further enhancing the practicality of BIM technology in architectural design and planning. By reducing the volume of cached data, the multi-level shell extraction algorithm not only improves efficiency, but also brings a more lightweight and flexible operating environment to the application of BIM models.

[0098] Optional, as attached Figure 3 As shown, the surface of the 3D BIM model is processed using a section filling algorithm, including viewpoint setting, section generation, contour filling, multi-section synthesis and rendering display:

[0099] Viewpoint setting includes: determining the observation point, i.e., the viewing position, according to the coordinates of the observer in the three-dimensional scene, and then determining the observation direction according to the direction of the observer's viewpoint toward the observation point;

[0100] Cross-section generation includes: projecting the three-dimensional object onto a plurality of parallel cross-sections according to the viewpoint direction, and generating cross-section profiles of the plurality of parallel cross-sections in the viewpoint direction;

[0101] Contour filling, including: performing solid filling operation on the contour of each section;

[0102] Multi-section synthesis, including: sorting the depth buffer of the filling results on each section, rendering all the sections to be synthesized into the depth buffer, and sorting the depth information; after the depth sorting, drawing the sections in depth order; sequentially synthesizing the sections arranged in depth order together to form an image with a solid surface texture;

[0103] Rendering and displaying, including: rendering and displaying the synthesized image to present a solid filling effect of the three-dimensional object when observed from different viewing angles.

[0104] Optionally, a solid filling operation is performed on the contour of each cross section, including: using a depth buffer algorithm to fill the internal area according to the geometric information of the contour.

[0105] The depth buffer algorithm is used in the contour filling stage. By processing the depth information, it can very effectively handle the occlusion relationship, achieve realistic visualization effects, and achieve good object texture and surface feel, which is especially suitable for complex 3D scene rendering.

[0106] Optionally, a depth buffer algorithm is used to fill the internal area based on the geometric information of the outline, including:

[0107] Allocate a pixel frame buffer the same size as the drawing screen;

[0108] In cross-section mode, draw the front side of the model once, fill each pixel position on the screen with the pixel point of the front side, and increase the corresponding value by 1;

[0109] In cross-section mode, draw the reverse side of the model once, fill each pixel position on the screen with the reverse pixel point, and reduce the corresponding value by 1;

[0110] Draw the model and compare each pixel with A. If the value is 0, the number of front and back sides is the same. If the value is greater than 0, it is the front side and no filling is required. If it is a negative number, the back side is exposed and needs to be filled. Set the position as the fill color.

[0111] Optionally, LOD allocation is performed according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy. The principle of the viewpoint distance allocation strategy is to allocate LOD based on the distance between the observer and the model. The farther the distance between the observer and the model, the lower level LOD is used; the closer the distance between the observer and the model, the higher level LOD is used.

[0112] In actual application, the CAD platform and GIS platform used by BIM data have great differences in data expression, organization and management methods.

[0113] Optionally, unify data organization, data storage, and data representation before the model segmentation phase;

[0114] Unified data organization, including: establishing mappings between layers and layers, reference files and feature sets, and assembly files and files between BIM models and GIS models;

[0115] BIM data manages elements in layers. A layer can contain elements of multiple data types. A file consists of multiple layers. In addition, multiple files can be referenced to form an assembly file. GIS data manages features in layers. A layer can only contain features of one data type. Multiple types of features are managed through feature sets. A file can consist of multiple feature sets. Since BIM data can be referenced at multiple levels, by establishing layer-layer, reference file-feature set, and assembly file-file mappings, it can ensure that data is extracted to the lowest level and that the layer relationship is correct after conversion.

[0116] Unified data storage, including: unified storage of BIM model structured and unstructured data;

[0117] In actual application, BIM models generally store geometry and attributes in the same file, while GIS software generally stores geometry and attributes separately. In addition, there will be relevant definition files for geographic coordinate information, but BIM models generally do not have geographic coordinate information definitions. The color, line width, symbol, transparency, etc. of the BIM model are expressed through attributes, while these attributes in the GIS platform are generally expressed in a symbolic way. For multiple similar elements, the BIM model reduces data storage and speeds up rendering by sharing units, while the GIS platform needs to instantiate and express them one by one. For structured and unstructured data, BIM generally uses separate storage, while the GIS platform uses relational database storage, so it is necessary to uniformly store the structured and unstructured data of the BIM model.

[0118] Unified data expression, including: using mapping to represent local materials of BIM models and GIS models.

[0119] In actual application, the basic units of elements in BIM data are points, units, lines, surfaces, bodies, etc., especially in three-dimensional expression, various bodies can be used to express complex three-dimensional entities, such as rotating bodies, bodies with chamfers, parametric entities, etc. The three-dimensional elements in BIM data are uniformly expressed as Mesh, so the data is discretized. In order to control the data conversion loss to the greatest extent and ensure the operating efficiency of the GIS platform, it is necessary to perform precision control during data conversion. For example, when an original cylinder is converted into Mesh, it is set to 96, 48, 24 or 8 nodes at different levels. Under the GIS platform, different display levels are used for different scales.

[0120] For the expression of texture, BIM data generally uses mapping to represent the local material of the model. Under the GIS platform, in addition to mapping, orthophotos can also be used to represent a large range of surface textures.

[0121] Without lightweight processing using shell extraction technology, large-volume BIM models often experience delays, freezes, flashes, and lazy loading during loading, resulting in low loading efficiency and incomplete model display. After adopting multi-level shell extraction technology, the delays, freezes, flashes, and lazy loading during model browsing have been successfully solved, so that even in large scenes (large scenes refer to the overall plan scenes composed of many models, such as the entire airport scene, which is composed of many models such as enclosures, pavement projects, drainage projects, signs and markings, slope support, etc.), the model can be displayed completely and smoothly, greatly improving loading efficiency. The use of BIM multi-level shell extraction algorithm can effectively reduce the amount of cached data and greatly improve the fluency of BIM model data.

[0122] The BIM engine's three-dimensional BIM image is parametrically displayed, the geometric data of the component graphics is calculated, and the points, surfaces, and lines are calculated in advance to obtain the structure and component attribute data; it can support multiple image data formats such as IFC, OBJ, DAE, FBX, 3DS, 3DXML, STL, and terrain data formats: b3dm, glTF, glb, bgltf, pnts, Geojson, png, wms, kml, CZML.

[0123] The present invention integrates the building model information in the BIM engine with the geographic location information in the GIS engine by establishing a unified data platform, and ensures the interoperability between the BIM model and the GIS model by processing the BIM model. Users can view and edit the geographic location information of the building project through the GIS model to ensure that the building is accurately located in the geographic space. Secondly, in the platform, through the BIM model, users can access detailed building model information, including building structure, equipment distribution, etc. This enables users to view the internal and external structures of the building in three-dimensional space; through virtual reality or augmented reality technology, users can more intuitively understand the design and layout of the building. For example, the geographic location information marked by the user in the GIS engine can be associated with the corresponding building model information in the BIM engine. In this way, not only can the location of the building be seen on the map, but also detailed information related to the location can be viewed through the BIM engine. In the maintenance and management stage, through the fusion platform, users can quickly locate the problem area and formulate a maintenance plan based on the information of the BIM engine.

[0124] By supporting the business development integration of BIM engine functions, the BIM model is loaded into the GIS engine scene, and the business functions of the BIM engine and GIS engine are integrated into a system platform. On the platform, users can use the GIS engine to perform geographic location information business function operations on construction projects, such as digging holes, measuring, and GIS roaming to perform one-step design management of the surrounding environment and location information of the project. On the fusion platform, click on the BIM engine model information to view the building information and achieve refined management. The building information of the design and construction stage and the completion and operation and maintenance stage of the building BIM model is comprehensively managed in the fusion scene, which can well assist the project construction and operation and maintenance management for the internal management of the project, whether it is the building equipment itself or the construction and design process.

[0125] Example 2

[0126] Based on the same principle as the method shown in Example 1 of the present invention, as shown in the attached Figure 4 As shown, the embodiment of the present invention also provides an image realization control system based on the fusion of BIM and GIS engine, including:

[0127] The data platform is used to associate the building model information in the BIM engine with the geographic location information in the GIS engine; the data platform includes a BIM model processing unit, which is used to process the BIM model;

[0128] The BIM model processing unit includes a model segmentation unit, a primary shell extraction unit, a multi-level refinement unit, a detail level management unit, a LOD management unit and a visual rendering unit;

[0129] Model segmentation unit, used to:

[0130] Divide the original BIM model into a number of first geometric units;

[0131] A primary shelling algorithm is used for each first geometric unit to remove local details of the 3D BIM model and the internal structure of the 3D BIM model, retaining key shapes and volumes;

[0132] The three-dimensional BIM model after primary shell extraction is divided again to obtain a number of second geometric units;

[0133] Primary shell element, used to: simplify each second geometry element using an iterative shelling algorithm, retaining key detail parameters;

[0134] Multi-level refinement elements for:

[0135] Classify detail parameters according to importance and level, formulate evaluation criteria for detail parameters, and the evaluation criteria are used to define the importance of detail parameters;

[0136] Establishing several hierarchical classifications of detail parameters according to their importance;

[0137] The detail level management unit is used to: sort the level classification of the detail parameters according to importance and functionality. The higher the level classification of the detail parameters, the stronger the importance and functionality of the detail parameters, and vice versa.

[0138] The LOD management unit is used to: allocate geometric parameter data to the hierarchical classification of detail parameters, so as to describe the geometric complexity of the hierarchical classification of detail parameters;

[0139] LOD allocation is performed according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy. The viewpoint distance allocation strategy allocates LOD based on the distance between the observer and the model. The outermost components of each division level are rendered in color to generate the shell corresponding to each division level, thereby obtaining the LOD structure.

[0140] The visualization rendering unit is used to: perform visualization rendering on the input data of the BIM model according to the LOD structure.

[0141] Optionally, local details include preset components and equipment, surface textures smaller than a set size, surface materials, redundant attributes and parameters, redundant document links, and geometric features; key detail parameters include the building's key geometric information, components and equipment, room layout and functional zoning, important attributes and parameters, connection relationships, main appearance and decoration, and key timing and progress information.

[0142] Optionally, the system also includes a section filling processing unit for processing the surface of the three-dimensional BIM model using a section filling algorithm, including viewpoint setting, section generation, contour filling, multi-section synthesis and rendering display:

[0143] Viewpoint setting includes: determining the observation point, i.e., the viewing position, according to the coordinates of the observer in the three-dimensional scene, and then determining the observation direction according to the direction of the observer's viewpoint toward the observation point;

[0144] Cross-section generation includes: projecting the three-dimensional object onto a plurality of parallel cross-sections according to the viewpoint direction, and generating cross-section profiles of the plurality of parallel cross-sections in the viewpoint direction;

[0145] Contour filling, including: performing solid filling operation on the contour of each section;

[0146] Multi-section synthesis, including: sorting the depth buffer of the filling results on each section, rendering all the sections to be synthesized into the depth buffer, and sorting the depth information; after the depth sorting, drawing the sections in depth order; sequentially synthesizing the sections arranged in depth order together to form an image with a solid surface texture;

[0147] Rendering and displaying, including: rendering and displaying the synthesized image to present a solid filling effect of the three-dimensional object when observed from different viewing angles.

[0148] Optionally, a solid filling operation is performed on the contour of each cross section, including: using a depth buffer algorithm to fill the internal area according to the geometric information of the contour.

[0149] Optionally, a depth buffer algorithm is used to fill the internal area based on the geometric information of the outline, including:

[0150] Allocate a pixel frame buffer the same size as the drawing screen;

[0151] In cross-section mode, draw the front side of the model once, fill each pixel position on the screen with the pixel point of the front side, and increase the corresponding value by 1;

[0152] In cross-section mode, draw the reverse side of the model once, fill each pixel position on the screen with the reverse pixel point, and reduce the corresponding value by 1;

[0153] Draw the model and compare each pixel with A. If the value is 0, the number of front and back sides is the same. If the value is greater than 0, it is the front side and no filling is required. If it is a negative number, the back side is exposed and needs to be filled. Set the position as the fill color.

[0154] Optionally, LOD allocation is performed according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy. The principle of the viewpoint distance allocation strategy is to allocate LOD based on the distance between the observer and the model. The farther the distance between the observer and the model, the lower level LOD is used; the closer the distance between the observer and the model, the higher level LOD is used.

[0155] Optionally, unify data organization, data storage, and data representation before the model segmentation phase;

[0156] Unified data organization, including: establishing mappings between layers and layers, reference files and feature sets, and assembly files and files between BIM models and GIS models;

[0157] Unified data storage, including: unified storage of BIM model structured and unstructured data;

[0158] Unified data expression, including: using mapping to represent local materials of BIM models and GIS models.

[0159] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An image control method based on the fusion of BIM and GIS engine, characterized in that: include: Process the BIM model, establish a unified data platform, and associate the building model information in the BIM model with the geographic location information in the GIS model; Processing of BIM models, including: Model segmentation stage, primary shelling stage, multi-level refinement stage, detail level management stage, LOD management stage and visual rendering stage; The model segmentation phase includes: Divide the original BIM model into a number of first geometric units; A primary shelling algorithm is used for each first geometric unit to remove local details of the 3D BIM model and the internal structure of the 3D BIM model, retaining key shapes and volumes; The three-dimensional BIM model after primary shell extraction is divided again to obtain a number of second geometric units; Primary shelling stage: each second geometric unit is simplified using an iterative shelling algorithm to retain key detail parameters; Multi-level refinement stage: Classify detail parameters according to importance and level, formulate evaluation criteria for detail parameters, and the evaluation criteria are used to define the importance of detail parameters; Establishing several hierarchical classifications of detail parameters according to their importance; Detail level management stage: the level classification of detail parameters is sorted according to importance and functionality. The higher the level classification of detail parameters, the stronger the importance and functionality of the detail parameters, and vice versa. LOD management stage: geometric parameter data is allocated to the hierarchical classification of detail parameters to describe the geometric complexity of the hierarchical classification of detail parameters; LOD allocation is performed according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy. The viewpoint distance allocation strategy allocates LOD based on the distance between the observer and the model. The outermost components of each division level are rendered in color to generate the shell corresponding to each division level, thereby obtaining the LOD structure. Visualization rendering stage: Visualization rendering of the input data of the BIM model based on the LOD structure; It also includes the use of section filling algorithms to process the surface of 3D BIM models, including viewpoint setting, section generation, contour filling, multi-section synthesis and rendering display: Viewpoint setting includes: determining the observation point, i.e., the viewing position, according to the coordinates of the observer in the three-dimensional scene, and then determining the observation direction according to the direction of the observer's viewpoint toward the observation point; Cross-section generation includes: projecting the three-dimensional object onto a plurality of parallel cross-sections according to the viewpoint direction, and generating cross-section profiles of the plurality of parallel cross-sections in the viewpoint direction; Contour filling, including: performing a solid filling operation on the contour of each section; performing a solid filling operation on the contour of each section, including: using a depth buffer algorithm to fill the internal area according to the geometric information of the contour; using a depth buffer algorithm to fill the internal area according to the geometric information of the contour, including: allocating a pixel frame buffer of the same size as the drawing screen; in cross-section mode, drawing the front side of the model once, filling each pixel position on the screen with a pixel point on the front side, and adding 1 to the corresponding value; in cross-section mode, drawing the back side of the model once, filling each pixel position on the screen with a pixel point on the back side, and subtracting 1 from the corresponding value; drawing the model, each pixel is compared with A, if the value is 0, the number of front and back sides is the same, if the value is greater than 0, it is the front side and does not need to be filled, if it is a negative number, the back side is exposed outside and needs to be filled, and the position is set to the fill color; Multi-section synthesis, including: sorting the depth buffer of the filling results on each section, rendering all the sections to be synthesized into the depth buffer, and sorting the depth information; after the depth sorting, drawing the sections in depth order; sequentially synthesizing the sections arranged in depth order together to form an image with a solid surface texture; Rendering and displaying, including: rendering and displaying the synthesized image to present a solid filling effect of the three-dimensional object when observed from different viewing angles.

2. According to claim 1, the image realization control method based on the fusion of BIM and GIS engine is characterized in that: Local details include preset components and equipment, surface textures smaller than the set size, and surface materials, redundant attributes and parameters, redundant document links, and geometric features; Key detailed parameters include the building's key geometric information, components and equipment, room layout and functional divisions, important attributes and parameters, connection relationships, main appearance and decoration, and key timing and progress information.

3. According to claim 1, the image realization control method based on the fusion of BIM and GIS engine is characterized in that: LOD allocation is performed according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy. The principle of the viewpoint distance allocation strategy is to allocate LOD based on the distance between the observer and the model. The farther the distance between the observer and the model, the lower level LOD is used; the closer the distance between the observer and the model, the higher level LOD is used.

4. The image realization control method based on the fusion of BIM and GIS engine according to claim 1 is characterized in that: Unify data organization, data storage and data expression before the model segmentation stage; Unified data organization, including: establishing mappings between layers and layers, reference files and feature sets, and assembly files and files between BIM models and GIS models; Unified data storage, including: unified storage of BIM model structured and unstructured data; Unified data expression, including: using mapping to represent local materials of BIM models and GIS models.

5. The image-based control system based on the fusion of BIM and GIS engine is characterized by: include: Data platform, used to associate building model information in the BIM engine with geographic location information in the GIS engine; The data platform includes a BIM model processing unit for processing the BIM model; The BIM model processing unit includes a model segmentation unit, a primary shell extraction unit, a multi-level refinement unit, a detail level management unit, a LOD management unit and a visual rendering unit; Model segmentation unit, used to: Divide the original BIM model into a number of first geometric units; A primary shelling algorithm is used for each first geometric unit to remove local details of the 3D BIM model and the internal structure of the 3D BIM model, retaining key shapes and volumes; The three-dimensional BIM model after primary shell extraction is divided again to obtain a number of second geometric units; Primary shell element, used to: simplify each second geometry element using an iterative shelling algorithm, retaining key detail parameters; Multi-level refinement elements for: Classify detail parameters according to importance and level, formulate evaluation criteria for detail parameters, and the evaluation criteria are used to define the importance of detail parameters; Establishing several hierarchical classifications of detail parameters according to their importance; The detail level management unit is used to: sort the level classification of the detail parameters according to importance and functionality. The higher the level classification of the detail parameters, the stronger the importance and functionality of the detail parameters, and vice versa. The LOD management unit is used to: allocate geometric parameter data to the hierarchical classification of detail parameters, so as to describe the geometric complexity of the hierarchical classification of detail parameters; LOD allocation is performed according to the viewpoint distance allocation strategy in the formulated LOD allocation strategy. The principle of the viewpoint distance allocation strategy is to allocate LOD based on the distance between the observer and the model. Perform color rendering on each outermost component of each division level, generate the shell corresponding to each division level, and obtain the LOD structure; A visualization rendering unit is used to: visualize the input data of the BIM model according to the LOD structure; It also includes the use of section filling algorithms to process the surface of 3D BIM models, including viewpoint setting, section generation, contour filling, multi-section synthesis and rendering display: Viewpoint setting includes: determining the observation point, i.e., the viewing position, according to the coordinates of the observer in the three-dimensional scene, and then determining the observation direction according to the direction of the observer's viewpoint toward the observation point; Cross-section generation includes: projecting the three-dimensional object onto a plurality of parallel cross-sections according to the viewpoint direction, and generating cross-section profiles of the plurality of parallel cross-sections in the viewpoint direction; Contour filling, including: performing a solid filling operation on the contour of each section; performing a solid filling operation on the contour of each section, including: using a depth buffer algorithm to fill the internal area according to the geometric information of the contour; using a depth buffer algorithm to fill the internal area according to the geometric information of the contour, including: allocating a pixel frame buffer of the same size as the drawing screen; in cross-section mode, drawing the front side of the model once, filling each pixel position on the screen with a pixel point on the front side, and adding 1 to the corresponding value; in cross-section mode, drawing the back side of the model once, filling each pixel position on the screen with a pixel point on the back side, and subtracting 1 from the corresponding value; drawing the model, each pixel is compared with A, if the value is 0, the number of front and back sides is the same, if the value is greater than 0, it is the front side and does not need to be filled, if it is a negative number, the back side is exposed outside and needs to be filled, and the position is set to the fill color; Multi-section synthesis, including: sorting the depth buffer of the filling results on each section, rendering all the sections to be synthesized into the depth buffer, and sorting the depth information; after the depth sorting, drawing the sections in depth order; sequentially synthesizing the sections arranged in depth order together to form an image with a solid surface texture; Rendering and displaying, including: rendering and displaying the synthesized image to present a solid filling effect of the three-dimensional object when observed from different viewing angles.