A method for creating fish habitats

By transforming the diversion tunnel into a suitable fish habitat, the problem of low utilization rate of the diversion tunnel was solved, providing a suitable environment for fish to spawn, hatch, grow, develop, and overwinter, reducing the cost of artificial habitats, and improving the utilization efficiency and fish-attracting effect of the diversion tunnel.

CN118087444BActive Publication Date: 2026-11-10CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410293652.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2026-11-10
Estimated Expiration
2044-03-14

AI Technical Summary

Technical Problem

Existing technologies have failed to effectively utilize diversion tunnels to create fish habitats, resulting in low utilization rates or their abandonment, and thus failing to address the impact of water conservancy and hydropower projects on fish habitat environments.

Method used

By assessing the conditions of the diversion tunnel, shaping the river morphology, setting up a gravel riverbed, forming a material flow transport channel, and creating a fish-attracting environment at the outlet, and by combining the scheduling of water temperature, water depth, flow velocity, sediment, planktonic plants and animals and benthic animals, the diversion tunnel is transformed into a suitable fish habitat.

Benefits of technology

It has achieved comprehensive utilization of resources, provided a fish habitat that is not adversely affected by water conservancy and hydropower projects, reduced the cost of artificial habitats, and improved the utilization efficiency and fish-attracting effect of diversion tunnels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118087444B_ABST
    Figure CN118087444B_ABST
Patent Text Reader

Abstract

This invention discloses a method for creating a fish habitat, comprising the following steps: S1, evaluating a diversion tunnel to determine whether it meets the conditions for creating a fish habitat; S2, creating a river morphology within the diversion tunnel that meets the conditions in step S1; S3, creating a material flow transmission channel to provide material flow to the diversion tunnel; S4, creating a fish-attracting environment at the outlet of the diversion tunnel; S5, comprehensive management of the fish habitat environment. This invention achieves comprehensive resource utilization and reduces the cost of fish protection in water conservancy and hydropower projects by transforming a diversion tunnel, which is a temporary facility, into a fish habitat that meets the different needs of fish for spawning, hatching, growth and development, and overwintering, and is not adversely affected by dams.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of fish conservation technology, and in particular to a method for creating fish habitats. Background Technology

[0002] Rivers are affected by water-related engineering projects, leading to altered runoff, loss of riparian habitats, reduced downstream nutrient transport, eutrophication, and pollution, resulting in the deterioration or disappearance of fish habitats. For example, dams and sluices built for purposes such as flow regulation, hydroelectric power generation, water level control, or erosion reduction obstruct rivers, disrupting the longitudinal flow of water, sediment, and aquatic organisms throughout time and space. Loss of river connectivity has been proven to be one of the causes of declining or even extinct freshwater fish and mammal populations, as well as a significant decrease in species diversity.

[0003] Currently, mitigation measures implemented by water conservancy and hydropower projects to mitigate the impact on fish populations include removing obstacles to fish migration, constructing fish passage facilities, conducting stock enhancement and release programs, and fisheries management. Due to economic or safety considerations, removing obstacles to fish migration is often not feasible. When removing obstacles is not feasible, a common measure is to construct fishways to improve fish habitat connectivity and provide routes for fish to migrate upstream for spawning. Besides high construction costs, fishways often require fish crossing dams to pass through reservoir areas unsuitable for their habitats. For areas above the dam where suitable habitats for upstream fish have disappeared, the ecological benefits of fishways are even lower. Stock enhancement and release, as a primary means of fisheries management, also depend on the suitability of aquatic habitats. Suitable fish habitats are fundamental to maximizing the benefits of measures such as removing obstacles to fish migration, constructing fish passage facilities, and stock enhancement and release programs.

[0004] A diversion tunnel is a tunnel used for river diversion during construction. When the river is blocked at the dam site, the water flows through the diversion tunnel. Common diversion tunnels range in length from tens of meters to several kilometers. Most of these tunnels connecting rivers for diversion are sealed off and abandoned before the reservoir is filled, and are not well utilized. In rivers with cascade reservoirs, suitable sections for native flowing-water fish habitats are extremely rare. When natural rivers are severely damaged, using diversion tunnels to create a completely new fish habitat unaffected by the dam is more effective than measures such as fish passage facilities or fish stocking.

[0005] Currently, technologies related to fish habitats are all based on existing river sections, including fish habitat protection, damaged habitat restoration, and fish habitat enhancement structures. For example, patent application CN105951660A discloses a comprehensive protection system for fish habitats in the upstream and downstream areas of reservoirs and tributaries, providing a method for planning the protection of original habitats for fish habitats in tributaries; patent application CN113957845A discloses a method and system for constructing an ecological restoration system for fish habitats, providing a method for constructing a system for the protection and restoration of damaged habitats; patent application CN114831057A discloses a method for the artificial combination and construction of lake fish habitats, proposing an artificial habitat unit structure; and patent application CN111651895A discloses a method for constructing alternative habitats in tributaries based on dam removal and local micro-topographical artificial intervention, proposing a method for habitat restoration in river sections after dam removal.

[0006] However, the aforementioned existing technologies have not addressed the impact of water conservancy and hydropower project regulation on fish habitats, have not addressed how to utilize diversion tunnels to create fish habitats, and have not solved the problem of low utilization rates or abandonment of diversion tunnels. Summary of the Invention

[0007] The main objective of this invention is to propose a method for creating fish habitats, which utilizes diversion tunnels to create fish habitats, thereby solving the problem of low utilization rates or abandonment of diversion tunnels.

[0008] To achieve the above objectives, the present invention proposes a method for creating fish habitats, comprising the following steps: S1. Evaluate the diversion tunnel to determine whether it meets the conditions for creating a fish habitat; S2. For the diversion tunnels that meet the conditions in step S1, create a river shape inside them; S3. Create a material flow transmission channel to provide material flow for the diversion tunnel; S4. Create a fish-attracting environment at the outlet of the diversion tunnel; S5. Comprehensive scheduling of fish habitat environment.

[0009] Preferably, in step S1, the conditions that a diversion tunnel suitable for creating a fish habitat must meet include: the length of the diversion tunnel. Not less than 50m; the slope of the diversion tunnel No greater than 1:5 Maximum clear width of the diversion tunnel Not less than 1.0m; maximum clearance of the diversion tunnel Not less than 1.5m; ; In the formula: The length of the fish that swims upstream is measured in meters. The initial velocity of the spawning fish when jumping is expressed in meters per second. The angle of incidence for the fish to jump; It is the acceleration due to gravity; The elevation of the inlet of the diversion tunnel; The elevation of the outlet of the diversion tunnel; This refers to the water level at the outlet of the diversion tunnel.

[0010] Preferably, in step S2, creating a river morphology inside the diversion tunnel includes the following steps: S201. During the construction of the diversion tunnel, multiple levels of pre-embedded parts are installed at intervals on the bottom wall of the diversion tunnel along the direction of water flow. S202. Before the reservoir is filled with water, interception plates are installed on each level of embedded parts; S203. When the diversion tunnel flows through, interception plates are used to intercept pebbles and gravels, forming a pebble and gravel riverbed. S204. Remove one section of each level of interception plate to form a gravel flow channel; S205. Utilizing the scouring effect of water flow, a fish habitat is formed between two adjacent interceptor plates.

[0011] Preferably, each stage of the embedded component includes an embedded plate, an embedded rod, and a vertical pole; the embedded plate is embedded in the bottom wall of the diversion tunnel, and the top surface of the embedded plate does not protrude above the surface of the bottom wall; the upper end of the embedded rod is inserted into the through hole of the embedded plate and welded and fixed, and the top end of the embedded rod is flush with the top surface of the embedded plate; the lower end of the embedded rod extends downward and is embedded in the bottom wall of the diversion tunnel; the top surface of the embedded rod is provided with a downwardly extending internal threaded hole; the lower end of the vertical pole is provided with an external threaded section, which is screwed into the internal threaded hole of the embedded rod; a reinforcing block is welded between the bottom surface of the embedded plate and the embedded rod; a row of vertical poles is provided along the upstream edge and downstream edge of the embedded plate; the intercepting plate is installed in the interval formed between the two rows of vertical poles.

[0012] Preferably, each stage of the interceptor plate has a two-section structure, including a first plate and a second plate. The first plate is installed on one vertical side of the second plate. The first plates in adjacent stages of the interceptor plate are staggered, that is, the first plate in the previous stage of the interceptor plate is located at the first side wall of the diversion tunnel, and the first plate in the next stage of the interceptor plate is located at the first side wall of the diversion tunnel. The top of the second plate is inclined, and the height of the top of the second plate gradually increases along the direction away from the first plate. The first plate is perpendicular to the axis n of the diversion tunnel, and the second plate is inclined to the axis n of the diversion tunnel, which is used to guide the water flow to the first plate. A gravel sedimentation tank is formed between adjacent stages of the interceptor plate.

[0013] Preferably, in step S203, a gate is installed at the inlet end of the diversion tunnel to regulate the flow rate and velocity of the diversion tunnel, thereby controlling the flow of gravel and pebbles from the upstream riverbed to the diversion tunnel until the intercepted sediment is deposited in the gravel and pebbles sedimentation tank. In step S204, when each gravel and pebbles sedimentation tank is filled with gravel and pebbles, the gravel and pebbles around the first plate are removed, and the first plate and the uprights on the upstream and downstream sides of the first plate are removed to form a stepped gravel and pebbles flow channel.

[0014] Preferably, in step S205, the flow rate of the diversion tunnel is controlled by using the gate at the inlet end of the diversion tunnel, and the water flow is used to push the pebbles in the gravel riverbed downstream from the gravel flow channel; and a gravel scouring zone and a gravel accumulation zone are formed in each gravel sedimentation tank, so that the water depth in each fish habitat gradually increases from the gravel accumulation zone to the gravel scouring zone.

[0015] Preferably, in step S3, the method for creating a material flow transmission channel is as follows: a sealing body is installed at the inlet end of the diversion tunnel to seal the inlet of the diversion tunnel; a mixing pool is installed in the diversion tunnel near the downstream side of the sealing body; multiple pipes are pre-embedded in the sealing body, and the outlet end of each pipe is connected to the mixing pool; the inlet end of each pipe is set at different water depths in the reservoir to divert water from different water layers and the substances carried in the water to the mixing pool; control valves are installed on each pipe to control the flow rate of each pipe; an outlet pipe is installed on the side wall downstream of the mixing pool, and a flow control valve is installed on the outlet pipe.

[0016] Preferably, in step S4, the method for creating a fish-attracting environment is as follows: a water replenishment baffle is installed at the outlet of the diversion tunnel. When the vertical sidewall of the diversion tunnel connected to the highest vertical side of the last stage second plate is the right sidewall, the upstream end of the water replenishment baffle is connected to the short vertical side of the second plate, and the downstream end of the water replenishment baffle abuts against the right sidewall of the diversion tunnel; the water replenishment baffle, the last stage second plate, and the right sidewall of the diversion tunnel together form a water replenishment and energy dissipation pool; in the mixing pool and A water supply pipe is installed between the water supply and energy dissipation tanks to divert water from the mixing tank to the water supply and energy dissipation tank. A flow control valve is installed on the water supply pipe. Along the water flow direction, multiple third plates are sequentially spaced between the water supply baffle and the left side wall of the diversion tunnel. A V-shaped notch is provided in the middle of the third plate. A fish-attracting pool chamber is formed between two adjacent third plates, and gravel is laid in the fish-attracting pool chamber. A water supply slit is provided on the water supply baffle to divert water from the water supply and energy dissipation tank to the fish-attracting pool chamber.

[0017] Preferably, the top height of the third plate gradually decreases from both sides towards the middle, and transitions to a V-shaped notch through a straight section.

[0018] Preferably, the pipeline includes at least a first pipeline, a second pipeline, a third pipeline, and a fourth pipeline; the inlet of the first pipeline is located at the surface water level of the reservoir; the inlet of the second pipeline is located at the middle water level of the reservoir; the inlet of the third pipeline is located at the lower water level of the reservoir; and the inlet of the fourth pipeline is located at the riverbed near the tail of the reservoir.

[0019] Preferably, in step S5, the comprehensive management of the fish habitat environment includes the management of planktonic plants and animals; the method is as follows: by operating the first pipe and adjusting the flow rate of the first pipe, the water in the surface water and the planktonic plants and animals carried by the surface water are introduced into the mixing pool and then flow into the guide tunnel.

[0020] Preferably, in step S5, the comprehensive environmental management of fish habitat includes the management of organic matter and sediment. The method is as follows: the fourth pipeline is used to introduce riverbed sediments with organic matter into the mixing pool and then flow into the diversion tunnel; the control valve on the fourth pipeline is adjusted to control its flow rate, thereby managing the content of organic matter and sediment in the diversion tunnel.

[0021] Preferably, in step S5, the comprehensive scheduling of the fish habitat environment includes water temperature regulation, which is achieved by utilizing the temperature differences between different water layers in the reservoir and selecting one or more of the first, second, and third pipelines for operation, or a combination of them, based on the water temperature requirements at different stages of spawning, hatching, growth and development, and overwintering.

[0022] Preferably, in step S5, the comprehensive management of the fish habitat environment includes water depth and flow velocity management; the method is as follows: the flow control valve on the outflow pipe is adjusted to control the outflow flow rate in combination with the requirements of water depth and flow velocity at different stages of spawning, hatching and growth and development.

[0023] Preferably, in step S5, the comprehensive scheduling of the fish habitat environment includes lighting scheduling. The lighting scheduling method is as follows: along the axial direction of the diversion tunnel, multiple supplementary lights are sequentially and spaced apart on the top of the diversion tunnel; by using supplementary lights to supplement the lighting inside the diversion tunnel, the light intensity inside the diversion tunnel is synchronized with the natural light intensity of the water surface outside the tunnel.

[0024] Due to the adoption of the above technical solution, the beneficial effects of the present invention are as follows: (1) The present invention transforms the diversion tunnel, which is a temporary facility, into a habitat suitable for fish with different needs such as spawning, hatching, growth and development and overwintering, thus realizing the comprehensive utilization of resources.

[0025] (2) This invention provides a fish habitat that is not adversely affected by water conservancy and hydropower projects, and the water temperature, water depth, flow velocity, sediment, illumination, planktonic plants and animals and benthic animals can be regulated.

[0026] (3) Based on the characteristics of the flowing water carrying the riverbed substrate, the present invention transforms the originally regular and smooth diversion tunnel into a near-natural riverbed filled with gravel substrate through simple interception, thereby reducing the cost of creating artificial habitat gravel riverbeds. (4) Based on the characteristics of the movement of riverbed sediment driven by the flowing water, the present invention increases local scouring by simple interception, forming a near-natural river channel cross section with gravel bottom, meandering main flow line and different water depths, thereby reducing the cost of creating diverse artificial habitats.

[0027] (5) The present invention can improve the fish attraction effect at the outlet of the diversion tunnel by changing the values ​​of water temperature, sediment, planktonic plants and animals and benthic animals. Attached Figure Description

[0028] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the structures shown in these drawings without creative effort.

[0029] Figure 1 This is a schematic diagram of the layout of the diversion tunnel; Figure 2 This is a flowchart of the fish habitat creation method provided by the present invention; Figure 3 This is a schematic diagram of the cross-section of the diversion tunnel, where (a) is the inlet end and (b) is the outlet end; Figure 4 This is a structural schematic diagram of the embedded parts; Figure 5 This is a schematic diagram of the three-dimensional structure of the embedded part; Figure 6 This is a three-dimensional structural diagram of two adjacent interceptor plates; Figure 7 A schematic diagram of a multi-stage interceptor plate-formed gravel sedimentation tank with alternating distribution; Figure 8 A schematic diagram illustrating the formation of a gravelly riverbed at the bottom surface of a diversion tunnel; Figure 9 A schematic diagram of the main flow path of the diversion tunnel after the first slab is removed and the second slab is retained. Figure 10 A schematic diagram of the riverbed after erosion and fish habitats; Figure 11 A schematic diagram of the structure for creating a material flow transmission channel; Figure 12 This is a schematic diagram showing the layout of the sealing structure, various pipes, and the water supply pipe. Figure 13 A schematic diagram showing the layout of the mixing tank with various pipes, water supply pipes, and fish habitats; Figure 14 A schematic diagram illustrating the creation of a fish-attracting environment at the outlet of the diversion tunnel; Figure 15 This is a schematic diagram showing the arrangement of supplementary lighting in the diversion tunnel.

[0030] Explanation of reference numerals: 12. Riverbank; 13. Upstream cofferdam; 14. Downstream cofferdam; 15. Power plant; 16. River dam structure; 17. Reservoir riverbed; 2. Diversion tunnel; 21. Inlet end; 22. Outlet end; 23. Bottom wall; 24. Gravel sedimentation tank; 25. Gravel riverbed; 251. Gravel scouring zone; 252. Gravel accumulation zone; 26. Fish habitat pond; 27. Blocking structure; 28. Mixing tank; 28a. Outflow pipe; 2 9. Trapezoidal dashed frame; 3. Embedded parts; 31. Embedded plate; 32. Embedded rod; 33. Upright; 33a. External thread section; 34. Reinforcing block; 5. Interception plate; 51. First plate; 52. Second plate; 53. Third plate; 54. Water replenishment partition; 541. Water replenishment seam; 6. Pipe; 61. First pipe; 62. Second pipe; 63. Third pipe; 64. Fourth pipe; 65. Water replenishment pipe; 651. Water replenishment energy dissipation pool; 7. Supplemental lighting.

[0031] Additionally, the black arrows in the diagram indicate the direction of water flow. Detailed Implementation

[0032] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.

[0033] It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present invention are only used to explain the relative positional relationship and movement of each component in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indication will also change accordingly.

[0034] Furthermore, the use of terms such as "first" and "second" in this invention is for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of that feature. Additionally, the technical solutions of the various embodiments can be combined with each other, but only on the basis of being achievable by those skilled in the art. When the combination of technical solutions is contradictory or impossible to implement, such a combination of technical solutions should be considered non-existent and not within the scope of protection claimed by this invention.

[0035] Combination Figure 1 As shown, before constructing the upstream cofferdam 13 and the downstream cofferdam 14 to impound water, a diversion tunnel 2 was built inside the mountain on one side of the riverbank 12 of a hydropower station. The upstream end of the diversion tunnel 2 is the inlet end 21, and the downstream end is the outlet end 22. The diversion tunnel 2 is 700m long, with an inlet elevation of 2362m and an outlet elevation of 2360m. Water upstream of the upstream cofferdam 13 flows from the diversion tunnel 2 to the downstream cofferdam 14. A dry construction environment is formed between the upstream cofferdam 13 and the downstream cofferdam 14 for constructing the power plant building 15 and the river-blocking structure 16. The cross-sectional shape of the diversion tunnel 2 is a city gate shape.

[0036] Combination Figure 2 As shown in the figure, this embodiment proposes a method for creating fish habitats, including the following steps: S1. Evaluate the diversion tunnel 2 to determine whether it meets the conditions for creating a fish habitat; S2. For the diversion tunnel 2 that meets the conditions in step S1, create a river shape inside it; S3. Create a material flow transmission channel to provide material flow for diversion tunnel 2; S4. Create a fish-attracting environment at the outlet of diversion tunnel 2; S5. Comprehensive scheduling of fish habitat environment.

[0037] In this embodiment, in step S1, the conditions that the diversion tunnel 2 suitable for creating a fish habitat must meet include: Length of diversion tunnel 2 Not less than 50m; The slope of diversion tunnel 2 No greater than 1:5 ; Maximum clear width of diversion tunnel 2 Not less than 1.0m; Maximum clearance of diversion tunnel 2 Not less than 1.5m; ; In the formula: The length of the fish that swims upstream is measured in meters. The initial velocity of the spawning fish when jumping is expressed in meters per second. The angle of incidence for the fish to jump; It is the acceleration due to gravity; The elevation of the inlet of diversion tunnel 2; The elevation of the outlet of diversion tunnel 2; This refers to the water level at the outlet of diversion tunnel 2.

[0038] In step S2, creating a river morphology inside the diversion tunnel 2 includes the following steps: S201. During the construction of the diversion tunnel 2, multiple levels of embedded parts 3 are set at intervals on the bottom wall 23 of the diversion tunnel 2 along the direction of water flow. The embedded parts 3 are metal structures pre-embedded on the bottom wall 23 of the diversion tunnel 2 during the construction of the diversion tunnel 2. S202. Before the reservoir is filled with water, interception plates 5 are installed on each level of embedded parts 3. S203, when the diversion tunnel 2 flows through, the interception plate 5 intercepts the gravel and pebbles to form a gravel riverbed 25; S204. Remove one section of each level of interceptor plate 5 to form a gravel flow channel; S205. Using the scouring effect of water flow, a fish habitat pool 26 is formed between two adjacent interceptor plates 5.

[0039] Combination Figure 3 and Figure 4 As shown, each level of the embedded component 3 includes an embedded plate 31, an embedded rod 32, and a vertical rod 33. The embedded plate 31 is embedded in the bottom wall 23 of the diversion tunnel 2, and the top surface of the embedded plate 31 does not protrude above the surface of the bottom wall 23 to ensure the flatness of the bottom wall 23. The upper end of the embedded rod 32 is inserted into the through hole of the embedded plate 31 and welded and fixed, and the top end of the embedded rod 32 is flush with the top surface of the embedded plate 31. The lower end of the embedded rod 32 extends downward and is embedded in the bottom wall 23 of the diversion tunnel 2. The top surface of the embedded rod 32 is provided with a downwardly extending internal threaded hole 32a. The lower end of the vertical rod 33 is provided with an external threaded section 33a, which is screwed into the internal threaded hole 32a of the embedded rod 32. The vertical rod 33 and the embedded rod 32 are connected by threads, so that the two form a detachable connection structure. A reinforcing block 34 is welded between the bottom surface of the embedded plate 31 and the embedded rod 32. By setting the reinforcing block 34, the connection between the embedded rod 32 and the embedded plate 31 is made more secure. A row of uprights 33 is set along the upstream and downstream edges of the embedded plate 31. The intercepting plate 5 is installed in the gap formed between the two rows of uprights 33. When installing the intercepting plate 5, it is only necessary to insert the intercepting plate 5 into the gap between the two rows of uprights 33, which is simple and convenient to install and remove.

[0040] Combination Figure 6 As shown, each stage of the interceptor plate 5 has a two-section structure, including a first plate 51 and a second plate 52; the first plate 51 is installed on one vertical edge of the second plate 52. The first plates 51 of adjacent interceptor plates 5 are staggered, that is, the first plate 51 of the upper stage interceptor plate 5 is located at the first side wall of the diversion tunnel 2, while the first plate 51 of the lower stage interceptor plate 5 is located at the first side wall of the diversion tunnel 2, and vice versa.

[0041] Combination Figure 6 , Figure 7 As shown, the top of the second plate 52 is inclined, and its height gradually increases along the direction away from the first plate 51. The first plate 51 is perpendicular to the axis n of the diversion tunnel 2, and the second plate 52 is inclined to the axis n of the diversion tunnel 2, which is used to guide the water flow to the first plate 51. Figure 6 As shown, the normal of the first plate 51 forms an acute angle β with the axial direction n of the diversion tunnel 2; a gravel sedimentation pool 24 is formed between the two adjacent interceptor plates 5.

[0042] In this embodiment, in step S202, it is preferred to install the interceptor plate 5 after the power plant 15 has the capacity for overcurrent power generation and before the reservoir is filled with water. At this time, by setting a gate at the inlet end of the diversion tunnel 2 and closing the gate, the water in the river flows from the power plant 15 to the downstream.

[0043] Combination Figure 8 In step S203, a gate is installed at the inlet end of the diversion tunnel 2, and the flow rate and velocity of the diversion tunnel 2 are controlled by the gate to control the gravel bottom material flowing from the upstream riverbed to the diversion tunnel 2, until the intercepted bottom material is deposited in the gravel sedimentation tank 24, and finally covers the bottom wall of the entire diversion tunnel 2 and forms a gravel riverbed 25.

[0044] Combination Figure 9 As shown, in step S204, after each gravel sedimentation tank 24 is filled with gravel bottom material, the gravel around the first plate 51 is removed, and the first plate 51, as well as the uprights 33 on the upstream and downstream sides of the first plate 51, are removed to form a stepped, staggered gravel flow channel. Figure 9 The gravel substrate is not shown in the image. Figure 9 The dashed lines and arrows in the diagram indicate the main flow path of the diversion tunnel 2 after the first plate 51 is removed and the second plate 52 is retained.

[0045] Combination Figure 10As shown, in step S205, the flow rate of the diversion tunnel 2 is controlled by using the gate at the inlet end of the diversion tunnel 2. The water flow pushes the pebbles in the gravel riverbed 25 downstream from the gravel flow channel. Since the main flow line of the diversion tunnel 2 is tortuous and meandering, and since the top surface of the second plate 52 is inclined, a gravel scouring zone 251 and a gravel accumulation zone 252 are formed in each gravel sedimentation tank 24. As a result, the water depth in each fish habitat tank 26 gradually increases from the gravel accumulation zone 252 to the gravel scouring zone 251.

[0046] Combination Figures 11 to 13 As shown, before the reservoir is impounded and after the river morphology is established, it is necessary to construct a material flow transmission channel. In step S3, the method for constructing the material flow transmission channel is as follows: a sealing body 27 is installed at the inlet end of the diversion tunnel 2 to seal the inlet of the diversion tunnel 2; a mixing pool 28 is installed in the diversion tunnel 2 near the downstream side of the sealing body 27; multiple pipes 6 are pre-embedded in the sealing body 27, and the outlet end of each pipe 6 is connected to the mixing pool 28; the inlet end of each pipe 6 is set at different water depths in the reservoir to divert water from different water layers and the substances carried in the water to the mixing pool 28; a control valve (not shown in the figure) is installed on each pipe 6 to control the flow rate of each pipe 6; an outlet pipe 28a is installed on the side wall of the downstream side of the mixing pool 28, and a flow control valve (not shown in the figure) is installed on the outlet pipe 28a.

[0047] Combination Figure 14 As shown, in step S4, the method for creating a fish-attracting environment is as follows: a water replenishment baffle 54 is installed at the outlet of the diversion tunnel 2. Figure 14 In the middle, the side wall of the diversion tunnel 2 connected to the vertical edge of the second plate 52 of the last stage is the right side wall. At this time, the upstream end of the water replenishment baffle 54 is connected to the short vertical edge of the second plate 52, and the downstream end of the water replenishment baffle 54 abuts against the right side wall of the diversion tunnel 2; and vice versa. The water replenishment baffle 54, the last stage second plate 52, and the right side wall of the diversion tunnel 2 together form a water replenishment and energy dissipation pool 651; a water replenishment pipe 65 is provided between the mixing pool 28 and the water replenishment and energy dissipation pool 651 to divert water from the mixing pool 28 to the water replenishment and energy dissipation pool 651, and a flow control valve (not shown in the figure) is provided on the water replenishment pipe 65; along the water flow direction, multiple third plates 53 are arranged at intervals between the water replenishment baffle 54 and the left side wall of the diversion tunnel 2; a V-shaped notch is provided in the middle of the third plate 53, which forms both a water flow passage and a fish passage; a fish attraction pool is formed between two adjacent third plates 53, and gravel is laid in the fish attraction pool; from Figure 14As can be seen, the water replenishment baffle 54 and the sidewall of the diversion tunnel 2 are arranged at an angle of less than 90 degrees (α), which makes the entire fish inlet of the diversion tunnel 2 have a trapezoidal shape (as shown by the trapezoidal dashed frame 29 in the figure). Therefore, the width of the fish inlet can gradually transition to the gap formed by the first plate 51 that is removed in the last stage interceptor plate 5. In order to supplement the water flow in the fish attraction pool chamber, a water replenishment slit 541 is provided on the water replenishment baffle 54 to divert the water in the water replenishment energy dissipation pool 651 to the fish attraction pool chamber.

[0048] Combination Figure 14 As shown, the top height of the third plate 53 gradually decreases from both sides towards the middle, transitioning to a V-shaped notch through a straight section. Under the scouring action of the water flow, the pebbles in the fish-attracting chamber can tilt from both sides towards the middle, forming fish-attracting chambers with different water depths.

[0049] Combination Figures 11 to 13 As shown, the pipeline 6 includes at least a first pipeline 61, a second pipeline 62, a third pipeline 63, and a fourth pipeline 64. The inlet of the first pipeline 61 is located at the surface water level of the reservoir; the inlet of the second pipeline 62 is located at the middle water level of the reservoir; the inlet of the third pipeline 63 is located at the lower water level of the reservoir; and the inlet of the fourth pipeline 64 is located at the riverbed 17 near the tail of the reservoir. The mixing tank 28 serves to mix the material flows transmitted by the first pipeline 61, the second pipeline 62, the third pipeline 63, and the fourth pipeline 64, and also to reduce the energy of the water flow.

[0050] In this embodiment, the comprehensive management of the fish habitat environment is achieved through operational control of the first pipe 61, the second pipe 62, the third pipe 63, the fourth pipe 64, and the water supply pipe 65, thereby comprehensively regulating the abiotic and biotic environments within the diversion tunnel 2. The abiotic environment includes water temperature, water depth, flow velocity, and sediment; the biotic environment includes the biomass of planktonic plants, animals, and organic matter. Specifically, in step S5, the comprehensive management of the fish habitat environment includes: planktonic plant management; organic matter and sediment management; water temperature regulation; and water depth and flow velocity management. The specific method is as follows: 1) Phytoplankton scheduling. The surface water of the reservoir often contains phytoplankton. Therefore, by operating the first pipe 61 and adjusting the flow of the first pipe 61, the water in the surface water and the phytoplankton carried by the surface water are introduced into the mixing pool 28 and then flow into the guide tunnel 2.

[0051] 2) Organic matter and sediment regulation. The fourth pipeline 64 is used to introduce riverbed sediments containing organic matter into the mixing pool 28 and then into the diversion tunnel 2; the control valve on the fourth pipeline 64 is adjusted to control its flow rate, thereby regulating the organic matter and sediment content in the diversion tunnel 2.

[0052] 3) Water Temperature Control. Utilizing the temperature differences between different water layers in the reservoir, and considering the temperature requirements at different stages of spawning, hatching, growth and development, and overwintering, one or more of the first, second, and third pipes 61 or 62 can be operated in combination. Furthermore, through the combined operation of the first, second, and third pipes 63, water from the mixing pond 28 is diverted to the replenishment and energy dissipation pond 651 via the replenishment pipe 65, and then flows through the replenishment seam 521 to each fish-attracting pond chamber. This achieves the goal of controlling the temperature difference between the fish-attracting pond chambers and the downstream river water, thereby increasing the fish-attracting effect of the pond chambers by utilizing the temperature difference.

[0053] 4) Water depth and flow rate control. The outflow rate is controlled by adjusting the flow control valve on the outflow pipe 28a, taking into account the different water depth and flow rate requirements during the spawning, hatching, and growth stages. Additionally, the range of influence of the fish-attracting water flow in the fish-attracting pond can be controlled by regulating the flow rate of the water supply pipe 65.

[0054] In addition, the comprehensive management of the fish habitat environment includes lighting management. The lighting management method is as follows: along the axial direction of the diversion tunnel 2, multiple supplementary lights 7 are sequentially and spaced apart on the top of the diversion tunnel 2; by using the supplementary lights 7 to supplement the lighting inside the diversion tunnel 2, the light intensity inside the diversion tunnel 2 is kept synchronized with the natural light intensity of the water surface outside the tunnel.

[0055] The above description is merely a preferred embodiment of the present invention and does not limit the patent scope of the present invention. Any equivalent structural transformations made using the contents of the present invention's specification and drawings under the inventive concept of the present invention, or direct / indirect applications in other related technical fields, are included within the patent protection scope of the present invention.

Claims

1. A method for creating fish habitats, characterized in that, Includes the following steps: S1. Evaluate the diversion tunnel (2) to determine whether the diversion tunnel (2) meets the conditions for creating a fish habitat; S2. For the diversion tunnel (2) that meets the conditions in step S1, create a river shape inside it; S3. Create a material flow transmission channel to provide material flow for the diversion tunnel (2); S4. Create a fish-attracting environment at the outlet of the diversion tunnel (2); S5. Comprehensive management of fish habitat environment; In step S2, creating a river morphology inside the diversion tunnel (2) includes the following steps: S201. During the construction period of the diversion tunnel (2), multiple levels of embedded parts (3) are set at intervals on the bottom wall (23) of the diversion tunnel (2) along the direction of water flow. S202. Before the reservoir is impounded, interceptor plates (5) are installed on each level of embedded parts (3). S203, When the diversion tunnel (2) flows through, it uses the interception plate (5) to intercept the gravel and form a gravel riverbed (25). S204. Remove one section of each level of interceptor plate (5) to form a gravel flow channel; S205. Using the scouring effect of water flow, a fish habitat pool (26) is formed between two adjacent interceptor plates (5). In step S3, the method for creating a material flow transport channel is as follows: A sealing body (27) is installed at the inlet end of the diversion tunnel (2) to seal the inlet of the diversion tunnel (2); a mixing pool (28) is installed in the diversion tunnel (2) near the downstream side of the sealing body (27). Multiple pipes (6) are pre-embedded in the sealing body (27), and the outlet of each pipe (6) is connected to the mixing tank (28); the inlet of each pipe (6) is set at different water depths in the reservoir to divert water from different water layers and the substances carried in the water to the mixing tank (28); control valves are installed on each pipe (6) to control the flow rate of each pipe (6); An outlet pipe (28a) is provided on the side wall downstream of the mixing tank (28), and a flow control valve is provided on the outlet pipe (28a).

2. The method for creating a fish habitat as described in claim 1, characterized in that: In step S1, the conditions that a diversion tunnel (2) suitable for creating a fish habitat must meet include: Length of diversion tunnel (2) Not less than 50m; The slope of the diversion tunnel (2) No greater than 1:5 ; Maximum clear width of diversion tunnel (2) Not less than 1.0m; Maximum clearance of diversion tunnel (2) Not less than 1.5m; ; In the formula: The length of the fish that swims upstream is measured in meters. The initial velocity of the spawning fish when jumping, in meters per second; The angle of incidence for the fish to jump; It is the acceleration due to gravity; The elevation of the inlet of the diversion tunnel (2); The elevation of the outlet of the diversion tunnel (2); The water level at the outlet of the diversion tunnel (2).

3. The method for creating a fish habitat as described in claim 1, characterized in that: Each level of the embedded part (3) includes an embedded plate (31), an embedded rod (32), and a vertical rod (33); The pre-embedded plate (31) is pre-embedded on the bottom wall (23) of the diversion tunnel (2), and the top surface of the pre-embedded plate (31) is not higher than the surface of the bottom wall (23); The upper end of the pre-embedded rod (32) is inserted into the through hole of the pre-embedded plate (31) and welded and fixed. The top end of the pre-embedded rod (32) is flush with the top surface of the pre-embedded plate (31). The lower end of the pre-embedded rod (32) extends downward and is embedded in the bottom wall (23) of the diversion tunnel (2). The top surface of the pre-embedded rod (32) is provided with a downwardly extending internal threaded hole (32a). The lower end of the upright (33) is provided with an external thread section (33a), which is screwed into the internal thread hole (32a) of the embedded rod (32); A reinforcing block (34) is welded between the bottom surface of the embedded plate (31) and the embedded rod (32); A row of uprights (33) is provided at the upstream and downstream edges of the pre-embedded plate (31); the interceptor plate (5) is installed in the gap formed between the two rows of uprights (33).

4. A method for creating a fish habitat as described in claim 3, characterized in that: Each level of the interceptor plate (5) has a two-section structure, including a first plate (51) and a second plate (52); the first plate (51) is installed on one vertical edge of the second plate (52); The first plate (51) in the two adjacent interceptor plates (5) are staggered, that is, the first plate (51) in the upper interceptor plate (5) is located at the first side wall of the diversion tunnel (2), while the first plate (51) in the lower interceptor plate (5) is located at the first side wall of the diversion tunnel (2). The top of the second plate (52) is inclined, and the height of the top of the second plate (52) gradually increases along the direction away from the first plate (51); The first plate (51) is perpendicular to the axis n of the diversion tunnel (2), and the second plate (52) is inclined to the axis n of the diversion tunnel (2) to guide the water flow to the first plate (51). A gravel sedimentation tank (24) is formed between two adjacent interceptor plates (5).

5. A method for creating a fish habitat as described in claim 4, characterized in that: In step S203, a gate is set at the inlet end of the diversion tunnel (2) to regulate the flow rate and velocity of the diversion tunnel (2) to control the gravel bottom material flowing from the upstream riverbed to the diversion tunnel (2) until the intercepted bottom material is deposited in the gravel sedimentation tank (24). In step S204, after each gravel sedimentation tank (24) is filled with gravel bottom material, the gravel around the first plate (51) is removed, and the first plate (51) and the uprights (33) on the upstream and downstream sides of the first plate (51) are removed to form a stepped gravel flow channel.

6. A method for creating a fish habitat as described in claim 5, characterized in that: In step S205, the flow rate of the diversion tunnel (2) is controlled by using the gate at the inlet end of the diversion tunnel (2), and the water flow is used to push the pebbles in the gravel riverbed (25) to move downstream from the gravel flow channel; and a gravel scouring zone (251) and a gravel accumulation zone (252) are formed in each gravel sedimentation tank (24), so that the water depth in each fish habitat (26) gradually increases from the gravel accumulation zone (252) to the gravel scouring zone (251).

7. A method for creating a fish habitat as described in claim 6, characterized in that: In step S4, the method for creating a fish-attracting environment is as follows: A water replenishment baffle (54) is installed at the water outlet of the diversion tunnel (2). When the vertical side of the second plate (52) of the last stage is connected to the side wall of the diversion tunnel (2) which is the right side wall, the upstream end of the water replenishment baffle (54) is connected to the short vertical side of the second plate (52), and the downstream end of the water replenishment baffle (54) abuts against the right side wall of the diversion tunnel (2); the water replenishment baffle (54), the last stage second plate (52), and the right side wall of the diversion tunnel (2) together form a water replenishment energy dissipation pool (651). A water supply pipe (65) is provided between the mixing tank (28) and the water replenishment and energy dissipation tank (651) to divert water from the mixing tank (28) to the water replenishment and energy dissipation tank (651). A flow control valve is provided on the water supply pipe (65). Along the direction of water flow, multiple third plates (53) are arranged sequentially at intervals between the water replenishment baffle (54) and the left side wall of the diversion tunnel (2); a V-shaped notch is provided in the middle of the third plate (53); a fish-attracting pool chamber is formed between two adjacent third plates (53), and gravel is laid in the fish-attracting pool chamber; a water replenishment seam (541) is provided on the water replenishment baffle (54) to divert the water in the water replenishment energy dissipation pool (651) to the fish-attracting pool chamber.

8. A method for creating a fish habitat as described in claim 7, characterized in that: The top height of the third plate (53) gradually decreases from both sides to the middle, and transitions to a V-shaped notch through a straight section.

9. A method for creating a fish habitat as described in claim 1, characterized in that: The pipeline (6) includes at least a first pipeline (61), a second pipeline (62), a third pipeline (63), and a fourth pipeline (64); the inlet of the first pipeline (61) is located at the surface water level of the reservoir; the inlet of the second pipeline (62) is located at the middle water level of the reservoir; the inlet of the third pipeline (63) is located at the lower water level of the reservoir; and the inlet of the fourth pipeline (64) is located at the riverbed (17) of the reservoir near the tail of the reservoir.

10. A method for creating a fish habitat as described in claim 9, characterized in that: In step S5, the comprehensive scheduling of the fish habitat environment includes the scheduling of planktonic plants and animals; the method is: by operating the first pipe (61) and adjusting the flow rate of the first pipe (61), the water in the surface water and the planktonic plants and animals carried by the surface water are introduced into the mixing pool (28) and then flow into the guide tunnel (2).

11. A method for creating a fish habitat as described in claim 9, characterized in that: In step S5, the comprehensive scheduling of the fish habitat environment includes the scheduling of organic matter and sediment. The method is as follows: the fourth pipe (64) is used to introduce the reservoir riverbed sediment with organic matter into the mixing pool (28) and then flow into the diversion tunnel (2); the control valve on the fourth pipe (64) is adjusted to control its flow rate, so as to realize the scheduling of organic matter and sediment content in the diversion tunnel (2).

12. A method for creating a fish habitat as described in claim 9, characterized in that: In step S5, the comprehensive scheduling of the fish habitat environment includes water temperature regulation. The method is as follows: by utilizing the temperature difference characteristics of different water layers in the reservoir, and combining the water temperature requirements of different stages such as spawning period, hatching period, growth and development period and overwintering period, one or more of the first pipeline (61), second pipeline (62), and third pipeline (63) are selected for operation or combined operation.

13. A method for creating a fish habitat as described in claim 1, characterized in that: In step S5, the comprehensive management of the fish habitat environment includes water depth and flow velocity management; the method is to adjust the flow control valve on the outflow pipe (28a) to control the outflow flow rate by combining the requirements of water depth and flow velocity at different stages of spawning, hatching and growth and development.

14. A method for creating a fish habitat as described in claim 1, characterized in that: In step S5, the comprehensive scheduling of the fish habitat environment includes lighting scheduling. The lighting scheduling method is as follows: along the axial direction of the diversion tunnel (2), multiple supplementary lights (7) are sequentially and spaced apart on the top of the diversion tunnel (2); by using the supplementary lights (7) to supplement the lighting inside the diversion tunnel (2), the light intensity inside the diversion tunnel (2) is synchronized with the natural light intensity of the water surface outside the tunnel.

Citation Information

Patent Citations

  • Fish habitat comprehensive protection system for upper stream, down stream, main stream and branch stream of reservoir

    CN105951660A

  • Branch alternative habitat construction method based on dam dismantling and local micro-landform manual intervention

    CN111651895A

  • Fish habitat ecological restoration system construction method and system

    CN113957845A

  • Artificial combination construction method for lake fish habitat

    CN114831057A

  • Tunnel type nature fishway imitated fish-barring lifting device and method

    CN105603943A