A prefabricated tunnel entrance and construction method for existing high-speed railway tunnels

By installing prefabricated tunnel sheds at the entrances of existing high-speed railway tunnels, and utilizing pile-supported columns and reinforced concrete structures, the safety hazards posed by falling rocks at the tunnel entrances to trains have been resolved. This has enabled rapid installation and effective protection, ensuring safe train operation.

CN118088218BActive Publication Date: 2026-11-17CHINA RAILWAY 12TH BUREAU GRP CO LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410160854.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2026-11-17
Estimated Expiration
2044-02-05

AI Technical Summary

Technical Problem

Dangerous rocks and falling stones above the entrances of existing high-speed railway tunnels pose a threat to train safety, and existing technologies are insufficient to provide effective protection without affecting train operations.

Method used

The structure adopts a modular shed structure, consisting of columns supported by pile foundations, longitudinal beams, transverse beams, and end walls. Combined with reinforced concrete slabs and a waterproof system, it utilizes the longitudinal and transverse beams of the steel pipe concrete structure and welded box-section to limit movement, achieving rapid installation and protection.

Benefits of technology

Without affecting the normal operation of the railway, the prefabricated tunnel can be quickly installed to effectively protect the tunnel entrance from dangerous rocks and falling stones, avoid damage to the line, and is simple to construct and has good controllability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118088218B_ABST
    Figure CN118088218B_ABST
Patent Text Reader

Abstract

This invention belongs to the field of railway tunnel entrance protection, specifically relating to a prefabricated tunnel entrance and construction method for existing high-speed railway tunnels. The prefabricated tunnel spans the existing railway line and is supported by pile foundations on both sides. The prefabricated tunnel includes columns, longitudinal beams, transverse beams, end retaining walls, and reinforced concrete slabs. The column bases are connected to the pile foundations. The longitudinal beams are placed on top of the columns located on the same side of the existing railway line. The transverse beams span the existing railway line at both ends and rest on the top surface of the longitudinal beams. Both the longitudinal and transverse beams are fixed by horizontal and vertical limiting. A ring of end retaining walls is set within the plane formed by the top surfaces of the transverse beams. Reinforced concrete slabs are laid on the top surface of the transverse beams. By using a prefabricated steel structure without affecting the normal operation of the railway line, the original structure is not affected. The process is simple, controllable, and avoids damage to the line caused by falling rocks at the tunnel entrance, thus preventing disruption to train operation. It is suitable for construction on existing railway lines.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of railway tunnel entrance protection, specifically relating to a prefabricated tunnel entrance for existing high-speed railways and its construction method. Background Technology

[0002] High-speed railways are a concrete manifestation of railway modernization. As railways open and operate, the number of railways increases. Due to various factors such as geography, environment, and personnel, dangerous rocks and falling stones have accumulated above the tunnel entrances in some sections over the years, posing safety hazards to daily train operation. Without affecting the normal daily operation of trains, the prefabricated tunnel entrance construction method can solve such problems, complete the installation in a short period of time, and ensure the safety of train operation. Summary of the Invention

[0003] This invention addresses the problem of dangerous rocks and falling stones above tunnel entrances on high-speed railway lines that affect train safety. To ensure uninterrupted operation, a modular canopy is added to the tunnel entrance.

[0004] This invention provides the following technical solution: a prefabricated tunnel entrance for an existing high-speed railway tunnel, wherein the prefabricated tunnel spans the existing line and is supported by pile foundations on both sides; The prefabricated shed includes columns, longitudinal beams, transverse beams, end walls, and reinforced concrete slabs; The column base is connected to the pile foundation, the longitudinal beam of the tunnel is placed on the column top located on the same side of the existing line, and the transverse beam of the tunnel spans both ends of the existing line and rests on the top surface of the longitudinal beam of the tunnel. Both the longitudinal beam and the transverse beam of the tunnel are fixed by horizontal and vertical limiting. Two sets of lateral and longitudinal limiters are installed at the connection between the longitudinal beams of the shed and each column. The two sets of lateral and longitudinal limiters are fixed on the longitudinal beams of the shed and locked in front, behind, left and right of the column. At the connection point between each crossbeam of the shed and the longitudinal beams of the shed on the left and right sides, a set of transverse beams is set on the left and right sides. The transverse beams are fixed on the crossbeams of the shed and locked on both sides of the longitudinal beams of the shed. A set of transverse beams is set at each end of the longitudinal beams of the left and right side openings. The transverse beams of the openings are fully laid between the transverse beams, and the top surfaces of the transverse beams of the openings are seamlessly connected. An end retaining wall is set in a circle within the plane formed by the top surface of the shed beam. The end retaining wall is fixedly connected to the shed beam, and a drainage structure is set on the end retaining wall along the existing line direction. A reinforced concrete slab is laid on the top surface of the shed beam. A bottom layer of single-sided self-adhesive waterproof membrane is applied to the surface of the reinforced concrete slab. A waterproof mortar leveling layer is set on top of the bottom layer of single-sided self-adhesive waterproof membrane. A lightweight foamed concrete backfill buffer layer is set on top of the waterproof mortar leveling layer. The thickness of the lightweight foamed concrete backfill buffer layer is between 0.7 and 1.9m, forming a drainage slope that is high in the middle and low on both sides of the existing line. A top layer of single-sided self-adhesive waterproof membrane is applied on the surface of the lightweight foamed concrete backfill buffer layer. A clay waterproof layer is then covered on top of the top layer of single-sided self-adhesive waterproof membrane.

[0005] Furthermore, the columns are steel-concrete composite structures, including external steel pipes and internal cast-in-place concrete; the longitudinal beams and transverse beams of the shed are welded box-shaped sections with stiffening ribs, with the transverse limiters of the longitudinal beams, the longitudinal limiters of the longitudinal beams, and the longitudinal limiters of the transverse beams welded to the longitudinal beams of the shed, and the transverse limiters of the transverse beams welded to the transverse beams of the shed; the top plates of the transverse beams of the shed are welded together, and the end retaining walls are welded to the top surface of the transverse beams of the shed using symmetrical welds.

[0006] Furthermore, the column consists of two sections. The first section is anchored to the pile foundation. Flanges are welded to both ends of the steel pipe of the first section. A bearing plate is pre-embedded in the top of the pile foundation and external reinforcing bars are installed. The bearing plate is connected to the bearing plate anchor bars, which extend from the top surface of the bearing plate. The lower flange of the steel pipe of the first section rests on the bearing plate. After the bearing plate anchor bars pass through the corresponding holes, the connecting nuts lock the lower flange to the bearing plate. The external reinforcing bars of the pile foundation extend into the steel pipe of the first section. After concrete is poured into the steel pipe, the first section of the column is connected to the pile foundation as one unit. A connecting beam is welded between the first sections of the column located on the same side as the existing line. A flange is welded to the bottom of the steel pipe of the second section of the column. The steel pipes of the first and second sections of the column are connected by flanges. Concrete is poured inside the steel pipes for connection. A stiffening plate is welded between the flange and the steel pipe.

[0007] Furthermore, the longitudinal beam of the shed includes several independent segments, and a 2mm wide installation gap is set between the segments of the longitudinal beam of the shed, and the installation gap is filled with foam plastic board.

[0008] Furthermore, the installation gap between the end retaining walls is 10mm, and the installation gap is filled with foam plastic board. Each end retaining wall along the existing line direction has a pre-reserved drainage hole in the middle and is connected to a drainage pipe. The opening of the drainage pipe in the lightweight foam concrete backfill buffer layer is wrapped with non-woven fabric.

[0009] Furthermore, a grounding steel bar is pre-embedded in each column of the prefabricated shed. The lower end of the grounding steel bar is connected to the outward reinforcing bar of the pile foundation, and the upper end is connected to the longitudinal beam of the shed and a grounding terminal is installed.

[0010] Furthermore, the longitudinal beam has a chamfered end facing the column on the side of the transverse limit and the longitudinal limit of the longitudinal beam, and a chamfered end facing the longitudinal beam of the shed on the side of the transverse limit and the longitudinal limit of the transverse beam on the side of the transverse beam of the shed.

[0011] A construction method for prefabricated tunnel entrances on existing high-speed railway lines, comprising the following steps in pile foundation construction: S1: Lay out the lines according to the design control coordinates and re-measure the pile positions; conduct construction layout according to the cross lines of the pile holes and set up protective piles outside the pile positions; S2: Pile hole excavation and support. The excavation height of each pile hole section is between 0.6 and 1.2 meters. After excavation, a concrete retaining wall is poured. The concrete retaining wall does not encroach on the design cross-sectional dimensions of the pile hole. When excavating the next pile hole section, it is done after the formwork of the previous concrete retaining wall section is removed. S3: Final hole inspection; S4: Fabrication and installation of the pile reinforcement cage. The reinforcement cage is pre-disassembled, tied into shape, and then lapped and installed inside the pile hole. After the reinforcement cage is installed in place, it is fixed to prevent it from floating. S5: Concrete is poured into the pile hole.

[0012] Furthermore, the installation of the support column includes the following steps: S1: Hoist the steel pipe of the first column section, connect the lower flange of the steel pipe to the bearing plate at the top of the pile foundation through the bearing plate anchor bars and bolts. After the steel pipe of the first column section is hoisted, hoist the connecting beam and weld it firmly. S2: Pour concrete into the first column section, transport the concrete into the steel pipe, and vibrate it in layers to make it dense; the concrete surface after pouring is 1m away from the top surface of the steel pipe of the first column section, and pre-embed joint steel bars with a length of 1.2m and 60cm extending into the top and bottom. S3: Hoist the steel pipe of the second column section. The steel pipe of the second column section is connected to the steel pipe of the first column section by a flange. S4: Pour concrete into the second column section, transport the concrete into the steel pipe, and vibrate it in layers until it reaches the top surface of the steel pipe.

[0013] Compared with the prior art, the advantages of the present invention are: This invention provides a method for constructing a prefabricated tunnel entrance for existing high-speed railway lines. Without affecting the normal operation of the railway line, a prefabricated steel structure is used. During nighttime track maintenance windows, manually excavated bored pile foundations are constructed on both sides of the line. After installing steel-concrete composite columns, the upper crossbeams are hoisted and assembled to form a complete tunnel entrance for line protection. Therefore, it does not affect the original structure, the process is simple, and it offers good controllability. It avoids damage to the line caused by falling rocks at the tunnel entrance, which could affect train operation, and is suitable for construction on existing lines. Attached Figure Description

[0014] Figure 1 This is a front view of a prefabricated shed. Figure 2 This is a side view of a prefabricated shed. Figure 3 This is a cross-sectional view of the longitudinal beam of the shed. Figure 4 This is a cross-sectional view of the crossbeam of the shed. Figure 5 This is a schematic diagram showing the positions of the longitudinal and lateral limiters of the longitudinal beam. Figure 6 This is a schematic diagram showing the position of the lateral limit of the crossbeam; Figure 7 This is a schematic diagram showing the position of the longitudinal limit of the crossbeam; Figure 8 This is a schematic diagram showing the connection between the first column and the pile foundation; Figure 9 This is a schematic diagram showing the connection between the first column and the connecting beam.

[0015] In the diagram: 1-Pile foundation; 2-Column; 2.1-First column section; 2.2-Second column section; 3-Longitudinal beam of the shed; 4-Horizontal beam of the shed; 5-End retaining wall; 6-Reinforced concrete slab; 7-Longitudinal limit of the longitudinal beam; 8-Horizontal limit of the transverse beam; 9-Longitudinal limit of the transverse beam; 10-Waterproof mortar leveling layer; 11-Lightweight foamed concrete backfill buffer layer; 12-Clay waterproof layer; 13-Track; 14-Connecting beam; 15-Pressure plate anchor bar; 16-Pressure plate; 17-Lower flange; 18-Outer reinforcing bar; 19-Horizontal limit of the longitudinal beam. Detailed Implementation

[0016] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0017] like Figures 1-7 As shown: A prefabricated tunnel entrance for an existing high-speed railway tunnel, the prefabricated tunnel spans the existing line and is supported by pile foundations 1 on both sides; the prefabricated tunnel includes columns 2, tunnel longitudinal beams 3, tunnel transverse beams 4, end retaining walls 5 and reinforced concrete slabs 6.

[0018] The base of column 2 is connected to pile foundation 1. The longitudinal beam 3 of the tunnel is placed on the top of column 2 on the same side as the existing line. The transverse beam 4 of the tunnel spans both ends of the existing line and rests on the top surface of the longitudinal beam 3. Both the longitudinal beam 3 and the transverse beam 4 of the tunnel are fixed by horizontal and vertical limiting.

[0019] Two sets of lateral limiters 19 and two sets of longitudinal limiters 7 are installed at the connection between the longitudinal beam 3 and each column 2. The two sets of lateral limiters 6 and the two sets of longitudinal limiters 7 are fixed on the longitudinal beam 3 and locked in front, behind, left and right of the column 2 to limit the horizontal displacement of the longitudinal beam 3.

[0020] At the connection point between each crossbeam 4 and the left and right longitudinal beams 3, a set of transverse beam limiting 8 is installed on each side. The transverse beam limiting 8 is fixed to the crossbeam 4 and locked onto both sides of the longitudinal beam 3. A set of longitudinal beam limiting 9 is installed at each end of the left and right longitudinal beams 3. The crossbeam 4 is fully laid between the longitudinal beam limiting 9, and the top surfaces of the crossbeams 4 are seamlessly connected.

[0021] No welding work is required during the installation of the longitudinal beams 3 and the transverse beams 4 of the shed. No fasteners are needed for connection; they can be hoisted directly, resulting in high construction efficiency.

[0022] An end retaining wall 5 is set in a circle within the plane formed by the top surface of the shed beam 4. The end retaining wall 5 is fixedly connected to the shed beam 4, and a drainage structure is set on the end retaining wall 5 along the existing line direction.

[0023] A reinforced concrete slab 6 is laid on the top surface of the shed beam 4. A bottom layer of single-sided self-adhesive waterproof membrane is applied to the surface of the reinforced concrete slab 6. A waterproof mortar leveling layer 10 is set on top of the bottom layer of single-sided self-adhesive waterproof membrane. A lightweight foamed concrete backfill buffer layer 11 is set on top of the waterproof mortar leveling layer 10. The thickness of the lightweight foamed concrete backfill buffer layer 11 is between 0.7 and 1.9 m, forming a drainage slope that is high in the middle and low on both sides of the existing line. A top layer of single-sided self-adhesive waterproof membrane is applied to the surface of the lightweight foamed concrete backfill buffer layer 11. A clay waterproof layer 12 is covered on top of the top layer of single-sided self-adhesive waterproof membrane.

[0024] Column 2 is a steel-concrete composite structure, consisting of an external steel pipe and an internal cast-in-place concrete structure; the longitudinal beam 3 and the transverse beam 4 of the shed are welded box-shaped sections with stiffening ribs. The transverse limit 19, the longitudinal limit 7, and the transverse limit 9 of the longitudinal beam are welded to the longitudinal beam 3 of the shed, and the transverse limit 8 of the transverse beam is welded to the transverse beam 4 of the shed; the top plates of the transverse beam 4 of the shed are welded together, and the end retaining wall 5 is welded to the top surface of the transverse beam 4 of the shed using symmetrical welds.

[0025] like Figure 8 , Figure 9As shown: Column 2 consists of two sections. The first section, Column 2.1, is anchored to the pile foundation. Flanges are welded to both ends of the steel pipe of the first section, Column 2.1. A bearing plate 16 is pre-embedded in the top of the pile foundation 1 and external reinforcing bars 18 are installed. The bearing plate 16 is connected to the bearing plate anchor bars 15, which extend from the top surface of the bearing plate 16. The lower flange 17 of the steel pipe of the first section, Column 2.1, rests on the bearing plate 16. After the bearing plate anchor bars 15 pass through the corresponding holes, connecting nuts are used to connect the lower flange 17 to the pile foundation. The bearing plate 16 is locked, and the outward reinforcing bars 18 of the pile foundation 1 extend into the steel pipe of the first column 2.1. After the steel pipe is filled with concrete, the first column 2.1 is connected to the pile foundation 1 as a whole. The connecting beam 14 is welded between the first columns 2.1 on the same side as the existing line. The bottom end of the steel pipe of the second column 2.2 is welded with a flange. The steel pipes of the first column 2.1 and the second column 2.2 are connected by the flange. The steel pipe is filled with concrete for connection. The stiffening plate is welded between the flange and the steel pipe.

[0026] The longitudinal beam 3 of the shed consists of several independent segments. A 2mm wide installation gap is provided between the segments of the longitudinal beam 3, and the installation gap is filled with foam plastic board.

[0027] The installation gap between the end retaining walls 5 is 10mm. The installation gap is filled with foam plastic board. Each end retaining wall 5 along the existing line direction has a pre-reserved drainage hole in the middle and is connected to a drainage pipe. The opening of the drainage pipe in the lightweight foam concrete backfill buffer layer 11 is wrapped with non-woven fabric.

[0028] Each column 2 of the prefabricated shed has a grounding steel bar pre-embedded inside. The lower end of the grounding steel bar is connected to the outward reinforcing bar of the pile foundation 1, and the upper end is connected to the longitudinal beam 3 of the shed and a grounding terminal is installed.

[0029] The longitudinal beam transverse limit 19 and longitudinal beam longitudinal limit 7 have a chamfered end facing the column 2, the transverse limit 8 has a chamfered end facing the shed longitudinal beam 3, and the longitudinal limit 9 has a chamfered end facing the shed crossbeam 4.

[0030] A construction method for a prefabricated tunnel entrance on an existing high-speed railway line includes the following steps: 1. On-site survey and inspection of equipment and pipelines We conducted on-site surveys and inspections of the equipment, pipelines, and lines, and modified the design and construction plans to varying degrees based on the actual site conditions, developing practical and feasible optimized solutions for construction.

[0031] Based on the on-site survey and investigation, the project drawings were compared, reviewed, and jointly examined. Any problems discovered were promptly reported in writing to the supervising engineer, the construction unit, and relevant departments of the railway bureau. A detailed implementation plan was also carefully prepared and submitted to the supervising unit, the construction unit, and relevant departments of the railway bureau for approval.

[0032] 2. Construction of pile foundations (manually excavated bored piles) Preparations: Before pile foundation construction, the ground should be leveled and widened, and interception, drainage, and seepage prevention facilities should be set up. Underground drainage, ventilation, and lighting equipment should be prepared. A proper muck removal route should be arranged; materials and equipment should be stacked reasonably to avoid increasing borehole wall pressure and affecting construction.

[0033] Surveying and setting out: After the site is leveled, the lines are laid out according to the design control coordinates, and the pile positions are re-measured. Construction layout is carried out according to the cross lines of the pile holes, and protective piles are set outside the pile positions to allow for timely correction of the pile positions during construction.

[0034] Locking point construction: To ensure construction safety and borehole stability during pile hole excavation, a reinforced concrete locking point 30 cm above ground level must be constructed. The locking point formwork uses a brick structure, with internal steel reinforcement and concrete pouring. An operating platform should be erected on the locking point, lifting equipment installed, and prominent safety warning signs and sturdy protective railings set up. During rainy season construction, a rain shelter must be erected with robust reinforcement measures to prevent it from being blown off and encroaching on the boundary.

[0035] Pile hole excavation and support: Excavation can only begin one day after the formwork is removed following the pouring of the interlocking concrete. The excavation height of each pile hole section should be between 0.6 and 1.2 meters, and concrete retaining walls should be poured promptly. The concrete retaining walls must not encroach on the designed cross-sectional dimensions of the pile hole. Excavation of the next pile hole section should only begin after the formwork of the previous section's concrete retaining walls has been removed. Sectioning is strictly prohibited at locations of soil-rock strata changes or sliding surfaces. Harmful gas detection and drainage / ventilation within the pile hole should be conducted during excavation. Lifting equipment should have a self-locking function, and the height of the bucket filled with excavated material must not exceed the upper edge of the bucket. After being lifted to the ground, the material should be transported by handcart to a temporary stockpile area for centralized storage. Excavated material should be removed promptly; large-scale stockpiling on hillsides is strictly prohibited. Discarding excavated material into river channels is strictly prohibited, as this will affect bridge flood drainage. Construction access roads above the pile top and the accumulation of excavated material or heavy objects around the hole opening are strictly prohibited. During breaks in excavation, the hole opening must be covered and locked to ensure operational safety. Take rock samples from each section, compare them with the designed geological conditions, record the data, and draw a geological columnar section.

[0036] Final inspection: During the excavation and support of the pile hole, the verticality and cross-sectional dimensions of the pile hole should be checked after each section is excavated and supported. After excavation and support to the designed pile bottom elevation, the pile hole base and cross-sectional dimensions should be checked. Roughen the concrete retaining wall, pump out accumulated water, and clean loose stones and loose soil from the bottom of the hole to ensure that the pile base and net cross-sectional dimensions meet the design and specification requirements.

[0037] Fabrication and installation of the pile reinforcement cage: After the pile hole excavation and support are completed and inspected, the pile reinforcement cage is fabricated and installed. The reinforcement cage should be pre-disassembled, tied into shape, and then overlapped and installed inside the pile hole. After the pile reinforcement cage is installed in place, fixation measures should be taken to prevent it from floating. When tying the reinforcement cage, the cooling pipes should be tied according to the design requirements, and measures should be taken to avoid blockage. The grounding device should be installed according to the requirements of the "Railway Integrated Grounding System" (Tonghao (2016) 9301).

[0038] Pour the concrete for the pile body; the C40 concrete for the pile body is mixed at a centralized mixing plant, transported by mixer trucks, and poured by ground pump.

[0039] 3. Column construction The columns adopt a steel-concrete composite structure with an outer diameter of 1400mm and a wall thickness of 36mm. C40 concrete is poured into the pipes. The top of the columns is connected to the longitudinal beam of the shed opening, and the bottom is connected to the pile foundation.

[0040] The construction process is as follows: hoist the steel pipe of the first column section, connect the lower flange of the steel pipe to the bearing plate at the top of the pile foundation through the bearing plate anchor bars and bolts. After the steel pipe of the first column section is hoisted, hoist the connecting beam and weld it firmly. Before installing the steel pipe of the first column section, check the elevation of the top surface of the pile foundation, the levelness of the bearing plate and the condition of the bearing plate anchor bars. Only after confirming that they meet the design and specification requirements can the steel pipe be installed. The concrete inside the first column section is poured. C40 commercial concrete is used. The concrete is transported into the steel pipe and compacted in layers. The surface of the poured concrete is 1m away from the top surface of the steel pipe of the first column section, and splicing steel bars are pre-embedded. The splicing steel bars are 1.2m long and extend 60cm inwards at the top and bottom. The steel pipe of the second column is hoisted and connected to the steel pipe of the first column using a flange. The concrete inside the second column section is poured. C40 commercial concrete is used. The concrete is transported into the steel pipe and compacted in layers until it reaches the top surface of the steel pipe.

[0041] 4. Construction of longitudinal beams and transverse beams of the shed. Both the longitudinal and transverse beams of the tunnel are welded box-sections with stiffening ribs. The longitudinal beams are 900mm wide and 1000mm high. The transverse beams are 800mm wide and 1000mm high. They are made of Q355B steel, fabricated in a specialized factory, and installed on site using a truck crane.

[0042] The longitudinal beam of the shed consists of an 11.99m long independent segment and a 12.79m long independent segment. The installation gap between the two independent segments is 2mm, which is filled with polyethylene foam board.

[0043] The total length of the tunnel crossbeams is 19.5m. They are manufactured in sections in the factory, with each section positioned 1m from the central partition. After being transported to the site, they are spliced ​​and welded together, and then hoisted as a whole. A total of 30 crossbeams are installed sequentially from the smallest to the largest mileage, with the top plates of the tunnel crossbeams connected by welding.

[0044] The longitudinal beam longitudinal limit, transverse beam transverse limit, transverse beam longitudinal limit, and longitudinal beam transverse limit are all made of the same Q355B steel as the steel box girder. They are prefabricated in the factory according to the design dimensions and welded in the storage area according to the design and measurement results before the steel box girder is hoisted. After the welds pass the inspection, they are painted.

[0045] 5. End wall construction: After the main structure of the prefabricated tunnel is completed, end walls are constructed around the top surface of the tunnel's crossbeams. The end walls are fabricated in a specialized factory and transported to the site for installation by a truck crane.

[0046] Each end retaining wall along the existing line has a 75mm diameter drainage hole pre-reserved in the middle and connected to a Φ70 PVC drainage pipe. The opening of the drainage pipe is wrapped with non-woven fabric in the lightweight foamed concrete backfill buffer layer.

[0047] 6. Construction techniques for other structures above the shed / cave After the end retaining wall is installed, a C35 reinforced concrete slab, 30cm thick, is laid on the surface of the shed beam. A single-sided self-adhesive waterproof membrane is applied to the surface of the reinforced concrete slab, followed by leveling with M20 waterproof mortar. After the leveling layer has solidified, a buffer layer of lightweight foamed concrete is used for backfilling, with a thickness of 0.7–1.9m, forming a drainage and buffer slope. Then, a top layer of single-sided self-adhesive waterproof membrane is applied to the surface of the lightweight foamed concrete backfill buffer layer, and finally, a 30cm thick clay waterproof layer is placed on top.

[0048] The waterproof mortar leveling layer uses M20 waterproof mortar, which is manually mixed on site with a mix ratio of cement:sand:waterproofing agent = 1:2:0.5.

[0049] Before applying the waterproof mortar leveling layer, the substrate should be moistened with water, and a layer of neat cement slurry should be brushed on before laying the mortar. Mix the cement mortar according to the mixing ratio, and the mortar layer should be approximately 20mm thick. After leveling and compacting with a 2m straightedge, smooth it with a wooden trowel. Pay attention to smoothing out any pits or sand holes in the surface, and fill and smooth any pores or gaps on the substrate surface.

[0050] Expansion joints are set in the waterproof mortar leveling layer. The principle of setting them is: set them during pouring, set them evenly and straight, and the corners should be smoothed into an arc shape with a radius of not less than 50mm. The expansion joints are 6m long and 20mm wide, and are filled with building sealant.

[0051] After the waterproof mortar leveling layer has solidified, a lightweight foamed concrete backfill buffer layer is used, with a thickness of 0.7–1.9 m, forming a drainage and buffer slope. Cast-in-place foamed concrete conforming to FC A07-C2-W10-S-JG / T 266-2011 is used, with a strength grade of C2 and a water absorption rate grade of W10.

[0052] The above description of the disclosed embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A prefabricated tunnel entrance for existing high-speed railway tunnels, characterized in that: The prefabricated tunnel spans the existing railway line and is supported by pile foundations (1) on both sides; The prefabricated shed includes columns (2), longitudinal beams (3), transverse beams (4), end walls (5), and reinforced concrete slabs (6); The column base of the column (2) is connected to the pile foundation (1). The longitudinal beam (3) of the shed is placed on the top of the column (2) located on the same side of the existing line. The transverse beam (4) of the shed spans both ends of the existing line and rests on the top surface of the longitudinal beam (3). Both the longitudinal beam (3) and the transverse beam (4) of the shed are fixed by horizontal and vertical limiting. Two sets of longitudinal beam lateral limiters (19) and two sets of longitudinal beam longitudinal limiters (7) are set at the connection between the longitudinal beam (3) of the shed and each column (2). The two sets of longitudinal beam lateral limiters (19) and the two sets of longitudinal beam longitudinal limiters (7) are fixed on the longitudinal beam (3) of the shed and locked in front, back, left and right of the column (2). Each crossbeam (4) of the shed is connected to the left and right longitudinal beams (3) of the shed, and a set of horizontal limiters (8) are set on the left and right sides. The horizontal limiters (8) are fixed on the crossbeam (4) of the shed and locked on both sides of the longitudinal beam (3). A set of longitudinal limiters (9) for crossbeams is set at both ends of the left and right side shed longitudinal beams (3). The shed crossbeams (4) are fully laid between the longitudinal limiters (9), and the top surfaces of the shed crossbeams (4) are seamlessly connected. An end wall (5) is set in a circle in the plane formed by the top surface of the shed beam (4). The end wall (5) is fixedly connected to the shed beam (4). A drainage structure is set on the end wall (5) along the existing line direction. A reinforced concrete slab (6) is laid on the top surface of the shed beam (4). A bottom layer of single-sided self-adhesive waterproof membrane is applied to the surface of the reinforced concrete slab (6). A waterproof mortar leveling layer (10) is set on the top of the bottom layer of single-sided self-adhesive waterproof membrane. A lightweight foamed concrete backfill buffer layer (11) is set on the top of the waterproof mortar leveling layer (10). The thickness of the lightweight foamed concrete backfill buffer layer (11) is between 0.7 and 1.9 m, forming a drainage slope that is high in the middle and low on both sides of the existing line. A top layer of single-sided self-adhesive waterproof membrane is applied to the surface of the lightweight foamed concrete backfill buffer layer (11). A clay waterproof layer (12) is covered on the top layer of single-sided self-adhesive waterproof membrane. The column (2) is a steel pipe concrete structure, including an external steel pipe and an internal cast-in-place concrete; the shed longitudinal beam (3) and the shed transverse beam (4) are welded box sections with stiffening ribs. The longitudinal beam transverse limit (19), the longitudinal beam longitudinal limit (7) and the transverse beam longitudinal limit (9) are welded to the shed longitudinal beam (3), and the transverse beam transverse limit (8) is welded to the shed transverse beam (4); the top plates of the shed transverse beam (4) are welded together, and the end wall (5) is welded to the top surface of the shed transverse beam (4) with symmetrical welds; The column (2) consists of two sections. The first section (2.1) is anchored to the pile foundation. Flanges are welded to both ends of the steel pipe of the first section (2.1). A bearing plate (16) is pre-embedded at the top of the pile foundation (1) and external reinforcing bars (18) are provided. The bearing plate (16) is connected to the bearing plate anchor bars (15). The bearing plate anchor bars (15) extend from the top surface of the bearing plate (16). The lower flange (17) of the steel pipe of the first section (2.1) rests on the bearing plate (16). After the bearing plate anchor bars (15) pass through the corresponding holes, the nuts are connected to secure the lower flange (17). 17) Locked with the bearing plate (16), the outward reinforcing bar (18) of the pile foundation (1) extends into the steel pipe of the first column (2.1), and after the concrete is poured into the steel pipe, the first column (2.1) and the pile foundation (1) are connected as one unit; the connecting beam (14) is welded between the first columns (2.1) on the same side as the existing line; the bottom end of the steel pipe of the second column (2.2) is welded with a flange, and the steel pipes of the first column (2.1) and the second column (2.2) are connected by the flange, the inside of the steel pipe is filled with concrete for connection, and the flange and the steel pipe are welded with a stiffening plate.

2. The prefabricated tunnel entrance for existing high-speed railways according to claim 1, characterized in that: The aforementioned shed longitudinal beam (3) includes several independent segments. A 2mm wide installation gap is provided between the segments of the shed longitudinal beam (3), and the installation gap is filled with foam plastic board.

3. The prefabricated tunnel entrance for existing high-speed railways according to claim 2, characterized in that: The installation gap between the end guards (5) is 10mm. The installation gap is filled with foam plastic board. Each end guard (5) along the existing line direction has a pre-reserved drainage hole in the middle and is connected to a drainage pipe. The drain pipe is located in the lightweight foam concrete backfill buffer layer (11) and the pipe opening is wrapped with non-woven fabric.

4. The prefabricated tunnel entrance for existing high-speed railways according to claim 3, characterized in that: Each column (2) of the assembled shed is pre-embedded with a grounding steel bar. The lower end of the grounding steel bar is connected to the outward extension steel bar of the pile foundation (1), and the upper end is connected to the longitudinal beam (3) of the shed and a grounding terminal is provided.

5. The prefabricated tunnel entrance for existing high-speed railways according to claim 1, characterized in that: The longitudinal beam transverse limit (19) and longitudinal beam longitudinal limit (7) have chamfered ends facing the column (2), the transverse limit (8) has chamfered ends facing the shed longitudinal beam (3), and the longitudinal limit (9) has chamfered ends facing the shed cross beam (4).

6. A construction method for a prefabricated tunnel entrance of an existing high-speed railway tunnel, used for constructing the prefabricated tunnel entrance of an existing high-speed railway tunnel as described in claim 4, characterized in that, Pile foundation construction includes the following steps: S1: Lay out the lines according to the design control coordinates and re-measure the pile positions; conduct construction layout according to the cross lines of the pile holes and set up protective piles outside the pile positions; S2: Pile hole excavation and support. The excavation height of each pile hole section is between 0.6 and 1.2 meters. After excavation, a concrete retaining wall is poured. The concrete retaining wall does not encroach on the design cross-sectional dimensions of the pile hole. When excavating the next pile hole section, it is done after the formwork of the previous concrete retaining wall section is removed. S3: Final hole inspection; S4: Fabrication and installation of the pile reinforcement cage. The reinforcement cage is pre-disassembled, tied into shape, and then lapped and installed inside the pile hole. After the reinforcement cage is installed in place, it is fixed to prevent it from floating. S5: Concrete is poured into the pile hole.

7. The construction method of a prefabricated shed-type tunnel entrance for an existing high-speed railway as described in claim 6, characterized in that, Install columns Includes the following steps: S1: Hoist the steel pipe of the first column (2.1), connect the lower flange (17) on the steel pipe to the bearing plate (16) at the top of the pile foundation (1) through the bearing plate anchor bar (15) and bolts. After the steel pipe of the first column (2.1) is hoisted, hoist the connecting beam (14) and weld it firmly. S2: Pour concrete into the first column section (2.1), transport the concrete into the steel pipe, and vibrate it in layers to make it dense; the concrete surface after pouring is 1m away from the top surface of the steel pipe of the first column section (2.1), and pre-embed the splice steel bars. The splice steel bars are 1.2m long and extend 60cm into the top and bottom. S3: Hoist the steel pipe of the second column (2.2). The steel pipe of the second column (2.2) is connected to the steel pipe of the first column (2.1) by a flange. S4: Pour concrete into the second column (2.2), transport the concrete into the steel pipe, and vibrate it in layers until it reaches the top surface of the steel pipe.

Citation Information

Patent Citations

  • Component based protection scaffolding structure for preventing high slope rock fall of highway, and construction method thereof

    CN109594485A

  • Operating high-speed rail tunnel portal anti-impact combined structure system

    CN119712150A

  • Position structure of bridge pile foundation and subway tunnel

    CN217078829U