Industrial chain analysis method and device based on indicator system

Through the industrial chain analysis method based on the index system, the software product characteristics and data are obtained, weighted calculations and analysis are carried out, and the index system is adjusted, the subjectivity and limitations of the existing methods are solved, and the comprehensive and comprehensive software development industry chain is achieved. Accurate assessment and real-time monitoring to adapt to the needs of different environments and stages.

CN118113333BActive Publication Date: 2024-11-01WUHAN WEIPENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410316636.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-11-01
Estimated Expiration
2044-03-20

AI Technical Summary

Technical Problem

The existing industrial chain analysis method based on the index system has subjectivity and limitations, and it is difficult to flexibly set up the index system according to different industrial chains, and it is impossible to comprehensively and accurately evaluate all links of the industrial chain in the software development field, and it is impossible to promptly discover problems and potential risks. .

Method used

Provide an industrial chain analysis method based on the index system. By obtaining the characteristics of the software product, determining the analysis indicators, weighted calculations according to the preset weights, obtaining data from each link, using the preset analysis method for analysis, and adjusting the index system based on the analysis results , monitor and optimize the operation status of the industrial chain in real time.

Benefits of technology

A comprehensive assessment of all links of the software industry chain has been achieved, which reduces the uncertainty of subjective judgment and qualitative analysis, provides more accurate assessment results, can promptly discover problems and potential risks, and provides guidance for the formulation of improvement strategies, which is applicable to Different industrial environments and development stages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118113333B_ABST
    Figure CN118113333B_ABST
Patent Text Reader

Abstract

The present application relates to the field of industrial chain technology, and in particular to an industrial chain analysis method and device based on an index system. The method comprises: obtaining the characteristics of software products in the software industrial chain; based on the characteristics of the software products, determining at least one analysis index of the software industrial chain, the types of the analysis indexes including reliability index, security index, usability index, performance index and maintainability index; performing weighted calculation on the at least one analysis index according to a preset weight method to obtain an index system; obtaining the first corresponding data of the software product in each link of the software industrial chain; according to the index system, using a preset analysis method, analyzing the first corresponding data of each link to obtain an analysis result; adjusting the index system according to the analysis result. The present method can flexibly set different index systems according to different industrial chains.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of industrial chain, and in particular to an industrial chain analysis method and device based on an indicator system. Background Art

[0002] With the rapid development of information technology, the industrial chain in the field of software development has become one of the important pillars of today's economic development. However, how to effectively analyze and evaluate the industrial chain in the field of software development to improve its quality, efficiency and security has always been the focus of the industry. Traditional industrial chain analysis methods often rely on qualitative analysis and subjective judgment, lacking objective quantitative indicators and data support. This method is difficult to comprehensively and accurately evaluate each link of the industrial chain, cannot timely discover problems and potential risks, and is difficult to formulate targeted improvement strategies.

[0003] In order to solve these problems, some industrial chain analysis methods based on indicator systems have emerged. These methods quantitatively analyze and evaluate each link of the industrial chain by constructing a comprehensive and systematic indicator system. The indicator system usually includes indicators in software quality, development efficiency, security, innovation capability and industrial ecology. However, the existing industrial chain analysis methods based on indicator systems still have some shortcomings. For example, the selection of indicators and the determination of weights may be subjective and limited, and different indicator systems may be suitable for different industrial environments and development stages.

[0004] Therefore, there is an urgent need for an industrial chain analysis method and device based on an indicator system to flexibly set different indicator systems according to different industrial chains. Summary of the invention

[0005] Based on this, it is necessary to provide an industrial chain analysis method, device, computer equipment, computer-readable storage medium and computer program product based on an indicator system, which can flexibly set different indicator systems according to different industrial chains in response to the above-mentioned technical problems.

[0006] In the first aspect, the present application provides an industrial chain analysis method based on an indicator system, including:

[0007] Obtain the characteristics of software products in the software industry chain;

[0008] Based on the characteristics of the software product, determining at least one analysis indicator of the software industry chain, wherein the types of the analysis indicator include reliability indicator, security indicator, usability indicator, performance indicator and maintainability indicator;

[0009] Performing weighted calculation on the at least one analysis indicator according to a preset weight method to obtain an indicator system;

[0010] Acquire first corresponding data of the software product in each link of the software industry chain;

[0011] According to the indicator system, using a preset analysis method, analyzing the first corresponding data of each link to obtain an analysis result;

[0012] According to the analysis results, the indicator system is adjusted.

[0013] In one embodiment, adjusting the indicator system according to the analysis result includes:

[0014] Determining the score of at least one analysis indicator of the software industry chain according to the analysis result;

[0015] According to the score, a corresponding preset improvement plan and a preset monitoring mechanism are matched, wherein the preset improvement plan includes at least one of optimizing the development process, enhancing the testing efficiency, improving the quality management, improving the development tools and improving the output efficiency;

[0016] In the process of implementing the preset improvement plan in the software industry chain, obtaining second corresponding data of each link in the software industry chain returned based on the preset monitoring mechanism;

[0017] Obtaining an improvement effect value of the second corresponding data compared to the first corresponding data;

[0018] If the improvement effect value is greater than a preset threshold, the indicator system is adjusted according to the matched preset improvement plan.

[0019] In one embodiment, in the process of implementing the preset improvement plan in the software industry chain, before obtaining the second corresponding data of each link in the software industry chain returned based on the preset monitoring mechanism, it also includes:

[0020] Analyze the preset improvement plan using a Gantt chart management tool to obtain a schedule, which includes the corresponding task volume and priority of each link;

[0021] Determine the key links of the schedule by identifying the critical path;

[0022] Using resource allocation algorithms, human resources are allocated to each link according to the corresponding task volume and priority of each link;

[0023] Analyze the problems and risks that are expected to occur in the key links through risk prediction algorithms;

[0024] Based on the problems and risks expected to occur in the key links, the task progress of the key links is monitored in real time using a real-time monitoring algorithm;

[0025] According to the task progress of the key links, the corresponding task volume and priority of each link in the schedule plan are adjusted.

[0026] In one embodiment, adjusting the task amount and priority of each link in the schedule plan according to the task progress of the key link includes:

[0027] If the task progress of the key link is less than the preset progress threshold, the task matching degree and task progress of the human resources in each link are obtained;

[0028] According to the task matching degree and task progress of the human resources in each link, the task volume and priority of the key links are adjusted with the optimal solution goal;

[0029] According to the adjusted task volume and priority of the key link, the corresponding task volume and priority of other links are adaptively adjusted.

[0030] In one embodiment, adjusting the task amount and priority of each link in the schedule plan according to the task progress of the key link includes:

[0031] If the task progress of the key link is lower than the preset progress threshold, determining the link type of the key link;

[0032] If the link type is a development link, then according to the preset allocation rules, part of the pre-order preparation task volume of the development link is allocated to the task volume of the testing link until the task progress of the development link reaches the preset progress threshold.

[0033] In one embodiment, allocating part of the pre-processing task amount of the development phase to the task amount of the testing phase according to a preset allocation rule until the task progress of the development phase reaches a preset progress threshold further includes:

[0034] Obtaining remaining human resources of the testing phase according to a portion of the pre-processing task amount of the development phase allocated to the testing phase;

[0035] When some software functions are developed in the development phase, the remaining human resources in the testing phase are used to test the developed software functions in parallel.

[0036] In one embodiment, the method further comprises:

[0037] If the task progress of the key link is lower than the preset progress threshold, analyze the reasons for the progress delay of the key link;

[0038] If the cause of the progress delay includes frequent changes in software functional requirements, the backup human resources of the key links are called and the frequent changes are recorded;

[0039] In the case that the backup human resources of the key link are not called upon during the preset period, the task volume of the key link is suspended until confirmation information of the software function requirement is obtained.

[0040] In the second aspect, the present application also provides an industrial chain analysis device based on an indicator system, including:

[0041] An acquisition module is used to acquire the characteristics of software products in the software industry chain;

[0042] A processing module, configured to determine at least one analysis indicator of the software industry chain based on the characteristics of the software product, wherein the types of the analysis indicator include reliability indicator, security indicator, usability indicator, performance indicator and maintainability indicator;

[0043] A calculation module, used to perform weighted calculation on the at least one analysis indicator according to a preset weight method to obtain an indicator system;

[0044] The acquisition module is further used to acquire the first corresponding data of the software product in each link of the software industry chain;

[0045] The processing module is further used to analyze the first corresponding data of each link according to the indicator system and adopt a preset analysis method to obtain an analysis result;

[0046] An adjustment module is used to adjust the indicator system according to the analysis result.

[0047] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:

[0048] Obtain the characteristics of software products in the software industry chain;

[0049] Based on the characteristics of the software product, determining at least one analysis indicator of the software industry chain, wherein the types of the analysis indicator include reliability indicator, security indicator, usability indicator, performance indicator and maintainability indicator;

[0050] Performing weighted calculation on the at least one analysis indicator according to a preset weight method to obtain an indicator system;

[0051] Acquire first corresponding data of the software product in each link of the software industry chain;

[0052] According to the indicator system, using a preset analysis method, analyzing the first corresponding data of each link to obtain an analysis result;

[0053] According to the analysis results, the indicator system is adjusted.

[0054] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the following steps are implemented:

[0055] Obtain the characteristics of software products in the software industry chain;

[0056] Based on the characteristics of the software product, determining at least one analysis indicator of the software industry chain, wherein the types of the analysis indicator include reliability indicator, security indicator, usability indicator, performance indicator and maintainability indicator;

[0057] Performing weighted calculation on the at least one analysis indicator according to a preset weight method to obtain an indicator system;

[0058] Acquire first corresponding data of the software product in each link of the software industry chain;

[0059] According to the indicator system, using a preset analysis method, analyzing the first corresponding data of each link to obtain an analysis result;

[0060] According to the analysis results, the indicator system is adjusted.

[0061] In a fifth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:

[0062] Obtain the characteristics of software products in the software industry chain;

[0063] Based on the characteristics of the software product, determining at least one analysis indicator of the software industry chain, wherein the types of the analysis indicator include reliability indicator, security indicator, usability indicator, performance indicator and maintainability indicator;

[0064] Performing weighted calculation on the at least one analysis indicator according to a preset weight method to obtain an indicator system;

[0065] Acquire first corresponding data of the software product in each link of the software industry chain;

[0066] According to the indicator system, using a preset analysis method, analyzing the first corresponding data of each link to obtain an analysis result;

[0067] According to the analysis results, the indicator system is adjusted.

[0068] The above-mentioned industrial chain analysis method, device, computer equipment, computer readable storage medium and computer program product based on the index system can comprehensively evaluate each link of the software industry chain by constructing a comprehensive and systematic index system. Indicators of different aspects such as software quality, development efficiency, security, innovation ability and industrial ecology can be included in the evaluation scope, so as to fully understand the overall situation of the industrial chain. This method reduces the uncertainty of subjective judgment and qualitative analysis in traditional methods by adopting quantitative analysis and evaluation methods. The establishment of the index system makes the evaluation process more objective, and can provide more accurate results by quantitative analysis based on data. By obtaining the first response data of software products in each link of the industrial chain and adopting preset analysis methods and index systems, the operation status of the industrial chain can be monitored in real time. This helps to discover problems and potential risks in a timely manner and provide guidance for formulating targeted improvement strategies. The method can flexibly set different index systems according to different industrial chains. This means that according to the specific industrial environment and development stage, a suitable index system can be selected for analysis and evaluation, increasing the applicability and flexibility of the method. BRIEF DESCRIPTION OF THE DRAWINGS

[0069] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments or the related technical descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0070] Figure 1 It is an application environment diagram of an industrial chain analysis method based on an indicator system in one embodiment;

[0071] Figure 2 A schematic diagram of a process flow of an industrial chain analysis method based on an indicator system in one embodiment;

[0072] Figure 3 It is a flowchart of an industrial chain analysis method based on an indicator system in another embodiment;

[0073] Figure 4 It is a flowchart of an industrial chain analysis method based on an indicator system in another embodiment;

[0074] Figure 5 is a structural block diagram of an industrial chain analysis device based on an indicator system in one embodiment;

[0075] Figure 6 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0076] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0077] The industrial chain analysis method based on the indicator system provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown, the terminal 102 communicates with the server 104 through a network. The data storage system can store data that the server 104 needs to process. The data storage system can be integrated on the server 104, or placed on the cloud or other network servers.

[0078] Server 104 obtains the characteristics of software products in the software industry chain; based on the characteristics of the software products, determines at least one analysis indicator of the software industry chain; performs weighted calculation on at least one analysis indicator according to a preset weight method to obtain an indicator system, and the types of analysis indicators include reliability indicators, security indicators, usability indicators, performance indicators and maintainability indicators; obtains the first corresponding data of each link of the software product in the software industry chain; according to the indicator system, uses a preset analysis method to analyze the first corresponding data of each link to obtain analysis results; adjusts the indicator system according to the analysis results.

[0079] The terminal 102 may be, but is not limited to, various personal computers, laptops, smart phones, tablet computers, IoT devices, and portable wearable devices. The IoT devices may be smart speakers, smart TVs, smart air conditioners, smart car-mounted devices, etc. The portable wearable devices may be smart watches, smart bracelets, head-mounted devices, etc. The server 104 may be implemented as an independent server or a server cluster consisting of multiple servers.

[0080] In an exemplary embodiment, Figure 2 As shown in the figure, an industrial chain analysis method based on an indicator system is provided. Figure 1 The server in the example is used to illustrate, including the following steps S202 to S212. Among them:

[0081] Step S202, obtaining characteristics of software products in the software industry chain.

[0082] Specifically, the characteristics of software products in the software industry chain refer to the features and attributes of software products during the software development, production and delivery process. These characteristics can involve multiple aspects, such as functional characteristics, technical characteristics, quality characteristics and market characteristics. The following are some explanations of software product characteristics:

[0083] Features: The features of a software product refer to the functions and capabilities it provides. Software products are usually designed and developed to solve specific problems or meet specific needs, so its features describe the functions it has and how the functions work.

[0084] Technical features: The technical features of a software product include the technology platform used, development language, architecture design, etc. Technical features can involve the scalability, usability, performance, etc. of the software product.

[0085] Quality characteristics: The quality characteristics of a software product refer to the quality attributes that are of concern during the development of the software product, such as reliability, security, maintainability, and testability. Quality characteristics are important indicators for evaluating and measuring the quality of software products.

[0086] Market characteristics: The market characteristics of software products include the target user groups, competitive environment, etc. The analysis of market characteristics can help understand the competitiveness of software products in the market and changes in market demand.

[0087] Step S204, based on the characteristics of the software product, at least one analysis indicator of the software industry chain is determined, and the types of analysis indicators include reliability indicators, security indicators, usability indicators, performance indicators and maintainability indicators.

[0088] Specifically, based on the characteristics of software products, at least one analysis indicator of the software industry chain is determined, and software quality indicators can be selected. Software quality indicators are an indicator system for evaluating and measuring the quality of software products, reflecting the quality level of software products in all aspects. Among them:

[0089] Reliability indicators: measure the stability and reliability of the normal operation of software products. For example, the crash rate, error handling and recovery capabilities of the application.

[0090] Security indicators: focus on the security and protection measures of software products, and evaluate whether the software products can protect user data and system security. For example, the number of security vulnerabilities, security assessment results, etc.

[0091] Usability index: evaluates the friendliness of the software product interface and the simplicity of operation. For example, whether the interface design is intuitive and easy to use, whether the user experience is good, etc.

[0092] Performance indicators: measure the running speed, response time and resource utilization efficiency of software products. For example, program execution time, network request response time, resource consumption, etc.

[0093] Maintainability indicators: Evaluate the maintainability and scalability of software products, including code readability, testability, modularity and scalability.

[0094] Step S206: perform weighted calculation on at least one analysis indicator according to a preset weight method to obtain an indicator system.

[0095] Specifically, the weighted calculation according to the preset weight method is to consider the importance of different indicators and comprehensively derive a comprehensive indicator system. This can more comprehensively evaluate various indicators in the software industry chain and provide a more scientific basis for decision-making.

[0096] In order to perform weighted calculation, it is first necessary to determine the weights of each indicator. The weights can be set based on professional knowledge, practical experience or relevant data. A common setting method is to determine the weights through expert surveys or the analytic hierarchy process (AHP).

[0097] Assume that software quality indicators are selected as the analysis indicator system, and the following indicators and their corresponding weights are set:

[0098] Reliability index: weight is 0.3

[0099] Safety index: weight is 0.2

[0100] Usability index: weight is 0.15

[0101] Performance index: weight is 0.25

[0102] Maintainability index: weight is 0.1

[0103] To perform weighted calculation using these weights, you can follow these steps:

[0104] Each indicator is normalized and converted into a range from 0 to 1.

[0105] Multiply the normalized value of each indicator by its corresponding weight to obtain the weighted value.

[0106] Add up all weighted values ​​to get the final comprehensive index.

[0107] For example, assuming that the normalized value of the reliability index is 0.8, the safety index is 0.9, the usability index is 0.7, the performance index is 0.85, and the maintainability index is 0.75, weighted calculation based on the set weights can yield the following results:

[0108] (0.8*0.3)+(0.9*0.2)+(0.7*0.15)+(0.85*0.25)+(0.75*0.1)=0.8035.

[0109] In this way, we get a comprehensive index value, which is used to represent the overall quality performance of the software industry chain. The higher the value, the better the overall quality.

[0110] Step S208, obtaining first corresponding data of each link of the software product in the software industry chain;

[0111] Step S210: According to the indicator system, a preset analysis method is used to analyze the first corresponding data of each link to obtain an analysis result.

[0112] Specifically, some common software industry chain links and possible first corresponding data:

[0113] Requirements analysis phase: time to write requirements documents, number of requirements changes, time to confirm requirements, etc.

[0114] Design and planning phase: time to write design documents, number of design reviews, number of design changes, planning time, etc.

[0115] Development phase: code writing time, code quality assessment results, number of code changes, number of code reviews, development cycle, etc.

[0116] Testing phase: test case writing time, test execution time, number of defects found, defect repair time, test coverage, etc.

[0117] Deployment and delivery phase: deployment time, deployment success rate, user feedback time, delivery time, etc.

[0118] Operation and maintenance aspects: fault response time, fault repair time, maintenance cost, user satisfaction survey, etc.

[0119] After obtaining the first corresponding data, the data of each link can be analyzed according to the preset indicator system and analysis method. The analysis method can be selected according to the specific situation, for example:

[0120] Comparative analysis: Compare data from the same link, compare differences between different projects, teams or time periods, and find potential problems or points for improvement.

[0121] Trend analysis: Observe the data change trends in each link, analyze whether there is a trend of improvement or deterioration, and take timely measures to make adjustments.

[0122] Root cause analysis: Through in-depth analysis of link data, find the root causes of problems or good performance and provide targeted suggestions for improvement.

[0123] Comprehensive evaluation: The data from each link is combined and weighted calculation is performed according to the preset weights to obtain an overall evaluation value to evaluate the quality level of the software industry chain.

[0124] By analyzing the first-hand corresponding data of each link in the software industry chain, we can help discover potential problems and improvement opportunities, optimize the operating efficiency and quality of the industry chain, and thus improve the overall quality of software products and user experience.

[0125] Step S212: adjusting the index system according to the analysis results.

[0126] Specifically, importance ranking: Based on the analysis results, re-evaluate the importance of each analysis indicator and rank them. By analyzing the weight and impact of the results, determine which indicators are more critical for evaluating the performance and effectiveness of the software industry chain. When adjusting the indicator system, more influential indicators can be placed in a more important position.

[0127] New indicators: According to the analysis results, it is found that the original indicator system may be insufficient, missing or unable to fully evaluate specific aspects of the software industry chain. Based on the new needs raised by the analysis results, consider adding new indicators to supplement the deficiencies of the original indicator system.

[0128] Deleting or adjusting indicators: According to the analysis results, it is found that some indicators may no longer be applicable or have low explanatory power when evaluating the software industry chain. For these indicators, it is possible to consider deleting or adjusting their weights to maintain the simplicity and effectiveness of the indicator system.

[0129] Adjust indicator weights: Determine the importance and contribution of each analysis indicator based on the analysis results. Adjust indicator weights accordingly based on actual needs and the weight of the analysis results to ensure that more important indicators have higher weights in the overall evaluation, reflecting their important impact on the performance of the software industry chain.

[0130] Set standards and thresholds: According to the analysis results, set reasonable standards and thresholds for each indicator. These standards and thresholds can be used as the basis for evaluating the software industry chain, helping to determine the compliance of different indicators, timely discover problems and formulate improvement measures.

[0131] When adjusting the indicator system, it is necessary to comprehensively consider the analysis results, business needs and actual conditions to ensure that the indicator system can comprehensively and accurately evaluate all aspects of the software industry chain. At the same time, regular evaluation and adjustment of the indicator system is also a continuous improvement process to adapt to the ever-changing business environment and needs.

[0132] In the above-mentioned industrial chain analysis method based on the indicator system, by constructing a comprehensive and systematic indicator system, a comprehensive evaluation can be conducted on each link of the software industry chain. Indicators of different aspects such as software quality, development efficiency, security, innovation ability and industrial ecology can be included in the evaluation scope, so as to fully understand the overall situation of the industrial chain. This method reduces the uncertainty of subjective judgment and qualitative analysis in traditional methods by adopting quantitative analysis and evaluation methods. The establishment of the indicator system makes the evaluation process more objective, and can provide more accurate results by quantitative analysis based on data. By obtaining the first response data of software products in each link of the industrial chain and adopting preset analysis methods and indicator systems, the operation status of the industrial chain can be monitored in real time. This helps to discover problems and potential risks in a timely manner and provide guidance for the formulation of targeted improvement strategies. This method can flexibly set different indicator systems according to different industrial chains. This means that according to the specific industrial environment and development stage, a suitable indicator system can be selected for analysis and evaluation, increasing the applicability and flexibility of the method.

[0133] In an exemplary embodiment, Figure 3 As shown in the figure, according to the analysis results, the indicator system is adjusted, including:

[0134] Step S302, determining the score of at least one analysis indicator of the software industry chain according to the analysis result;

[0135] Step S304, matching corresponding preset improvement plans and preset monitoring mechanisms according to the scores, wherein the preset improvement plans include at least one of optimizing development processes, enhancing testing efficiency, improving quality management, improving development tools, and improving output efficiency;

[0136] Step S306, in the process of implementing the preset improvement plan in the software industry chain, obtaining second corresponding data of each link in the software industry chain returned based on the preset monitoring mechanism;

[0137] Step S308, obtaining an improvement effect value of the second corresponding data compared with the first corresponding data;

[0138] Step S310: If the improvement effect value is greater than a preset threshold, the indicator system is adjusted according to the matched preset improvement plan.

[0139] Specifically, when analyzing the software industry chain, one or more analysis indicators can be selected, such as development efficiency, test coverage, quality management indicators, etc. For each selected indicator, an evaluation and scoring can be performed to understand its performance in the software industry chain.

[0140] Based on the scores, the corresponding preset improvement plans and preset monitoring mechanisms can be matched. Among them:

[0141] Optimize development process: Improve development efficiency and quality management through process improvement, application of project management tools and methods. The preset monitoring mechanism can include data collection on project completion time, accuracy and compliance of task assignment, etc.

[0142] Enhance testing efficiency: Improve test coverage and problem-finding efficiency by optimizing test strategies, tools, and automated testing. The preset monitoring mechanism can include data collection on test coverage, defect discovery rate, and problem-solving time.

[0143] Improve quality management: Strengthen quality control and process management, including measures such as code review, defect management, and continuous integration. The preset monitoring mechanism can include data collection on code quality assessment, number of defects, and continuous integration success rate.

[0144] Improve development tools: Provide better development environment and tool support to improve development efficiency and code quality. The preset monitoring mechanism can include data collection on development tool usage, feedback, and developer satisfaction.

[0145] Improve output efficiency: Improve the efficiency and quality of software output through technology improvement, tool use and teamwork. The preset monitoring mechanism can include data collection on the number of lines of code, function point delivery rate and customer satisfaction.

[0146] In the process of implementing the preset improvement plan, it is necessary to collect the second corresponding data to compare the situation before and after the improvement. These data can be indicator data related to the improvement plan, such as development time, test coverage, quality indicators, etc. before and after the improvement. By comparing the first corresponding data and the second corresponding data, the improvement effect value can be calculated to evaluate the effectiveness of the improvement measures. The improvement effect value can be obtained by calculating the difference, proportion or other appropriate methods. If the improvement effect value is greater than the preset threshold, it means that the improvement plan has achieved significant results. According to the matching preset improvement plan, the indicator system of the software industry chain can be adjusted, including modifying weights, adding or deleting relevant indicators, etc., to more reasonably reflect the impact and performance of the improvement plan. These adjustments should be based on data and actual results, and be fully evaluated and verified.

[0147] In an exemplary embodiment, Figure 4 As shown, in the process of implementing the preset improvement plan in the software industry chain, before obtaining the second corresponding data of each link in the software industry chain returned based on the preset monitoring mechanism, it also includes:

[0148] Step S402, using a Gantt chart management tool to analyze the preset improvement plan and obtain a schedule, which includes the corresponding task volume and priority of each link;

[0149] Step S404, determining the key links of the schedule by identifying the critical path;

[0150] Step S406, using a resource allocation algorithm to allocate human resources to each link according to the corresponding task volume and priority of each link;

[0151] Step S408, analyzing the problems and risks expected to occur in key links through risk prediction algorithms;

[0152] Step S410, based on the problems and risks expected in the key links, using a real-time monitoring algorithm to monitor the progress of the key links in real time;

[0153] Step S412, according to the task progress of the key links, adjust the corresponding task volume and priority of each link in the progress plan.

[0154] Specifically, the Gantt chart is a project management tool that can display tasks and work according to a timeline, thereby helping to understand and plan the project schedule. Through Gantt chart analysis, a schedule can be obtained, which includes the corresponding task volume and priority of each link. The Gantt chart displays the timeline and tasks of the project in a graphical form, clearly and visually presenting the work plan and schedule. This helps team members and stakeholders better understand the progress and sequence of the project, deepen their understanding and concentration on the work. The Gantt chart can clearly show the dependencies and advance / delay relationships between tasks. By analyzing the Gantt chart, the dependencies between various improvement plans can be identified and evaluated, and the order of when to start work and the order of tasks can be determined. This helps to plan a reasonable workflow and task priority to avoid resource conflicts and delays. The Gantt chart can help establish clear time frames and milestones, and can track the actual completion of tasks and compare them with the plan. By continuously updating and monitoring the Gantt chart, progress control can be carried out, deviations can be discovered and corrected in a timely manner, and appropriate measures can be taken to ensure the timely implementation and smooth completion of the improvement plan.

[0155] By identifying the critical path, the key links in the project schedule can be determined. The critical path refers to the path that takes the longest time to complete in the entire project, which determines the overall duration of the entire project. Therefore, determining the critical path can help better manage and control the project schedule. According to the corresponding task volume and priority of each link, the resource allocation algorithm is used to allocate human resources to each link. Resource allocation is to ensure that each task has enough human resources to complete, while also considering the priority and urgency of the task to improve overall efficiency and quality. Through the risk prediction algorithm, the key links are analyzed to predict possible problems and risks. This can help prepare countermeasures in advance and reduce the impact of potential risks on the project schedule and quality. Using the real-time monitoring algorithm, the progress of the tasks in the key links is monitored in real time. By monitoring the difference between the actual progress and the expected progress of the task, problems and delays can be discovered in time, and corresponding adjustment measures can be taken to ensure the progress and quality of the project. According to the progress of the tasks in the key links, the corresponding task volume and priority of each link in the schedule are adjusted in time. By adjusting the schedule according to the actual situation, it is possible to better adapt to project changes and risks and ensure the smooth progress of the project.

[0156] The progress of tasks in key links can be monitored through real-time monitoring algorithms. This can be based on the comparison of actual task completion and expected task progress, or it can be obtained through the update of task status to obtain the latest progress information. According to the monitored task progress data, the progress of tasks in key links is analyzed. The difference between actual progress and expected progress can be compared to identify whether there is a delay or early completion, and the quality of task completion can be evaluated. According to the analysis results of the progress of tasks in key links, the possible impact and risks on the progress and quality of the entire project are evaluated. If the progress of tasks in key links lags behind expectations, it may cause delays and delivery problems in the entire project. Based on the assessment of impacts and risks, formulate corresponding adjustment strategies. This may include reallocating resources, adjusting the priority of tasks, strengthening support and coordination of key links, etc. The goal is to improve the progress of tasks in key links through adjustments to ensure the overall progress and quality of the project. According to the formulated adjustment strategy, the task volume and priority of each link in the schedule are adjusted. This may involve rescheduling the start and end time of tasks, adjusting the dependencies between tasks, reallocating resources, etc. The adjusted schedule should be able to better reflect the current project status and actual situation. When making adjustments, communicate and coordinate with all parties involved in the project, including project managers, team members, and stakeholders. Ensure that they understand the reasons and impacts of the adjustments and work together to make necessary changes. After the adjustments, continue to monitor the changes and impacts of task progress. By comparing the task progress data before and after the adjustments, evaluate the effectiveness of the adjustment strategy and identify and deal with potential problems in a timely manner.

[0157] In an exemplary embodiment, according to the task progress of the key links, the corresponding task amount and priority of each link in the schedule plan are adjusted, including:

[0158] If the task progress of the key link is less than the preset progress threshold, the task matching degree and task progress of the human resources in each link are obtained;

[0159] According to the task matching degree and task progress of human resources in each link, adjust the task volume and priority of key links with the optimal solution goal;

[0160] Based on the adjusted task volume and priority of the key links, adaptively adjust the corresponding task volume and priority of other links.

[0161] Specifically, obtain the task matching degree and task progress of human resources in each link:

[0162] In this step, it is necessary to assess the match between the human resources required for each link and the currently assigned personnel. This includes examining the skills, knowledge and experience required for each link and comparing them with the existing personnel. If the human resources do not match the task requirements, it may be necessary to reassign or re-recruit personnel to ensure that each link has appropriate human resources support.

[0163] In addition, it is necessary to obtain task progress information of each link to understand the completion status of the task. This can be obtained through communication with the task executor, progress reports or project management tools. Task progress information includes the completion status of the current task, the remaining workload and the estimated completion time.

[0164] Based on the task matching degree and task progress information of the human resources obtained, the task volume and priority can be adjusted. If the task progress of the key link is less than the preset progress threshold, the following adjustments may need to be considered:

[0165] More human resources can be allocated to key links to speed up task completion. This can include reallocating resources from other links or mobilizing members of other project teams. Evaluate how tasks are allocated to ensure that each person can fully utilize their expertise and improve task execution efficiency. It may be necessary to reallocate tasks or provide training and support to improve personnel's work capabilities. By adjusting the amount and priority of tasks, you can ensure that tasks in key links receive more attention and resource support, thereby improving task progress.

[0166] The optimal solution goal refers to finding the best solution or strategy to achieve a specific goal under given conditions and constraints. In the above case, the optimal solution goal is to adjust the task volume and priority of key links so that the task progress reaches the preset progress threshold and make the best arrangement based on the task matching degree of human resources.

[0167] For example, assume that the key links of a key project are the design phase, development phase, and testing phase, and each phase has corresponding tasks and human resources. The preset progress threshold is that each phase should be completed within 30 days, but the current task progress of the design phase is only 20 days, the task progress of the development phase is only 15 days, and the task progress of the testing phase is only 25 days.

[0168] Among them, the optimal solution target can be solved using the following algorithms:

[0169] Greedy Algorithm: Greedy algorithms gradually solve problems by selecting the current optimal solution at each step, but they cannot guarantee a global optimal solution. In some problems, greedy algorithms can provide approximate optimal solutions or fast solutions, such as Prim's algorithm and Kruskal's algorithm for minimum spanning trees.

[0170] Dynamic Programming: Dynamic programming algorithm breaks down the problem into overlapping sub-problems and uses the solutions to the sub-problems to build the solution to the larger problem. By saving the intermediate results, the global optimal solution is found while avoiding repeated calculations. Dynamic programming algorithm is suitable for problems with optimal substructure and no aftereffect, such as the knapsack problem and the longest common subsequence problem.

[0171] First, the degree of fit between tasks and human resources is evaluated based on the task fit of human resources in each link. For example, the design phase may require a senior designer to complete the task, while the development phase may require a group of developers to carry out related work. The evaluation of task fit can take into account factors such as skill fit, experience level, and workload.

[0172] Then, according to the task matching degree and task progress, adjust the task volume and priority. Guided by the optimal solution goal, adjustments can be made in the following ways:

[0173] Increase human resources in key links: If the task progress is delayed due to insufficient human resources, you can consider increasing human resources in related links to improve task progress.

[0174] Optimize the amount of tasks in key links: If the amount of tasks is too large and the progress is delayed, you can reduce the burden and speed up the completion of tasks by reasonably allocating workload and task priorities. For example, adjust the priority of certain tasks in the design phase to high to ensure that key tasks are completed within the specified time.

[0175] Adjust the task priority of other links: If the tasks in other links are progressing faster, their task priority can be adjusted appropriately so that more resources and attention can be used for the key links to reach the preset progress threshold.

[0176] Through the above adjustments, the optimal solution goal is to find an optimal solution so that the tasks of key links can be completed within the preset progress threshold and ensure that the matching degree between human resources and tasks is as optimal as possible.

[0177] After adjusting the task volume and priority of the key links, it is necessary to adaptively adjust the task volume and priority of other links to ensure the balance and coordination of the entire schedule. This is to avoid idle resources or resource shortages in other links due to the adjustment of key links. Adaptive adjustment of the task volume and priority of other links can be made according to the adjustment of key links. For example, if the task volume of the key link is reduced, the task volume of other links can be increased to make full use of available resources; if the task volume of the key link is increased, the task volume of other links can be appropriately reduced to avoid excessive dispersion of resources.

[0178] In general, adjusting the task volume and priority of each link in the schedule according to the progress of the key links is to optimize the use of human resources, improve the progress of the key links, and ensure the rationality and feasibility of the schedule of the entire project. This process needs to be evaluated and adjusted according to the actual situation to ensure that the project can be completed on time and achieve the expected goals.

[0179] In an exemplary embodiment, according to the task progress of the key links, the corresponding task amount and priority of each link in the schedule plan are adjusted, including:

[0180] If the task progress of the key link is lower than the preset progress threshold, the link type of the key link is determined;

[0181] If the link type is the development link, then according to the preset allocation rules, part of the pre-order preparation task volume of the development link is allocated to the task volume of the testing link until the task progress of the development link reaches the preset progress threshold.

[0182] Specifically, in progress management, projects are usually divided into different links, such as development link, testing link, deployment link, etc. The link type of the critical link can be determined based on the task progress being lower than the preset progress threshold. For example, if the task progress of the development link is lower than the preset progress threshold, that is, the development work is lagging behind, then the link can be identified as a critical link. In some cases, the task progress of the critical link is lower than the preset progress threshold. In order to speed up the progress of the critical link, a part of the pre-order preparation task volume can be allocated from the development link to the testing link according to the preset allocation rules until the task progress of the development link reaches the preset progress threshold. The purpose of this is to provide more time and resources for the development work by reducing the task volume of the development link to speed up the task progress. At the same time, by allocating a part of the pre-order preparation task volume to the testing link, testing work can be carried out at the same time to discover and solve possible problems in advance.

[0183] Before the development phase, the test environment personnel can participate in assisting in solving the following preparatory tasks:

[0184] Environment configuration and preparation: Test environment personnel can participate in assisting the development team in environment configuration and preparation. They can provide requirements, configuration, and setup suggestions for the test environment to ensure that the development team gets a test environment that meets their needs.

[0185] Test case design: Test environment personnel can assist the development team in designing test cases. Their understanding of the system and testing experience can help determine key test points and test coverage to ensure that the development work meets the system's functional and quality requirements.

[0186] Resource allocation and adjustment: Test environment personnel can assist the development team in resource allocation and adjustment. They can provide reasonable suggestions and plans based on the test environment and human resources to ensure that development work has sufficient resource support.

[0187] Stability and availability of the test environment: Test environment personnel can help the development team ensure the stability and availability of the test environment. They can monitor and manage the test environment, discover and resolve possible environmental problems in advance, and ensure that development work can be carried out in a reliable test environment.

[0188] Acceptance testing support: People in the test environment can participate in the development team's acceptance testing. They can assist in executing test cases, record test results, provide feedback and suggestions, and help the development team with problem solving and improvement work.

[0189] It is important to note that in the process of solving the preparatory tasks in the development phase, the personnel in the test environment should maintain close communication and collaboration with the development team. Through effective cooperation, it can ensure that the preparatory work can be completed smoothly, providing good conditions and support for the development phase.

[0190] It should be noted that this adjustment should be based on reasonable preset allocation rules and ensure that the adjusted task allocation is still reasonable and feasible. The adjustment process needs to be carried out under the consultation and decision-making of the project management team to ensure the smooth progress of the entire project and the achievement of goals. In short, the adjustment of task volume and priority according to the progress of key tasks is aimed at optimizing the execution of the project schedule, ensuring that the tasks of key links can be completed on time, and making full use of resources to improve the overall efficiency and quality of the project.

[0191] In an exemplary embodiment, according to a preset allocation rule, part of the pre-processing task amount of the development phase is allocated to the task amount of the testing phase until the task progress of the development phase reaches a preset progress threshold, and further includes:

[0192] Obtain the remaining human resources of the testing phase based on the partial amount of preparatory tasks of the development phase assigned to the testing phase;

[0193] In case some software functions are developed in the development phase, the remaining human resources in the testing phase are used to test the developed parts of the software functions in parallel.

[0194] Specifically, by allocating a portion of the pre-processing tasks to the testing phase, some human resources for the testing phase can be reserved before the development phase. The purpose of this is to ensure that the testing phase can be carried out in a timely manner after the development is completed, so as to avoid delays in the overall progress due to waiting for the development to be completed. When some software functions are developed in the development phase, the remaining human resources in the testing phase can be used to perform functional testing in parallel. The advantage of this is that some of the completed software functions can be tested while the development phase is in progress. This helps to discover potential problems and defects early, solve them in advance, and improve software quality and development efficiency. The task progress in the development phase needs to reach a preset progress threshold before it can be allocated. This means that the development team needs to allocate some tasks and human resources to the testing team after reaching a certain progress. The testing phase needs to reserve sufficient human resources to handle the pre-processing tasks assigned to the test and to perform functional testing in parallel. This requires reasonable planning and arrangement of the human resources of the testing team so that it can cope with both tasks at the same time.

[0195] In general, this allocation method can achieve parallel work in the development and testing stages, speeding up the speed and efficiency of the entire software development process. Through reasonable task allocation and resource planning, problems can be discovered and solved early, making the software development process smoother.

[0196] In an exemplary embodiment, the method further comprises:

[0197] If the progress of the key tasks is lower than the preset progress threshold, analyze the reasons for the delay in the progress of the key links;

[0198] If the cause of the progress delay includes frequent changes in software functional requirements, call on spare human resources in key links and record the frequent changes;

[0199] If the backup human resources of the key links are not called upon during the preset period, the task volume of the key links will be suspended until confirmation information of the software function requirements is obtained.

[0200] Specifically, if the progress of the tasks in the key links is lower than the preset progress threshold, it is necessary to analyze the reasons for the progress delay. This helps to identify the problems that cause progress delays and prepare for taking corresponding measures. If the reason for the progress delay involves frequent changes in software functional requirements, the backup human resources of the key links can be called. At the same time, the content of these frequent changes is recorded for subsequent reference and improvement. The call for backup human resources is to cope with the progress pressure that may be caused by frequent changes. In the absence of calling backup human resources, if there is uncertainty in the software functional requirements, the task volume of the key links can be suspended. The purpose of this is to wait for confirmation information of the software functional requirements. The acquisition of confirmation information can help ensure that the development work carried out in the key links is based on confirmed requirements, avoiding a large number of subsequent changes and rework.

[0201] In summary, the purpose of this method is to analyze the reasons for progress delays in key links and take corresponding measures according to different reasons, such as calling on spare human resources, recording change operations or suspending tasks, to ensure that the software development project can be completed on time and reduce progress delays caused by change operations or uncertainties.

[0202] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0203] Based on the same inventive concept, the embodiment of the present application also provides an industrial chain analysis device based on an indicator system for implementing the industrial chain analysis method based on an indicator system. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more embodiments of the industrial chain analysis device based on an indicator system provided below can refer to the limitations of the industrial chain analysis method based on an indicator system in the above text, and will not be repeated here.

[0204] In an exemplary embodiment, Figure 5 As shown, an industrial chain analysis device based on an indicator system is provided, comprising:

[0205] An acquisition module 502 is used to acquire the characteristics of software products in the software industry chain;

[0206] A processing module 504 is used to determine at least one analysis indicator of the software industry chain based on the characteristics of the software product, where the types of the analysis indicator include reliability indicator, security indicator, usability indicator, performance indicator and maintainability indicator;

[0207] The calculation module 506 is used to perform weighted calculation on the at least one analysis indicator according to a preset weight method to obtain an indicator system;

[0208] The acquisition module 502 is further used to acquire the first corresponding data of each link of the software product in the software industry chain;

[0209] The processing module 504 is further used to analyze the first corresponding data of each link according to the indicator system and adopt a preset analysis method to obtain an analysis result;

[0210] The adjustment module 508 is used to adjust the indicator system according to the analysis result.

[0211] Each module in the above-mentioned industrial chain analysis device based on the indicator system can be implemented in whole or in part through software, hardware and their combination. Each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of each of the above modules.

[0212] In an exemplary embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as shown in FIG. Figure 6 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store the first and second corresponding data of each link in the software industry chain. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, an industrial chain analysis method based on an indicator system is implemented.

[0213] Those skilled in the art will understand that Figure 6 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0214] In an exemplary embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.

[0215] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0216] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0217] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0218] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0219] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. An industrial chain analysis method based on an indicator system, It is characterized in that The method comprises: Obtain the characteristics of software products in the software industry chain; Based on the characteristics of the software product, determining at least one analysis indicator of the software industry chain, wherein the types of the analysis indicator include reliability indicator, security indicator, usability indicator, performance indicator and maintainability indicator; Performing weighted calculation on the at least one analysis indicator according to a preset weight method to obtain an indicator system; Acquire first corresponding data of the software product in each link of the software industry chain; According to the indicator system, using a preset analysis method, analyzing the first corresponding data of each link to obtain an analysis result; The first corresponding data of each link includes: Requirements analysis phase: time required to write requirements documents, number of requirements changes, and time required to confirm requirements; Design and planning phase: design document writing time, number of design reviews and design changes, and planning time; Development stage: code writing time, code quality assessment results, number of code changes, number of code reviews, and development cycle; Testing phase: test case writing time, test execution time, number of defects found, defect repair time and test coverage; Deployment and delivery phase: deployment time, deployment success rate, user feedback time and delivery time; Operation and maintenance: fault response time, fault repair time, maintenance cost and user satisfaction survey; Wherein, the preset analysis method includes: Comparative analysis: Compare the data of the same link, compare the differences between different projects, teams or time periods, and obtain potential problems or improvement points; Trend analysis: Analyze whether there is a trend of improvement or deterioration based on the data change trend of each link; Root cause analysis: Analyze the link data to find out the causes of problems or good performance; Comprehensive evaluation: The data of each link is weighted and calculated according to the preset weights to obtain an overall evaluation value for evaluating the quality level of the software industry chain; Determining the score of at least one analysis indicator of the software industry chain according to the analysis result; According to the score, a corresponding preset improvement plan and a preset monitoring mechanism are matched, wherein the preset improvement plan includes at least one of optimizing the development process, enhancing the testing efficiency, improving the quality management, improving the development tools and improving the output efficiency; In the process of implementing the preset improvement plan in the software industry chain, obtaining second corresponding data of each link in the software industry chain returned based on the preset monitoring mechanism; Obtaining an improvement effect value of the second corresponding data compared to the first corresponding data; If the improvement effect value is greater than a preset threshold, the indicator system is adjusted according to the matched preset improvement plan.

2. The method according to claim 1, It is characterized in that In the process of implementing the preset improvement plan in the software industry chain, before obtaining the second corresponding data of each link in the software industry chain returned based on the preset monitoring mechanism, the method further includes: Analyze the preset improvement plan using a Gantt chart management tool to obtain a schedule, which includes the corresponding task volume and priority of each link; Determine the key links of the schedule by identifying the critical path; Using resource allocation algorithms, human resources are allocated to each link according to the corresponding task volume and priority of each link; Analyze the problems and risks that are expected to occur in the key links through risk prediction algorithms; Based on the problems and risks expected to occur in the key links, the task progress of the key links is monitored in real time using a real-time monitoring algorithm; According to the task progress of the key links, the corresponding task volume and priority of each link in the schedule plan are adjusted.

3. The method according to claim 2, It is characterized in that The step of adjusting the task amount and priority of each link in the schedule according to the task progress of the key link includes: If the task progress of the key link is less than the preset progress threshold, the task matching degree and task progress of the human resources in each link are obtained; According to the task matching degree and task progress of the human resources in each link, the task volume and priority of the key links are adjusted with the optimal solution goal; According to the adjusted task volume and priority of the key link, the corresponding task volume and priority of other links are adaptively adjusted.

4. The method according to claim 2, It is characterized in that The step of adjusting the task amount and priority of each link in the schedule according to the task progress of the key link includes: If the task progress of the key link is lower than the preset progress threshold, determining the link type of the key link; If the link type is a development link, then according to the preset allocation rules, part of the pre-order preparation task volume of the development link is allocated to the task volume of the testing link until the task progress of the development link reaches the preset progress threshold.

5. The method according to claim 4, It is characterized in that The method further includes allocating part of the pre-processing task amount of the development phase to the task amount of the testing phase according to the preset allocation rule until the task progress of the development phase reaches a preset progress threshold. Obtaining remaining human resources of the testing phase according to a portion of the pre-processing task amount of the development phase allocated to the testing phase; When some software functions are developed in the development phase, the remaining human resources in the testing phase are used to test the developed software functions in parallel.

6. The method according to claim 2, It is characterized in that The method further comprises: If the task progress of the key link is lower than the preset progress threshold, analyze the reasons for the progress delay of the key link; If the cause of the progress delay includes frequent changes in software functional requirements, the backup human resources of the key links are called and the frequent changes are recorded; In the case that the backup human resources of the key link are not called upon during the preset period, the task volume of the key link is suspended until confirmation information of the software function requirement is obtained.

7. An industrial chain analysis device based on an indicator system, It is characterized in that The device comprises: An acquisition module is used to acquire the characteristics of software products in the software industry chain; A processing module, configured to determine at least one analysis indicator of the software industry chain based on the characteristics of the software product, wherein the types of the analysis indicator include reliability indicator, security indicator, usability indicator, performance indicator and maintainability indicator; A calculation module, used to perform weighted calculation on the at least one analysis indicator according to a preset weight method to obtain an indicator system; The acquisition module is further used to acquire the first corresponding data of the software product in each link of the software industry chain; The processing module is further used to analyze the first corresponding data of each link according to the indicator system and adopt a preset analysis method to obtain an analysis result; The first corresponding data of each link includes: Requirements analysis phase: time required to write requirements documents, number of requirements changes, and time required to confirm requirements; Design and planning phase: design document writing time, number of design reviews and design changes, and planning time; Development stage: code writing time, code quality assessment results, number of code changes, number of code reviews, and development cycle; Testing phase: test case writing time, test execution time, number of defects found, defect repair time and test coverage; Deployment and delivery phase: deployment time, deployment success rate, user feedback time and delivery time; Operation and maintenance: fault response time, fault repair time, maintenance cost and user satisfaction survey; Wherein, the preset analysis method includes: Comparative analysis: Compare the data of the same link, compare the differences between different projects, teams or time periods, and obtain potential problems or improvement points; Trend analysis: Analyze whether there is a trend of improvement or deterioration based on the data change trend of each link; Root cause analysis: Analyze the link data to find out the causes of problems or good performance; Comprehensive evaluation: The data of each link is weighted and calculated according to the preset weights to obtain an overall evaluation value for evaluating the quality level of the software industry chain; An adjustment module, used to determine the score of at least one analysis indicator of the software industry chain according to the analysis result; According to the score, a corresponding preset improvement plan and a preset monitoring mechanism are matched, wherein the preset improvement plan includes at least one of optimizing the development process, enhancing the testing efficiency, improving the quality management, improving the development tools and improving the output efficiency; In the process of implementing the preset improvement plan in the software industry chain, obtaining second corresponding data of each link in the software industry chain returned based on the preset monitoring mechanism; Obtaining an improvement effect value of the second corresponding data compared to the first corresponding data; If the improvement effect value is greater than a preset threshold, the indicator system is adjusted according to the matched preset improvement plan.

8. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.

9. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.